Loading...
CONTRACT 5179 Professional Services Agreement CLOSEDAgreement No. 5179 PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF EL SEGUNDO AND ANDERSONPENNA PARTNERS, INC. This AGREEMENT is entered into this 13th day of July, 2016, by and between the CITY OF EL SEGUNDO, a municipal corporation and general law city ( "CITY ") and ANDERSONPENNA PARTNERS, INC., a CORPORATION ( "CONSULTANT "). 1. CONSIDERATION. A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below; B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement; C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed TWENTY -TWO THOUSAND, ONE HUNDRED TEN DOLLARS AND FIFTY -FIVE CENTS ($22,110.55) for CONSULTANT's services. CITY may modify this amount as set forth below. Unless otherwise specified by written amendment to this Agreement, CITY will pay this sum as specified in the attached Exhibit "A," which is incorporated by reference. 2. SCOPE OF SERVICES. A. CONSULTANT will perform services listed in the attached Exhibit "A," which is incorporated by reference. B. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement. 3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT will use the appropriate generally accepted professional standards of practice existing at the time of performance utilized by persons engaged in providing similar services. CITY will continuously monitor CONSULTANT's services. CITY will notify CONSULTANT of any deficiencies and CONSULTANT will have fifteen (15) days after such notification to cure any shortcomings to CITY's satisfaction. Costs associated with curing the deficiencies will be borne by CONSULTANT. -I_. Agreement No. 5179 4. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit "A ") the tasks performed, the percentage of the task completed during the billing period, the cumulative percentage completed for each task, the total cost of that work during the preceding billing month and a cumulative cash flow curve showing projected and actual expenditures versus time to date. 5. NON - APPROPRIATION OF FUNDS. Payments due and payable to CONSULTANT for current services are within the current budget and within an available, unexhausted and unencumbered appropriation of the CITY. In the event the CITY has not appropriated sufficient funds for payment of CONSULTANT services beyond the current fiscal year, this Agreement will cover only those costs incurred up to the conclusion of the current fiscal year. 6. ADDITIONAL WORK. A. CITY's city manager ( "Manager ") may determine, at the Manager's sole discretion, that CONSULTANT must perform additional work ( "Additional Work ") to complete the Scope of Work. If Additional Work is needed, the Manager will give written authorization to CONSULTANT to perform such Additional Work. B. If CONSULTANT believes Additional Work is needed to complete the Scope of Work, CONSULTANT will provide the Manager with written notification that contains a specific description of the proposed Additional Work, reasons for such Additional Work, and a detailed proposal regarding cost. C. Payments over $25,000 for Additional Work must be approved by CITY's city council. All Additional Work will be subject to all other terms and provisions of this Agreement. 7. FAMILIARITY WITH WORK. A. By executing this Agreement, CONSULTANT agrees that it has: Carefully investigated and considered the scope of services to be performed; ii. Carefully considered how the services should be performed; and iii. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONSULTANT agrees that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. -2- Agreement No. 5179 Should CONSULTANT discover any latent or unknown conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT's own risk until written instructions are received from CITY. 8. TERM. The term of this Agreement will be from April 4, 2016 to December 31, 2016. Unless otherwise determined by written amendment between the parties, this Agreement will terminate in the following instances: A. Completion of the work specified in Exhibit "A "; B. Termination as stated in Section 16. 9. TIME FOR PERFORMANCE. A. CONSULTANT will not perform any work under this Agreement until: CONSULTANT furnishes proof of insurance as required under Section 23 of this Agreement; and ii. CITY gives CONSULTANT a written notice to proceed. B. Should CONSULTANT begin work on any phase in advance of receiving written authorization to proceed, any such professional services are at CONSULTANT's own risk. 10. TIME EXTENSIONS. Should CONSULTANT be delayed by causes beyond CONSULTANT's control, CITY may grant a time extension for the completion of the contracted services. If delay occurs, CONSULTANT must notify the Manager within forty-eight hours (48 hours), in writing, of the cause and the extent of the delay and how such delay interferes with the Agreement's schedule. The Manager will extend the completion time, when appropriate, for the completion of the contracted services. 11. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below: A. Exhibit A: Scope of Work; Budget; and Proposal for Services. 12. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties. -3- Agreement No. 5179 13. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number. 14. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement. 15. WAIVER. CITY's review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT's performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character. 16. TERMINATION, A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. B. CONSULTANT may terminate this Agreement at any time with CITY's mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date. C. Upon receiving a termination notice, CONSULTANT will immediately cease performance under this Agreement unless otherwise provided in the termination notice. Except as otherwise provided in the termination notice, any additional work performed by CONSULTANT after receiving a termination notice will be performed at CONSULTANT" own cost; CITY will not be obligated to compensate CONSULTANT for such work. D. Should termination occur, all finished or unfinished documents, data, studies, surveys, drawings, maps, reports and other materials prepared by CONSULTANT will, at CITY's option, become CITY's property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination, not to exceed the total costs under Section 1(C). E. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated. F. By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 17. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT under this Agreement are CITY's -4- Agreement No. 5179 property. CONSULTANT may retain copies of said documents and materials as desired, but will deliver all original materials to CITY upon CITY's written notice. CITY agrees that use of CONSULTANT's completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY's own risk. 18. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or public CITY without CITY's prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties. 19. INDEMNIFICATION. A. CONSULTANT agrees to the following: i. Indemnification for Professional Services. CONSULTANT will save harmless and indemnify and at CITY's request reimburse defense costs for CITY and all its officers, volunteers, employees and representatives from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, any injuries or damages sustained by any person or property resulting or arising from any negligent or wrongful act, error or omission by CONSULTANT or any of CONSULTANT's officers, agents, employees, or representatives, in the performance of this Agreement, except for such loss or damage arising from CITY's sole negligence or willful misconduct. ii. Indemnification for other Damages. CONSULTANT indemnifies and holds CITY harmless from and against any claim, action, damages, costs (including, without limitation, attorney's fees), injuries, or liability, arising out of this Agreement, or its performance, except for such loss or damage arising from CITY's sole negligence or willful misconduct. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONSULTANT will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise. R For purposes of this section "CITY" includes CITY's officers, officials, employees, agents, representatives, and certified volunteers. C. It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement. -5- Agreement No. 5179 D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 23, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification. 20. ASSIGNABILITY. This Agreement is for CONSULTANT's professional services. CONSULTANT's attempts to assign the benefits or burdens of this Agreement without CITY's written approval are prohibited and will be null and void. 21. INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only. 22. AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with respect to all services and matters covered under this Agreement. CITY will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. CONSULTANT will retain such financial and program service records for at least three (3) years after termination or final payment under this Agreement. 23. INSURANCE, A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Typeo'f arts ra ce Commercial general liability: Professional Liability Business automobile liability Workers compensation Limits $1,000,000 $1,000,000 $1,000,000 Statutory requirement -6- Agreement No. 5179 B. Commercial general liability insurance will meet or exceed the requirements of the most recent ISO -CGL Form. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 1185 or 88, or equivalent. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. C. Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. D. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 0106 92, including symbol 1 (Any Auto). E. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." F. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to Section 16. 24. USE OF SUBCONTRACTORS. CONSULTANT must obtain CITY's prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation. 25. INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the status on the project, which will include a schedule update and a short narrative description of progress during the past month for each major task, a description of the work remaining and a description of the work to be done before the next schedule update. -7- Agreement No. 5179 26. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: If to CONSULTANT: AndersonPenna Partners, Inc. 1225 W. 190th Street, Ste. 255 Gardena, CA 90248 Attention: Dino D'Emilia 949 - 428 -1500 310- 359 -1203 ddemilia @andpen.com If to CITY: City of El Segundo 350 Main Street El Segundo, CA Attention: Stephanie Katsouleas 310 -524 -2356 Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 27. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY's conflict of interest regulations. 28. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT's bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT's bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability. 29. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT's or CITY's obligations under this Agreement. 30. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County. Agreement No. 5179 31. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state, and local laws applicable to this Agreement. 32. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. There is one (1) Attachment to this Agreement. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns. 33. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party. 34. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 35. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. CITY's executive manager, or designee, may execute any such amendment on behalf of CITY. 36. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Agreement, agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 37. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 38. TIME IS OF ESSENCE. Time is of the essence for each and every provision of this Agreement. 39. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, acts of terrorism, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' reasonable control, then the Agreement will immediately terminate without obligation of either party to the other. 40. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the N Agreement No. 5179 proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY. [Signatures on next page] -lo- Agreement No. 5179 IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. ATTEST: Tea y, er,, '` l C C'le APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney By ii David H. King, Assistant City Attorney Insurance Reviewed By: -11- Dino D'Emilia, VP Construction Services AndersonPenna Partners, Inc. Taxpayer ID No. 2c) - 31106SO PARTNERS ANDEMONTENNA June 27, 2016 Floriza Rivera, PE Project Manager City of El Segundo Public Works Department 350 Main Street El Segundo, CA 90245 Agreement No. 5179 Subject: Proposal to Provide Materials Testing Services -Richmond Street Improvements Project Dear Ms. Rivera: AndersonPenna Partners, Inc. (APP) understands the City of El Segundo requires materials testing for the Richmond Street Improvements Project. Attached is a proposal from Koury outlining their services and fees. The not -to- exceed fee for the sampling, testing and laboratory services, including a 10% markup to cover administration and overhead, is $22,110.55. If you have any questions about this proposal, please feel free to contact me at ddemilia @andpen.com or at (310) 359 -1203, or contact Gary Heinbuch at gheinbuch @andpen.com or at (951) 840 -5920. Respectfully submitted, AndersonPenna Partners, Inc. Dino P. D'Emilia, PE, QSD Vice President, Construction Services 1 225 W. 190'" STREET, SUITE 255 • GARDENA, CA 90248 11010N 1, I'l t.U111 PHN 3 10 359 1203 • FAX 949 258 5053 CERTIFIED DBE E Agreement No. 5179 K-0 I f Y ENGINEERING & TESTING, INC. May 11, 2016 Gary Heinbuch Senior Construction Manager AndersonPenna Partners 3737 Birch Street, Suite 250 Newport Beach, CA 92660 Subject: Construction Inspection & Material Testing Koury Proposal No. 16 -0369 City of El Segundo Richmond Street Road Rehab Dear Mr. Heinbuch: Koury Engineering & Testing submits this proposal for the City of El Segundo Richmond Street Road Rehab project. Our proposal is based on the enclosed Estimated Budget Breakdown and Master Fee Schedule of Rates. We are fully prepared and committed to respond to the needs of this project as well as the schedule for completion. Koury has three full - service geotechnical and materials testing laboratories located in Chino, Gardena and San Diego. Koury is licensed by the Division of the State Architect (DSA), City of Los Angeles, Caltrans, MTA, ACE, AMRL, CCRL and AASHTO certified as an approved testing agency. SCOPE OF SERVICES 1. Testing Co. goes to Project site and takes sample of native soil to test at Lab. 2. Testing Co. goes to Project site at a later date (when called by Inspector ) to take sample of CMB to test at Lab. 3. 