THIS MAINTENANCE AGREEMENT ( "Agreement ") is made and entered into this 1st day of
October, 2009, by and between the CITY OF EL SEGUNDO, a general law city and municipal
corporation ( "CITY ") and Johnson Controls, Inc., a for profit Corporation ( "CONTRACTOR ").
The Parties agree as follows:
1. CONSIDERATION.
A. As partial consideration, CONTRACTOR agrees to perform the work listed in the
SCOPE OF SERVICES, below;
B. As additional consideration, CONTRACTOR and CITY agree to abide by the
terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONTRACTOR on an invoiced
basis an amount set forth in the attached Exhibit "A," which is incorporated by
reference, for CONTRACTOR's services. CITY will pay such amount promptly,
but not later than thirty (30) days after receiving CONTRACTOR's invoice.
2. TERM. The term of this Agreement will be from October 1, 2009, to September 30, 2012.
The Agreement may be renewed upon mutual consent of the parties.
3. SCOPE OF SERVICES.
A. CONTRACTOR will perform services listed in the attached Exhibit A.
B. CONTRACTOR will, in a workmanlike manner, furnish all of the labor,
technical, administrative, professional and other personnel, all supplies and
materials, equipment, printing, vehicles, transportation, office space and facilities,
and all tests, testing and analyses, calculation, and all other means whatsoever,
except as herein otherwise expressly specified to be furnished by CITY, necessary
or proper to perform and complete the work and provide the professional services
required of CONTRACTOR by this Agreement.
4. PREVAILING WAGES.
A. Pursuant to Labor Code § 1720, as specified in 8 California Code of Regulations
§ 16000 and set forth in DIR Decision Nos. 99 -028 and 2000 -091,
CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR's
responsibility to interpret and implement any prevailing wage requirements and
Pagel of 8
3987 .
CONTRACTOR agrees to pay any penalty or civil damages resulting from a
violation of the prevailing wage laws.
B. In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem
wages are available upon request from CITY's Engineering Division or the
website for State of California Prevailing wage determination at
http: / /www.dir.ca.gov /DLSR/PWD. CONTRACTOR must post a copy of the
prevailing rate of per diem wages at the job site.
C. CITY directs CONTRACTOR's attention to Labor Code §§ 1777.5, 1777.6 and
3098 concerning the employment of apprentices by CONTRACTOR or any
subcontractor.
D. Labor Code§ 1777.5 requires CONTRACTOR or subcontractor employing
tradesmen in any apprenticeship occupation to apply to the joint apprenticeship
committee nearest the site of the public works project and which administers the
apprenticeship program in that trade for a certificate of approval. The certificate
must also fix the ratio of apprentices to journeymen that will be used in the
performance of the contract. The ratio of apprentices to journeymen in such cases
will not be less than one to five except:
When employment in the area of coverage by the joint apprenticeship
committee has exceeded an average of 15 percent in the 90 days before the
request for certificate, or
ii. When the number of apprentices in training in the area exceeds a ratio of
one to five, or
iii. When the trade can show that it is replacing at least 1/30 of its
membership through apprenticeship training on an annual basis state -wide
or locally, or
iv. When CONTRACTOR provides evidence that CONTRACTOR employs
registered apprentices on all of his contracts on an annual average of not
less than one apprentice to eight journeymen.
V. CONTRACTOR is required to make contributions to funds established for
the administration of apprenticeship programs if CONTRACTOR employs
registered apprentices or journeymen in any apprenticeable trade on such
contracts and if other contractors on the public works site are making such
contributions.
vi. CONTRACTOR and any subcontractor must comply with Labor Code §§
1777.5 and 1777.6 in the employment of apprentices.
Page 2 of 8
3981
vii. Information relative to apprenticeship standards, wage schedules and other
requirements may be obtained from the Director of Industrial Relations,
ex- officio the Administrator of Apprenticeship, San Francisco, California,
or from the Division of Apprenticeship Standards and its branch offices.
