CONTRACT 5656 Public Works Contract CLOSEDAgreement No. 5656 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND CORRAL CONSTRUCTION & DEVELOPMENT INC. FIRE STATION #1 CHIEFS' LIVING QUARTERS RVIPROVEMENTS PROJECT PROJECT NO. PW 18-01 This CONTRACT is entered into this 2e day of February, 2019 by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and Corral Construction & DeveloDment. lnc., ("the Contractor"). 1. WORK. A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed Sixtv-six thousand. four hundred Dollars ($66 0.00) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. Agreement No. 5656 3. TIME FOR PERFORMANCE. A. The Contractor will fully complete the Work within Forty (40) working days (the "Contract Time.") B. The Contract Time will commence when the City issues a Notice to Proceed. The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until; The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13. 5. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. 7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. Agreement No. 5656 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and the manner in which is it performed. The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The Citv Ken Berkman Public Works Director City of El Segundo 350 Main Street, El Segundo, CA 90245 (310) 524-2356 The Contractor Rene Soto Vice President Conal Construction & Development, Inc. 5211 E. Washington Blvd, #2-122 Commerce, CA 90040 (562) 762-6632 coi-ra.l,COIStl-LiCk.dorl,"Fl)' ,Ill110o.COII'a Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Agreement No. 5656 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other parry. There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications, 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITYIMODIFICATION. The Parties represent and warrant that all necessary 'k action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a parry is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. Agreement No. 5656 IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY O SE DO Greg Ca er City M ager ATTEST.- Tracy TTEST:Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. l ENSLEY, City Attorney By'. David H. Iii � Assistant Ci ttorney Insurance Reviewed by: ,wm 11-w"19 Ren So , Vice President Corral Construction & Development, Inc. Taxpayer ID No. - 3 . 5'11 q'5 - Contractor State License No.: Contractor City Business License No.: 3qlqto Agreement No. 5656 PROPOSAL FOR THE FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT Project No.: PW 18-01 Date [Fez --m 6 [ (b . 201b Company Name C-oPl tc `r R&wLoPm&w-' ► NCi TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the contract documents, access and any other field conditions which may affect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. E UAL EMPLOYMENT OPPORTUNITY COMPLIANCE I -C-1 Agreement No. 5656 BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION DECLARATION BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I -C-2 Agreement No. 5656 BID SCHEDULE FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Company Name: CO V,M tiwil ndjh4 tp-4 4 0L'1 -'U -y n4& -?k -T- I &C, BASE BID ITEMS Item No. Description Bathroom #1- Fire Chief Bathroom p Remove and dispose of all existing tile, 1 sinks, fixtures, toilet, unnecessary plumbing components, electrical/light fixture demo, and all appurtenances per the specifications. Furnish all labor, materials, tools, equipment, 2 and incidentals for the installation of the Fire Chief s bathroom per the specifications. Bathroom #2 - Battalion Chief Bathroom Remove and dispose of all existing tile, 3 sinks, fixtures, toilet, unnecessary plumbing components, electrical/light fixture demo, and all appurtenances per the specifications. All repairs necessary to mitigate water 4 damaged wall. Includes removal/replacement of drywall and treatment or removal of mildew. Furnish all labor, materials, tools, equipment, and incidentals for the installation of the Fire 5 Chief s bathroom per the specifications. Repairs to water valve included in this line item. Battalion Chief Dorm Remove three (3) lockers, remove wallpaper 6 throughout room, repair walls behind lockers, and paint repaired wall. 7 Remove existing carpet. Furnish and install new carpet throughout room. Captain's Dorm/New Office Space Remove three (3) lockers, remove wallpaper 8 throughout room, repair walls behind lockers, frame in and drywall bathroom door, and I -C-3 Unit QTY I Unit I Price ($) 1 LS W5-00 1 LS t3�;-00 1 LS 45-00 LS 400 b LS LS 100 SF 13 Coo Total 135Da �saa L+vD a l 3 Sod b000 $ 0oa 21 2q()0 1 LS boyo BC)bU paint all walls. 9 Remove existing carpet. Furnish and install new carpet throughout room. 10 Miscellaneous improvements as determined by the Engineer as necessary TOTAL BASE BID FOR ITEMS 1-10 IN FIGURES = ..: 00 Agreement No. 5656 100 SF Z'( 'Lit) a 1 LS $5,000.00 $5,000.00 TOTAL BID WRITTEN 1N WORDS: ';AVT Sl/ G, S/ [—`6u �2 m� n ILt'b DD-i-n-�5 All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I -C-3 Agreement No. 5656 BIDDER'S INFORMATION Company Name: Cb-VUC,,A) / frU1K4 W 4 VJ t: Zop/Vi i �c BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) If corporation, State of Incorporation (i.e., California) C/ -fu f-Dx U to Business (',[T94L4'L Gw (r-aAA ndJ a- 06V6-wPwter-4r i Ate, Address 5 21 04.6 H ,�sG-ra),l Bwb Z- lz.-t, w Telephone No.___6(oZ - —j to Z - le to 3 -2- Facsimile Facsimile No. )k' oXA;F State Contractor's License No. and Class 112-10160-5 . _G 3 _�4 Original gDate The following bare the �aa�ras, t 9 � y addresses, and Date 2 2 �.� �........_ and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: 6#-*A55TD txwafiL P /t-ESt o ei rr ,jV11J65 garb V if ti PRGSEVe7 r 2 lZL f o'wlaLL,"6 , ev* -'1004.0 (66 z ('0 't - (o(0 The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: u tA I -C-4 Agreement No. 5656 BIDDER'S INFORMATION (CONTINUED) Company Name: G4VUct c WWW Cv1,UU1uJ <- 1D�� Lo PM LJjT WG Bidder shall list the name of the person who attended the mandatory pre-bid job walk: Name: Title: V (.0 0PAOS100 r I -C-5 Agreement No. 5656 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all aforenamed principals this I I day of A&WIA k�, 206 . BIDDER . tb aAM- UVOC.0 M/tL h. 4- l W b 57,(( 65'. (V141 IJ G -W PVVO 2,-124, Subscribed and swornto this day of P12c-• NOTARY PUBLIC I-C-6 12018 ti RAMON ROCHA FERNANDEZ Notary Public - California r Los Angeles County. Commission N 2241525 { L` ' /lldyyhtli j, My Comm. Expires May 7, 2022 . I lj. Y i u�J .4l' w Agreement No. 5656 Bid Bond No.: 11-791-038 PROPOSAL GUARANTEE BID BOND FIRE STATION # I CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 KNOW ALL MEN BY THESE PRESENTS that, Corral Construction & Development, Inc. as BIDDER, and American Contractors Indemnity Company , as SURETY, are held and firmly bound unto the City of El Segundo, in the penal SUM of tenoVe6c8nin DOLLARS (s10), which is ten I (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this 18th of December 18 day 20_ BIDDER* Corral construction & Development, Inc. 4-1 SURF Contractors ,Ty* American Blake A Pfister, Attorney-in-fact 5211 E Washington B1 #2-122 Commerce, CA 90040 562-522-1926 Indemnity Company 801 S Figueroa St #760 Los Angeles, CA 90017 310-649-0990 Subscribed and sworn to this — day of 20 NOTARY PUBLIC *Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I -C-7 Agreement No. 5656 CALWOMIA, ALL-PURPOW ACKNOWLIEDWWff CML CODE § 1159 IM1WIII11 .IIi 11141101JI11 I I Jllll,tlllL, NI WII LrWIWWIVIiYIIGIIr11wIIdMoV'rl, A notary W* or gther ~ ung this certificate verifies only the Identity of the individual who signed the doclJnlent to YYf Lich this certilicaate Is attached, and not the Vuftftlss, accuracy, or vd ty of that document. r State of California ) County Of Q, r n a e ) OnDecem ber 14, 2018bqf0reMq" Lianne Nahina, Notary Public Date Here Insert Name and TWO of the Officer persor,Wly appeareld Blake A. Pfister Names) of Signer(q) who proved to me on the basis of satisfactory evidence to be the person(4 whose names) IslAW subscribed to the within instrument and acknowledged to me that halftofty executed the same In his, r autlixxtred ca , and that by his4ft~ signaturep on the Instument the "" or the entity upon behalf of which ft personi acted, executed the instrument. I cerW under PENALTY OF PERJURY under the laws of the State of Californlis that the foregoing paragraph Is true and correct. LIANNE NAHINA C4 . �� COMM. it 2134629 XI WITNESS my hand and official seal. • NOTARY F1K"ALIFORNIA ;V ORANGE COUNTY N S nater MY COMM EXP. DEC , 2019 ig e .,, Signature of Notary Public Though this section Is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document Iptrlon of Attached DomxneM Title or Type of Document Bid R o u d Document Date: December 18 2018 Number of Pages: 1 Signer(s) Other Than Named Above: N / A , N o n e C ) C49kned by Sigma's Nie: Blake A. Pfister ® Corporate Officer — 'TItles): 0 Partner — 13 Limited 0 General EJ Individual . ® Attorney In Fact 0 Trustee ® Guardian or Conservator ® Other. Signer Is Representing: American contractors Indemnity`Company Signers Name: - - - - - - ® Corporate Officer — Thle(s): ® Partner — ® Limited O General ® Individual l3 Attorney in t=act • Trustee O Guardian or Conservator ® Other. Signer Is Representing: 02014 National Notary Association - www.NabonaiNotary,org • 1 -800 -US NOTARY (14MO-676-6827) Item #5907 POWER Off" ATTORNEY �1�i A ME RICAN CONTRACTORS IN D01NITY COMPANY Tirrx��S'80'VDCINGcWentNo.�5656 UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland corporation and U.S, Specialty Insurance Company, aTexas corporation (collectively, the ','Companies"), do by these presents make, constitute and appoint: Blake A. Pfister of Mission Viejo, California its true and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power acid authority' hereby conferred in its name, place and si6ad, to -execute, acknowledge and deliver any and all bonds, recognizances , uIldertakings: or other instrunients or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond penalty does not exceed *****Three Million***** Dollars ($ **3,000,000.00* This Power of Attorney shall expire without further action on November 3,2019, This Power of Attorney is granted under and by authority ofthe following resolutions adopled by the Boards of Directors of the Companies: Be if Resolved, that the President, any Vic-PrCsidClit, any Assistant Vice-president, any Secretary or any Assistant Secretary shalt be and is hereby vcstcd with full and, 01 Wild aetr for and oil behalf of the Company subject to the following power, itillmrity tar any one or more suitable: persons as Anorney(s)-in-Fact to mpres it provisions" may be given fell powcrandau0iority for and in the name of and on behalf orthe Company, In execute, acknowledge and deliver, any and all bonds, rccognizaaces, contracts, agrerinictits or indemnity and other conditional or obligatory undQrulkings, including any and all censer for the release of retained lacrecotages and/or final estimates on cn-inecting and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so exceulod by any such Attorney -ha -t" act shall be binding upon the Company as, if signed by the President and scaled and effacted by (lie Corporakc Seermsry, fle as Rzsolvvdthat tile signature or any authorized officer and seal or the Company heretofore or hereafter affixed to any p*wcr of attorney or any certificate relating thereto by facsinuto,and any power ornttorney orcortificate 4eoring, facsimile Signature or shall be valid and binding upon the Company with respect to any build ar undcriaking to which it is artached, IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 1st day of November, 2016. AMERICAN CONTRAcTotts INDEMNITY COMPANY TEXAS' BONDINC COA1 PAN Y Corporate Seals UNITED STATESSURruCOMPANY U.S. SPECIALTY INSURANCE COMPANY CT ha i' J + 'o X By: SLK 25. 1919 lnw,7 IAlai'In Vic P it Daniel P. gr,, e. resilet rry104 111"I"11100, I A notary public or other officer completing this certificate verifies only the identity of tire individual who signed the docurnent to which this certificate is attached, and not tile truthfulness, accuracy, or validity of that document. State of California County of Los Angeles S&� Oil this I st day of November, 2016, before rile, Sabina Morgenstein, a notary public, personatly appearcO Daniel P. Aguilar, Vice President of American Contractors Indeninity Company, Texas Bonding Company, United States Surety Cornpany;:Bnd U;S. Specialty Insurance Company who proved to me on the hasis of satisfactory evidence to be tile person whose name is .subscribed to the within instalment and acknowiedged to me that he executed the same in his authorized capacity, and that by his, signature on tile instrument the person, or the entityupon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. - - - - - - - - - SABINA MORGENSTEIN Commission to 2129258 Signature- California Los Angeles County (Seal) 1pJ 11 11 rrrw Notary Public My Comm, Expires Nov 9" 2019 1 1, Kio Lo, Assistant Secretary of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty, Insurance Company, do hereby certify that the aboyeand foregoing is true and correct copy of a Power of Attorney, executed by said Companies, whiph is still in Full fbrce and: efrect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in, full force and efrect. I I In of DeWitness emWheberreof' 201.8 I have hereunto set my hand and affixed the seals of said Companies at Los An, Califhmia this L8 _th day c Corporate Seals .....yr7 ,i ...... Oft, 'OYMa,dNul 0 Assistant:Secrelnry Bond No 11-791-038 E%� 5t,PT n 2" 4 k 0 Agency No. 3074 Agreement No. 5656 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: OUZO} )o 5 Class No.: $ 1 L -6:k 2. The expiration date of BIDDER'S Contractor License is: 2,$ 120 -&-, 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on l ZJ t% . 20_Lb, at Cvv,-'R"-' 1 C/t F,G-O(E07-D Typed Name V Lcr, tw Title (insert City and State where Declaration signed). r ,tt, C V16w 4- pUWUpM&ter lAfL Company Name I -C-8 Agreement No. 5656 NON -COLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID (pursuant to Cal. Pub. Contract Code § 7106) The undersigned declares: I am the V c,w of CvAAAt, Gari TpAtc j„ , the parry making the foregoing bid. PewW/KcWr i NC, The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of Ca ifornia that the foregoing is true and correct and that this declaration is executed on J"( l L t _[date], at P.l�t,►t [city], Gk [state]." Dated this _ day of p( t &M�_ ._�. 20 � .. ...............�... Name V" P& scow Title Signator I -C-9 Agreement No. 5656 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." Signature of Bidder: Kl/)Ua Title: V IC 5 09"5106-M-1 Business Name: OUYZ4tVW.,, G VICTfItirUJ 4-QtvCZO�°N�+G-' lNL Business Address: y'2tt 6 . lMbTt 81 -Vo Z -I LZ Telephone Number: ( 2j- _ _„- tem Dated this 19 day of 0QW-WAM , 20 . I -C-10 Agreement No. 5656 DESIGNATION OF SUBCONTRACTORS FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Company Name: LMAA1, Ca4h 44L41*J * 416, As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Name of Subcontractor Address (Number and Street) N irNa, (City, Zip Code) Description of Subcontractor's Portion of Contractor Work Estimated $ License No. Subcontracted Amount .............. ........................................................................................... (Make copies of this page if additional space is needed) AXSig�nature of Bidder at`l I -C-11 Agreement No. 5656 REFERENCES Company Name: COYZ941, CwWuV AAtAl w a Oe,-VL--LOPrMW CT INC, The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime contractor or major subcontractor within the past five (5) years: 1. 2. Project Title: Pouyvl Location: 3q? MnZtJ fI".1C�.#,m. 1 ct 105 CO( W- Q 9'PL Mph 35D K&tire ST-- r 1 SC-(, o; c-& q n LIQ r Name and address of owner OgLANba (filoAGu.t;2. 3I v — Sz - 2-1-5,2- Name z5,2Name and current telephone number of person familiar with project Type of Work: rzei ov b t, , P M Mz N &• Contract amount: $, (TITD Date completed:- zo I -t Amount of work done by my/our firm under contract $.. (of, am Did your firm have any financial interest in Project? N o Project Title: rad-?` V Iooxm nw Avo I Prva,&oA&-Ar Location: ltmitw 5r. C 59 (11,.A o l CA 416 ISI OV"- t."1. `Ir Y1AAW) C -b MM N rr_� 9d LdAm 0 1 Name and address of owner 1, G'Y3L o - 1'rW - 1-3 z1 Name and current telephone number of person familiar with project Type of Work: tz4>m.o o&"L� Contract amount: $ ?.y I svu Date completed: I/ 201-" Amount of work done by my/our firm under contract $_._... 14 1 OM Did your firm have any financial interest in Project? 00 I -C-12 3 a 5, Agreement No. 5656 ProjectTitle: PwA, ,Lm Ltoa/t" PCsrtov&l �_4,1MoneL Location: _&tc-�Jpo n.q AM% C -A CI t 1 q l Name and address of owner Name and current telephone number of person familiar with project Type of Work: kG"Move L- I PIHNV r f6 - Contract amount: $ 00 , 0W Date completed: 77.01 "1 Amount of work done by my/our firm under contract $ wwww__U D ) OVD Did your firm have any financial interest in Project? Project Title: $&v &;"& -m. H"d-UvKC„o/ty c,JC +- il-Ir-cht -7ro RvWtM,6 6 FS It 9 Location: 32,51 11. d/h12,&;n, fit. >,,v3 - F=u -x4u J , CA a uS 3 5 Name and address of owner p►tuL uKr3INj-� -11q- Name 1K-Name and current telephone number of person familiar with project: Type of Work: ;,�pAOV&-lµ l P JAfV 1JG- Contract amount: $ 1 U , OwD Date completed: to 1 2b 11 , Amount of work done by my/our firm under contract $ N W ) vVD Did your firm have any financial interest in Project? ND Project Title: M,&*M— V&IzOGMWje- "V&e r(1 PA*VeW &-K-r Location: A62,6 . Jf/ trW,4L/ � . � �AJOVY) , c,4 Ol o'71 3, _CM o'er LIM- o (d MX3 5 -DI -0 CLW -V- IWC- • Ln --W orno c q °l o r7 l * - Name and address of owner s►;'Y►n�i'l�Tl�/ c( ►g rtpit`?LS c Z ' I�tr ' al 1 2S'D S- Name and current telephone number of person familiar with project: I -C-13 Agreement No. 5656 Type of Work: aVWxro9L Contract amount: $ 1 l 3 I cm -a Date completed: 31-" i SI Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? NO B'iclder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: CAIL J..ts V--'aOL-� P Ft CT (2- 212 -0P 2 -- r "z c t ani -3° ° ��t a vtu-r � ( P g4ot - 1gOO - t!!N3 I -C-14 Agreement No. 5656 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Company Name: 0"Al, CuvAl-"urLnn 4- 10eWL0A 0vr INC.., Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. 1. Have you ever been disqualified from any government contract? Yes ❑ No A 2. If yes, explain the circumstances: 3. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes X No ❑ Bidder's"Signature Name (Please Print) I -C-15 Agreement No. 5656 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01, Company Name: b ill. C,wd 5r'fUA .R,'J t- 0 9W C.L rW (;'Wr l A46 To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Tyne of Insurance Limits Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 1185 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (3 0) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the insurer will provide thirty (3 0) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires Califomia Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this insurance will render the bidder's proposal "nonresponsive." Date I -C-16 ............. .--- .......... Bid& is ignature Agreement No. 5656 IN I A LJ December 12, 2018 ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for FIRE STATION #1 CHIEFS' BATHROOM IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time is still Tuesday, December 18, 2018, at 11:00 am. 2. Clarification 1: a. The overhead condensation drain in the Chief's Bathroom should be routed through the attic space back to a downspout near the Battalion Chief's Bathroom. It is a straight shot from the Chief s Bathroom to the downspout. It is estimated that the route is 30 -feet. PVC pipe can be used. Scope of work in the technical specifications has been updated to reflect this revision. 3. Clarification 2: a. The wallpaper in the Battalion Chief s Bedroom shall be completely removed. Scope of work in the technical specifications has been revised to reflect this revision. 4. Clarification 3: a. A level 4, or greater, finish on the walls shall be provided on the two bedroom walls and any walls that are to remain exposed during the renovation. Page 1 of 2 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5656 J.0 FY IN! N I 1..F '0917.2017 5. Bidder Question 1: a. Would it be possible to have 45 working days instead of 30 working days to complete this project? b. City response: The City is agreeable to changing the duration of the project to 40 workine days to allow for quality work to be performed. 6. Please include the updated bid schedule with your bid proposal. It has been included as an attachment to this addendum. The entire specification package and bid package have been updated to reflect these changes. Additions to the documents are shown in bold, while deletions have a StFi1Eethfeu#h to denote the change. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this Addendum with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non-responsive and subject to rejection. Signature: Date: t24 (v I 116 Print Company Name: (,OKAAJ, UAf SrIP-td Lt1v-sJ 4 o,c PM04r Page 2 of 2 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 December 18, 2018 ADDENDUM NO.2 to Agreement No. 5656 THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date has been postponed to Tuesdav, ,lanuary 8.. 2019, at 11:00am in the City Clerk's office, 350 Main Street, El Segundo, CA 90245. a. The Notice Inviting Bids has been updated and is included as an attachment to this addendum. All other information in the specifications remains unchanged. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this Addendum with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non-responsive and subject to rejection. Signature: Print Company Name: 17 Page 1 of 1 Date: 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5656 FAITHFUL PERFORMANCE BOND FIRE STATION #1 CHIEFS' LIVING QUARTERS IlVIPROVEMENTS PROJECT NO.: PW 18-01 Bond No, 1001097140 Bond Fee: $1,992 Corral Construction & Development, Inc. as principal ("PRINCIPAL") and U.S. 'Insurance Company a corporation Specialty .. .. incorporated under the laws of the State of Texas and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY'), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of Sixtv-six thousand. four hundred Dollars ($'66.400,001 lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. PW 18-01, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 18-01, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 18-01) which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's completion and acceptance by CITY. Aqqreement No. 5656 Bond No. 1001097140 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code C'ESMC"), 5. SURF -TY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 18-81 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.644 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perforin its obligations within the time allowed, P CIPAL"'s obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] SIGNED AND SEALED this 8th day of Corral Construction & Development, Inc. P ACIPAL"s P SID' PRINCIPAL I s ..SECRETARY Agreement No. 5656 Bond No. 1001097140 March 2019 U.S. Specialty Insurance Company SURETY Blake A Pfister, Attorney-in-fact PRINCIPAL's MAILING SURETY's MAILING ADDRESS: ADDRESS: Corral Construction & Development,Inc U.S. Specialty Insurance Company 5211 E Washington B #2-122 801 S Figueroa St #700 Commerce, CA 90040 Los Angeles, CA 90017 NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. See Attachment Agreement No. 5656 Cordftde pmuant to 995.640(s) Code of CWN Pmcklm PEAN C. LQPA _, P, - , �, Co" Clerk of the Cow# of tv State of Caftmia, In and for aid Courtly DO HEREBY CERTIFY THAT It J—rz 4�� —N. ;4 ificate Oi duthofity s n admRted sur* Utied by nsuTmm-- (;oanissmw; aumonmg m uww(er to traasW stirety ineurwoo In rio sme ot Caworrua. dna aun based on the racwts shown in the D"amnem Of !iic,ufpjv�ewebsitb that autnofltyn,asiii otDwswrondefed,ivvomd,coak4 it) 7"WxW am County on ,y MIT Nmrw an my I hM .11 an 11 d ftid w c 0 My CL M BY. Agreement No. 5656 CAUFORNIA ALL-PURPOW A091111MLED6110111110ff CIVIL CODE $1189 A notary public or cow ~ completing this catificate vatiles only the Wm* of the individual who WMW the document to which this =Waft Is attached, and not the truttftww, accuracy, or vdft of that dommml. State of California County of —=anu, On March 8, 2019 before", Li,anne Nahina, Notary Public Dift Here Insert Nam and 77de of the Officer persorwy, appeared 8 1 a k e A - P f i s te r Name(s) of Signofs) A I il 711' jr r4; L1ANNE NAHI NA X WtAM. # 2134629 NOTARY PUBLIC -CALIFORNIA ORANGECOUNTY Cl) MY COMM, EXP. DEC 5,2019 , , I car* under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. I WITNESS my hand and official seal. Signature od"-t Signatum of Notary Public Place Notary SOW Above OP77ONAL Though this section Is optional, completing this Information can deter alteration of the document or fraudulent reattachment of this form to an unintended document Desorlip on of Attadwd Doammint rft or Type Of Doeurnert Bond 10010971,40. Document Date: March 8, 2019 Number of Pages: 31 Signer(s) Other Than Named Above: NZA, None. Capadol") Chalmed: by Sk"w($) Signer'sName: BIake A. P,fi-s,ter 13 Corporate Officer — nie(s): 0 Partner — 0 Umbd M General EJ Individual 0 Attorney In Fact 0 Trustee 13 Guardian or Conservator 0 Other. 