Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
2002 NOV 19 CC PACKET - 2§ �
( §
§ ®
4 0�
(
§ ■
a{ ° , \
\ `
j\
HO IF
, � { , 7•�� (§ §
` §§ k 22
y§)
r E §,)®_
5 ;i:!!
° .a!lr��. EL`
}! /§ | \) )('a \
!'!!Aw!
a�:\r = § ; ■�- - . _ • :e, E
§§E! § § |E ■!!B|!!t; »N §!B ; ■ §§ k )� !!»E! | .
t ■; „ ■z :l ;l:!! ; ■ ;,! ■,E ; ■!F, f !! ): { ( \ \\ M, \
�){ k) 0 k /
)LE !k
) . | |!
2 0 )ƒ
w0
(\ ƒ f (_ \ #
�
�
CITY OF EL SEGUNDO
PAYMENTS BY WIRE TRANSFER
10126/2002 THROUGH 11/08/2002
Date
Payee Amount
Description
10/28/02
Federal Reserve
35000
Employee Savings Bonds EE
10/28/02
Federal Reserve
10000
Employee Savings Bonds 1
10/29/02
PGC El Segundo LLC
26,416 34
Golf Course Payroll Transfer
10/30/02
Health Comp
79303
Weekly claims 10/25
11/4/02
Seimens
44,837 50
Qtrly Energy Mgmt
11/5/02
TP Cingular
2,57671
Refund
11/7/02
Employment Development
40,157 01
State Taxes PR 10
11/7/02
IRS
200,597 90
Federal Taxes PR 10
11/6/02
Health Comp
1,14775
Weekly claims 11/1
10/26- 11/8/02
Workers Comp Activity
16,169 19
SCRMA checks issued
333,145 43
DATE OF RATIFICATION, 11/19102
TOTAL PAYMENTS BY WIRE: 333,145.43
Certified as to the accuracy of the wire transfers by
Depu reasur Date
! / -/z ti,2,-
erector of Administrative Service Date
City
M6r ger Date
Information on actual expenditures is available in the City Treasurer's Office of the City of El Segundo
J:�
REGULAR MEETING OF THE EL SEGUNDO CITY COUNCIL
WEDNESDAY, NOVEMBER 6, 2002 — 5 00 P M
5 00 P M SESSION
CALL TO ORDER — Mayor Pro Tern Jacobs at 5 00 p m
ROLL CALL
Mayor Gordon -
Present arrived at 5 07 p m
Mayor ProTem Jacobs -
Present
Council Member Gaines -
Absent
Council Member McDowell -
Present
Council Member Wernick -
Present
CLOSED SESSION
The City Council may move into a closed session pursuant to applicable law, including the Brown Act (Government
Code Section §54960, et sue) for the purposes of conferring with the City's Real Property Negotiator, andlor
conferring with the City Attorney on potential and /or existing litigation, and /or discussing matters covered under
Government Code Section §54957 (Personnel), and /or conferring with the City's Labor Negotiators, as follows
CONFERENCE WITH LEGAL COUNSEL — EXISTING LITIGATION (Gov't Code §54956 9(a))
1 Southern California Edison v State of California, Department of Transportation, LASC
YC043605
2 City of El Segundo v Stardust West, LASC YC031364
3 In the matter of Application for Certification of the El Segundo Power Plant Redevelopment
Project, California Energy Commission Docket No 00- AFC -14
CONFERENCE WITH LEGAL COUNSEL — ANTICIPATED LITIGATION
Significant exposure to litigation pursuant to Government Code §54956 9(b) -2- potential case (no further public
statement Is required at this time), Initiation of litigation pursuant to Government Code §54956 9(c) -1- matter
DISCUSSION OF PERSONNEL MATTERS (Gov't Code §54957) — None
CONFERENCE WITH CITY'S LABOR NEGOTIATOR (Gov't Code §54957 6) — None
SPECIAL MATTERS — None
Council moved into open session at 6 55 p m
3
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
P 0 '
REGULAR MEETING OF THE EL SEGUNDO CITY COUNCIL
WEDNESDAY, NOVEMBER 6, 2002 — 7 00 P M
7 00 P M SESSION
CALL TO ORDER — Mayor Gordon at 7 00 p m
INVOCATION — Chaplain Jim Rozman of Los Angeles Air Force Base
PLEDGE OF ALLEGIANCE — Councilmember Nancy Wernick
PRESENTATIONS —
a) Council Member McDowell presented a Proclamation to Fire Chief Norm Angelo
proclaiming November 11, 2002 through December 20, 2002 as the Spark of Love Toy
Drive and encouraging the community to support this holiday program by contributing
toys and non - perishable foods to the El Segundo Fire Department during the period of
November 11 -20, 2002
b) Mayor ProTem Jacobs presented a Proclamation observing November 11, 2002 as
Veterans Day in honor of the unfailing valor, dignity, and courage of our patriotic men
and women in uniform, so that their spirit and selfless public service may shine brightly
in the annals of history
ROLL CALL
Mayor Gordon -
Present
Mayor ProTem Jacobs -
Present
Council Member Gaines -
Absent
Council Member McDowell -
Present
Council Member Wernick -
Present
PUBLIC COMMUNICATIONS — (Related to City Business Only — 5 minute limit per person, 30
minute limit total) Individuals who have received value of $50 or more to communicate to the City Council on behalf
of another, and employees speaking on behalf of their employer, must so identify themselves prior to addressing the
City Council Failure to do so shall be a misdemeanor and punishable by a fine of $250 While all comments are
welcome, the Brown Act does not allow Council to take action on any item not on the agenda The Council will
respond to comments after Public Communications is closed
a) Gayle Segars, Chairman of Candy Cane Lane, presented a request for the same level
of City assistance for the December 14 -23, 2002 Candy Cane Lane Holiday Program,
in the 1200 block of East Acacia Avenue, as in previous years. (Consent Item # 5)
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
PAGE NO 2
101
b) Susan Sanchez of the El Segundo Chamber of Commerce requested City support and
sponsorship for the 391h Annual Holiday parade on Sunday, December 8, 2002 from
1 00 p m to 3:00 p m , and Tree Lighting at the Civic Center Plaza on Thursday,
December 5, 2002 from 4 15 p m to 5 30 p m (Consent Item # 6)
c) Brian Crowley, resident, requested more information on consent item number 8
d) Chris Bennett, Good Stuff Restaurants, spoke about becoming part of the community,
and gave information about the restaurant
A PROCEDURAL MOTIONS
Consideration of a motion to read all ordinances and resolutions on the Agenda by title only
MOVED by Council Member McDowell, SECONDED by Council Member Wernick to read all
ordinances and resolutions on the Agenda by title only MOTION PASSED BY UNANIMOUS
VOICE VOTE 4/0 COUNCIL MEMBER GAINES ABSENT
B SPECIAL ORDERS OF BUSINESS
1 Consideration and possible action for a public hearing to modify the Paramedic
Transport Rates and broaden the policy on transport billing to include the billing of
Medicare, Medi -Cal, Medicaid, and private insurance companies of residents to provide
transport services (The estimated additional revenues to be received are $123,000)
Mayor Gordon stated this is the time and place hereto fixed for a public hearing to modify the
Paramedic Transport Rates and broaden the policy on transport billing to include the billing of
Medicare, Medi -Cal, Medicaid, and private insurance companies of residents to provide
transport services
He asked if proper notice of the hearing was done in a timely manner and if any written
correspondence had been received Clerk Mortesen stated that proper notice was completed
and no written communications had been received by the City Clerk's Office
Norm Angelo, Fire Chief, gave a report
Council consensus to close the public hearing
Mark Hensley, City Attorney, read by title only
RESOLUTION NO 4278
A RESOLUTION ADOPTING AN AMENDED RATE SCHEDULE FOR RECOVERING FIRE
DEPARTMENT PARAMEDIC TRANSPORT COSTS
MOVED by Council Member McDowell, SECONDED by Mayor ProTem Jacobs to approve
Resolution No 4278 adopting an amended rate schedule for recovering Fire Department
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
PAGE NO 3
X
91
E
Paramedic transport costs. MOTION PASSED BY UNANIMOUS VOICE VOTE 4/0
COUNCIL MEMBER GAINES ABSENT
2 Consideration and possible action (Public Hearing) regarding the adoption of an
amendment to the 2002 -2003 Community Development Block Grant (CDBG) Program to
add a new protect entitled, "Architecture and Engineering Services for the Removal of
Architectural Barriers at Two Public Facilities Joslyn Center and El Segundo Library"
and amendment to the City Hall West ADA Elevator Protect
Mayor Gordon stated this is the time and place hereto fixed for a public hearing regarding the
adoption of an amendment to the 2002 -2003 Community Development Block Grant (CDBG)
Program to add a new protect entitled, "Architecture and Engineering Services for the
Removal of Architectural Barriers at Two Public Facilities Joslyn Center and El Segundo
Library" and amendment to the City Hall West ADA Elevator Protect
He asked if proper notice of the hearing was done in a timely manner and if any written
correspondence had been received Clerk Mortesen stated that proper notice was completed
and no written communications had been received by the City Clerk's Office
Mary Strenn, City Manager, gave a report
Council consensus to close the public hearing
MOVED by Council Member McDowell, SECONDED by Council Member Wernick to adopt
the new 2002 -2003 CDBG Protect, Architecture and Engineering Services for the Removal of
Architectural Barriers at Two Public Facilities Protect and Budget of $40,000, and the
Amendment for the CDBG City Hall West ADA Elevator Protect, replacing the General Fund
portion of the protect budget with unspent CDGB funds of $100,000, and authorize the City
Manager to execute the contracts, in a form approved by the City Attorney, with the Los
Angeles County Community Development Commission MOTION PASSED BY
UNANIMOUS VOICE VOTE 4/0 COUNCIL MEMBER GAINES ABSENT
UNFINISHED BUSINESS - NONE
REPORTS OF COMMITTEES, BOARDS AND COMMISSIONS - NONE
CONSENT AGENDA
3 Approved Warrant Numbers 2528940 on Register No 2 in the total amount of
$2,224,68919 and Wire Transfers from 10/07/2002 through 10/25/2002 in the total
amount of $1,102,543 80 Authorized staff to release Ratified Payroll and Employee
Benefit checks, checks released early due to contracts or agreement, emergency
disbursements and /or adjustments, and wire transfers
4 Approved City Council Meeting Minutes of October 15, 2002
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
1 n n PAGE NO 4
5 Approved request by the Chairperson of Candy Cane Lane, for the same level of City
assistance for the December 14 -23, 2002 Candy Cane Lane holiday program in the
1200 block of East Acacia Avenue, as in previous years provided that all necessary
permit applications are submitted, including sound amplification permits, and project
meets applicable City requirements
6 Approved request by the El Segundo Chamber of Commerce for City support and
sponsorship for the 39th Annual Holiday Parade on Sunday, December 8, 2002 from
1 00 p m to 3 00 p m , and Tree Lighting at the Civic Center Plaza on Thursday,
December 5, 2002 from 4 15 p m to 5 30 p m provided the events meet all applicable
City requirements
7 PULLED BY COUNCIL MEMBER WERNICK DUE TO A POTENTIAL CONFLICT
8 PULLED BY MAYOR PRO TEM JACOBS DUE TO A POTENTIAL CONFLICT
9 Awarded Contract No 3078 to Flo- Systems, Inc, in the amount of $11,650, authorized
the City Manager to execute the contract on behalf of the City
10 PULLED BY MAYOR GORDON DUE TO A POTENTIAL CONFLICT
11 Approved an annual purchase order contract, on a single- source basis, with Blue
Diamond Industries to supply asphalt paving materials to the City for street maintenance
project (Annual cost is not to exceed $45,000)
12 Approved Change Order No 1 to Valley Crest Landscaping for the landscaping and
irrigation of the golf course Sepulveda Boulevard frontage — Approved Capital
Improvement Program (Estimated Cost - $48,420)
13 Accepted the work as complete on 2001 -2002 Slurry Seal of various streets — Approved
Capital Improvement Program — Project No PW 01 -20 (Contract Amount - $149,703 65)
Authorized the City Clerk to file the City Engineer's Notice of Completion in the County
Recorder's Office
14 Accepted the work as complete on project for the Park Vista Senior Housing Deck
Resurfacing and Waterproofing (615 East Holly Avenue) — Project No PW 00 -13 —
Approved Park Vista Operating Budget (Contract Amount - $98,900) Authorized the
City Clerk to file the City Engineer's Notice of Completion in the County Recorder's
Office
15 Accepted the work as complete on the termite fumigation of Government Buildings —
Approved Facilities Maintenance Operating Budget — Protect No PW 01 -24 (Contract
Amount - $32,062 50) Authorized the City Clerk to file the City Engineer's Notice of
Completion in the County Recorder's Office
16 Awarded three (3) year contracts to Warehouse Uniforms, Contract No 3080, Carmen's
Uniforms, Contract No 3081, and Long Beach Uniform, Contract No 3082, as the Police
Department's primary suppliers of uniforms and accessories Authorized the City
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
PAGE A�O0 /'
Manager to exercise the renewal option for an additional three (3) year period If in the
City's best Interest, for a maximum total contract length of six (6) years
17 Adopted resolutions giving approval to apply for grant funds from the Proposition 12 Per
Capita Grant Program ($152,000), Resolution No 4279, and Roberti- Z'Berg Block Grant
Program ($49,061), Resolution No 4280, with a City match ($21,026) Directed staff to
review appropriate Recreation and Parks Capital Project(s) for funding under the State
Bond Act of 2000
18 Directed the City Manager to forward a letter of support for the Los Angeles County
Department of Beaches and Harbors' application to the California Coastal Commission
to construct four (4) beach volleyball courts at the County managed beach adjacent to
the Grand Ave beach parking lot at Vista Del Mar
19 Adopted resolutions establishing a 401(a) Deferred Compensation Matching Plan and
Trust (Plan) through Nationwide Retirement Solutions, Resolution No 4281, and ICMA
Retirement Solutions, Resolution No 4282
20 Adopted the annual resolutions, Resolution Nos 4283, 4284, 4285 and 4286 updating
the employer's contribution under the Public Employees' Medical and Hospital Care Act.
