Loading...
CONTRACT 3742A Amendment CLOSED�41 37421, .: FIRST AMENDMENT TO AGREEMENT NO. 3742 BETWEEN THE CITY OF EL SEGUNDO AND TETRA TECH. INC. FOR PROFESSIONAL SERVICES THIS FIRST AMENDMENT ( "Amendment "), is made and entered into on this 2nd day of June 2009, by and between the CITY OF EL SEGUNDO, a general law city and Municipal Corporation existing under the laws of California ( "City "), and Tetra Tech, Inc., (Consultant). 1. Agreement No. 3742 ( "Agreement "), executed by the parties on or about September 1, 2007 is amended to add the services as set forth on Exhibit A hereto: The Consultant will begin performance of these additional services on June 2, 2009. Consultant will complete each of the tasks included in Exhibit A to City's satisfaction. If City is not satisfied with such services, the Consultant will work on such matter until City approves of the service. For the additional services included in Exhibit A, this Amendment No. 1 provides an increase to the Agreement in an amount not to exceed $63,625.00. 2. The attached Exhibit A which is incorporated by reference adds to the Consultant's Scope of Services in the Agreement. 3. This Amendment may be executed in any number of counterparts, each of which will be an original, but all of which together constitute one instrument executed on the same date. 4. Except as modified by this Amendment, all other terms and conditions of Agreement No. 3742 remain the same. [Signatures on following page] 37 G 2 A IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUNDO A general law city. 4yt, ager ATTEST: Cindy Mo e , City Clerk r APPROkBerger, Mark DmBy: 1� Tetra Tech, Inc. Dale Wah, Chief Structural Engineer Taxpayer ID No. 95- 4148514 OTETRATECH 3742A. A EXHIBIT "A" 2009 HOURLY CHARGE RATE AND EXPENSE REIMBURSEMENT SCHEDULE Professional Engineering Intern/Technician/Assistant... $ 62.00 Project Administrator .. ............................... $ 105.00 Designer /CAD Operator /Engineer I........... $ 115.00 Engineer II and III /Senior Designer .......... $ 125.00 Biologist...................... ............................... $ 125.00 Planner........................ ............................... $ 125.00 Senior Engineer /Landscape Architect........ $ 139.00 Project Engineer /Project Coordinator ........ $ 160.00 Senior Pl anner ............. ............................... $ 175.00 Senior Scientist ........... ............................... $ 175.00 Senior Project Engineer ............................. $ 175.00 Project Manager /Sr. Project Coordinator... $ 195.00 Senior Project Manager .............................. $ 255.00 Program Director /Project Director ............. $ 270.00 Administrative Administrative Clerk ... ............................... $ 60.00 Word Processor /Admin. Support ............... $ 85.00 Graphic Designer ........ ............................... $ 115.00 Reimbursable In -House Costs Photo Copies (B &W 8.5 "x11 ") ...... $ 0.15 /Each Photo Copies (B &W 11 "x 17 ") ....... $ 0.40 /Each Color Copies (up to 8.5 "x 11 ") ........ $ 2.00 /Each Color Copies (to 11 "x 17 ") .............. $ 3.00 /Each Computer Usage ............................. $ 2.50 /Hour Survey /Maauine Survey Technician I .... ............................... $ 109.00 Survey Technician II /Field Supervisor ...... $ 125.00 Senior Surveyor .......... ............................... $ 141.00 Project Surveyor ......... ............................... $ 163.00 Two - Person Survey Party .......................... $ 230.00 Two- Person Survey Party with GPS .......... $ 275.00 Three - Person Survey Party ........................ $ 320.00 Survey Travel Time (Two - person) ............. $ 109.00 Survey Travel Time (Three - person) ........... $ 153.00 Construction Manaeement Construction Observer I ............................. $ 95.00 Construction Observer II ............................ $ 110.00 Senior Construction Observer .................... $ 130.00 Resident Engineer ....... ............................... $ 160.00 Construction Manager . ............................... $ 180.00 Compact Discs . ............................... $10.00 /Each Large Format Copies ..................... $ 0.40 /S.F. Mileage ............ ............................... $0.585 /Mile *current GSA POV Mileage Rate subject to change Company Vehicles .......................... $8.00 /Hour All other direct costs, such as reproduction, special photography, postage, delivery services, overnight mail, out -of- area telephone calls, printing and any other services performed by subcontractor, will be billed at cost plus 15 %. NOTE: All costs and rates are effective January 1, 2009, and subject to annual increase. L: \Admin \Forms \Contract \Exhibit A - CA 2009.doc Tt TETRA TECH, INC. May 21, 2009 City of El Segundo 350 Main Street El Segundo, CA 90245 3742A • via email: DGarcia @elsegundo.org Attention: Mr. Daniel Garcia Reference: Proposal for Structural Engineering Services for Seismic Retrofit of 3.1 Million Gallon Reservoir Gentlemen: Tetra Tech appreciates this opportunity to submit this proposal for our services. This proposal is in response to your verbal request on Tuesday, May 12, 2009. It is our understanding that the City wishes to proceed with the final design and construction of the option shown in the cost estimate of our November 2008 Seismic