0"", --' specialty S4,ner Is Re ro eptin .y L , c isuran p'off1pag Signer's Narnw. ------- 0 -----70 Corporate Officer — Title(s): 0 Partner — 0 Limited 0 Gen" 0 Individual 0 Attorney In Fact 0 Trustee 0 Guardian or Conservator 0 Other Signer Is Representing: AAW 02014 National Notary Association - www,NabongdNotary,org - 1 -S00 -US NOTARY (1-800-876-6827) Item #5907 Agreement No. 5656 TOK10MARINE HCC POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS., That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United -States Surety Company, a M aryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: Blake A. Pfister of Mission Viejo, California its true and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship to Include riders, amendments:, and consents of Surety, providing the bond penalty does not exceed ***'*Five MiIiii , Dollars ( ***$5,000,00i ) . This Power of Attorney shall expire without further action on April 23111, 2022, This, Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Ado rney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions; Attorney -in -Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed4nd'effected- by the Corporate Secretary. Be it Resolved, that the signature of any=buthorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, andzny power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 15t day of June, 2018. AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING OMPANY UNITED, STAT,,f .",P�ANY ,,Ufp,,$,fECIAL ..,,SURETY,l,CG Jro ,4aduWro;§URANCE COMPANY State of California 16� BY: County of Los Angeles N`4L,, 6 F Ile. Daniel P. Aguilar, Vice President 1� A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the trulhfulness, accuracy, or validity of that document ] i " ��ally appeared Daniel P. Aguilar, Vice President of On this 1°1 day of June, 2018, before me, Sonia O; Carrejo, a notary pupublic!'peSor n American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity, upon behalf of which the' person acted, executed the instrument. I certify under PENALTY OF PERJURY under the; laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal, MA 000 COA Noury plublic Lot Angi cQuiq Signature (seal) 1, Kio Lo, Assistant Secretary American Contractors Indemnity Company, A c=Temr�tt$A Texas Bonding onzdoing ,Company, United- States Surety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the BoardsTof Directors;- set out in the Power of Attorney are in full force and effect. In Witness Whereof, l have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this 8t 11 day of March J 2019 Corporate Seals Bond No, 1001097140 Agency No. 3074Ptiwb Kio Lo, Assi&Secretary KCSINIANPOAll %dsit tmhcc,C0M/:,Luo, lei for more in rimation Agreement No. 5656 U . . ........... . . ....... .... .... A notanjr pubk ow cftev officei, coirnpAefiny i(N.s rxarF.Jk;afe w4v the idenfity of thp indMdua� who pagned the" (kwtmnr� ,nf. to WlliCh thi�, osvt�`Ihaate L",� aiiad'wld, and, not the N,a, aonurhq, or valkhly of that Los A' ngek,:1,s J. .. .... nNotail"y PUblic b ev t 0 1 j por unaRy appeared wfx ,)roved to rile On the, basis. of safisfactaly evidelloe to be: the peu,sorl(e) wbose narneM, is subsclu) di to the wfthin instn,irrient—and ackriloMedged to inethat I /shefthArexecuted flov,; SarrK Zzhel,/06r authorized o�apacity(lpes), arid tt'lat by ffle instrurnent the person , or tl,iie entity Llpcwl: behalf of wVli(Tthe p.lSoNsl ac, ted, execuled 'the- 4"istruirnent, d1 cerfify under PIENALTY OF IFT.RJURY under -the ialws Of ffie State of California thiat the, foregoi Fig paragraph is true and correct. - - - - rrq,hafrid aind cdlfkJal ��r�� Win - . . ..... --- — OP770NAL dot= ORMATION Desc ription ofAftached Document 'rhe piremding, Certfficate of k*noWedgment k4aftacllad to a donument tMed/for the purpose of' laab�wl containing 1pages, and dated The signer(s) capacity or authority is/as., / IndividualK D, Aftomey4n-fact I I Corporate Officer(s) .............. . ... . ......... ....... ....... CATHY J. GUZMAN Notary Public - California z Los Angeles County Commission # 2241533 My Comm. Expires May 7 2022 lll Method of Signer Identification Proved to me on the basis of satisfactory evidence: D form(s) of identification [-I credible winess( es) Notarial event is detailed in notary journal on: Pa #8 Entry#_ Notary contact: Other I_ Additional Signer Guardian/Conservator I Partner - Limhed/General Trustee(s) Other: representing: . . .... .... I V1 . .. . . . . . ... . . . .............. . .............. . .. . .. . Signer(s) Thumbprints(s) � J Agreement No. 5656 � e4CKiVOiAiLE—DGIVIENi 1 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. .__......... ....... .......... ....,...._. — State of California County of.� On� before me/� personally appeared b who proved to me on the basis of satisfactory evidence to be the person (s+ name* is/aze subscribed to the within instrument and acknowledged to me that he/sh44haLy executed the same in his/herAbeir authorized capacity(ies4, and that by his/h ir-signature(4on the instrument the person(&); or the entity upon behalf of which the person(s�acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. i I Signature (Seal) ........... --------------- LOUIS A. SOLIS Notary Public - California Los Angeles County Z4 Commission # 2148852 My Comm. Expires Apr 19, 2020 Agreement No. 5656 LABOR AND MATERIALS BOND FIRE STATION #1 CHIEFS' LIVING QUARTERS WROVEMENTS PROJECT NO.: PW 18-01 Bond No. 1001097140 Bond Fee: Included in Performance Bond Corral Construction & Development, Inc. ,as principal ("PRINCIPAL") and U—S.' peci a l ty Tnsuranre Company , a corporation incorporated under the laws of the State of Texas and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of Sixtvv-six thougngL four hundred Dollars ($66.400.001), lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS, SPECIFICATIONS NO. PW 18-01 ("Public Project"), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 18-019 and the public works contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 18-01), which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment. PRINCIPAL will pay for all materials and other supplies, for equipment Bond No. 1001097Aqbeement No. 5656 used in, on, for or about the performance of the Public Project; and will pay for all work and labor thereon, 4, This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code C'ESMC"), 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SLTRETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7, Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect, [SIGNATURES ON FOLLOWING PAGE] Agreement No. 5656 Bond No. 1001097140 SIGNED AND SEALED this 8th day of March 19 Corral Construction & Development, Inc. U.S. Specialty, Insurance Company I A PRESID SURETY Blake A Pfister, Attorney-in-fact P CIP-��s'SECRETAR-�—' PRINCIPAL's MAIMING ADDRESS: Corral Construction & Development, Inc. 5211 E Washington Blvd#2-12� Commerce, CA 90040 StJRETY's MAILING ADDRESS: U.S. Specialty Insurance Company 801 S Figueroa St #700 Los Angeles, CA 90017 NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office, (2) Bond shall be effective for one (1) year after acceptance of the job. F== Agreement No. 5656 > of l��,� � ' 1.�� of . , miaCloft of Cant,, in yantl far said Do HEREBY CERTIFY THAT ;ias a cerliawte Of auathorfity ari admidad swety issued by the Ca, omia nsurance Commns�oner autitcttrMN #0 ° rer to Uaty insurance In :rte State of CMtorrw. arta mat cased on the MOD$ds Shown In the t 01 kwd 41MV-Ke W9bMte Drat a ¢urrom,Y 1486 rtot 0SW GUfMWWW' M ' Cart annuwa w suspooded At 7 i+�set my band and alstxed the seal of , Currry Oil 1 n nor �r C `' ................. .. ...... . ...,, COUNTYCLERK Do" Courcy Clerk „°k Agreement No. 5656 CAUFOiiN% ALL4PURPOU ACKNOV&UQMWff CML CODE $1189 �,ii us IIS IiVhNI;IdItlPIJIVII'tl.dllwY�la Im I �Nlhuui Milh A notary public or gther ofiwer cornp"V this certiiwb vedw only the Identity of the individuei who signed the doclN11N3mt io which thte catilade is attar W, and not the huthfufness, ac m acy, or validity of that dommneni. State of Calffomia )' Cou* of --Q=l g f„ ) On March 8, 2019 beforeme, Lianne Nahina, Notary Public Date Here Insert Name and Title of the Officer py appeared Blake A. Pfister Names) of Sbrw(s) who proved to me on the basis of satWfactory evidence to be the person( narne(s) 1914 subscribed to the within instrunvwd and to me that helOWW4V exemited the same In his0111006'authorizedcapacKyW, and that byhWWWWsW*Awe0onthe mart thepersorift or upon of which the executed the instrument. I cerW under PENALTY OF PERJURY under of Ow State of Calitiomis that the foregoino pmgraph LIANNE NAHINA Is true and correct. ;s` COMM. # 2134629 WITNESS hand and official seal. "' NOTARY PUBLIC•CALIFORNIA; ORANGECn COUNTY ra MY COMM, EXP. DEC , C5' 20,19 Signature of Notary Public Place Notary Seal Above OPTIONA Though this section Is optional, completing this Information can deter alteration of the document or fraudulent reeftchment of this form to an unintended documo ty of A#Sdwd Downwd 1 Tft orType .Of Doc�rtn ft . 001097140 Document Date: March 8, 2019 Number of Pages:. 3 Signer(s) Other Than Named Above: N/A, Non e C ) CWnW by ) Signer's Name: Blake A . Pfister Signer's Name: 0 Corporate Officer — Tiiie(a): 0 Corporate Officer -- Title(s): 0 Partner — ® Limited 0 General 0 P -- ® Limited O General individual ® Attorney in Fact 0 individual 0 Attorney in Fact 0 T ® Guardian or Conservator 0 ThWee O Guardian or Conservator 0 Other. ® Other. S ner is �Renpr semi gu . S . Soec i al tv Signer Is Representing: nsura�w'u+aaw«�wwm�;da,r+,wwau�aau+'w+�r,vswwaruew�,w�u+,�„rrmwa�wa�w�us�,aw+yaw.mr��awa����ucw�ww+�«w4wrs 02014 National NotaryAssociation - www.NationaiNotary,org -1-800-US NOTARY (1-800-876-6827) Item #5907 Agreement No. 5656 TOKIOMARINE POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a M aryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: Blake A. Pfister of Mission Viejo, California its true and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other Instruments or contracts of suretyship to Include riders, amendments, and consents of surety, providing the bond penalty does not exceed ***'*Five Milflon*`* , Dollars ( ***$5,000,000.00*** 1, This Power of Attorney shall expire without further action on April 231d , 2022. This Power of Attorney Is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be if Resolved, that the President, any Vice-president, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and Is hereby vested with full power and authority to appoint any one or more suitable, persons as Attorneys) -in -Fact to represent and act for and on behalf of the Company subject to the following provisions; Attorney -in -Fact may be given full' power and authority for and In the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or Indemnity and other conditional or obligatory, undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by, any such Attorney -in -Fact shalt be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter a'ffixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which It is attached, IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 1St day ofJune, 2018. AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING O'MPANY UNITED SJAUr Et_ f J '4SOMPANY ,A Vo§f ECIA�, kY4N§,URANCE COMPANY . ......... . XY —State of California By: County of Los Angeles OOV 1 41 Daniel P. Aguilar, Vice President A Notary Public, or other officer completing this certificate verifies only the identity of the individual who signed the document -to which this certificate is attached, and not the truthfulness, accuraqy� or validity of that document On this 1st day of June, 2018, before me, Sonia O. Carrejo, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument -the_ person, or the entity upon behalf of which the, person acted, executed the instrument, I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal, SONIA 0. CARREJO Notary Pubh - Calfr"n1a LOS Angeles county co.11slon 0 2239479 Signature(seal) mycomm rjolofsApq 23, Iml —7 V 1, Kio Lo, Assistant Secretary V American Contractors Indemnity Company, Texas Bonding Company, United -States - Surety -Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Direclors_, set out in the Power of Attorney are in full force and effect. In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this 8th day of March 20,9 "W ..... .... . ... Corporate Seals dt�?­ �P ('s 'M A Bond No. �L001097140 2—pl, 54siaSeAcretary 'A17 Ki Lo, As 0, Agency No. 3074 '�40 w of 00 1�,, 4,61, J'III "*wwa VwnqWl HCCSMANPOA46/2018 visit tmhcc.com/surety for moriinformation Agreement No. 5656 LL �. L .. .. . . ...... . . ...... . . ctl otary public Cr othsr offimr conipleting this Certificate verift-s on1j, tile iGntity of the individual who signed the to which fi�is Certificate iF sitschad, and not the truthfu[ness, amrpcy, al- vatidity of tlj&t docul a f? callfdo untri, 00 LfiFd yr 00-f LLC 111s-11A.r1i, ge 1, e- s"," fa Cb)� be -re MPI, 011-.. f -( -MIN v io woved to me ol"i Vie basis Of Satisfi-Ictory evklsnci to, be the pewsollM'iose lwnvk�10 subsabod to the wiffiin instrurrlent,,,,ind ackn(Ahledged to lshehf) q executed tkie same iri capacity ) and that by signatursko on the P Ks ws-on erAfty, upon behaff of whkh the-, p ,rsoq acted, e -,d instrument the pe ol" this xecutp the Instrurnent, cadff"'y u'lndol' PENAI n-1 OF PERAI)IRY unden, VnieWw�s. of the State of calffbrni�I' th".difie.. fi"))regoinq parapi"4.1ph G.s' trine in carrect. WIJTNEF-O''� rrl�y i--tand, and offirA,[ vcal,, th) A 111J Pescription of Attached Document The preceding Certificate of Acknoviviedgment is attached to a document titled/for the purpose of Lckbolr cnO P - containing pages, and dated The signerW) capacity or authority is/aye as: ,\IndiwidualK 0' Attomey4n-fact f ! Corporate Officer(s) CATHY J. GUZMAN Notary Public - California ILos Angeles County z Commission # 2241533 My Comm, Expires May 7, 2022 I - r Method of Signer Identification Proved to me on the basis of satisfactory evidence: J form(s) of identification [ I credible vAtness(es) Notarial event is detailed in notary journal on: Page # _ Entry # Notary contact: , Other Additional Signer j Signer(s) Thumbprints(s) Guardian/Conservator Partner - Limited/General Trustee(s) Other: representing: i r 7,� : ... . . . . . ....... ... ............ .... . Agreement No. 5656 ACKNOWLEDGMENT .................................... A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ... ��- County ofSelli On��, before me, /� Jr toicd-er) 31(insertname and title of th personally appeared /V1jC 'd'61 / ' !'� ►! �" who proved to me on the basis of satisfactory evidence to be the person(t-whose name(* is/afe subscribed to the within instrument and acknowledged to me that he/sl y executed the same in his/ho4t#teir authorized capacity(), and that by his/herd ignature}on the instrument the person(., or the entity upon behalf of which the perso cted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. LOUIS A. SOLIS Notary Public - California Z Los Angeles County Commission * 2148852 I Comm, ExpNres A r 19d 2020 Signature... � , � (Seal) Agreement No. 5656 CONTRACT DOCUMENTS PLANS & SPECIFICATIONS FOR FIRE STATION #1 CHIEFS' LIV NG QUARTERS I.M:PROVEMENTS PROJECT PROJECT NO.: PW 18-01 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 350 MAIN STREET EL SEGUNDO, CA 90245 310-524-2300 http://www.eIsegundo.org/depts/works/bids rfps.asp http://www.elsegundo.org/depts/works/proj ect_request_contact_form.asp MANDATORY PRE-BID MEETING TUESDAY, DECEMBER 4, 2018 AT 10:00 AM AT FIRE STATION #1, 314 MAIN STREET, EL SEGUNDO, CA 90245 BIDS DUE TUESDAY, DECEMBER 18, 2018 AT 11:00 AM Agreement No. 5656 BIDS WILL BE RECEIVED UP TO THE HOUR OF 11:00 A.M. TUESDAY, DECEMBER 18, 2018 IN THE OFFICE OF THE CITY CLERK CITY HALL 350 MAIN STREET EL SEGUNDO, CALIFORNIA 90245 AT WHICH TIME THEY WILL BE PUBLICLY OPENED a Agreement No. 5656 SPECIAL INSTRUCTIONS TO CONTRACTORS Contractors are required to review section 7-3 of the STANDARD SPECIFICATIONS, pages II -B-24 thru II -B-26 "LIABILITY INSURANCE". ONLY CONTRACTORS ABLE TO OBTAIN AND FURNISH THE REQUIRED COVERAGE AND ENDORSEMENT "ISO" FORMS SHOULD CONSIDER SUBMITTING A BID PACKAGE. The Contractor will be required to apply and obtain an Encroachment Permit from the City Public Works Department as well as any applicable Building/Safety Permit from the City Building Planning and Building Safety Department. The permits will be issued on a "no -fee" basis. The Contractor shall be responsible for calling the Building Safety Division for inspections. All noted deficiencies shall be corrected by the contractor. The project will not be accepted as complete until the contractor obtains a final sign -off from the Department of Planning and Building Safety. Agreement No. 5656 TABLE OF CONTENTS SECTION I - LEGAL A. NOTICE INVITING SEALED BIDS B. BIDDING INSTRUCTIONS I. DEFINITION 2. BIDDER'S REPRESENTATIONS 3. BIDDING DOCUMENTS 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS 5. PRODUCT SUBSTITUTIONS 6. SUBCONTRACTORS 7. ADDENDA 8. PRE-BID CONFERENCE 9. FORM AND STYLE OF BIDS 10. BID SECURITY 11. MODIFICATION OR WITHDRAWAL OF BID 12. OPENING OF BIDS 13. REJECTION OF BIDS 14. AWARD C. PROPOSAL 1. PROPOSAL, FIRST PAGE 2. BID SCHEDULES a. BASE BID 3. BIDDER'S INFORMATION 4. BIDDER AND NOTARIAL ACKNOWLEDGEMENT 5. PROPOSAL GUARANTEE BID BOND 6. CONTRACTOR'S LICENSE DECLARATION 7. NON -COLLUSION DECLARATION 8. WORKER'S COMPENSATION CERTIFICATION 9. DESIGNATION OF SUBCONTRACTORS 10. REFERENCES 11. BIDDER'S STATEMENT OF PAST DISQUALIFICATIONS 11. INSURANCE REQUIREMENTS D. CITY OF EL SEGUNDO PUBLIC WORKS CONTRACT E. FAITHFUL PERFORMANCE BOND PAGE I -A- I TO A-3 I -B -I TO B-8 I -B -I I -B-1 I -B-2 I -B-2 I -B-3 I -B-3 I -B-3 I -B-3 I -B-4 I -B-5 I -B-6 I -B-6 I -B-6 I -B-6 I -C-1 TO C-17 I -C-1 I -C -3a I -C -3a I -C-4 I -C-6 I -C-7 I -C-8 I -C-9 I -C-10 I -C-1 I I -C-12 I -C-15 I -C-16 I -D-1 TO D-5 I -E-1 TO E-3 F. MATERIAL AND LABOR BOND I -F-1 TO F-3 Agreement No. 5656 SECTION II — GENERAL REQUIREMENTS PAGE A. GENERAL SPECIFICATIONS II -A-1 TO A-2 1. REGISTRATION OF CONTRACTORS II -A-1 2. INSURANCE AND CITY BUSINESS LICENSE II -A-1 3. EMERGENCY INFORMATION II -A-1 4. FURNISHING OF WATER II -A-1 5. CALIFORNIA — OCCUPATIONAL SAFETY 1-2 AND HEALTH ADMINISTRATION II -A-1 6. SOUND CONTROL II -A-2 7. AIR POLLUTION CONTROL II -A-2 8. WORKER UNIFORMS II -A-2 B. GENERAL PROVISIONS II -B-1 TO B-34 0-0 STANDARD SPECIFICATIONS II -B-1 0-1 GENERAL II -B-1 0-2 NUMBERING OF SECTIONS II -B-1 1-2 DEFINITIONS II -B-1 1-2.1 ADDITIONAL DEFINITIONS II -B -I 1-3 ABBREVIATIONS II -B-2 2-0 SCOPE AND CONTROL OF WORK II -B-2 2-1.1 ACCESS TO PROJECT SITE II -B-2 2-1.2 OWNERSHIP AND USE OF CONTRACT II -B-3 DOCUMENTS 2-3 SUBCONTRACTS II -B-3 2-3.1 GENERAL II -B-3 2-3.2 ADDITIONAL RESPONSIBILITY II -B-4 2-4 CONTRACT BONDS II -B-4 2-5 PLANS AND SPECIFICATIONS II -B-4 2-5.1 GENERAL II -B-4 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS II -B-5 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS II -B-5 2-8 RIGHT-OF-WAY II -B-6 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES II -B-6 2-9 SURVEYING II -B-6 2-9.3 SURVEY SERVICE II -B-6 2-9.3.1 CONSTRUCTION SURVEYING II -B-6 2-9.3.2 MEASUREMENT AND PAYMENT II -B-7 3-3.2.2 BASIS FOR ESTABLISHING COSTS II -B-7 3-3.2.3 MARK UP II -B-7 it Agreement No. 5656 SECTION II — GENERAL REQUIREMENTS (Continued) 3-3.3 DAILY REPORTS BY CONTRACTOR 3-4 CHANGED CONDITIONS 3-5 DISPUTED WORK 4-1.3 INSPECTION REQUIREMENTS 4-1.3.1 GENERAL 4-1.3.2 INSPECTION OF MATERIALS NOT PRODUCED LOCALLY 4-1.6 TRADE NAMES OR EQUALS 5-2 PROTECTION 5-2.1 INCORRECT LOCATION OF UTILITIES 5-4 RELOCATION 5-4.1 RESPONSIBILITY OF UTILITY REMOVAL OR RELOCATION 5-5 DELAYS 5-5.1 CALCULATING IDLE TIME 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 CONTRACT SCHEDULE 6-1.2 CONTENT OF CONTRACT SCHEDULE 6-1.3 EFFECT OF CONTRACT SCHEDULE 6-1.4 COMMENCEMENT OF CONTRACT TIME 6-4 DEFAULT BY CONTRACTOR 6-4.1 GENERAL 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL OVER THE WORK 6-4.3 SURETY'S ASSUMPTION OF CONTROL 6-6 DELAYS AND EXTENSIONS OF TIME 6-6.1 GENERAL 6-6.2 EXTENSION OF TIME 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR 6-6.4 WRITTEN NOTICE AND REPORT 6-7.2 WORK DAYS AND WORKING HOURS 6-7.4 NIGHT WORK 6-7.5 WEEKEND AND HOLIDAY WORK 6-8 COMPLETION AND ACCEPTANCE 6-8.1 GENERAL GUARANTY 6-9 LIQUIDATED DAMAGES 6-9.1 FAILURE TO COMPLETE WORK ON TIME 6-11 DISPUTES AND CLAIMS; PROCEDURE 6-11.1 GENERAL 6-11.2 FORM n PAGE II -B-8 II -B-8 II -B-9 II -B-9 II -B-9 II -B-10 II -B-14 11-B-14 11-B-15 II -B-15 II -B-15 II -B-15 II -B-16 II -B-16 II -B-17 11-B-17 II -B-17 II -B-17 II -B-17 11-B-18 II -B-18 11-B-18 Agreement No. 5656 SECTION II — GENERAL REQUIREMENTS (Continued) 6-11.3 CLAIMS SUBMITTED TO ENGINEER 6-11.4 CLAIMS IS PREREQUISITE TO OTHER REMEDY 6-11.5 DECISION ON CLAIMS 6-11.6 APPEAL OF ENGINEER'S DECISION 6-11.7 MEDIATION 6-11.8 ARBITRATION 6-11.9 WHEN ARBITRATION DECISION BECOMES BINDING 6-11.10APPEAL TO SUPERIOR COURT; WAIVER OF JURY TRIAL 7-2 LABOR 7-2.3 PREVAILING WAGES 7-2.4 RECORD OF WAGES PAID; INSPECTION 7-3 LIABILITY INSURANCE 7-3.1 GENERAL 7-3.2 INDEMNIFICATION AND DEFENSE 7-5 PERMITS 7-8.1 CLEAN UP AND DUST CONTROL 7-8.1.1 GENERAL 7-8.1.2 WATERING 7-8.6 WATER POLLUTION CONTROL 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS 7-10 PUBLIC CONVENIENCE AND SAFETY 7-10.1 TRAFFIC AND ACCESS 7-10.2 STREET CLOSURES, DETOURS, BARRICADES 7-10.5 PROTECTION OF THE PUBLIC 7-15 HAZARDOUS MATERIAL 9-2 LUMP SUM WORK 9-3.2 PARTIAL AND FINAL PAYMENTS 9.3.3 DELIVERED MATERIALS 100- 1 TERMINATION OF AGENCY LIABILITY iv PAGE II -B-20 II -B-20 II -B-20 II -13-21 II -B-21 II -B-21 II -B-22 II -13-22 II -B-22 II -13-22 II -B-23 II -B-23 If -B-24 II -B-26 II -B-27 II -B-27 II -B-27 II -B-28 II -B-28 II -B-29 II -13-29 II -B-29 II -B-30 II -B-30 II -13-31 II -B-32 II -13-32 II -B-33 II -13-34 SECTION III — SPECIAL PROVISIONS 1-0 GENERAL SCOPE, TIME FOR COMPLETION AND LOCATION OF WORK 2-0. NOTIFICATIONS 3-0. STANDARDS 4-0. EXAMINATION OF JOB SITE 5-0. INSPECTION 6-0. USE OF PRIVATE PROPERTY 7-0. STORAGE OF MATERIALS AND EQUIPMENT 8-0. CENTERLINE TIES 9-0. QUALITY ASSURANCE SECTION IV — MEASUREMENT AND PAYMENT SECTION V — TECHNICAL SPECIFICATIONS 0 Agreement No. 5656 PAGE III -A-1 III -A-2 III -A-3 III -A-3 III -A-3 III -A-3 III -A-4 III -A-4 III -A-4 Agreement No. 5656 NOTICE INVITING SEALED BIDS FOR THE FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT IN THE CITY OF EL SEGUNDO PROJECT NO.: PW 18-01 The City of EI Segundo is accepting sealed bids in the City Clerk's office, 350 Main Street, El Segundo, California 90245, until 11:00 a.m. on: TUESDAY, DECEMBER 18, 2018 at which time they will be publicly opened. Bids will not be accepted after that time. As described in the Bidding Documents, the bids are for a public works project ("Project") which consists of CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT at Fire Station #1 and related work as shown on the plans on file with the City's Public Works Department. The project location is at 314 Main Street, El Segundo, CA 90245. Construction shall include but not be limited to the removal and replacement of tiles, drywall, waterproofing layers, countertops, sinks, faucets, plumbing, toilets, shower head controls, flooring, painting and various improvements as identified in these specifications. Work on the Project must be performed in strict conformity with Specifications No. PW 18-01: FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT which is filed with the Public Works Department. Copies of the Plans, Specifications, Contract Documents and Engineer's estimate are available from the Engineering Division of the Public Works Department, City of El Segundo, 350 Main Street, El Segundo, California, 90245. Plans And Specifications are alternately available electronically via http://www.elsegundo.org/depts/works/project_request_contact form.asp A pre-bid meeting is scheduled for Tuesday, December 4, 2018, at 10:00 am, at the Fire Station #l, 314 Main Street, El Segundo, CA 90245. Bidders' attendance at this meeting is mandatory. Questions regarding the bid shall be submitted by 5:00 pm on Tuesday, December 11, 2018 to http://www.elsegundo.org/depts/works/project_ request contact form.asp. The terms and conditions for bidding on the Project are described in the attached Bidding Instructions. This project requires payment of State prevailing rates of wages for Los Angeles County. The contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing VNIN Agreement No. 5656 Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov. Note that the Project is subject to compliance monitoring and enforcement by California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4 to be nonresponsive. The contractor to whom the contract is awarded must assist in locating, qualifying, hiring and increasing the skills of minority group employees and applicants for employment, as set forth in Executive Order 11246 and 11375. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City of El Segundo hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. Prevailing Wage: Federal Labor Standards Provisions, including prevailing wage requirements of the Davis -Bacon and Related Acts will be enforced. In the event of a conflict between Federal and State wage rates, the higher of the two will prevail. The Contractor's duty to pay State prevailing wages can be found under Labor Code Section 1770 et. Seq. and Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor's request. In entering into a Public Works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or Sub -Contractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public I -A-2 Agreement No. 5656 works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders and submitted to the Public Works Department, 350 Main Street, City of El Segundo, in a sealed envelope plainly marked on the outside: "SEALED BIDS FOR PROJECT NO.: PW 18-01 FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the State Business and Professions Code. For these projects, those acceptable classes of license shall be "A" or "B". The successful Contractor and his Sub -Contractors will be required to possess the correct license for their project classifications, and valid City Business Licenses from the City of El Segundo. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. Any contract entered into pursuant to this notice shall become effective or enforceable against the City of E1 Segundo only when the formal written contract has been duly executed by the appropriate officer(s) of the City of El Segundo. DATED this day of , 20 CITY OF EL SEGUNDO, CALIFORNIA ....... ........ Tracy Weaver, City Clerk I -A-3 Agreement No. 5656 BIDDING INSTRUCTIONS 1. DEFINITIONS. Unless provided otherwise, the definitions in the Greenbook, Special Conditions, or other Contract Documents are applicable to all Bidding Documents. 1.1 "Addenda" means written or graphic instruments issued by the City before the Bid Deadline that modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections. 1.2 "Alternate" means a proposed change in the Work, as described in the Bidding Documents which, if accepted, may result in a change to either the Contract Sum or the Contract Time, or both. 1.3 "Bid Deadline" means the date and time designated in the Notice for Bids as the last date and time for receipt of Bids, as may be revised by Addenda. 1.4 "Bidder" means a person or firm that submits a Bid. 1.5 "Bidding Documents" means the construction documents prepared and issued for bidding purposes including all Addenda. 1.6 "Lump Sum Base Bid" means the sum stated in the Bid for which Bidder offers to perform the Work described in the Bidding Documents, but not including unit price items or Alternates. 1.7 "Unit Price" means an amount stated in the Bid for which Bidder offers to perform the Unit Price Work for a fixed price per unit of measurement. 2. BIDDER'S REPRESENTATIONS. By making its Bid, Bidder represents that: 2.1 Bidder read, understood, and made the Bid pursuant to the requirements in the Bidding Documents. 2.2 Bidder visited the Project site and is familiar with the conditions under which the Work will be performed and the local conditions as related to the Contract Documents. 2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding Documents. 2.4 Bidder and all Subcontractors, regardless of tier, have the appropriate current licenses issued by the State of California Contractor's State License Board for the Work to be performed. If Bidder is a joint venture, the Bidder will have a joint venture license appropriate for the performance of the work, and each member of the joint venture will likewise have the appropriate license. Business and Professions Code §§ 7000-7191 establish licensing requirements for contractors. If a Bidder, that is a specialty contractor, submits a Bid involving 3 or more specialized building trades, the work of which is more than incidental and supplemental to the performance of the Work for which Bidder holds a specialty contractor license, Bidder must also hold either (1) a specialty contractor "C" license in each such trade, (2) a General Engineering contractor "A" license, or (3) a General Building contractor "B" license. This requirement is applicable whether or not Bidder lists a Subcontractor for each such trade. 2.5 If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Agreement No. 5656 Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2.6 Bidder has the expertise and financial capacity to perform and complete all obligations under the Bidding Documents. 