MOVED by Council Member McDowell, SECONDED by Council Member Wernick to approve
Consent Agenda items 3, 4, 5, 6, 9, 11, 12,13,14, 15, 16, 17, 18, 19, and 20 MOTION
PASSED BY UNANIMOUS VOICE VOTE 4/0 COUNCIL MEMBER GAINES ABSENT
CALL ITEMS FROM CONSENT AGENDA
7 Consideration and possible action on a request from DIreCTV to place a temporary sign
on the building celebrating its 11th million customer The sign, which exceeds the
specifications of the City's Sign Code, will be located on the north side of their building at
2230 East Imperial Highway, and will be in place for two months, beginning
approximately November 20, 2002 Applicant DirecTV
MOVED by Council Member McDowell, SECONDED by Mayor ProTem Jacobs to
approve DirecTV's request to Install one (1) oversized sign for two (2) months
MOTION PASSED BY THE FOLLOWING VOICE VOTE AYES MAYOR GORDON,
MAYOR PRO TEM JACOBS, COUNCIL MEMBER MCDOWELL, NOES. NONE,
ABSENT COUNCIL MEMBER GAINES, NOT - PARTICIPATING COUNCIL MEMBER
WERNICK 3/0/1
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
PAGE NQ 0 j
8 Consideration and possible action regarding 612 Twin Holdings, LLC's application for
(1) an amendment to the Lease and Construction Agreements with the City for the 176
stall parking garage located at 121 West Grand Avenue, (2) an addendum to
Environmental Assessment No 581 for the parking garage, (3) granting authority to the
City Manager to execute an easement agreement with 612 Twin Holdings
MOVED by Council Member McDowell, SECONDED by Council Member Wernick to
approve Addendum to Environmental Assessment No 581, Resolution No 4287, and
approve an amendment to the Lease and Construction Agreements No 3010 between
612 Twin Holdings, LLC and the City of El Segundo to add an additional nine parking
spaces and 778 square feet of commercial use to the previously approved parking
garage located at 121 West Grand Avenue and authorize the City Manager to execute
an easement agreement No. 3083 with 612 Twin Holdings, LLC MOTION PASSED BY
THE FOLLOWING VOICE VOTE AYES MAYOR GORDON, COUNCIL MEMBERS
MCDOWELL AND WERNICK, NOES NONE, ABSENT COUNCIL MEMBER GAINES,
NOT - PARTICIPATING MAYOR PRO TEM JACOBS 3/0/1
10 Adopt plans and specifications for the Camp Eucalyptus Project at 645 California Street
— Approved Capital Improvement Program Project No PW 02 -16 - (Estimated Project
Cost - $356,000) Authorized staff to advertise the project for receipt of construction
bids
MOVED by Council Member McDowell, SECONDED by Council Member Wernick to adopt plans
and specifications for the Camp Eucalyptus Protect at 645 California Street — Approved Capital
Improvement Program Project No PW 02 -16 - (Estimated Project Cost - $356,000) Authorized
staff to advertise the project for receipt of construction bids MOTION PASSED BY THE
FOLLOWING VOICE VOTE AYES MAYOR PROTEM JACOBS, COUNCIL MEMBERS
WERNICK AND MCDOWELL, NOES NONE, ABSENT COUNCIL MEMBER GAINES, NOT -
PARTICIPATING MAYOR GORDON 3/0/1
F NEW BUSINESS — NONE
REPORTS — CITY MANAGER — NONE
H REPORTS —CITY ATTORNEY —NONE
I REPORTS — CITY CLERK - NONE
J REPORTS — CITY TREASURER — NONE
K REPORTS —CITY COUNCIL MEMBERS
Council Member McDowell —
Spoke regarding the upcoming Hyperion Meeting and urged attendance, and the hazard
waste round up
Council Member Wernick —
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
PAGE NO 7
106
Spoke regarding the Hyperion Meeting
Mayor Pro Tern Jacobs —
Reported on the Health Care situation in Los Angeles County
Mayor Gordon —
21 Consideration and possible action regarding the formation of a City Council
Subcommittee that will examine new business recruitment incentives for a period not to
exceed 90 days
MOVED by Mayor Gordon, SECONDED by Council Member McDowell to form a City Council
Subcommittee comprised of two Council Members for the purpose of examining new business
recruitment incentives for a period not to exceed 90 days MOTION PASSED BY UNANIMOUS
VOICE VOTE 4/0 COUNCIL MEMBER GAINES ABSENT
PUBLIC COMMUNICATIONS — (Related to City Business Only — 5 minute limit per person, 30
minute limit total) Individuals who have received value of $50 or more to communicate to the City Council on behalf
of another, and employees speaking on behalf of their employer, must so identify themselves prior to addressing the
City Council Failure to do so shall be a misdemeanor and punishable by a fine of $250 While all comments are
welcome, the Brown Act does not allow Council to take action on any item not on the agenda The Council will
respond to comments after Public Communications is closed
Brian Cowley, resident, read a letter regarding the El Segundo Corporate Campus
MEMORIALS — Adjournment In memory of Dwaine Mcllroy
CLOSED SESSION - NONE
ADJOURNMENT at 7 37 p m
Cindy Mortesen, City Clerk
MINUTES OF THE REGULAR CITY COUNCIL MEETING
NOVEMBER 6, 2002
PAGE NO 8 J
10 "(
MINUTES OF THE
SPECIAL JOINT MEETING OF THE EL SEGUNDO CITY COUNCIL
RECREATION & PARKS COMMISSION
TUESDAY, OCTOBER 8, 2002 — 7 00 P M
300 E Pine Avenue (George E Gordon Clubhouse), El Segundo, California
CALL TO ORDER — Mayor Gordon at 7 05 p.m
CALL TO ORDER — Chairman McCaverty at 7 06 p m
ROLL CALL
Mayor Gordon
Mayor ProTem Jacobs
Council Member Gaines
Council Member McDowell
Council Member Wernick
ROLL CALL
Commissioner Bundy
Commissioner Fearn
Commissioner Glynn -Rich
Commissioner McCaverty
Commissioner Randall
- Present
- Present
- Absent
- Present
- Present
- Absent
- Absent
- Present
- Present
- Present
City Manager, Mary Strenn introduced staff and gave direction on the process and purpose of the
meeting
A COMMUNITY CENTER PUBLIC WORKSHOP
1 Receive public input regarding potential revisions to the design of and concerns
regarding the Community Center Project located at 300 E Pine Avenue and
Recreation & Park Master Plan
LPA Associates presented an overview of the proposed center and the master plan for the
recreation park They presented the process that was gone through for the development of the
Community Center and the information gathered from the public workshops held
Public Comments
Tom Lindsey, resident, spoke against the gymnasium on the scout lot, and suggested that we
further try and persuade the School Board to accept the gym on one of their campuses He also
stated that he doesn't know of anyone who is interested in having a gym in recreation park
Joe Brandin, resident, stated that this workshop was a good idea, and should have been done a
year ago He also stated that he felt the current building is good and could be used much more
efficiently
1
108
Carl Jacobson, resident, requested confirmation of the size of the parking lot re- stripping LPA
stated that there would be enough space He stated that a School Board Member had indicated
that a new gym built next to the existing high school gym might be possible, and there may be
grant funds available for joint use of a gymnasium
Carol Well, resident, requested clarification of the number of classrooms in the current
configuration She also said that no additional classrooms have been added to the proposed
project. LPA stated that even thought no more classrooms have been added, the proposed
classrooms would be more user friendly and would be larger Ms Wells stated that separating the
gym from the proposed building is a good idea, and possibly the gym could be built in stages
Susan Richardson, resident, stated she was pleased that the preschool play yard is separate from
the elementary school age play yard She felt the new facility should be used for a larger display
for arts, crafts, and cultural projects She also stated that the gym floor may restrict its use for other
activities
Donna West, resident, stated that LPA had done a good fob in trying to make the gym fit, but she
had not heard a lot of support for the gym She also asked if there were no gym, could there be
more classrooms built in that space She also asked what would happen if the whole 6 million
dollars was not spent
Susan Truax, resident, spoke regarding the need for a wooden floor dance space
Pam Roach, resident, spoke about how skate boarders may use the new space She also asked
about moving the play yard closer to the baseball field, and the possibility of baseballs being hit
into the lots She further stated that partitioned rooms are very difficult to hold meetings in when a
class is being held adjacent to the meeting room
Lorne Porry, resident, stated she felt that the arts needed more attention She felt that putting a
basketball court over the existing court would be a good compromise
Christopher Porry, resident, supported the arts portion of the proposed budding and stated he was
in favor of increasing the arts and drama portion of the building
Kitty Crowley, resident, asked if the gym was to be air conditioned LPA stated it would be She
asked if the increased play area were added, would the open green space be reduced LPA stated
that it would be reduced
Linda Poepoe, resident, stated that no one present tonight spoke in favor of a gym She further
stated that if there were people who wanted a gym built they would be there tonight to support the
idea She did not feel that a gym could be used for very many other events because of the flooring
and that the theater space could not be used for other events due to the increased number of
programs that would be presented She also stated that someone could coordinate the use of the
school district classrooms and other city buildings for meetings and programs
Olivia Potinger, resident, spoke in favor of classrooms
Rick Sobosky, resident, spoke in favor of the gym and explained the need for one
2 1OJ
Jane Tunno, non - resident, spoke against the project
John Morton, resident, asked if Plan "G" was a larger than Plan "A" He also stated that the gym
space had not been reduced
Jan Cruickshank, resident, spoke against the gymnasium She also suggested a shuttle bus might
be put into service for large events to alleviate parking problems She also read correspondence
from resident Liz Garnholz
Lori Choquette, resident, spoke in favor of a new budding She further stated that classroom space
needed to be increased and a larger venue was needed for the theater
Anthony Hedayat, resident, spoke about the perceived disagreement between the arts and sports
facilities He further stated that most of the existing sports facilities are in better shape and better
maintained than the current facilities for drama He further stated that the gym did not fit within the
existing space Supported a quality theater space
Kerry King, resident, requested clarification of the square foot area for the tiny tot lots
Mathew Rice, resident, spoke regarding the gym fitting into the current configuration He stated
that he would like to see a gym built but it would be a better to explore other sites
Linda Pollard, resident, stated she has consistently requested that the building size be reduced
and space be used more efficiently Stated that if the additional foot print was expanded towards
the west, no green space would be lost She suggested a multi -use room could be developed that
could be used for dance and athletics, and perhaps upgrading the Joslyn Center with a second
story for dressing rooms and a theater space
Paulette Caudill, resident, asked if there was a master plan for the rest of the facilities in the city
She suggested that perhaps a city -wide use master plan be created for the best use of all city
resources
Bill McCaverty, Chairman of Recreation and Parks Commission, stated that the many
recommendations were appreciated and the Commission wanted to reflect the community's
desires when making a recommendation to the Council
Council discussed the input received from the community Council stated that they were very
receptive to community feelings and were trying to do the right thing for everyone concerned
Noted that moving the proposed gym to another sight might be a good resolution A master plan
for all the parks may be considered, and maybe there could be a better use for other parks With
the input from the Community Center Public Workshop, Council felt they could bring all the
suggestions together and come up with a feasible plan
ADJOURNMENT at B'40 p m
Cindy Mortesen, City Clerk
110
EL SEGUNDO CITY COUNCIL
AGENDA ITEM STATEMENT
MEETING DATE November 19, 2002
AGENDA HEADING: Consent Agenda
Consideration and possible action regarding the establishment of a professional service
contract with Kimley -Horn & Associates to prepare the Circulation Element of the General Plan
and Environmental Impact Report (EIR) The amount to be paid to the consultant under this
agreement is $244,530
RECOMMENDED COUNCIL ACTION.
1 Approve a professional services contract in a form approved by the City Attorney with
Kimley -Horn & Associates to prepare the Circulation Element of the General Plan and
EIR
Alternatively, discuss and take other action related to this Item
BACKGROUND & DISCUSSION:
On September 17, 2002, the City Council directed staff to distribute a Request for Proposal
(RFP) for a consulting firm to prepare a Circulation Element and an accompanying
Environmental Impact Report (EIR)
On September 19, 2002, Planning Division staff distributed a Request for Proposal (RFP) for
the preparation of a Circulation Element of the General Plan and EIR The City received three
proposals by the October 18, 2002 deadline Staff invited all three candidate firms to Interview
on November 5, 2002 These firms were Kimley -Horn and Associates, Ultrasystems
Environmental, and David Evans and Associates
(Background and discussion continued on the next page....)
ATTACHED SUPPORTING DOCUMENTS'
1 Draft Scope of Services with Kimley -Horn & Associates in the amount of $244,530
FISCAL IMPACT
Operating Budget. $250,000
Amount Requested: $244,530 (an additional $23,530 if a Land Use Element Amendment is later required )
Account Number- 001 -400- 2402 -6214
Project Phase: N/A
Appropriation Required _Yes X No
ORIGINA BY: DATE.
�/�
Jame ansen, Director of Community, Economic and Development Services
Mary St nn, y Manager ��GZ
111
al
BACKGROUND & DISCUSSION (continued)
Based on the Interviews and the submitted proposals, staff recommends that the contract be
awarded to Klmley -Horn & Associates as the firm most capable of carrying out the objectives
of the project and the firm most responsive to the requirements of the RFP Staff also
recommends the retention of Klmley -Horn & Associates based upon their knowledge of the
subject property and their proven ability to complete such projects In a timely manner The firm
and the project managers who will lead the consultant team have experience working on
Circulation Elements throughout California Mr Herman Basmaciyan, who worked on the 1992
Circulation Element which was adopted as part of the General Plan, will be the Project
Manager Christopher Joseph and Associates will prepare the EIR Christopher Joseph &
Associates has completed EIRs for many large projects Including the El Segundo Corporate
Campus.
