Loading...
CONTRACT 4987C CLOSEDAgreement No. 4987C THIRD AMENDMENT TO AGREEMENT NO. 4987 BETWEEN THE CITY OF EL SEGUNDO AND JAMES McNARY, dba BINO CONSTRUCTION THIS THIRD AMENDMENT ( "Amendment ") is made and entered into this 19th day of April, 2016, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation existing under the laws of California ( "CITY "), and JAMES McNARY, dba Bino Construction ( "CONTRACTOR"). In addition to the amount set forth in Section 2 of the Agreement, the CITY agrees to pay CONTRACTOR an additional sum not to exceed three thousand dollars ($3,000.00) for the additional work specified in the Scope of Services attached hereto as Exhibit `B" and incorporated herein by reference. 2. This Amendment may be executed in any number of counterparts, each of which will be an original, but all of which together constitutes one instrument executed on the same date. 3. Except as modified by this Amendment, all other terms and conditions of Agreement No. 4987 will remain the same. [SIGNATURES ON NEXT PAGE] Agreement No. 4987C IN W\TN'6SS, W\ IL, 8L()F the part \csheulvhu�ccxcc'u\uJ this /\nmendnlcnt tile Juyand year first hercinuh.xc*riMcn OTY(}F 6L8[(i||Nl8). AT[E8T �PPR0�[DAST8K)KM� JAMES14cN}\RY dhu@inoConstruction 8 }�mw^ Taxpayer 11) No. v Agreement No. 4987C EXHIBIT B SCOPE OF ADDITIONAL WORK FOR THIRD AMENDMENT TO CONTRACT NO. 4987 Prp j e c t-Sp ccilic Scant -e The Contractor, James McNary, dba Bino Construction, shall remove additional water proofing layers and concrete float on the exterior deck of Unit 219 in the Park Vista Senior Housing facility. The facility is located at 615 E. Holly Avenue in the City of El Segundo, CA 90245. The additional demolition for the aforementioned dwelling unit will include the following: Remove additional water proofing layers and concrete float on deck. • Remove deteriorated flashing along the perimeter of the deck. • Remove exterior stucco as necessary along the perimeter of the deck. • Install new base paper and lath along the perimeter of the deck. • Install new continuous deck flashing along the perimeter of the deck in conjunction with the concrete groundwork. • Apply scratch, brown and finish concrete stucco along the perimeter of the deck as necessary to match existing stucco finish. • Apply primer and exterior stucco paint along the perimeter of the deck as necessary to match existing stucco paint. • All debris to be cleaned and disposed of upon completion. General Scope conditions shall remain the same unless otherwise stated. Attachments: Bino Construction Cost Estimate Dated April 10, 2016 Agreement No. 4987C Name: Floriza Rivera Company: Public Works Department City of El Segundo Phone number: 310 524 2361 Fax number: E -mail: friveraAelsegundo.org> cc: No. of pages: 6 April 10, 2016 Dear Floriza, Attached, please find a CHANGE ORDER revised estimate for 615 E. Holly Ave. Units 219- 221 El Segundo, CA 90245. Upon approval please sign the last estimate approval page and returned the entire document to us by email to james @binoconstruction.com, or fax (323) 935 -5960. Should you have any questions, please call us at (323) 935 -4800 or e -mail me at james @binoconstruction.com, or fax (323) 935 -5960. James McNary Bino Construction 818 231 8563 Page 1 of 6 Agreement No. 4987C Your HOA Specialist 'CONSTRUCTION NG UNDER ONE GOOD ROOF 12101 Van Nuys Blvd., Suite 34 • Sylmar, CA 91342 • Lic. No. 695300 Phone (323) 935 -4800 • Fax (323) 935 -5960 www.binoconstruction.com CHANGE ORDER - ESTIMATE April 10, 2016 Attn.: Floriza Rivera CHOREVESTHOO41016 REVESTH0031016 ESTH0030616 Project Address: 615 E. Holly Ave. El Segundo, CA 90245 Description Price Balcony Deck Repair -- Recommendations: Unit 219 • Move area contents as needed. • Remove water proofing and concrete as needed by cup grinding the existing deck waterproof layer in phases to existing drains. • Remove water proof material from base edge of perimeter wall flashings as needed. • Adjust the slope to improve the existing drainage and pooling as best as possible during the grinding process. • Remove drain caps and lower the drain flow level as needed to accommodate the lower deck slope adjustment. • Provide and apply Acripatch to all flashing joints and drain bezel joints and allow appropriate cure time during the work process. • Provide and apply deck mud or non - shrink grout to adjust the slope further and to improve pooling as best as possible. • Provide and apply AVM base primer to the entire deck. • Provide and apply fiberglass sheeting embedded in AVM 100 waterproof base to the entire deck and drain perimeters.. • Provide and apply two layers of AVM protective smooth. • Provide and apply by hopper AVM knock down finish texture. • Provide and apply two coats of AVM top coat water proof sealer with color to match existing as close as possible. Price Per Deck: • Reinstall existing drain covers. Clean up and dispose of debris. $ 5,950.00 Page 2 of 6 Agreement No. 4987C Unit 220 • Move area contents as needed. • Remove water proofing and concrete as needed by cup grinding the existing deck waterproof layer in phases to existing drains. • Remove water proof material from base edge of perimeter wall flashings as needed. • Adjust the slope to improve the existing drainage and pooling as best as possible during the grinding process. • Remove drain caps and lower the drain flow level as needed to accommodate the lower deck slope adjustment. • Provide and apply Acripatch to all flashing joints and drain bezel joints and allow appropriate cure time during the work process. • Provide and apply deck mud or non - shrink grout to adjust the slope further and to improve pooling as best as possible. • Provide and apply AVM base primer to the entire deck. • Provide and apply fiberglass sheeting embedded in AVM 100 waterproof base to the entire deck and drain perimeters.. • Provide and apply two layers of AVM protective smooth. • Provide and apply by hopper AVM knock down finish texture. • Provide and apply two coats of AVM top coat water proof