Loading...
CONTRACT 3543 Professional Services Agreement3543. PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF EL SEGUNDO AND ELLASOTELO This AGREEMENT is entered into this r 10'%+ day of J DV. , 20�.� by and between the CITY OF EL SEGUNDO, a municipal corporatiofi and general law city ( "CITY ") and ELLA SOTELO, an individual ( "CONSULTANT "). 1. CONSIDERATION. A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below; B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement; C. As additional consideration, CITY agrees to pay CONSULTANT in the manner set forth in the attached Exhibit `B," which is incorporated by reference. CONSULTANT understands and agrees that funding for CONSULTANT's services are derived solely from the state of California's budget allocation to the Department of General Services, Telecommunications Division, 9 -1 -1 Emergency Communications Office. CITY is not obligated, under any circumstances, to pay CONSULTANT in the event CITY cannot be reimbursed by the state of California for any reason including, without limitation, for the State's failure to allocate monies to the Department of General Services for the 9 -1 -1 Emergency Communications Office. e,s� — -- CONSULTANT CITY 4NAGER 2. SCOPE OF SERVICES. A. CONSULTANT will perform services listed in the attached Exhibit "A," which is incorporated by reference. B. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement. 3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT will use the appropriate generally accepted professional standards of practice existing at the time -1- 3 5 4 3 • . ." of performance utilized by persons engaged in providing similar services. CITY will continuously monitor CONSULTANT's services. CITY will notify CONSULTANT of any deficiencies and CONSULTANT will have fifteen (15) days after such notification to cure any shortcomings to CITY's satisfaction. Costs associated with curing the deficiencies will be borne by CONSULTANT. 4. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit `B "). 5. NON - APPROPRIATION OF FUNDS. As set forth above, payments owed to CONSULTANT are dependent upon the state of California. At the time this Agreement was executed, both Parties understood that payments due and payable to CONSULTANT for Services are within the State's current budget and within an available, unexhausted and unencumbered appropriation of the state of California, General Services, Telecommunications Division. In the event the state of California has not appropriated sufficient funds for payment of CONSULTANT services beyond the current fiscal year, this Agreement will immediately terminate. Under no circumstances is CITY obligated to use CITY's own monies, whether through the General Fund or otherwise, to pay CONSULTANT. 6. FAMILIARITY WITH WORK. A. By executing this Agreement, CONSULTANT agrees that it has: i. Carefully investigated and considered the scope of services to be performed; ii. Carefully considered how the services should be performed; and iii. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONSULTANT agrees that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONSULTANT discover any latent or unknown conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT's own risk until written instructions are received from CITY. 7. TERM. The term of this Agreement will be from November 1, 2005 to November 1, 2006. This Agreement will automatically renew on its anniversary date unless terminated by either party before that date. Under no circumstances will the term of this Agreement be extended beyond five (5) years after its effective date. 8. TIME FOR PERFORMANCE. -2- 3543. . A. CONSULTANT will not perform any work under this Agreement until: i. CONSULTANT furnishes proof of insurance as required under Section 21 of this Agreement; and ii. CITY gives CONSULTANT a written notice to proceed. B. Should CONSULTANT begin work on any phase in advance of receiving written authorization to proceed, any such professional services are at CONSULTANT's own risk. 9. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below (check all that apply): A. ® Exhibit A: Scope of Work; B. ® Exhibit B: Schedule of Rates. 10. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties. 11. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number. 12. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement. 13. WAIVER. CITY's review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT's performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character. -3- 3543. 14. TERMINATION. A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. B. CONSULTANT may terminate this Agreement at any time with CITY's mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date. C. Upon receiving a termination notice, CONSULTANT will immediately cease performance under this Agreement unless otherwise provided in the termination notice. Except as otherwise provided in the termination notice, any additional work performed by CONSULTANT after receiving a termination notice will be performed at CONSULTANT" own cost; CITY will not be obligated to compensate CONSULTANT for such work. D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated. E. By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 15. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT under this Agreement are CITY's property. CONSULTANT may retain copies of said documents and materials as desired, but will deliver all original materials to CITY upon CITY's written notice. CITY agrees that use of CONSULTANT's completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY's own risk. 16. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or public CITY without CITY's prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties. 17. INDEMNIFICATION. A. CONSULTANT agrees to the following: i. Indemnification for Professional Services. CONSULTANT will save harmless and indemnify and at CITY's request reimburse defense costs for CITY and all its officers, volunteers, employees and representatives from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, any injuries -4- 3543 • a or damages sustained by any person or property resulting or arising from any negligent or wrongful act, error or omission by CONSULTANT or any of CONSULTANT's officers, agents, employees, or representatives, in the performance of this Agreement. ii. Indemnification for other Damages. CONSULTANT indemnifies and holds CITY harmless from and against any claim, action, damages, costs (including, without limitation, attorney's fees), injuries, or liability, arising out of this Agreement, or its performance. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONSULTANT will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise. B. For purposes of this section "CITY" includes CITY's officers, officials, employees, agents, representatives, and certified volunteers. C. It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement. D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 21, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification. 18. ASSIGNABILITY. This Agreement is for CONSULTANT's professional services. CONSULTANT's attempts to assign the benefits or burdens of this Agreement without CITY's written approval are prohibited and will be null and void. 19. INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only. 20. AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with respect to all services and matters covered under this Agreement. CITY will have free access at all reasonable times to such records, and the right to examine and audit the same and to make -5- 3543. transcript therefrom, and to inspect all program data, documents, proceedings and activities. CONSULTANT will retain such financial and program service records for at least three (3) years after termination or final payment under this Agreement. 21. INSURANCE. A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below (check all that apply): Type of Insurance Limits ® Commercial general liability: $1,000,000 B. Commercial general liability insurance will meet or exceed the requirements of the most recent ISO -CGL Form. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. C. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." D. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to Section 14. 22. USE OF SUBCONTRACTORS. CONSULTANT must obtain CITY's prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation. 23. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: M If to CONSULTANT: Ella Sotelo 2202 Robruce Lane Hacienda Heights, CA 91745 Attention: If to CITY: City of El Segundo 350 Main Street El Segundo, CA 90245 Attention: Max Phipps 3543 Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 24. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY's conflict of interest regulations. 25. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT's bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT's bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability. 26. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT's or CITY's obligations under this Agreement. 27. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County. 28. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state, and local laws applicable to this Agreement. 29. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. There are Two (2) Attachments to this Agreement. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns. 30. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party. -7- 35 4 3 31. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 32. AUTHORITY /MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. CITY's executive manager, or designee, may execute any such amendment on behalf of CITY. 33. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Agreement, agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 34. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 35. TIME IS OF ESSENCE. Time is of the essence for each and every provision of this Agreement. 36. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, acts of terrorism, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' reasonable control, then the Agreement will immediately terminate without obligation of either party to the other. 37. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY. [Signatures on next page] 3543 • :':'; IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF anager ATTEST: �--Sg" Cindy Morte , City Clerk APPRC MARK Lm In Ella Sotelo S&Z, Ella Sotelo Consultant Taxpayer ID No. On -file 3543-777 EXHIBIT A Scope of ces A. The CONTRACTOR will serve as the Los Angeles 9 -1 -1 County Coordinator. CONTRACTOR must perform the duties set forth in the State of California, Department of General Services, Telecommunications Division, 9 -1 -1 Emergency Communications Office, 9 -1 -1 Operations Manual, Chapter VIII, County Coordinator and MSAG Responsibilities (Revised February 2004). Chapter VIII of the 9 -1 -1 Operations Manual, is attached hereto as Exhibit A -1 and incorporated herein by this reference. The specific duties to be performed by the CONTRACTOR include, without limitation, the following: 1. Act as a central point of contact for the phone companies and the State 9 -1 -1 Office. 2. Act as liaison between the telephone companies and Public Safety Answering Points (PSAP) within the county on issues related to call routing and jurisdictional boundaries. 3. Prepare Emergency Service Numbers (ESN) assignments for jurisdictions within the county. 4. Distribute ESN assignments to PSAPs in the county. 5. Arbitrate and resolve ESN boundary assignment problems between PSAPs. 6. Assign default ESNs on 9 -1 -1 trunk groups for telephone companies. 7. Annually review Master Street Address Guide (MSAG) printout for accuracy and /or changes. 8. Correct ESN assignments on the MSAG printout. 9. Conduct training sessions for the PSAP staff (i.e., MSAG reconciliation and MSAG change request form procedures). 10. Make copies of the MSAG or MSAG discrepancy list and distribute the list to each jurisdiction within the county. 11. Collect MSAG change forms from the PSAPs and monitor their reconciliation effort. 12. Review the MSAG change documents for accuracy and acquire the proper signatures. 13. Update MSAG changes received from PSAPs through the MSAG maintenance database. 14. Interface with the telephone companies for Automatic Location Identification (ALI) updates, inserts, changes, deletions and trouble reports involving misrouted calls. 15. Conduct periodic countywide meetings for county PSAP representatives to discuss items such as operational needs, MSAG, State policies and procedures, county policies and procedures, a telephone company's network or equipment changes, etc. 16. Work with the State 9 -1 -1 Program Office staff, the California Highway Patrol (CHP) and PSAPs, in the routing of wireless 9 -1 -1 calls. 2 .