The cost for the Circulation Element and EIR Is $244,530 If a Land Use Element amendment
is later required as part of the project (to revise the Floor Area Ratios, for Instance) the
Lightfoot Planning Group will prepare the amendment The cost would be an additional
$29,000 The Lightfoot Planning Group prepared the 1992 General Plan The 2002/2003
budget has an allocation of $250,000 for the Circulation Element and EIR If a Land Use
Element amendment is required, an additional $23,530 will need to be allocated for this
project Staff is recommending that the current contract should be for $244,530 If the Council
determines that the additional work is necessary, an amendment will be brought to the City
Council for review and approval
P \Planning & Building Safety \PROJECTS \Klmley- HomcontraclCC doc
112
III. Approach and Scope
APPROACH
The City of El Segundo last adopted an update to Its
General Plan in 1992 The General Plan Update
included a comprehensive evaluation and update of the
Circulation Element At that time, a substantial amount of
traffic analysis was conducted, and a variety of Land Use
and Floor Area Ratio (FAR) alternatives were tested for the
Mixed -Use areas of the City The Circulation Element
changes adopted at that time reflected the City's vision for
local and regional transportation and mobility needs for
buildout of its city
Many developments that have taken place since the 1992
Update are in keeping with the General Plan vision A
substantial amount of new office development has been
constructed in the past year The El Segundo Corporate
Campus was recently approved for over 2 million square
feet of professional office, at a 92 floor area ratio There
have also been changes within the City, as well as
throughout the region, that have the potential to change
ambient traffic conditions substantially – enough so that
City staff and the City Council of El Segundo have decided
to revisit the Circulation Element It Is the City's desire to
once again revisit target or allowable FARS in the Mixed -
Use and the Corporate Office areas of the City, and to
investigate non - traditional means to accommodate the
increasing transportation needs In the City
The Update of the City of EI Segundo's Circulation
Element will Involve close coordination with the City of El
Segundo staff and the City Council A comprehensive
traffic forecasting effort will be undertaken to develop a
reliable and sufficiently detailed means to evaluate large or
small changes in land use, FARS, and network
assumptions Traffic conditions will be evaluated on all city
street segments, and at up to 60 Intersections A summary
of a generalized process proposed for the Update of the
Circulation Element is presented on the exhibit on the next
page A discussion of each of the steps to be undertaken
is provided in the Scope of Services section of the
Proposal
City of El Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copyright 02002, Kimley -Hom and Associates, Inc
Traffic Analysis and Circulation Element
Development
Below is an outline of the efforts envisioned to compile the
necessary data and Information for the preparation of the
updated Circulation Element for the City of El Segundo
Task 1 — Project Initiation
We will meet with City staff and the project team to discuss
roles, expectations, Imes of communication, coordination
of activities, and analysis methodology for the Circulation
Element update At this time, we hope to obtain copies of
previous relevant reports (such as the traffic study for the
El Segundo Corporate Campus) and any available existing
data from the City We will discuss the various network
scenarios and FAR options, and determine the format In
which the land use and FAR information will be provided
Task 2 — Data Base Compilation
The previous Circulation Element effort for the City of El
Segundo provided a thorough account of existing roadway
conditions We will verify and update information about
existing roadway characteristics, Including number of
lanes, one -way or two -way operation, current Circulation
Element classification, on- street parking, bike lanes, truck
routes, transit routes, and posted speed limits
We will obtain and compile existing traffic volume
Information, using current count data available from City
count records, and recent traffic Impact studies It Is
assumed that average daily traffic volumes will be
available from the City, and that current morning and
evening peak -hour traffic counts at up to sixty (60)
Intersections will be obtained by Klmley -Hom from recent
traffic studies, where available When necessary, Klmley-
Hom will conduct peak -hour traffic counts, preferably prior
to the holiday season
We will prepare a graphic depicting the public
transportation services available throughout the City,
including the various transit and rail service providers In a
separate table, the transit schedules, frequency, and inter-
transferability will be summarized
We will update existing Circulation Element graphics depicting
circulation features such as functional classification, street
capacity, and truck routes and bicycle routes through the city
III Approach^ and Scope - Pagel q `)
�AL7 Assoc�,hc 1
Task 3 — Presentation of Existing Conditions
We will summarize existing dally and peak - hourly
operating levels of service using the Intersection Capacity
Utilization (ICU) methodology of Intersection evaluation
We will provide accompanying Level of Service (LOS)
tables and Existing Conditions graphics
Task 4 — Development of Buildout Forecasts
Future buildout traffic forecasts will be developed using the
land use and network assumptions reflected in the current
General Plan This effort will be performed with a traffic
forecasting methodology to be selected by City staff and
the City Council Kimley -Horn will provide a brief summary
of the differences, benefits, and limitations of altemative
forecasting methodologies Kimley -Hom will make a
recommendation as to the preferred methodology The
selected modeling methodology will be
• Technically sound and defensible
• Responsive to the types of analyses the City wishes to
perform
• Easy to explain and understand
• Capable of producing results consistent with changes in
model inputs
• Easy to update, as needed, after the Circulation
Element Update protect is completed
To ensure consistency and technical compatibility with
regional transportation planning, we propose to develop
regional trip distribution assumptions based on the
Southern California Association of Governments (SCAG)
Regional Model Using the regional input for travel pattems
to, from, and through El Segundo, we will develop a
subarea model The subarea model will reflect the details
of the City's street and roadway network in much greater
detail than possible with the regional model Likewise, the
subarea model will be refined to reflect the land uses in the
City and a refined Traffic Analysis Zone (TAZ) structure
The base year and 2025 regional model networks and trip
tables will be obtained from SCAG The El Segundo
subarea model will first be developed and validated for
base year conditions After ascertaining that the base year
subarea model Is capable of reflecting current traffic
Cdy of El Segundo Circulation Element Update and Environmental Impact Report
71-770007 02
Copyright 02002, i0mley -Horn and Associates, Inc
conditions in El Segundo, we will develop the 2025
subarea model The validation of the base year model
would give us the confidence that the modeling process
would truly perform the function of a sound technical
analysis tool
Using a refined and custom - tailored subarea model will
allow us to accurately reflect El Segundo land uses and the
roadway network Starting the modeling process with the
SCAG model data as a base will allow us to maintain
compatibility with the regional planning process and to
account for the effects of Intercity and pass through traffic
attributable to such regional traffic generators as the
airport, the Playa Vista project, and others
All proposed traffic forecasting assumptions and
methodologies will be set forth in a technical report, and
presented to City staff and the City Council for review and
approval prior to beginning the analysis
The traffic forecasting process will take Into account the
trip generating potential of vacant and underdeveloped
land within the City, per current General Plan designations
Klmiey -Horn will depend on detailed parcel -by- parcel land
use data from the City to quantify the existing land use vs
the potential land use, per General Plan designations In
the analysis of altematives, the levels of development
attributable to diffenng FAR assumptions will be reflected
for the affected parcels
As an optional task, Kimley -Hom will offer to update the
City's existing Traffix program to reflect the results of the
subarea modeling effort and train City staff in Its use This
would allow the City to conduct small -scale traffic Impact
analyses, or sensitivity runs for selected zones or areas
within the City once the Circulation Element effort is
complete
III Approach and Scope - Page 2
:❑ �,,,„c 114
f
Task S — Update of Circulation Goals and
Policies
We will review the current Circulation Element goals and
policies, and formulate recommendations for modifying,
updating, or enhancing them Revisions will take Into
consideration measures to reduce traffic demand, such as
shuttles and TOM programs, programs to enhance mid -day
tnp Interaction between major employment centers and
downtown, and "creative" ways to enhance traffic capacity,
such application of Intelligent Transportation System (ITS)
technology, and traffic engineering measures to enhance
capacity
Task 6 — Evaluation of General Plan Buildout
Conditions
Once the traffic forecasting methodology is selected,
buildout operating conditions with the Master Plan
Circulation Network and Land Use Plan currently reflected
In the City's General Plan traffic levels will be analyzed
Circulation system improvements needed to accommodate
traffic demand generated by the General Plan land uses
will be identified We will analyze potential circulation
system improvements using the updated goals and
policies If necessary, mitigation measures will be identified
to accommodate the level of land use growth per the
General Plan Presentation of analysis results will include
tables and graphics depicting the LOS of roadway
segments and intersections Freeway interchanges will be
analyzed to identify appropriate improvements at entrance
and exit ramps and at ramp terminals
Alternative Land Use FAR Scenarios
In addition to the analysis of "General Plan Buildout"
conditions, a number of model runs will be conducted to
test potential changes to the City's Master Plan Circulation
Plan and Land Use Plan
The citywide traffic model will be run a number of times to
test a variety of FAR assumptions in the Mixed -Use Zone
and the CO areas of the City Specific FAR scenanos
ranging from 0 8 to 13 will be developed in conjunction
with City staff
City of El Segundo Circulation Element Update and Environmental Impact Report
TUTONT 02
Copyright 02002, Krmley -Nom andAssoaates, Inc
We suggest the following approach to the analysis of
altemative FARS after the completion of the analysis of the
General Plan FAR level
1 FAR of 13 In all MU and CO zones (highest traffic
volume scenano)
FAR of 0 8 In all MU and CO zones (lowest traffic
volume scenano)
3 FAR of 1,0 in all MU and CO zones (medium
traffic volume scenano)
4 Fully analyze the traffic Impacts associated with
each scenano
5 In discussions with City staff and /or City Council
identify and analyze additional FAR scenarios
Analyze the additional hybrid scenanos only to
the level of roadway segments (no intersection
analysis) to Indicate how Impacts might change
compared to those Identified In the analysis of the
General Plan and the low, medium, and high
traffic volume scenanos
7 Based on the analysis of roadway segments
select on or two preferred scenanos, with City
Council Input and guidance
8 Analyze the preferred scenano(s) fully, including
Intersection Impacts
We believe that this approach would be cost effective,
yet responsive to he City's needs and will help focus
on the FAR alternatives likely to be selected
Alternative Network Scenarios
The model will also be used to evaluate specific
modifications to the existing and Circulation Element
network These network modifications will include the
potential elimination of future street extensions identified In
the City's Circulation Element, such as Grand Avenue,
Nash Street, and Manposa Avenue
A separate run will be conducted to evaluate the Impacts of
returning Nash Street and Douglas Street to two -way
operation
III Approach and Scope - Page 3
oMMo = k. 115
C I T Y O F E L S E G U N D 0
Task 7— Preparation of the Circulation D. Recommended Bicycle Route System
Document
A draft Circulation Report Document will be prepared to
address all existing major roadways and future planned
roadways, transit routes, freeway Interchanges, and
alternative transportation modes The document will
Identify recommended circulation systems and specific
Improvements to provide for the existing and future
circulation needs of the City of El Segundo, consistent with
the land use plan identified in the General Plan or a
revised Land Use element with different FAR designations
The Circulation Report Document will Include the following
Items
A. Master Plan of Roadways
A Master Plan of roadways will be developed which
designates the recommended classification and roadway
width for existing and future roadways throughout the City
of El Segundo Evaluation of the projected operabon of the
recommended roadway system will be conducted and any
projected deficiencies will be identified and appropriate
mitigation measures will be considered
B. ITS Component
The ITS component will be a new section In the City's
Circulation Element The ITS component will document as
a starting point, the current ITS efforts of the El Segundo
Employer's Association in cooperation with the County of
Los Angeles Any ITS enhancements Identified in the
course of the traffic analysis will be Incorporated into the
ITS component along with a discussion of benefits of ITS
In traffic control and momtonng
C. Recommended Truck Route System
A recommended truck route system will be developed to
serve the existing and projected shipping needs of the
existing and future commercial and industnal land uses
within the City, particularly on the routes leading to and
from the freeway system and Los Angeles Intemational
Airport (LAX) The truck route system needs to balance the
need for mobility and potential conflicts with residential
areas, schools, and other sensitive land uses
City of EI Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copyright 0 2002, Kimley -Hom end Associates, Inc
A recommended a bicycle route system that will support
and encourage the use of the bicycle as a viable and
convenient travel mode within the City of El Segundo,
particularly adjacent to and serving area schools, parks,
other recreational facilities and commercial / Industnal
activity centers will be developed
E. Pedestrian Circulation System
A recommended a pedestrian circulation system that will
support and encourage walking as a convenient travel
mode throughout the City of El Segundo will be developed
Alternative Modes of Travel
Recommendations and policies will be Identified to provide
for alternative modes of travel to the single occupant
vehicle, In addition to cycling and walking, the following
alternatives will be considered
• Transit – Fixed route and demand responsive
• Carpooling and vanpooling
• Other options
Transportation System Management (TSM)
TSM techniques will be evaluated and appropnate
recommendations will be Incorporated Into the Circulation
Element Suggested TSM techniques for consideration
Include
• Traffic signal synchronization, Including signal timing
and coordination across jurisdictional boundanes,
• Signal timing and phasing techniques, such as
protected /permissive or split phase timing,
• ITS elements, such as video surveillance or changeable
message signs,
• Auxiliary traffic lanes, such as acceleration and
deceleration lanes,
• Intersection Improvements Including turn lanes or
channelization,
• Peak -hour turning restncbons or parking restnctons,
and
III Approach and Scope - Page 4
rm0 .r. 11 r;
• Improvements designed to assist transit flow or reduce
transit/auto conflicts, such as bus turnouts and signal
preemption systems
Transportation Demand Management (TDM)
Program
• Review of existing TDM activities in City
• Identification of additional TDM opportunities
• Coordination with regional TDM activities
• Recognition of regional guidelines that would affect TDM
actions
Congestion Management Plan (CMP) Consistency
• Review of existing CMP activities In the City
• Identification of CMP opportunities, requirements, and
constraints
• Coordination with Regional CMP activities to ensure
General Plan consistency
Task 8 — Interagency Coordination
Throughout the Circulation Element
Development Process
Throughout the General Plan Update, it will be necessary
to coordinate with adjoining and nearby cities, the County,
Caltrans, SCAG, Public Transportation providers, and
other involved agencies We will participate In such
coordination activities
Task 9 — Team Meetings/Presentations
Attendance /participation in up to three meetings with City
Council and one presentation each to the City Planning
Commission and to the City Council are Included In the
work program
Environmental Analyses and Documentation
Because It is expected that the Circulation Element EIR will
be scrutinized by affected parties, adjacent residents, and
surrounding communities, It Is Important that the potential
environmental effects of the project be fully analyzed
Although any EIR can be challenged, a comprehensive
approach using appropriately conservative assumptions Is
City of El Segundo Circulabon Element Update and Environmental Impact Report
TL770007 02
Copynght 02002, Kimley -Hom and Associates, Inc
likely to withstand any legal challenge that might be raised
The EIR must respond directly to Issues raised by
responsible agencies and community organizations An
EIR that provides thoughtful and well- documented
responses to Issues raised during the environmental
review process Is the best means of allowing the project to
proceed In the most expeditious manner
Because of the nature of the proposed General Plan
Element, a Program EIR will be prepared to address the
potential environmental effects of proposed physical
improvements and projected changes in transportation
patterns that will result from Implementation of the policies
and programs of the Circulation Element In order to
assure that the resulting EIR Is both analytically correct
and legally defensible, the CAJA team will prepare a
comprehensive and factual EIR that addresses existing
conditions, project impacts, mitigation measures,
cumulative Impacts and alternatives to the project The EIR
will also include a complete justification that the City of El
Segundo may use to conclude that remaining issues not
specifically addressed in the EIR would not be significant
The EIR will be prepared based on the standards and
requirements of CEQA, the State CEQA Guidelines, and
the City of El Segundo, The EIR will be prepared to meet
the exacting standards of quality employed by CAJA in the
preparation of our previous EIRs in El Segundo and
throughout Southern California
The following tasks will be performed by the CAJA team to
prepare a Program EIR for the proposed Circulation
Element, and will commence as soon as an EIR project
description can be developed based upon the
transportation analysis and draft Circulation Element
prepared for the City
The scope of work outlined below assumes that the
Program EIR will be limited to addressing the potential
environmental Impacts of transportation improvement
projects and the effects associated with projected traffic
levels resulting from implementation of proposed
Circulation Element programs and policies It does not
Include analysis of changes to the General Plan Land Use
Element, Including plan designations and zoning changes
for different areas of the City
III Approach and Scope - Page 5
C21=11 , . I I
Evaluation of the potential environmental impacts
associated with any such changes is provided as an
Optional Task and presented at the end of this scope of
work
Task I —Review of Existing Information
CAJA will review existing information from previous
environmental reviews and pertinent documentation for
other development projects which have recently occurred
in the City CAJA will analyze this Information to determine
issues, findings and problem resolutions that could be
relevant to the EIR A concerted effort will be made to
utilize and Incorporate as much existing data as possible
Into the EIR
Task 2 — Preparation of a Draft Initial Study
The Initial Study consists of a checklist which is used to
identify areas where the proposed project could potentially
result In environmental Impacts, as well as areas where the
proposed project has no potential to result In Impacts
CAJA will prepare a Draft Initial Study for the proposed
project utilizing the City's Initial Study Checklist The Initial
Study will be comprised of a completed checklist and
detailed responses to all questions, with particular
emphasis given to responses where the Impact is not
significant and the response provided will serve as the
primary record of the City's determination that the Impact is
not significant The Initial Study Is also a valuable tool in
refining the scope of the EIR and Identifying any additional
technical reports that may be required for the proposed
project
Task 3 — Notices and EIR Scoping
CEQA Includes prescribed noticing requirements to Inform
the public and other cognizant agencies that
documentation is being prepared for a project CAJA will
prepare the Notice of Preparation (NOP) required by
CEQA for the proposed project In the format used by the
City and will circulate It to all Identified commenting
agencies and Interested parties
City of El Segundo Circulation Element Update and Environmental Impact Repoli
TL770007 02
Copyright 0 2002, Wmley -Horn and Associates, Inc
U N D O
The NOP will include a map of the City showing areas
where potential circulation Improvements may occur, a
brief description of the proposed project, and a preliminary
list of the environmental effects to be evaluated In the EIR
A finalized scope for the Draft EIR will be defined after all
comments on the NOP have been received, CAJA will
work with the City to determine 6 the comments expand
the scope of work or require additional technical sections
to be included In the EIR The Initial Study, NOP, and all
correspondence received In response to the NOP will be
attached as an Appendix to the Draft EIR CAJA will
circulate all other required public notices including the
Notice of Completion and Notice of Determination
Task 4 — Preparation of Administrative Draft
EIR
An Administrative Draft EIR will be prepared for review by
the City This subsection outlines the major sections which
will be Included In the Administrative Draft EIR
Summary
A tabular summary will be Included as the first section of
the EIR The Summary will Include an Introduction,
description of the proposed project and alternatives, a
tabular summary of expected environmental effects and
recommended mitigation measures, along with a summary
evaluation of alternatives
Introduction and Overview of Environmental
Setting
The Introduction section of the EIR will include a narrative
on the background of the EIR process, a description of the
process used to develop the proposed project and
alternatives, and a short summation of the project approval
process The environmental setting will provide a physical
description of the areas within City in which transportation
improvements are proposed to be constructed Existing
improvements and land uses will be described as
appropriate
III Approach and Scope - Page 6 t r
Dr" amid Faeom jc 1 C}
C I T Y O F
A discussion and tabular list of related projects /cumulative
development will be presented, and the location of such
development will be plotted on an area map A related
projects "list- based" approach (CEQA Guidelines, Section
15130(b)(1)(A)] will be used to analyze the potential
cumulative impacts of the proposed project in conjunction
with other projected growth in the area
Description of the Proposed Project
E L S E G U N D 0
As a Program EIR, the project description will provide an
overview of the policies and programs set forth in the
proposed Circulation Element, the relevant assumptions
used to project future transportation conditions In the City,
and specific physical Improvements and changes (e g ,
new facilities, reconfiguration of existing facilities, removal
of previously planned facilities, etc ) that are proposed to
be Implemented as part of the proposed Circulation
Element The project description will include a qualitative
and graphical description of proposed changes in the City's
circulation system, and will include regional and vicinity
maps and aerial photos as appropriate For CEQA
purposes, the project description will also Include a
statement of project objectives to be developed in
conjunction with the City
Environmental Setting, Impacts, and Mitigation
As an Introduction to this section of the EIR, each
environmental impact area determined not to have a
potentially significant impact on the environment, as
Identified in the Initial Study described above, will be listed,
with an accompanying discussion of the reasons for the
determination
Each of the areas of potential impact will describe the
existing conditions, environmental Impact after
development of the proposed project and alternatives,
recommended mitigation measures, net unmitigated
environmental Impact after project development, and
cumulative impact
City of El Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copyright 02002, Kimley -Hom and Associates, Inc
Existing Conditions Analysis of the existing
environmental setting is necessary in order to compare
those conditions to any changes created and produced by
the proposed project, and to Identify any significant
environmental effects of the proposed project For
purposes of an environmental analysis within the EIR, the
environmental setting is defined as the physical conditions
In the affected areas as they exist at the time the Notice of
Preparation Is published (State CEQA Guidelines, Section
15126 2, revised October 26, 1998)
Environmental Impacts of the Proposed Project. Each
of the environmental subject areas will be evaluated to
determine impact significance Under CEQA, a significant
impact is defined as a substanbal, or potentially
substantial, adverse change in the physical environment.
