19inspections to assure conformance to Codes until such time the permit is
renewed or cancelled. A re- inspection fee per unit for each inspection will be
charged until such time the permit is renewed or cancelled by the permittee. In
addition, any permit not renewed or cancelled within 180 days of expiration will
have the Certificate of Occupancy revoked and the permittee will be charged a
per day processing fee to offset the cost of further inspections, processing, and
legal proceedings.
Permitted Locations; Screening. Temporary structures may be permitted in all
non - residential zones. Temporary structures installed or constructed for a period
of three months or more must be screened from the public view when required
by, and in a manner subject to the approval of the Building Official.
CBC Appendix § J103 is amended as follows:
J103.3 and J103.4 are added to read as follows:
J103.3 Plan Review Fees. When a plan or other data are required to be submitted, a
plan review fee must be paid at the time of submitting plans and specifications for
review. The plan review fee must be as set by resolution. Separate plan review fees
will apply to retaining walls or major drainage structures as required elsewhere in this
code. For excavation and fill on the same site, the fee will be based on the volume of
excavation or fill, whichever is greater.
J103.4 Grading Permit Fees. A fee for each grading permit will be paid to the Building
Official as set forth by resolution. Separate permits and fees will apply to retaining walls
or major drainage structures as required elsewhere in this code. There is no separate
charge for standard terrace drains and similar facilities.
CBC Appendix § J107 is amended as follows:
J107.4.1 is added to read as follows:
J107.4.1 Construction Debris. Construction debris cannot be buried on any
construction site, and must be removed before final inspection. "
SECTION 5. ESMC § 13 -1 -3 is amended in its entirety to read as follows.
"13 -1 -3: BUILDING PERMIT LIMITATIONS:
A. No building permit may be issued for any structure listed in this Section
until the Planning Commission determines either:
That the project will not have a potential for a significant effect on
the environment; or
2. That the significant environmental effects of the project would either
Page 6 of 9
01i