20 visits by Tester ( when called by Inspector ) to take compaction tests. 4. 6 visits by Concrete Tester to take samples to test at Lab. 5. 4 visits by AC Tester to test compaction and take samples to test at Lab. fm 1W1111011114142=1 We propose to provide Construction Inspection & Material Testing in accordance with the attached Master Fee Schedule of Rates and Terms & Conditions. This proposal is not a "Not to Exceed" budget. Our service is based on time and material. Koury will utilize multi - licensed inspectors, whenever possible, to reduce project inspection costs. We will not exceed the estimated budget amount without prior notification. Koury provides monthly budget updates via email and with your invoice at no extra charge. We submit for your consideration our estimated budget in the amount of $20,100.50. 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 1 Agreement No. 5179 ffiffiff,49111iffm Our services will be performed at the request of your authorized field representative, who will be responsible for coordinating our services within the construction schedule. We request at least 24 -hours advance notice prior to the time of our services, in order to meet the project needs. However, we will make every attempt to provide personnel, providing the personnel are available, for last minute requests for an expedited fee. Attached is our Koury Contact Listing, which provides you with our dispatch office hours, specific information required to schedule inspections, and contact telephone numbers. Please provide this listing to your authorized field representative. HIIIINJEUM Our services will be performed in accordance with generally accepted professional engineering principles and practices. We make no other warranties, either expressed or implied. We carry General and Professional Liability Insurance, Worker's Compensation Insurance, and Auto Insurance, as required by law. A sample certificate can be provided at your request. To provide authorization to proceed, please sign the attached Terms and Conditions and, forward a complete copy of this proposal with an original signature to our office prior to our first visit to the site. Please do not hesitate to contact Nicole Miller, Business Development Manager, at (909) 606 -6111 ext. 206 if you should have any questions or require additional information. Regards, Koury Engineering & Testing, Inc. Nicole Miller Business Development Manager nicolem @kouryengineering.com www.kouryengineering.com 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 2 Agreement No. 5179 How to Request airn Inspection To request an inspection, please call before 2:00 pm the day prior to the inspection requirement. This will insure we can provide an inspector on the day & time you requested. All dispatch requests must be made through the Chino office only. Dial (909) 606 -6111, and choose option 2. Dispatch hours are 7:00 am to 5:00 pm. When calling for an inspection please have the following information available: • Koury Project No. 16 -0369 • Project name & address • Project contact name and phone no. • Type of inspection • Inspection day and start time. Estimated duration (hours and /or days) • If pour concrete, grout, mortar, etc... How many yards? Pour for slab, footings, etc? • Special instructions or req'd tools? Torque test - socket size? Coring - diameter core? Koury Engineering Contact Numbers Contact Phone Number Corporate Office (909) 606 -6111 -Tel (909) 606 -6555 - Fax Dispatch Department (909) 606 -6111 ext 497 (Option 2) 24 -Hour Emergency Dispatch (310) 713 -4005 - Mobile Material Testing Laboratory Chris Loera, Manager (909) 606 -6111 ext 501 Operations Raymond Roblero, Operations Mgr. (909) 606 -6111 ext 402 (310) 713 -4005 - Mobile Armen Gaprelian PE, GE, Managing Engineer (909) 606 -6111 ext 504 QA /QC Chris Loera, Manager (909) 606 -6111 ext 501 (310) 713 -1222 - Mobile Geotechnical Engineering Jacques B. Roy, PE, GE (909) 606 -6111 ext 706 (310) 320 -0502 - Mobile Accounts Receivable Andria Lopez, AR Supervisor (909) 606 -6111 ext 802 Business Development Manager Nicole Miller (909) 606 -6111 ext 206 (310) 363 -1586- Mobile 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • vwvw.kouryengineering.com page 3 Agreement No. 5179 City of El Segundo Richmond Street Reconstruction: Estimate Prepared Using email dated 5/11/16 Description Qty Unit Rate Amount Soils Technician - Construction Observation and Testing Asphalt Paving Compaction Testing 32 Hourly $ 83.00 $ 2,656.00 Aggregate Base Compaction Testing 60 Hourly $ 83.00 $ 4,980.00 Curb & Gutter and Road Subgrade Compaction Testing 60 Hourly $ 83.00 $ 4,980.00 Nuclear Gauge 24 Daily $ 35.00 $ 840.00 Mileage 750 Mile $ 0.75 $ 562.50 Travel Time 24 Hourly $ 83.00 $ 1,992.00 LABORATORY SOILS TESTING 6 Hourly $ 45.00 $ 270.00 Geotechnical Laboratory Testing 1 Estimate $ 500.00 $ 500.00 TOTAL ESTIMATED GEOTECHNICAL MONITORING & TESTING FEES $ 16,510.50 Concrete - Manhole Base/ Bus Pad/ Collar /Box LABORATORY MATERIALS TESTING 24 Hourly $ 83.00 $ 1,992.00 Concrete Cylinder Compression Tests 24 Sample $ 22.00 $ 528.00 TOTAL ESTIMATED MATERIAL INSPECTION & LABORATORY FEES $ 2,520.00 PROJECT COORDINATION Staff Engineer 1 Hourly $ 100.00 $ 100.00 Senior Engineer 1 Hourly $ 130.00 $ 130.00 Project Manager- Field Supervisor 6 Hourly $ 95.00 $ 570.00 Admin 6 Hourly $ 45.00 $ 270.00 TOTAL PROJECT COORDINATION FEES $ 1,070.00 Geotechnical Fees Material Fees Project Coordination ADDITIONAL SERVICES AVAILABLE AS NEEDED Final Grading Report Concrete Batch Plant Inspection Final Material Compliance Report Mix Design Review $ 16,510.50 $ 2,520.00 $ 1,070.00 TOTAL $ 20,100.50 (NOT IN TOTAL) 1 Report $ 2,500.00 TBD Hourly $ 83.00 TBD Report $ 500.00 TBD Mix $ 150.00 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 4 Agreement No. 5179 INSPECTORS Materials Inspector (Concrete, Masonry, Structural Steel and Welding, Fireproofing, Shotcrete) ......................... $ Building Inspector (Wood Construction) .................. ............................... ...... . .. $ Building Inspector ( MEP) ...... ..... .......... $ Specialty Inspector (Glu -Lam BeamslTrusses at Fab Shop/Med Gas/Add. Specialty Inspections)___ ... ...... _ $ Soils Inspector (Soils, Asphalt, Piles) ...... ..... ..... ........ ...... ..... .... ...... .....,.. $ Soils Inspector (LA Deputy Grading Inspector)... .. .............. ....... .. ........ .......... ,.............. ............. $ Nuclear Gauge Equipment... ..... . ... .. _,. ........ , „..., .., ,. , ...., , ,,.., ,. ,, ... ...... ..,..... ,.,, ,.. ,.,, ,,,, , ,... $ Soils Inspector Mileage ....... . . ......... ....., .. , ......... ......, $ Soils Inspector Travel Time (portal to portal),,,., .... .. _ ..., , .., ...... NON - DESTRUCTIVE TESTING AND ADDITIONAL SERVICES Lab Technician - 1 man & equipment (Torque, Pull, Pachometer, Schmidt Hammer, Coring)) .... ........ .......................... $ Asst. Lab Technician 11­­­1­1­___ ....... ....... ... , .,...., $ Non - Destructive Testing: UT, PT, MT.,,,,,,,, $ Ground Penetrating Radar -Technician ........................................................................................ ............................... $ Utility Locating - Technician ..... ... „ ..... .......... .. ....... ...... . ... ........ ..... - ...... $ Asst. Technician - (GPR and Utility Locating).._,,.___, ... .. ......... ... .,.,, , ., ...,.., ........,, ,,.., .,.. . <,., ....,... $ Radiography Technician .. ...... .......... ....... .., ..,.,. ....... . , ,. ...... .,,,.. $ Radiography Truck $ Radiography Film ........ ............ .... ...... . ,.... ..... ........ $ Non - Destructive Testing: Couplant and Dye Penetrant,.. „....„ ....., „ .. .......... ............... ........ ... ......... $ Parking (if necessary) $ Travel Time ........... .......... ........ ...... ,,... ..,,. ,.., ... ......... ......... .......... .... ......... $ Mileage ,.., . , , ..... .,., .,., ,.. ,,.., ,,,.. , ......... $ FIELD EQUIPMENT CHARGE AND CONSUMABLES Equipment - Torque Wrench .......... .... . „. , ... . ...... ............... .... .. ... ...,.,......... _. ........ $ Equipment - Skidmore Bolt Tension Calibrator.., „....,,..... ....... ... ......... ...... .... .. ... . . ... .......... $ Equipment -Skidmore Bolt Tension Indicator...,.,... ., .. $ Equipment - Multiplier .._ ........ ..... ..... ..... ....... .... ... .. ............ ........ , .......... $ Equipment - Schmidt Hammer ...... . ...... .......... ........ .... ..... .......... ............. $ Equipment - Dry Film Thickness Gauge ................................................... ...... .. ....... ......... .......,.. $ Equipment - Non - Shrink Grout Mold 2" Cube ............ .......... $ Equipment - Slab Moisture Test Kit (Per Kit) ..................... ....................... ..................... ................. ............ ....... ,........ „. $ Equipment - Tile Test Kit (Per Kit) ...... .......... . ........ ......... ....... ............. _ .................... _ ..... ............. $ Equipment - Unit Weight Kit: scale, bucket, plate, mallet, rod ......................... ........ .....,.,.. $ Equipment- Air-Entrainment.,..,,.. .. ..... ................... ...... . ........ ......... ....... _........ ...... .. ,... ..,..., $ Equipment - Windsor Probe .... ................... ........ ........ ......... ......... .......... .... ......... $ Equipment - Truck Charge ...... ......." .......... .. ,.. ,.,, ...,..,,,,. ,.., . , , ..... .,., .,., ,.. ,,.., ,,,.. , ......... $ Equipment - Epoch $ Equipment - Coring ............................ $ Equipment - Relative Humidity Probes ......... .... ...... .. .._ ..... ............... .......... $ Isotope Depletion 314 .................. ...... . ......... $ Hazardous Waste Disposal ................... .. $ LABORATORY HOURS AND TESTING SERVICES Laboratory hours are 7:00 a.m. through 4:00 p.m., Monday through Friday. Break results available at 8:00 a.m. Additional charges will be made for off - hours, weekends or holidays as follows: 83.00 Per Hour 93.00 Per Hour 93.00 Per Hour Quote Per Hour 83.00 Per Hour 95.00 Per Hour 35.00 Per Day 0.75 Per Mile Equal to Rate of Service 110.00 Per Hour 85.00 Per Hour 95.00 Per Hour 250.00 Per Hour 175.00 Per Hour 110.00 Per Hour 95.00 Per Hour 195.00 Per Shift 0.15 Per Sq /In 60.00 Per gallon Cost Plus 20% Equal to Rate of Service 0.75 Per Mile 65.00 Per Day 150.00 Per Day 65.00 Per Day 15.00 Per Day 40.00 Per Day 40.00 Per Day 25.00 Per Day 35.00 Per Day 35.00 Per Day 20.00 Per Day 20.00 Per Day 15.00 Per Day 55.00 Per Day Quote Per Day Quote Per Day 55.00 Per Probe 18.00 Each 15.00 Each Off -hour Laboratory Operations per hour . ,., .., ., . .. ..... ...... $ 500.00 Per Hour Saturday Laboratory Operations per hour .............. ............._.... .............. .... , .,.. ...... .... ..,.... .. ......- $ 500.00 Per Hour Sunday or Holiday Laboratory Operations per hour ........ ............................... ........ ...... ......... $ 750.00 Per Hour Pick Up Sample Trip Charge (2 hour minimum)...,. ......... $ 50.00 Per Hour After Hours Pick Up Sample Trip Charge.,.... ... ........... ............................. __ ........ ..................... _ ...... .......... $ 100.00 Per Hour 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 5 Agreement No. 5179 ASTM Physical Characteristics mm|L AND AGGREGATE ocoUnit Weight ........................................................................ ..................................................... $ 45.00 Each o4829 Expansion Index -_----........ --_---__-_.... - ___ ............ .... ..... ...... $ Vano Each C117, D1140 #xoo Wash ................... ......... ....................................................................................... ........ $ 50.00 Each o136 Particle-Size Distribution "Sieve" Analysis (retained on#coonmvo )------------$ mzoo Each D1140, D422 Particle-Size Distribution ' Sieve Analysis + Hydrometer Combined ... ----_-------$ 185.00 Each o4318 Aoorberg Limits, __--...... ____ ...... _--_----_------_-___-............... _-$ 110.00 Each o2435 Consolidation _-___--- ....... .... ........ ... ---_-_-_-............ -_-_--_-$ 125.00 Each o2419.cTM217 Sand Equivalent Value m Soil and Fine Aggregate (Set mThree),.._ $ 75.00 Each Set C127 Specific Gravity and Absorption (Coarse *gomgote} ....... -----_-_--_-------$ 65.00 Each c128 Specific Gravity and Absorption (Fim*Auomoam)-_----------_-- ...... -___$ 95.00 Each oon* Specific Gravity (Svil) ................................................................................................... ...... '$ 95.00 Each o2216 Moisture Content .... _ ...... .......... - .... .... ........... .......... ____ ...... ........... _--_-_'-$ 15.00 Each o2216 Moisture Content Quick wuoo ......... .................. -_----....... -----........ ............. $ 30.00 Each 0000n Direct Shear (3 Points) ................ ..... ____ ......... _...... ....... _._--............ ----$ 200o0 Each 000un oirooahvonemomeuoamvm(3pomts)-_-_--_-__-_-__---_-_----$ 280.00 Each o1557-A,o Maximum Density -----_-_--_-_-...... ....... ...... ... .... ... -... ... ........... ... ........ $ 135z0 Each o1557-C Maximum Density ...... ---_--_-__-__-----__---............... -_-___ ......... $ 1*5.00 Each o2844,oTm301 n-Value(3 Points) ............. ....... _....... '--_-_-'--...... ... ....... _-_--....... $ 300.00 Each CTmouV Durability Index (coarse mnm$_- ...... ___ _-........ ........ ____ ...... $ 250.00 Each crmuun Durability Index (coarse on fine) ... --_--........ ................................................................. $ 150o0 Each n1*2 Clay Lumps a Friable pumoleo___-_-__ ...... -- ........ ---................... ....... $ 120u0 Each o3744.oT229 Durability |rmvm for Coarse Aggregates -...... ...... -........ .... -_-...... _-........ ............ * 150z0 Each CHEMICAL PROPERTIES crmm*o Resistivity. .... -__-......... _--_--_-----_------_-__-....... ....... ......... 75.00 Each CTMn43 pH.. ....... ....._.......__--__---__-.--_.------...... --_--_---_-$ nouw Each CTm417aulpham- .......... - .......................................... ___... ... ....... ..... ... ............................ $ noon Each oTm4uz Chloride .... ................ __........ ...... .... _... ...... -___....... --........ ....... '__--...... $ 60.00 Each CTMn4n.417.4zu ounouwty Series __ ... ........... __.................. .............. ---............ -_---_--_--$ 185z0 Each ASPHALT CONCRETE c192 Review m Existing Mix oouiOn_-- ... ----------__-----_--_ ..... ....... _$ 150.00 Each o136 Gradation vr Extracted oommle-__ ... .... __--...... -........ _--........ ____ .......... $ 70o0 Each onau Unit Weight - Molded Specimen m Cores ...... -........ -------......... - ..................... $ 45z0 Each D2726 ,D6926 Compacted Maximum Density - MARSHALL ..... _-_-_-............ -_--_-'........ -..$ 175z0 Each o5581 FivmMix - Morsha - Stability Per Pomt.---_-_ ........... ___ ......... _--..... _-- Quote CONCRETE cno Concrete Cylinders Compression Test (6^x1cl--__---_ ........................ -__...... -$ 22.00 Each o469 Concrete Cylinder Compression Test with mos (Modulus m Elasticity) .......... ............... --$ mmuw Each c495 Lightweight Fill Concrete (rxn")_ ....... _--... __-....................................................... $ 22.00 Each C42 Concrete Cores, n^ Max. Diameter, Includes Core Tnm----_-_---_-__-__-_$ 35.00 Each c42 axommte Cores, o^ Max. Diameter, Including Core Trim ............ __--_............... * 35.00 Each c42 Gunn Cores, n^ Max. Diameter, Including Core Tnm-- ... ------...... ............... ---$ 35.00 Each o157 Grout s»nnxago(aoum- puu Readings, Up to 000ays-_- ....... .......... -------* couoo Set C567 Unit Weight m Hardened Light Weight Concrete -_-_------_-_--_------.$ 35.00 Each c567 Unit Weight mx Hardened Light Weight Concrete (Oven Dry) ....... ............................. ...... -'$ 100.00 Each C567 Equilibrium Density m Hardened Light Weight Cvnomte-_-- .... - ............. _-_-_-$ 150.00 Each C684 Rapid Cure Concrete Cylinders (Boil Momou-___--_--__---_--_-----$ 40.00 Each c157 Drying Shrinkage (o Bars - Four Readings, upTvnm Days) ..... ........ ..... ... .... ...... ........ $ 250.00 8m C495 Lightweight Fill Concrete Density .... ..... ........... .............. - ............... ...... __... $ 35.00 Each o138 Density (Unit Weight) mConcrete ......... ................................. ................ .............................. $ nw/m Each Set c173 Air Entrainment Test (Volumetric Method) ............................................................... ............... $ noow Each Set c231 Air Entrainment Test (Pressure mvmoo-wonunhw,einmAnnrenmo_-___--_---$ nozm Each Set cro Flexure Tevs^xe^aeamo--_-_____-_-__-__-'__'---_--__-p 85.00 Each C496 Splitting Tensile o^x1u^ Cylinders ................ -_.............. $ oo/m Each p1869 Measuring Moisture Vapor Emission Rate ........ 35.00 Each n2170 Relative Humidity Probe .................... ................... ._--_-.................. ..... __--_-_$ 55.00 Each A615 nhomicaAnalyois--_------------_---__..___-_-___--'-$ 300.00 Each n2170 Relative Humidity ................................................ _-_........... __-____-__.-_-_$ 55.00 Each o42 In Laboratory Core Cutting, --_...... _-....... ............. ... .... __-.... ....... ...... ............. -$ mzoo Each MASONRY BLOCK o780 mortvnyngem(2"x*) _--___---_--___-----__----_-_-- $ 22.00 Each C109 Mortar Cubes (2"x ...... ________$ 22.00 Each o1019 omuPnomoCrxnl_--_------__-___-__--_----__--_--_$ ox/m Each C1314 Grouted Prisms Compression (Masonry AomynuaOe nestm8"x8"x1o^- .......... ........ _.0 95.00 Each 16-03e9 Koury Engineering, Inc. ^ Chino, o^ (909) 606-6111 ^ vwvw.xouryenginoonng.uom page 16-0369 Koury Engineering, Inc. - Chino, CA (909) 606-6111 - www.kouryengineering.com page 7 Agreement No. 5179 o1314 Grouted Prisms Compression (Masonry Assemblage) Test /8^x8^x16^ -_--__'$ 120.00 Each n140 Moisture Content om Received each ......... ......... --................... --.-_---__...... -$ no{m Each n140 Absorption, onoquireu--- ....... --__-------...... --_--__....... ....... ....... $ *o.00 Each c1*0 Measurements ..... ....... - ............ ....... --................ -----_--------_---_$ 30.00 Each C140 Compression 58"x8"x16", Qty n Required _....... ______-____$ 45.00 Each o1*0 Compression >o^xo^x1o^ Qty n Required __-...... -........... -....... _---_-----$ 55.00 Each n426 Linear Shrinkage, Qty a Required, .............. -....... ....... __-_-__---........ _-__* 0000 Each o42 maoonrycore - oumpmoown_ $ 55.00 Each c42 maaonryovre - Shea _____--_-___-____-___________-$ 75.00 Each C42 m Laboratory Core Cuffing ....................... ........................ _-...... ........................................ $ ouoo Each BRICK cnr Compression .......... ...... ....... ....... ---....... --...... -_-___--------- .... -$ *u.00 Each c67 Modulus mnuptore-__-_--_ ........... --_ ...... -- ....... --_-----_ ...... ....... $ 50.00 Each c67 Absorption, Soak .......... _.................. _--__-_...... -............... -_---_--_-...... $ 30.00 Each n67 Absorption, Boil ................... ............... ........ ..... - ......... ....................................................... $ 30.00 Each Cnr Absorption, Saturation Coefficient -__-...... ....... ........ ..... .... ... ..... ....... ------..y 40o0 Each c67 mumnatemAuuorpuon_---_---_-_-__----_-_---__-_-_-_---$ *0.00 Each c67 Efflorescence $ 55.00 Each c67 Efflorescence with wvrta-_-__-_--__---_---_---_-_--------_$ 65.00 Each STEEL REINFORCING A615x706 Tensile No. o Bar and mmolle,_-_-_-_-___-_- .............. -_--__----_-_$ 45z0 Each ^615m706 Tensile No. nTo11 Bar ................................. ----_---____'-_'_--__--'m 45.00 Each A615w706 Tensile No. 14Bar .................................... ........... ........ ------'--............ ........... -p 70.00 Each ^615m706 Bend Test No. oBar and nmalle,-----------_-_...... 45.00 Each A615oA706 Bend Test No. oTv11 Bar ................ 45.00 Each ^615m70e svnuwu14 Bar .... 70.00 Each A615oA706 Bend / Tensile Test No. 1x--------------- ........ ____--_-....... __--$ 250.00 Each A706 Chemical ^malysm--- .... ---------- .......... --_-_--_- .......... ............ $ 300.00 Each A615x706 Deformation Compliance --........... ...... -----__._-_-__--_-__---_-.$ nnoo Each A615x706 Cut nv Size (for mu ng)'--_-___-_-_-____'----_-_-_'-$ 10o0 Each STEEL COUPLED WELDED REINFORCING A615x706 Tensile No. o Bar and Smaller ... ------_--_--___--__-_-.......... -_--$ 70.00 Each *615w706 Tensile No. o Toll Bar__-_--____ ........ -__-........ -__........ ----_-_* 000m Each A615m706 n,mum No. 14 Bar -_- ........ ...... '___-....... _........ ...... -_----_- ........ _'$ 100.00 Each *615m706 Tensile No. 1n Bar_ ... .......... _....... ....... -_ ...... --_-_---_---....... ----$ 275.00 Each nTnumTunALoTssL Aurmromu Bolt Tensile Test ...... ----_------------------_----_-----...... $ 55.00 Each x370/F606 Bolt Proof Tost- .... -----....... -_-----_---------------_---_-_ S *o.00 Each A370/r606 Nut Proof Test ........... -.................... .... ... ................. ............. .............................. ......... -$ 45o0 Each x370/F606 Nelson Stud Tensile Test .... ..... _-_-.... ............... 115.00 Each A370/F606 Metal Deck Tensile Test (formed sheet 135.00 Each s10 Brinell Hardness nest._ ..... ..................... __-____........ ............ ........ ...... ......... $ 45.00 Each s18 Rockwell Hardness Tvo .... ............ .......... _...... ...... ................ ___-__- ___ -.S *5.00 Each x370/F606 Coupon Tensile Test ................... ............... .......... --_......... ........ _-_--_-......... --$ *o.00 Each A370/F606 Coupon Bend Test ._ ...... 40.00 Each A370/F606 Nut / Bolt / Washer Hardness ........ ....... -... ...... S, 45.00 Ea. Pc Aoo Metal Deck Coating, ........... _...... -_........ .......... ........... _---___-____-_$ 115.00 Each A370/F606 Machining m Preparation o[Samplev__---_--_- ..... _-__------_-_-$ 40.00 Each PRESTRESS ^*16 Prestressed Strand (Yield / Tensile) ............................................................. _-------'$ 125.00 Each Sample Preparation (Grease Removal) ----_-_--_----_-____--------$ 15.00 Each nRspmmop|wm uso4n-a Oven Dry oononty---- ...... ---................. .................................................................... $ 45.00 Each uao*n-8 Adhesive/Cohesion Testing ................ _-_...... ................... ........ ...... ....... --__-_$ 45.00 Each Rmop|mm uoCm2-10 Tiles (Breaking Strength /Auoorpumn) .................. -_....... -__-__-_......... ........ ... _ 60.00 Each Mineral Shake -noxura| ...... _-........ .......... ...... - .... -.......... -....... - ....... _---_$ *0.00 Each m|neraSxaxo-xuvo,onon-------------------------------. $ 30.00 Each Tagging, Material Id and Sampling nkm-----__--_-_- ...... ---_--___--_$ 70.00 Per Hour 16-0369 Koury Engineering, Inc. - Chino, CA (909) 606-6111 - www.kouryengineering.com page 7 Agreement No. 5179 y11•Z•7:a9Asrr.1 * *1 Price Includes 1 technician and equipment Floor Flatness (Under 10,000 ft) ..................................................................................................... .............................. $ Quotation Floor Flatness Final Report,,,,,. ,... ......... ...... .... . .. ...... .... . ... . . .... .... .. ........ $ 200.00 Each Additional Technician (if necessary) ................ .... ... ...... ............, $ 95.00 Per Hour WELD PROCEDURE AND WELDER QUALIFICATIONS Review Existing Welding Procedure Specification ( WPS)-report ..................... ......... ....... ...,,,.., ............ $ 150.00 Each Review Welding Procedure Qualification (PQR) report.. ...... ...... ..... $ 150.00 Each Observe Welder Qualification ( AWS/ CWI).,.... ....... ..................... .............. .................... ................,..., „,...._........See Materials Inspector Rate Weld Tensile Test Plate (1 -inch thick or less),,, ,,,, ,,,,,,,,,,,,, ,,,,, , ,,, .......... ...... ,,,. ,, ,,,..,, $ 80.00 Each Weld Bend Test Plate (1 -inch thick or less) .................................................................................... ............................... $ 55.00 Each Weld Macro Etch Plate (1 -inch thick or less),........ ...... ............................... $ 70.00 Each Weld Tensile Test Rebar #3 through #9.. ...... ....... ..... ....... .. ........ .........,... $ 90.00 Each Weld Macro Etch Rebar #3 through #9.., . , ..., ... . ......... .......... ___ .......... ..... . ..... $ 70.00 Each Weld Tensile Test Rebar #10 through #14 .. ............. ..... .. .... . „_ ...... ,, , ,, ... ........ .,., . ,. , ., ....,,.,. „, $ 125.00 Each Weld Macro Etch Rebar #10 through #14,,.,,, .... . ... ..... . ........ ... . ... .. ... . ..... ..... $ 110.00 Each Weld Tensile Test Rebar #18 ...................... .,.. ...... ., ............. ............................... ,..................... $ 275.00 Each Weld Macro Etch Rebar #18.,.. .... ... ......... , . .. .......,.. ..... ... , .. .........., $ 180.00 Each X -Ray Plate or Rebar in Laboratory (1 -inch thick or less) ... ........... . ........ ....... ...... ...... $ 150.00 Each ENGINEERING AND PROFESSIONAL SERVICES Senior Engineer/ Senior Geologist....,,. „ ......... ..... .. ... ...... ........ ............., $ Staff Engineer /Geologist ....,,.,. .............. <... ......... , ....,... $ Project Manager / Field Supervisor.. ...... ... ... .... ...... $ Administration .... .. ................. ... . ...... ...,,, ..,..., $ Drafter Test Technicians Lab -Materials__ .._ . .._ .,...... $ Certified Payroll ..... ....... . 1. ..... .. .... ......... .... $ Court Appearance (4 -Hour Minimum) ...., ...... ......... . ................ . ..... _ $ Preparation for Court, Consultation (in our Office) .................... ................... ........... .....,......... ........ , .,...,.,,....,,,.,,,,.,........ $ Preparation for Court, Consultation (Out of our Office, 4 -Hour Minimum) .,,.,, ... ........ $ Expert Witness Testimony (Corporate Officers and Engineers) Deposition (portal to Portal, 4 -Hour Minimum). - ................. .......... ...... .......... ...... ............... $ REPORTS Final Materials Compliance Report.,.,,,,,. „ .....,,. „ . . .. ... ... .. . .. ........... $ Final Laboratory Verified Report (LVR) DSA -291 (Required for DSA Projects) ... .... ... ..... .......... .... . ...... ....... .............:.... $ Final Special Inspection Verified Report (SIVR) DSA -292 (Required for DSA Projects)..... .... . ............................ $ Interim Report from Engineer..,, ...... , .,.. _, ..... ..... _. . .... , ,.... ...... ................. ....... $ Review of Existing Mix Design, Determination of Proportions (3 Bus. Day Result),.... ..... ............ $ Review of Existing Mix Design, Determination of Proportions (Same Day Result)_ ........... $ Report for Special Services / Off Site Testing ...... , , .., .., ... .... . ...... ...... .... .... ....... $ Final Grading / Compaction Report ( Comprehensive) ...... ......... ......... ....... ................ ......... .,... ...................... ............... $ Final Geotechnical Verified Report (GVR) DSA -293 (Required for DSA Projects) ......,, ....,,,,.,. $ Pad Certificate Report ............... .............. ... ... .. ... .... ... .. „,.,, .......,, Utility Trench Compaction Report ............ . ..... . ... ....... . .... ...., ... ............, $ Wall Backfill Report ... ...... .. . .. . ... ....... ..... ....... ...... .. ... . . . . .. .. ...,..I. .............. $ MonthlyInterim In- Grading Report ..... .......... ........................................................................_..,...... ............................... $ Pile /Shoring Monitoring Report,,,,,,,,,, . ,, „ ...... . ......... .. .,., . . Plan Review (Grading/ Foundation).... ... .. ..,. ,. . .... . ....... $ Extra Stamped Reports .......... ......... ...... ,....... ... ,... .......,. ........, .........__ $ MINIMUM HOURLY CHARGES Minimum charges will apply for 2, 4 & 8 hour blocks defined as follows: 2 -hour minimum: Inspector shows up, no work requested or performed 4 -hour minimum: 1 to 4 hours. 8 -hour minimum: Work over 4 hours. Note: Less than 24 -hour call -out notice may necessitate premium charges. 130.00 Per Hour 100.00 Per Hour 95.00 Per Hour 45.00 Per Hour 85.00 Per Hour 65.00 Per Hour 75.00 Per Week 350.00 Per Hour 250.00 Per Hour 250.00 Per Hour Quotation 275.00 Per Hour 500.00 Each 500.00 Each 100.00 Each 500.00 Each 150.00 Each 300.00 Each 200.00 Each 2,500.00 Each 1,000.00 Each 1,500.00 Each 2,500.00 Each 1,500.00 Each 1,000.00 Each 2,000.00 Each 1,000.00 Each 150.00 Each 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 8 Agreement No. 5179 Charges For Service and Contract Terms Prevailing Wage Projects The charges for services and General Terms and Conditions set forth below will govern the provision of services and will constitute the contract terms between the Owner or Owner's Representative (Client) and Koury Engineering and Testing, Inc (KET) unless the Client and KET have executed a written contract with respect to such services, in which case the terms and provisions of the written contract shall control. Anticipated Costs 1.1. KET estimates a budget to assist the client with code required inspections and testing based upon information provided by the client. KET's ability to perform within the estimated budget depends heavily on the accuracy of the information provided, as well as the cooperation and assertiveness of client's management staff. 