The specific criteria or threshold of significance for
determining the significance of a particular impact will be
Identified in conjunction with the City prior to the Impact
discussion in each issue section, and will be consistent
with the new criteria set forth in the revised CEQA
Guidelines
Mitigation Measures Where applicable, mitigation
measures will be presented In each respective
environmental subject area in the following classification
scheme
• Mitigation Measures required to reduce an Identified
significant impact to a less- than - significant level
• Circulation Element Mitigation Measures, mitigations
that are recommended as policies in the proposed
Circulation Element that will reduce or avoid significant
environmental impacts
• Non - Required Measures, mitigations that are
recommended (but not required) to further enhance
environmental conditions within the project and the
surrounding locale, and which can reduce an Identified
non - significant Impact
• Code - Required Measures required by local, regional,
state, and /or federal regulations and statutes which
must be Imposed as conditions of project approval
Such code - required measures will be listed even though
they are not necessarily required to reduce identified
Impacts
III Approach and Scope - Pagel C�
rlz❑ = h
L
Y anon Monitoring itMiugaban Morn ustbe coil
Mitig include a DgA_requrred Plan m
ise The EIR will also 11 This GE rocadures The
anon A clear, cone ReP°�ng prop tarty poftaes and P 0 m will list lt)
of impact After Mrd9 act after the of, acts vnll be around oiling P ,lr anon
4evei organized monrtonng and reP 2 correlate the mt„ tthe
e level of impart Na rs gnrf cant" mtgaUo1) easures, t) ental actions tdent�N
statement of th ure5 will be P" or „}ass than proleolmingahon m ovemm and (3)
ml meal sr nlrcant, acts rn vafious 9 lwll reQu", rtment.
as either x g s cumulamenUGUmu }afive measures to theot the Pf0} de
defined ,the prof imp mentatwn er ovemmental f he mil gaVo The
devOOP undo le
related tarry of EI 5e9 andior oth 9e eXacutron ° ram will
also
t umulativn IMP dennfied outside them1ght be included are the CrIY morntar th ReP°��ng grog eniorceme "I
con}unctw . and P °ssrbry e tarty that urrements, c
Master Plan It that shout Mondanng onbdng req sand Pe
Re0d p�}ects outside ,lelment and the l� act drscuaclons MrtgaUon s Grfw tep rting iomo fished
ulatNe rmP establish Pe nalbes, reP° lha estab
the Playa�Ista De a iePresent a worst case procedures and Pe nsistentvnth
noted thmug � era�Y because impact schedules consistent
will be h,mPacts 9 exPeGted) aR, mon }tongs of the GrtY
lhat such would be are, for the most P s on procedure
scenano (Mlot than eels te' 0a) exstm9 use sectwns
prootons far related P {AJ gections uired
wdhout subtracb vex rt rs assumed for d andwa other Olt maude the following
Mateo is will be approved and In 11 also Adverse Impacts
calculatee �)actsrtes sed Pr ° }ect The p}Rvn
related P e of the Prop° of Unavo+dabie Significant
purposes that all related a e} will lrieely be sub}eCreduce
within the the ham }} also +Summary impacts
developed h related PfOJ s which wi + Growth tnduan9
ovelo ,eaG anon measure ersons GonsuWe
unspec }fled maig • 0(gariizatwna and P nnel graft
• RepottPreparotionPerso inistrative
cumulatNe imPaGis proposed Project itiat of the �dm
to the atNes +oth a Task 5 -- sublo
Afternattvesropare an analysis °t ahem pro}ect iR to the city imum of lw0 drags °f
GAdA rnll p ro }act This Prop°n the EIRncludes No involves a max ve Draft
ed ency review ftEIR The first Adni�mstrafi withthe
include typical ag Dra ensrve °ommenis,
aro alv es t° be aaUves may mments The review
AltematNe) Such the Admmistrah'V the mos f w r co has approved
end dons) EjRwoukd rece onng s until the "m llE1R
• No Prolar tE usbn9 twns subsequent draft to continue ublrcation as a D of the
cod Use Assume rovements and canecfion Y Drat IEIR for P five copies
r Altemata l a uraUons�lmP trve Cp p wkp submft at each
aadwal G°nfig 1 the Adm n�slm }anon Gi lot review
• Alternate R ana}Yses ate base nvironmenta for public arc raft E}R to the lY
ii1 meets for the d by then eriaco parficular prolect Admm,strafive D
The req . as dicta 1evrew interval
^rule of reason tect the o W� I be determinverapteGa °t
Quality Aclanat e sr 'NA that se at con affect
SP 6c aftem staff, It is norrtGafifom
with tarty issuRmg
consultation have been decided EIRs The m
court cases t altematNesaliemahves analyses
the scope at PTO made tat chagerrges' whjch m tum' SIS
court decisions
haw to leg a uacy tar such analy
ERs more vul standards of adobe of atternave5 o
has cbeng behind the re}ecof the altemafives l° mkt
The reasoning on the inablIM
ryprcally � actives
the pro)e Gt
_.u. Girc��t�EtUP��andEnnramentatlmPa�RePa�
111 APPro� a� ScoPa • Fw
8
Task 6 — Production and Circulation of the
Draft EIR
When the City has approved the Administrative Draft EIR
for release as a Draft EIR, CAJA will print 75 copies of the
Draft EIR and its Technical Appendices CAJA will also be
responsible for the circulation of the Draft EIR to the State
Clearinghouse, identified commenting agencies, and
interested parties In addition, CAJA will prepare and
circulate the Notice of Completion for the Draft EIR
Task 7 — Preparation of the Final EIR
The Draft EIR will be circulated to the public for a minimum
of 45 days Following the closure of the public comment
period, CAJA will prepare and submit five copies of the
Administrative Final EIR to the City The Final EIR will
consist of a summary, corrections, additions, and
responses to comments to the EIR Each comment
received on the Draft EIR will be responded to in the Final
EIR The extent of work necessary to complete the Final
EIR is contingent upon the amount and nature of
comments that are received after the Draft EIR is
circulated For the purposes of this proposal, It is assumed
that a workload of approximately 120 hours will be required
to complete the Final EIR Should responses to comments
exceed the anticipated workload, additional hours would be
billed on a time and materials basis, with prior approval of
the City
CAJA will begin preparation of the Final EIR immediately
after circulation of the Draft EIR commences During the
time the Draft EIR is being circulated for public comment,
the summary and corrections and additions sections of the
Final EIR will be prepared Written comments on the Draft
EIR will be responded to as soon as they are forwarded to
CAJA by the lead agencies It is anticipated that some
comments will be received before the end of the public
circulation penod and that responses to these comments
could be prepared immediately upon receipt
City of El Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copyright 0 2002, IOmley -Hom and Associates, Inc
CAJA will make changes to the Administrative Final EIR
following its review by the City When the City has
approved the Administrative Final EIR for release as the
Final EIR, CAJA will print 50 copies of the Final EIR and
circulate them to all appropriate agencies and individuals
CAJA will also prepare and circulate the Notice of
Determination
Task 8 — Project Coordination /Public
Participation
Successful preparation of the EIR will require effective
communication between the City and CAJA CAJXs
expenence in managing other projects of similar scale and
complexity has shown that regular working meetings
provide this type of communication Attendance at various
public hearings will also be required as a part of the EIR
process CAJA has budgeted for a total of 10 meetings or
hearings for all purposes over the course of the EIR
process Attendance at additional meetings or hearings
would be billed on a time and materials basis
Task 9 — Statement of Facts and Findings
Prior to consideration of the proposed project and
certification of the Final EIR, CAJA will prepare the
Statement of Facts and Findings for any significant
environmental effects identified in the EIR The findings will
individually identify the significant environment effects of
the proposed project and provide a reasoned discussion of
the appropriate findings of the Lead Agency
Task 10 — Statement of Overriding
Considerations
Prior to consideration of the proposed project and
certification of the Final EIR, CAJA will prepare the
Statement of Ovemding Considerations (If required) The
Statement of Overriding Considerations will describe why
the benefits of the project outweigh Its significant
unavoidable effects, if such effects are Identified by the
EIR
III Approach and Scope - Page 9 121
M" ail s.h
Environmental Issues to be Analyzed in the EIR
Based on a survey of the project site, discussions with City
staff, and review of the RFP, CAJA will propose to analyze
the following environmental issues in detail in the
Circulation Element Program EIR
• Transportation/Traffic
• Air Quality
• Noise
• Geology and Soils
• Hydrology/Water Quality
• Land Use and Planning
• Cultural Resources
• Hazards and Hazardous Materials
The following pages provide a summary of the content and
technical approach for each environmental impact category
which will be analyzed in the Circulation Element Program
EIR
Transportation/Traffic
Evaluation of transportation and traffic Impacts will be
based upon the extensive analysis and modeling that will
be conducted in the process of developing the policies and
programs included within the draft Circulation Element
This section will address existing traffic conditions within
the City, along with projected traffic conditions with and
without implementation of the proposed Circulation
Element
Air Quality
Characterize Existing Conditions. This task will involve
compiling historical data from the nearest air pollutant
monitoring station The number of exceedances of State
and Federal Ambient Air Quality standards will be
documented We will document existing ambient
background carbon monoxide concentrations using the
CAL3QHC dispersion model Sensitive locations will be
identified for purposes of establishing existing CO "hot
spot" conditions within the City
CO or El Segundo Ciroulabon Element Update and Environmental Impact Report
TL770007 02
Copyright 02002, Kimley -Horn and Associates, Inc
CO concentration measured In parts per million will be
calculated for the one -hour and eight -hour penods and
compared with State standards To provide a regional
context, the most recent attainment and non - attainment
status designations from the California Air Resources
Board (CARB) will be discussed
Assess Construction Impacts. Based upon a generic
construction scenano for proposed transportation
improvement projects, WE will estimate the short-term air
quality effects associated with construction of the proposed
protect The analysis will seek to define the worst -case
phase and will consider construction activities associated
with site preparation and construction phases
Area Source Air Quality Impact Assessment. Using the
SCAQMD guidelines as well as the U S Environmental
Protection Agency's (EPA) AP42 emissions factor
document, all applicable sources of air emissions for each
phase of the construction process will be combined into a
total area source emission rate
Emissions from the construction site will be quantified on a
daily and quarterly basis in pounds per day and tones per
quarter, respectively These emissions will be compared
with daily and quarterly emissions thresholds established
by the SCAQMD to determine the potential for significant
impacts
Mobile Source Air Quality Impact Assessment. To the
extent that the construction scenano prepared for the
proposed project suggests that traffic flow will be disrupted
on streets adjacent to the proposed project, a mobile air
quality impact assessment will be conducted for carbon
monoxide This work will be accomplished using the
CAL3QHC microcomputer model to determine carbon
monoxide concentrations at sensitive receptor locations
adjacent to the affected streets Specific consideration will
be given to areas of heavy pedestrian activity as well as to
the housing developments located within close proximity to
the site, where either traffic speeds are reduced or the
traffic is moved physically closer to sensitive areas
Significant Impacts will be determined by comparing model
results with CAAS and to SCAQMD incremental change
criteria
III Approach and Scope -Pagel 0 12 2
con atl ncealebs.h
Prepare Operations Phase Impact Analysis. The Impact
analysis for air quality will utilize criteria for determining
significant Impacts consistent with Appendix G of the
CEQA Guidelines Specific Impact methodologies
employed will be as follows
The air quality assessment will be prepared to satisfy the
requirements of the SCAQMD Specific analysis will
include
Daily Emissions Mobile emission rates will utilize the most
recent EMFAC7F series factors required by SCAQMD,
emission factors will be generated using the Caltrans
EMFAC7F microcomputer program or the CARB URBEMIS
7 or Bunsen 7G programs Mobile emissions rates will be
applied to vehicle miles of travel statistics for citywide
traffic
Carbon Monoxide Hot Spots The roadside carbon
monoxide analysis will be conducted In accordance with
the procedures established by US EPA and SCAQMD In
the carbon monoxide modeling protocol document
Specific attention will be given to two classes of roadway
intersections First, analytical priority will be given to
intersections that will be expected to operate at LOS E or
F Second, Intersections that will be adjacent to sensitive
land uses will be evaluated The CAL3QHC microcomputer
carbon monoxide dispersion model will be used at
intersections that may be substantially affected by the
project
Identify Mitigation Measures. We will select mitigation
measures that will either eliminate or substantially reduce
any Identified air quality Impacts Mitigation measures will
be selected to ensure that performance standards are met
and that the measures are feasible and enforceable
Measures will address both short-term and long -term
aspects of the project
Noise
To supplement existing noise data sources, we will
conduct field measurements using a Type II sound level
meter capable of out - putting a printed record and time
histograms Measurements will be conducted during the
peak travel hour and off peak penods to assist In
characterization of noise level vanations in the project
vicinity throughout the day
City of El Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copynght 02002, Kimley -Horn and Associates, Inc
U N D 0
Assess Construction Impacts. Based upon a generic
construction scenario for proposed transportation
Improvement projects, we will estimate the short-term
noise effects associated with construction of the proposed
project The analysis will seek to define the worst -case
phase and will consider construction activities associated
with site preparation and construction activities
Mobile Noise Sources. To address the Impact of heavy
trucks accessing the construction site during excavation
and foundation phases of the project, Caltrans Sound 32
microcomputer model will be used in conjunction with truck
traffic volume estimates to simulate the added noise from
local roadways
As In the case of stationary noise sources,
ambient/existing noise conditions will be established
through a representative sound - monitoring program In the
project vicinity In addition, noise levels will be estimated
using the Sound 32 model for sensitive receptor locations
throughout the City to assess the future noise levels from
the changes In traffic levels that would result from
Implementation of the Circulation Element programs and
policies
Identify Mitigation Measures. We will select mitigation
measures that will either eliminate or substantially reduce
any Identified noise Impacts Mitigation measures will be
selected to ensure that performance standards are met
and that the measures are feasible and enforceable
Measures will address both short-term and long -term
aspects of the project
Geology and Soils
CAJA will prepare the analysis of geotechnical /seismic
considerations for the Program EIR Existing geotechnical
conditions within the City will be taken from the City's
General Plan and General Plan EIR, which Identify existing
local and regional geologic /seismic hazards (faulting,
seismicity, dam failure), geologic conditions, and site
stability (erosion, hillside conditions) conditions In
addition, maps of Seismic Hazard Zones released by the
California Division of Mines and Geology will be consulted
regarding liquefaction hazards
III Approach and Scope - Page 11 123
�^^
�L, ad nsorJS, he
ajar
it
C I T Y O F E L S E G U N D O
State Alquist -Pnolo zone maps and 1990 Los Angeles
County General Plan seismic study will be also be
consulted regarding groundshakmg hazards The purpose
of this analysis will be to Identify any potential geotechnical
or seismic Issues that could affect transportation
Improvement projects Identified in the proposed Circulation
Element Mitigation measures will be focused on defining
requirements for site specific Investigations for future
Improvement projects located within Identified hazard
areas All other projects will be subject to building code
requirements designed to address known conditions
throughout the City of El Segundo
Hydrology/Water Quality
CAJA will prepare the analysis of drainage, hydrology, and
water quality considerations for the Program EIR Existing
drainage infrastructure and areas of potential flooding
hazard within the City will be identified from the City's
General Plan, General Plan EIR, and additional
coordination with the Department of Public Works as
required In addition, FEMA flood hazard maps will be
consulted regarding potential flooding hazards The
purpose of this analysis will be to identify any potential
issues related to drainage or flooding that could affect
transportation improvement projects Identified In the
proposed Circulation Element Water quality issues during
construction will be addressed in the context of countywide
construction runoff requirements and the Los Angeles
County Standard Urban Stormwater Management Plan
(SUSMP) Mitigation measures will be focused on defining
requirements for site specific investigations for future
Improvement projects located within Identified hazard
areas with respect to drainage and flooding and
implementation of Best Management Practices (BMPs)
with respect to runoff water quality
Land Use and Planning
CAJA will evaluate the proposed Circulation Element for
compliance and consistency with established plans,
policies, and regulations, Including the City of El Segundo
General Plan and Regional Comprehensive Plan and
Guide (RCPG) The analysis will focus on the extent to
which the proposed Circulation Element would Implement
or hinder Implementation of relevant policies
City of El Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copyright 0 2002, Kim/ey -Nom and Associates, Inc
Cultural Resources
CAJA will prepare the analysis of cultural resource
considerations for the Program EIR The location of
potential areas of sensitivity with respect to cultural
resources will be taken from the City's General Plan and
General Plan EIR The purpose of this analysis will be to
identify any potential cultural resource issues that could
affect transportation improvement projects identified in the
proposed Circulation Element Mitigation measures will be
focused on defining requirements for site specific
investigations for future improvement projects located in
the vicinity of identified cultural resources
Hazards and Hazardous Materials
CAJA will prepare the analysis of hazardous material
considerations for the Program EIR The location of
potential areas of sensitivity with respect to hazardous
materials will be taken from the City's General Plan,
General Plan EIR, and other development projects recently
completed In the City The purpose of this analysis will be
to Identify any potential hazardous materials issues that
could affect transportation Improvement projects Identified
In the proposed Circulation Element Mitigation measures
will be focused on defining requirements for site specific
Investigations for future Improvement projects located in
the vicinity of identified hazardous materials conditions
Optional Task — Land Use Element
The scope of work presented above assumes that the
Program EIR for the proposed Circulation Element will be
limited to addressing the potential environmental impacts
of proposed transportation improvement projects and the
effects associated with projected traffic levels resulting
from Implementation of proposed Circulation Element
programs and policies In the event that, during
development of the proposed Circulation Element, the City
identifies amendments to the General Plan Land Use
Element that are required to be evaluated In the Program
EIR, the following additional scope of work will be required
In order to address the potential environmental Impacts of
such amendments
III Approach and Scope - Page 12 124
d R.=W
C20❑ ar.J.