2.7 The person executing the Bid Form is duly authorized and empowered to execute the Bid Form on Bidder's behalf. 2.8 Bidder is aware of and, if awarded the Contract, will comply with Applicable Code Requirements in its performance of the Work. 2.9 The Bidder has paid the City's business license fee(s) 2.10 The Bidder, per SB 854 requirements for public projects, has registered with and paid their annual fee to the California State Department of Industrial Relations. Information about SB 854 and its requirements can be found at this link: http://www.dir.ca.gov/Public-Works/SB854.html 3. BIDDING DOCUMENTS 3.1 Bidders may obtain complete sets of the Bidding Documents from the City's Public Works Department for the sum stated in the Notice for Bids. 3.2 Bidders will use a complete set of Bidding Documents in preparing Bids. 3.3 The City makes copies of the Bidding Documents available, on the above terms, for the sole purpose of obtaining Bids for the Work and does not confer a license or grant permission for any other use of the Bidding Documents. 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS. 4.1 Before submitting its Bid, Bidder will carefully study and compare the various documents comprising the Bidding Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the Bid is submitted; will examine the Project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City's Representative errors, inconsistencies, or ambiguities discovered. 4.2 Requests for clarification or interpretation of the Bidding Documents will be addressed to the City's Representative. 4.2.1 The release of the bid package begins a quiet period for potential Bidders participating in this project. The City of El Segundo realizes it is critical to provide Bidders with a vehicle to ask questions so that quality responses can be prepared. Questions must be submitted in writing to project managers via the City website: �Ittp://WNL, \v.eiSCLIutido.or /(ieLits/wot-ks/t)roiect rectuest contact l'orm.astj. Responses to all questions will be provided in writing to all Bidders in accordance with the schedule below. We will not identify companies or individuals that pose questions. Potential bidders must not call City of El MM Agreement No. 5656 Segundo employees to discuss potential projects or ask questions regarding the bid. Questions Due by 5:00 pm, December 11, 2018 Questions Answered by December 13, 2018 4.3 Clarifications, interpretations, corrections, and changes to the Bidding Documents will be made by Addenda. Clarifications, interpretations, corrections, and changes to the Bidding Documents made in any other manner will not be binding and Bidders must not rely upon them. 5. PRODUCT SUBSTITUTIONS. Substitutions will only be considered before award of the Contract and as provided for in the Contract Documents. SUBCONTRACTORS. 6.1 Each Bidder will list in the Bid Form all first-tier Subcontractors that will perform work, labor or render such services. The Bid Form contains spaces for the following information when listing Subcontractors: (1) Work Activity; (2) name of Subcontractor; (3) city of Subcontractor's business location. Failure to list any of these items on the Bid Form will result in the City treating the Bid as if no Subcontractor was listed for the Work and that Bidder represents to the City that it is fully qualified to perform that portion of the Work and will perform do so. 6.2 Subcontractors listed in the Bid Form will only be substituted after the Bid Deadline with the City's written consent in accordance with California law. 7. ADDENDA. 7.1 Addenda will be in writing and issued only by the City. Addenda will be mailed or delivered to all who are known by the City to have received a complete set of Bidding Documents and who have provided a street address for receipt of Addenda. 7.2 Copies of Addenda will be made available for inspection at the City's Public Works Department. 7.3 The City will issue Addenda so that they are received by prospective Bidders not later than three (3) business days before the Bid Deadline. Addenda that withdraw the request for Bids or postpone the Bid Deadline may be issued anytime before the Bid Deadline. 7.4 Each Bidder is responsible for ensuring that it has received all issued Addenda before issuing a Bid. 8. PRE-BID CONFERENCE. Bidder will attend a Pre -Bid Conference where the City will discuss the Bidding Documents, answer questions, accept comments, and conduct a Project site visit. The City requires all Pre -Bid Conference attendees to arrive for the meeting on time and to sign an attendance list which is used to determine if Bidders meet this requirement. Any Bidder not attending the Pre -Bid Conference in its entirety will be deemed to have not complied with the requirements of the Bidding Documents and its Bid will be rejected. I -B-3 Agreement No. 5656 9. FORM AND STYLE OF BIDS 9.1 Bids will be submitted on the Bid Form included with the Bidding Documents. Bids not submitted on the City's Bid Form will be rejected. 9.2 All blanks on the Bid Form will be filled in legibly in ink or by typewriter. 9.3 Bidder's failure to submit a price for any Alternate or unit price will result in the Bid being considered as nonresponsive. If Alternates are called for and no change in the Lump Sum Base Bid is required, enter "No Change." 9.4 Each Bidder must fill out the "Bidders Statement of Past Contract Disqualifications" form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The Bidder must explain the circumstances of each disqualification. The City may reject the bid based on such information. 9.5 Bidder will make no stipulations on the Bid Form nor qualify the Bid in any manner. 9.6 The Bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the Bidder (if awarded the Contract) specifically agrees to construct a completed work ready for the use and in the manner which is intended. In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished must be paid for according to the unit or lump sum price established for such work under the contract, wherever such unit or lump sum price has been established. In the event no prices are named in the contract to cover such changes or alterations, the cost of such changes must be covered as extra work. 9.7 The Bid Form will be signed by a person or persons legally authorized to bind Bidder to a contract. Bidder's Representative will sign and date the Declaration included in the Bid Form. Failure to sign and date the declaration will cause the Bid to be rejected. 9.8 Bids must be submitted in writing on the Proposal forms provided by the City of El Segundo. One (1) set of these Proposal forms is inserted loose herein for use by the bidders. Bidders are required to submit one (1) original set of the proposal forms. All information requested therein must be clearly and legibly set forth in the manner and form indicated. 9.9 Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed. No bidder shall at any time after submissions of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Plans, Specifications, or other contract documents shall be called to the attention of the City of El Segundo and clarified prior to the submission of proposals. 10. BID SECURITY 10.1 Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Agreement No. 5656 Sum Base Bid as security for Bidder's obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to "City of El Segundo." When a Bond is used for Bid Security, failure to use the City's Bid Bond form will result in the rejection of the Bid. 10.2 If the apparent lowest responsible Bidder fails to sign the Agreement and furnish all items required by the Bidding Documents within the time limits specified in these Instructions to Bidders, the City will disqualify such Bidder and select the next apparent lowest responsible Bidder until all bids have been exhausted or the City may reject all bids. In such an event, the disqualified Bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the Bid Security, between the amount of the disqualified Bid and the larger amount for which the City procures the Work. 10.3 If a Bid Bond is submitted and an attorney-in-fact executes the Bid Bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the Bid Bond. The surety issuing the Bid Bond will be listed in the latest published State of California, Department of Insurance list of, "Insurers Admitted to Transact Surety Insurance in This State." 10.4 The City will retain Bid Security until the occurrence of one of the following: 10.4.1 All items required by the Bidding Documents have been furnished and the Agreement has been signed by the successful Bidder and the City. 10.4.2 The specified time has elapsed during which Bids may be withdrawn. 10.4.3 All Bids have been rejected. 10.5 The Bid Form, Bid Security, if applicable, and all other documents required to be submitted with the Bid must be enclosed in a sealed opaque envelope. The envelope must be addressed to the City Clerk. The envelope must be identified with the Bidder's name and address, and identify the Project for which the Bid is submitted, as follows: "SEALED BIDS FOR PROJECT NO.: PW 18-01 FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT. IN THE CITY OF EL SEGUNDO. DO NOT OPEN WITH REGULAR MAIL." Proposals may be mailed or delivered by messenger. 10.6 Bids will be deposited at the designated location on or before the Bid Deadline. A Bid received after the Bid Deadline will be returned to Bidder unopened. 10.7 Bidder will assume full responsibility for timely delivery at the location designated for receipt of Bids. 10.8 Oral, telephonic, facsimile, or telegraphic Bids are invalid and will not be accepted. 10.9 All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws related to bids for contracts of this nature whether the same is expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and other contract documents, and to full compliance therewith. 11. MODIFICATION OR WITHDRAWAL OF BID. 11.1 Before the Bid Deadline, a submitted Bid may be modified or withdrawn. Notice of Agreement No. 5656 such action will be given to the City in writing and signed by the Bidder's authorized representative. A change so made will be so worded as not to reveal the amount of the original Bid. 11.2 A withdrawn Bid may be resubmitted up to the Bid Deadline, provided that it then fully complies with the Bidding Requirements. 11.3 Bid Security will be in an amount sufficient for the Bid as modified or resubmitted. 11.4 Bids may not be modified, withdrawn, or canceled within ninety (90) calendar days after the Bid Deadline unless otherwise provided in Supplementary Instructions to Bidders. 11.5 Proposals may not be withdrawn after said Bid Deadline without forfeiture of the proposal guarantee. 11.6 The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so. 11.7 No mention shall be made in the proposal of Sales Tax, Use Tax, City Business License, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable. 11.8 No mention shall be made in the proposal of the cost of bonds as all amounts bid will be deemed and held to include any such costs, which may be applicable. 12. OPENING OF BIDS. Bids submitted in the manner required by these instructions and are received on or before the Bid Deadline will be opened publicly. 13. REJECTION OF BIDS. 13.1 The City will have the right to reject all Bids. 13.2 The City will have the right to reject any Bid not accompanied by the required Bid Security or any other item required by the Bidding Documents, or a Bid which is in any other way materially incomplete or irregular. 13.2.1 Unrequested/unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered. 13.3 In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor. No proposal will be accepted from a bidder who has not been licensed in accordance with the provisions of the State Business and Professions Code. Agreement No. 5656 14. AWARD 14.1 The City may retain all bids for a period of ninety (90) calendar days for examination and comparison, and to delete any portion of the work from the contract. 14.2 The City will have the right to waive nonmaterial irregularities in a Bid and to accept the lowest responsive Bid as determined by The City. 14.3 The City will have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents. 14.4 The City will determine the low Bidder on the basis of the sum of the Lump Sum Base Bid plus all unit prices multiplied by their respective estimated quantities as stated in the Bid Form, if any, plus the Contractor Delay Damages multiplied by the "multiplier" as stated in the Bid Form, plus the amounts of all accepted Alternates. 14.4.1 Inclusion of Contractor Delay Damages within the Bid Form is solely for the purpose of determining the low bidder and establishing the City's maximum daily liability as a result of City delays to Contractor, if any, and City has no obligation to pay any daily Contractor Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Proposal Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 14.5 The City will select the apparent lowest responsive and responsible Bidder and notify such Bidder within thirty (30) calendar days (unless number of days is modified in Supplementary Instructions to Bidders) after the Bid Deadline or reject all bids. Within ten (10) days after receiving the City's notice that Bidder was selected as the apparent lowest responsible Bidder, Bidder will submit to the City all of the following items: 14.5.1 One original of the Agreement signed by Bidder. 14.5.2 One original of the Payment Bond. 14.5.3 One original of the Performance Bond. 14.5.4 Certificates of Insurance on form provided by the City. 14.5.5 Names of all Subcontractors, with their addresses, telephone number, facsimile number, trade on Bidders' company stationery. Evidence, as required by the City, of the reliability and responsibility of the proposed Subcontractors such as statements of experience, statements of financial condition, and references. 14.5.6 Preliminary Contract Schedule. 14.5.7 Selection of Retention Options and Escrow Agreement for Deposit of Securities in Lieu of Retention and Deposit of Retention. If not submitted, the City will withhold retention. 14.5.8 Cost Breakdown. 14.6 Before award of the Contract, the City will notify Bidder in writing, if the City objects to a Subcontractor proposed by Bidder, in which case Bidder will propose a substitute acceptable to the City. Failure of the City to object to a proposed Subcontractor before award will not preclude the City from requiring replacement of any Subcontractor based upon information received subsequent to award, RM 14.7 14.8 Agreement No. 5656 information which cannot be properly evaluated before award due to time constraints, or information relating to a failure to comply with the requirements of the Contract. If Bidder submits the original signed Agreements and all other items within ten (10) days after receiving the City's notification, and all such items comply with the requirements of the Bidding Documents, the City will award the Contract to Bidder by signing the Agreement and returning a signed copy of the Agreement to Bidder. If the City consents to the withdrawal of the Bid of the apparent lowest responsible Bidder, or the apparent lowest responsible Bidder fails or refuses to sign the Agreement or submit to the City at I of the items required by the B idding Documents, within ten (10) days after receiving the City's notification, or the City determines that the Bidder is not financially or otherwise qualified to perform the Contract, the City may reject such Bidder's Bid and select the next apparent lowest responsible Bidder, until all bids are exhausted, or reject all Bids. Agreement No. 5656 PROPOSAL FOR THE FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT Project No.: PW 18-01 Date 20� Company Name TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the contract documents, access and any other field conditions which may affect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. EQUAL EMfI'LOYMENT OPPORTUNITY COMPLIANCE Agreement No. 5656 BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AI+'FIIII°1!IATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION DECLARATION BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of EI Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I -C-2 Agreement No. 5656 BID SCHEDULE FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Company Name: BASE BID ITEMS Item No. Description _.............................. — Bathroom #1 — Fire Chief Bathroom Remove and dispose of all existing tile, 1 sinks, fixtures, toilet, unnecessary plumbing components, electrical/light fixture demo, and all appurtenances per the specifications. .............................................. Furnish all labor, materials, tools, equipment, 2 and incidentals for the installation of the Fire Chief's bathroom per the specifications. Bathroom #2 — Battalion Chief Bathroom Remove and dispose of all existing tile, 3 sinks, fixtures, toilet, unnecessary plumbing components, electrical/light fixture demo, and all appurtenances per the specifications. _..-..._.............................................. All repairs necessary to mitigate water 4 damaged wall. Includes removal/replacement of drywall and treatment or removal of mildew. Furnish all labor, materials, tools, equipment, and incidentals for the installation of the Fire 5 Chief's bathroom per the specifications. Repairs to water valve included in this line item. Battalion Chief Dorm Remove three (3) lockers, remove wallpaper 6 throughout room, repair walls behind lockers, and paint repaired wall. ...... _.............. _... �.... ............................................... _ 7 Remove existing carpet. Furnish and install new carpet throughout room. Captain's Dorm/New Office Space Remove three (3) lockers, remove wallpaper 8 throughout room, repair walls behind lockers, frame in and drywall bathroom door, and I -C-3 Unit QTY Unit Price ($) ..... ......................................................... ................................................__.. 1 LS 1 LS LS 1 LS LS LS 100 SF 1 LS Total Agreement No. 5656 . ............... ._w........................................................... .. 9 Remove existing carpet. Furnish and install 100 SF new carpet throughout room. 10 Miscellaneous improvements as determined 1 LS $5,000.00 $5,000.00 by the Engineer as necessary TOTAL BASE BID FOR ITEMS 1-10 IN FIGURES = TOTAL BID WRITTEN IN WORDS: All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I -C-3 Agreement No. 5656 BIDDER'S INFORMATION Company Name: BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) If corporation, State of Incorporation (i.e., California) Business Address Telephone No. Facsimile No. State Contractor's License No. and Class Original Date Issued Expiration Date The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: I -C-4 Agreement No. 5656 BIDDER'S INFORMATION (CONTINUED) Company Name: Bidder shall list the name of the person who attended the mandatory pre-bid job walk: Name: Title: I -C-5 Agreement No. 5656 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all aforenamed principals this day of 20 BIDDER Subscribed and sworn to this day of , 20_. NOTARY PUBLIC I -C-6 Agreement No. 5656 PROPOSAL GUARANTEE BID BOND FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 KNOW ALL MEN BY THESE PRESENTS that, , as BIDDER, and , as SURETY, are held and firmly bound unto the City of El Segundo, in the penal sum of DOLLARS ($_), which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of EI Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of , 20 BIDDER* SURETY* Subscribed and sworn to this day of 20 NOTARY PUBLIC *Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I -C-7 Agreement No. 5656 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: Class No.: 2. The expiration date of BIDDER'S Contractor License is: , 20 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on , 20, at Signature Typed Name Title Company Name (insert City and State where Declaration signed). I -C-8 Agreement No. 5656 NON -COLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID (pursuant to Cal. Pub. Contract Code § 7106) The undersigned declares: I am the_ of the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ................. Nate], at city], _ _Jstate]." Dated this day of 20 Name Title Signature I -C-9 Agreement No. 5656 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." Signature of Bidder: Title: Business Name: Business Address: Telephone Number: ( ) Dated this day of '120 I -C-10 Agreement No. 5656 DESIGNATION OF SUBCONTRACTORS FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Company Name: As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Des.:.- _................ . cription of Subcontractor's Portion of Name of Contractor Work Estimated $ Subcontractor Address License No. Subcontracted Amount (Number and Street) (City, Zip Code) I_............. _ V i . ........... (Make copies of this page if additional space is needed) Signature of Bidder Date Agreement No. 5656 REFERENCES Company Name: The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime contractor or major subcontractor within the past five (5) years: I . Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? ...._............ 2. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Date completed: ............ Contract amount: $a...... _.... .......................... _ Amount of work done by my/our firm under contract $...... Did your firm have any financial interest in Project? .. I -C-12 Agreement No. 5656 3. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $.......................... _.... Did your firm have any financial interest in Project? 4. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ .............................. Date completed: Amount of work done by my/our firm under contract $„ Did your firm have any financial interest in Project? 5. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: I -C-13 Agreement No. 5656 Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $... Did your firm have any financial interest in Project? Bidder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: I -C-14 Agreement No. 5656 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Company Name: Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. I Have you ever been disqualified from any government contract? Yes ❑ No ❑ 2. If yes, explain the circumstances: 3, Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes ❑ No ❑ Bidder's Signature Name (Please Print) I -C-15 Agreement No. 5656 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01, Company Name: To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type offii, igince Limits, Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires Cali fornia Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this insurance will render the bidder's proposal "nonresponsive." Date I -C-16 Bidder's Signature Agreement No. 5656 END PROPOSAL SECTION I -C-17 Agreement No. 5656 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND [CONTRACTOR] FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO. PW 18-01 This CONTRACT is entered into this day of , 20 , by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and , ("the Contractor"). 1. WORK. A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed Dollars ($ ) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. 3. TIME FOR PERFORMANCE. ffm Agreement No. 5656 A. The Contractor will fully complete the Work within = 4+if 1:�Wort-,, (40) working days (the "Contract Time.") B. The Contract Time will commence when the City issues a Notice to Proceed. The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until: The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E, Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. 7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. 8. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits I -D-2 Agreement No. 5656 of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and the manner in which is it performed. The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The City The Contractor Ken Berkman Public Works Director City of El Segundo 350 Main Street, El Segundo, CA 90245 (310) 524-2356 Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. I -D-3 Agreement No. 5656 There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications. 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. I -D-4 CITY OF EL SEGUNDO ............... Greg Carpenter City Manager ATTEST: Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney David H. King, Assistant City Attorney Insurance Reviewed by: I -D-5 Agreement No. 5656 Taxpayer ID No. ............. Contractor State License No.: Contractor City Business License No.: Agreement No. 5656 FAITHFUL PERFORMANCE BOND FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Bond No. Bond Fee: ("PRINCIPAL") and , a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. PW 18-01, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 18-01, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 18-01) which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's completion and acceptance by CITY. I -E-1 Agreement No. 5656 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 18-01 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -E-2 SIGNED AND SEALED this day of PRINCIPAL's PRESIDENT PRINCIPAL's SECRETARY PRINCIPAL's MAILING ADDRESS: Agreement No. 5656 20 SURETY's PRESIDENT SURETY's SECRETARY SURETY'S MAILING ADDRESS: NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I -E-3 Agreement No. 5656 LABOR AND MATERIALS BOND FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 Bond No. Bond Fee: ,, as principal ("PRINCIPAL") and __ , a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT, SPECIFICATIONS NO. PW 18-01 ("Public Project"), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 18-01, and the public works contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 18-01), which are made a part of this bond when said plans and profiles are approved by the City Council and fled with CITY's Engineering Division. 2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment. I -F-1 Agreement No. 5656 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor thereon. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 18-01, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -F-2 SIGNED AND SEALED this day of PRINCIPAL'S PRESIDENT PRINCIPAL's SECRETARY PRINCIPAL's MAILING ADDRESS: Agreement No. 5656 ,20 SURETY'S PRESIDENT SURETY's SECRETARY SURETY'S MAILING ADDRESS: NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I -F-3 Agreement No. 5656 SECTION II - GENERAL 1111,01118 MINTS CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL SPECIFICATIONS 1. REGIS'IRATION OF C.ONTRAC"I'ORS No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the laws of the State of California relating to licensing of contractors, for the type of work to be performed under this Contract. 2. INSURANCE AND CITY BUSINESS LICENSE Contractor and Sub -Contractors will obtain appropriate insurance and a City Business License before execution of the construction contract. 