sealer with color to match existing as close as possible. Price Per Deck: • Reinstall existing drain covers. • Clean up and dispose of debris. $ 5,950.00 Unit 221 • Move area contents as needed. • Remove water proofing and concrete as needed by cup grinding the existing deck waterproof layer in phases to existing drains. • Remove water proof material from base edge of perimeter wall flashings as needed. • Adjust the slope to improve the existing drainage and pooling as best as possible during the grinding process. • Remove drain caps and lower the drain flow level as needed to accommodate the lower deck slope adjustment. • Provide and apply Acripatch to all flashing joints and drain bezel joints and allow appropriate cure time during the work process. • Provide and apply deck mud or non - shrink grout to adjust the slope further and to improve pooling as best as possible. • Provide and apply AVM base primer to the entire deck. • Provide and apply fiberglass sheeting embedded in AVM 100 waterproof base to the entire deck and drain perimeters. • Provide and apply two layers of AVM protective smooth. • Provide and apply by hopper AVM knock down finish texture. • Provide and apply two coats of AVM top coat water proof sealer with color to match existing as close as possible. Price Per Deck: Page 3 of 6 Agreement No. 4987C • Reinstall existing drain covers. • Clean up and dispose of debris. $ 5,950.00 Notes: •- T '. r t t -dam n r °oar le zc s� fl x . la t rat t; . • This estimate does not include any areas outside of the unit deck wall enclosures. Each unit deck is approximately 90 square feet. • The client understands that any and all estimate fees herein may change if engineering /structural /architectural drawings modify the job scope. • As part of the existing waterproofing a deck mud float was added by another company to affect a slope of sorts and this will be all or in part removed thus reducing existing elevations. New deck mud or non - shrink concrete grout will be added to build up to achieve an approximate '/_� inch grade to lip edge space along sliding door threshold and a slope no more than 2% to drains although the boarder around the drains may be more than that. This adjustment may not match exactly the current blueprint adjustment plan as imperfections exist. Additional fees apply, if engineering reading must be taken at time of sloping and floating the deck as this is not a normal deck waterproofing process. The remaining areas will be floated and sloped as best as possible to the two drains working within the 2% parameters and `/-2 inch threshold lip to grade requirement. This is not a perfect process as each deck is different. The work will not be based on imperfect metric readings as they have already been modified during the door installation in order to level the previously un -level door threshold bases. • Slope units, elevation units, and any other units must be interpreted and converted by the architectural /engineering /city groups directly and clearly in inches before the floating begins and must not slow work processes. Bino Construction shall not be held responsible for any such delays and or adjustments once work has commenced or after work has been completed. • Lead times apply for all material orders. • Bino Construction will comply with the following Labor Compliance Requirements on all public projects upon estimate approval: (Prevailing Wage, SB85, SB 854, Labor Code sections 1771.1(a) & 1725.5, Public Works Contractor Registration Program, Electronic Certified Payroll Records to Labor Commissioner, and other requirements described on the direct links provided: http : / /www.dir.ca.gov /Public- WorksISB854.html. • Estimated work time is approximately I week per deck. However, city requirements or changes, engineering or architectural changes, site access and coordination changes, RFI delays, and weather and other unforeseen conditions may impact time to completion. • The total price provided is good only if all decks are approved together. An additional 15 percent applies per section if any amount less than three deck repair sections above are approved. Adclifional loud and l'rogc ssix�glees:, $ 925.00 Original Total Approved Estimate: $ 18,775.00 Page 4 of 6 reement No. 4987C CHANGE ORDER Replace stucco /deck screed 9I�t,.,�,:hi ig (Qbwse vations: A fter demolition offarst layer of deck flashing, we exposed two additional improperly installed deteriorated over layers of waterproofing and one deteriorated concrete float on top of the original deck concrete at Unit 219. There was significant moisture underneath all layers trapped and the concrete float and other waterproof layers were delaminated and cracking. Due to the trapped moisture the perimeter flashing was deteriorated and must be replaced. This requires stucco demo, flashing replacement, and new stucco patch around the entire perimeter of the deck. We will not charge extra for the two extra days required to demo extra concrete and two extra waterproof layers. However the additional stucco /flashing work will add approximately 3 extra days of work to the project. • Note -If units 220 and 221 require new flashing /stucco no additional fees a 1. Unit 219: • Remove up to 4 inches of stucco around the inside perimeter of deck wall. • Remove the deteriorated screed /deck flashing. • Prepare the area with new base paper and lath as needed. • Provide new weep screed /deck continuous flashing to the affected area in conjunction with the deck work. Hourly Rate: • Apply scratch /brown /and finish stucco to the affected area to match existing $ 125.00 texture as close as possible. Total Hours: • Apply touch up primer and exterior stucco paint to the affected area to 24.0 match existing as close as possible. Total Amount: • Clean u and dis ose of debris. $ 3,000.00 Change Order Total: does not include additional insurance /processing fees if $ 3,000.00 re uired. !f this is required an additional 6.5% of the change order total applies, Ad'usted Estimate Total: $ 211775.00 Page 5 of 6