Loading...
CONTRACT 4941L Other SOUTHERN CALIFORNIA Agreement No. 4941 L Ej� S�N® 2016 Direct Install Program Partnerships Customer Authorization Form An EDISON INTERNATIONAL*Company Customer Name �, �..„ , u�12 perform /I services outlined below. Please review,comp e; � � � horiz Service Account Name_.:...� i fie,sign an sub It this form authorizing an SCE-approved Consultant to erf rm the Contact Name I ►L J�' *aIRJC'. Service Account Number /�ell, ' _ ✓�- r� Contact Title .�1"�� � � AV° Service Address Phone. j . i This Customer Authorization Form is entered into by the Customer listed above in connection with Southern California Edison's(SCE)Third Parry Implemented Turnkey Program(Program). I,—0��� (use'Contact Name'listed above),a representative of Customer,am duly authorized to sign this Authori ation on behalf of Customer.Customer hereby authorizes_1-Y y,... (Consultant)to conduct an Energy Survey of Customer's facility and to replace and/or install energy efficiency equipment recommended by Consultant as a result of the Energy Survey(collectively,the"Work"). Customer understands that Consultant has been pre-approved,after a competitive solicitation, by SCE to perform the Work and that the Work will be performed at no cost.Customer agrees that all of the Work shall be subject to all terms and conditions of this Authorization and of the Program. Customer agrees to provide Consultant reasonable access to Customer's facility for the Work,including the Energy Survey and replacement and/or installation of the recommended energy efficiency measures.Customer further agrees to provide SCE and Consultant(or other SCE consultants)reasonable access to Customer's Facility for all inspections or verifications of such Work as may be required by SCE in its sole discretion. Customer acknowledges that SCE will provide up to$10,000 in services and equipment per Service Account for accounts with demands of 0-99 kW,or up to$15,000 per Service Account for accounts with demands of 100-199 kW.Project caps are subject to change without notice. Program funding is limited and is available on a first-come,first-served basis until funding is depleted or the Program is terminated. Customer must meet the following requirements to be eligible for the Program:(1)Facility site must be a nonresidential active SCE customer and the facility must be located within SCE's service territory;(2)SCE Customers must pay the Public Purpose Programs Charge("PPP")on the SCE electric meter where the Work is to be performed;(3)Customer certifies that Customer has not and will not receive any funds from any other energy conservation program funded by the PPP for the same energy savings components installed under this Program;and(4) Customer and all Work must meet all other Program requirements,terms and conditions; Customer acknowledges that connected load at Customer's facility may increase if the Work involves replacing burned out or missing lamps. Customer hereby agrees that SCE makes no warranty,expressed or implied,with respect to the Work,including without limitation the implied warranties of merchantability and fitness for a particular purpose.Customer agrees to hold harmless SCE,its officers,directors,affiliates and employees,from and against any and all liability, damages, losses, claims, demands, actions, costs, including attorneys'fees and expenses and all court or arbitration or other dispute