3. EI'v"II:WR(3ENCY INFORMATION The names, addresses and telephone numbers of the Contractor and Sub -Contractors, or their representatives, will be filed with the City Engineer and the City Police Department BEFORE PERFORMING WORK. 4. FURNISHING OF WATER Water necessary for the prosecution of the work as herein specified will be furnished by the City in the following manner: The Contractor will deposit with the City Water/Wastewater Division the sum of One Thousand, One Hundred, Forty-four Dollars ($1,444.00) to insure against damage to a 2 '/2" Fire Hydrant water meter which will be furnished and installed by the City at a point convenient to the site of the work. This deposit will be refunded to the Contractor upon completion of the Project if, after removal and inspection of said meter by the City, it is found to be in satisfactory condition. In event of damage to this meter while under the jurisdiction of the Contractor, all or any part of said deposit may be retained by the City. A non-refundable Activation Fee of One Hundred, Ten Dollars ($110.00) will be charged upon activation of the temporary meter. CALIFORNIA - OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION, All work performed under this contract will be done in strict compliance with the Cal -OSHA Rules and Regulations, latest edition. 11-A-1 Agreement No. 5656 6. SOUND CONTROL The Contractor will comply with all local sound control and noise level rules, regulations and ordinances that apply to any work performed pursuant to the contract. Each internal combustion engine, used for any purpose on the Project or related to the Project, will be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine will be operated on the Project without said muffler. The use of loud signals will be avoided in favor of light warnings except those required by safety laws for the protection of personnel. 7. Alli POIJ,U]"J :IN CIONTROL The Contractor is put on notice that he must abide by all existing rules and regulations of the SCAQMD (South Coast Air Quality Management District), relating to all operations or equipment which discharge visible emissions or solid or liquid particles to the atmosphere. 8. WORKER UNIFORMS All workers under the employment of the Contractor or his/her Sub -Contractor will wear an orange vest or an orange shirt while working in the public right-of-way. I1 -A-2 Agreement No. 5656 CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL PROVISIONS 0-0 STANDARD SPI.1,01:ICATIONS 0-1 GENERAL Except as modified by these Standard Specifications, the provisions of the latest edition of the "Standard Specifications for Public Works Construction" ("Greenbook") and its supplements prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, constitute the Standard Specifications for this project. 0-2 NUMBERING OF SECTIONS The numbering contained within the Standard Specifications of the Contract Documents is intended to correspond with Greenbook numbering. 1-2 DEFINITIONS The following subsection is added to Subsection 1-2 of the Greenbook. 1-2.1 ADDITIONAL DEFINITIONS Acceptance — The date on which the City Council accepts the Work as complete. Architect, Design Engineers, Soils Engineer, Structural Engineers - Advisors employed by the City. City Council - The body constituting the awarding authority of the City. Compensable Delay -- a delay entitling the Contractor to an adjustment of the Contract Sum and an adjustment of the Contract Time in accordance with this Agreement. Due Notice - A written notification, given in due time, of a proposed action where such notification is required by the contract to be given a specified interval of time (usually 48 hours or two working days) before the commencement of the contemplated action. Notification may be from Engineer to Contractor or from Contractor to Engineer. Engineer - The City Engineer, or designee, as defined in the Greenbook. Unless otherwise provided, all correspondence and decisions made relative to the contract will be by the City Engineer or his designated representative. PCC — California Public Contract Code. Prompt - The briefest interval of time required for a considered reply, including time required for approval of a governing body. Agreement No. 5656 Public Works Director — The City's Public Works Director, or designee. ❑ (Check if applicable) State Standard Specifications - State of California Standard Specifications, dated July 1992, Business and Transportation Agency, Department of Transportation Working Days - A working day is defined as any day, except Saturdays, Sundays, legal holidays and days when work is suspended by the Engineer, as provided in Subsection 6-3 and days determined to be non -working in accordance with Subsection 6-7, "Time of Completion." 1-3 ABBREVIATIONS The following Subsection is added to Subsection 1-3 of the Greenbook. 1-3.1 The following abbreviations are added to Subsection 1-3 of the Greenbook: AAN American Association of Nurserymen AGC Associated General Contractors of America AISC American Institute of Steel Construction APWA American Public Works Association ASME American Society of Mechanical Engineers IEEE Institute of Electric and Electronic Engineers NEC National Electric Code Green Book The most current edition of the Standard Specification for Public Works Construction, and subsequent supplements prepared by Public Works Standards, Inc. WATCH Work Area Traffic Control Handbook SPPWC Standard Plans for Public Works Construction by the American Public Works Association SSPWC Standard Specifications for Public Works Construction by the American Public Works Association ASA American Standard Association CITY City of El Segundo 2-0 SCOPL' AND CONTROL OF WORK. The following subsections 2-1.1 and 2-1.2 are added to the Greenbook. 2-1.1 ACCESS TO PROJECT SITE Not later than the date designated in the City Notice to Proceed, the City will provide access to the real property and facilities upon which the Work is to be performed, including access to real property and facilities designated in the Contract Documents for the Contractor's use. II -B-2 Agreement No. 5656 2-1.2 OWNERSHIP AND USE OF CONTRACT DOCUMENTS. The Contract Documents and all copies furnished to or provided by the Contractor are the City's property and may not be used on other work. 2-3 S1,111C:.ONTFACTS Subsection 2-3 Subcontractors of Greenbook is deleted in its entirety and replaced with the following subsection. 2-3.1 GENERAL Except as provided in PCC §§ 4100 et. seq., each bidder will file with its bid the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractor's total bid. Only one subcontractor will be listed for each portion of the work, which portion will be defined in the bid. In each instance, the nature and extent of the work to be sublet will be described. The failure of the Contractor to specify a subcontractor, or the listing of more than one subcontractor for the same portion of the work, constitutes an agreement by the Contractor that it is fully qualified to perform that portion itself and that it will perform that portion itself. The Contractor must have the City Council's written consent to substitute a subcontractor other than that designated in the original bid, to permit any subcontract to be assigned or transferred, or to allow a subcontract to be performed by other than the original subcontractor. Subcontracting of work for which no subcontractor was designated in the original bid, and which is more than one-half of one percent of the work, will be allowed only in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the City Council setting forth the facts constituting the emergency or necessity. Violation of any of the above provisions will be considered a breach of the Contract, and the City may terminate the Contractor's control over the Work, cancel the contract, or assess the Contractor a penalty of not more than ten percent of the subcontract involved. All persons engaged in the work, including subcontractors and their employees will be considered as employees of the Contractor. The Contractor will be solely responsible for and have control over construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work. The City will deal directly with, and make all payments to, the prime Contractor. When subcontracted work is not being prosecuted in a satisfactory manner, the Agreement No. 5656 Contractor will be notified to take corrective action. The Engineer may report the facts to the City Council. If the City Council so orders, and on receipt by the Contractor of written instructions from the Engineer, the subcontractor will be removed immediately from the Work. That subcontractor will not again be employed on the Work. If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2-3.2 ADDITIONAL RESPONSIBILITY Add the following to Subsection 2-3.2 Additional Responsibility: The Contractor will submit experience statements for each subcontractor who will perform contract work that amounts to more than ten percent (10%) of the Work. 2-4 CONTRACT BONDS The following paragraph is added to Subsection 2-4 of the Greenbook. The Faithful Performance Bond and the Labor and Materials Bond must be paid and in effect for one year after the acceptance of the job by the City in accordance with the guarantee required by Subsection 6-8.1. 2-5 PLANS AND SPECIFICATIONS Subsection 2-5.1 of the Greenbook is replaced by the following subsection. 2-5.1 GENERAL The Contractor will maintain the following at the Work site: One as -built copy of the Plans and Specifications, in good order and marked to record current changes and selections made during construction. As -built plans must be submitted to the City representative for approval before the City pays a final retention amount. 2„ The current accepted Contract Schedule. Shop Drawings, Product Data, and Samples. 4. Approved permits from other agencies, including Cal -OSHA permits for trench shoring. Agreement No. 5656 5. All other required submittals. The Plans, Specifications, and other Contract Documents will govern the Work. The Contract Documents are intended to be complementary and cooperative and to describe and provide for a complete project. Anything in the Specifications and not on the Plans, or on the Plans and not in the Specifications, will be as though shown or mentioned in both. Payment for any items on the plans for which there is no specific bid item will be included in the various items of work or in any item to which it is appurtenant. If the Contractor performs any work which it knows or should know involves an error, inconsistency, or omission without notifying and obtaining written consent from the Engineer, the Contractor will be responsible for the resulting losses, including, without limitation, the costs of correcting defective work. 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS The following paragraph is added to subsection 2-5.2 of the Greenbook: As the figured dimensions shown on the plans and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions will be followed in preference to the scaled dimensions, and plans to a large scale will be followed in preference to the plans to a small scale. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract, the Contractor will apply to the Engineer for such further explanations as may be necessary, and will conform thereto as part of the Contract so far as may be consistent with the terms thereof. Any items shown on drawings and not mentioned in the specifications will be of like effect as if shown or mentioned in both. 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS Although it is believed that much of the information pertaining to conditions and existing utilities that may affect the cost of the Work will be shown on the Plans or indicated in the Specifications, the City does not warrant the completeness or accuracy of such information. The Contractor will carefully study and compare each of the Contract Documents with the others and with information furnished by the City and will promptly report in writing to the Engineer any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable law observed by the Contractor. The Contractor will take field measurements, verify field conditions, perform soil investigations, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to the Contractor before commencing the Work. Errors, inconsistencies, or omissions discovered at any time will be promptly reported in writing to the Engineer. :I' Agreement No. 5656 2-8 RIGHT-OF-WAY The following subsection is added to Subsection 2-8 of the Greenbook. 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES When the Contractor arranges for additional temporary work areas and facilities, the Contractor will provide the City with proof that the additional work areas or facilities have been left in a condition satisfactory to the owner(s) of said work areas or facilities before acceptance of the work. 2-9 SURVEYING Subsection 2-9.3, Survey Service, is deleted in its entirety and replaced by the following subsection: 2-9.3 SURVEY SERVICE 2-9.3.1 CONS"I`RI..IC:."I°ION' S1..II,ZVI:;YINC; The Contractor will provide for all construction surveying required to layout, monitor and complete the work. The surveying will be performed by a Land Surveyor or Civil Engineer authorized to practice land surveying by the State of California. The Project Benchmark is shown on the plans. The Contractor will establish all necessary control lines based on the plans and record information on file with the County of Los Angeles Surveyor and the Engineer. It is the responsibility of the Contractor to protect the survey control as shown on the plans. If the survey control is destroyed or disturbed during construction, the Contractor will provide for resetting them and file appropriate documents with the County of Los Angeles at the direction of the Engineer. Computations, survey notes, and other data used to accomplish the work will be neat, legible and accurate. Copies of all computations, survey notes, and other data (electronic format may be required) will be furnished to the Engineer before beginning work that requires their use. 2-9.3.2 M[--,ASIuPRI~°aI'vll NT AND PAYMENT Construction Survey — Unless a separate bid item is provided, payment will be considered included in the other items of the bid and no additional payment will be made therefore. 3-3.2.2 IASIS FOR ES]"'ABLISHING COSTS Subsection 3-3.2.2.3, Tool and Equipment Rental is modified where the second and third paragraphs are replaced with "Regardless of ownership, the rates to be used in Agreement No. 5656 determining the equipment usage costs will not exceed those listed for the same or similar equipment in the California State Department of Transportation publication of Labor Surcharge and Equipment Rates effective for the period of usage." 3-3.2.3 MARK UP Subsection 3-3.2.3, Mark Up, is deleted in its entirety and replaced by the following subsection: (a) Work by Contractor. The following percentages will be added to the Contractor's costs and will constitute the markup for all overhead and profits. 1) Labor............................................20 2) Materials......................................15 3) Equipment Rental ........................15 4) Other Items and Expenditures...... 15 To the sum of the costs and markups provided for in this subsection, l percent will be added as compensation for bonding. No other formula, e.g., the Eichleay or other method, may be used to calculate daily damages for office overhead, profit, or other purported loss. (b) Work by Subcontractors. When all or any part of the extra work is performed by a Subcontractor, the markup established in 3-3.2.3(a) will be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor. (c) In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Bid Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 3-3.3 DAILY" REPORTS BY CONTRACTOR Add the following paragraph to subsection 3-3.3, Daily Reports by Contractor: If disagreement continues regarding extra work, the Contractor may seek compensation in accordance with the Claims procedure. Daily Reports required by this subsection must be made part of the Claim as supporting data for the Claim. 3-4 CHANGED CONDITIONS Subsection 3-4, Changed Conditions, is deleted in its entirety and replaced with the following subsection: If the Contractor encounters concealed or unknown conditions that differ materially from those anticipated or expected ("changed conditions"), the Contractor will immediately notify the Engineer in writing of such changed conditions (upon mm Agreement No. 5656 discovery and before disturbing such changed conditions), as provided in Subsection 6-11, so that the Engineer can determine if such conditions require design details that differ from those design details shown in the Contract Documents. Notwithstanding the time period set forth in Subsection 6-11.3, the Contractor is liable to the City for any extra costs incurred as a result of the Contractor's failure to promptly give such notice. Changed conditions include, without limitation, the following: Subsurface or latent physical conditions differing materially from those represented in the Contract Documents; 2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and Material differing from what is represented in the Contract which the Contractor believes may be hazardous waste as defined in California Health & Safety Code § 25117 that is required to be removed to a Class I, II, or III disposal site in accordance with applicable law. The Engineer will promptly investigate conditions that appear to be changed conditions. The Engineer's decision, and any dispute regarding that decision, will be made in accordance with Section 6-11 except that the Engineer will render a decision promptly. Any information provided pursuant to INFORMATION AVAILABLE TO BIDDERS is subject to the following provisions: The information is made available for the Bidders' convenience and is not a part of the Contract. 2. The City has not determined the accuracy or completeness of such information and all such information is made available to Bidders without any representation or warranty by the City whatsoever as to its accuracy, completeness, or relevancy. Bidders will independently evaluate such information for their use and will be solely responsible for use or interpretation of such information. Any such use or interpretation will not be the basis of any claim against the City. 3-5 DISPUTED WORK Subsection 3-5 is deleted in its entirety and replaced by the following subsection. If the Contractor and the City do not reach agreement on disputed work, the City may direct the Contractor to proceed with the work. Any payment for the disputed work will be determined pursuant to the claims procedures in these Standard Specifications. Although not to be construed as proceeding under extra work provisions, the Contractor will keep and furnish records of disputed work as required by the Contract MM Agreement No. 5656 Documents. 4-1.3 INSI'l.,,.( "'I"ION 'fREOt,JIR,EMEN'FS Subsection 4-1.3, Inspection Requirements, is deleted in its entirety and replaced by the following subsections. 4-1.3.1 GENERAL Unless otherwise specified, inspection at the source of production for such materials and fabricated items as bituminous paving mixtures, structural concrete, fabricated metal products, cast metal products, welding, reinforced and unreinforced concrete pipe, application of protective coatings, and similar shop and plant operations is not required. A certificate of compliance, signed by an authorized officer of the producer, certifying compliance with the contract documents will be submitted for all of the following materials: steel pipe, sizes less than 18 inches; vitrified clay pipe; asbestos cement pipe; cast iron pipe; reinforced concrete pipe; non -reinforced concrete pipe; and PVC sewer and water pipe; subject to sampling and testing by City. Standard items of equipment, such as electric motors, conveyors, plumbing fittings and fixtures, lumber, plywood, and so on, are subject to inspection at the job site. All other equipment items will be inspected and tested in accordance with the contract documents. The City does not provide full time inspection. The Contractor will provide 24-hour minimum notice for each inspection required by the work unless other arrangements have been agreed upon, in writing, with the City Engineer. Any inspection required outside of normal working hours and days, including holidays, will be at the Contractor's cost at rates established by the City. 4-1.6 TRADE NAMES OR F."QUALS Whenever any material, product, equipment, or service is specified by brand, trade, or proprietary name, the item so specified will be deemed to be followed by the words "or equal". For the City's consideration of a proposed "equal" item, the Bidder must submit, a minimum of ten (10) calendar days before the date of the bid opening, documentation of the particulars of the proposed "equal item". At a minimum, the submitted documentation will include: Written request with explanation of why the product should be considered as an equal product. Material specifications. Technical specifications. Test data. ■ Samples. �+ Comparison chart of key specifications of the "equal" item against similar Agreement No. 5656 specifications of the specified item. Work locations and reference telephone numbers of at least three (3) locations where the proposed "equal" item has been recently installed under similar conditions. r Warranty data. The Bidder will be notified by the Engineer whether or not the proposed "equal" product is acceptable to the City five (5) calendar days before the date of the bid opening. Failure to submit all required documentation and/or submittal of incomplete documents may result in the City's rejection of the proposed "equal" product without further consideration. 5-2 PROTECTION The following subsection is added to Subsection 5-2 of the Greenbook. 5-2.1 INf,(:)RItlXT [,,CATION OF 1. TIL "l"11= If the Contractor, while performing the Work, discovers utility facilities not identified correctly or not shown in the contract plans or specifications by the City, the Contractor will immediately notify the City and utility owner in writing. 5-4 RELOCATION The following subsection is added to Subsection 5-4 of the Greenbook. 5-4.1 RI,"SPONSIBILITY OF LJTII,ITY REMOVAL, OR RELOCA11ON The City will be responsible to arrange for the removal, repair, or relocation of existing utilities located within the project limits if such utilities are not correctly identified in the contract plans or specifications by the City. The City will have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation. 5-5 DELAYS The following paragraphs are added to Subsection 5-5 of the Greenbook. Actual loss, as used in this Subsection, will be understood to include no items of expense other than idle time of equipment and necessary payments for idle time of workers, cost of extra moving of equipment, and cost of longer hauls. Compensation for idle time of equipment and idle time of workers will be determined by Subsection 5-5.1 and no markup will be added in either case for overhead and profit. The cost of extra moving of equipment and the cost of longer hauls will be paid for as extra work. The following subsection is added to Subsection 5-5 of the Greenbook. Agreement No. 5656 5-5.1 CALCULATING IDLE TIME Equipment idle time will calculated in accordance with Subsection 3-3.2.2 and based upon the actual normal working time during which the delay condition exists, but in no case will exceed 8 hours in any one day. The days for which compensation will be paid will be the calendar days, excluding Saturdays, Sundays and legal holidays, during the existence of the delay. Worker idle time will be calculated in accordance with Subsection 3-3.2.2. 6-1 CONSTRllCT1ON SCI IEDULF; AND COMM[ EN CEMENT OF WORK Section 6-1, Construction Schedule and Commencement of Work, is deleted in its entirety and replaced by the following subsections. Pre-C01IStructioia Meetillg,; After contract award, the City will arrange for a pre -construction meeting to discuss the construction of the project. City will invite utility agencies and the contractor will arrange for all of its sub -contractors to attend the meeting. 6-1.1 CONTRACT SCHEDULE After notification of award and before starting any work, the Contractor will submit a Contract Schedule to the Engineer for review, as required by these Specifications within fifteen (15) calendar days of award. 6-1.2 CON'Fl::N'1" 01-'C'ONTRAC:°I" SCHED1r.JL The Contract Schedule, and any updated Contract Schedule, will meet the following requirements: 1. Schedules must be suitable for monitoring progress of the Work. 2. Schedules must provide necessary data about the time for the Engineer's decisions. 3. Schedules must be sufficiently detailed to demonstrate adequate planning for the Work. 4. Schedules must represent a practical plan to complete the Work within the Contract Time. 5. Schedules must show the critical path method for completing the Work. The Engineer's review of the form and general content of the Contract Schedule and any updated Contract Schedules is only for the purpose of determining if the listed requirements are satisfied, nothing more. 6-1.3 EFFECT OF CONTRACT SCF1EDULJ` The Contract Schedule, and any updated Contract Schedules, will represent a practical plan to complete the Work within the Contract Time. Extension of any schedule MBM Agreement No. 5656 beyond the Contract Time will not be acceptable. Schedules showing the Work completed in less than the Contract may be acceptable if judged by the Engineer to be practical. Acceptance of such a schedule by the Engineer will not change the Contract Time. The Contract Time, not the Contract Schedule, will control in determining liquidated damages payable by the Contractor and in determining any delay. If a schedule showing the Work completed in less than the Contract Time is accepted, the Contractor will not be entitled to extensions of the Contract Time for Excusable Delays or Compensable Delays or to adjustments of the Contract Sum for Compensable Delays until such delays extend the completion of the Work beyond the expiration of the Contract Time. The Contractor will plan, develop, supervise, control, and coordinate the performance of the Work so that its progress and the sequence and timing of Work activities conform to the current accepted Contract Schedule. The Contractor will continuously obtain from Subcontractors information and data about the planning for and progress of the Work and the delivery of equipment, will coordinate and integrate such information and data into updated Contract Schedules, and will monitor the progress of the Work and the delivery of equipment. The Contractor will act as the expeditor of potential and actual delays, interruptions, hindrances, or disruptions for its own forces and those forces of Subcontractors. The Contractor will cooperate with the Engineer in developing the Contract Schedule and updated Contract Schedules. The Engineer's review and comments about any schedule or scheduling data will not relieve the Contractor from its sole responsibility to plan for, perform, and complete the Work within the Contract Time. Review and comments about any schedule will not transfer responsibility for any schedule to the Engineer or the City nor imply their agreement with (1) any assumption upon which such schedule is based or (2) any matter underlying or contained in such schedule. The Engineer's failure to discover errors or omissions in schedules that have been reviewed, or to inform the Contractor that the Contractor, Subcontractors, or others are behind schedule, or to direct or enforce procedures for complying with the Contract Schedule will not relieve the Contractor from its sole responsibility to perform and complete the Work within the Contract Time and will not be a cause for an adjustment of the Contract Time or the Contract Sum. The Contractor will perform the Work in accordance with the currently accepted Contract Schedule. 