Evaluation Report (SER) with the estimated construction cost of $1.6M . This involves the addition of new plywood roof sheathing, strengthening the walls with reinforced concrete, and the addition of steel shear transfer frames. The repairs and retrofits described in the SER for this option will therefore serve as a basis for the scope of work for this proposal. Since no visual observation or site reconnaissance of the interior or exterior of the tank have been performed as of yet, effort on our part, which may required to correct unforeseen deficiencies, damage, deterioration, etc., are not included in the scope of work of this proposal. However, we have included in our workscope the necessary site reconnaissance to verify the condition of the existing construction. We propose to provide the following scope of services: I. Preliminary Engineering Design Phase A. Kick -Off Meeting (none assumed) B. Site Reconnaissance 1. Visual observation of the existing condition of the roof framing, and underside of the roof sheathing and upper portion of the exterior walls (above the water level at the time of our visit) as viewed from the inside of the reservoir. This observation will be conducted from an inflatable 3475 East Foothill Boulevard, Suite 300, Pasadena CA 91 107 Tel 626.351.4664 Fax 626.683.0060 www.tetratech.com Tt TETRA TECH, INC. Mr. Daniel Garcia May 21, 2009 Page 2 boat. On the day of our visit, we will need access to the interior reservoir, the water level of the reservoir is to be within 3 to 3 -1/2 feet of the bottom of the lowest roof framing member, and the City will need to provide the necessary confined space monitoring and disinfection of our boat and oars (if deemed necessary by the City). 2. Underwater video examination of the interior wall surfaces of the tank not visible from above the water surface will be performed by our subconsultant DiveCorr. For this investigation, the water level should be brought to overflow elevation, if possible, for purposes of leak detection. This effort should ideally be performed before item 1 above. Il. Final Engineering Design Phase A. Drawings Produce structural drawings for the proposed improvements using AutoCAD 2007. It is anticipated that this will include a total of seven drawing sheets (see Exhibit D, "Hours and Fees" for sheet titles). B. Structural Calculations The preliminary analysis previously performed by Tetra Tech for the SER will serve as a basis for the final structural calculations. Additional structural analysis will be performed in order to finalize the design of the reinforced concrete wall strengthening, roof diaphragm nailing and shear transfer frame connections. The pertinent portions of the preliminary calculations from the SER will be combined with the new analysis to create a complete set of structural calculations. C. Specifications Produce technical specifications in MS Word format for inclusion with the City's standard "boiler plate" documents. The specifications will use the Construction Specification Institute (CSI) Master Format D. Construction Cost Estimates 3742/ ;`..�i TETRA TECH, INC. Mr. Daniel Garcia May 21, 2009 Page 3 Perform material quantity estimates, and determine material costs to be used as the basis for the Engineer's construction cost estimate. Our estimate will be prepared in a spreadsheet format for accurate calculation and tabulation of costs. Deliverables At the 60% Level of Completion: ➢ Plans- Two (2) Sets of Blueprints ➢ Specifications- Two (2) Sets of Outline Specs. ➢ Preliminary Construction Cost Estimate At the 90% Level of Completion: ➢ Plans- Four (4) Sets of Draft Final Blueprints (2 for Eng. Dept. & 2 for Bldg. Dept.) ➢ Specifications- Two (2) Copies of Draft Final Special Provisions ➢ Cost Estimate- Four (4) Copies of Draft Final Construction Cost Estimate ➢ Calculations- Two (2) Copies of the Structural Calculations At the 100% Level of Completion: ➢ Plans- Four (4) Sets of Final Blueprints (2 for Eng. Dept. & 2 for Bldg. Dept.) ➢ Specifications- Two (2) Copies of Final Special Provisions ➢ Cost Estimate- Four (4) Copies of Final Construction Cost Estimate ➢ Calculations- Two (2) Copies of the Structural Calculations E. Design Review Meetings Attend Design Review Meetings at the 60% and 90% levels of project completion, which will include selected members of the design team and City staff. Meeting Deliverables: Draft Meeting Agenda (approximately 1 week prior to meeting) om TETRA TECH, INC. Mr. Daniel Garcia May 21, 2009 Page 4 3742A.s.. Final Meeting Agenda (distributed at the meeting) Meeting Minutes (within approximately 1 week after meeting) Two (2) sets of blueline prints of the Drawings (60% level of Completion) in 22" x 34" format Four (4) sets of blueline prints of the Drawings (90% level of Completion) in 22" x 34" format F. Approvals and Reviews Submit the Drawings, Specifications, Estimates and Calculations for City review and comment at 60 %, 90% and 100% levels of completion, as described in the "Deliverables" section, above. It is assumed that the City will route these documents to all other involved City /State /County agencies (City Building Department, City Planning, County Health Department, etc.) for review, and channel their comments back to TETRA TECH for our response. It is also assumed that the City will, at the 90% level of