Loading...
CONTRACT 4438D Amendment CLOSED Agreement No. 4438D FOURTH AMENDMENT TO AGREEMENT NO. 4438 BETWEEN THE CITY OF EL SEGUNDO AND NCM ENGINEERING CORPORATION THIS FOURTH AMENDMENT ("Amendment") is made and entered into this 4th day of June 2018, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation existing under the laws of California ("CITY"), and NCM ENGINEERING CORPORATION, a California corporation ("CONSULTANT"). The parties agree as follows: 1. Pursuant to Section 35 of Agreement No. 4438 ("Agreement"), Section 1.0 of the Agreement is amended to read as follows: "CONSIDERATION. As additional consideration, CITY agrees to pay CONSULTANT for CONSULTANT's services a sum not to exceed sixty-three thousand eight hundred sixty-six dollars ($63,866.00). CITY will pay this sum on the basis of the hourly rates and cost reimbursement rates as specified in the attached Exhibit"A", which is incorporated herein." 2. The Agreement is amended to extend the term to September 30th, 2019. The Agreement may be renewed upon mutual consent of the parties. CITY and CONSULTANT intend for this Amendment to be retroactively effective beginning Deceiiiber 31, 2017. 3. 'I'lie Agreement is amended to add the services set forth in Exhibit `B," which is attached to this Amendment and incorporated by reference. In accordance with the Agreement, CITY agrees to pay the total costs for all services listed in the attached Exhibit in exchange for CONSULTANT's services. 4. This Amendment may be executed in any number or counterparts, each of which will be an original, but all of which together constitutes one instrument executed on the same date. 5. Except as modified by this Amendment, all other terms and conditions of the Agreement, as amended, remain the same. [SIGNATURES ON NEXT PAGE] 1 Agreement No. 4438D IN WITNESS WHEREOF the parties hereto have executed this Amendment the day and year first hereinabove written. Cffw EL �JNDO NCM ENGINEERING CORPORATION y ci Guilhertne J.Nascimento, CFO ATTEST: Taxpayer ID No. 46-1487149 Tracy Weaver, City Clerk APPROVED AS TO FORM: f1clisicyt-) Marp .......................... City AtIonicy 2 Agreement No. 4438D Park Place Extension PrpjectEXHIBIT A NOVII: Engineering&Design Services Sc"01.)I.- VNI SUPP0141" S1JPI'0R'F 1)(!RlrlqG V Provide draft C&M agreements ENVIROMMIEN TAL DOCI.IkWNTPII/kSf� Task 1.1 Deliverables: lRci,v!III-'-��11': , Nkwq,,Illmm colli %� [tv"4111 I I I R c111111111,1111111s Revised Railroad Alignment Plans Allad 1111"111n w „gym iiiii!1111111111 m I,Iuw1iu01I T1111110 I11111, VI www Illlnm"III III R ill 111 U I ill a Ro will, IIV 11 c 4:' It s i I ill 4w 'III io I[I o4b 14 1 i I I a I iq 0 11 No additional work identified. Currently, the planning level plans and reports for Alternative I show UPRR track and BNSF track sharing a single two track bridge over Park Place. The NCM team will revise the planning level roadway, OPCliwllllll revising the row cost strategy(in addition to structures plans and the type selection memo from a incorporating stakeholder input re contribution of currently planned single two track bridge to two single lands from landowners as part of any development track bridges per Union Pacific RR comments. agreement). Deliverable is a revised ROW cost estimate incorporating a comprehensive valuation Revise roadway plans and right of way strategy based on input from stakeholders, the requirements exhibits following will be necessary: Revise bridge plans and edit type selection V Team(NCM/OPC)workshop to identify memo potential ROW savings measures Task 1.0 Deliverables: V OPC will hold a workshop with stakeholders Revised Plans and Type Selection Memo to establish a land value to be used for the ROW cost estimate, OPC will draft a memo summarizing the decisions made during workshop to be distributed V Revise cost estimate based on updated ROW Wilson and Company has attempted to obtain MOU's takes and input from workshop. with railroads, but the companies declined to commit without substantial design and funding being Task 1.3 Deliverables: completed. Instead Wilson has obtained comment letters from Chevron and BNSF. UPRR has requested v' Revised Preliminary Project Right of Way that they not share a single bridge with BNSF over Strategy Costs Park Place. Wilson will revise planning level railroad track alignments