6-1.4 COMMENCEMENT OF CONTRACT TIME The Contract Time will commence when the City issues a Notice to Proceed. The Work will start on the date specified in the Notice to Proceed and within a maximum of fifteen (15) calendar days after the date of the Notice to Proceed, and be diligently prosecuted to completion with the time provided in the Specifications. Agreement No. 5656 6-4 DEFAULT BY CONTRACTOR The language in subsection 6-4 is deleted in its entirety and replaced with the following subsections. 6-4.1 GENERAL Should the Contractor fail to begin delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fail to maintain the Work schedule (as determined by the current accepted Contract Schedule) which will ensure the City's interest, or if the Contractor is not carrying out the intent of the Contract, the City may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL -OVER THE WORK The City may terminate the Contractor's control over the Work without liability for damages when, in the City's opinion, the Contractor is not complying in good faith, has become insolvent, or has assigned or subcontracted any part of the Work without the City's consent. Should such termination occur, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity and quality of the Work completed at the time of termination, less damages caused to the City by the Contractor's action or inaction. In the event of such termination of control, the City may do any one, or combination of, the following: I. Serve written notice upon the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. In such event the Surety will, within 5 days, assume control and perform the Work as successor to the Contractor; 2. The City may perform the Work itself and deduct the cost thereof from any payment due to the Contractor; 3. The City may replace the Contractor with a different contractor to complete the work and deduct the cost thereof from any payment due to the Contractor. Nothing herein will waive, or serve as a limitation upon, any additional remedy the City may have under these Contract Documents or applicable law. 6-4.3 SURETY'S ASS1.111 PTll:: N OF CONTROL Should the Surety assume any part of the Work, it will take the Contractor's place in all respects for that part, and will be paid by the City for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default will be payable to the Surety as the Work progresses, subject to the terms of the Contract. If the Surety does not assume control and perform the Work within 5 days after Agreement No. 5656 receiving notice of cancellation, or fails to continue to comply, the City may exclude the Surety from the premises. The City may then take possession of all material and equipment and complete the Work by City's forces, by letting the unfinished work to another contractor, or by a combination of such methods. In any event, the cost of completing the Work will be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the City. If the sums due under the Contract are insufficient for completion, the Contractor or Surety will pay to the City within 5 days of completion, all costs in excess of the sums due. The provisions of this subsection will be in addition to all other rights and remedies available to the City under applicable law. 6-6 DELAYS AND E "I'lINSIONS OF TIME Subsection 6-6 is deleted in its entirety and replaced with the following subsections. 6-6.1 GENERAL If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays except as otherwise provided herein. Excusable delay may include: war, earthquakes exceeding 3.5 on the Richter Scale, government regulation, labor disputes outside the contemplation of the parties, strikes outside the contemplation of the parties, fires, floods, changes to the Work as identified herein, or other specific events that may be further described in the Specifications. Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole will not warrant an extension of time. The City will not grant an extension of time for a delay by the Contractor's inability to obtain materials unless the Contractor furnishes to the Engineer documentary proof. The proof must be provided in a timely manner in accordance with the sequence of the Contractor's operations and accepted construction schedule. Should delays be caused by events other than those included herein, the Engineer may, but is not required to, deem an extension of time to be in the City's best interests. 6-6.2 EXTENSIONS OF TIME If granted, extensions of time will be based upon the effect of delays to the critical path of the Work as determined by the current accepted Contract Schedule. Delays to minor portions of the Work that do not affect the critical path will not be eligible for extensions of time. 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR Any payment for compensable delay will be based upon actual costs as set forth in ff 119 -MA Agreement No. 5656 Subsection 5-5 excluding, without limitation, what damages, if any, the Contractor may have reasonably avoided. The Contractor understands that this is the sole basis for recovering delay damages and explicitly waives any right to calculate daily damages for office overhead, profit, or other purported loss, using different formulas including, without limitation, the Eichleay Formula. 6-6.4 WRITTEN NOTICE AND REPORT If the Contractor desires payment for a delay or an extension of time, it will give the Engineer written notice of such request not later than the time limit set forth in the Proposal for submitting a claim after the event or occurrence giving rise to a delay claim. Failure to submit a written request within such amount of time will result in the Contractor waiving its delay claim. Any claim for payment or an extension of time must be in the form required by the "Claims" sections of these Specifications. In no event will the City grant the Contractor an extension of time if the delay is within the Contract Time as identified by the Contract Documents. 6-7.2 WORK DAYS AND WORKING HOURS City Hall is open from Monday thru Thursday lam -5pm and alternating Friday's 7am- 4pm. It is closed the following holidays: New Year's Day Martin Luther King, Jr. Day President's Day Memorial Day Independence Day Labor Day Veteran's Day Thanksgiving Christmas Eve Christmas New Year's Eve New Year's Day - Tuesday, January 1, 2019 - Monday, January 21, 2019 - Monday, February 18, 2019 - Monday, May 27, 2019 - Thursday, July 4, 2019 - Monday, September 2, 2019 - Monday, November 11, 2019 - Thurs-Fri, November 28-29, 2019 - Tuesday, December 24, 2019 - Wednesday, December 25, 2019 - Tuesday, December 31, 2019 - Wednesday, January 1, 2020 Working on Fridays when City Hall is closed is acceptable. If the Contractor, however, requests an inspection a day when City Hall is closed, then the Contractor will have to reimburse the City for the costs of inspection. The Contractor must request such an inspection at least 48 hours in advance. City inspections during hours when City Hall is closed are subject to inspection overtime fees to be paid for by the Contractor. Friday work that does not require inspection can be done without an inspection fee and must be discussed with City staff before its occurrence. If the Contractor does construction on a Friday or a day when City Hall is closed, that day is counted as a project working day. On workdays, Contractor's activities will be confined to the hours between 7:00 a.m. Agreement No. 5656 and 4:00 p.m. Please see Section 6-7.5 below for weekend and holiday work restrictions. 6-7.4 NIGHT WORK The following paragraph is added to Section 6-7 of the Greenbook: The City will not permit Work between the hours of 4 p.m. and 7 a.m. of the following day unless specifically provided for in the bid documents or unless the Contractor receives prior written approval. 6-7.5 WEEKEND AND HOLIDAY WORK The Engineer may, but is not required to, allow the Contractor to work on Saturdays, Sundays and City Holidays. 6-8 COMPLETION AND AM":'PTANC E Subsection 6-8 of the Greenbook is deleted in its entirety and replaced by the following: The Work will be inspected by the Engineer for acceptance upon the Engineer receiving the Contractor's written assertion that the Work is complete. If, in the Engineer's judgment, the Work is complete and is ready for acceptance, the Engineer will accept the Work on behalf of the City in the manner prescribed by the City. The Engineer will recommend approval of the Notice of Completion to the City Council. This will be the date when the Contractor is relieved from responsibility to protect the Work. All work will be guaranteed by the Contractor against defective workmanship and materials furnished by the Contractor for a period of 1 year from the date the Work was completed. The Contractor will replace or repair any such defective work in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the City may perform this work and the Contractor's sureties will be liable for the cost thereof. 6-8.1 GENF:IRAL GUARANTY The Contractor will remedy any defects in the work and pay for any damage to other work resulting therefrom, which will appear within a period of one year from the date of final acceptance of the work unless a longer period is specified. The owner will give notice of observed defects with reasonable promptness. 6-9 LIOUIDATED DAMAGES Subsection 6-9, Liquidated Damages, of the Greenbook is deleted in its entirety and IMM Agreement No. 5656 replaced by the following subsections. 6-9.1 FAILURE TO COMPLETE WORK ON TIME If all the work called for under the contract is not completed before or upon the expiration of the Contract Time, the City will sustain damage. Since it is and will be impracticable to determine the actual damage which the City will sustain in the event of and by reason of such delay, it is therefore agreed that the Contractor will pay to the City the sum specified in the Proposal for each and every calendar day beyond the time prescribed to complete the work not as a penalty, but as a predetermined liquidated damage. The Contractor agrees to pay such liquidated damages as are herein provided, and in case the same are not paid, agrees that the City may deduct the amount thereof from any money due or that may become due to the Contractor under the contract. Unless otherwise specified, liquidated damages will be $250 per calendar day. 6-11 DISPUTES AND CLAIMS. PROCEDt)R 6-11.1 GENERAL Consistent with PCC § 10240.6, "Claim" means a written demand or assertion by the Contractor that seeks an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, including a determination of disputes or matters in question between the City and the Contractor arising out of or related to the Contract Documents or the performance of the Work, and claims alleging an unforeseen condition or an act, error, or omission by the City, the Engineer, their agents or employees. "Claim" does not mean, and the Claims procedures herein do not apply, to the following: I . Claims respecting penalties for forfeitures prescribed by statute or regulations, which a government agency is specifically authorized to administer, settle, or determine. 2. Claims respecting personal injury, death, reimbursement, or other compensation arising out of or resulting from liability for personal injury or death. 3. Claims respecting a latent defect, breach of warranty, or guarantee to repair. 4. Claims respecting stop notices. If a Claim is subject to the Change Order procedures, the Claim arises upon the issuance of a written final decision denying in whole or in part the Contractor's Change Order Request. If a Claim is not subject to the Change Order Procedures, the Claim arises when the Contractor discovers, or reasonably should discover, the condition or event giving rise to the Claim. 6-11.2 FORM A Claim must include the following: I1 -B-17 Agreement No. 5656 A statement that it is a Claim and a request for a decision. 2. A detailed description of the act, error, omission, unforeseen condition, event or other condition giving rise to the Claim. If the Claim is subject to the Change Order procedures, a statement demonstrating that a Change Order Request was timely submitted and denied. 4. A detailed justification for any remedy or relief sought by the Claim, including to the extent applicable, the following: a) If the Claim involves extra work, a detailed cost breakdown claimed. The breakdown must be provided even if the costs claimed have not been incurred when the Claim is submitted. b) To the extent costs have been incurred when the Claim is submitted, the Claim must include actual cost records (including, without limitation, payroll records, material and rental invoices) demonstrating that costs claimed have actually been incurred. C) To the extent costs have not yet been incurred at the time the Claim is submitted, actual cost records must be submitted on a current basis not less than once a week during any periods costs are incurred. A cost record will be considered current if submitted within seven (7) calendar days of the date the cost reflected in the record is incurred. At the Engineer's request, claimed extra costs may be subject to further verification procedures (such as having an inspector verify the performance of alleged extra work on a daily basis). If the Claim involves an error or omission in the Contract Documents: a) An affirmative representation that the error or omission was not discovered before submitting a bid for the Contract; and b) A detailed statement demonstrating that the error or omission reasonably should not have been discovered by the Contractor, its Subcontractors and suppliers, before submitting a bid for the Contract. If the Claim involves an extension of the Contract Time, written documentation demonstrating the Contractor's entitlement to a time extension. T If the Claim involves an adjustment of the Contract Sum for delay, written documentation demonstrating the Contractor's entitlement to such an adjustment. 8. A personal certification from the Contractor that reads as follows: «l BEING THE (MUST BE AN OFFICER) OF ___...mm.. (CONTRACTOR NAME), DECLARE Agreement No. 5656 UNDER PENALTY OF PERJURY UNDER CALIFORNIA LAW, AND DO PERSONALLY CERTIFY AND ATTEST THAT I HAVE THOROUGHLY REVIEWED THE ATTACHED CLAIM FOR ADDITIONAL COMPENSATION OR EXTENSION OF TIME, AND KNOW ITS CONTENTS, AND SAID CLAIM IS MADE IN GOOD FAITH; THE SUPPORTING DATA IS TRUTHFUL AND ACCURATE; THAT THE AMOUNT REQUESTED ACCURATELY REFLECTS THE CONTRACT ADJUSTMENT FOR WHICH THE CONTRACTOR BELIEVES CITY IS LIABLE; AND, FURTHER, THAT I AM FAMILIAR WITH CALIFORNIA PENAL CODE § 72 AND CALIFORNIA GOVERNMENT CODE § 12650, ET SEQ., PERTAINING TO FALSE CLAIMS, AND FURTHER KNOW AND UNDERSTAND THAT SUBMITTING OR CERTIFYING A FALSE CLAIM MAY LEAD TO FINES, IMPRISONMENT, AND OTHER SEVERE LEGAL CONSEQUENCES." 6-11.3 CLAIMS SI.IBMIT"I"ED TO ENGINEER Within thirty (30) calendar days after the circumstances giving rise to a Claim occur, the Contractor will submit its Claim to the Engineer for a decision. Regardless of any Claim submittal, or any dispute regarding a Claim, unless otherwise directed by the Engineer, the Contractor will not cause any delay, cessation, or termination of the Work, but will diligently proceed with the performing the Work in accordance with the Contract Documents. Except as otherwise provided, the City will continue to make payments in accordance with the Contract Documents. 6-11.4 CI.,AIM IS PREREQUIS1"I'E "1"O O°T°11EIZ REMEDY The Contractor certifies that it is familiar with PCC § 10240.2 and understands and agrees that submitting a Claim in accordance with these Specifications is an express condition precedent to the Contractor's right to otherwise pursue a claim whether through alternative dispute resolution or by litigation. Should the Contractor fail to submit a claim in accordance with these Specifications, including the time limits set forth herein, it will waive any right to a remedy, whether in law or equity, it might otherwise have pursuant to the Contract Documents or applicable law. 6-11.5 DEC'ISION ON CLAIMS The Engineer will promptly review Claims submitted by the Contractor in accordance with these Specifications. Should the Engineer require additional supporting evidence to evaluate the claim, the Engineer will request such additional information in writing. Any such requested data will be furnished not later than ten (10) calendar days after the Contractor receives the Engineer's request. The Engineer will render a decision not later than thirty (30) days after either receiving the Claim or the deadline for furnishing additional supporting data, whichever is later. If the Claim amount is more than $50,000, the time period will be extended to sixty (60) days. If the Engineer fails to render a decision within the time period established herein, then the Claim will be deemed denied. The Engineer's decision will be final and binding unless appealed in accordance with these Specifications. Agreement No. 5656 The Engineer's decision on a Claim will include a statement substantially as follows: "This is a decision pursuant to the General Specifications of your contract. If you are dissatisfied with the decision, and have complied with the procedural requirements for asserting claims, you may have the right to alternative dispute resolution or litigation. Should you fail to take appropriate action within thirty (30) calendar days of the date of this decision, the decision will become final and binding and not subject to further appeal." 6-11.6 APPEAL OF ENGINEf"R'S DECISION Should the Contractor dispute the Engineer's decision, then the Contractor must appeal that decision to the City's Public Works Director within thirty (30) calendar days of receiving the Engineer's decision. The Public Works Director will address disputes or claims within thirty (30) calendar days after receiving such request and all necessary supporting data. The Public Works Director's decision on the dispute or claim will be the City's final decision. If the Contractor disputes the Public Works Director's decision, then the Contractor must demand alternative dispute resolution in accordance with this Section and the PCC within thirty (30) calendar days of the City's final decision. 6-11.7 MEDIATION If the City and the Contractor agree, disputes between the parties may be submitted to non-binding mediation. If the parties cannot agree to an alternative form of mediation, then mediation will be administered by the American Arbitration Association ("AAA") under its Construction Industry Mediation Rules, unless the use of such rules are waived by mutual stipulation of both parties. The parties may, but are not required to be, represented by counsel in mediation. The requirement for mediation will not alter or modify the time limitations otherwise provided for claims and no conduct or settlement negotiation during mediation will be considered a waiver of the City's right to assert that claim procedures were not followed. 6-11.8 ARBITRATION If the City and Contractor do not agree to mediation, then a disputes will be submitted to neutral non-binding (except as provided herein) arbitration. Arbitration will be conducted in accordance with PCC § 10240.3. Any decision rendered by an arbitrator will be consistent with PCC § 10240.8. The exclusive venue for any arbitration will be in Los Angeles County. The expenses and fees of the arbitrators and the administrative fees, if any, will be ff o Agreement No. 5656 divided among the parties equally. Each party will pay its own counsel fees, witness fees, and other expenses incurred for its own benefit. 6-11.9 WI®IEN AI�BITRKFION DECISION BECOMES BINDING The decision rendered by the arbitrator will become binding upon the parties unless appealed to the Los Angeles County Superior Court pursuant to PCC § 10240.12 within thirty (30) calendar days of the decision. If subsequent litigation results in an award to the party appealing the arbitration that is less than or equal to that of the arbitration decision, or if the litigation results in a decision in favor of the nonappealing party, then the party appealing the arbitration will pay the nonappealing party's attorney's fees and court costs. 6-11.10 APPEAL TO SUPERIOR COUIZT, WAIVER OF JURY TRIAL Should a party timely object to the arbitration decision, it may file a petition with the Los Angeles County Superior Court in accordance with California Code of Civil Procedure ("CCP") §§ 1285, et seq. Notwithstanding the limitations set forth in CCP § 1286.2, the court may vacate, correct, or adjust an arbitration award, and enter judgment in accordance with CCP § 1287.4, for any legal or equitable basis including, without limitation, error of law. The court will apply the substantial evidence standard of review when considering the appeal of an objecting party. BY EXECUTING THESE CONTRACT DOCUMENTS, THE CONTRACTOR AGREES TO HAVE DISPUTES OR CONTROVERSY CONCERNING THE CONSTRUCTION, INTERPRETATION, PERFORMANCE, OR BREACH OF THESE CONTRACT DOCUMENTS, INCLUDING CLAIMS FOR BREACH OF CONTRACT OR ISSUES OF BAD FAITH DECIDED IN ACCORDANCE WITH THIS SECTION 6-11. BOTH THE CITY AND THE CONTRACTOR WAIVE THEIR RIGHT TO A JURY TRIAL FOR THESE DISPUTES OR ISSUES. 6-11.11 AB 626 CLAIMS; PIZOCESS Claims made by a Contractor for one or more of the following are subject to the claim resolution process set forth in Public Contract Code section 9204: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by the city under a contract for a public works project. (B) Payment by the city of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the city. 7-2 LABOR The following subsections are added to Subsection 7-2 of the Greenbook. Agreement No. 5656 7-2.3 11Ml `All_,ll ) WAGES The Contractor will post at appropriate conspicuous points at the site of the project a schedule showing determinations of the Director of Industrial Relations of the prevailing rate of per diem wages. It will be the Contractor's responsibility to obtain copies of the prevailing rate of per diem wages. One source that may be used is the California Department of Industrial Relations website which is currently located at www.dir.ca.gov, or by calling the Prevailing Wage Unit at (415) 703-4774. Attention is directed to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by the Contractor or any subcontractor. Labor Code § 1777.5 requires the Contractor or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except: a) When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the ninety (90) calendar days before the request for certificate, or b) When the number of apprentices in training in the area exceeds a ratio of one to five, or C) When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or d) When the Contractor provides evidence that the Contractor employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. The Contractor is required to make contributions to funds established for the administration of apprenticeship programs if the Contractor employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. The Contractor and any subcontractor will comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex -officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. 11-B-22 Agreement No. 5656 7-2.4 RECORD OF WAGES LAID: INSPECTION Every Contractor and subcontractor will keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with the Work. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by the City, the Contractor will provide copies of the records at its cost. 7-3 LIABILITY INSLIR),%NCE Subsection 7-3, Liability Insurance, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-3.1 GENERAL Contractor must procure and maintain for the duration of the contract the following insurance coverages and limits against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the work covered by this agreement by the Contractor, its agents, representatives, employees or subcontractors: COVERAGE PER OCCURRENCE Comprehensive General Liability Business Auto Workers' Compensation ISO FORM CL 00 02 01 85 or 88 CA 00 01 01 87 COMBINED SINGLE LIMIT $2,000,000 $1,000,000 Statutory Contractor will provide endorsements or other proof of coverage for contractual liability. Combined single limit per occurrence will include coverage for bodily injury, personal injury, and property damage for each accident. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the policy will be endorsed such that the general aggregate limit will apply separately to this contract and a copy of the endorsement provided to the City. Liability policies will contain, or be endorsed to contain the following provisions: GENERAL LIABILITY AND AUTOMOBILE LIABILITY: The City, its officers, officials, employees, agents, and volunteers will be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage will contain no special limitations on the scope or protection afforded to the City, its officers, officials, employees, agents, or volunteers. II -B-23 Agreement No. 5656 The Contractor's insurance coverage will be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, and volunteers will be excess of the Contractor's insurance and will not contribute with it. The insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. Any failure to comply with reporting provisions of the policies will not affect coverage provided to the City, its officers, officials, employees, agents and volunteers. The Contractor's insurance will apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. WORKER'S COMPENSATION: The insurer will agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. ALL COVERAGES: Each insurance policy required by this subsection will be endorsed to state that coverage will not be suspended, voided, cancelled by either party, reduced in coverage or in limits except after thirty (30) calendar days written notice by certified mail, return receipt requested, has been given to: CITY CLERK City of El Segundo 350 Main Street El Segundo, CA 90245 Notwithstanding the foregoing, the endorsement may state that insurance may be cancelled upon ten (10) calendar day notification for non-payment of premium. The Contractor will provide the City with updated proof of insurance should the Contract Time extend beyond the policy expiration date. All liability insurance will be on an occurrence basis. Insurance on a claims made basis will be rejected. Any deductibles or self-insured retentions will be declared to and approved by City. The insurer will provide an endorsement to City eliminating such deductibles or self-insured retentions as respects the City, its officials, employees, agents, and volunteers. Except for Workers Compensation Insurance, Contractor will furnish to City certificates of insurance and endorsements on forms acceptable to the City's City Attorney, duly authenticated, giving evidence of the insurance coverages required in this contract and other evidence of coverage or copies of policies as may be reasonably required by City from time to time. Endorsements must be supplied on ISO Form No. II -B-24 Agreement No. 5656 CG 20 10 11 85, or equivalent. Certificate/endorsement for Workers Compensation Insurance will be furnished on State Comp Fund or other industry standard form. Except for worker's compensation insurance, all insurance required herein will be placed with insurers with a Best's Rating of not less than A:VII. Worker's compensation insurance policies will meet the requirements of California law. All subcontractors employed on the work referred to in this contract will meet the insurance requirements set forth for Contractor. Contractor will furnish certificates of insurance and endorsements for each subcontractor at least five days before the subcontractor entering the job site, or Contractor will furnish City an endorsement including all subcontractors as insureds under its policies. Except as provided in Subsection 6-10, the Contractor will save, keep and hold harmless the City, its officers, officials, employees, agents and volunteers from all damages, costs or expenses in law or equity that may at any time arise or be claimed because of damages to property, or personal injury received by reason of or in the course of performing work, which may be caused by any willful or negligent act or omission by the Contractor or any of the Contractor's employees, or any subcontractor. The City will not be liable for any accident, loss or damage to the work before its completion and acceptance, except as provided in Subsection 6-10. The cost of such insurance will be included in the various items of work in the Contractor's bid and no additional compensation for purchasing insurance or additional coverage needed to meet these requirements will be allowed. In the event that any required insurance is reduced in coverage, cancelled for any reason, voided or suspended, Contractor agrees that City may arrange for insurance coverage as specified, and Contractor further agrees that administrative and premium costs may be deducted from payments due to the Contractor. Contractor will not be allowed to work until alternate coverage is arranged. Coverage will not extend to any indemnity coverage for the active negligence of the additional insured if the agreement to indemnify the additional insured would be invalid under Civil Code § 2782(b). 