1.2. Project actual budget totals may vary. Estimated budget hours are based on 40 hours a week, 8 hours a day, Monday- Friday. Client shall monitor the percentage of work remaining to assure inspections and testing is not greater than the estimated budget and adjusts the contractor's labor and scheduling to maintain the work completion schedule. 1.3. A call scheduling inspection and testing beyond KET's estimated budget is deemed acceptance that Client will pay for additional services beyond KET's estimated budget. 1.4. Client recognizes and agrees that any "anticipated costs," "budget estimates," or the like that may be prepared by KET are NOT "guaranteed maximums," "lump sums;" or "not -to- exceed totals ". Client will be invoiced for all work performed and only for work performed based on KET's working conditions and hours as an attachment to their contract. 1.5. Client recognizes, if shop steel fabrication service is required, KET's estimate of hours, unless otherwise noted, is for one steel fabrication facility only. 1.6. Additionally, any weekly overtime hours, Saturday or Sunday, double shift, and /or night shift differential for shop steel inspection are NOT included in KET's proposal. Minimum Charges 2.1. 2 -hour minimum: Inspector shows up; no work requested or performed. 2.2. 4 -hour minimum: 1 to 4 hours. 2.3. 8 -hour minimum: Work over 4 hours. 2.4. NOTE: Less than 24 hour call -out notice may necessitate premium charges. Working Hours 3.1. Regular Time: First 8 hours, Monday- Friday 3.2. Time and One -Half Hours: Hours over 8 -12 Monday- Friday, and first 12 Hours on Saturday; Double Time: All hours worked after 12, Monday- Saturday, Sunday, and Holidays. 3.3. KET observes the following holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, and Christmas Day. 3.4. Overtime hours shall be billed in one hour increments. One half (.5) hour of overtime is billed as one (1) hour of overtime. 3.5. NOTE: Day shift hours are between 5:OOam and 5:OOpm. 4. Shift Differential 4.1. Second (Swing Shift) -Eight (8) hours will be charged for 7.5 hours worked. Time worked in excess of 7.5 hours will be billed at time and one -half rate. 4.2. Third (Graveyard Shift) -Eight (8) hours will be charged for 7 hours worked. Time worked in excess of 7 hours will be billed at time and one -half times the hourly rate. Travel Time and Mileage 5.1. Travel time costs for soil monitoring and soil technicians will be invoiced at regular contracted billing rate. 5.2. Mileage costs for soil monitoring and soil technicians will be invoiced at $0.75 per mile. 5.3. Portal -to -Portal travel time and mileage costs will apply for Engineers, Site Supervisors, Technicians (including Utility Locating and NDT) and Consultants at the contracted billing rate, mileage will be invoiced at $0.75 per mile. Portal -to -Portal is recognized as KET's office to work site and return. 5.4. EXCLUDED - Travetfime-costs fot rr tetiel °4rtapecl' ors tectgnieit r�s "w61f °be tsty ed at regul r rn'lra ed WIfng-rate. 5.5. For projects within a 100 mile radius: mileage costs for material inspectors /technicians will be invoiced at $0.75 per mile after the first 50 miles. For projects in excess of 100 miles from a KET office, travel time and milage will be charged in addition to hours worked from KET's closest office. Scheduling and Cancellations 6.1. A 24 -hour notice is required when scheduling an inspection or technician. If same day scheduling or scheduling after 2:OOpm the preceding day is requested, a premium expedite fee of $75 per inspector or technician will apply. 6.2. If inspection service is not canceled with KET's dispatch department by 2:OOpm for the next day for ICC, LA City or LA County jurisdictions, a premium cancellation fee will apply at the rate of $75 per inspector or technician. 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 9 Agreement No. 5179 7. Expedite Fee 7.1. All expedited and rush requests for, lab work, test results, report reviews, etc. will be charged an expedite fee at 1.5 times the Master Fee Schedule of Rates. 8. Escalation Clause 8.1. The prices quoted below for all services will change July 1 st each year in accordance with the wage listed by the Director of Industrial Relations which is tied to Operating Engineers Local 12. The charges for services set forth in this Schedule of Fees will be adjusted by changes in our general administrative and overhead expenses each year thereafter. These adjusted charges shall become the agreed upon basis for charges by Koury to the Client. 9. Certified Payroll 9.1. Certified payroll requests will have a processing fee applied for each project, billed at $75 per payroll week. 10. Laboratory Testing I D." , '.J) - Inspection-unit rat do-not include matefiet -sarnplelabofW rry testing.& sas�wppe pock�trP. 6�rwr,ges �A ater l sra� wpt . plok »up -ohar e:wilfapply�of q pep sampif� arwd 2 roo�ar rvmifalrrtrefr�ilttcPa- a�pclreec�gefut Che rate.o�P�.�; 0 p r�t�our: 10.2. A soils sample pick -up charge will be invoiced at regular billing rate with a 2 -hour minimum. 10.3. Unless otherwise agreed, all samples or test specimens will be disposed of or destroyed upon completion of testing. If Client requires samples to be retrieved or stored, arrangements can be made at an additional cost. Quotation will be provided for such services. 10.4. Samples requiring more than one person to handle due to oversize or weight, will incur an extra handling charge. Quotation will be provided for such services. 11. Reimbursable Expenses 11.1. Outside Services performed by others and direct costs incurred on the Client's behalf, will be charged at cost plus 15 %. 11.2. Project exclusive equipment or material will be invoiced at cost plus 15 %. 11.3. Business licenses or inspection jurisdiction fees for project specific requirements will be invoiced at cost plus 15 %. 11.4. If free parking is not available, parking charges will be charged to the Client at cost plus 15 %. 11.5. Incidentals, including airfare, car rental, food, lodging, and parking, will be charged at cost plus 15% for out of area inspections unless provided by Client. 12. Terms of Payment SEE TERMS IN AGREEMENT 12.1. Client agrees invoices rendered for professional or technical services will be prepared bi- weekly and are due upon presentation. 12.2. All invoice errors or necessary corrections shall be submitted to KET within Fifteen (15) days of receipt of invoice; thereafter customer acknowledges invoice is correct and valid for payment due to KET. 12.3. Invoices will be deemed delinquent if not paid within thirty (30) days from date of invoice, and will be subject to a late payment charge of 1.5% of the invoice total for each month unpaid. 12.4. In the event, an attorney is needed for collection, Client is responsible for reimbursing attorney's fees and or court costs. 