completion, submit two sets of the drawings and structural calculations to the City Building Department for plancheck. It is further assumed that all plancheck and/or permit fees will be paid by the City. Perform internal QA/QC of structural design. This includes review and input on the initial concept; monitoring of the structural design during the course of the project to ensure compliance with the established design concept; and final review prior to project completion to ensure a constructible, code compliant design, that effectively satisfies the intent of the project. G. Project Administration and Supervision Perform oversight of the project team, which includes client contact, project administration, and supervision of in -house Tetra Tech project staff as well as oversight of our subeonsultant. I11. Bid Phase A. Attend Pre -Bid Conference 3 7 4 2A .; TETRA TECH, INC. Mr. Daniel Garcia May 21, 2009 Page 5 B. Provide Input on Bid Addenda and Clarifications C. Attendance at bid opening is not included in the scope of this proposal D. Bid Review, Report & Recommendation for Award IV. Construction Phase Services A. Shop Drawing Reviews Review contractor - prepared shop drawings to verify conformity with the design intent (see "Structural Manhour/Fee Estimate" spreadsheet for list of shop drawings included under this item). Our fee estimate assumes one initial review and a maximum of one follow -up review for each submittal. Additional reviews may be billed as additional services. In order to expedite the review process and facilitate distribution of shop drawings to the City, Tetra Tech, the general contractor and subcontractors will utilize electronic submittals of the shop drawings in PDF format, which will be specified as a requirement in the project specifications. Shop Drawing Review Deliverables: Reviewed Shop Drawing Submittals (1- marked up set of each) B. Structural Observations Perform structural observations at the project site to verify conformity with the approved structural drawings. A total of three (3) site visits has been assumed. These observations are to occur at the discretion of the Engineer. Also included under this workscope item is a written follow -up report of our observations. Structural Observation Deliverables: Structural Observation Reports- Three (3) reports total, one for each of 3 site visits. V. Project Closeout A. Final Jobwalk and Develop Punchlist are not included in the scope of this proposal TETRA TECH, INC. 3742A. Mr. Daniel Garcia May 21, 2009 Page 6 B. Produce Record Drawings Prepare "Record Drawings" based upon contractor's clearly marked -up plans of authorized field changes, plus drawing revisions due to change orders and clarifications. Record Drawing Deliverables: One (1) set of record drawings, on 22 "04" mylar Those services not considered in our scope of services include, but are not limited to, the following: 1. Geotechnical investigation or investigative report. 2. Material sampling or laboratory testing. These services can be provided as additional services if so requested in writing. The fee for our services will be a not -to- exceed amount of $63,625 (refer to Exhibit "D" for fee breakdown). Charges for our services, as defined in our scope of services, and for any additional services, authorized in writing, will be based upon our 2009 Hourly Charge Rate and Expense Reimbursement Schedule, Exhibit "A" (enclosed). These fees will remain in effect for sixty days from the date of our proposal after which they will be subject to re- evaluation. Our work will be performed in accordance with our current agreement, except as otherwise noted in this proposal. If this is agreeable, please sign and return one signed copy of this proposal. This document will then serve as our agreement to provide our services. Thank you for allowing us the opportunity to again serve you. If you should have any questions, please do not hesitate to call. 2A f1 tea TECH, INC. Mr. Daniel Garcia May 21, 2009 Page 7 Dale E. Wah, SE 2582 Chief Structural Engineer Divisional Vice President DEW /sz m: `marketing4)roposals \wtrs\2009\ 095 \wordpro\prp docs\prp09025wA'09095 letter proposal- final. doe prp09O25 W WO9095 Enclosures Proposal for Structural Engineering Services for Seismic Retrofit of 3.1 Million Gallon Reservoir CLIENT AUTHORIZATION Authorized Signature Name (Print) Title Date P.O. or Billing Reference Number W � 3 Y W •Q �rr YV W y Q C W o pC U � � U d cd y 37 4 2A e?,ora W E w 0, rn 0 o, 0 3 3 N O O� 0. P. O N X N c � N G N / O W G N Q � N b � h � y E � � U U O A Z U .-1 U O a� 3 w w y y � y oaw �M o w o [ G L fA r..i 3742A. -A A w y o .. N � cdd i'a 0. w E w rn O O� O 3 3 N O �q L 0. a 0 x Y td O� N c � N G ^ � N / O bq C N Q � N 'b O � T y N E 7 U U O Q Q v a U O OO >, I N W � 3 w a� y � y o � W W o C o c;: � V a � w 37 4 2A imm �A w� M cl YE 0. W y N W O� O Q� O 3 3 N O O� O 0. G O Y N Q Y N Oo G G A NN _ / O W 'C L d � ry C y 'C C U a V O Q Q U .j 0 Or T a� w 3 Y w �1 •O YY y � y oaw a � � W o p u � U fx a • y v� 3742A . 4 W =l w� a� ro � 0. w E v w a` 0 a 0 3 3 N O O 0. 4 O Y ti N _A X cd O� N o G N a = / O bq C N Q � N �p O h 'O C y V � U O Q Q U .-1 ° C, Q o� ai P. E Q 3 E .y w a H oaw w o � u � a� 37424 • r Ln w A O .� �a c a w w 0 a, 0 3 3 N O O a is 0 x v g Y R D\ N o � N C ttl N i C 5q O F N � N �p O w b K y O v U O Q