� i 3543. EXHIBIT A -1 State of California 9 -1 -1 OPERATIONS MANUAL CHAPTER VIII COUNTY COORDINATOR RESPONSIBILITIES Introduction With changing technology, new Legislation, and an ongoing effort by all agencies for continued improvement to California's 9 -1 -1 system, this chapter is intended as a guide for 9 -1 -1 County Coordinators so they will have an understanding of what their responsibilities are and what the State of California, 9 -1 -1 Program Office expects of them. It is estimated that between 50 percent to 100 percent of a County Coordinator's regular work schedule may be spent on 9 -1 -1 related activities. In order to effectively maintain the integrity of the 9 -1 -1 Master Street Address Guide (MSAG), disseminate information in a uniform and timely manner to all Public Safety Answering Points (PSAPs), and coordinate between local service providers, it is vital that each county in California have someone designated as the 9 -1 -1 County Coordinator. The 9 -1 -1 County Coordinator is an important part of the 9 -1 -1 environment and is vital to the proper functioning of the 9 -1 -1 MSAG. The 9 -1 -1 County Coordinator will need to work closely with the service providers that maintain the MSAG, the Incumbent Local Exchange Carriers (ILECs), one or more Competitive Local Exchange Carriers (CLECs), and the State of California 9 -1 -1 Program Office. The 9 -1 -1 County Coordinator is responsible for assigning Emergency Service Numbers (ESN) to address ranges within their county or jurisdiction. They will assist in jurisdictional boundary assignments within their county as necessary for ESN assignments and the routing of wireless 9 -1 -1 calls to the appropriate PSAP. The 9 -1 -1 County Coordinator will be directly involved with implementation of wireless 9 -1 -1. The passage of Assembly Bill 1263, which took effect January 1, 2001, allows for routing of wireless 9 -1 -1 calls directly to local PSAPs under specific conditions. The bill further provides that routing decisions will be made in consultation with wireless carriers, providers of 9 -1 -1 selective routing service, and local law enforcement officials. Responsibilities of a 9 -1 -1 County Coordinator Although duties may vary by jurisdiction, a 9 -1 -1 County Coordinator should: • Act as a central point of contact for the telephone companies and State 9 -1 -1 Program Office; • Act as liaison between the telephone companies and the PSAPs within that county on issues related to call routing and jurisdictional boundaries; • Prepare the ESN assignment list for the jurisdictions within the county; • Distribute ESN assignments to the PSAPs in the county; • Arbitrate and resolve ESN boundary assignment problems between PSAPs; Rev. 2/2004 V111.1 `� 354 3 • Assign default ESNs on 9 -1 -1 trunk groups for telephone companies, (ILEC and CLEC); • Annually review MSAG printout for accuracy and /or changes; • Correct ESN assignments on the MSAG printout; • Conduct training sessions for the PSAP staff (i.e., MSAG reconciliation and MSAG change request form procedures); • Make copies of the MSAG or MSAG discrepancy list and distribute the list to each jurisdiction within their county; • Collect MSAG change forms from the PSAPs and monitor their reconciliation effort; • Review the MSAG change documents for accuracy and acquire the proper signatures; • Forward MSAG change forms received from PSAPs to the MSAG maintenance unit of the telephone companies; • Interface with the telephone companies (ILECs and CLECs) for Automatic Location Identification (ALI) updates, inserts, changes, deletions and trouble reports involving misrouted calls; • Conduct periodic countywide meetings that are attended by PSAP representatives. It is suggested that meetings be conducted at least twice a year to discuss items such as operational needs, MSAG, State policies and procedures, county policies and procedures, a telephone company's network or equipment changes, etc.; Work with the State 9 -1 -1 Program Office staff, the California Highway Patrol (CHP) and PSAPs, in the routing of wireless 9 -1 -1 calls. Desirable Qualifications of a 9 -1 -1 County Coordinator The State of California 9 -1 -1 Program Office is requesting the 9 -1 -1 County Coordinators to do a variety of tasks. Some of these tasks require specific skills and experience but most require only a strong dedication to serve their community and to provide the best 9- 1-1 services possible. Following are some of the desirable qualifications of a 9 -1 -1 County Coordinator: • The support and approval of the supervisor(s); • A strong desire to meet the 9 -1 -1 expectations of the citizens they serve; • A good working relationship with all the PSAP personnel; • A good working relationship with the service providers in their area, both ILEC and CLEC; • An excellent understanding of the 9 -1 -1 MSAG and Automatic Number Identification (ANI) Data Base Management System (DBMS); • Accessibility during regular working hours for the benefit of PSAP contacts; (NOTE: Voice mail should not be used as a standard means of communication) Master Street Address Guide (MSAG) The MSAG is the heart of the 9 -1 -1 system and enables proper routing of a 9 -1 -1 call to the appropriate PSAP. It is a computerized database and living document that contains a list of all street names and the corresponding house number ranges and communities (postal and local when different). Each range of house numbers on a street within a predefined jurisdiction is assigned an ESN. Telephone number records contain the actual service address that is used by the MSAG for validation and appropriate ESN Rev. 2/2004 VI I I.2 3543•::s assignment. Before an ESN assignment can occur, it is imperative that the service address assigned to a telephone subscriber precisely match the entry in the MSAG. Although MSAG Tariff A -9 states that MSAG reports are available to 9 -1 -1 County Coordinators once annually free of charge, they may find it necessary to request the reports more frequently. For a nominal fee, additional MSAG reports are available from the DBMS provider on a quarterly, semi - annual, or annual basis. The DBMS provider automatically sends the annual reports. However, it is the responsibility of the 9 -1 -1 County Coordinator to contact the DBMS provider(s) and arrange to receive the reports at an interval that best meets the needs of the 9 -1 -1 County Coordinator. The National Emergency Number Association (NENA) standards provide guidelines for making MSAG modifications. The State of California, 9 -1 -1 Program Office supports the NENA standards. For your convenience, the following are Standards 9 and 10 from NENA Recommended Data Standards For Local Exchange Carriers, ALI Service Providers and 9 -1 -1 Jurisdictions. (NENA 02 011, March 2000) ANI /ALI TROUBLE REPORTING PROCESS • All ANI /ALI Trouble Reports are to be sent to the 9 -1 -1 Data Base Management System Provider. • The 9 -1 -1 Data Base Management System Provider will determine if there are any data base or selective routing problems on their end prior to forwarding the trouble report to the appropriate Service Provider. • Within one (1) business day, the 9 -1 -1 Data Base Management System Provider will forward all ANI /ALI Trouble Reports to the appropriate Service Provider indicating whether or not trouble was found on their end or if the Service Provider needs to also check their equipment and systems. The Service Provider will have one (1) business day to resolve the ANI /ALI Trouble Report and return it to the 9 -1 -1 Data Base Management System Provider. Upon receipt, the 9 -1 -1 Data Base Management System Provider will return a completion notification to the originator. MSAG MODIFICATION PROCESS FLOW ® The jurisdiction's authorized 9 -1 -1 Data Base Coordinator is the only entity allowed to approve changes to the MSAG. No 9 -1 -1 Data Base Management System Provider or Service Provider may make MSAG changes without written authorization from the jurisdiction except for internal telco type fields such as county code and exchange code. All Service Providers will obtain an initial complete MSAG via the negotiated medium (CD -ROM, file transfer, diskette, Email, paper) from the 9 -1 -1 Data Base Management System Provider per the negotiated contracts. As jurisdictions request changes to their MSAG, the 9 -1 -1 Data Base Management System Provider must forward a copy of the request to all Service Providers within one (1) business day. This is necessary to ensure all subscriber records contain MSAG valid addresses. ® If a jurisdiction is requesting an MSAG range (be) deleted and there are TN records attached to the MSAG, it is recommended that the Data Base Management System Rev. 2/2004 V111.3 3 5 4 3 - 7 3, Provider print the associated TN's and return to the Jurisdiction Data Base Manager prior to making any MSAG changes. Complete NENA Standards can be found at: http: / /www.nena.org MSAG change procedures are often multi - phased when the changes require notification to more than one telephone service provider. It is imperative that the 9 -1 -1 County Coordinator work closely with the DBMS and the service provider(s). Population growth in California that drives new housing, the expanding business climate, an increased number of telephone service providers, and the dynamics of rural annexation, create the necessity for continual MSAG updates and additions. The 9 -1 -1 County Coordinator is responsible for completing misroute forms, either electronically or manually. Electronic delivery provides for better tracking and follow -up of the requested MSAG changes and shall be used whenever available. Pacific Bell and Verizon provide for electronic delivery of MSAG changes. If the 9 -1 -1 County Coordinator needs assistance with electronic delivery of MSAG, they should contact either Pacific Bell or Verizon. Both electronic and manual /paper forms MUST INCLUDE the 10 -digit ANI. In order to assist the DBMS provider in processing the forms, it is imperative that all helpful information be included. The REMARKS /COMMENTS section of the form shall include: 1. The County Coordinator's full name and contact telephone number 2. The community code and /or city code 3. Any additional information that will assist in the processing of the request When a street name change, addition, deletion, or other modification to the MSAG is reported to the DBMS provider, it is possible that the change will affect areas served by a CLEC. The DBMS provider must forward a copy of the request to all service providers within one (1) business day. If the 9 -1 -1 County Coordinator is requesting an MSAG range be deleted and there are telephone number (TN) records attached (i.e., CLEC service is being provided to TNs) it is recommended that the NENA Standards be followed. However, the DBMS provider and the 9 -1 -1 County Coordinator may establish their own process flow as long as it will serve to maintain the integrity of the MSAG. Any deviation from the NENA Standards shall be documented in writing and signed by the 9 -1 -1 County Coordinator and the DBMS provider. It is important for the 9 -1 -1 County Coordinators to understand they are responsible for updating information that is maintained in the MSAG. The DBMS providers are required to contact CLECs regarding MSAG changes. It is the responsibility of the 9- 1-1 County Coordinator to monitor the status of their request to assure completion. Emergency Service Number (ESN) An ESN is a three to five digit number representing a unique combination of emergency service agencies (law enforcement, fire, and emergency medical services). The 9 -1 -1 r) 4 r) I. x. Rev. 2/2004 V111.4 3543.7 County Coordinator is responsible for assigning an ESN to a specific range of addresses within a particular geographical area. A default ESN is assigned to a designated default PSAP. Whenever a 9 -1 -1 call cannot be selectively routed due to an ANI failure, garbled digits or other cause, the default ESN will route the call to the PSAP that normally would receive most of the calls from that telephone company central office. The 9 -1 -1 County Coordinator and the selected default PSAP should work together and be in agreement as to the default routing of 9 -1 -1 calls. The default ESN(s) should not be provided to any service provider except when requested, using the properly completed Emergency Telephone System plan for Network Services (form TD- 280A). No default ESN shall be provided via voice, fax, e- mail or other means of communications other than the signed completed TD -280A. Wireless 9 -1 -1 Implementation The passage of Assembly Bill 1263 (AB 1263), which took effect January 1, 2001, allows for routing of wireless 9 -1 -1 calls directly to local PSAPs under specific conditions. In addition to jurisdictional considerations, those conditions include agreement among the California Highway Patrol (CHP), the Department of General Services (DGS) 9 -1 -1 Program Office, and the affected local agency, that alternate routing is economically and technologically feasible and will benefit public safety. The bill further provides that routing decisions will be made in consultation with wireless carriers, providers of 9 -1 -1 selective routing service, and local law enforcement officials. Wireless carriers will be asked to route 9 -1 -1 calls through the public switched telephone network (PSTN) to designated seven -digit emergency lines at the local PSAP. With the appropriate lines and equipment, PSAPs may receive "Caller ID" with wireless 9 -1 -1 calls. However, this routing method will NOT provide location information. The 9 -1 -1 Operations Manual, Chapter IV, Wireless 9 -1 -1 Services, has been revised and is available on the 9 -1 -1 Program Office web page at: http://www.td.dqs.ca-gov/services/911 Click on "9 -1 -1 Operations Manual ". The 9 -1 -1 County Coordinator will be an integral part of the improvements being made to wireless 9 -1 -1 call routing. They may be asked to work as a liaison between the 9 -1 -1 Program Office, CHP, and the local PSAPs, to coordinate meetings and disseminate information. They will need to have a basic understanding of Federal Communications Commission (FCC) Report and Order 94 -102, Phases I and II and a general understanding of AB 1263. CLEC /ILEC Coordination This section is intended as a brief guide for 9 -1 -1 County Coordinators with regard to ILECs and CLECs. As soon as reviews are complete, Chapter IX of the 9 -1 -1 Operations Manual will fully explain the 9 -1 -1 Program Office policy regarding CLECs deploying network services within the State of California. °I f Rev. 2/2004 V111.5 2` v 3543; '"77 The California Public Utilities Commission (CPUC) requires that all CLECs providing voice network services in California provide access to 9 -1 -1. As a result, in order to maintain the MSAG and provide ESNs, the 9 -1 -1 County Coordinators may now need to coordinate with more than one service provider. To eliminate some elements of error, the default ESN number(s) should not be provided to any service provider except when requested using the properly completed Emergency Telephone System plan for Network Services (form TD- 280A). No default ESN shall be provided via voice, fax, electronic mail