Land Use and Planning Population, Housing, and Employment
CAJA will evaluate the proposed amendments to the Land
Use Element for compliance and consistency with
established plans, policies, and regulations Including the
existing City of El Segundo General Plan and Regional
Comprehensive Plan and Guide (RCPG) The analysis will
focus on the extent to which the proposed Land Use
Element amendments would implement or hinder
implementation of relevant policies In addition, the overall
land use pattern that would result from proposed changes
in the Land Use Element will be evaluated to identify areas
where land use conflicts could potentially occur
If such potential circumstances are Identified, mitigation
measures will be Identified and will be focused on
establishing a process and criteria for addressing site
specific incidences of land use conflict
Public Services
CAJA will evaluate the potential Impacts of proposed land
use changes on the provision of public services (police,
fire, schools, parks, libraries) CAJA will confer with
appropriate City Police and Fire Department personnel
relative to the potential impact of the buildout of the City In
accordance with the amended Land Use Element upon
police and fire protection services Coordination with
appropriate school districts, the City's Recreation
Department, and Public Library sources will also be
undertaken to obtain data on existing conditions and
assess Impacts with regard to schools, parks, and libraries
With regard to schools, the most current Information on
school Impact fees will be reflected
Utilities
CAJA will confer with appropriate personnel In the
Department of Public Works to determine If the project can
be satisfactorily served by the existing water distribution,
sanitary sewer, and solid waste collection /disposal
systems CAJA will also contact utility agencies with regard
to assessing the adequacy of natural gas and electricity
services to be delivered to the City to accommodate future
development under the amended Land Use Element
Cdy of El Segundo Ciroulahon Element Update and Environmental Impact Report
TI-770007 02
Copynght 0 2002, IGmley -Hom andAssociates, Inc
CAJA will conduct the housing, population, employment,
and socioeconomic Impact analysis for the Program EIR
Existing population, housing, and employment
characteristics will be compiled for the City using census
data and the most current SCAG projections Projected
Increases In population and employment under the
amended Land Use Element will be calculated using
commonly accepted factors Projected changes in
population, housing, and employment resulting from the
amended Land Use Element will be compared to
projections In local plans and SCAG forecasts
Aesthetics /Urban Design/Light & Glare
CAJA will evaluate the aesthetic and urban design Impacts
from the projected development expected to occur under
the amended Land Use Element The existing urban
design character of the City will be described In general
terms encompassing development density, building height
and massing, architectural and historic resources, color,
condition and open space, along with roadway and
sidewalk characteristics Subareas possessing common
visual characteristics within the City will be identified as
appropriate to assist in describing the general visual
character of the City Impacts to the urban design
character of the City will be evaluated based on allowable
uses, building height, and density under the amended
Land Use Element Appropriate photographs and other
illustrations will be Included Vantage points and urban
design subareas will be identified In consultation with City
staff CAJA will also review the potential aesthetic and
urban design character of future development In the City
within the context of existing urban design policies
Mitigation measures for future development projects within
the City will be consistent with these established
procedures
CAJA will evaluate the existing night lighting and daytime
glare conditions of the City, based on a visual survey of the
area CAJA will assess the potential lighting impacts of
potential development resulting from the amended Land
Use Element based on expected generalized conditions,
since specific project design data will not be available
III Approach and Scope- Page 13 �J
rM❑ antl ABBOCNk6,Yc
Consideration will be given to lighting needs and Impacts
on adjacent sensitive land uses and pedestrian ways
Potential light and glare Impacts will be also evaluated In
the context of any City of El Segundo regulations
pertaining to nighttime lighting and glare Mitigation
measures will be structured to provide guidance to future
development projects In developing specific lighting plans
In addition, issues are Identified in the scope of work for
the proposed Circulation Element Program EIR that would
be addressed through sensibvdy analysis based on
General Plan information (I e, geotechnical /seismic,
hydrology /water quality, cultural resources, hazardous
materials)
Under this optional task, the sensitivity analysis for these
issues would be expanded to include areas where future
land uses could change as a result of implementing the
amended Land Use Element The analysis will Identify
areas where future development under the amended Land
Use Element could potentially be affected by the conditions
addressed In these sections
Land Use Element Update (if needed)
We will review the current Land Use Element and Identity
definitions, goals, objectives, and policies that may need to
be amended to accurately reflect new direction that the
City wishes to pursue in the Corporate Office and Urban
Mixed Use land use designations Text will be prepared to
describe the current planning process and the
conditions /issues identified that led to the proposed
changes Appropriate amendments to existing definitions
and policies, or new policy language, will be drafted as
needed to accomplish the City's goals Table LU -3 will be
updated to amend buildout projections within the Corporate
Office and Urban Mixed Use categories If data for the
remaining categories Is available from other City sources,
the entire table can be updated It is assumed that there
will not be amendments to the Land Use Map (Exhibit LU-
4) as a result of this study
A review of the remainder of the General Plan will be
conducted to identify any other policy inconsistencies that
may occur as a result of this study Minor language
changes In descriptive text or policies will be drafted and
recommended as needed
City of El Segundo Circulation Element Update and Environmental Impact Report
TL770007 02
Copynght 02002, Kimley -Horn and Associates, Inc
Any need for additional research or specialized studies that
may be required to address Inconsistencies will be
Identified, but such research or studies are not part of this
proposal
The proposed fee for this optional task Includes two
meetings with City staff, one planning commission hearing,
and one City Council hearing
III Approach and Scope - Page 14
WMWW 12 r;
EL SEGUNDO CITY COUNCIL MEETING DATE November 19, 2002
AGENDA ITEM STATEMENT AGENDA HEADING: Consent
AGENDA DESCRIPTION
Consideration and possible action regarding approval of extension of Agreement with the City
of Manhattan Beach for Median Landscape Maintenance of Rosecrans Avenue
RECOMMENDED COUNCIL ACTION.
(1) Approve second Amendment to Median Landscape Maintenance Agreement with the City
of Manhattan Beach, (2) Authorize the City Manager to execute the Amendment on behalf of
the City, (3) Alternatively, discuss and take other action related to this item
BACKGROUND & DISCUSSION:
The cities of El Segundo and Manhattan Beach entered into the Median Landscape
Maintenance Agreement on the 31 day of May 1977 The agreement was for 20 years ending
on the 301h day of June 1997. In July of 1997 both cities extended the agreement for a period
of 5 years, ending on the 30" day of June 2002 Staff from both cities feel this agreement has
worked well in the past and recommend continuing the Agreement for a ten -year period
The agreement calls for the City of Manhattan Beach to maintain the median on Rosecrans
Avenue from Highland Avenue to Sepuveda Boulevard. The City of El Segundo is to maintain
the median from Sepulveda Boulevard to Aviation Boulevard
ATTACHED SUPPORTING DOCUMENTS 1) Second Amendment to Agreement 2513,2) Original
Agreement between the Cities of Manhattan Beach and El Segundo (May 3, 1997)
FISCAL IMPACT. None
Operating Budget
Amount Requested-
Account Number-
Project Phase.
Appropriation Required- _Yes x No
Mark Trujillo, Acting Park Mai tenance Superintendent
, Director Recreation and Parks
Mary Strenn, Manager
5
12
SECOND AMENDMENT TO
AGREEMENT NO. 2513 BETWEEN
THE CITY OF EL SEGUNDO AND THE CITY OF MANHATTAN BEACH
FOR MEDIAN LANDSCAPE MAINTENANCE OF ROSECRANS AVENUE BETWEEN
HIGHLAND AVENUE AND AVIATION BOULEVARD
THIS SECOND AMENDMENT ( "Amendment') is made and entered into this 19TH day of
November 2002, by and between the CITY OF EL SEGUNDO, a general law city and municipal
corporation existing under the laws of California, and the CITY OF REDONDO BEACH, a general
law city and municipal corporation existing under the laws of California
This Amendment extends the term of Agreement No 2513 until November 19, 2012
2 This Amendment may be executed in any number or counterparts, each of which will be an
original, but all of which together shall constitute one instrument executed on the same date
Except as modified by this Amendment, all other terms and conditions of Agreement No
2513 will remain the same.
CITY OF EL SEGUNDO,
a general law city
Mary Strenn,
City Manager
ATTEST
Cindy Mortesen,
City Clerk
APPROVED AS
Mark D Hensler
Ltz
Karl H Berger,
Assistant City i
CITY OF MANHATTAN BEACH
a general law city
C W-19M
AGREEMENT BF,TWE'IU THE CITIES OF - wL IqWA �A-
MANHATTAN BEACII AND E7, SEGUNDO %("� I EC S
142' J mveY ;7=1
FOR THE MEDIAN LANDSCAPE MAINTENANCE OF ROSECRANS Ez..'a vr'
AVF,NUE BFTHEEN HIGHLAND AVENUE AND AVIATION BOULEVARD( /�csQq
THIS AGREEMENT, made and entered into this -3rd day
of May , 1977, between the CITY OF MANHATTAN BEACH and M%
the CITY OF EL SEGUNDO, municipal corporations of the County of Lose
Angeles, State of California, is made with respect to the following
facts: -/- � G N
1. Rosecrans Avenue, between Aviation Boulevard and Highland
Avenue is on the Select System of Streets for the Cities of Manhattan
Beach and E1 Segundo with the City boundary generally coinciding with
the center line of Rosecrans Avenue,
2, The two cities desire to jointly maintain median island
landscaping, irrigation system and appurtenances on Rosecrans Avenue
between Aviation Boulevard and Highland Avenue.
3. Title 1, Division 7, Chapter 5, Article 1 of The Government
Code of the State of California (Sections 6500 to 6513, Inclusive,
providini, for ,joint powers agreements between public agencies as
defined in Section 6500 of the Government Code) gives authority
for the ,joint accomplishment such projects.
NOW, THEREFORE., IT IS MUTUALLY AGREED AS FOLLOWS;
A. The scope of the landscape maintenance shall include all trees,
shrubs and ground cover, irrigation system, water supply and appurtenan-
ces within the median island of Rosecrans Avenue between Aviation Boule-
vard and Highland Avenue.
B. The City of Manhattan Beach wall perform all maintenance
functions for the Rosecrans Avenue landscaped median from Highland
e °'""'%[venue to Sepulveda Boulevard.
Certified to b,
e true copy 0
Wil documo i
on tie in my 1
oftep.g�
C. The City of El Segundo .^,ball perform all maintenance functions
for the Rosecrans Avenue landscaped median from Sepulveda Boulevard to
Aviation Boulevard.
D. It is mutually understood and agreed that any major changes in
the type or amount of landscaping as it exists shall be done only with
the concurrence of both parties.
E. This contract shall become effective on the date mentioned
above and shall run for a twenty (20) year period beginning July 1, 1977
and ending, June 30, 1997.
F. Notwithstanding the provisions of Paragraph G above, either
party may terminate this agreement as of the first day of July of any
year upon notice in writing to the other party of not less than two
(2) calendar months prior to the date of termination.
The CITY OF. MANHATTAN BEACH and the CITY OF EL SEGUNDO have
caused this agreement to be approved by the City Councils of said
Cities with authority that the same be executed by the respective
Mayors and City Clerks of said Cities, the day and year first hereinabov�
written.
