1161.0 *a
LrGy L LG � LG
Material Deliveries
Diesel particulate reduction device, applicable parts, 1 lot — 11 units
and clamps /brackets.
Mobile Installation
Remaining 11 vehicles.
6 - 6 weeks
3 - 4 weeks
Maintenance and Service
All emission retrofits require filter cleaning/deashing service at approximately 50,000 miles or 1 year —
whichever comes first. Mechanical Issues with the engine and /or vehicle can cause premature plugging
of the filter resulting in more frequent service intervals. Please be aware that improper maintenance of
the retrofit can void the manufacturer's warranty and that many vendors do not provide maintenance
service for the retrofits that they sell and install.
Ironman is able to provide on -site maintenance and service and recommends semi - annual filter cleaning
as follows:
Filter Deashing at Metropolitan Water District Facilities (Mobile Services)
Metropolitan Water District is responsible for removal and reinstallation of substrate(s):
Pulse Deashing: $200.00 per substrate — Average cleaning time is 30 minutes.
Ironman is responsible for removal and reinstallation of substrate(s). A minimum of three
substrates per visit is required.
Pulse Deashing: $400.00 per substrate — Average maintenance time is 3 hours.
Payment Terms
Ironman's payment terms are Net 30.
References
City of San Bernardino
182 South Sierra, San Bernardino, CA 92408 -1454
George Newlin - (909) 384 -5220
1 location (26 vehicles)
Waste Management Corporation
16804 Sheringham Lane, Lutz, FL 33549
Paul Gagnon - (727) 860 -4171
13 locations (480 vehicles)
Part of Long Beach
1400 W. Broadway, P.O. Box 570, Long Beach, CA 90802
Jeff Hood - (562) 590 -4160
6 locations (514 vehicles)
First Student
15730 South Figueroa Street, Gardena, CA 90248
Mark Elias (321) 947 -7600
6 locations (290 vehicles)
Project Summary. Conducted fleet analysis to determine implementation percentage: data logged
vehicles to determine best available control technology (BACT), conducted fleet assessment to determine
best configuration /part number to be applied; and provided on -site installation, maintenance training, and
general assistance until project was completed. Back pressure testing was also conducted to ensure
product performance.
1
c�.;.c CC71,TC:r ;Q 10W !h 5 -LT -ETA K:GCS L6G�!EEloT