7-3.2 INDEMNIFICATION AND DEFENSE In addition to the provisions of Subsection 7-3 of the Greenbook as between the City and Contractor, Contractor will take and assume all responsibility for the work as stated herein or shown on the plans. The Contractor will bear all losses and damages directly or indirectly resulting to it, to the City, its officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents, traffic control, job site maintenance, or any other causes whatsoever. The Contractor will assume the defense of and indemnify and save harmless the City of EI Segundo, its officers, employees, and agents, from and against any and all claims, losses, damage, expenses and liability of every kind, nature, and description, directly II -B-25 Agreement No. 5656 or indirectly arising from the performance of the contract or work, regardless of responsibility for negligence, and from any and all claims, losses, damage, expenses, and liability, howsoever the same may be caused, resulting directly, or indirectly from the nature of the work covered by the contract, regardless of responsibility for negligence, to the fullest extent permitted by law. In accordance with Civil Code § 2782, nothing in this Subsection 7-3.2 or in Subsection 7-3 of the Standard Specifications will require defense or indemnification for death, bodily injury, injury to property, or any other loss, damage or expense arising from the sole negligence or willful misconduct of the City, or its agents, servants or independent contractors who are directly responsible to the City, or for defects in design furnished by such persons. Moreover, nothing in this Subsection 7-3.2 or in Subsection 7-3 will apply to impose on the Contractor, or to relieve the City from, liability for active negligence of the City. The City does not, and will not, waive any rights against the Contractor which it may have by reason of the aforesaid hold harmless agreements because of the acceptance by the City, or deposit with City by Contractor, of any insurance policies described in Subsection 7-3 of the Special Provisions. This hold harmless agreement by the Contractor will apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered by reasons of any of the aforesaid operations of Contractor, or any subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages. No act by the City, or its representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, will in any respect relieve the Contractor or anyone else from any legal responsibility, obligation or liability he might otherwise have. 7-5 PERMITS The following paragraph will be added to Subsection 7-5 of Greenbook: The Contractor will apply for permits required by the City. These permits will be issued on a "no -fee" basis. However, the Contractor must pay for and obtain all other permits from other governmental and utility agencies necessitated by their operations. All bonding fees, (overweight and oversized vehicle permit fees) inspection permit fees or other fees charged or required for such permits must be paid by the Contractor. These costs will be included in the bid item provided. If no bid item is included, costs will be included in the various items of work, and no additional payment will be allowed. 7-8.1 CLEANUP AND DUST COMFIWL. Subsection 7-8.1, Cleanup and Dust Control, of the Greenbook is deleted in its entirety and replaced by the following subsections. Agreement No. 5656 7-8.1.1 GENERAL On any construction project requiring trenching within public streets and for which total trenching is in excess of 500 feet, the Contractor will be required to sweep the worksite utilizing a pick-up type street sweeper a minimum of once daily. 7-8.1.2 WATERING Water for dust control caused by Contractor's operations or the passage of traffic through the work will be applied as necessary or as directed by the Engineer. Water for the above or other purposes may be obtained from any approved source. If the Contractor chooses to use a City fire hydrant upon placing deposits and fees as described in this contract, the Engineer will cause a meter to be installed. All water used from the hydrant will be metered and charged to the Contractor at the prevailing rate plus the current daily meter rental rate. The Contractor will be charged a $15 reconnect fee if the Contractor wishes to move the meter to a different hydrant. Costs of water to be used will be included in the cost of various bid items. 7-8.6 W'ATEli. POI..I,I. TION CONTROL The following requirements are added to establish storm water and urban runoff pollution prevention controls. (a) Storm or construction generated water containing sediment such as, construction waste, soil, slurry from concrete/asphalt concrete saw cutting operations, clean up of concrete transit mixers or other pollutants from construction sites and parking areas will be retained or controlled on site and will not be permitted to enter the storm drain system. (b) Temporary sediment filtering systems such as sandbags, silt fences, or gravel berms will be utilized to trap sediment so that only filtered water enters the City's storm drain system. Proper clean up and disposal of settled sediment and the filtering system will be the responsibility of the Contractor. (c) Discharge of concrete transit mixer wash water on to approved dirt areas (sub - grade area designated for new concrete construction for example) is acceptable. Discharge on to private property, parkway areas, or the street is not permitted. (d) Plastic or other impervious covering will be installed where appropriate to prevent erosion of an otherwise unprotected area, along with any other runoff control devices deemed appropriate by the City. (e) Excavated soil stored on the site will be covered in a manner that minimizes the amount of sediments running into the storm drain system, street or adjoining properties. (f) No washing of construction or other industrial vehicles and equipment will be allowed adjacent to a construction site. During the rainy season (October 15 to April 15), Contractor will keep at the construction site sufficient materials and 11-B-27 Agreement No. 5656 labor to install temporary sediment filtering systems and other water pollution prevention control measures. These control measures will be in place and maintained by the Contractor on a daily basis on days when construction is not in progress due to rain. (h) All costs associated with water pollution control will be borne by the Contractor. Any expense incurred by the City to expeditiously respond to storm drain contamination resulting from Contractor's failure to implement water pollution control measures will be charged to the Contractor. 7-9 PROTI-;CTION AND RESTOI KION Ol° EXISTING IMPROVEMENTS The following requirements are added to Section 7-9: Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectively reduced by the Contractor's operations, such striping or markings will also be considered as existing improvements and the Contractor will replace such improvements. Relocations, repairs, replacements, or re -establishments will be at least equal to the existing improvements and will match such improvements in finish and dimensions unless otherwise specified. 7-10 PLJBI.JC CONVENIENCE AND SAFETY The following requirement is added to Section 7-10: Unless otherwise specified all traffic control will be performed in accordance with the Work Area Traffic Control Handbook (WATCH) Latest Edition, published by Building News. 7-10.1 TRAFFIC AND ACCESS The Contractor will notify the occupants of all affected properties at least 48 hours before any temporary obstruction of access. Vehicular access to property line will be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer. At least one (1) twelve (12) foot wide traffic lane will be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The traffic lanes will be maintained on pavement, and will remain unobstructed. All work requiring that a lane be closed or a lane moved right or left will be noticed to the traveling public by use of City approved lighted arrow boards. Clearances from traffic lanes will be five (5) feet to the edge of any excavation and two (2) feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction. One four (4) foot wide paved pedestrian walkway will be maintained in the parkway area on each side of all streets. The clearance from the pedestrian walkway to any II -B-28 Agreement No. 5656 traffic lane will be five (5) feet. Pedestrians and vehicles will be protected from all excavations, material storage, and/or obstructions by the placement of an adequate number of lighted barricades (minimum two (2)) at each location, one (1) at each end of the obstruction or excavation), which will have flashing lights during darkness. Barricades will be Type I or Type II per Section 7-3 of the WATCH Manual and lights will be Type A per Section 7-6 of the "Work Area Traffic Control Handbook" (WATCH). 7-10.2 S"1'REI1 .'I°Cl.,,OS(,JRIa.S, DET0t.1RS, BARRICADES Street closures will not be allowed except as specifically permitted by the Engineer. The Contractor will prepare any traffic control or detour plans that may be required as directed by the Engineer. Lane transitions will not be sharper than a taper of thirty (30) to one (1). Temporary traffic channelization will be accomplished with barricades or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor will prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed on finish pavement surfaces, which are to remain. Where access to driveway or street crossings need to be maintained, minimum 1 1/4 inch thick steel plating will be used to bridge the trench. All steel plating will have temporary asphalt concrete 1:12 minimum sloped ramps to assist vehicles to cross comfortably over the plates and have a non-skid surface. Plates subject to vehicle high traffic speeds and in residential areas will be secured by welding at the discretion of the Engineer. 7-10.5 PROTECTION OF `141E PL)BLIC It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor will use foresight and will take such steps and precautions as his operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the Project which will require that immediate and unusual provisions be made to protect the public from danger or loss of life, or damage to life and property, due directly or indirectly to prosecution of work under this contract. Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor's operations and when, in the opinion of the Engineer, immediate action will be considered necessary in order to protect the public or property due to the Contractor's operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation immediately, the Engineer may provide suitable protection to said interests by causing II -B-29 Agreement No. 5656 such work to be done and material to be furnished as, in the opinion of the Engineer, may seem reasonable and necessary. The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, will be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. Such remedial measures by the City will not relieve the Contractor from full responsibility for public safety. 7-15 l IAZARDOUS MATERIAL The following Subsection will be added to Section 7 of the Greenbook: For any excavation, which extends more than four feet below existing grade, the Contractor will promptly, and before the conditions are disturbed, notify the Engineer, in writing, of 1) any material that the Contractor believes may be hazardous waste, as defined in Health and Safety Code § 25117, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law, 2) subsurface or latent physical conditions at the site differing from those indicated, or 3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. After receiving notice from the Contractor, the Engineer will promptly investigate any condition identified by the Contractor as being hazardous. The rights and obligations of the City and the Contractor with regard to such conditions (including, without limitation, the procedures for procuring change orders and fling claims) will be specified by the provisions of Subsection 3-4 (Changed Conditions) of the Greenbook. If a dispute arises between the City and the Contractor whether the conditions materially differ, involve hazardous waste, or cause a change in the Contractor's cost or time required for performance of the work, the Contractor will not be excused from any scheduled completion date provided for by the contract, but will proceed with all work to be performed under the contract. The Contractor will retain all rights provided by Subsection 3-5, Disputed Work, of the Greenbook. If the Engineer determines that material called to the Engineer's attention by the Contractor is hazardous waste, or if the Engineer otherwise discovers the existence of hazardous waste, the Contractor will be responsible for removal and disposal of the hazardous waste by qualified personnel and appropriate equipment in the manner required by law as directed by the Engineer, subject to the provisions of Section 3 (Changes in Work) of the Greenbook. 9-2 LUMP SUM WORK Subsection 9-2, Lump Sum Work, of the Greenbook is deleted in its entirety and replaced by the following: Items for which quantities are indicated as "Lump Sum," "L.S.," or "Job" will be paid Agreement No. 5656 for at the price indicated in the Proposal. Such payment will be full compensation for all costs for labor, equipment, materials and plant necessary to furnish, construct and install the lump sum item of work, complete, in place, and for all necessary appurtenant work, including, but not limited to, all necessary cutting, patching, repair and modification of existing facilities, and clean up of site. Contractor will furnish three copies of a detailed schedule, which breaks down the lump sum work into its component parts and cost for each part, in a form and sufficiently detailed as to satisfy Engineer that it correctly represents a reasonable apportionment of the lump sum. This schedule is subject to approval by Engineer as to both the components into which the lump sum item is broken down, and the proportion of cost attributable to each component. This schedule will be the basis for progress payments for the lump sum work. 9-3.2 PARTIAL AND FINAL PAYMENTS The text of Subsection 9-3.2 of the Standard Specifications is deleted and replaced with the following: The closure date for the purpose of making partial progress payments will be the last working day of each month. The Contractor will prepare the partial payment invoice with measurement of the work performed through the closure date and submit it to the CITY for approval. When work is complete, the Contractor will determine the final quantities of the work performed and prepare the final progress payment, and submit it to the Engineer for approval. It will take a minimum of thirty-five (35) calendar days from the date of approving the Contractor's invoice to make the payment to the Contractor. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents, or legal release of filed Stop Payment Notices against the Contractor. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as -built conditions. The full five percent (5%) retention will be deducted from all progress payments. The Contractor will make a payment request for the retained amount, for approval by the City, upon field acceptance of the work by the City Engineer. The City Engineer upon field acceptance and receipt of the final as -built plans and any other reports or documents required to be provided by the Contractor will process a recommendation to the City Council for acceptance of the work. Not less than thirty-five (35) calendar days from the City Council acceptance of the work, the Contractor's final payment will be made provided Stop Payment Notices or other claims have not been filed against the Contractor and/or the City by material suppliers, sub -contractors, other governmental agencies, and private property owners. Until these Stop Payment Notices are released and claims are resolved the stop payment/claim amount will be withheld from the final payment. Agreement No. 5656 The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety or equal value. At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer, or a State or Federally chartered bank, as the escrow agent, who will pay such surety to the Contractor upon satisfactory completion of the contract. Pursuant to PCC § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, that any such election will be at the Contractor's own expense and will include costs incurred by the City to accommodate the Contractor's request. Progress payment paid by the City as contemplated herein, will be contingent upon the Contractor submitting, in addition to any additional documents, an updated Contract Schedule in the form prescribed by these Contract Documents. Failure of the Contractor to submit an acceptable updated Contract Schedule will result in the City withholding partial payment, without liability to the City, until such an acceptable updated Contract Schedule is submitted. Nothing herein will allow the Contractor to suspend or slow progress of the Work. A City Council resolution established a Project Payment Account, encumbered money in the current budget, and assigned that money to the Project Payment Account which is the sole source of funds available for payment of the Contract Sum. Contractor understands and agrees that Contractor will be paid only from this special fund and if for any reason this fund is not sufficient to pay Contractor, Contractor will not be entitled to payment. The availability of money in this fund, and City's ability to draw from this fund, are conditions precedent to City's obligation to make payments to Contractor. 9-3.3 DELIVERED Mtn,TFIUALS, Materials and equipment delivered or stored, but not incorporated into the work, will not be approved for progress payments. 100-1 TERMINATION OF AGENCY LIABILITY Before receiving final payment, the Contractor will execute a "Release on Contract" form which will operate as, and will be a release to the City, the City Council, and each member of the City Council and their agencies, from all claims and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act of neglect of the City of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided in Subsections 9-3 of the Standard Specifications and except for any unsettled claims listed on said form which have been fled in compliance with the requirements for making claims. - END OF SECTION - II -B-32 Agreement No. 5656 SECTION III -- SPECIAL PROVISIONS 1-0.GFNERAL SCOPE. "TIME FOR CONU>L[',`TION, AND LOCATION OF WORK 1-1. General ScoDe of Work: The work to be done consists of furnishing all labor, materials, tools, equipment and incidentals for the removal and replacement of tile, drywall, waterproofing layers, countertops, sinks, faucets, plumbing, shower head and controls, and flooring. 1-2. Location of the Work: Fire Station #1 Building — 314 Main Street, EI Segundo, CA 90245 1-3. Working Days acid Time for Conivietion: 1. Contractor will commence work on date specified in the Notice to Proceed to be issued to the said Contractor by City of El Segundo Public Works Department and shall complete work within i"fty (30forty (40) working days after the date of commencement. 2-0. NOTIFICATIONS 2-1. General The CONTRACTOR will notify all agencies listed here in a minimum of seventy- two (72) hours before start of operation. The following list of names and telephone numbers are intended for the convenience of the CONTRACTOR and the City does not guarantee either the completeness or correctness of this list. OPERATION OFFICE TELEPHONE 1. Start of work, Cheryl Ebert, Public Works Staff 310-524-2321 shutdown of work, Ken Berkman, Director of Public Works 310-524-2356 or resumption of Shawn Bonfield, Fire Department Staff 310-524-2228 work after shutdown 2. Closing of streets El Segundo Police Department** 310-524-2200 El Segundo Fire Department** 310-524-2269 ** The CONTRACTOR will notify the Engineering Division before notifying these offices. The following information is provided for CONTRACTOR'S use to notify agencies if their facilities are affected by CONTRACTOR'S work: 1. City of El Segundo — Government Buildings 310-524-2713 2. City of El Segundo — Water Division 310-524-2742 3. City of El Segundo - Wastewater Division 310-524-2754 III -A-1 Agreement No. 5656 2-2. City Staff Notiflication The Contractor shall submit all required employee notices to the City at the pre - construction meeting for approval. The Contractor shall hand -deliver Notices to affected City staff regarding the work at least two (2) weeks before the project begins construction. Notices shall include the project times, dates, working hours, and description of project activities. If any changes occur to project times, dates or working hours, the Contractor will revise and re -deliver the Notice to affected City Staff. The Contractor shall also notify the Police Department, the Fire Department, the City street sweeper, the City waste hauler, and all utilities of the construction schedule and any changes to it. 2-3. 1'a,rUP-61 Where street parking may need to be restricted, the Contractor shall post "TEMPORARY NO PARKING" signs on the curb 72 hours in advance of the construction, to alert motorists that parking shall not occur at the location and for what length of time. Signs placed shall be unobstructed and clearly visible from vehicles. Signs should be similar to those posted by City Public Works street maintenance staff. The signs are subject to the approval of the Engineer. The dates and times on the signs shall be site specific and shall cover the minimum time required for "NO PARKING" to facilitate construction. Generic long-term "NO PARKING" time designations are not acceptable. Parking shall not be restricted during any period when construction activity is not scheduled at this particular site. Staging on-site at the Police Department and Fire Station 1 parking lots for construction related activities and/or equipment must first be approved by City Staff. 3-0. MOBILIZATION Mobilization shall conform to the provisions of Section 9-3.4 of the Standard Specifications. The scope of work under mobilization includes but is not limited to: 1. Moving on to the site of all Contractor's equipment required for operations. 2. Arranging for and erection of Contractor's work and storage yard. 3. Posting all OSHA required notices. 4. Submittal of Construction Schedule, Contractor Contact List, and Notices to City staff for City approval. 5. Notification of employees and property owners. 6. Re -notification of employees and property owners for all construction schedule changes. III -A-2 Agreement No. 5656 7. Bringing unforeseen field conditions to City staff's attention in a timely manner. Restoration of private and public property to existing standard conditions upon demobilization. 9. Demobilization. 3-1 Demobilization shall include all activities for the Contractor to remove all equipment and construction debris from the project areas after construction is complete. Demobilization shall also include general cleanup activities and specific punch list items and cleanup activities determined by the City Public Works Inspector or City Representative, to repair or replace any private or public facilities damaged by the construction and return public facilities to the same or better condition as that existing prior to construction. 3-2 The Contractor shall be responsible for performing the following preparatory work: 1. Meeting with the project manager and City stakeholders in a pre -construction meeting. a. During this meeting, the Contractor shall present an initial proposed schedule and work plan. City staff shall present a schedule of events that will occur at the Police Department and a list of any restrictions that may affect the construction schedule. b. The Contractor shall also present Notices to the Public regarding the work to be done (refer to Notifications section). 2. Finalizing and submitting a final work plan for the Contract that will detail the contracted project tasks and schedule and also accommodates any information clarified in the pre -construction meeting. City approval is required on the work plan before a Notice to Proceed will be issued. 3. Clearing the construction area to be worked on of all loose material and other objectionable material as applicable. 4. Providing and setting up of temporary barriers and security devices, for protection of the employees and public. This includes but is not limited to: barricades, temporary No Parking, and/or temporary No Pedestrian Traffic signage in the vicinity of the project area. 5. Providing appropriate temporary signage including signage for exit or building egress if necessary during construction. 6. Maintaining open or unobstructed building egress paths during construction. 7. Maintaining building fire or life safety systems unless three days prior written notice is submitted to the City Public Works Department and approval is granted to disrupt or disable those systems temporarily. 8. Notifying City staff according to Notification requirements. 3-3 The Contractor is responsible for performing demolition activities including but not limited to: 1. Conducting demolition to minimize interference with adjacent and occupied building areas. I11 -A-3 Agreement No. 5656 2. Disconnecting and removing utilities within demolition areas, and replacing them after construction, if applicable. 3. Removing and properly disposing of demolished materials and construction debris from the site unless specifically noted otherwise. 4. Removing materials as the work progresses. Upon completion of daily work, leave areas in a clean condition. 