ATTEST:
/ i v erc
(SEAL)
ATTEST:
CITY OF EL SEGUNDO
City ulerrk Mayor Pro Tempore
SEAL)
9my Clerk of I
M. /`M, .., i
131
APPROVED /ASS too�FOR
Crtr ATinxN[Y
CerNed to be
• true Copy of
Wd document
on Me In my
ORke
9my Clerk of I
M. /`M, .., i
131
vVw IWU,,
a Il • • A C U. : _ • • U: ►•: �: :
: 4 I
I '•
I• •� U : ►I U: • j•►
This AGREEMENT, made and entered into thisl_6.tbday of JUNE , 1997 between the
CITY OF MANHATTAN BEACH and THE CITY OF EL SEGUNDO, municipal corporations
of the County of Los Angeles, State of California, is made with respect to the following facts
I On May 3, 1977, the parties entered into an agreement to provide for
median landscape maintenance of Rosecrans Avenue between Highland Avenue and Aviation
Boulevard ( "Original Agreement ") This Original Agreement is set to expire on June 30, 1997.
The parties desire to extend the term of the Original Agreement for a
period of five (5) years
NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS:
A The term of the Original Agreement shall hereby be extended for a period of
five (5) years so that the term of the Original Agreement shall now expire on June 30, 2002.
The CITY OF MANHATTAN BEACH and The CITY OF EL SEGUNDO have caused
this AGREEMENT to be approved by the City Councils of said cities with the authority that the
same may be executed by the respective Mayors and City Clerks of said Cities.
T-
Attest.
Clerk
(Seal)
Attest.
s Vandscap wpd
t' Y"3 soil tit 43613 yrf:•
- 'r' tar? ,ltyXpN rtslf >,,i•ter.1
CITY OF MANHATTAN BEACH
? ayor
CITY OF EL SEGUNDO
M1 p May
�r
n,
13 0 219
CITY OF MANHATTAN BEACH
MEMORANDUM
TO: Honorable Mayor and Members of the City Council
THROUGH: Geoff Dolan, City Managerip
FROM: Neil C. Miller, Director of Public Works O i
DATE: July 15, 1997
SUBJECT: Approve Extension of Agreement with the City of El Segundo for Median
Landscape Maintenance of Rosecrans Avenue
RECOMMENDATION:
That the City Council pass a motion to extend the Median Landscape Maintenance Agreement with
the City of El Segundo and sign the agreement that was approved by the El Segundo Council at
their meeting held June 16, 1997.
BUDGET IMPLICATION:
K-
No increase in the budget or allocation of funds are needed.
DISCUSSION:
The cities of El Segundo and Manhattan Beach entered in the Median Landscape Maintenance
Agreement on the 3 day of May 1977. The agreement was for 20 years ending on the 30" day of
June, 1997. The staff from both cities feel that this agreement has worked well in the past and
recommend continuing the agreement for a 5 -year period.
The agreement calls for the City of Manhattan Beach to maintain the median on Rosecrans from
Highland Avenue to Sepulveda Boulevard. The City of El Segundo is to maintain the median from
Sepulveda to Aviation.
ALTERNATIVES:
1. Approve the 5 -year extension.
2. Provide other direction.
Attachments: Agreement Extension
Current Agreement
13 ;;
EL SEGUNDO CITY COUNCIL MEETING DATE: November 19, 2002
AGENDA ITEM STATEMENT AGENDA HEADING: Consent
AGENDA DESCRIPTION:
Consideration and possible action on the awarding of RFP No. # PA02 -18 (Fire Uniforms and
Accessories) to the most responsive bidders, and authorize the City Manager to execute the
three (3) year agreement with a renewal option for an additional three (3) year period, for a
maximum total contract lenqth of six (6) vears
(1) Award the three (3) year contract to Keystone Uniforms, Carmen's Uniforms, Uniforms Inc.,
and Long Beach Uniform as the Fire Department's primary suppliers of uniforms and
accessories.
(2) Authorize the City Manager to execute the three (3) year agreement and to exercise the
renewal option for an additional three (3) year period, if in the City's best interest.
(3) Alternatively discuss and take other action related to this item
BACKGROUND & DISCUSSION:
The City's Fire Department has 60 employees who require initial issue or replacement
uniforms at some point in time This includes sworn suppression personnel as well as fire
prevention staff. RFP #PA02 -18 was issued to four (4) companies on August 22, 2002
Completed bids were due back on September 10, 2002 Responses were received from
Keystone Uniforms, Carmen's Uniforms, Uniform Inc., and Long Beach Uniforms.
Continued
ATTACHED SUPPORTING DOCUMENTS:
Uniform bid matrix
FISCAL IMPACT:
Operating Budget: N/A
Amount Requested: 0
Account Number: N/A
Project Phase: N/A
Appropriation Required: _Yes x No
• - e ee-
Chief
REVIEWED BY: DATE:
4,)
Mary St nn, City Manager
6
1311,
BACKGROUND & DISCUSSION (continued):
The four responses were evaluated with the following criteria: location, experience, facilities,
inventory, cost, and responsiveness to Department needs.
The attached "Fire Uniforms and Accessories Bid" Matrix summarizes the four vendors' bids.
The matrix does not contain the prices of all the items on the original bid, only those that are
regularly purchased. The matrix shows that the low bidder varies depending on the item to be
purchased.
After evaluating the four bidders, it appears that all are qualified to meet the Fire Department's
needs Therefore, staff recommends that all four vendors (Keystone Uniforms, Carmen's
Uniforms, Uniforms inc., and Long Beach Uniform) be selected as Fire Department suppliers
of uniforms and accessories This allows us to purchase individual items from the lowest
priced bidder and similarly priced items from the closest vendor, therefore reducing travel time
and increasing savings to the city. All of the bidders are aware that the recommendation is to
award the contract to four companies.
Based on all factors involved, it is recommended the City Council award the Fire Uniforms and
Accessories contract to Keystone Uniforms, Carmen's Uniforms, Uniforms Inc, and Long
Beach Uniform. In addition, authorize the City Manager to exercise the renewal option for an
additional three (3) year period, if in the City's best interest.
135
a)
t
N
c
O
W
0
Z
LO
CMm
M
N
7
O
Cl)
0
LL
O
W
13G
CD
co
00
C',
0
N
0
a)
0
In
0
O
0
co
O
FC)
00
m
m
a)
M to
]]]]T
N
N
V
M
0]
F
cm
c
47
(n
n
O
cn
n
cn
n
(n
m
N
O
00
m
m
m
M
117
m
In
m
(n
Jn
�-
V
N
V
co
V
m
m
M
m
M
d.
c
a0
m
m
m
�
n
M
co
O
O
O
O
O
O
O
O
O
O
O
O
O
O
S,
20
O
(O D
�
M
o
O
o
M
O
M
M
U�
In
O
V
m
m
m
y
cn
O
n
m
m
co
m
N
a7
O
co
n
m
(n
0
n
CO
co
m
m
r
00
0
V
c
N
n
n
CO
m
.-
LO
m
n
(D
N
v
(n
E
a
O
n
M
U
to
(n
r
I!)
Ln
in
(o
o
in
,
(()
LO
Un
(o
(o
0
m
m
0
m
m
m
r
m
m
N
m
m
m
m
m
—
E
N
(D
'V
n
I
n
m
00
CO
n
m
IT
co
m
co
O
O
0
0
0
O
O
O
O
O
O
O
O
O
O
O
O
00
o
O
N
O
o
0
0
N
0
a7
0
0
0
0
0
00
N
m
O
N
m
(D
a0
O
m
0
LO
"7
O
co
m
m
(n
N
(n
N
N
Zr
�
0000
PO
O
d
N
U)
n
T-
IT
M
4
o
n
CO
.-
C7
(D
N
T
co
7
~
d
Y
O
m0001M000m
O
O
cn
0
0
0
0
0
0
O
0
m
0
0
0
U')
0
U
0
cm
(n
t-
~
O
N
O
m
N
m
M
N
N
m
C
(OD
amD
O
(�D
`O
T
O
N
O
O
o
Lq
0
O
0
(o
0
0
0
0
0
0
o
0
0
O 0
0
0
0
0
0
(n
0
to
0
to
0
O
n
U
(n
m
N
O
n
M
M
cn
M
M
M
(n
m
m
m
( 7
C
m
to
a)
n
T
M
m
O
m�
0
V'
N
M
T
M
r
M
00
m
M
V
n
T
N
N
V'
N
n
N
E
�
Cl)
�o
O
O
ti')
O
u7
O
00
LO
Ln
O
01010
a7
(n
cn
O
C
m
m
N
in
n
N
N
cn
0
0
0
N
m
m
(n
M
,..
�
to
o^
C)
N
I
M
co
N
N
co
E
S
O�
N
co
M
O
O
0
co
co
O
LO
0
0�
M
7
d
iOn
TO
.c
V
CL
4)
a)
Y
`
-
E
E
N
3
c
Z
—
aXi
o
z
c
m
N
axi
E
Y
E`
as
—
o
a
o
_°o
Z
5
a`)
E
OO
y
m
c
4)
X
N
m
N
o
C
O
as
=
CL
O
o
(nL
o
Lo
o
3
L
7�
N
m
a)
d
(=n
o
o1i�v
n
N
M
U
(a
a)
m01
T
¢aLL
i
o
h
a�
LL
�-
c
O
N
�.,
N
IL
U-
O
jo
O
N
co
N
C
N
O
0
i
r
L
I
Z
i'
C
3
(n
C
a
c
W
ci
CL
N
m
-a
m
v
3
(=i)
N
c
ai
c0
_
to
m
m
a�
p
a
0
m
c
U
�
I
U
E
3
EL-
415
N
U
)
C)
j
C
$
o
o
a
C3
to
'N
O
O
J
07
d
m
a5 CL
U)
O
Y
�
ci�5
i
�
OAT
_
_a
-°mm
co
�
=
�
L
CO
L
Cn
OS
LL
07
d
M
LL
O
of
z
L
U)
a)
in
O
Co
co
U
cz
U
N
I=
0
F=
N
h
O
U
I—o
0
Z
LO
CMm
M
N
7
O
Cl)
0
LL
O
W
13G
EL SEGUNDO CITY COUNCIL MEETING DATE: November 19, 2002
AGENDA ITEM STATEMENT AGENDA HEADING: Consent
AGENDA DESCRIPTION:
Consideration and possible action regarding a request by the Fire Department to authorize
staff to purchase a Low Power AM Radio Station from a single source vendor (Information
Station Specialists (ISS), Inc ), through grant funding provided by the Office of Traffic Safety
and Caltrans Total project cost not to exceed $28,000 00 FISCAL IMPACT. NONE
RECOMMENDED COUNCIL ACTION:
(1) Waive the formal bidding process per the Municipal Code; (2) Authorize purchase and
installation of a low power AM radio station through single source vendor (ISS, Inc ); (3)
Authorize the City Manager to execute a standard city Professional Services Agreement on
behalf of the City; (4) Authorize staff to seek and purchase, using alternative funding
resources, radio- controlled electronic warning beacons (approximately 20) to alert the
community of an emergency, (5) Alternatively discuss and take other action related to this
Item.
BACKGROUND & DISCUSSION:
On May 31, 2001, the City of El Segundo was awarded grant funding in the amount of
$23,000 00 for a low power AM radio station. On November 7, 2001, the City Council
approved in -kind funding of $5,000 00 to support costs for labor, installation and other costs
needed to complete the AM radio project, bringing the total of project funding to $28,000.00.
The November 7'h Council action authorized the City Manager to sign and execute an
agreement between the City of El Segundo, the State of California Office of Traffic Safety
(OTS), and Department of Transportation ( Caltrans), . (continued on next page)
ATTACHED SUPPORTING DOCUMENTS:
None
FISCAL IMPACT:
Capital Budget:
$28,00000
Amount Requested:
$28,00000
Account Number:
001- 400- 3255 -8104
Project Phase:
Phase 2, November 1, 2002 to May 31, 2003
Appropriation Required:
_Yes X No
ORIGINATED BY: DATE:
Fire
REVIEWED BY: DATE:
Mary Stre City Manager ovol30Z
7
1311
BACKGROUND & DISCUSSION (Continued from page 1):
for the purchase, acquisition, and installation of a low power AM radio station The contracts
were signed and the project was implemented on May 1, 2002. Staff completed frequency
testing and analysis in June and an application filed to the Federal Communications
Commission (FCC) in July 2002. The project contracts were signed and the project was
started on May 1, 2002 after a 6 -month state procedural delay The project contract period
was then extended to May 31, 2003 to complete purchase and installation.
On October 1, 2002, the FCC issued the City of El Segundo a 10 -year renewable license
(W PWA795 — 1040 KHz AM) to operate the radio station. The FCC approved installation of
the station at 400 Lomita (Water Plant). Per discussions with our radio communications staff,
approval from FAA is not required due to the lower power, short antennae, and the nature of
the project The proposed project is exempt from the requirements of the California
Environmental Quality (CEQA) Guidelines, pursuant to Section 15303, Class 3. In October
2002, the Low Power AM Radio Station User's group (comprised of representatives from
Police, Fire, CEDS, Public Works, Recreation & Parks, ISD, and Community Cable) met and
reviewed the project with the Emergency Services Coordinator (Project Manager) This group
is also assisting in the development of operational guidelines. The Fire Department is ready to
initiate a purchase based on the following recommendations from the user's group:
1 Purchase from a single source vendor. Information Station Specialists, Inc (ISS) -
Model "AM Alert" Emergency Advisory Radio System The Emergency Services
Coordinator researched AM radio vendors in the United States ISS is one of two
vendors that produce low power AM radio systems. The other vendor only produces
high -end, large commercial radio systems (e.g. state and federal highways). The ISS
system follows similar system designs at LAX, Torrance, Malibu, and Culver City
The ISS system is self - contained It receives NOAA (weather /tsunami), and EAS
(Amber) Alerts. The ISS system is expandable with the following standard features
and options.
a, Transmitter, pre -wired ground plane antenna, digital message programmer in
dual -door, rack -mount security cabinet. With all wiring, mounts, metering,
connectors and instructions (standard).
b. 4 -day battery for uninterrupted broadcasting (standard).
c 14 3 minutes for stored message blocks (standard).
d Instant trigger messages— allows instant recording of messages from a landline
or cell phone (shelter in place, evacuations, safety messaging).
e Expandable coverage (standard feature)
1 Live cut -in feature and feeds —through telephone line (optional).
2 Electronic Flashing Beacons, self - contained, w /encode /decode feature,
solar powered battery (4 -day capacity) (optional)
2 With remaining grant funds, purchase warning beacons (cost: $2000 each)
3 Staff will seek alternative funding sources to allow for the purchase of the additionally
needed optional warning beacons (approximately 20) to be placed at major roadways,
intersections, and schools. We will seek funding through donations and publiclprivate
partnerships with our community resources (civic groups /organizations, and local
business & industry)
4 Educate the public on the radio system through press releases, presentations, and
other resources (Community Cable) to increase awareness in the community in the
first year of operation
138
EL SEGUNDO CITY COUNCIL MEETING DATE: November 19, 2002
AGENDA ITEM STATEMENT AGENDA HEADING- Consent Agenda
AGENDA DESCRIPTION:
Consideration and possible action authorizing the City Manager to execute a professional
service agreement with Bob Murray & Associates for an amount not to exceed $23,500 for the
purpose of providing executive search services (Fiscal Impact - $23,500)
RECOMMENDED COUNCIL ACTION:
1) Authorize the City Manager to execute a professional service agreement with Bob Murray &
Associates for the purpose of providing executive search services, 2) Alternatively, discuss and
take other action related to this item
BACKGROUND & DISCUSSION,
Staff solicited bids from the firms of Maximus, Bob Murray & Associates and Shannon
Executive Search for the purpose of providing executive search services. The firms contacted
represent the top search firms in California, and the City has utilized the principals from all
three firms in the past
Staff completed a comprehensive analysis of the three proposals based on price, experience,
quality of proposed work and reputation A summary of that analysis is attached as "Table 1."