or other means of communications other than the completed TD -280A. Additionally, when an ILEC has sold a block of telephone numbers to a CLEC, those numbers should not be added to the ALI DBMS until such time that service has been issued by the CLEC. County Coordinator Reimbursement This information has been revised and moved to Chapter III Rev. 2/2004 VIII.6 2 4 `i 3543. -7",tl EXHIBIT B SCHEDULE OF RATES A. CITY shall compensate CONTRACTOR for satisfactory performance of services rendered and expenses incurred under this Agreement. Compensation for services rendered will be based on the actual hours worked by CONTRACTOR at the hourly rates set forth below, in an amount not to exceed One Hundred Fifty Thousand Dollars ($150,000) for the first contact year. The maximum amount of compensation, hourly and expense rates for any extension(s) thereafter shall be specified in a properly executed and authorized written amendment to this Agreement. B. The maximum amount of compensation or the rate of compensation may be increased by written amendment to the Agreement at any time during the Agreement period should the CITY receive notification, in writing, from the State of California that the annual reimbursement commitment to the CITY has been increased. Hourly Rates: A. For the initial twelve (12) month period of this Agreement, the rate of compensation to CONTRACTOR shall lf be Fifty-Five Dollars ($55.00) per hour. This CONTRACTOR works less than one whole hour, is inclusive of all overhead costs. compensation will be prorated in quarter -hour increments. B. For the second twelve (12) month extension option, the rate of compensation to CONTRACTOR shall be Fifty-Six works ess thanr one whole hour) of all overhead costs. If CONTRACTOR compensation will be prorated in quarter -hour increments. C. For the third twelve (12) month extension option, the rate of compensation to CONTRACTOR shall be Fifty -Seven Dollars ($57.00) per hour. This hourly rate is inclusive of all overhead costs. If CONTRACTOR works less than one whole hour, compensation will be prorated in quarter -hour increments. D. For the forth twelve (12) month extension option, the rate of compensation to CONTRACTOR shall be Fifty-Eight TRACTOR works less than one whole hourly rate is inclusive le hour o all overhead costs. If CON compensation will be prorated in quarter -hour increments. E. For the fifth twelve (12) month extension option, the rate of compensation to CONTRACTOR shall CONTRACTOR works lesOs) than one rate is inclusive one whole hour, co if C mpensation will of all overhead costs. If be prorated in quarter -hour increments. 115 3543 -. *a Reimbursable Expenses: A. Mileage Rates: CONTRACTOR shall be reimbursed for the direct costs of mileage for travel necessary to perform the duties under this Agreement. Mileage will be reimbursed at a cents - per -mile rate in an amount equal to the annual standard car mileage allowance as determined by the Internal Revenue Service ( "IRS "). The current rate set by the IRS is $.40.5 per mile, effective October 1, 2005, B. Travel Rates: CONTRACTOR shall be reimbursed for direct costs of transportation, lodging, meals, and incidental expenses to undertake necessary out -of -town travel and /or overnight travel. 1. The class of air travel shall be limited to standard coach. The lack of seating on flights is justification only in the event that the travel had to be undertaken on very short notice through no fault of CONTRACTOR. day 2. Meals and associated tips shall be limited to Thirty -Six Dollars ($36.00) per C. Other Rates: 1, Conference registration fees, and incidental expenses related to 9 -1 -1 County Coordinator business, and, annual membership dues to the National Emergency Number Association ( "NENA ") shall be reimbursed as outlined in pages 4 — 6 of the State of California, Department of General Services, Telecommunications Division, 9 -1 -1 Emergency Communications Office, 9 -1 -1 Operations Manual, Chapter III, Funding (Revised August 2005). Chapter III of the 9 -1 -1 Operations Manual, is attached hereto as Exhibit B -1 and incorporated herein by this reference. Disallowed Expenses: A. Should the State of California disallow any of the expenses submitted and refuse to provide reimbursement, CITY will in turn disallow payment for those same expenses to CONSULTANT. Immediately following fortification of payment refusal from the State, the disallowed expenses will be withheld by CITY from the next payment to CONSULTANT. 3543 - 71, EXHIBIT B -1 State of California 9 -1 -1 OPERATIONS MANUAL CHAPTER III -- FUNDING INTRODUCTION 111.2 Need More Information? 111.2 How to Communicate with the California 9 -1 -1 Emergency Communications Office (9 -1 -1 Office) 111.2 FUNDING POLICIES 111.17 "New" Public Safety Answering Point (PSAP) 111.3 PSAP Expenses 111.4 PSAP Expenses Eligible For Reimbursement 111.4 Education 111.7 Network Services 111.8 Eligible PSAP Network Services 111.8 Customer Premise Equipment (CPE) 111.10 9 -1 -1 CPE Defined 111.10 Master Purchase Agreement for 9 -1 -1 CPE 111.10 CPE Funding Allotment 111.10 Residual Funds 111.11 CPE System Maintenance After Five Years 111.11 CPE Replacement Parts and Equipment Repairs 111.11 Standard 9 -1 -1 System 111.12 Service /Equipment Approval List - Residual Funds 111.13 CPE Provisioning 111.14 Measured Call Volumes 111.14 CPE Funding Level Calculations 111.14 Geographic Information Systems (GIS) 111.16 GIS Funding Allotment 111.16 Authorized Use of GIS Allotment Funds 111.16 FUNDING PROCESSES FOR SERVICES & EQUIPMENT 111.17 9 -1 -1 System CPE Replacement or Certified Upgrade 9 -1 -1 System CPE Reimbursement Claim Process 111.18 9 -1 -1 System CPE Direct Funding Process 111.20 Geographic Information Systems (GIS) GIS Reimbursement Claim Process 111.23 GIS Direct Funding Process 111.25 Network and Other 9 -1 -1 Services /CPE Reimbursement Claim Process 111.27 Direct Funding Process 111.28 PSAP Expenses Reimbursement Claim Process 111.29 STATEMENT OF WORK (SOW) 111.30 Rev. 8/5/2005 111.1 � } 3 5 4 3 9 -1 -1 OPERATIONS MANUAL ` Chapter III — Funding 9 -1 -1 OPERATIONS MANUAL CHAPTER III - FUNDING INTRODUCTION The administration of funding for equipment and services related to the answering of 9 -1 -1 calls is based upon laws passed by the California State Legislature. Most of the pertinent code sections relating to the reimbursement of 9 -1 -1 equipment and services can be found in the California Revenue and Taxation Code Sections 41001 — 41176. In essence, the laws indicate that the State of California, Department of General Services, Telecommunications Division, California 9 -1 -1 Emergency Communications Office (9 -1 -1 Office), shall manage the State Emergency Telephone Number Account and reimburse agencies for equipment and services necessary to answer 9 -1 -1 calls. Section 41138 also provides authority to local agencies to obtain equipment from any vendor; however, reimbursable costs cannot exceed those that have been approved by the 9 -1 -1 Office. The goal of the 9 -1 -1 Office is to enable each public safety answering point (PSAP) to provide the fastest, most reliable, cost - effective telephone access to emergency services for any 9 -1 -1 caller in California. The objective of the 9 -1 -1 Office in defining the funding policies outlined in this chapter is to provide sufficient funding to each PSAP to successfully manage their local operations in compliance with all 9 -1 -1 standards. Need More Information? The entire Revenue and Taxation Code, as well as applicable sections of the Government Code, are included in the appendix of the State of California 9 -1 -1 Operations Manual. The manual and other 9 -1 -1 Office documents can be found on the 9 -1 -1 Office website, as follows: www.td.dgs.ca.gov /services /911 To view the 9 -1 -1 Operations Manual upon reaching the 9 -1 -1 Office homepage, scroll down and select" 9 -1 -1 Operations Manual ". How To Communicate With the 9 -1 -1 Office A complete list of 9 -1 -1 Office staff including agency consultant assignment areas, e-mail addresses and telephone numbers may be viewed at our website address noted above. To view this list upon reaching the DGS Telecommunications Division homepage, scroll down (if necessary) and select "California 9 -1 -1 Emergency Communications Office ", scroll down and select " 9 -1 -1 Staff Organization List ". Or, you may reach our office at the following telephone numbers: Telephone: (916) 657 -9207 FAX: (916) 657 -9882 When corresponding with the 9 -1 -1 Office, please direct correspondence to: State of California Department of General Services Telecommunications Division California 9 -1 -1 Emergency Communications Office 601 Sequoia Pacific Boulevard, MS -911 Sacramento, CA 95814 -0282 Ny Rev. 8/5/2005 111.2 3543 • :.` 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding "NEW" PUBLIC SAFETY ANSWERING POINT FUNDING POLICY To be established as a new public safety answering point (PSAP) and receive 9 -1 -1 Office funding, the agency must meet the following criteria. 1. Be a public agency as defined in Government Code Section 53101: "Public agency as used in this article, means the state, and any city, county, city and county, municipal corporation, public district, or public authority located in whole or in part within this state which provides or has authority to provide firefighting, police, ambulance, medical, or other emergency services ". 2. Commit to answer 9 -1 -1 calls 24 hours per day, seven days per week for at least five years. 3. Provide documentation to support an anticipated call volume of 300 or more 9 -1 -1 calls per month (PSAPs that answer less than 300 calls per month will be considered on a case -by -case basis). Note: The 9 -1 -1 Office encourages PSAPs to consider PSAP consolidation, when appropriate, to make more efficient use of PSAP and 9 -1 -1 Office resources. All requests to fund new 9 -1 -1 systems that will answer calls diverted from previously funded PSAP locations will be considered on a case -by -case basis. Exceptions may be made in those cases where it can be demonstrated that funding a new PSAP will result in an overall reduction in 9 -1 -1 costs and /or a measurable improvement of 9 -1 -1 service. Rev. 8/5/2005 111.3 3543•.,: 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding PSAP EXPENSES FUNDING POLICY With changing technology, new legislation, and an ongoing effort by all agencies for continued improvement to California's 9 -1 -1 network, the 9 -1 -1 Office recognizes that PSAPs dedicate considerable resources to support effective response to 9 -1 -1 callers in their community. It is the policy of the 9 -1 -1 Office to reimburse PSAPs for documented costs directly associated with this effort. PSAP Expenses Eligible For Reimbursement The following are categories of PSAP expenses that may be approved for reimbursement. Categories and activities that require pre - approval by the 9 -1 -1 Office before the expense is incurred are noted in parentheses. PSAPs may request reimbursement for these expenses by following the reimbursement claim process provided at the end of this chapter. WAGES Designated PSAP Managers, designated County Coordinators, and PSAP designated individuals may be reimbursed documented wages (straight time salary and benefits) for the following 9 -1 -1 related activities. 1. MSAG /ESN - time spent performing 9 -1 -1 Master Street Address Guide (MSAG) tasks necessary to effectively maintain the integrity of the MSAG, including emergency services number (ESN) jurisdiction assignment and modifications to ensure proper routing of wireline and wireless 9 -1 -1 calls. Reimbursement for contracted MSAG /ESN services, in lieu of reimbursement for the 9 -1 -1 County Coordinator's performance of these activities, requires prior written approval from the 9 -1 -1 Office. The PSAP shall use their local procurement process when selecting a provider for MSAG /ESN services. The request for prior approval shall include a cover letter on agency letterhead and a copy of the entire MSAG /ESN contractor's bid. The proposed MSAG /ESN contract and /or the request letter must provide a description of 9 -1 -1 MSAG /ESN activities to be performed and the objectives that must be met by the contractor. The 9 -1 -1 Office will review the request and respond in writing to the local agency with a Commitment To Fund (TD -288) identifying MSAG /ESN contracted services eligible for reimbursement from the 9 -1 -1 Office. Once reimbursement for an MSAG /ESN contractor is approved, PSAPs may request reimbursement for these expenses by following the reimbursement claim process provided at the end of this chapter. 2. Dissemination of 9 -1 -1 related information to county PSAPs - time spent by designated County Coordinators for this activity. 3. Coordination of 9 -1 -1 services - time spent by. PSAP Managers and County Coordinators coordinating wireline /wireless services between 9 -1 -1 service carriers and the 9 -1 -1 Office. 4. 9 -1 -1 system certified upgrade or replacement - time spent on activities related to the procurement of 9 -1 -1 customer premise equipment (CPE) that has been approved for funding by the 9 -1 -1 Office. 5. Training (PRE- APPROVAL REQUIRED) - time spent to travel to /from and attend specifically defined 9 -1 -1 training that is pre- approved by the 9 -1 -1 Office and held within the State of California. Documentation including a class agenda with a sign -in sheet showing the signatures of attendees or a certificate of completion must be provided to confirm attendance. Rev. 8/5/2005 111.4 `' O 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 3543 • .'`:"t 6. Special meetings (PRE- APPROVAL REQUIRED) - time spent traveling to /from location and documented attendance at an advisory or project meeting requested by the 9 -1 -1 Office. Documentation including a dated meeting agenda on agency letterhead and a sign -in sheet showing the signatures of attendees must be provided to confirm attendance. 