to separate the UPRR and BNSF L"I tracks over Park Place to accommodate two bridges. Team will provide additional coordination and support Wilson and Company will complete coordination with UP comment letter with goal to receive a letter services to the City as needed to respond to additional supporting alternatives including Alternative I (BNSF comments received by stakeholders and public comment through environmental approval. and UPRR side by side over Park Place). Wilson will provide the City with draft C&M agreements for both V City may draw on any team members to UPRR and BNSF. The Railroads will not comment or respond to needed additional tasks. negotiate C&M agreements until design is substantially complete. Task 1.4 Deliverables: Revise railroad track plans V' As Determined by Public Works Director Coordinate with UPRR Agreement No. 4438D Exhibit B Page 1 COST PROPOSAL Project: Park Place Extension Project Management Support Client: City of EI Segundo Consultant: NCM Engineering Corp 350 Main Street 22362 Gilberto EI Segundo, CA 90245 Suite 125 Rancho Santa Margarita, CA 92688 ATTN: Ken Berkman, PE ATTN: William Nascimento, PE, SE Public Works Director Project No. ElSegundo Element: Project Management Support Prepared by: WN Date: April 19, 2018 Proposed Services: Please see attached scope of services. OH Multiplier for Design Build Proposal., 273% Manhour Estimate: Man Direct Billing Labor Hours Rate Rate Cost 1 Project Manager 95.00 259.16 2 Senior Project/Bridge Engineer 72 75.00 204.60 14,731 3 Project/Bridge Engineer 80 65.00 177.32 14,186 4 Design Engineer 53.00 144.58 5 Assistant Engineer 80 42.00 114.58 9,166 6 QC 85.00 231.88 7 Senior CAD Operator 32 48.00 130.94 4,190 8 CAD Operator 40 41.00 111.85 4,474 9 Clerical/Administrative 30.00 81.84 Total Cost+Fee 304 $46,747 (A) Other Direct Costs: Other Direct Costs (Billed at actual cost with receipts) 1 Reproduction 2 Copying $120 3 Plotting 4 Transportation/Travel $549 5 Special Deliveries $50 6 Computer 7 Subconsultants $16,400 Subtotal-ODC $17,119 (B) Total Proposed Fee 11otal Amount $631866 (C)=(A+B) Agreement No. 4438D ExhibitPage 2 NCM Engineering Corp. COST PROPOSAL Project: Park Place Extension Project Management Support Client: City of EI Segundo Date: April 19,2018 Element: Project Management Support Proj: ElSegundo Labor Hours I Classification 1 2 3 4 5 6 7 8 9 Total Subtotal PM Sr.PE PE DE Asst QC Sr.CAD CAD Clr Subs Hours i t0 O N Co c0 co V In V (D M fn N CO o1 10 Co m V fl- V V O u) Or V N N N V> 69 fA fH to d> fA Ef> ff> TASKS/SUBTASKS Engineerinq Services 1 (.;iDo pique"lik'¢OO 2 P;^,i,wn'Ir„.;'„'' 12 20 40 40 112 $15,059 3 Nd unm!ra 20 20 40 32 112 $16,412 4 0 d,cidi,Xu' ,'a4,VA iro."•'r As ai,,,, i 40 40 80 $15,277 5 6 7 8 Total 72 80 �) 80 32 1 40 304 $46,747.0111 Agreement No. 4438D Exhibit...-.- Page 3 NCM Engineering Corp. COST PROPOSAL Project: Park Place Extension Project Management Support Client: City of EI Segundo Date: April 19, 2018 Element: Project Management Support Proj: ElSegundo Ref# Description Unit Amount Cost/Unit Total 1 Reproduction/Plotting Number of Drawings(Half Size) Ea Size of Drawings (Half Size) 1.5 Sq Ft Size of Drawings(Full Size) 6 SCI Ft ISluelines(FUlll Size) Sets Sq Ft 015 /Sq FI Xerox(Full Size) Sets Sq Ft 0.50 /Sq Ft Sepia transparency(Full Size) Sets Sq Ft 0.80 /Sq Ft Contact Mylars (Full Size) Sets Sq Ft 1.90 /Sq Ft Vellums(Fuel Slze) Sets Sq Ft 0.95 /Sq Ft Subtotal(1) 2. Copying/Binding Reports 5 Ea 200 Sheets 0.12 /Sheet 120 Calculations Ea Sheets 0.12 /Sheet Specifications Ea Sheets 0.12 /Sheet Half Size Drawings Sets Sheets 0.45 /Sheet Mn(hng(Reports) Ea Tot 2.5 Ea Subtotal (2) $120.00 3 Plotting Plotting (Half Slee) Sets Sheets 5.75 /Sheet Plotting) (Full Size) Sets Sheets 6.50 /Sheet Subtotal (3) 4 Transportation/Travel Flight Persons Trips EA 418 EA/Round Ti Rental Car 1 Day(s) EA Trip 5 Trips Total 45 EA Day 225 Hotel/Per Diem Days 150 EA Day Personal Car(Mileage) 120 Miles Round T61) 5 Trip 0.540 $/mile 324 I Subtotal (4) $549.00 5 Special Deliveries Express Mail 2 Deliveries 1 Ea 25 $/EA 50 Special Delivery Ea Ea 55 Subtotal (5) $50.00 6 Computer Costs Engineering Design Hr 8 CAD Hr 24 Subtotal (6) 7 Subconsultants Wilson&Co LS 7,500 Overland Pacific LS 8,900 Utility Coordinating, Inc. LS Subtotal (Subs) $16,400 Total (1 through 6) $17,119.00