resolution costs,or any of them,resulting from,arising out of,or in any way directly connected with Work performed by Consultant.Customer hereby agrees to hold the Consultant solely responsible for any and all claims, losses,liabilities,damages and expenses,including attorneys'fees and costs,which Customer may incur as a result of the Work.Customer is solely responsible for ownership of the equipment and services underthe Program.Items installed are warranted by Consultant for one year. Customer agrees that SCE may provide Customer's contact information to Consultant(and other SCE consultants)for the exclusive purpose of carrying out theWork and the Program.Customer acknowledges that Consultant has been authorized to contact Customer only with regard to performing the Work,and that any other services,installations,improvements or equipment provided to Customer by Consultant have not been authorized by SCE,and SCE assumes no responsibility therefore. By signing below, I acknowledge that SCE will reimburse the installing contractor for the Work performed and that this expense will be charged to the Partnership budget allocated to my City,County or Partnership.Partnership programs may count energy savings associated with the Work towards their goal achievement.This initiative is limited in funding and is in conjunction with SCE's Commercial Direct Install (DI)program.All terms and conditio s of the Commercial Direct Install program apply to Partnerships customers. AGREED AND ACCEPTED: 6 ` i ,r/Customer Signature Date2 a, a ate. l� for tFESSilN . ry� KCITY ATTO E comprehensive FCI Management Consultants f 'R CFll Lighting&Electrical FESS � � j ...,�..1,'l.'j�a 1,1, 1376 North Brasher Street•Anaheim,CA 92807 577 S.Lake Ave.,Suite 101•Pasadena,CA 81101 3550 E.Gilman Street a Long Beech,CA 90515 www.oamornte-re"ogtcom hupJ/resseneWcomfladeaMm www.ldmgt.com Direct Install Program is funded by California ratepayers and administered by SCE under the auspices of the California Public Utilities Commission. For further information,please contact SCE at(800)736-4777 NR-402-V"913 White-SCE Canary-Vendor Goldenrod-Customer r Kano Aweement No. 4941 L LDtitity Direct Irr'stallatiodr Prouram-Su rvev Worksheet U'adate 0 1103TI 7 Room Description: Date: 2/22/2017 By: JS Business Name: Public Works Water Yard SAN: 3000006098 ID: 20079 Service Account Name: El Segundo,City of Rate: GS-2 Op Hours: 2288 SAN Address: 400 Lomita Street,El Segundo,90245 Contact Name: Greg Carpenter Position: City Manager Language: English Business Phone: (310)524-2365 Contact Phone: Segment:HM LO SO LR (S'Nt E G SCH t)NI'V CC MISC ✓" Area: 6,500 Volt: 120 Ht: 18 FC: NA Cust Signature: Cuslomw acklla.ledga That fiml dgcrmination of smiees,insmllmions,inprolemrnts or equipmrnt to be prmided.rill be finalimd fdb..ing a pl.sicsl ins pcclion imp=6on of the=isliog cquiptum and conditions by a tochnician No senico.installations,impro%a Is orequip3aatt aro guaranteed prior to this inspxliou """"""1`r Ie l'JAI,o.rrroCryl 1 p I TYp'r iCONV 1)I t)E,yf,°RYr'r'l'K7h1i g„ NN1A1 r{ I.VRS I 'TYPE C wY •„. NJU:'"id':RtP'N'Nf7N' ;ti'4JM III{I7 �2FT 1 to I i.AW Gt,. F IS p I LED(HIGHBAY) 22679419 n 96450 ( ) d.d.Ux'u41 GU. F211.P•R ILw) I.l"1777 10 tl.liU 18o>32Ur 7CIIG ti. F4II:E w2 14,J I)111U IlMAY %1751) 4Fi(I to I) N.u3x95 w1, lau.P•R(L...) LED(HIGHBAY) LT-221105 WD 320-300., 4Fr 7 to_) 11CZZl. :1. F42I. I LED(HIGHBAY) I.T.":Dnmllnnv IXD5 (_ 7 44 LT-t9P10 21. FJJLP-R 11.111 LTba702 V'.1iD 500>750w I0C441� IL F'441i1: ,11111-LI:U IIIGIMAY F441 P•N 4Fr(4 to 4) LED(HIGHBAY) LT-'MJxfb 41. 