CONTRACT 4849 Public Works Contract CLOSEDAgreement No. 4849
PUBUC WORKS CONTRACT
BETWEEN
THE CITY OF EL SEG,NDO AND
D
I. RECITALS„ The Pattes, ,,
q
Ucicurmnts am
A. Any [anguage OW refiwas paynxim of oxytios, ftom City r o ft'Vot(oileer, fcw
coMtabon of the Work is Dcwtumonj rrx )dreg
: ft nsabon lbr matenats and t w actay aamages', or
oVw km of cci sa; and
u The insurance provided by ft Vciunleer to to Cfty satisfies
ones , of ft, Caftad Dc=rrenls arod, upw U
*00 be te!
Agreement No. 4849
!!V"I' ; r ,, [ .-, � I' ,,;. i " ice°' "" . A copy of the rxevadmg rate ci per dionmages nuxt
be rxisled at die job site.
A. r t Pro f required Muir ttua CA)nbDd umts (°1
"). Voluntow awees to do addftnW word sin m r qos
codered by thal Cky Sri acwdarwA volh ft Conti, wA Ckxw * .
w
'nw t %pj t " to bK by the tee ,n
. CONTRACT SUM. Ttw Valuniew r pic°e . d , City, and Ofm A vMM van ba3ed
uIxm fts rWesent wtt completed at i t to City Accordingly,
CA:NIIMd KAH t .
A, 'tut l Aft coeVio* W ° t wo(king days (the
c
, The QxIVSKA time will coffunwict WhM Me CXY A es a notice, 0 pro
The ur e, t ft any w tcfing provispuns induded
on the notxv to t t
The r ivW not. port.
RI
Agreement No. 4849
ThO VOlUrItW f rrr ,$ VW t IMSUM by u
Cortrtr . Mid
- SlxxAd On VoWteer gin l he Work W' d receiving uthon to
proceed. W , at tho, VofunteetOs own crW acid rssk-
T DI'SPUT`ES Disputes isarig tran fts ConbwA vWl be detempred s awdancA with
Ow Contract CkxAmwft arxi Pliubft Contracts 1024-0-1024013.
3
Agreement No. 4849
1. NOTIC ES. All cornmunkm, tons 6D ciftix pwly bo doamod
wlian remived by awb party respective namm, and as foll w :
Rocfoaboo P t
t , w 2 to S
El Swjitmdo, CA 9024, , m
In
Agreement No. 4849
19.EFFECTOF COWLICT. In Me evwwt d any awftl, °s %, xwyw . '
Agreement No. 4849
IN WITNESS WHEMOF d* Partie's hwalo have executod this CO*W Olm di
and yow fiM heweiftalb(,we wrd".
Him
Ez
AT"] ESP -
Aa(rp AS TO FORM,
C� ity A6 y
6
PAREN 1'(S) IGUARDIAN(S) •
01ANIEL CHAVEZ
)(Mv k-e C- LAO, ve
Napw
;LO (so
Agreement No. 4849
Daniel Chavez
Eagle Scout Service Project
,ogle Scout Service Project
Camp Eucalyptus
Introduction
Camp Eucalyptus, located in the heart of El Segundo, is primarily dedicated to the local Girl
Scout Organization. It currently serves over S troops and is open on weeknights and weekends
for special events and campouts. The fence around the camp is covered in invasive ivy and needs
removal.
My Eagle Scout Service Project involves the following:
1. Remove the existing ivy surrounding the fence on the east fence.
2. Plant red trumpet vines to replace the ivy and to provide curb appeal.
3. Installing an irrigation system to water the newly planted red trumpet vines.
1. Removal of existing ivy:
The existing ivy on the east fence is over 15 years old and presents an unkempt look of Camp
Eucalyptus and also harbors rats and other rodents which can destroy the environment of the
camp. I plan to remove and replace the ivy.
Step 1: Locate the root source of the ivy.
Step 2: Saw off the root securing the ivy to the fence and dig it up from the ground.
Step 3: Remove the ivy from the fence using trimmers.
Step 4: Dispose of the ivy at the bio waste center.
201
Agreement No. 4849
Daniel Chavez
Eagle Scout Service Project
2. Red Trumpet Vinnes:
As stated previously the current ivy reduces the curb appeal of the camp and harbors rodents and
other pests. I will be planting red trumpet vines, the same plant that hangs from the baseball
fields at rec park, to increase curb appeal and maintain the wooded look of the camp while
getting rid of the rodents.
Step 1: After removal of current ivy, purchase around 15 red trumpet vines.
Step 2: Plant the vines at 10 foot intervals to give them space to grow.
Step 3. Support the vines so they can grow in an organized manner.
3. Irrigation System:
An irrigation system will be installed to keep maintenance of the newly planted vines to make
sure they grow to be healthy. This system will be made out of secure PVC piping and will stem
from the existing tap around the center of the camp. It will water each of the separate vines and
will ensure that they grow. The pipes used will be schedule 40 due to the hard and rocky ground
at the camp so it will last longer. A backflow preventer will be installed due to the irrigation
system not having its own independent source of water.
Step 1: Fit PVC piping to the specifications of the camp fence.
Step 2: Drill the holes for the drip irrigation system and insulate there so they don't present
unwanted leakage.
3. Fit system to the existing tap.
Timelines and Costing:
202
Agreement No. 4849
Daniel Chavez
Eagle Scout Service Project
I plan to complete my project before the start of Summer in time for the Girl Scout Summer
campout. I plan to have the project completed over 3 weekends, depending on the stubbornness
of the existing ivy. I am prepared to allot more time if necessary. I need an estimate of at least 15
volunteers to help with labor and clean -up.
The total cost of the project is estimated to be around $600 dollars, which covers the cost of
stipplies, materials, and food and drink for the volunteers.