CONTRACT 4987A CLOSEDAgreement No. 4987A
FIRST AMENDMENT TO
AGREEMENT NO. 4987 BETWEEN
THE CITY OF EL SEGUNDO AND
JAMES McNARY, dba BINO CONSTRUCTION
THIS FIRST AMENDMENT ( "Amendment ") is made and entered into this 21 st day of
March, 2016, by and between CITY OF EL SEGUNDO, a general law city and municipal
corporation existing under the laws of California ( "CITY "), and JAMES McNARY, dba Bino
Construction ( "CONTRACTOR ").
In addition to the amount set forth in Section 2 of the Agreement, the CITY agrees to
pay CONSULTANT an additional sum not to exceed one thousand, sixty two dollars
and fifty cents ($1,062.50) for CONSULTANT'S services, for the increased scope
specified in the attached Exhibit `B," which is incorporated by reference.
2. This Amendment may be executed in any number of counterparts, each of which will
be an original, but all of which together constitutes one instrument executed on the
same date.
Except as modified by this Amendment, all other terms and conditions of Agreement
No. 4987 will remain the same.
[SIGNATURES ON NEXT PAGE]
Agreement No. 4987A
W'17111'1114ESS W1 11`�BXOF dir hs he've exectium,'ithis A��rwrid'i'rwna the dRY �"cad
year, hcreitiftf")ove �,,,vriflcn,
CITY OF EL SEGUNDO, BINO CONSTRUCTION,
a law city, a California Corporation
. ........... .
President, BIND.
ATTEST:
v
X"
/1 c"I'leric
A11PROVED "1"0 FOM
y Atu'�rney
- � Icvl 1
Agreement No. 4987A
EXHIBIT B
SCOPE OF ADDITIONAL WORK FOR
FIRST AMENDMENT , TO CONTRACT NO. 4987
Project Specific Scoff
The Contractor, James McNary, dba Bino Construction, shall provide an additional %z" height
increase for the new sliding doors installed at unit 219 as well as custom sill extension trim in the
interior frame of the new sliding doors for units 219, 220 & 221. The facility is located at 615 E.
Holly Avenue in the City of El Segundo, CA 90245. The additional work for the aforementioned
dwelling units will include the following:
ustoin Sill Extension !Units 219, , 2202221
• Expose drywall corners around the new sliding door frame
• Install custom galvanized finish trim extensions to the new sliding door frame to extend
the door sill to the drywall to protect the exposed framing
• Seal the joints of the custom galvanized finish trim as needed
• Provide and apply bonding metal primer to finished areas
• Provide and apply acrylic enamel paint
Increase Sliding, Door l -lei hg t by Y2" — Unit 219
• Remove the new sliding door
• Adjust header and vertical studs around the sliding door frame by additional '' /z"
• Reinstall new sliding door to new height
General Scope conditions shall remain the same unless otherwise stated.
Attachments: Bino Construction Cost Estimate Dated March 10, 2016
Your HOA Specialist
CONSTRUCTION
E V E R Y T 11 1 N G U N D E R O N E G O O D R O O F
12101 Van Nuys Blvd., Suite 34 • Sylmar, CA 91342 • Lic. No. 695300
Phone (323) 935 -4800 • Fax (323) 935 -5960
www.binoconstruction.com
Name:
Floriza Rivera
Company:
Public Works Department
City of El Segundo
Phone number:
310 524 2361
Fax number:
E -mail:
frivera(- ,elsegundo.org>
cc:
No. of pages: 14
March 10, 2016
Dear Floriza,
Attached, please find a change order estimate for 615 E. Holly Ave. #219 -221 El Segundo, CA
90245.
Upon approval please sign the last estimate approval page and returned the entire document to us
by email to james @binoconstruction.com, or fax (323) 935 -5960.
Should you have any questions, please call us at (323) 935 -4800 or e -mail me at
james @binoconstruction.com, or fax (323) 935 -5960.
James McNary
Bino Construction
818 231 8563
Page 1 of 4
CHANGE ORDER-ESTIMATE
March 10, 2016 CHOESTH0031016
ESTHO 122015
Attn.: Floriza Rivera
..............
Project Address: 615 E. Holly Ave. El Segundo, Unit 219 — 221 CA 90245
Description
Price
Sliding Door Installation -- Recommendations:
General Construction Labor —_work to be performed per drawing and by
general construction practices where drawings are non- descripted.
• Move area contents as needed.
• Remove existing sliding glass door from opening.
• Prepare framing and exterior stucco as needed for reinstallation of
new door, new flashings, and weatherproofing.
• Provide wood and hardware to reconstruct the framed opening as
needed to accommodate a raised door installation.
• Construct a raised base at door threshold as part of the framing
reconstruction as needed.
• Provide and install perimeter door and threshold base seal flashings.
• Install one new sliding glass door (provided by the city of El
Segundo).