1'44IJ'•R(I.o.,) I.T-35734 IJiD40>131.. 4Fr(A/13) 11173L12) 11, F43FI: LED(HIGHBAY) 230-1-1101IIGIa3AY F461 V,N I.T-79821 31. 171111'44(21.11.1UH-) I:r.68154 IND1,31+'I W'9 1417(%/81 IEL'JJIJ21 JL FJJIiE LED(HIGHBAY) -)I-LEDIIIGImAY FJ111J'•N Y.T-26187 41, F441.P.R(21..13a16us1 LT-54307 I.L•U160>22oW �8FT KIT) 16rcu.1 u. Pill:421 POOL PUMP t-i°,w� vsrl'<3Imssrp ( �I.T•18409 4IT-21, 1421.11-11(1-) SFf(KIT) II GC141x 21. 111E 233.TLED RJnli ieH l'. ( �L1`-491171 41741, F44T.P•RILa.) 'TEED I.T.11950 41N't'U.r4p)fl�k•1M 142 SFT 1 to I 18-)1)1. NL FanES LED(A-Lamp) $07-IJ:UA9 INCA(«i0..1 ( ) LT•20983 n, 1,x ILI••R IL..) 1.1.1x691) LED 9W 7WI049 LU61FT1S 8Fr(2 to 2) 19-0221. 2b. FN21is LED(PAR30) 333-PAR3011011 CICA(--5U,0 1.7.27615 21. 1:92LP-R(1...1 1.T-111739 LED 10 TO I I W U-LAMP 20.=Ij 2L F401;6 LED(PAR38) 351.1`.113x1,1.016 INCA(<.1%) I.1`-396711 21. FI221.11-It'l m) N.T•18766 IlU 15 TO 16W 23-0221. 2L F821:11s 165-,1R16LED7 IINIAX'FN 06.51,,1 SFr HO(2 to 2) 1.T-27645 !1. 1,221y'-fit I I-0 LED(MR 16) LT-18453 usn6n)7. Open Si• WAM.'N v,3.x111N LED(Candelabra) 174--.1:111:12 INCA P 1n I.T•19511) 1FDI MON N.T-111117'1 U; 3T03W 61-MT75C4N \1175 Highboy 4L I:r-121166 1`4411N(N-I) 63-2 N Hi be 6L LT 26100 F46L P-N lNmnull 3211 to 2611 fiSCI I WT. I, F•411.1. 1TA91011 tll F41 WL(29.1 66-C22WI. 21`. F42U. 3211-63811 LT-32645 21.. F42WI.(2 211..1 I32W to 2811 67-33111. ]U, 173111. LT-10154 31. F43WI.(211..1 611C44W1. 41, 'F441J. I32W to 28W I.T-59655 4t. IF'44WLI28.,) 70C22WI. 2-G. 171L1. I4Fr(2 to 2,28W) 1.7-6043! 21, FLwT-(211.9 NNNYYY,,, NI 71-c-M. 3t., F4U.L 4Fr(3 to 2,28W) I.T•71214 EG, �FJ2WI.(28,0 �4FT(4 to 2,28W) 72-CM 1. 41. F431.I. 74-C!222 21. 1,4211E 12-8.9 7JCl2WI.IR) ll. 177111. 4FIF(5 to 2.28W-Rea) I.T-249115 21. F42WL•N(211..) 4Fr(4lo?.?J1\V-ReR) 15.C22WIJR) 41. F441J. 1.T-30765 21, F42WI:N(2996 4FT Tube Guard 91.1'-•4 NA 417 TI Inli GUARD 8Fr Tube Guard 9--T611 %F x17 Tm3E❑UANU .T4(00 Nn Sensor-4LHB 1.7411x)7 Srnsar-41.1 Ephh., Sensor-6L H 1-7610 Nn 1:1`x.76161 :x.wu,wv.nl,bUirhtsgv �I 'U-TAMP RFFUXTUR 1914C22U 21, IS.F42U!14 � 91429 2I. 1`221J1 S �LED(Down Li t) 2111.11'0 1NCA(-40•T00W) I.T4 701 I.ED-<e15W �LED(HIGHBAY) 20785 11.0 44-Um, 20413D I1101MAY I:r 96175 LED(HIGHBAY) Y?1dJiUInG1uIAY LT M200 47531 I10 131 a K", LED(HIGHBAY) 2-2-22.1J0 1110tmAY la m250 992111) UU)161)-187., 227.11])11101 WAY LTI NOW LED(HIGHBAY) :161178 IJU3I47>220., LED(HIGHBAY) 1*IJU)111GUnnY I-T IVU 'm713 IJU)1,'0>262. LED(HIGHBAY) 2254JT)URIUnnY I:1`M4o0 Noes: 214599 LID 261-28(m t LAMP COLOR: El IOOK 15000'K E36500K Agreement No. 4941 L SCE DIRECT INSTALLATION PROGRAM 2013 SURVEY WORKSHEET BUSINESS NAME: public Works Deoart.- ID# Water San:# 3000006098 OP HR. 2288 BUSINESS HOURS: 6:30a-Sp M-Th DATE: 10.30.15 �CONVERTION#S I I2L I4L I I1� 2331 11 L-I I I I I I LOCATION Paragem Building 10 40 I N __Pump Building 6 12 j Conference Rm. 8 16 RR;M/W&Hall 4 4 Stairwell Downstairs Break Rm 1 10 42 Storage Parts 1 I 3 + 14 RR;M/W&Hall 1 �, 2 Meter Rm. p 6 24 Large Garage 15 60 �I I I TOTAL 021 I 44 0... 0..... 214 u.. 0 .,......0 .... 0...... 1 ... 0.. .... A/C Working Y/N.. SCHEDULE APPT: 'YES/NO A US'TI Vi E ed A PREFERRED INSTALL NOTES: 194 T LED s Upstairs 4000K 20 T LEDs 1p-9p 1p-10:30p E-MAIL: @ 12p-Sp