Staff is recommending that the City Council authorize the retention of Bob Murray &
Associates largely on that firm's reputation for successfully soliciting interest from quality
applicants from throughout the State
ATTACHED SUPPORTING DOCUMENTS:
Table 1 — Staff Analysis of Search Firm Proposals
FISCAL IMPACT: $23,500
Operating Budget: $70,000
Amount Requested. $23,500
Account Number. 001 -400- 2901 -6244
Project Phase* NIA
Appropriation Required, _Yes X No
ORIGINATED. , DATE: November 12, 2002
I :ys
IXL /L
•
13's
i
C
a)
N
.3
$a
� O
Na
E
aLL
r `
M
C N
O
w
O
V �N
O
Q
O
vM
a! U)
B
140
w�
U N> 'a
yy y
�cu
c m
O •L..
U
7 O
a ca U iC
U c
c O
cn
N N y
CL 0 X cc
° c to
U 0 ai U
a 'a
m ><
uJ
� o- 0Ni a� o
d
T a7
a)
N N a) ca
X
U N j
O. m C U Co
C
L
=3
��°
3"rn,°c
d
0C
M) t> °
o. (n a�
n ca c o
V
G7
fn LL .00 L
N a7
Y V) a7 a7
7
CL
N M U
O-
N 7
07 d
V 00
O c
W
47 m
EEwo�
a)
`moa)
N a c
3a'EEa�
c
G
t o �•
a m
v°i
aTi a°Q- �
c
°U m E
2
�0in
a>i
3
C C N
fn CL
gO
a)
Y c
X `O ai
c a)
O O C=
a7 E
7
a) ca
al — N �= O
cn C fn (0 N
a) 6 c
c E a) Fu c
T` o f
w V o a�
yti >U a'
jj°
ca'rnw �E
ty�°ya)52
cw
y ma
c`UOo
U n5�
E «a �
°cw X mm
n_
L U c L
x524
ca>>L
co
0
a>
CO CD a) v 3
a3 U U
c
U-0 E
myw
(n
u
T
O O
w O
E O L
0 L
L c
EZ O -_
aE
o co
a°
w �U) c
L U� aci
p.
�c°i'a
300
3 °oc
a7 U
m e
c y -0
co E.°
c
m E u
EL'S
Y E @�
Y E NY
0
�3°
ALL
o0EU
3V Yw
ooEcn
3U,=,Y
y
c
n
acmm
a Qi T
Q)w
a aJ T
a)w-
a=i
ca N O
w
a7 0 -°
a7 to -°
O
y ),
Z' c`0
a) a a o
'° U U
�« a a) c
'°
V U c
Q) a)
°-
�+
L)
N
Z.
a) @ m
cn E g
y cu
cn C c
0
0 y c6 CO
O N c C
U V N d
Q V L_ U
�O V L °U U
z
c a
m
0- m°
a` 3
a` c 3-0
+�
fn
N
H
CD
N
O
N w
p
o
O
N cn
aa)
aa) 0
V
m m
6q
CL x
Q
CL x O y
m
co
o �°n
CD
CD
c
613, °o
z
E
N
CL N
_
aN
p` CD
C
O
OlOn Y.
C
00 0
y
O -
W
a)
n
O O
a r
h 6 +, +
Cd 64 f0
EA a) F
b4 0 F
EA o 40
E
>
LL
06
N
O
T y
x
y
2 a)
W
E
7 m
m
U
C L
Z
N
X
c 2
m Q
Cn fn
140
EL SEGUNDO CITY COUNCIL
AGENDA ITEM STATEMENT
MEETING DATE: November 19, 2002
AGENDA HEADING: Consent Agenda
AGENDA DESCRIPTION:
Consideration and possible action regarding award of contract to BKM Total Office of
California L P , for City Hall Improvements Phase 1— Approved Capital Improvement Program
(Fiscal Impact = $44,250 00)
RECOMMENDED COUNCIL ACTION.
Recommendation — (1) Recommend that City Council waive the formal bidding process per
the Municipal Code, and approve the City's use of U S Communities, Fairfax County, VA,
competitively solicited MasterAgreement #RQ01- 411313 -16, for office furniture with Steelcase
(manufacturer) and award contract to the authorized distributor and installers BKM Total Office
of California L P , in the amount of $44,250 00, (2) Authorize the City Manager to execute a
standard City Professional Services Agreement on behalf of the City, (3) Alternatively discuss
and take other action related to this item
BACKGROUND & DISCUSSION.
In mid 2000, a Council subcommittee was formed that included a Council Member, the City
Manager and two department heads working with Chelsea Design Group, to establish design
and color standards for future City Hall improvements Office furniture finishes were among
the areas established The office furniture colors and patterns selected by the sub - committee
and approved by the City Council are manufactured by Steelcase (continued)
ATTACHED SUPPORTING DOCUMENTS:
None
FISCAL IMPACT:
Capital Improvement Program: $760,100.00
Amount Requested, $44,250.00
Account Number, 301 - 400 -8201 -8475
Project Phase, Award of contract
Appropriation Required: No
ORIGINATED BY: DATE:
//Y� /)I 11-12--02-
Bret Plumlee Director Administrative Services
REVIEWED BY: DATE:
Mary trenn, City Manager
0
141
BACKGROUND & DISCUSSION cont..
Currently City Hall is on the list of approved Capital Improvement Projects. Phase 1 includes
office furniture for (10) workstations as a component of this capital improvement program
Some of the office furniture installation work will be completed after hours and on weekends to
minimize disruption to the public and staff Staff recommends award of the U S Communities
Master Agreement to BKM Total Office of California L P for phase 1 (East Wing) The total
cost of this phase is $44,250
14 2
EL SEGUNDO CITY COUNCIL
AGENDA ITEM STATEMENT
AGENDA DESCRIPTION
MEETING DATE November 19, 2002
AGENDA HEADING Consent Agenda
Consideration and possible action regarding an agreement with JCM Facilities Planning
and Management for professional architectural services for City Hall Improvements Phase
2 — Approved Capital Improvement Program — Protect No PW 02 -19 — (estimated cost of
service = $17,500 00)
RECOMMENDED COUNCIL ACTION.
Recommendation — (1) Approve the standard consultant agreement, (2) Authorize the
City Manager to execute the agreement on behalf of the City, (3) Alternatively discuss and
take other action related to this item
BACKGROUND & DISCUSSION.
On September 4, 2001, the City Council authorized staff to solicit proposals from
consultants to provide design and construction support services for City Hall improvements
(Additional background and discussion on the next page. )
ATTACHED SUPPORTING DOCUMENTS
None
FISCAL IMPACT:
Capital Improvement Program
Amount Requested
Account Number.
Project Phase
Appropriation Required
$666,35000
$ 17,500 00
301 - 400 - 8201 -8475
Agreement for professional architectural services
No
ORIGINATED BY n DATE November 12, 2002
Gti
Andres Santamana, Director of Public Works
REVIEWED BY. ti
Mary Strenn,
1117_r111=111
10
200211119 — nrchne=rai sernces for cM Hall Improeemenls Phase z
24
BACKGROUND & DISCUSSION: (continued)
Twelve (12) firms obtained Requests for Proposals, and six (6) firms attended the pre -
proposal job walk The City received the following proposals
JCM Facilities Planning and Management $17,50000
WMM Associates (Proposal contained
only hourly rates)
Staff reviewed the proposals and recommends retaining JCM Facilities Planning and
Management to provide the professional architectural services JCM Facilities Planning
and Management have recently provided satisfactory architectural services for other
clients
The scope of the consultant services includes preparation of plans and specifications for
construction, bidding, and construction support services
Phase 2 will address ingress /egress to West Garden Area, renovation of West Garden
Room, new conference room and retrofit Administrative Services office space
300211119- Amhfteural sei,cea Jar cM Hall Impmvements Phase 14
t
EL SEGUNDO CITY COUNCIL MEETING DATE November 19, 2002
AGENDA ITEM STATEMENT AGENDA HEADING Consent Agenda
AGENDA DESCRIPTION.
Consideration and possible action authorizing staff to advertise the installation of an ADA
elevator at City Hall (350 Main Street) — Project No PW 02 -18 — Approved Capital
Improvement Program — (Estimated cost = $300,000 00)
RECOMMENDED COUNCIL ACTION,
Recommendation — (1) Authorize staff to advertise the project again for receipt of construction
bids, (2) Alternatively discuss and take other action related to this item
BACKGROUND & DISCUSSION
The City Council, on July 2, 2002, adopted plans and specifications for City Hall improvements
and authorized staff to advertise the protect for receipt of construction bids The project
includes installing one (1) interior ADA approved elevator from the basement to the first floor,
including demolition, removal, realignment and re- installation of partitions, door assemblies,
floor systems and mechanicals to accommodate the elevator installation
On the November 12, 2002 bid opening, the City Clerk did not receive any bids, although
extensive advertising was conducted Upon contacting various companies which specialize in
this type of installation, the City was Informed that they had been previously occupied on other
projects but that they were now available to bid
Based on this information, staff recommends going out to bid on this protect again
ATTACHED SUPPORTING DOCUMENTS.
None
FISCAL IMPACT None at this time
Capital Improvement Program $666,35000
Amount Requested.
Account Number; 301 -400- 8201 -8475
Project Phase,
Appropriation Required- No
ORIGINATED BY- � DATE. November 13, 2002
Andres Santamarta, Director of Public Works
20021119 - Installation of ADA Elevator at Qty Hall 11
145
EL SEGUNDO CITY COUNCIL
AGENDA ITEM STATEMENT
AGENDA DESCRIPTION
MEETING DATE November 19, 2002
AGENDA HEADING- Consent Agenda
Consideration and possible action to approve Tract Map No 53334 which encompasses
210 and 214 Whiting Street
RECOMMENDED COUNCIL ACTION-
Recommendation — (1) Approve Tract Map No. 53334, (2) Alternatively discuss and take
other action related to this Item
BACKGROUND & DISCUSSION
Tract Map No. 53334 is a subdivision to consolidate two (2) lots (210 and 214 Whiting
Street) to construct a seven (7) unit condominium project The environmental assessment
on this project was approved by the City Planning Commission on April 12, 2001
The tract map is ready for approval by the City Council After approval, the map will be
recorded in the County Recorder's Office
ATTACHED SUPPORTING DOCUMENTS*
Location map
FISCAL IMPACT, None
Capital Improvement Program
Amount Requested:
Account Number.
Project Phase
Appropriation Required-
ORIGINATED BY. � /J DATE. November 12, 2002
Andres Santamana, Director of Public Works
REVIEWED BY DATE
!/
Mary Strenn, City Man er -12
20021119 —Approve Tract Map No 53334
14t')
I L-
I
HOLLY Aug
I R
•° - GRAND
;o .°
�
40
,rJSae1
�• o
_
Ell
ax
No
s°
N
^
®19 317
g 15 2 5
4
dMi
18
5
3`
lo,
w
w
S
17 307
s Z
16 357
2 R
F
w
f
rn
no - --
'
17 U551
-- -
R 7
f
w
w
F
N
3 R
4 °
w
'Re 26 347
—
u
c__°
a5
S� 8133
°10
•° - GRAND
;o .°
�
,xe
` 2 7
�• o
_
n4
ax
No
Z
N
^
®19 317
g 15 2 5
4
dMi
18
5
IB 5
lo,
w
w
S
17 307
207 6
-
N
w
. R
16
p
sn
a
•° - GRAND
;o .°
�
,xe
i ICLIIi
�• o
_
n4
ax
N
Z
N
^
I/2
•213
g 15 2 5
4
F"
216 4
5
IB 5
lo,
w
w
S
-1011 21
207 6
-
N
w
. R
-- 05
°
S 1 0 309
Lki
IN
B•
O
w
a IL
FRANKLIN
Z
,xe
.356 20 8
�• o
yi -
52 21
O
N
Y 46 22 3
N
°
•222
n
338 24 3
g 15 2 5
uN1r
14 223
216 4
13 ME
IB 5
6
-1011 21
•0 •E 40
71
We
100
i
p] i NN
B 203
a IL
FRANKLIN
Z
,xe
.356 20 8
357
yi -
52 21
,•s
25
Y 46 22 3
37 Util� 349
T �
8 42 23 g
e
8 tt
338 24 3
28
29
3 32 I
.3 0 2
--
30
g�3
139
3 Y
31 3
Y 4 3
32 317
_ 313
'•s 6
3 308 7 S
S 1 0 309
3048 1'
l 2 4
P e !
30
a IL
FRANKLIN
Z
,xe
145 3
•0
146 I
N
22
ee
c e
5j
143 2 S
P
-1021
P
•13_8
S 21 MD
139
3 Y
S 138
31_/2
2 e
S 16 1 1
y-
135
4 S
y
l 2 4
S 1 13]
as
eo
1°
>
a5
S� 8133
°10
`g
—12
C
6
e
17 13
II
°
123 7
S
124 7
16 129
2.6 a
- ixnn
R;
120 8
15127
U
P °
f
w•.-ns °(•_ql
BINDEfl--
Z
I{ W N Om
a +) °, eo
°
<S
so So
50 SO 45
=
>
5:9 10 R
_
t3
�9
CIO 1
„12 „13 14„
3
F
-
yl�
�
J
4. n5. �JI
{/
614
Sec C°+
?RAcT MO�P 5333¢
L
-
GU°
P063 2 "
(w� ° 3/ 53
N .._".
e0 Fa
J00L'
Y
e°
3144
•3±
N
• p
P
P
P
P
3 142 2
S 21 MD
.140 3 3
S 20 135
S 138
3 19
Y 138 5 I/
S 16 1 1
4d,
S T 7
41227
S/261
Isms
15 117
as
eo
1°
10
n so
°10
y
9
II
12
13 14
2
17 cr
7
nh
_ L
13t
-Fj
lot
� h
STAqqARD
EL SEGUNDO CITY COUNCIL
AGENDA ITEM STATEMENT
AGENDA DESCRIPTION
MEETING DATE November 19, 2002
AGENDA HEADING Consent Agenda
Consideration and possible action for acceptance of the Acacia Park Irrigation System
Replacement — Approved Capital Improvement Program — Project No PW 02 -13 —
(contract amount = $18,696 00).