• Patch interior door perimeter drywall then touch up prime and paint
to match existing as close as possible.
• Apply 60 lbs. base paper, scratch, brown, and finish stucco textures
to match existing texture as close as possible.
• Touch up prime the new stucco patched area.
• Apply sika I joint sealer at door perimeter; to include threshold
base.
Price Per Door:
• Apply two coats of Dunn Edwards exterior stucco paint to match
existing color as close as possible.
$ 9,855.00
• Clean up and dispose of debris.
Interior Reconstruction
• Interior reconstruction repairs that are unrelated to the door
Per Hour Price:
installation will be billed hourly.
$ 125.00
Bond and Processing Fees:
$ 1,500.00
Page 2 of 4
Notes:
���zt r- tttcur +�,- +�vcrrtvc- trcc- c-ctcrts� rs rcr. ��, • rr- rrrrecr. c: rress ,c�wrawuss�cccc�cv�x�',
a"rI Zi�trllpwM car anhtng..j =sew not istd -in
• We reserve the right to install all electrical access components in the
most efficient and accessible manner available based on our final
determination if not drawing is provided and ADA requirements are
met.
• The client understands that any and all estimate fees herein may
change if engineering /structural /architectural drawings modify the
job scope.
• Lead times apply for all material orders.
• Bino Construction will comply with the following Labor Compliance
Requirements on all public projects upon estimate approval:
(Prevailing Wage, SB85, SB 854, Labor Code sections 1771.1(a) &
1725.5, Public Works Contractor Registration Program, Electronic
Certified Payroll Records to Labor Commissioner, and other
requirements described on the direct links provided:
http://www.dir.ca.govIPublic-WorksISB854.htmL
• Does not include rekeying services.
Original Approved Estimate: ESTH0122015 $ 31,065.00
.........
CHANGE ORDER
Custom Sill Extension Trim—Recommendations: Due to the sliding glass door
frames being ordered 4 % inch wide rather than exactly like the existing 5 % inch
wide old frames; we have to customize a finish sill trim and drywall corner bead.
This is billable under the Interior Reconstruction section herein above.
• Provide 3 each custom galvanized finish trim extensions to sliding door
frames.
Hourly Rate:
• Modify trim sets to extend the sill door trim and protect the exposed
$ 125.00
framing.
Total Hours:
• Seal the joints of the custom installed flashings as needed.
4.5
• Provide and apply Alkyd bonding metal primer to finished areas.
Total Amount:
• Provide and apply semi -gloss acrylic enamel paint.
$ 562.50
Unit 219 -221: Increase Sliding Door Heights % inch to improve slope away from
doors.
• Unit 219 - -- Remove new sliding doors and frame and increase height by 1/2
Hourly Rate:
inch. ( 4 hours - Billable)
$ 125.00
• Unit 220 - -- Remove new sliding doors and frame and increase height by /2
Total Hours:
inch. (4 hours - NO CHARGE)
4.0
• Unit 221 - -- Remove new sliding doors and frame and increase height by 1/2
Total Amount:
inch. (4 hours - NO CHARGE)
$ 500.00
Change Order Total:
$ 1,062.50
Adiusted Estimate Total:
$ 32,127.50
Page 3 of 4
Comments:
• All of the above work to be completed in a substantial and workman like manner
according to standard construction practices and codes.
• Any alteration or deviation from the above specification involving extra cost of material
or labor will only be executed upon written orders for the same and will become an
extra charge over the sum mentioned above.
• The cost ofpermits and permit processing is not included. Contractor to be notified if
obtaining permits is requested
• All agreements must be made in writing.
• Contractors are required by law to be licensed and regulated by the Contractors State
License Board. Any question concerning a contractor may be referred to the registrar of
the board, whose address is: CSLB, 3132 Bradshaw Rd. P.O. Box 26000, Sacramento,
CA 95826.
• Right to cancel: You, the buyer, may cancel this transaction at any time prior to
midnight of the third business day after the date of this transaction.
• Proposal is valid for 30 days.
w esrdndeM.. , s....tti�oncir��iill�
the eontrotntr
prte4, der�naaha =al Btirnnd gctstl�lairr
peg+ �z�de��thls�,` l�ac��r, �s- BI��'�- C�n�st�•a�e��n�s° -nt : "' ggedu�gl�c�nt
rr v l e amlal I n f n r coda a* kh4he eonti 16a at-s:
• Terms of payment –A 40% down payment is due upon signing. Payment in full is due
upon completion, A finance char ge of'2.0 %per month applies fin- any amount due.
Acceptance CH013ST110031016
The undersigned hereby authorizes you to furnish all material and labor required to complete the
work mentioned in the above proposal. The undersigned agrees to pay the amount stated in said
proposal upon presentation of billing.
Dated— ................ . ...... day of , 2016
Acceptor's Printed Name
Acceptor's Signature
Page 4 of 4