CONTRACT 3684 Other CLOSEDContract Number: 3684
RESIDENTIAL SOUND INSULATION PROGRAM CONTRACT
BETWEEN
THE CITY OF EL SEGUNDO AND
TRON CONSTRUCTION, INC.
This contract is entered into this 20'h day of December 2006, by and between the City of El
Segundo, a general law city and municipal corporation ( "the City ") and Tron Construction, Inc.
( "the Contractor ").
1. WORK.
A. The Contractor will provide all work required by the Contract Documents (the
"Work "). The Contractor agrees to do additional work arising from changes
ordered by the City in accordance with the Contract Documents.
B. The Contractor and the City agree to abide by the terms and conditions contained
in the Contract Documents;
C. The Contractor will furnish all of the labor; supplies and materials; equipment;
printing; vehicles; transportation; office space and facilities; all tests, testing and
analyses; and all matters whatsoever (except as otherwise expressly specified to
be furnished by the City) needed to perform and complete the Work and provide
the services required of the Contractor by the Contract Documents.
D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders;
Supplementary Instructions to Bidders; Proposal; this Contract; Standard
Specifications; Supplementary Conditions; Exhibits; Technical Specifications;
List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice
of Completion; and all other documents identified in the Contract Documents
which together form the contract between the City and the Contractor for the
Work. The Contract Documents constitute the complete agreement between the
City and the Contractor and supersede any previous agreements or
understandings.
2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed One million,
three hundred fifty -seven thousand, four hundred dollars and zero cents ($1,357,400.00) for the
Work in the manner set forth in the Contract Documents. The City may adjust this amount as set
forth in the Contract Documents.
3. TIME FOR PERFORMANCE.
A. The Contractor will fully complete the Work within the time specified in the
Contract Documents (the "Contract Time. ")
Residential Sound Insulation Program 1 Group 15 Construction Contract (12/20/2006)
Contract Number: 3684
B. The Contract Time will commence when the City issues a notice to proceed. The
Contract Documents will supersede any conflicting provisions included on the
notice to proceed issued pursuant to this Contract.
C. The Contractor shall not perform any Work until:
i. The Contractor furnishes proof of insurance as required by the Contract
Documents; and
ii. The City gives the Contractor a written, signed, and numbered purchase
order and notice to proceed.
D. By signing this Contract, the Contractor represents to the City that the Contract
Time is reasonable for completion of the Work and that the Contractor will
complete the Work within the Contract Time.
E. Should the Contractor begin the Work before receiving written authorization to
proceed, any such Work is at the Contractor's own cost and risk.
4. DISPUTES. Disputes arising from this contract will be determined in accordance with the
Contract Documents and Public Contracts Code §§ 10240 - 10240.13.
5. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a
Taxpayer Identification Number. `
6. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole
expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and
certificates that may be required in connection with the Work.
7. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models,
photographs and reports prepared by the Contractor under the Contract Documents are the City's
property. The Contractor may retain copies of said documents and materials as desired, but will
deliver all original materials to the City upon the City's written notice.
8. INDEMNIFICATION. The Contractor agrees to indemnify and hold the City harmless as
set forth in the Contract Documents. The requirements as to the types and limits of insurance
coverage to be maintained by the Contractor as required by the Contract Documents, and any
approval of such insurance by the City, are not intended to and will not in any manner limit or
qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the
Contract Documents, including, without limitation, to the provisions concerning indemnification.
9. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor
will act as an independent contractor and will have control of all work and the manner in which
is it performed. The Contractor will be free to contract for similar service to be performed for
other employers while under contract with the City. The Contractor is not an agent or employee
Residential Sound Insulation Program 2 Group 15 Construction Contract (12/20/2006)
Contract Number: 3684
v,0� n
f S E l-iiI
of the City and is not entitled to participate in any pension plan, insurance, bonus or similar
benefits the City provides for its employees. Any provision in this Contract that may appear to
give the City the right to direct the Contractor as to the details of doing the work or to exercise a
measure of control over the work means that the Contractor will follow the direction of the City
as to end results of the work only.
10. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with
respect to all services and matters covered under this Contract. The City will have free access at
all reasonable times to such records, and the right to examine and audit the same and to make
transcript therefrom, and to inspect all program data, documents, proceedings and activities. The
Contractor will retain such financial and program service records for at least three (3) years after
termination or final payment under the Contract Documents.
11. NOTICES. All communications to either party by the other party will be deemed made
when received by such party at its respective name and address as follows:
The City
James S. O'Neill
City of El Segundo
City Hall
350 Main Street
El Segundo, CA 90245
The Contractor
Ron Donaldson
Tron Construction, Inc.
P.O. Box 8419
Fresno, California 93747
Any such written communications by mail will be conclusively deemed to have been received by
the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and
properly addressed as noted above. In all other instances, notices will be deemed given at the
time of actual delivery. Changes may be made in the names or addresses of persons to who
notices are to be given by giving notice in the manner prescribed in this paragraph.
12. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein are for the
exclusive benefit of the Contractor and the City and not for the benefit of any other party. There
will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations
under this Contract.
13. INTERPRETATION. This Contract was drafted in, and will be construed in accordance
with the laws of the State of California, and exclusive venue for any action involving this
Contract will be in Los Angeles County.
14. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity
between any provision of the Contract Documents, precedence will be as follows:
A. This Contract;
B. Precedence of documents as determined in the Standard Specifications.
Residential Sound Insulation Program 3 Group 15 Construction Contract (12/20/2006)
H
Contract Number: 3684
15. SEVERABILITY. If any portion of the Contract Documents are declared by a court of
competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified
to the extent necessary in the opinion of the court to render such portion enforceable and, as so
modified, such portion and the balance of this Contract will continue in full force and effect.
16. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary
action has been taken by the Parties to authorize the undersigned to execute this Contract and to
engage in the actions described herein. This Contract may be modified by written amendment.
The City's city manager, or designee, may execute any such amendment on the City's behalf.
17. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract,
agreements ancillary to this Contract, and related documents to be entered into in connection
with this Contract will be considered signed when the signature of a party is delivered by
facsimile transmission. Such facsimile signature will be treated in all respects as having the
same effect as an original signature.
18. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof
will be construed as both covenants and conditions, the same as if the words importing such
covenants and conditions had been used in each separate paragraph.
19. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of
reference only and will not affect the interpretation of this Contract.
20. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the
Contract Documents.
21. COMMUNITY DEVELOPMENT BLOCK GRANT REQUIREMENT
This is a federally assisted construction contract and Federal labor standards, including Davis -
Bacon requirements, will be enforced. If Federal and State wage rates are applicable, then the
higher of the two will prevail.
[Signatures on next page]
Residential Sound Insulation Program 4 Group 15 Construction Contract (12/20/2006)
�T Y O
0
S�C13
Contract Number: 3684
IN WITNESS WHERE OF the parties hereto have executed this contract the day and
year first hereinabove written.
CITY OF EL SEGUNDO:
Ag
ATTEST:
CONTRACTOR:
Tron Construction, Inc.
Ron Donaldson
President
By: Taxpayer ID
Cindy ortesen Number
City Clerk
Contractor State
License Number
Contractor City
Business License
Number
APPROVED AS TO FORM:
MARK D. HENSLEY, CITY ATTORNEY
By: T �
Karl er,
Assistant City Attorney
� -3 3/0-7
a
Residential Sound Insulation Program 5 Group 15 Construction Contract (12/20/2006)