7. Countywide PSAP Manager's meeting (PRE- APPROVAL REQUIRED) - time spent traveling to /from the meeting location and documented attendance (County Coordinators may include time spent planning and coordinating the meeting). 8. CaINENA quarterly meeting and annual conference (PRE- APPROVAL REQUIRED) - time spent traveling to /from the meeting location and documented attendance (not to exceed 8 hours of attendance each day). Reimbursement for this time is limited to the pre- approved designated County Coordinator and pre- approved designated PSAP Manager. Reimbursement for the CaINENA quarterly meeting is limited to one per year at the location (North or South) nearest the PSAP location. MILEAGE — Designated PSAP Managers, designated County Coordinators, and PSAP designated personnel that have been pre- approved by the 9 -1 -1 Office may be reimbursed documented mileage incurred while traveling to perform activities in direct support of the PSAP 9 -1 -1 call taker function. The rate of reimbursement will be based on the PSAP's current documented policy for mileage reimbursement. If no PSAP policy is provided, the State of California, Department of Personnel Administration (DPA), mileage reimbursement rate will be applied. TRANSPORTATION (PRE- APPROVAL REQUIRED) Designated PSAP Managers, designated County Coordinators, and PSAP designated personnel that have been pre- approved by the 9 -1 -1 Office may be reimbursed for documented (receipts required) transportation costs (air, railway, bus, rental car, tolls, and parking) incurred while traveling to destinations over 50 miles from the PSAP location to perform activities in direct support of the PSAP 9 -1 -1 call taker function. The rate of reimbursement will be based on the PSAP's current documented policy for transportation reimbursement. If no PSAP policy is provided, the State of California, DPA, transportation reimbursement rate will be applied. LODGING (PRE- APPROVAL REQUIRED) Designated PSAP Managers, designated County Coordinators, and PSAP designated personnel that have been pre- approved by the 9 -1 -1 Office may be reimbursed for documented (receipts required) lodging expenses incurred while traveling to destinations over 50 miles from the PSAP location to perform activities in direct support of the PSAP 9 -1 -1 call taker function. The rate of reimbursement will be based on the PSAP's current documented policy for lodging reimbursement. If no PSAP policy is provided, the State of California, DPA, lodging reimbursement rate will be applied. MEALS (PRE- APPROVAL REQUIRED) Designated PSAP Managers, designated County Coordinators, and PSAP designated personnel that have been pre- approved by the 9 -1 -1 Office may be reimbursed for documented (receipts required) meal expenses incurred while traveling to destinations over 50 miles from the PSAP location to perform activities in direct support of the PSAP 9 -1 -1 call taker function. The rate of reimbursement will be based on the PSAP's current documented policy for reimbursement of meals. If no PSAP policy is provided, the State of California, DPA, reimbursement rate for meals will be applied. Rev. 8/5/2005 111.5 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 3543. - MEMBERSHIP (PRE- APPROVAL REQUIRED) Annual membership to the National Emergency Number Association (NENA), California Chapter (CaINENA) may be reimbursed by the 9 -1 -1 Office. Reimbursement will be limited to the pre- approved designated County Coordinator and pre- approved designated PSAP Manager. A current membership number must be provided when requesting reimbursement. REGISTRATION (PRE- APPROVAL REQUIRED) Reimbursement for the cost of registration to attend the annual CaINENA Conference and Trade Show and a CaINENA quarterly meeting may be funded by the 9 -1 -1 Office. Reimbursement will be limited to the pre- approved designated County Coordinator and pre- approved designated PSAP Manager. Reimbursement for the cost of registration (receipt required) to attend a quarterly meeting is limited to one per year at the location (North or South) nearest the PSAP location. INCIDENTAL EXPENSES (PRE- APPROVAL REQUIRED) Expenditures related to performance of reimbursable activities (for example: printing costs for the dissemination of 9 -1 -1 related information to PSAPs by the County Coordinator) may be funded by the 9 -1 -1 Office. ,) Rev. 8/5/2005 111.6 3543. , 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding EDUCATION FUNDING POLICY Funding by the 9 -1 -1 Office for public education materials and /or services for use in selected- advertising campaigns or community awareness events that is specifically focused on the proper use of 9 -1 -1 may be available from the 9 -1 -1 Office. Pre - approval is required for all education funding requests and each request will be evaluated on a case -by -case basis. The written request to the 9 -1 -1 Office for funding pre - approval must include: 1. a detailed description of the educational product and /or services provided and how they address the proper use of 9 -1 -1; 2. a detailed list of costs for which the PSAP is seeking reimbursement; and, 3. a plan for presentation of the material (for example, a community safety day, booth at local fair, or school events with a listing of schools and classes). Unless purchases are made using a state contract vehicle, such as the California Multiple Award Schedule (CMAS), a master purchase agreement (MPA), or a master service agreement (MSA) where the 9 -1 -1 Office may pay directly, all funding must be based on the Reimbursement Claim Process, Network and Other 9 -1 -1 Services/CPE, outlined in this chapter. The 9 -1 -1 Office does not fund general crime or safety education material. 3 Rev. 8/5/2005 111.7 3543. 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding NETWORK SERVICES FUNDING POLICY Every telecommunications carrier offering local voice network (wireline and wireless) service in California is required by the California Public Utilities Commission (CPUC) to provide customer access to 9 -1 -1. Therefore, it is the policy of the 9 -1 -1 Office to provide cost recovery funding to telecommunications carriers for delivery of wireline and wireless 9 -1 -1 services in the State of California. Funding shall be contingent upon compliance with the National Emergency Number Association (NENA) recommended standards; contingent upon compliance with the standards, policies, and procedures defined by the 9 -1 -1 Office; and based on the CPUC tariff rates and state contracted rates. NOTE: Coordination for system moves and /or system replacement that impact network services should be coordinated with all stakeholders including the PSAP manager, state 9 -1 -1 Office consultant, equipment contractor, and network provider(s). Eligible PSAP Network Services The following items are eligible for 9 -1 -1 Office funding as stipulated. PSAPs must use either the Network and Other 9 -1 -1 Services/CPE, Reimbursement Claim Process or the Direct Funding Process, as indicated in parentheses () after each item below. Funding processes are outlined at the end of this chapter. 7 -Digit Emergency Lines - Unlisted (Reimbursement Claim Process) The 9 -1 -1 Office does not mandate or fund the publication of 7 -digit emergency numbers. PSAPs may request reimbursement for two unlisted 7 -digit emergency lines. These lines shall be used to answer transferred 9 -1 -1 wireline or wireless calls only. Calls answered on these lines shall be answered in a similar manner and with the same priority as 9 -1 -1 lines. Any previously 9 -1 -1 Office- funded personal communications systems (PCS) or wireless 9 -1 -1 telephone lines will be considered the non - published 7 -digit emergency lines. Funding includes installation, monthly service, taxes, caller ID feature (where available), and telephone system line cards (new systems only). If call traffic on these lines exceeds capacity, the 9 -1 -1 Office may fund additional lines after verification of call traffic. 9 -1 -1 Telephone Lines /9 -1 -1 Trunks (Direct Funding Process) The 9 -1 -1 Office will fund the number of 9 -1 -1 telephone lines necessary to answer emergency calls at a P.01 grade of service. No less than two telephone lines per routing tandem will be funded at each PSAP. Funding will include installation charges, monthly service, mileage charges and toll charges associated with the answering and transferring of 9 -1 -1 calls. Additional justification must be included in requests with excessive mileage (more than 50 miles) to connect a PSAP to a tandem switch. Installation and monthly service for pre- approved relocated services will be funded, however the overlap in billing for two locations is limited to a maximum of one month. ALI Dial Backup Circuit (Direct Funding Process) The purpose of the automatic location identification (ALI) dial backup circuit is to restore the ALI database connection should the primary ALI retrieval circuit fail. An analog telephone line and associated equipment (modem and cabling) will be funded. Funding for the analog telephone line will include installation, equipment, toll and monthly service. Installation and monthly service for pre- approved relocated services will be funded, however the overlap in billing for two locations is limited to a maximum of one month. Rev. 8/5/2005 111.8 3543 • -. 71 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding ALI Retrieval Circuits (Direct Funding Process) One digital ALI retrieval circuit with two virtual channels and the equipment necessary to connect this circuit to the PSAP CPE will be funded per PSAP. Funding will include installation, equipment and monthly service Installation and monthly service for pre- approved relocated services will be funded, however the overlap in billing for two locations is limited to a maximum of one month. Alternate Answer Circuits (Direct Funding Process) Requests for new alternate answer circuits will be funded by the 9 -1 -1 Office to provide an expedient method to reroute 9 -1 -1 calls to the nearest appropriate PSAP in the event a PSAP's 9 -1 -1 telephone system fails or the communications center is evacuated. Where feasible, alternate routing of calls must be to an answer point that already has direct connectivity to the same tandem switch. If a PSAP answers 9 -1 -1 calls from two or more tandems, the 9 -1 -1 Office may fund additional alternate routing circuits necessary to deliver calls to more than one local PSAP. A letter of authorization from the PSAP agreeing to answer rerouted calls must accompany any request for alternate answer funding. These circuits shall not be used to reroute 9 -1 -1 call traffic for the purpose of sharing call workload with other PSAPs. Changes to existing alternate answer configurations may be funded when caused by circumstances beyond the control of the PSAP or when the PSAP location is moved; however, the overlap in billing for two locations is limited to a maximum of one month. CPE Maintenance Telephone Line (Direct Funding Process) One analog telephone line for remote maintenance of customer premises equipment by a contractor will be funded. Funding will include installation, equipment and monthly service. Foreign Language Interpretation Services (Contact 9 -1 -1 Office Consultant) The 9 -1 -1 Office will establish and fund the contract necessary to provide 9 -1 -1 call interpretation services to all PSAPs. PSAPs will be provided an account and telephone number for access to the interpretation service. For additional details on this service or the contract, please contact your 9 -1 -1 Office consultant. Management Information System (Contact 9 -1 -1 Office Consultant) The collection and display of 9 -1 -1 call traffic statistics via a network management information system (MIS) is currently funded and provided by state contracts. Funding includes the data network telephone lines, data processing and archiving of collected data. Specific PSAP data is available for viewing by that PSAP, provided they have access to the internet. PSAPs without access to the internet can receive paper copies of various statistical reports from their 9 -1 -1 Office consultant. Connection to a state contracted MIS for the production of call traffic reports is required by the 9 -1 -1 Office to determine annual CPE allotment amounts for each PSAP. If the PSAP is not currently connected to these services and plans to seek funding by the 9 -1 -1 Office, the PSAP should contact their assigned 9 -1 -1 Office consultant to obtain this service. Rev. 8/5/2005 111.9 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 3543 -. -71 CUSTOMER PREMISE EQUIPMENT (CPE) POLICY It is the policy of the 9 -1 -1 Office to ensure high quality and best value for local agencies in the procurement and maintenance of 9 -1 -1 customer premise equipment (CPE) and services. To accomplish this, the 9 -1 -1 Office staff will advise and support PSAPs in their efforts to procure 9 -1 -1 CPE that maximizes the ability of PSAP personnel to efficiently and effectively answer and process 9 -1 -1 calls. To receive 9 -1 -1 Office funding, the PSAP must follow the funding process for the reimbursement or direct funding as outlined in this chapter (refer to FUNDING PROCESSES FOR SERVICES & EQUIPMENT, 9 -1 -1 System CPE Replacement or Certified Upgrade). 