RECOMMENDED COUNCIL ACTION
Recommendation — (1) Accept the work as complete, (2) Authorize the City Clerk to file
the City Engineer's Notice of Completion in the County Recorder's Office, (3) Alternatively
discuss and take other action related to this item
BACKGROUND & DISCUSSION
On June 6, 2002, the City Council awarded a contract in the amount of $17,228 00 to
Mariposa Horticultural Enterprises for the Acacia Park irrigation system replacement
Subsequent to contract award, staff authorized the contractor to modify the water service
connection to the park at an additional cost of $1,468 00
The final contract amount is $18,696 00 All work has now been completed to staffs
satisfaction
ATTACHED SUPPORTING DOCUMENTS
1 Notice of Completion
2 Location map
FISCAL IMPACT
Capital Improvement Program* $35,50000
Amount Requested
$18,69600
Account Number
301- 400 - 8202 -8642
Project Phase:
Acceptance of work
Appropriation Required
No
ORIGINATED BY. „
4644'e"'t. DATE. November 12, 2002
Andres Santamana, Director of Public Works
REVIEWED Y DATE 3
Recording Requested by
and When Recorded Mail To:
City Clerk, City Hall
350 Main Street
El Segundo, CA 90245
20021119 — AccePtance of Acacia Park lmgabon System Replacement—PW 02 13 148
NOTICE OF COMPLETION OF CONSTRUCTION PROJECT
Project Name Acacia Park Irrigation System Replacement
Project No PW 02 -13
Notice is hereby given pursuant to State of California Civil Code Section 3093 et seq that
N
u. J I A1Nno0 S3139NV S0-1 AMY 3NHOH1NIYH d0 A110
O W
y Z I 00310 NVS
r < an) ) rfaN31 r
C] 7 > l
$ 9 9 9 9 9 9
n3 w �unN♦ Y]�M sit,
o
�Y`J � ' Ill III I r
ONP
HUM J J
NOUTIM
i s v 1• r NOYnX AII� If0
IX 10 .I-
IYG 1H1YON
+ 1
1, �M O0xo0]tl
J � V
N nq0
zp r < 8 Mltldl AN
Q, ; OY 81110 l•1M]xLLNm
z M ? ~• 3NIl N33Y0 i Otl13W 3 u OIIO.v'
¢ z
w - if y t --► -► N£VN r
n a> "" IIL S AYM
f NLtN NYYd Z
a U
y = XV Y• Q
G W
w = T 0 -IL,y AVM m
-I 131VAIMMI)
w j AYM SS)NOfW 031111 2
zz S zo W Q
p Y F
wt U 15 .UI]L S 1YOYIN MlN : W W 7 1
r z r m MVI S£1 m - i
v0)ninllf =
w N 15 VNIMIN, M91tl Sul XI I� 3" Np
M
I'II N�I�I1IfI I .III IL 19 fIONIIIlONllll ]M Nl] w O
Ift INId
1S MUNINS"
'3M 1nSWU y
1L ftiM•M � I VI11)fMlOi f
1L tlxYOolva a 3M N1Yd U
YOJI I] 16 X00310 0 �3M ]IdYN
L YOtn]N �� ]M ]1.1]13
I'� y ; nt IIYNII
1f Vil"32
In IJ y0 MI'Sit0M1f
LL ONVIAYtN II�1 A
R I 9Y A)xYn01i
It 111
Z YlINOI �� �® NO1
p
w I 13 A • LL�JJJ Sf VYY]NI
H !f MX33 in 3N9Mtlf
J ' O EE3 ® 1t N0013Nt
U
lG YN30t XI �
4 N =
© 33 3 BB�e y lG OY10NYly N
18 NIYN
Y 1f OXONN]IY
U ❑EEBBB J 1L OYOJMOJ`Oii •P (H
�a�� ❑ ❑�� ®� if 11MIOYIn
1L fNI11NN
Is Y1SIA •NOl Q
•n"
uz ` i X
Z
15 1G3YJllIN
ZO
is 1 Y IN f� s � W
Uu W, N
Is]^p0 is nana � ANN V_
-�punp AN] I•.M ES \ O J
Y pNO ` W
P4n-
n o of °-, Q U a
2 o
Q
U W N
_ H }
LL oU _ U1
s U
Q m
a
IA
z
W
�.5��
EL SEGUNDO CITY COUNCIL
AGENDA ITEM STATEMENT
AGENDA DESCRIPTION
MEETING DATE November 19, 2002
AGENDA HEADING Consent Agenda
Consideration and possible action to authorize the City Manager to make an advance
payment of $75,000 00 and to execute a reimbursement agreement with Exxon Mobil
(Exxon) Pipeline Company for relocation of Exxon's 8" pipeline for the Douglas Street Gap
Closure Project - Approved Capital Improvement Program - (estimated cost = $375,000.00)
COUNCIL ACTION
Recommendation — (1) Approve an advance payment of $75,00000 to Exxon, (2)
Authorize the City Manager to execute a reimbursement agreement with Exxon as
approved by the City Attorney, (3) Alternatively discuss and take other action related to
this item
BACKGROUND & DISCUSSION
Exxon currently operates an 8" het fuel pipeline within the Douglas Street Gap Closure
Project site This pipeline is currently within the railroad /MTA right -of -way and needs to be
relocated to facilitate the construction of the Douglas Street Gap Closure /Railroad Grade
Separation Project
(Background & discussion continued on next page...)
ATTACHED SUPPORTING DOCUMENTS
1 Letter from Exxon Mobile Pipeline Company
2. Rough draft of reimbursement agreement
FISCAL IMPACT
Capital Improvement Program* $1,600 000 00
Amount Requested $ 375,000 00
Account Number 301 - 400 - 8203 -8949
Project Phase, Under Design
Appropriation Required: No
ORIGINATED BY %�a�'_ 7y DATE November 12, 2002
JLR�rI.
Andres Santamaria, Director of Public Works
REVIEWED BY
Strenn,
DATE•
14
20021119 - Agreement - Erton Mobile Pipeline - a Inch Pipeline - Douglas Street 99
l5
BACKGROUND & DISCUSSION (continued):
Exxon has estimated that the engineering design costforthe relocation work is $75,000 00
and a preliminary construction cost estimate of $300,000 00, and Exxon expects to be
reimbursed for the final actual cost of design and construction
To perform the relocation design, Exxon requires an advance payment of $75,000 00
After completion of design, Exxon will establish more accurate pipeline relocation cost
estimates for finalizing the reimbursement agreement Staff recommends City Council
authorization for the City Manager to make this advance payment and to execute a
reimbursement agreement at a later date pursuant to approval of the agreement language
by the City Attorney
20021119 — Agreement— ExwMObleP %Nlme- 8tmhPiNeOne- 0OglasStreet x52
L
NOV -08 -02 15:00 FROM -Mobil Cerritos
RieWmMobil Pipeline Company
12851 East 186° Saaat
Genies, CA e0703
(910) 212 -1794 Telephone
(310) 212-1780 FarslnWe
3102121760 T -554 P 002/003 F -256
E *onMobit
Pipeline
Mr. Bellur Devaraj
City of El Segundo
Public Works Department
350 Main Street
El Segundo, CA 90245 -3895
November 08, 20M
RE: DOUGLAS STREET UNDERCORSSING PROJECT
Our File: 2001 -224
Dear Mr. Devari j;
As you are aware, ExxonMobil has been working with Mr. Pete Tuccillo, of the Parsons Company on the design of the
above captioned project. On 10/25/02, Mr. Tuceillo met with myself, Anthony Ramsier (ExxonMobil), and Mike Millek
(ExxonMobil) and confirmed that the original proposed reroute of ExxonMobil s 8 -inch M -141 Jet Fuel Pipeline would
no long be possible.
In lieu of the initial relocation proposal, ExxonMobil has met with Mr. Tuccillo and Mr. Bud Pingree and Mr. Oscar
Peraha of SPEC Services Inc. to discuss the possibility of the construction technique known as HonzonW Directional
Drilling. Based off of a review of the subject site along with proposed construction plans for the area, SPEC Services
believes it would be feasible to perform Horizontal Directional Drilling within the existing MTA right-of-way. By
utilizing this method of construction ExxonMobil would eliminate the need to obtain additional landrights to
accommodate the reroute. To initiate the review and design of this process the below sequence of events is required.
1. A non - refundable $75,000 from -end fee will be necessary to commence engineering of the proposed re- route.
Although "non - refundable" should the project be cancelled for any reason ExxonMobil will provide an itemized
statement of costs associated with the subject project and if necessary refund any unused funds. Subsequently
should the initial $75,000 fall short of the overall total for Engineering costs, ExxonMobil will look to the City
of El Segundo for reimbursement of the outstanding expenses. Should the project be finalized this fee ($75,000)
will appear as a credit on the final statement of all casts associated with this project including applicable
overhead
2. A check in the amount of $75,000 should be forwarded w ExxonMobil Oil Corporation All funds must be
forwarded to a lockbox address and must t reference a Cu¢tomer Number, which 1 shall provide. In this regard,
prior to forwarding of the subject payment please furnish me with the exact name and address of the Drawer
(City of EI Segundo) as they will appear on the check. The check should be made payable and addressed to
ExxonMobil Oil Corporation P O Box 676389, Dallas, TX 75267.
3. A reimbursement agreement will be entered into between ExxonMobil Oil Corporation and the City of El
Segundo for the overall estimated costs including but not limited to Engineering, Construction, Materials and
overhead ExxonMobil requires that this document be fully executed by all parties prior to the purchase of
maiwials and commencement of any comrtrucuon activities.
M Exxonlltobil Subsidiary
NOV -08 -OZ 15:00 FROM -Mobil Cerritos
3102121788 T -554 P 003/003 F -256
4. The City of El Segundo and its designated representatives shall work with MTA to ensure that ExxonMobil will
have the required access, construction area and if neccysary documentation to amend our existing rights to
perform the proposed reroute within MTA parcels.
1 would like to take this opportunity to express our appreciation with Mr. Tuccillols efforts to work with ExxonMobil in
developing a proposed route for our 8 -inch pipeline. Upon receipt of the above - mentioned funds. ExxonMobil will issue
the required documents for SPEC Services to commence designing phase of the proposed reroute.
Should you have questions, l may be reached at (310) 212 -1794.
Very truly yours,
Teri A. Shinde
Senior Rights of Way and Claims Specialist
For ExxonMobil Oil Corporation
TAS
(City —EISegundo- tequest.doc)
w: A Ramsier
P Tuccillo
REIMBURSEMENT AGREEMENT
This Agreement made and entered into this _ day of , 2002, by and
between PARTY-1 ("PARTY-1"), having a mailing address at
and PARTY -2 Motor Sales, U S A , Inc, ("PARTY-2") having a mailing address at
WITNESSETH
WHEREAS, PARTY-1 has been provided rights to that certain easement located
more specifically outlined in that certain document recorded
on , in the official records of the County of Los
Angeles, State of California (the "Easement "),
WHEREAS, PARTY-2 proposes to ("Project "),
WHEREAS, PARTY-2 has requested that PARTY-1 reroute its
pipeline within the subject Easement,
WHEREAS, PARTY _2 has agreed to reimburse PARTY _1 for the actual costs and
expenses incurred in the reroute of said pipeline and its appurtenances; and
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements
hereinafter set forth, it is hereby agreed by and between PARTY —2 and PARTY —I as follows
REROUTE OF PIPELINE PARTY_2 agrees to provide to PARTY _1 no less than sixty
(60) days advance written notice of desired start date of required construction activities specific
to the the reroute of subject pipeline
PARTY-1 shall relocate and /or remove PARTY-1 owned facilities in conflict with the
subject Project The work shall be done by ExxonMobil Pipeline Company and /or its contractors
in a workmanlike and expeditious manner in accordance with accepted industry practices and
work schedules, and using diligence to complete required adjustments Upon completion of work
as outlined in this agreement, PARTY —I shall provide to PARTY _2 copies of as -built drawings
PARTY-2 agrees that PARTY—I's failure to complete the required work in accordance
with project schedules will not constitute a breach of this Agreement by PARTY-1, nor subject
PARTY_1 to any liability or responsibility for added expense to PARTY —2 so long as PARTY —1
uses commercially reasonable efforts to meet such schedule
PAYMENT BY PARTY 2. PARTY _2 shall pay in advance to PARTY _1 the estimated
cost for the adjustment of said pipelines and their appurtenances Such estimated cost is shown
on Exhibit "A ", which is incorporated herein by reference Upon completion of the subject work
PARTY —I shall submit to PARTY —2 an itemized statement outlining all costs associated with the
subject project including supporting documentation Should the actual cost to complete the
required reroute of said pipelines and their appurtenances be less than the estimated cost, the
difference shall be refunded to PARTY —2 Should the actual cost be greater than the estimated
cost, PARTY _2 shall remit the difference to PARTY _1 within ninety (90) days of receipt of the
above mentioned statement showing actual costs
PARTY-2, its successors or assigns, shall hold PARTY _1 harmless and free from
any and all claims of damages which may occur, arising from the negligence of PARTY-2,
its successors and assigns, in connection with the development of the land, or in
particularly with PARTY—Ts Project and the work performed by PARTY 2 within the
Easement. Further, PARTY-11 shall not be liable for any damage to the surface of the land,
xx4�J — M`� '1�1L-15r
plants, grass, shrubbery, trees or any other improvements resulting from or relating to
the work defined herein, except that PARTY 1 shall be Fable for and shall indemnify
PARTY_2 from and against any liabilities, claims and costs resulting either from the
activities of PARTY —1 employees, agents and /or contractors or from spillage, release or
discharge of petroleum products or other hazardous substance from the pipelines.
ENTIRETY OF AGREEMENT This Agreement constitutes the entire agreement
between the parties hereto and no alterations of the terms and conditions of this Agreement shall
be valid unless in writing and signed by both of the parties hereto This Agreement shall be
binding upon and inure to the benefit of the parties hereto, their successors and assigns, except
that no party to this Agreement may assign any of its rights or obligations hereunder without the
prior written consent of the other party In the event that construction of the Project has not
commenced for a period of two (2) years from the date of this Agreement, this Agreement shall
become null and void
IN WITNESS WHEREOF, }he parties hereto have executed this Agreement on the day
and year first written above
PARTY-`)
By
Print Name
Title
PARTY —2
By
Print Name
Title
ra
15 r,
EL SEGUNDO CITY COUNCIL MEETING DATE November 19, 2002
AGENDA ITEM STATEMENT AGENDA HEADING' Reports - City Council
Consideration and possible action regarding the appointment of members of the City Council
who will serve on a subcommittee that will examine new business recruitment incentives for a
period not to exceed 90 days
RECOMMENDED COUNCIL ACTION'
(1) Appoint two Council members to the subcommittee for the purpose of examining new
business recruitment incentives for a period not to exceed 90 days
(2) Alternatively, discuss and take other action related to this item
BACKGROUND & DISCUSSION:
On November 6, 2002 the City Council formed a subcommittee that will examine new business
recruitment incentives for a period of not to exceed 90 days Following the establishment of
the subcommittee, the Mayor suggested the appointment of two Council members be
scheduled for the meeting of November 19"
ATTACHED SUPPORTING DOCUMENTS- None
FISCAL IMPACT.
Operating Budget
N/A
Amount Requested:
N/A
Account Number:
NIA
Project Phase
NIA
Appropriation Required
N/A
O IGIN BY /./l/��v
Mike Gordon, M yg or DATE
1
ORIGINATED BY
Mary Stre , City Manager DATE
f 15
Recording Requested by
and When Recorded Mail To
City Clerk, City Hall
350 Main Street
El Segundo, CA 90245
NOTICE OF COMPLETION OF CONSTRUCTION PROJECT
Project Name Acacia Park Irrigation System Replacement
Project No PW 02 -13
Notice is hereby given pursuant to State of California Civil Code Section 3093 at seq that
1 The undersigned is an officer of the owner of the interest stated below in the property
hereinafter described
2 The full name of the owner is City of El Segundo
3 The full address of the owner is City Hall, 350 Main Street, El Segundo, CA, 90245
4 The nature of the interest of the owner is Public park
5 A work of improvement on the property hereinafter described was field reviewed by the
City Engineer on November 5, 2002 The work done was Install new irrigation system
6 On November 19, 2002, the City Council of the City of El Segundo accepted the work of
this contract as being complete and directed the recording of this Notice of Completion in
the Office of the County Recorder
7 The name of the Contractor for such work of improvement was, Manposa Horticultural Enterprises
8 The property on which said work of improvement was completed is in the City of El
Segundo, County of Los Angeles, State of California, and is described as follows Park
9 The street address of said property is 621 West Acacia Avenue
Dated
Bellur K Devaraj
City Engineer
VERIFICATION
I, the undersigned, say I am the City Engineer of the City El Segundo, the declarant of the foregoing
Notice of Completion, I have read said Notice of Completion and know the contents thereof, the same is
true of my own knowledge
I declare under penalty of perjury the foregoing is true and correct
Executed on 2002 at El Segundo, California
Bellur K Devaraj
City Engineer
SPECIFICATIONS - PROJECTS \PW 02 -13 NOG (11- 05 -02)
149