12.5. KET reserves the right to terminate services to a client without notice if client's account is past due more than thirty (30) days. Upon such termination of services, the entire amount accrued for all services performed shall immediately become due and payable to KET. Client waives any and all claims against KET, its subsidiaries, affiliates, servants, and agents in connection with termination of work/services pursuant to this agreement. 13. Insurance SEE TERMS IN AGREEMENT 13.1. KET carries all insurance required by law. Additional costs for waiver of subrogation, extra insurance certificates, coinsurance endorsements or additional insurance will be invoiced to the client at $150 each. 14. Final Reports 14.1. When final report is required, KET must first review all inspection and material testing reports; KET will address and clear up any unresolved issues on these reports, typically with the Architect or Engineer of Record. 14.2. Depending on the project complexity and length of KET services performed, this process can require a minimum of ten (10) business days for completion. If there are exceptions, the final report review can require an extended length of time to complete. 14.3. Report fee is as negotiated per contract. An additional charge will incur for every report processed per permit number associated with the project. Engineer will be billed at $130 per hour. 14.4. Client is required to send KET written request for all final project reports via fax, email, or US mail. 14.5. Final reports are as stated, but not limited to: Final Material Compliance Report and Final Grading / Compaction Report. 14.6. KET will release final report to client once account, including cost of final report, is paid in full. 15. Service Authorization 15.1. Verbal request will be considered authorization to perform billable work. Client shall designate member(s) of staff who have authority to request services and notify KET in writing to their authorized representative. Otherwise all service requests are billable 16. Proposal Valid Duration 16.1. Proposed Master Fee Schedule of Rates, Terms & Conditions and General Conditions stated within are valid for 30 days from proposal date. 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 10 Agreement No. 5179 General Conditions 1. Indemnification In the event of any claim against KET by any party other than Client, Client agrees to hold KET, including its shareholders, officers, directors, employees, agents, and representatives, free and harmless of any from, and to indemnify and defend KET against, any and all liability, claims, causes of action, demands, judgments, losses, damages, expenses, or cost (including, but not limited to, all costs and fees of litigation) of every kind, nature and description, including but not limited to, any and all demands arising by reason of injury or death to person or damage to property, real or personal, including loss of use thereof, economic loss or loss damages otherwise arising directly or indirectly out of the obligations herein undertaken, or out of operations conducted by client, however caused or alleged to have been caused, even if due to acts, errors, omissions or negligence, active, affirmative or passive of KET, except for such losses or damages arising out of or caused by the sole negligence or willful misconduct of KET. 2. Limitation of Liability Client and KET agree to limit the liability, including but not limited to, for consequential damages, of KET, including its shareholders, officers, directors, employees, agents and representatives for any acts, errors, omissions, breaches of contract, or negligence, active, affirmative, passive, concurrent or sole, on the part of KET, arising directly or indirectly from the performance of the professional services under this agreement, to Client to $10,000 or an amount equal to KET's fee, whichever is greater. Client agrees and understands that, in order to provide the professional services requested at the agreed upon fees, this agreement does not provide full liability of KET losses or damages which may arise directly or indirectly under this agreement. Client further understands that should Client require KET to accept exposure to greater liability under this agreement, Client has the opportunity to negotiate in advance a higher limitation of liability, or to eliminate entirely such limit of liability, but that the higher fees commensurate with this higher risk of liability to KET shall be subject to agreement. Client agrees that this provision limiting KET's liability cannot be modified, altered, or varied except by written instrument signed by Client and KET. Client understands and agrees that KET is not an insurer; that this agreement does not provide Client with insurance coverage by KET or anyone acting on its behalf; that all fees hereunder are based solely on the value of the professional services to be provided by KET; that insurance, if any, shall be obtained by Client at Client's sole expense 3. Warranty of Authority to Sign The person signing this contract warrants that he /she has the authority to sign on behalf of the client for whose benefit Consultant's services are rendered. If such person does not have such authority, he /she is personally liable for all breaches of this contract and that, in any action against him/ her of such warranty, a reasonable attorney's fee shall be included in judgment rendered. 4. Dominant Terms The terms and conditions of this Agreement shall take precedents over any terms and conditions which may appear in Client's purchase order, approval or acceptance. Any terms and conditions of Client's purchase order, approval or acceptance which are not identical to the terms and conditions of this Agreement are null and void, are not part of the agreement between KET and Client and are not binding upon KET. The terms and conditions of this agreement may not be varied or changed, nor any of its provisions waived, except by written agreement, signed by an authorized representative of KET. If Client's terms are different, a statement of worth will be provided with updated terms and conditions. 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 11 Agreement No. 5179 The Master Fee Schedule of Rates, Terms & Conditions and General Conditions set forth will be governed by State of California laws, provision of services and will constitute as contract agreement between Client and Koury Engineering & Testing, Inc. (KET) unless the Client and KET have executed a written contract with respect to such services, in which case the written contract shall control. Client's Signature Title Date Koury Representative Signature Title Date ENGINEERING & TESTING, INC. Corporate Office: Branch Office: 14280 Euclid Ave 17800 S. Main St. Ste. 302 Chino, CA 91710 Gardena, CA 90248 16 -0369 Koury Engineering, Inc. • Chino, CA (909) 606 -6111 • www.kouryengineering.com page 12 e are a key member of the construction team while safeguarding the public. We improve operational logistics and provide superior quality control through the continuing development of our engineering staff and technical expertise, utilization of classroom training and field supervisors, thus defining the industry standard. KOURY ENGINEERING & TESTING, INC. CORPORATE OFFICE 14280 Euclid Avenue Chino, California 91710 P:909.606.6111 F:909.606.6555 BRANCH OFFICE 17800 South Main Street, Suite 302 Gardena, California 90248 P:310.851.8685 F:310.851.8692 www.l<ouryengineering.com