9 -1 -1 System CPE Defined: Includes all equipment and systems used within the PSAP to answer 9 -1 -1 calls. This includes, but is not limited to, 9 -1 -1 workstations, telephone key systems, controllers, servers, cabling, and /or ancillary systems and products associated with the delivery and receipt of 9 -1 -1 calls. Master Purchase Agreement (MPA) For 9 -1 -1 CPE: The State of California has implemented a Master Purchase Agreement (MPA), contract DGS -0026, that provides PSAPs an effective procurement vehicle for system replacement or certified upgrade (where the existing CPE is certified to last, as new, for an additional five years) of their 9 -1 -1 system CPE and services. The prices listed on the MPA for equipment and services are the maximum allowable, and the price of systems varies from contractor to contractor. PSAPs may be able to obtain price discounts or additional equipment by soliciting price offers from different providers on the MPA contract, thus increasing the buying power of their annual allotment. Use of the MPA is not mandatory; however, PSAPs will need to use their local procurement process should they choose not to use the MPA. CPE Funding Allotment: In order to provide funding in an equitable manner throughout the state, the 9 -1 -1 Office has established a CPE funding allotment calculation that is based on each PSAP's volume of 9 -1 -1 calls using the CPE Provisioning Policy (provided in this chapter), the median prices obtained from the CPE contract for a standard system, and the PSAP's 9 -1 -1 call taker staffing commitment. The CPE funding allotment for each PSAP is designed to permit the PSAP to accrue funding, on an annual basis, toward their next replacement of a complete 9 -1 -1 system or certified upgrade (where the existing CPE is certified to last, as new, for an additional five years). Upon receipt of a PSAP's request for CPE funding, the 9 -1 -1 Office consultant will perform a 9 -1 -1 call traffic analysis and calculate an annual CPE allotment eligibility amount. For clarification, the CPE allotment eligibility amount stops accruing upon installation of the 9 -1 -1 system replacement or certified upgrade for which it was intended. Upon request by the PSAP for their next system replacement or certified upgrade, the 9 -1 -1 Office will perform a new call volume traffic analysis and calculate a new CPE allotment eligibility amount with a new accrual beginning the first January after the last 9 -1 -1 system replacement or certified upgrade. In an effort to provide flexibility to the PSAP for 9 -1 -1 related funding, PSAPs may request use of the CPE allotment for a special purchase before system replacement or certified upgrade. Items that may be eligible for funding are listed in the list of Standard System items and the Service /Equipment Approval List For Residual Funds provided in this chapter. However, when it is time to replace or upgrade the PSAP's 9 -1 -1 system CPE, for which this annual CPE allotment is designed to fund, the agency may be required to provide local funding if the remaining CPE allotment funds are insufficient at that time. Rev. 8/5/2005 111.10 �J� 3543 - : ;' 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding For 9 -1 -1 Office budgeting purposes and to allow the PSAP adequate time to evaluate various 9 -1 -1 system CPE contractors, PSAPs should submit their request for 9 -1 -1 system CPE replacement or certified upgrade and their plan for use of any residual funds to the 9 -1 -1 Office at least 12 to 18 months before planned installation. Residual Funds: If the final cost for complete 9 -1 -1 system CPE replacement or certified upgrade is less than the PSAP's CPE funding allotment eligibility amount, this residual amount is referred to as residual funds. These residual funds may be used for the purchase of additional 9 -1 -1 Office approved equipment and services as detailed in the Service /Equipment Approval List For Residual Funds provided in this chapter. Planning and subsequent request for use of these residual funds must take place when the PSAP prepares and submits their purchase order (PO) package in accordance with the Funding Process for 9 -1 -1 System Replacement or Certified Upgrade as outlined in this chapter. CPE System Maintenance After Five Years Five years after installation of a 9 -1 -1 CPE system (which includes one year of system warranty and four years of system maintenance), PSAPs may choose to enter into an agreement with a CPE contractor for additional maintenance. Maintenance agreements are not automatic and 9 -1 -1 Office funding requires pre - approval at least two months prior to the expiration of the "existing" agreement. Maintenance costs that are directly billed to, or reimbursed by, the 9 -1 -1 Office will be deducted from the PSAP's CPE allotment. Contact your 9 -1 -1 Office Consultant to determine the appropriate steps required for pre - approval and subsequent funding by the 9 -1 -1 Office. CPE Replacement Parts and Equipment Repairs Funding will be provided for replacement parts and equipment repairs caused by normal use of the equipment. PSAPs will not be required to submit for prior funding approval of replacement parts when immediate replacement is necessary to restore normal operation of the CPE. PSAPs shall provide a facility with adequate heating, cooling, ventilation, light, electrical supply and overload protection to protect the equipment so that it may operate as intended by the manufacturer. Costs to repair damage to equipment, caused by PSAP negligence or the lack of adequate facilities to house and protect the equipment, shall be the responsibility of the PSAP. If an act of nature or other circumstance causes damage to the equipment, and the PSAP has made a reasonable effort to protect such equipment, the 9 -1 -1 Office will review and may approve funding requests for replacement parts and equipment repairs. All requests for funding replacement parts and equipment repairs for reasons other than those caused by normal use will be evaluated on a case -by -case basis. 147.157 Rev. 8/5/2005 111.11 3543 - : I 4 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding STANDARD 9 -1 -1 SYSTEM A standard 9 -1 -1 system includes all 9 -1 -1 CPE and systems used within the PSAP to answer 9 -1 -1 calls. This includes, but is not limited to, 9 -1 -1 workstations, telephone key systems, controllers, servers, cabling, and /or ancillary systems and products associated with the delivery of a 9 -1 -1 call. The elements of a standard 9 -1 -1 system include the following: 01. Cabling A. assume a 100 -foot run from demarcation point to 9 -1 -1 workstation with no obstructions B. punchdown block at demarcation point for connection to PSAP provided logging recorder 02. Call Detail Records collection - capability for third party contractor to remotely collect real time ANI, ALI, and call detail data via network connection 03. Centralized automatic message accounting (LAMA) enhanced 9 -1 -1 (E9 -1 -1) trunk cards 04. Computer - full telephony computer, intelligent workstation (IWS) 05. Computer Aided Dispatch (CAD) interface - ANI /ALI output interface to PSAP CAD 06. Headsets 07. Instant recall recorder (IRR) 08. Keyboard 09. Keypad dialer (if no phone set) 10. Keyboard arbitrator 11. Line card with caller ID for unlisted 7 -digit emergency lines 12. Maintenance - one (1) year parts and labor warranty, four (4) year maintenance service 13. Monitor - 17" 14. Mouse 15. Phone set (only if necessary for computer telephony integration) 16. Printer 17. Telecommunications devices for the deaf (TDD /TTY) 18. Training on system use for call takers and supervisors 19. Uninterrupted power supply (UPS) - One UPS serving all backroom equipment (15 minutes) 20. Uninterrupted power supply (UPS) - One UPS serving each position (15 minutes) 258 Rev. 8/5/2005 111.12 3543.:' 1,61 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding SERVICE /EQUIPMENT APPROVAL LIST FOR RESIDUAL FUNDS A PSAP may request pre - approval from the 9 -1 -1 Office to use residual funds from their CPE funding allotment (in accordance with requirements outlined in the CPE Funding Policy, CPE Funding Allotment of this chapter) to purchase additional 9 -1 -1 services and /or equipment from the list below where the services and /or equipment is planned for use within the communication center and in direct support of 9 -1 -1 call takers. Documentation must be provided to describe how the service /equipment will meet this requirement. Facility modifications and GIS related equipment must include justification, project plan, and floor plans. All requests must include a detailed itemization of costs. Funding for the items below that are available on the state MPA should be requested at the time of system replacement or certified upgrade in a concise plan for use of all residual CPE allotment funds and in accordance with the 9 -1 -1 System CPE Direct Funding Process outlined in this chapter. Requests for funding of items not on the MPA or not purchased at the same time of the CPE upgrade /replacement, must be requested in accordance with the Reimbursement Claim Process, Network and Other 9 -1 -1 Services/CPE, outlined in this chapter. 01. Automated attendant 02. Automatic call distribution (ACD) 03. Call Traffic Study 04. Cards - Centrex /1MB administrative line card 05. Cards - computer software interface or protocol 06. Computer Aided Dispatch (CAD) system components 07. Computer - full telephony computer, intelligent workstation (IWS) 08. Computer - spare parts in support of IWS 09. Computer (only for use in the communication center in direct support of 9 -1 -1 call takers) 10. Computer support items (flat screen monitor, keyboard, mouse, wrist rest) 11. Equipment removal expenses 12. Facility modifications necessary to install 9 -1 -1 system 13. Furniture - call taker position, including dispatch chair, desk, and 9 -1 -1 console 14. Geographical Information System (GIS) related services and equipment 15. Headset 16. Interconnection of PSAP administration and 9 -1 -1 telephone system 17. Logging recorder 18. Maintenance for 9 -1 -1 CPE 19. Management Information System (MIS) 20. Moves, adds and changes (costs to perform routine reprogramming or the relocation of equipment within the same location) 21. Power - PSAP facility emergency power generators or battery backup systems 22. Printer, including paper and ribbon products 23. Private Switch ALI (PS -ALI) 24. Radio line control cards and radio interface with 9 -1 -1 CPE 25. Radio dispatch console equipment at the 9 -1 -1 call taker position 26. Telephone set(s) at the 9 -1 -1 call taker position 27. Training on use of 9 -1 -1 IWS for call takers and supervisors 25 Rev. 8/5/2005 111.13 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 3543 CPE PROVISIONING POLICY It is the policy of the 9 -1 -1 Office to use measured 9 -1 -1 call volumes to calculate PSAP 9 -1 -1 CPE provisioning and subsequent CPE funding allocations at a level needed for the PSAP to answer 9 -1 -1 calls at a P.01 grade of service (no more than one busy per 100 call attempts during a normal busy hour). Measured Call Volumes The 9 -1 -1 Office can access PSAP 9 -1 -1 call traffic statistics by way of a web -based management information system (MIS). PSAP connection to a state contracted MIS for the production of call traffic reports is required by the 9 -1 -1 Office to determine current CPE provisioning levels and annual CPE allotment amounts for each PSAP. Call traffic associated with major catastrophes, natural disasters, and /or other abnormal call spikes will not be used as a basis for determining CPE provisioning. PSAPS not currently connected to these services should contact their assigned 9 -1 -1 Office consultant to obtain this service. CPE Funding Level Calculations The 9 -1 -1 Office has established CPE funding allotment amounts at various funding levels that are based on the quantity of 9 -1 -1 calls, including up to 20 percent of 9 -1 -1 calls that are abandoned before they are answered; and, with exception to funding level five, emergency 9 -1 -1 transferred calls answered by the PSAP on nonpublished 7 -digit emergency lines. FUNDING LEVEL ONE - PSAPs that answer 1 to 300 emergency calls per month. PSAPs at this level of 9 -1 -1 call volume will be considered on a case -by -case basis for 9 -1 -1 Office funding. Established. PSAPs that answer 300 or less 9 -1 -1 calls and emergency 7 -digit 9 -1 -1 transfer calls, including up to 20 percent of total 9 -1 -1 calls that are abandoned before they are answered during the typical busy MONTH, may be "grandfathered" at a minimum level of funding. Continued funding for "grandfathered" systems will be assessed on a case -by -case basis as each system is due for replacement or certified upgrade. 2. FUNDING LEVEL TWO - PSAPs that answer 301 to 800 emergency calls per month. The CPE provisioning determination for this level is based on the total volume of 9 -1 -1 calls and emergency 7 -digit 9 -1 -1 transfer calls answered at the PSAP, including up to 20 percent of total 9 -1 -1 calls that are abandoned before they are answered during the typical busy MONTH. The typical busy month will be based on selection of the three highest call volume months over the previous 18 months, adding the total of the three selected months, then dividing the total by three. 3. FUNDING LEVEL THREE - PSAPs that answer 801 to 1200 emergency calls per month. The CPE provisioning determination for this level is based on the total volume of 9 -1 -1 calls and emergency 7 -digit 9 -1 -1 transfer calls answered at the PSAP, including up to 20 percent of total 9 -1 -1 calls that are abandoned before they are answered during the typical busy MONTH. The typical busy month will be based on selection of the three highest call volume months over the previous 18 months, adding the total of the three selected months, then dividing the total by three. All funding level calculations for PSAPs with a call volume of over 1200 calls per month will be performed using the calculations for funding level four (typical busy hour) AND funding level five (typical busy month). The calculation that provides the highest CPE funding amount for the PSAP will be applied. '2 Rev. 8/5/2005 111.14 3543.;; 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 4. FUNDING LEVEL FOUR — PSAPs that answer over 1200 emergency calls per month. The CPE provisioning determination for this level is based on the volume of 9 -1 -1 calls and emergency 7 -digit 9 -1 -1 transfer calls answered at the PSAP, including up to 20 percent of total 9 -1 -1 calls that are abandoned before they are answered during the typical busy hour. The 9 -1 -1 Office will use the following formula to determine the CPE provisioning level and funding allotment amount based on the typical busy hour. TYPICAL BUSY HOUR FORMULA: E = [(Nx2) (T +60 seconds)] 13600 E = estimated 9 -1 -1 call volume during busy hour measured in Erlangs (one Erlang equates to one hour of call traffic) N = number (or quantity) of 9 -1 -1 calls answered during typical busy hour, including up to 20% abandoned calls X2 = the N is doubled to account for emergency 7 -digit 9 -1 -1 transfer calls T = time (estimated average 9 -1 -1 call duration during typical busy hour) +60 = call wrap -up time added to each counted call /3600 = divided by number of seconds in one hour EXCERPT FROM ERLANG B TABLE WHERE P =.01 POSITIONS 3 4 5 6 7 8 9 10 11 12 13 14 15 ERLANGS .46 .87 1.36 1.91 2.50 3.13 3.78 4.46 5.16 5.88 6.61 7.35 8.11 Example: Where a PSAP that answers an average of fifty (50) 9 -1 -1 calls during their typical busiest hours and the average call time for these calls is 80 seconds, the formula would be ((50x2) x (80 +60)113600 = 3.89 Erlangs of call traffic. From the above table excerpt the formula calculates a result of 10 positions to handle between 3.78 and 4.46 Erlangs of call traffic at the P.01 grade of service. 