Loading...
97Table 3 - Implementation Schedule for a Municipality or Utility Located in a Low - Population County or Granted Low - Population County Status (3) Accelerated Turnover Option for Municipality or Utility Located in a Low - Population County or Granted Low - Population County Status. A municipality or utility headquartered in a county listed in Table 2 or granted low- population county status may elect to follow the option in Table 4 below in lieu of the implementation schedules in Table 1 or 3. Table 4 — Accelerated Turnover Option for a Municipality or Utility Located in a Low - Population County or Granted Low - Population County Status Fleet Percent Percentage of Group Compliance Group Engine Model -Years to Use Best Available Deadline, Fleet to use Date as of Control Technology as of December 31 Dec 31 BACT 20 2009 newer engine 40 2011 1 1960-1987 60 2013 2025 1994-2006 80 2015 100% 2025 100 2017 20 2008 40 2010 2 1988 —2002 60 2012 80 2014 100 2016 20 2011 2003 —2006 40 2012 3 (Includes dual -fuel and 60 2013 bi -fuel engines) 80 2014 100 2015 (3) Accelerated Turnover Option for Municipality or Utility Located in a Low - Population County or Granted Low - Population County Status. A municipality or utility headquartered in a county listed in Table 2 or granted low- population county status may elect to follow the option in Table 4 below in lieu of the implementation schedules in Table 1 or 3. Table 4 — Accelerated Turnover Option for a Municipality or Utility Located in a Low - Population County or Granted Low - Population County Status 6 G. ;8 Fleet Percent Compliance Percent of Compliance Engine Model- to Repower Date as of Fleet to use Date as of Year with a 1994 or Dec 31 BACT Dec 31 newer engine 1960-1993 100% 2020 100% 2025 1994-2006 N/A N/A 100% 2025 6 G. ;8