5. Removing temporary work. 4-0 WORK SCHEDULE Prior to access to the Police Department building, all Contractor employees working in and around the buildings must submit names and have proper identification at least 24 hours in advance to gain access to the buildings. Contractor shall be responsible for including in the final work plan a workable construction schedule that incorporates the following conditions: 1. The schedule for the Fire Station #1 work is subject to the approval of the Public Works Department and the Fire Department. 2. All work shall take place Monday through Thursday between the City Hall hours of 7:00 am and 4:00 pm unless previously approved by the Public Works Director and Fire Department for any other day of the week. 3. The Contractor shall coordinate all inspections and final sign -offs for permits and the project with Public Works Department and Building Safety staff. 5-0. STANDARDS Section 0-1 on page II -B-1 of these Specifications is supplemented by the following additional requirements: 1. All work shall be 2015 Standards Specifications for Public Works Construction (SSWPC) unless otherwise shown on the plans, technical specifications, or as specified herein. Submittal of a bid will be evidence that the Contractor is familiar and knowledgeable about these specifications. 2. Strict compliance with State and local safety codes will be enforced. 6-0. EXAMINATION OF JOB SITE The BIDDER shall make a detailed physical inspection of the site before submitting his proposal. It is understood that the BIDDER is satisfied regarding existing conditions and existing access conditions which may affect bid prices for the proposed work. 7-0. INS PEC'I"l ON Section 4-1.3 on page II -B-9 of these Specifications is supplemented by the following additional requirements: III -A-4 Agreement No. 5656 1. On all questions relating to quantities, the acceptability of material, or work, the execution, progress or sequence of work, and the interpretation of specifications or plans, the decision of the Engineer is final and binding, and shall be precedent to any payment under the Contract. 2. All work and materials are subject to inspection and approval of the Engineer. 3. Legible copies of material/weight certification shall be turned over to the inspector on a daily basis. 4. Inspection of the work shall not relieve the Contractor of the obligations to fulfill all conditions of the Contract. 8-0 USE i. F PRIVATE PROPERTY The use of any private property by the Contractor is prohibited, unless written approval is obtained from the City owner and the property owner. The prohibited uses include, but is not limited to the, Contractor's use of water, electricity or natural gas from private property, storage of material or equipment, and turning around/ parking of his vehicles on private property. 9-0. S"T"ORAGE OF MATERIALS AND EOUIPMEN"T° 1. No material or equipment shall be stored in public right-of-way without prior approval from the Public Works Department. 2. The Contractor shall be responsible for obtaining a site for storage of material and equipment. The site shall not be within or adjoining the residential areas of the City. Site shall be subject to approval by the City. 3. The sites for stockpiling and batching materials shall be clean and free from objectionable material. 4. The City does not have nor does guarantee any designated property within the City for storage of materials. 5. If the Contractor finds a private property for storage of his materials, the Contractor shall furnish the City a letter of approval and a letter of release (at the end of the job and cleanup of the storage site) from the property owner for this purpose. 6. The Contractor shall adhere to Best Management Practices and NPDES requirements to protect the City right-of-way and storm drain system during construction. 7. Deliver all materials in their original containers with seals unbroken and manufacturer's label and product identification clearly legible on each package. 8. Store all un -containerized materials at the site under adequate cover, maintaining them in a dry condition until ready for use. 10-0. DISPOSAL OF REMOVAI...S All removed roof materials shall become the property of the Contractor. Materials shall be legally discarded away from the site of work. III -A-5 Agreement No. 5656 Note: There are no authorized dump facilities within the City of El Segundo. 11-0. tJAL,1'VY ASSURANCE Contractors shall exercise due care to assure procurement, storage and placement of materials form site or offsite sources which will comply with the requirements, specifications and standards set out herein. Contractor may, at his discretion, have such tests and inspections as he may desire performed by qualified personnel or independent testing services, for his guidance and control of the work. 12-0. COMPLETION Upon completion of work at each site, the Contractor shall conduct careful inspection with the City Inspector and shall correct all defective work to the satisfaction of the Owner. The Contractor shall coordinate all inspections and final sign -offs for Encroachment Permits and Building Permits with City staff. All scrap, litter and debris resulting from operations specified herein, shall be removed and the premises left in a clean and satisfactory condition. 13-0. WARRANTY The Contractor and/or manufacturer shall warrant all work performed under this Contract for a period of two years from the date of Owner's acceptance of completed job. Any defects in materials or workmanship appearing during this period shall be corrected without cost to the City. - END OF SECTION - 111-A-6 Agreement No. 5656 SECTION IV — MEASUREMENT AND PAYMENT 1-0 BID ITEMS Proposed Bid prices shall be complete for each bid item. All bid items shall cover the costs for all mobilization, construction, and demobilization activities required for each item. Prior to construction, the Contractor shall verify all listed quantities and bring any discrepancies to the City's attention. Pavinent will be made to the COINTIZACTOR lased on contract Unit bid Iaricesv..... CONTRACTOR slUall submit invoices for pavinent based on actual measut•ed anj co,11) 2Ic�lguant.ities. Fire Chief Bathroom 1-1 Base Bid Item 1. Measurement and payment for the removal and disposal of all existing tile, sinks, fixtures, and unnecessary plumbing components, and removal of existing light fixtures, lockers, mirrors, and tiles, and all demolition necessary in the bathroom will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-2 Base Bid Item 2. Measurement and payment for the conipl to installation of the Fire Chief's bathroom per these specifications. This includes procurement and installation of all materials, including toilet, light fixtures, ceiling fan, shower tiles, wall tiles, floor tiles, sink, countertop, mirror, lockers, shower door, shower waterproofing, shower faucet, shower shampoo nook, and installation of soap & paper towel dispensers. Repair of any miscellaneous pipe, elbows, couplings, and plumbing components, is also included under this line item, including rerouting the condensation pipe to the existing downspout near the Battalion Chiefs bathroom. This item will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. Battalion Chief Bathroom 1-3 Base Bid Item 3 Measurement and payment for the removal and disposal of all existing tile, sinks, fixtures, and unnecessary plumbing components, and removal of existing light fixtures, lockers, mirrors, and tiles, and all demolition necessary in the bathroom will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-4 Base Bid Item 4. Measurement and payment for the removal and replacement of drywall for the investigation of water damaged wall and material, and treatment for mildew as needed, will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-5 Base Bid Item 5. Measurement and payment for the eoinLLIete installation of the Fire Chief's bathroom per these specifications. This includes procurement and installation of all materials, including toilet, light IV -A-1 Agreement No. 5656 fixtures, ceiling fan, shower tiles, wall tiles, floor tiles, sink, countertop, mirror, lockers, shower door, shower waterproofing, shower faucet, shower shampoo nook, and installation of soap & paper towel dispensers. Repair of any miscellaneous pipe, elbows, couplings, and plumbing components, is also included under this line item, in addition to repairing the valve behind the wall (adjacent to the toilet). This item will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. Battalion Chief Dorm 1-6 Base Bid Item 6. Measurement and payment for the removal of three (3) wooden lockers in the Battalion Chief bedroom, removal of wallpaper throughout the room, repairs to drywall behind lockers and as needed throughout the room, and painting repaired walls (all to a level 4 finish) will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-7 Base Bid Item 7. Measurement and payment for the removal of existing carpet and installation of new carpet in the Battalion Chief bedroom, will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. Captain's Dorm / New Office Space 1-8 Base Bid Item 8. Measurement and payment for the removal of three (3) wooden lockers in the Fire Chief bedroom, repairs to drywall behind lockers, removal of wallpaper throughout room, framing in existing door frame to bathroom (including frame and drywall), and painting all walls will throughout room (all to a level 4 finish), will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-9 Base Bid Item 9. Measurement and payment for the removal of existing carpet and installation of new carpet in the Battalion Chief bedroom, will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-10 Base Bid Item 10. Placeholder only. Miscellaneous improvements as determined by the Engineer as necessary. Actual payment to be agreed upon by both the Engineer and the Contractor at time of construction. 2-0. PROGRESS PAYMENTS -� �..................................._WWW..... Lump sum items shall be billed on a percentage completed basis. The City reserves the right to request a schedule of values to be submitted by the Contractor for any bid item in order to determine payment for work completed. IV -A-2 Agreement No. 5656 Unit cost items shall be billed on a units -completed basis. Work that is not completed cannot be submitted for billing. The Contractor is encouraged to submit invoices with ample time for City staff to process an invoice. Processing time includes City staff time to inspect and verify lump sum percentage completed and units completed for bid items. [V -A-3 Agreement No. 5656 SECTION "tip' — TECHNICAL St''ECIF1CATIONS SECTION 01110 DESCRIPTION OF WORK 01110-1 -GENERAL 1.1 Summary A. The work to be done under this Contract includes the furnishing of project management, labor, materials, tools and equipment for the construction of the Fire Station #1 Chiefs' Living Quarters Improvements project for the City of El Segundo, all in accordance with the Contract Documents and Plans. 1.2 Project Identification A. The project name is "Fire Station #1 Chiefs' Living Quarters Improvements Project". B. Fire Station #1 is located at 314 Main Street, El Segundo, CA 90245. C. Refer to Section III, Special Provisions, of the Contract for requirements related to work schedule, mobilization, standards, and other general requirements. 1.3 Scope of Work (Base Bid) A. Construction of Bathroom #1 — Chief's Bathroom shall include, but is not limited to, the following: 1. Remove existing sink and countertop. a. Furnish and install new quartz countertop — GQ Quartz Frozen Leaf (GQB-009)*. Countertop shall have a mitered edge and drop apron (approx. 6"). b. Install GFCI outlet near sink, and as required per current code. c. Remove soap dispensers, paper towel dispensers, toilet paper holders, seat protective covers, and other appurtenances in the bathroom. 2. Remove existing toilet. a. Furnish and install new toilet —Kohler Santa Rosa 1 -piece, white. 1 Bathroom tiles — existing shower tiles, wall tiles, and floor tiles shall all be removed. a. New floor tiles: Penny round CC Mosaics— Matte Grey (UFCC 116- 12M)*. *Product may be purchased at Golden State Stone in Hawthorne, CA. TECHNICAL SPECIFICATIONS V -A -I Section 01112 (Description of Work) City of EI Segundo Agreement No. 5656 b. New shower tiles: 3"x12" polished glass smokey grey*. Shower tiles shall be floor to ceiling in height. c. New wall tiles: 3"x12" polished glass smokey grey*. Wall tiles outside of shower area shall be 3.5 -feet tall and have a Jolly Edge Trim 5/16" Schiene Bright Chrome (schluter edge). 4. In the shower: a. Contractor shall remove and replace all waterproofing membrane before installing green backer board, waterproofing system, and new tiles. b. The shower valves shall be replaced. New shower hand faucets and overhead shower head shall be installed — Chicago Faucet shall be used. The shower head shall be a detachable shower head that can also be used as a hand held showerhead. c. A shampoo nook shall be constructed as part of the project. d. New trap primer in the floor drain. e. The HVAC pipe that enters the bathroom from the ceiling shall be relocated. tt ++,The pipe shall be rerouted to an existing downspout near the Battalion Chiefs bathroom. The pipe will be 30 -feet in length in a straight shot from the existing unit to the downspout. The new pipe may be PVC. Remove existing shower door. Furnish and install new shower door. Shower door shall be a frameless, glass shower door, min. 3/8 -inch thick. 6. Remove existing locker. Replace with updated locker in phenolic or solid surface material, WilsonArt, Asian Night (7949K), or similar. Locker may be the same shape and size as the existing locker. 7. Remove existing overhead lighting fixture above the sink. Replace with new recessed lights. Recessed lights shall be energy efficient LED lights and be suitable in a wet / moist environment. a. Min. of 2 lights shall be installed above the sink. b. One new LED light shall be installed in the shower stall. Existing light to be removed. Remove existing mirror. Furnish and install new mirror. 9. Where drywall is exposed, including ceiling, paint walls — Swiss Coffee — Semi -gloss. Exposed walls shall be level 4 finish. TECHNICAL SPECIFICATIONS V—A-2 Section 01112 (Description of Work) City oFEI Segundo Agreement No. 5656 10. Remove existing fan grilles and fan. Furnish and install a new fan with a higher horsepower and minimum 90 CFM. When in operation, fan shall be silent/unnoticeable. 11. Attic crawl space cover shall be removed. Furnish and install new attic crawl space cover, painted to match the ceiling color. 12. Remove existing hardware on existing pocket sliding doors. Provide new, functioning hardware on door to the Chief's bedroom. B. Construction of Bathroom #2 —Battalion Chief Bathroom shall include, but is not limited to, the following: Remove existing sink and countertop. a. Furnish and install new quartz countertop — GQ Quartz Frozen Leaf (GQB-009)*. Countertop shall have a mitered edge and drop apron (approx. 6"). b. Install GFCI outlet near sink, and as required per current code. c. Remove soap dispensers, paper towel dispensers, toilet paper holders, seat protective covers, and other appurtenances in the bathroom. 2. Remove existing toilet. a. Furnish and install new toilet —Kohler Santa Rosa 1 -piece, white, 3. Bathroom tiles — existing shower tiles, wall tiles, and floor tiles shall all be removed. a. New floor tiles: Penny round CC Mosaics — Matte Grey (UFCC 116- 12M)*. b. New shower tiles: 3"x12" polished glass smokey grey*. Shower tiles shall be floor to ceiling in height. c. New wall tiles: 3"x12" polished glass smokey grey*. Wall tiles outside of shower area shall be 3.5 -feet tall and have a Jolly Edge Trim 5/16" Schiene Bright Chrome (schluter edge). 4. In the shower: a. Contractor shall remove and replace all waterproofing membrane before installing green backer board, waterproofing system, and new tiles. b. The shower valves shall be replaced. New shower hand faucets and overhead shower head shall be installed — Chicago Faucet shall be TECHNICAL SPECIFICATIONS V -A-3 Section 01112 (Description of Work) City or El Segundo Agreement No. 5656 used. The shower head shall be a detachable shower head that can also be used as a hand held showerhead. c. A shampoo nook shall be constructed as part of the project. d. New trap primer in the floor drain. 5. Remove existing shower door. Furnish and install new shower door. Shower door shall be a frameless, glass shower door, min. 3/8 -inch thick. 6. Along the south wall of the shower (adjacent to the toilet), a water valve behind the wall shall be exposed, and replaced. Previous investigations indicated there may be rust on the valve. 7. On the north wall of the bathroom and shower, expose the interior of the wall (i.e. remove the drywall) and investigate damage caused by water intrusion. Mitigate as needed, which may include using KILZ or other mildew resistant finish or mildew remediation as needed. 8. Remove existing overhead lighting fixture above the sink. Furnish and install new recessed lights. Recessed lights shall be energy efficient LED lights and be suitable in a wet / moist environment. a. Min. of 2 lights shall be installed above the sink. b. One new LED light shall be installed in the shower stall. Existing light to be removed. 9. Remove existing mirror. Furnish and install new mirror. 10, Where drywall is exposed, including ceiling, paint walls — Swiss Coffee — Semi -gloss. Exposed walls shall be level 4 finish. 11. Remove existing fan grilles and fan. Furnish and install a new fan with a higher horsepower and minimum 90 CFM. When in operation, fan shall be silent/unnoticeable. 12. Attic crawl space cover shall be removed. Furnish and install new attic crawl space cover, painted to match the ceiling color. C. Battalion Chief Dorm Remove/demolish three (3) lockers. 2. P P l I s b h 4 e4`M. , ' ng--g�A4 3. Remove wallpaper throughout the room. TECHNICAL SPECIFICATIONS V -A-4 Section 01112 (Description of Work) City of El Segundo Agreement No. 5656 2-4. Repaint and repair walls throughout the room — Swiss Coffee (eggshell). Walls shall be a level 4 finish. 3-S. Remove all existing carpet within the limits of the room. Furnish and install carpet throughout the room (Shaw carpet tiles — color to be selected by the City). D. Captain's Dorm / New Office Space 1. Remove/demolish three (3) lockers. 2. Remove pocket door to Jack and Jill bathroom. Frame in, insulate, drywall, prep, and paint the location. Use Swiss Coffee (eggshell) paint. Walls shall be a level 4 finish. 3. Remove wallpaper throughout the room. 4. Repaint and repair walls throughout the room. Walls shall be a level 4 finish. 5. Remove all existing carpet within the limits of the room. Furnish and install carpet throughout the room (Shaw carpet tiles — color to be selected by the City). 1.4 Protection of the Facility A. Cover fire detectors, HVAC air intake, and fans to prevent dust and debris from leaving the work area. B. Protect the flooring around works areas and in traveled paths to minimize dust / debris from leaving the work area. C. Equipment and materials to be removed at the end of each day as to maintain a neat, safe area. D. Only one bathroom can be demolished at a time. After the first bathroom has been completed, work may begin on the other bathroom. E. Work may not begin on the bathrooms until all materials have been Drocured and onsite, readv for installation. All submittals must be approved by the engineer and fire department before work may proceed. . Contractor shall submit to the City samples of all products for approval. Contractor shall also submit a realistic schedule of the work to be done for approval. END OF SECTION 01110 TECHNICAL SPECIFICATIONS V—A-5 Section 01112 (Description of Work) City oFEI Segundo SECTION 01045 CUTTING AND PATCHING 01045-1 – GENERAL Agreement No. 5656 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services for cutting, patching and finishing required to complete the modifications required by the Plans, Technical Specifications, and Standard Details, including without limitation: A. Inspect existing conditions, both before and during the performance of work. B. Request information when unforeseen conditions are encountered before proceeding with work. C. Patch and refinish existing visible surfaces after the removal of existing items. D. Removal and reinstallation, or replacement, of existing moldings, trim, casing, etc. E. Cutting required for the proper installation of new mechanical systems. F. Termination and sealing off of smoke holes, exhaust ducting, and other penetrations in the shell of the structure. 01045-2 —EXECUTION 2.1 Inspect existing conditions of the building, both before and during the performance of work, with special attention to elements subject to damage or to movement during cutting and patching and conditions affecting the installation of products or the performance of work. Unsatisfactory or questionable conditions must be identified in a Request for Information (RFI) in accordance with the Special Provisions. 2.2 Provide adequate temporary support as necessary to assure the structural value or integrity of the affected portion of the work. 2.3 Provide devices and methods to protect other portions of the project from damage. 2.4 Provide protection from the elements for that portion of the project which may be exposed by cutting and patching work. 2.5 Execute cutting and removal by methods which will prevent damage to other work and adjacent surfaces and will properly prepare surfaces to receive installation of repairs and new work. 2.6 Execute fitting and adjustment of products to provide a finished installation to comply with specified products, functions, tolerances, and finishes. 2.7 Restore work that has been improperly cut or removed; install new products to provide completed work in accordance with requirements of Contract documents. TECHNICAL SPECIFICATIONS V -A-6 Section 01045 (Cutting and Patching) City of EI Segundo Agreement No. 5656 2.8 Fit work tight to pipes, sleeves, ducts, conduit, outlet boxes, and other penetrations through surfaces. 2.9 Holes remaining after removal of old hardware must be filled, sanded smooth, primed, and painted to match adjacent surfaces. 2.10 The Contractor must remove existing moldings, trim and any other surface mounted items when necessary to properly install tile and other work related items. After the installations are completed the Contractor must reinstall all removed items i.e. trims, moldings, hardware, etc. after re -finishing to a smooth and blemish -free condition. If removed items cannot be properly reinstalled new materials must be supplied and installed. Exception must be the new hardware required for new acoustic doors. Refer to section 08713. All areas of demolition must be covered, patched or refinished to provide an acceptable appearance. 2.11 Repair and refinish entire surfaces as necessary to provide an even finish to match adjacent finishes to the satisfaction of the City: A. For continuous surfaces such as plaster or dry wall, repair or refinish to a natural break in the surface or to the nearest intersection. For an assembly refinish the entire unit. B. Acoustic plaster ceilings must be patched and refinished so that the area of work matches existing adjacent surfaces and materials. END OF SECTION 01045 TECHNICAL SPECIFICATIONS V—A-7 Section 0 104 (Cutting and Patching) City of EE Segundo Agreement No. 5656 SECTION 06400 CUSTOM CASEWORK 06400-1 — GENERAL 1.1 Provide wood, nails, screws, and other items as needed, and perform fabrication and installation of work, including without limitation: A. Cabinets, shelving and/or drawers made from phenolic materials. B. Countertops. C. Sinks and faucets. 1.2 Submittals A. Shop drawings showing list of materials, sizes, sections, elevations, construction details, hardware, assembly and installation in locations indicated on the Drawings. 1.3 References A. SEFA 3 Recommended Practices. B. Woodwork Institute C. American Woodwork Association, Section 400. D. Woodwork Institute of California, Manual of Millwork, current edition. 1.4 Qualifications A. Installer to have experience fabricating phenolic casework. 1. Installer to provide a list of previous projects where they have supplied cabinets and casework made of phenolic panels. 06400-2 — PRODUCTS 2.1 Materials A. Phenolic Cabinets, Shelving, and Drawers 1. The design of the custom casework is based on solid surface panels manufactured by WilsonArt, Asian Night (7949K), or equal, as a standard of qualify. 2. Cabinet Finish Hardware TECHNICAL SPECIFICATIONS V -A-8 SECTION 06400 (Custom Casework) City of EI Segundo Agreement No. 5656 a. Hardware shall be furnished and installed as required to provide a complete casework installation. Finish to be brushed stainless steel or approved as approved by the City. b. Hardware manufacturers shall be Stanley, Corbin, or equal. c. Miscellaneous hardware including, but not limited to the following: spikes, bolts, screws, lags, shields, straps, angles, cleats and other related items for fabrication and installation. B. Undermount sinks shall be American Standard rectangular undermount sink, front overflow, and built-in strainer (model 0614.000), or approved equal. C. Faucets shall be Chicago Faucets, deck mounted with 4" fixed centers, concealed hot & cold sink faucets, or approved equal. D. Countertop shall be GQ Quartz Frozen Leaf (GQB-009), slab with mitered 6" edge. 2.2 Construction A. Phenolic Cabinets, Shelving, and Drawers I . The cabinet shall incorporate full overlay design in which posts and rails are concealed behind the doors and drawer heads. The door and drawer heads shall create a .125" horizontal reveal. There shall be a .0625" vertical reveal at the edge of each cabinet creating a.125" vertical reveal at the end of each cabinet when two cabinets are set in place next to each other. 2. Component Thickness Schedule a. Cabinet sides and bottoms: 0.5" (13mm) b. Door and drawer heads: 0.5" (13mm) c. Horizontal rail supports: 0.5" (13mm) d. Cabinet backs: 0.31 " (8mm) e. Wall cabinet backs: 0.25" (6mm) f. Cabinet shelves: 0.5" (13mm) g. Work surfaces: As specified on drawings or by Architect. 3. Sectional units, cabinets and cases to be located on the floor shall be equipped with leveling devices that are easily adjustable, to compensate for unevenness in the floor. 2.3 Other Materials TECHNICAL SPECIFICATIONS V -A-9 SECTION 06400 (Custom Casework) City of EI Segundo Agreement No. 5656 A. All other materials, anchorages and accessories not specifically described but required for a complete and proper installation of solid phenolic custom casework, as recommended by the manufacturer, subject to the approval of the City. 06400-3 — EXECUTION 3.1 Fabrication A. Required prior to fabrication, Contractor to take field measurements and report any discrepancies to the City between the Contract Drawings and job conditions. Coordinate with other trades for locations of backings and supports. Inspect all backings and supports with the Inspector prior to covering the walls. Show all recorded measurements on the final shop drawings. B. Shop fabricate cabinetry units and countertops as complete sections of adequate size to permit easy handling, access to installation areas for assembly or required for setting in place and installing of closing pieces and components. C. Make holes and/or cutouts necessary for mechanical work to be incorporated into the countertops as necessary. D. Sink cut outs must be sealed with a water resistant sealer before sink rim is installed. E. A color matched waterproof caulk shall be used at all square butt joints including splashes and return ends. Caulking shall not exceed 1/16 inch. Refer to section 07900 of these specifications. F. All work, not true to line, not in satisfactory operating condition, improperly installed, damaged or marred will not be accepted. Remedy, remove or replace defective work to the satisfaction of the City at no added cost to the City. G. Casework hardware to be installed by the casework manufacturer in accordance with industry standard. 