Loading...
CONTRACT 3135 B Amendment3135 . AMENDMENT NO.2 THE CITY OF EL SEGUNDO — SHELL CALIFORNIA PIPELINE COMPANY LLC REIMBURSMENT AGREEMENT DATED MARCH 18, 2003 I3 B. C. D. E. CITY: Revise first paragraph of the reimbursement agreement to read as follows: By letter dated July 24, 2002, the city of El Segundo ( "City ") notified Shell of its plan to extend Douglas Street, north of Rosecrans Avenue to Alaska Avenue, by means of construction a grade separation structure at the Metro Green Line Station and Burlington Santa Fe Railroad tracks. The project will necessitate the relocation of an 8" petroleum pipeline owned by Shell as shown on CITY's 100% design plan drawing nos. U -2 and U -3 attached hereto collectively as Exhibit "A ". Revise the first sentence in the second paragraph to read as follows: SHELL is to prepared to relocate the pipeline subject to the following: Revise the estimate amount in item No. 1 to $270,000. Amendment No. 1 executed by the City on January 27, 2005 is hereby cancelled. All other items and conditions of the original March 18, 2003 agreement, not conflicting with this amendment, will remain the same. IN WITNESS WHEREOF, this Agreement has been duly executed by the parties hereto in El Segundo, California. CITY OF EL SEGUNDO By: Jeff wart City Manager Date: IS: Lk Il ATTE IN Ciriciy M6I City Clerk APPROVED Mark D. Hen By: Kad H. gerger, Assistant City A COMPANY: SHELL CALIFORNIA PIPELINE COMPANY LLC V T Date: .?- 2 %- ©6 TE: 6/2VO5 CAPITAL S /UNIT I E: TOTALLABOR ENTER CAPITAL CONTINGENCY % 10.00% ENTER EXPENSE CONTINGENCY % 10.00% ADMINISTRATION OVERHEAD 20.00% TOTAL CAPITAL TOTAL EXPENSE TOTAL CAPITAL ROUNDED TO TOTAL EXPENSE ROUNDED TO GRAND TOTAL SAY �f EST NO. ESTIMATE ESTIMATE OF CONSTRUCTION COST PROJECT: Douglas Street Relocation of 10" Ventura Crude & 8" LAX Products I OF I EXPENSE TOTAL S / UNIT I AFE# P.02134 16 8960 PREPARE[ BY: Dave Felger 1 ITEM N0. REQV UNITS DESCRIPTION 5000 5000 5000 MATERIAL 800 1 560 lin. Ft. 8.625"O.D. x.322" Wall X -42 Coated with Pritec 2000 2 2 ea 8.625" O.D. Std Wall Grd B 45 3R elbow 3 2 ea 8.625 "O.D. Std Wall Grd B 90 3R elbow 6000 4 t lot FIELD COATING 1500 5 800 lin. Ft. WARNING MESH 12000 6 1 lot MISC. FITTINGS 20000 20000 20000 TOTAL MATERIAL 5000 5000 5000 LABOR 30800 30800 520 lin. Ft. Labor to fabricate 8" 186500 1 lot X -ray 1 lot Hydrotest 3rd party 30 days Inspector w/ vehicle 1 lot Line drain 8" 1 lot Engineering 1 lot Drafting 440 lin. Ft. Remove /Dispose old 8" pipe TE: 6/2VO5 CAPITAL S /UNIT I E: TOTALLABOR ENTER CAPITAL CONTINGENCY % 10.00% ENTER EXPENSE CONTINGENCY % 10.00% ADMINISTRATION OVERHEAD 20.00% TOTAL CAPITAL TOTAL EXPENSE TOTAL CAPITAL ROUNDED TO TOTAL EXPENSE ROUNDED TO GRAND TOTAL SAY �f EST NO. SHEET I OF I EXPENSE TOTAL S / UNIT I EXTENSION COST 16 8960 8960 600 1200 1200 750 1500 1500 5000 5000 5000 1 800 800 2000 2000 2000 19460 185 96200 96200 6000 6000 6000 1500 1500 1500 400 12000 12000 15000 15000 15000 20000 20000 20000 5000 5000 5000 70 30800 30800 186500 17516 41192 264,668 265,000 $265,000 $270.000 6/22/05 Douglas St Reloc 2005 Est..xls 1 of 1