5. FUNDING LEVEL FIVE — PSAPs that answer over 1200 9 -1 -1 calls per month. As an alternative to funding level four, that is based on the PSAP's typical busy hour, the CPE provisioning determination for level five is based on the total number of 9 -1 -1 calls answered at the PSAP, including up to 20 percent of total 9 -1 -1 calls that are abandoned before they are answered during the averaged typical busy month. The typical busy month will be based on selection of the three highest call volume months over the previous 18 months, adding the total of the three selected months, then dividing the total by three. The 9 -1 -1 Office will use the following formula, based on the typical busy month, to determine the CPE provisioning level and funding allotment amount for PSAPs with over 1200 9 -1 -1 calls during a typical busy month. TYPICAL BUSY MONTH FORMULA: P = [(A /1000) + (1312000] P = CPE provisioning level A = total answered 9 -1 -1 calls for the averaged typical busy month /1000 = divided by 1000 B = total abandoned 9 -1 -1 calls (up to 20% of total) during the averaged typical busy month /2000 = divided by 2000 Example: Where a PSAP averages 12,300 calls per month over a selected three months, this number would be divided by 1000 to equal 12.3. Where the average number of abandoned calls during the same selected months is 2100, this number would be divided by 2000 to equal 1.05. The CPE provisioning level for this PSAP totals 13.35, which would be rounded up to 14. 4. b �. Rev. 8/5/2005 111.15 3543 • . • 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding GEOGRAPHIC INFORMATION SYSTEM (GIS) FUNDING POLICY In accordance with Federal Communications Commission (FCC) Order 94-102, the 9 1 -1 Office has launched a project to implement enhanced 9 -1 -1 services for wireless telephone users throughout California. A major emphasis of this project is the redistribution of statewide wireless 9 -1 -1 call volumes to local PSAPs from the California Highway Patrol (CHP) communications centers that handle an overwhelming number of wireless 9 -1 -1 calls. As an incentive for PSAP participation in this project that will significantly improve 9 -1 -1 wireless caller response time, the 9 -1 -1 Office will provide participating PSAPs a one -time allotment for costs associated with implementation of a GIS. Primary PSAPs that agree to answer wireless 9 -1 -1 calls directly or secondary PSAPs that receive transferred wireless calls through the 9 -1 -1 network may request GIS funding by following the GIS Reimbursement Claim Process or the GIS Direct Funding Process outlined at the end of this chapter. GIS Funding Allotment PSAPs approved for GIS funding will be provided a GIS allotment in accordance with the procedures provided in this chapter. The GIS funding allotment is based on the PSAP's 9 -1 -1 call volume statistics as determined by the CPE provisioning formulas outlined in this chapter. The one -time GIS allotment may be used in current and future years. Authorized Use of GIS Allotment Funds PSAPs may use their GIS funding allotment for software, hardware and services necessary to provide the 9 -1 -1 call taker with GIS mapping to be used for the display of Wireless Phase II latitude and longitude of the person that has dialed 9 -1 -1. GIS expenditures submitted for funding must include a GIS plan identifying the scope (task and /or item elements with a description of how the mapping requirement will be met), schedule and resources (itemization of proposed costs). PSAPs may use their GIS funding allotment for the following GIS related expenditures. The 9 -1 -1 Office will examine funding requests for GIS related items not listed below on a case -by -case basis. 01. Aerial photographs 02. Application interface device 03. CAD integration 04. Computer 05. Computer hardware upgrades 06. Computer software upgrades 07. Computer software used to create /manipulate map datasets 08. Consulting services for GIS 09. Datasets (commercial map datasets where, as a minimum, the dataset must have road centerlines and street address names and ranges) 10. Map maintenance 11. Map data conversion and installation 12. Monitors 13. Personnel time to build and maintain the PSAP portion of the GIS database, including A. creation of new map dataset road centerlines using aerial photographs and /or global positioning system (GPS) assisted data collection; B. creation of public safety related map layers; C. training; and, D. verification of map dataset accuracy. Activities may include: a. verification /correction of spatial street centerline data; b. verification /correction of street address ranges, street names and spellings; and, c. comparison, verification /correction of map dataset and /or Master Street Address Guide (MSAG). x'62 Rev. 8/5/2005 111.16 3543 -::;1 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding FUNDING PROCESSES FOR SERVICES AND EQUIPMENT Public safety answering points (PSAPs) requesting 9 -1 -1 Office funds may use the reimbursement process or the direct funding process. Reimbursement The reimbursement funding process provides the PSAP a vehicle to be compensated for 9 -1 -1 related expenses that are pre- approved for funding by the 9 -1 -1 Office. Refer to PSAP EXPENSES POLICY for services that may not require pre - approval. Invoices will be sent to and paid by the PSAP. The PSAP may then submit a reimbursement claim to the 9 -1 -1 Office. Direct Funding With prior approval from the 9 -1 -1 Office, the direct funding process allows the PSAP to order equipment and services and have all invoices sent directly to the 9 -1 -1 Office. Direct funding requires a State of California procurement vehicle, such as a state master contract and /or California Multiple Award Schedule (CMAS). FUNDING PROCESSES (Step -By-Step) In accordance with the funding policies provided in this chapter, four categories of services and equipment (CPE, GIS, Network and Other 9 -1 -1 Services /CPE, and PSAP Expenses) are provided on the following pages with detailed funding processes for reimbursement and direct funding. PSAP Managers are encouraged to contact their 9 -1 -1 Office consultant for assistance with these processes. Rev. 8/5/2005 111.17 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 3543 • ,7'1 Funding Process for: 9 -1 -1 SYSTEM CPE REPLACEMENT OR CERTIFIED UPGRADE 9 -1 -1 System CPE Reimbursement Claim Process In accordance with the CPE FUNDING POLICY outlined in this chapter, PSAPs requesting reimbursement for a complete 9 -1 -1 system CPE replacement or certified upgrade (where the existing CPE is certified to function, as new, for an additional five years) may use the following CPE Reimbursement Claim Process. 1. PSAP Requests Funding The PSAP writes a letter to the 9 -1 -1 Office requesting a complete system replacement or certified upgrade. For budgeting purposes, the initial request to upgrade or replace 9 -1 -1 equipment must be submitted to the 9 -1 -1 Office at least twelve months (18 months if feasible) in advance of the anticipated installation date. The letter shall include: A. an overview of requirements; B. the PSAP's planned number of staffed 9 -1 -1 call taker positions; C. the procurement process PSAP plans on using to obtain equipment and services (i.e., PSAP will perform a competitive bid or PSAP plans to use DGS- 0026); and, D. the desired installation date. 2. 9 -1 -1 Office Issues "Pre- Authorization Letter" If the PSAP request meets the funding requirements outlined in this chapter, a "pre- authorization letter" will be sent to the PSAP within eight weeks of the date the funding request letter was received by the 9 -1 -1 Office and will detail the approved allotment amount. The pre- authorization letter will also detail the steps the PSAP must follow to obtain final purchase approval from the 9 -1 -1 Office. If the PSAP funding request letter does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the funding request letter was received by the 9 -1 -1 Office. 3. PSAP Chooses 9 -1 -1 System From DGS -0026 or Prepares Bid Specifications Once pre- authorization is obtained from the 9 -1 -1 Office, the PSAP may choose to use the state CPE master purchase agreement (MPA), DGS -0026, or they may choose to use their PSAP's competitive bid procurement process. PSAPs are encouraged to examine the functional differences of available 9 -1 -1 systems, determine each contractor's ability to provide different services, and obtain multiple price offers from contractors for systems with matching configurations and functionality needed by the PSAP. NOTE: Coordination for system moves and /or system replacement that impact network services should be coordinated with all stakeholders including the PSAP manager, state 9 -1 -1 Office consultant, equipment contractor, and network provider(s). 4. PSAP Submits a Statement of Work (SOW) or a Bid Specification Once the PSAP has selected a 9 -1 -1 system and has prepared a SOW or the PSAP has prepared bid specifications for a complete system replacement, the PSAP should submit a funding request to the 9 -1 -1 Office with the following documentation. A. Copy of the "pre- authorization letter" B. Statement of Work with an itemization of all system replacement costs or bid specification Rev. 8/5/2005 111.18 3543 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 5. 9 -1 -1 Office Issues a Commitment To Fund If the PSAP request meets the funding requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent to the PSAP within four weeks of the date the funding request was received by the 9 -1 -1 Office. If the PSAP letter does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the funding request was received by the 9 -1 -1 Office. 6. The PSAP Purchases the 9 -1 -1 System CPE The PSAP uses their procurement process to purchase the system and authorizes the contractor to provide and install the equipment according to the conditions of their contract. 7. Contractor Invoices the PSAP Upon satisfactory installation of equipment or service, the contractor will invoice the PSAP. 8. PSAP Submits Claim For Reimbursement Upon payment of the invoice, the PSAP may submit a Reimbursement Claim (TD -290) form to the 9 -1 -1 Office, including the previously approved TD -288 with appropriate 9 -1 -1 Office tracking number, a document confirming the PSAP's acceptance date of the system, and copies of paid invoices with proof of payment (e.g. copy of cancelled check). 9. 9 -1 -1 Office Reviews, Approves, and Reimburses PSAP Upon receipt of a complete and accurate TD -290 with appropriate documentation, the 9 -1 -1 Office will review and approve the request within two weeks. The claim will be forwarded to the Department of General Services, Office of Fiscal Services, for payment processing. This final payment process may take up to 90 days. Rev. 8/5/2005 111.19 3543•.., 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 9 -1 -1 System CPE Direct Funding Process In accordance with the CPE FUNDING POLICY outlined in this chapter, PSAPs are required to follow the procedures below when seeking state funding for a complete 9 -1 -1 system replacement or certified upgrade where the PSAP uses a CMAS contract or state MPA DGS -0026 and invoices will be sent by the contractor to the 9 -1 -1 Office for direct payment. PSAPs must follow their own procurement processes when issuing a purchase order to procure 9 -1 -1 systems. 1. PSAP Requests Funding The PSAP writes a letter to the 9 -1 -1 Office requesting a complete system replacement or certified upgrade. For budgeting purposes, the initial request to upgrade or replace 9 -1 -1 equipment must be submitted to the 9 -1 -1 Office at least twelve months (18 months if feasible) in advance of the anticipated installation date. The letter shall include: A. an overview of requirements; B. the PSAP's planned number of staffed 9 -1 -1 call taker positions; C. the PSAP's choice of state procurement vehicle (CMAS or MPA DGS- 0026); and, D. the desired installation date. 2. 9 -1 -1 Office Issues "Pre- Authorization Letter" If the PSAP request meets the funding requirements outlined in this chapter, a "pre- authorization letter" will be sent to the PSAP within eight weeks of the date the funding request letter was received by the 9 -1 -1 Office and will detail the approved allotment amount. The pre- authorization letter will also detail the steps the PSAP must follow to obtain final purchase approval from the 9 -1 -1 Office. If the PSAP funding request letter does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the funding request letter was received by the 9 -1 -1 Office. 