3.2 Installation A. All grounds, backing, blocking, furring, structural support, and other anchorages required for countertop installation which become integral part of the floor, wall, and partitions shall be in place ready to receive the countertop. Countersink and plug screw anchors. All fasteners to be concealed. B., Correct any job conditions that are detrimental to timely and proper installation of cabinetry and countertops. Do not proceed until detrimental job conditions have been corrected. C. Install countertop in locations noted on the Contract Drawings, in plumb, square and in aligned position with walls. TECHNICAL SPECIFICATIONS V -A-1 0 SECTION 66400 (Custo'n Casework) City of El Segundo Agreement No. 5656 D. Fit hardware according to the manufacturer's specifications. Install hinges and drawer guides according to the recommendations of the manufacturer. 3.3 Clean -Up A. The Contractor must keep his work, and the adjacent areas, clear and free of all debris. During and on completion of the work each day, remove from the building and the site all debris, unused materials, and equipment and leave work in a clean, acceptable condition as part of the modification work. END OF SECTION 06400 TECHNICAL SPECIFICATIONS V -A-11 SECTION 06400 (Custom Casework) City of El Segundo SECTION 07900 SEALANT 07900-1 GENERAL Agreement No. 5656 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services to install sealant, including without limitation: A. Provide manufacturer's data for all sealant materials that are proposed in accordance with the Special Provisions. B. Properly prepare affected areas for the installation of new products. C. Assure that only products meeting or exceeding the requirements of the Contract Documents are utilized and installed. 07900-2 — PRODUCTS 2.1 At all exterior joints, provide one part polyurethane conforming to Federal Specification TT -S -00230C Type I1 Class A, Sikaflex-la or approved equal that has non -yellowing properties. 2.2 At all interior joints, provide water dispersed, acrylic latex caulk. 2.3 Sealant color must match or be harmonious with adjacent surfaces. 07900-3 — EXECUTION 3.1 Clean all spaces to be sealed. Remove all mortar, dust, or debris. Degrease with approved thinner or solvent where necessary. Joint cleaning must immediately precede filling and sealing to avoid re -accumulation of dust, etc., in joints. 3.2 All sealant must be installed by experienced persons and in strict accordance with manufacturer's instructions. All materials used in association with sealant must meet the requirements set forth in the sealant manufacturer's published literature. Smears, gaps, ridges, etc. are not allowed. 3.3 Apply by gun with cartridge nozzle cut to width of joint where possible. Fill joint completely, making sure sealant is forced against sides to insure intimate contact. 3.4 All sealant must be tooled to a smooth, uniform appearance. Tool must be dampened with slicking agent recommended by manufacturer in order to compress sealant against sides of joint and eliminate any air pockets. 3.5 Sealant depth must be a minimum of 1/4 -inch. Where joints are wider than 1/8 -inch, backer rod must be provided. 3.6 At completion of each run of sealing, clean margins of joint and adjacent areas with specified cleaning agent. Leave the work free of sags, smears, droppings, or any other defects. END OF SECTION 07900 TECHNICAL SPECIFICATIONS V -A-12 SECTION 07900 (Sealant) City of El Segundo SECTION 09200 FINISHES 09200-1 - GENERAL Agreement No. 5656 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services to complete finish work, including without limitation: A. Paint must be defined as any pigmented, clear, or stain finish that is required by existing conditions. B. Painting must include the painting of new surfaces (except aluminum, vinyl, new hinges, or other door hardware, or factory pre -finished materials) that are part of this work, the painting of existing surfaces to the extent necessary to blend them into the new work, and painting complete interior. C. Finish hardware must not be painted unless otherwise specified. 1.2 Definitions: U.V.I. - Ultraviolet Inhibitors V.O.C. - Volatile Organic Compounds 09200-2 - PRODUCTS 2.1 Paint, stains and clear finishes must be as manufactured by Dunn -Edwards, Benjamin - Moore, Frazee or equal as approved by the City. 2.2 Finish materials must be furnished in the manufacturer's original, standard, sealed containers that legibly show the designated name, formula, or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name of manufacturer. Materials not displaying the manufacturer's standard identifying label or materials bearing labels not exhibiting the foregoing information may be subject to rejection. 2.3 Undercoat material must be the product of the same manufacturer as the finish coat. Only the thinners recommended by the manufacturer must be used and then only to the recommended limits. Insofar as practicable, undercoat, finish coat, and thinner material must be parts of a unified proprietary finish system. 09200-3 - EXECUTION 3.1 All surfaces which require a painted, stained finish as specified on the plans must be smooth and free of defects before starting work. 3.2 A minimum of one primer coat and two finish coats must be applied to applicable work so that show -through of base finish is prevented. Drips, brush marks, roller pebbling, etc., will not be accepted. Open or empty paint or solvent containers must not be left TECHNICAL SPECIFICATIONS V -A-13 SECTION 09200 (Finishes) City of EI Segundo Agreement No. 5656 on the job at the end of the working day. Where painting the complete interior of one or more rooms is indicated, this must refer to all painted surfaces, including without limitation all walls, ceilings, door and window casings, doors, closets and cabinets. 3.3 Contractor will provide the City with paint color samples for the City's review and approval before work is to be started. Contractor will provide the City with one additional gallon of paint of the same color and type for the City's use, in addition to any remaining paint materials. 3.4 Materials Preparation Finishing materials must be prepared for use in strict accordance with the manufacturer's recommendations as approved. Material not in actual use must be stored in tightly covered containers. Containers used in storage, mixing, and application of paint must be maintained in a clean condition, free from foreign materials and residue. Materials must be stirred before application to produce a mixture of uniform density, as required during the application of materials. Any film which may form on the surface must be removed. If necessary, the material must be strained before using. Packaged paint may be thinned immediately before application where necessary to suit conditions of surface, temperature, weather, and method of application with not more than one pint of suitable thinner per gallon. The use of thinner must not relieve the Contractor from obtaining complete hiding of underlying materials. Paints of different manufacturers must not be mixed. 3.5 The requirement to paint, stain, or clear finish any surface, must include, but not be limited to, the following items: A. Dirt, dust, flaking or loose paint must be removed from all wall surfaces, trim, facias, eaves, door and window frames, and other similar surfaces so that new finishes will properly adhere. Sandblasting must not be allowed. B. Cracks, gaps and other damaged areas must be filled with a filler that is formulated for this purpose at interior surfaces. C. Apply at least one coat of primer to areas where bare substrate has been exposed or where filler has been applied. 3.6 Miscellaneous Painting and Stain Paint, stain, or clear finishes on surfaces damaged by the performance of the work must be repaired with materials of same type and color. If, in the opinion of the City, satisfactory repair cannot be made, refinish entire surface; the decision of the City as to quality of repair must be final. 3.7 Clean -Up The Contractor must keep the work and the adjacent areas clear and free from all debris. During and on completion of the work each day, remove from the building and the site TECHNICAL SPECIFICATIONS V -A-14 SECTION 04200 (Finishes) City of EI Segundo Agreement No. 5656 all debris, unused materials and equipment, and leave work in a clean condition that is acceptable to the City. Paint, stains, and all other unwanted paint marks must be completely removed and any resulting damage must be repaired. Existing unpainted surfaces must not be painted; paint, stains, and all other unwanted paint marks on such surfaces must be completely removed. END OF SECTION 09200 TECHNICAL SPECIFICATIONS V-A- 15 SECTION 09200 (Finishes) City of EI Segundo SECTION 09250 GYPSUM WALLBOARD 09250-1 — GENERAL Agreement No. 5656 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services to install gypsum wallboard, including without limitation: A. Provide and install all metal studs, drywall, wall insulation batts, sound deadening board, plaster, and stucco for patching and filling required as part of the modification work. Work must include all accessories and trim and duct. B. Painting must be as specified in Section 09200. 09250-2 — PRODUCTS 2.1 Moisture and mold -resistant gypsum wallboard must be 5/8" thick tapered edge gypsum wallboard. 2.2 Interior plaster, where required, must be gypsum plaster mixed in accordance with Chapter 47 of the latest applicable California Building Code. 2.3 Ceramic tile backer board. 09250-3 EXECUTION 3.1 Interior drywall and plaster must be applied in an acceptable manner. Interior drywall or plaster must be smooth or textured to match existing finishes and ready to receive paint. 3.2 Install ceramic tile backer board where necessary in an acceptable manner. 3.3 Existing electrical switches, outlets, etc., must be re -installed flush with the surface of a new secondary wall so that the modified installation is similar to the previously existing installation. 3.4 Work must include all necessary accessories and trim. Install metal edge trim whenever edge of gypsum wallboard would otherwise be exposed or semi -exposed. Provide type with face flange to receive joint compound. Install L -type trim where work is tightly abutted to other work. Install U -type trim where edge is exposed, revealed, gasketed, or sealant -filled (including expansion joints). 3.5 Clean -Up The Contractor must keep his work, and the adjacent areas, clear and free of all debris. During and on completion of the work each day, remove from the building and the site all debris, unused materials, and equipment and leave work in a clean, acceptable condition as part of the modification work. END OF SECTION 09250 TECHNICAL SPECIFICATIONS V -A-16 Section 04250 (Gypsum Wallboard) City of El Segundo SECTION 09300 CERAMIC TILE 09300-1 - GENERAL Agreement No. 5656 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services to install ceramic tile work indicated, including: A. Mosaic the and glazed wall tile. 1.2 Material, installation and workmanship shall conform to the Tile Council of America Specifications as follows: A. Glazed Ceramic Tile: A137.1. B. Ceramic Tile Institute: "Standards of the Tile Trade." 1.3 Submittals Catalog cuts of all ceramic tile must be submitted for review before work is started. Product data will be submitted for Portland cement, hydrated lime, sand, and grout material before work is started. 09300-2 - PRODUCTS 2.1 Portland cement to be ASTM C 150, type I or II. 2.2 Hydrated Lime to be ASTM C207, type S, high -calcium type. 2.3 Sand to be ASTM C144, clean, washed, sharp and fine aggregates. 2.4 Grout material shall be Hydroment Dry Tile Grout by Bostik Construction Products, Sno-Brite Grout by Technical Adhesives, Inc., or approved equal. 2.5 Wall Tile — 3"x12" polished glass smokey grey. Wall tiles outside of shower area shall be 3.5 -feet tall and have a Jolly Edge Trim 5/16" Schiene Bright Chrome (schluter edge). Note: this product is available at Golden State Stone in Hawthorne, CA. 2.6 Floor Tile — Penny round CC Mosaics — Matte Grey (UFCC I 16-12M). Note: this product is available at Golden State Stone in Hawthorne, CA. 2.7 Shower Floor Tile — 3"x12" polished glass smokey grey. Shower tiles shall be floor to ceiling in height. Note: this product is available at Golden State Stone in Hawthorne, CA. 09300-3 - EXECUTION 3.1 Tile to be symmetrical, avoid small cuts. No tile to be cut to a length or width less than 2 of the full length or width of the tile. Rub cuts smooth with a fine stone. Corners TECHNICAL SPECIFICATIONS V -A-17 Section 09300 (Ceramic Tile) City of El Segundo Agreement No. 5656 and lines will be straight and true. Straight joint patterns on walls and floor joints will be paralleled to walls. 3.2 Mortar setting bed for tile to be installed on a vertical surface to be 1 part Portland cement, 2 to 1 part hydrated lime, and up to 7 parts damp sand, by volume. Mortar setting bed for floor tile to be 1 part Portland cement and 6 parts damp sand, by volume with the addition of hydrated lime being permissible in a quantity not exceeding 10 percent of the cement content. Mortar for shower stall to be l part waterproof Portland cement and 4 parts damp sand, by volume. 3.3 Apply wall setting beds not sooner than 24 hours after application of scratch coat in areas to be tiled. 3.4 Make floor tile flush and hairline with adjoining surfaces and/or tile divider strips. Tile to have a "zero' grout line at all locations of installation. 3.5 Divider strips are required at the edge of tile floors at all doors and openings where material of floor finish or covering is different on each side of the opening, unless otherwise indicated or specified. Divider strips will be installed prior to placing mortar setting bed. 3.6 Floor tile joints shall be aligned and parallel to walls. Butt joints are required between tile and divider strips. Make joints flush and hairline. 3.7 Warranty All materials, apparatus, and equipment furnished and installed must be new and free from all defects. Should any problems develop or the system becomes inoperable within one (1) year from date of final acceptance of the work, due to faulty or inferior material and/or workmanship, the Contractor must correct the problems without any additional expense to the City. 3.8 Clean -Up Remove mortar and grout prior to hardening during progress of work. Clean surfaces thoroughly after grouting and pointing have set sufficiently. Remove all cement, dust and other foreign matter with plain water or mild alkaline cleaner. Sandblasting of exposed surfaces is prohibited. Contractor must keep his work, and the adjacent areas affected, clear and free of all debris. During, and on the completion of the work, remove from the building and the site all debris, unused materials and equipment, and leave work in a clean, acceptable condition. END OF SECTION 09300 TECHNICAL SPECIFICATIONS V -A-18 Section 04300 (Ceramic Tile) City oFEI Segundo Agreement No. 5656 SECTION 15050 BUILDING PLUMBING PIPING (Design -Build) 15050-1 - GENERAL 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services basic mechanical materials and methods including without limitation: A. Piping materials and installation instructions common in most piping systems. B. Cutting and patching. C. Touch-up paint and finishing. 1.2 Submittals Product data for all pipe, fittings, couplings, etc. to be submitted before work is started. 15050-2 - PRODUCTS 2.1 Copper tube per ASTM B88, Types K and L, water tube, drawn temper. 2.2 Pipe fittings, couplings, etc. per ASME B 16 specification. 2.3 Wire solder only. Paste mixed solder not permitted. 2.4 Pipe escutcheons to be cast -brass or stamped -steel, with set -screw. 15050-3 — EXECUTION 3.1 Remove and reinstall any pipe, fittings, couplings, etc. that is deemed to be in poor working condition. Contractor to obtain City approval prior to removing any existing pipe, fittings, couplings, etc. 3.2 Install pipe, fittings, couplings, etc. for new undermount sinks, and fixtures as necessary as part of the project work completion. New plumbing to be design -build. 3.3 Install pipe escutcheons for pipe penetrations of concrete and masonry walls, wall board partitions, and suspended ceilings. Pipe escutcheons will closely fit around pipe and completely cover the opening. 3.4 See plumbing fixture specifications for more information regarding new fixtures. 3.5 Warranty All materials, apparatus, and equipment furnished and installed must be new and free from all defects. Should any problems develop or the system becomes inoperable within one (1) year from date of final acceptance of the work, due to faulty or inferior TECHNICAL SPECIFICATIONS V -A-19 Section 15050 (Building Plumbing Piping) City of EI Segundo Agreement No. 5656 material and/or workmanship, the Contractor must correct the problems without any additional expense to the City. 3.6 Clean -Up Contractor must keep his work, and the adjacent areas affected, clear and free of all debris. During, and on the completion of the work, remove from the building and the site all debris, unused materials and equipment, and leave work in a clean, acceptable condition. END OF SECTION 15050 TECHNICAL SPECIFICATIONS V -A-20 Section 15050 (Building Plumbing Piping) City of El Segundo SECTION 16180 WIRING DEVICES (Design -Build) 16180-1 - GENERAL Agreement No. 5656 1.1 The work of this section includes the furnishing of all labor, materials, equipment and services to install a GFCI type receptacle and recessed lighting indicated on the Contract Drawings and as herein after specified, including: A. GFCI receptacle. B. Electrical wiring. C. Recessed lighting. 16180-2 - PRODUCTS 2.1 GFCI type receptacle. 2.2 Electrical wiring, as necessary, per the latest code. 2.3 IC -rated, energy efficient recessed lights. 16180-3 - EXECUTION 3.1 Install GFCI receptacle square, level, secure, and connected to a single set of circuit conductors. Plaster ears of receptacles and switches installed in flush boxes shall be seated against the finish surface. Plates installed at flush receptacle shall be square, level, secure, and seated against the finish. 3.2 Install electrical wiring, as necessary, for the installation of the GFCI receptacle per the latest code. Electrical wiring to be design -build. 3.3 Install recessed lighting per the latest code. Electrical wiring to be design -build. 3.4 Warranty All materials, apparatus, and equipment furnished and installed must be new and free from all defects. Should any problems develop or the system becomes inoperable within one (1) year from date of final acceptance of the work, due to faulty or inferior material and/or workmanship, the Contractor must correct the problems without any additional expense to the City. 3.5 Clean -Up Contractor must keep his work, and the adjacent areas affected, clear and free of all debris. During, and on the completion of the work, remove from the building and the site all debris, unused materials and equipment, and leave work in a clean, acceptable condition. END OF SECTION 16180 TECHNICAL SPECIFICATIONS V -A-21 Section 16180 (Wiring Devices) City of EI Segundo Agreement No. 5656 4•r9NvINN NAN.•f December 12, 2018 ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for FIRE STATION #1 CHIEFS' BATHROOM IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time is still Tuesday, December 18, 2018, at 11:00 am. 2. Clarification 1: a. The overhead condensation drain in the Chief's Bathroom should be routed through the attic space back to a downspout near the Battalion Chiefs Bathroom. It is a straight shot from the Chief's Bathroom to the downspout. It is estimated that the route is 30 -feet. PVC pipe can be used. Scope of work in the technical specifications has been updated to reflect this revision. 3. Clarification 2: a. The wallpaper in the Battalion Chief's Bedroom shall be completely removed. Scope of work in the technical specifications has been revised to reflect this revision. 4. Clarification 3: a. A level 4, or greater, finish on the walls shall be provided on the two bedroom walls and any walls that are to remain exposed during the renovation. Pagel of 2 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5656 1417.2817 5. Bidder Question 1: a. Would it be possible to have 45 working days instead of 30 working days to complete this project? b. City response: The City is agreeable to changing the duration of the project to 40 workhw, days to allow for quality work to be performed. 6. Please include the updated bid schedule with your bid proposal. It has been included as an attachment to this addendum. The entire specification package and bid package have been updated to reflect these changes. Additions to the documents are shown in bold, while deletions have a stf-i4wthfau#h to denote the change. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this Addendum with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non-responsive and subject to rejection. Signature: Print Company Name: Page 2 of 2 Date: 350 Main Street, EI Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5656 NIML•t '1617-.211A7 December 18, 2018 ADDENDUM NO.2 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date has been postponed to Tuesdav, xIanuary 8._101 9, at 11:00am in the City Clerk's office, 350 Main Street, EI Segundo, CA 90245. a. The Notice Inviting Bids has been updated and is included as an attachment to this addendum. All other information in the specifications remains unchanged. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this Addendum with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non-responsive and subject to rejection. Signature: Print Company Name: Page 1 of 1 Date: 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5656 CONTRACT DOCUMENTS PLANS & SPECIFICATIONS FOR FIRE ST"A"TION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT PROJECT NO.: PW 18-01 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 350 MAIN STREET EL SEGUNDO, CA 90245 310-524-2300 http://www.elsegundo.org/depts/works/bids rfps.asp http://www.elsegundo.org/depts/works/proj ect_request_contact_form.asp MANDATORY PRE-BID MEETING TUESDAY, DECEMBER 4, 2018 AT 10:00 AM AT FIRE STATION #1, 314 MAIN STREET, EL SEGUNDO, CA 90245 BIDS DUE TUESDAY, DECEMBER 189 2018 JANUARY 8, 2019 AT 11:00 AM Agreement No. 5656 BIDS WILL BE RECEIVED UP TO THE HOUR OF 11:00 A.M. TUESDAY, DEGEM.. ._, ,' JANUARY 8, 2019 IN THE OFFICE OF THE CITY CLERK CITY HALL 350 MAIN STREET EL SEGUNDO, CALIFORNIA 90245 AT WHICH TIME THEY WILL BE PUBLICLY OPENED 0) Agreement No. 5656 NOTICE INVITING SEALED BIDS FOR THE FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT IN THE CITY OF EL SEGUNDO PROJECT NO.: PW 18-01 The City of El Segundo is accepting sealed bids in the City Clerk's office, 350 Main Street, El Segundo, California 90245, until 11:00 a.m. on: TUESDAY, ,' , JANUARY 8, 2019 at which time they will be publicly opened. Bids will not be accepted after that time. As described in the Bidding Documents, the bids are for a public works project ("Project") which consists of CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT at Fire Station #1 and related work as shown on the plans on file with the City's Public Works Department. The project location is at 314 Main Street, El Segundo, CA 90245. Construction shall include but not be limited to the removal and replacement of tiles, drywall, waterproofing layers, countertops, sinks, faucets, plumbing, toilets, shower head controls, flooring, painting and various improvements as identified in these specifications. Work on the Project must be performed in strict conformity with Specifications No. PW 18-01: FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT which is filed with the Public Works Department. Copies of the Plans, Specifications, Contract Documents and Engineer's estimate are available from the Engineering Division of the Public Works Department, City of El Segundo, 350 Main Street, El Segundo, California, 90245. Plans And Specifications are alternately available electronically via http://www.elsegundo.org/depts/works/project_request_Contact form.asp A pre-bid meeting is scheduled for Tuesday, December 4, 2018, at 10:00 am, at the Fire Station #1, 314 Main Street, El Segundo, CA 90245. Bidders' attendance at this meeting is mandatory. Questions regarding the bid shall be submitted by 5:00 pm on Tuesday, December 11, 2018 to http://www.elsegundo.org/depts/works/project request contact form.asp. The terms and conditions for bidding on the Project are described in the attached Bidding Instructions. This project requires payment of State prevailing rates of wages for Los Angeles County. The contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing I -A-1 Agreement No. 5656 Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov. Note that the Project is subject to compliance monitoring and enforcement by California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4 to be nonresponsive. The contractor to whom the contract is awarded must assist in locating, qualifying, hiring and increasing the skills of minority group employees and applicants for employment, as set forth in Executive Order 11246 and 11375. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City of El Segundo hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. Prevailing Wage: Federal Labor Standards Provisions, including prevailing wage requirements of the Davis -Bacon and Related Acts will be enforced. In the event of a conflict between Federal and State wage rates, the higher of the two will prevail. The Contractor's duty to pay State prevailing wages can be found under Labor Code Section 1770 et. Seq. and Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor's request. In entering into a Public Works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or Sub -Contractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public I -A-2 Agreement No. 5656 works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders and submitted to the Public Works Department, 350 Main Street, City of El Segundo, in a sealed envelope plainly marked on the outside: "SEALED BIDS FOR PROJECT NO.: PW 18-01 FIRE STATION #1 CHIEFS' LIVING QUARTERS IMPROVEMENTS PROJECT IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the State Business and Professions Code. For these projects, those acceptable classes of license shall be "A" or "B". The successful Contractor and his Sub -Contractors will be required to possess the correct license for their project classifications, and valid City Business Licenses from the City of El Segundo. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. Any contract entered into pursuant to this notice shall become effective or enforceable against the City of El Segundo only when the formal written contract has been duly executed by the appropriate officer(s) of the City of El Segundo. DATED this day of , 20 CITY OF EL SEGUNDO, CALIFORNIA Tracy Weaver, City Clerk I -A-3