3. PSAP Chooses 9 -1 -1 System Once pre- authorization is obtained from the 9 -1 -1 Office, the PSAP is encouraged to examine the functional differences of available 9 -1 -1 systems, determine each contractor's ability to provide different services, and obtain multiple price offers from contractors for systems with identical configurations and functionality needed by the PSAP. Prices on the MPA contract are the maximum allowable. PSAPs may be able to obtain additional price discounts and /or additional services and equipment (see Service /Equipment Approval List For Residual Funds in this chapter) by obtaining price offers from different contractors. The PSAP is strongly encouraged to follow the steps listed below to choose a system. A. Examine different CPE systems /contractors and obtain price offers (a detailed breakdown of equipment, installation and maintenance costs) for systems with identical configurations. B. Document a comparative analysis of systems evaluated. C. Document selected system and why it was chosen. 1. Rev. 8/5/2005 111.20 3543•.., 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 4. Contractor Prepares Statement Of Work (SOW) The selected contractor prepares a SOW detailing all deliverables for this installation. Please refer to Statement of Work at the end of this chapter. This document is important because it insures that both the PSAP and the contractor agree on the elements necessary to meet the needs of the PSAP. The PSAP may use the 9 -1 -1 Office website to compare price quotes against current maximum contract prices for each CPE contract provider. NOTE: Coordination for system moves and /or system replacement that impact network services should be coordinated with all stakeholders including the PSAP manager, state 9 -1 -1 Office consultant, equipment contractor, and network provider(s). 5. PSAP Prepares and Submits a Purchase Order (PO) Package The 9 -1 -1 Office will assist the PSAP, as needed, in preparing a PO package. The PO document shall serve as the legally binding procurement instrument between the PSAP agency and the contractor. The PO package must include the following information. A. SOW B. Copy of pre- authorization letter C. Itemized list of all system elements D. Unsigned PO, which must include: a. the "ship to" address where the system will be installed; b. the "bill to" address of the 9 -1 -1 Office for all applicable system elements approved for funding; c. a statement on the front of the PO stating, "The purchase, installation, and maintenance of items identified in this purchase order shall comply exclusively with the terms and conditions of (State Contract DGS -0026 or CMAS contract number) and the attached Statement of Work. " d. a summary of costs on the PO document for the standard system replacement or certified upgrade including equipment, installation, training, maintenance, and taxes; e. a summary of costs on the PO document, in addition to the standard system, for other items on the contract the PSAP requests to purchase at the same time (list CPE allotment items separately from GIS allotment items); f. an attached cost table referencing a complete breakdown of all costs by item, and, E. Summary list of items (not on the MPA) being requested for use of residual funds, if any, that expire at the end of the calendar year of system replacement or certified upgrade (must use Reimbursement Process, Network and Other 9 -1 -1 Services/CPE). 6. 9 -1 -1 Office Issues a Commitment To Fund The 9 -1 -1 Office will review the PO package. If the PSAP's PO package meets the funding requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent to the PSAP within four weeks of the date the 9 -1 -1 Office received a complete and accurate PO package. If the PSAP's PO package does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the 9 -1 -1 Office received the PO package. 7. PSAP Authorizes Contractor To Proceed With Installation Upon receipt of the approved TD -288, the PSAP may then sign the PO and authorize the contractor to proceed with installation. The PSAP and the contractor should closely examine the schedule included in the SOW prior to signing the document. The contractor should be provided the signed PO and a copy of the TD -288. Rev. 8/5/2005 111.21 4 3543. 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 8. PSAP Performs Acceptance Testing Acceptance testing must be performed in accordance with contractual provisions. Once a system passes the acceptance testing, the PSAP shall submit a signed 9 -1 -1 Service and Equipment System Acceptance and Authorization (TD -284) form to the 9 -1 -1 Office so that payment can be rendered to the contractor. 9. Contractor Invoicing Upon satisfactory installation of equipment or service, the contractor may invoice the 9 -1 -1 Office. When invoicing the 9 -1 -1 Office, the contractor must include a breakdown of applicable equipment, labor, taxes, and surcharges. The tracking number from the TD -288 form must be noted on the invoice. When creating an account name for an invoice, the contractor must use the account naming convention provided by the 9 -1 -1 Office on the TD -288. 12 1 Rev. 8/5/2005 111.22 9 -1 -1 OPERATIONS MANUAL 3 5 3 '- Chapter III — Funding Funding Process for: GEOGRAPHIC INFORMATION SYSTEM (GIS) In accordance with the GIS FUNDING POLICY outlined in this chapter, PSAPs requesting funding for GIS may use the Reimbursement Process or the Direct Funding Process. Both methods require specific preliminary information outlined below that is necessary to determine GIS funding eligibility. GIS Reimbursement Claim Process 1. PSAP Requests GIS Funding The PSAP prepares and submits to the 9 -1 -1 Office a GIS funding request letter that must include the following information, as a minimum. A. The PSAP's planned number of staffed 9 -1 -1 call taker positions. B. A commitment from the PSAP to answer wireless 9 -1 -1 calls in their jurisdiction when the service becomes available. 2. 9 -1 -1 Office Issues "GIS Funding Eligibility Letter" If the PSAP request meets the GIS funding requirements outlined in this chapter, a "GIS funding eligibility letter" will be sent to the PSAP within two weeks of the date the funding request letter was received by the 9 -1 -1 Office. This letter will detail the amount of GIS funds that the PSAP may be eligible to receive, pending 9 -1 -1 Office approval of the PSAP's GIS spending plan. This letter will also detail the steps the PSAP must follow to obtain final purchase approval from the 9 -1 -1 Office. If the PSAP funding request letter does not meet the GIS funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the funding request letter was received by the 9 -1 -1 Office. 3. PSAP Prepares and Submits a GIS Spending Plan The PSAP prepares and submits to the 9 -1 -1 Office a GIS spending plan that should include the following information, as a minimum. A. The procurement process the PSAP plans on using, if necessary, to obtain equipment and /or services (i.e., competitive bid, state contract). B. A general overview of planned GIS activities (scope) with a description of the PSAP's current status of GIS deployment and a description of how the mapping requirement will be met then tested; C. A schedule for implementation (for example, anticipated dates for wireless 9 -1 -1 call delivery, demonstrated multi - jurisdictional planning, map dataset completion, hardware, software installation and training); and, D. An outline of resources (including costs) needed to accomplish GIS activities (CPE, consulting, personnel time). 4. 9 -1 -1 Office Issues a Commitment To Fund The 9 -1 -1 Office will review the GIS spending plan. If the PSAP spending plan meets the funding requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent to the PSAP within four weeks of the date the 9 -1 -1 Office received a complete and accurate GIS spending plan. If the PSAP's spending plan does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the 9 -1 -1 Office received a complete and accurate GIS spending plan. 5. PSAP Purchases GIS and/or Related Components The PSAP uses their procurement process to purchase the GIS and /or related GIS components and authorizes the contractor to provide and install the equipment according to the Rev. 8/5/2005 111.23 40 3543 , 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding conditions of their contract. The 9 -1 -1 Office strongly recommends that a statement of work (SOW) and a system acceptance plan be included in this process. (Please refer to Statement of Work in this chapter.) 6. Contractor Invoices the PSAP Upon satisfactory installation of equipment or service, the contractor will invoice the PSAP. 7. PSAP Submits Claim For Reimbursement Upon payment of the invoice, the PSAP may submit a Reimbursement Claim (TD -290) form to the 9 -1 -1 Office, including the previously approved TD -288 with appropriate 9 -1 -1 Office tracking number and copies of paid invoices with proof of payment. 8. 9 -1 -1 Office Reviews, Approves, and Reimburses PSAP Upon receipt of a complete and accurate TD -290 with appropriate documentation, the 9 -1 -1 Office will review and approve the claim within two weeks. The claim will be forwarded to the Department of General Services, Office of Fiscal Services, for payment processing. This final payment process may take up to 90 days. 270 Rev. 8/5/2005 111.24 3543,., 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding GIS Direct Funding Process In accordance with the GIS FUNDING POLICY outlined in this chapter, PSAPs may seek funding from the 9 -1 -1 Office for GIS. PSAPs requesting invoices for approved GIS CPE /Services to be sent by the contractor directly to the 9 -1 -1 Office for payment are required to follow the procedures below. PSAPs are also required to follow their own procurement processes when issuing purchase orders needed to procure a GIS. PSAP Requests GIS Funding The PSAP prepares and submits to the 9 -1 -1 Office a GIS funding request letter that must include the following information, as a minimum. A. The PSAP's planned number of staffed 9 -1 -1 call taker positions. B. A commitment from the PSAP to answer wireless 9 -1 -1 calls in their jurisdiction when the service becomes available. 2. 9 -1 -1 Office Issues "GIS Funding Eligibility Letter" If the PSAP request meets the GIS funding requirements outlined in this chapter, a "GIS funding eligibility letter" will be sent to the PSAP within two weeks of the date the funding request letter was received by the 9 -1 -1 Office. This letter will detail the amount of GIS funds that the PSAP may be eligible to receive, pending 9 -1 -1 Office approval of the PSAP's GIS spending plan. This letter will also detail the steps the PSAP must follow to obtain final purchase approval from the 9 -1 -1 Office. If the PSAP funding request letter does not meet the GIS funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the funding request letter was received by the 9 -1 -1 Office. 3. PSAP Prepares and Submits a GIS Spending Plan The PSAP prepares and submits to the 9 -1 -1 Office a GIS spending plan that should include the following information, as a minimum. A. The PSAP choice of state procurement vehicle (CMAS or MPA). B. A general overview of planned GIS activities (scope) with a description of the PSAP's current status of GIS deployment and a description of how the mapping requirement will be met then tested; C. A schedule for implementation (for example, anticipated dates for wireless 9 -1 -1 call delivery, demonstrated multi - jurisdictional planning, map dataset completion, hardware, software installation and training); and, D. An outline of resources (including costs) needed to accomplish GIS activities (CPE, consulting, personnel time). 4. 9 -1 -1 Office Issues "Pre- Authorization Letter" If the PSAP spending plan meets the funding requirements outlined in this chapter, a "pre- authorization letter" will be sent to the PSAP within four weeks of the date the spending plan was received by the 9 -1 -1 Office and will detail the approved GIS allotment amount. The pre- authorization letter will also detail the steps the PSAP must follow to obtain final purchase approval from the 9 -1 -1 Office. If the PSAP's spending plan does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the 9 -1 -1 Office received the GIS funding request. J Rev. 8/5/2005 111.25 3543.,,, 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding 5. PSAP Chooses Contracted GIS Equipment or Services Once pre- authorization is obtained from the 9 -1 -1 Office, the PSAP is strongly encouraged to follow the steps listed below to choose a system. A. Examine different GIS systems /contractors and obtain price offers (a detailed breakdown of equipment, installation and maintenance costs) for systems with identical configurations. B. Document a comparative analysis of the systems evaluated. C. Document the selected system and describe why it was chosen. 6. PSAP Prepares And Submits A GIS PO Package The 9 -1 -1 Office will assist the PSAP, as needed, in preparing a GIS PO package. The PO document shall serve as the legally binding procurement instrument between the PSAP and the contractor. The PO package shall include the following information. A. SOW B. Copy of pre- authorization letter C. Itemized list of all system elements D. Unsigned PO, which must include: a. the "ship to" address where the system or GIS components will be installed, b. the "bill to" address of the 9 -1 -1 Office (for all applicable system elements approved for funding); c. a statement on the front of the PO stating, "The purchase, installation, and maintenance of items identified in this purchase order shall comply exclusively with the terms and conditions of (State Contract DGS -0026 or CMAS contract number) and the attached Statement of Work. " d. a summary of all costs for items which the PSAP intends to purchase with GIS allotment funds, including equipment, installation, training, maintenance, services, and taxes with an attached cost table referencing a complete breakdown of costs. (GIS allotment items and CPE allotment items must be listed separately, if applicable.) 7. 9 -1 -1 Office Issues a Commitment To Fund The 9 -1 -1 Office will review the GIS PO package. If the PSAP's PO package meets the funding requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent to the PSAP within four weeks of the date the 9 -1 -1 Office received a complete and accurate PO package. If the PSAP's PO package does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the 9 -1 -1 Office received the PO package. 8. PSAP Authorizes Contractor To Proceed With Installation Upon receipt of the approved TD -288, the PSAP may then sign the PO and authorize the contractor to proceed with installation. The PSAP should closely examine the schedule included in the SOW prior to signing the PO. The contractor should be provided the signed PO and a copy of the TD -288. 9. Contractor Invoices the 9 -1 -1 Office Upon satisfactory installation of equipment or service, the contractor may invoice the 9 -1 -1 Office. When invoicing the 9 -1 -1 Office, the contractor must include a breakdown of applicable equipment, labor, taxes, and surcharges. The tracking number from the TD -288 form must be noted on the invoice. When creating an account name for an invoice, the contractor must use the account naming convention provided by the 9 -1 -1 Office on the TD -288. 272 Rev. 8/5/2005 111.26 3543 -..& 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding Funding Process for: NETWORK and OTHER 9 -1 -1 SERVICESICPE Reimbursement Claim Process — Network and Other 9 -1 -1 Services /CPE In accordance with the EDUCATION FUNDING POLICY, NETWORK SERVICES FUNDING POLICY, and CPE FUNDING POLICY outlined in this chapter, PSAPs requesting reimbursement funding for 9 -1 -1 network services and other 9 -1 -1 services and /or CPE (not GIS or system replacement), may use the following Reimbursement Claim Process. 1. PSAP Requests Funding The PSAP writes a letter to the 9 -1 -1 Office requesting the 9 -1 -1 service and /or equipment. The letter should include: A. an overview of requirements with associated costs; B. PSAP's planned number of staffed 9 -1 -1 call taker positions (if CPE funding allotment is to be used); C. procurement process PSAP plans on using to obtain equipment and services (i.e., competitive bid, noncompetitive bid, tariff, or state contract); and, D. desired installation date. 2. 9 -1 -1 Office Issues a Commitment To Fund If the PSAP funding request letter meets the requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent to the PSAP within two weeks of the date the letter was received by the 9 -1 -1 Office. If the PSAP letter does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the letter was received by the 9 -1 -1 Office. 3. The PSAP Purchases Equipment The PSAP uses their procurement process and authorizes the contractor to provide and install the equipment according to the conditions of their contract. 4. Contractor Invoices the PSAP Upon satisfactory installation of equipment or service, the contractor will invoice the PSAP. 5. PSAP Submits Claim For Reimbursement Upon payment of the invoice, the PSAP may submit a Reimbursement Claim (TD -290) form to the 9 -1 -1 Office, including the previously approved TD -288 with appropriate 9 -1 -1 Office tracking number and copies of paid invoices with proof of payment (e.g. cancelled check). 6. Review, Approval, and Reimbursement Upon receipt of a complete and accurate TD -290 with appropriate documentation, the 9 -1 -1 Office will review and approve the request within two weeks. The claim will be forwarded to the Department of General Services, Office of Fiscal Services, for payment processing. This final payment process may take up to 90 days. NOTE: Coordination for system moves and/or system replacement that impact network services should be coordinated with all stakeholders including the PSAP manager, state 9 -1 -1 Office consultant, equipment contractor, and network provider(s). Rev. 8/5/2005 111.27 3543. 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding Direct Funding Process — Network and Other 9 -1 -1 Services /CPE In accordance with the EDUCATION FUNDING POLICY, NETWORK SERVICES FUNDING POLICY, and CPE FUNDING POLICY outlined in this chapter, PSAPs requesting 9 -1 -1 Office funding where invoices will be sent by the contractor directly to the 9 -1 -1 Office for payment by means of a state contract or tariff are required to follow the procedures below. 1. PSAP Requests Funding The PSAP writes a letter to the 9 -1 -1 Office requesting the 9 -1 -1 service and /or equipment. The letter should include: A. an overview of requirements, and /or a list of items covered in the agreement, with associated costs; B. the PSAP's planned number of staffed 9 -1 -1 call taker positions (if the state CPE funding allotment is to be used); C. the desired installation date and /or terms of the agreement; and, D. the PSAP's choice of state procurement vehicle (CMAS, MPA) or tariff. When using a state CMAS contract or MPA DGS -0026, the PSAP must include a PO for the total amount of the contract with the following information: a. the "ship to" address where the service will be provided or the CPE will be installed; b. the "bill to" address of the 9 -1 -1 Office; and, c. a statement on the front of the PO stating, "The purchase, installation, and maintenance of items identified in this purchase order shall comply exclusively with the terms and conditions of (State Contract DGS -0026 or CMAS contract number). " 2. 9 -1 -1 Office Issues a Commitment To Fund If the PSAP request meets the funding requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent to the PSAP within two weeks of the date the letter was received by the 9 -1 -1 Office. If the PSAP funding request letter does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within two weeks of the date the letter was received by the 9 -1 -1 Office. 3. The PSAP Authorizes Vendor To Provide Equipment and/or Service Upon receipt of an approved TD -288, the PSAP may authorize the contractor to provide and install the equipment/services according to the conditions of the contract or tariff. NOTE: Coordination for system moves and /or system replacement that impact network services should be coordinated with all stakeholders including the PSAP manager, state 9 -1 -1 Office consultant, equipment contractor, and network provider(s). 4. Contractor Invoices the 9 -1 -1 Office Upon satisfactory installation of equipment or service, the contractor may invoice the 9 -1 -1 Office. When invoicing the 9 -1 -1 Office, the contractor must include a breakdown of applicable equipment, labor, taxes, and surcharges. The tracking number from the TD -288 form must be noted on the invoice. When creating an account name for an invoice, the contractor must use the account naming convention provided by the 9 -1 -1 Office on the TD -288. Rev. 8/5/2005 111.28 3543 . , , 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding Funding Process for: PSAP EXPENSES PSAPs requesting funding for expenses, as defined in the PSAP EXPENSES FUNDING POLICY provided in this chapter, must use the following Reimbursement Claim Process. Where pre - approval by the 9 -1 -1 Office is required, you must begin with step "1" below. Otherwise, you may begin with step "S' below. Reimbursement Claim Process — PSAP Expenses 1. PSAP Requests Funding Approval The PSAP submits a letter with appropriate attachments, if required, to the 9 -1 -1 Office requesting pre - approval for reimbursement of 9 -1 -1 services and /or expenses. 2. 9 -1 -1 Office Issues a Commitment To Fund Upon receipt of a complete funding request letter that meets the funding requirements outlined in this chapter, a Commitment To Fund (TD -288) form detailing the approved amount will be sent by the 9 -1 -1 Office to the PSAP within two weeks from the date the 9 -1 -1 Office received the funding request letter. If the PSAP funding request letter does not meet the funding requirements, the assigned 9 -1 -1 Office consultant will contact the PSAP for further information within one week from the date the 9 -1 -1 Office received the funding request letter. 3. PSAP Submits Claim For Reimbursement The PSAP may submit a Reimbursement Claim (TD -290) form to the 9 -1 -1 Office in accordance with the requirements of the PSAP Expense Funding Policy, outlined in this chapter, and the following requirements. A. Timely submission of claims — All reimbursement claims should be submitted on an annual, semi - annual, or quarterly basis each fiscal year (July 1 through June 30) and should be submitted no later than ninety (90) calendar days after the close of the fiscal year in which funds have been expended; B. Where pre - approval is required, the previously approved TD -288 with appropriate 9 -1 -1 Office tracking number and related documentation (receipts and membership information) must be included; and, C. PSAPs claiming reimbursement for wages must provide a detailed accounting for each activity, items 1, 2, 3, 4, 5, 6, 7, and /or 8 (as outlined in the PSAP Expense Funding Policy) with the number of hours and specific dates for each activity. The 9 -1 -1 Office will provide a documentation tool for this accounting, upon request. 4. 9 -1 -1 Office Reviews, Approves, and Reimburses PSAP A complete and accurate TD -290 with appropriate documentation will be reviewed and approved for payment by the 9 -1 -1 Office within two weeks. The claim will be forwarded to the Department of General Services, Office of Fiscal Services, for payment processing. This final payment process may take up to 90 days. Rev. 8/5/2005 111.29 �' t 5543 - ,'1 9 -1 -1 OPERATIONS MANUAL Chapter III — Funding STATEMENT OF WORK (SOW) Every installation of 9 -1 -1 equipment is different due to the unique needs of each PSAP. A statement of work (SOW) is recommended for all installation of 9 -1 -1 CPE and is required for use of the MPA DGS -0026 CPE contract. Therefore, prior to the commencement of any installation of a 9 -1 -1 system funded by the 9 -1 -1 Office, the contractor shall prepare a SOW detailing all deliverables. The SOW shall be signed by both the PSAP and the equipment/services contractor. Any subsequent changes to this planned installation must be documented by the contractor. The SOW should include the following information, as a minimum. 1. Project Contact Information - List of all project contact information (including name, telephone number, pager number, FAX number, and e-mail addresses) for the contractor project manager; sales representative (if different), installation contact, network provider contact, 9 -1 -1 Office consultant, PSAP project representative(s), and other identified project stakeholders. 2. Roles & Responsibilities — Identify the roles and responsibilities of each individual listed in number "1" above. 3. Floor Plans - Detailed floor plans identifying the planned location of all equipment to be installed and corresponding workstation outlets. 4. Facility Modifications Required — Contractor will describe, and provide specifications for, all facility modifications necessary to accommodate the new system. Arrangements for all modifications not performed by the contractor must be performed by the PSAP. 5. Cost Itemization - A detailed list of all costs (including quantity, make /model of all hardware, installed software and version(s), training, installation, and maintenance). 6. System Interfaces - The contractor shall list all equipment or systems that must be interfaced or integrated into the 9 -1 -1 system. The contractor and any third party contractors must agree on the interface specifications. Upon agreement, the costs, specifications, and responsibilities of the contractor will be documented in the SOW. 7. Circuitry — Identify quantity /type of telephone trunks, lines, and other circuits that will be connected to the system. Identify network provider service support and planning requirements. 8. System Programming - Complete programming records showing each telephone /intelligent workstation, station /line features, system speed dial numbers, agent profiles, supervisor profiles, ACD programming and any other adjustable software parameter necessary to meet the specific needs of a PSAP. 9. System Growth Capability — An explanation of configured system capacities and additional components needed to expand beyond current configuration. 10. Maintenance Facility — The name, city location, and telephone number of the primary and backup maintenance technician(s) responsible for on -site maintenance issues. The contractor will detail the capabilities of its maintenance facility to provide remote or on -site service, as needed. 11. Installation Schedule - Include equipment order date; equipment delivery date; network provider planning meeting date(s) and /or network termination support date(s); programming freeze date; equipment installation date; training date(s); and planned system in- service date. 12. Acceptance Testing — Refer and conform to contract requirements. Rev. 8/5/2005 111.30 State of California • Arnold Schwarzenegger, Governor 3543 c State and Consumer Services Agency (DI s DEPARTMENT OF GENERAL SERVICES Telecommunications Division EXHIBIT C October 18, 2005 Max Phipps, Lieutenant Communications Division El Segundo Police Department 348 Main Street El Segundo, CA 90245 -3885 Dear Lieutenant Phipps: The California 9 -1 -1 Emergency Communications Office (9 -1 -1 Office) reimburses public agencies for costs associated with 9 -1 -1 County Coordinator and Wireless Regional Coordinator responsibilities, including staff salary, in accordance with policy and procedures detailed in Chapter III of the State of California 9 -1 -1 Program Operations Manual. The 9 -1 -1 Office will reimburse your agency for all approved and documented hours spent to perform activities as outlined in Chapter III, which can be downloaded at http: / /www.td.dgs.ca.gov/ Publications /911 /911manual.htm. Reimbursement includes salary, benefits and approved expenses. if you have any questions or need guidance through this process, please do not hesitate to contact me at david.sanchez @dgs.ca.gov or (916) 657 -9177. Sincerely, DAVID F. SANCHEZ, 9 -1 -1 Consultant California 9 -1 -1 Emergency Communications Office DS:ja cc: Jack Wayt, Chief of Police, El Segundo Police Department Jeff Stewart, City Manager, City of El Segundo 17 601 Sequoia Pacific Boulevard ® Sacramento, California 95814 -0231 • (916) 657 -9903