E. CONTRACTOR and its subcontractors must keep an accurate certified payroll
records showing the name, occupation, and the actual per diem wages paid to
each worker employed in connection with this Agreement. The record will be
kept open at all reasonable hours to the inspection of the body awarding the
contract and to the Division of Labor Law Enforcement. If requested by CITY,
CONTRACTOR must provide copies of the records at its cost.
5. FAMILIARITY WITH WORK.
A. By executing this Agreement, CONTRACTOR represents that CONTRACTOR
has
Thoroughly investigated and considered the scope of services to be
performed;
ii. Carefully considered how the services should be performed; and
iii. Understands the facilities, difficulties, and restrictions attending
performance of the services under this Agreement.
B. If services involve work upon any site, CONTRACTOR warrants that
CONTRACTOR has or will investigate the site and is or will be fully acquainted
with the conditions there existing, before commencing the services hereunder.
Should CONTRACTOR discover any latent or unknown conditions that may
materially affect the performance of the services, CONTRACTOR will
immediately inform CITY of such fact and will not proceed except at
CONTRACTOR's own risk until written instructions are received from CITY.
6. INSURANCE.
A. Before commencing performance under this Agreement, and at all other times this
Agreement is effective, CONTRACTOR will procure and maintain the following
types of insurance with coverage limits complying, at a minimum, with the limits
set forth below:
Type of Insurance
Commercial general liability:
Business automobile liability
Workers compensation
Page 3 of 8
Limits combined single)
$2,000,000
$2,000,000
Statutory requirement.
3981
B. Commercial general liability insurance will meet or exceed the requirements of
ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth
above will be a combined single limit per occurrence for bodily injury, personal
injury, and property damage for the policy coverage. Liability policies will be
endorsed to name City, its officials, and employees as "additional insureds" under
said insurance coverage and to state that such insurance will be deemed "primary"
such that any other insurance that may be carried by City will be excess thereto.
Such insurance will be on an "occurrence," not a "claims made," basis and will
not be cancelable or subject to reduction except upon thirty (30) days prior
written notice to City.
C. Automobile coverage will be written on ISO Business Auto Coverage Form CA
00 0106 92, including symbol 1 (Any Auto).
D. CONTRACTOR will furnish to City duly authenticated Certificates of Insurance
evidencing maintenance of the insurance required under this Agreement,
endorsements as required herein, and such other evidence of insurance or copies
of policies as may be reasonably required by City from time to time. Insurance
must be placed with insurers with a current A.M. Best Company Rating
equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the
insurer will provide thirty (30) day notice of any cancellation of coverage.
CONTRACTOR will require its insurer to modify such certificates to delete any
exculpatory wording stating that failure of the insurer to mail written notice of
cancellation imposes no obligation, and to delete the word "endeavor" with regard
to any notice provisions.
E. Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance
required by this Agreement, City may obtain such coverage at CONTRACTOR's
expense and deduct the cost of such insurance from payments due to
CONTRACTOR under this Agreement or terminate.
7. TIME FOR PERFORMANCE. CONTRACTOR will not perform any work under this
Agreement until:
A. CONTRACTOR furnishes proof of insurance as required under Section 6 of this
Agreement; and
B. CITY gives CONTRACTOR a written Notice to Proceed.
C. Should CONTRACTOR begin work in advance of receiving written authorization
to proceed, any such professional services are at CONTRACTOR's own risk.
8. TERMINATION.
A. Except as otherwise provided, CITY may terminate this Agreement at any time
with or without cause. Notice of termination will be in writing.
Page 4 of 8
3981 .
B. CONTRACTOR may terminate this Agreement upon providing written notice to
CITY at least sixty (60) days before the effective termination date.
C. Should the Agreement be terminated pursuant to this Section, CITY may procure
on its own terms services similar to those terminated.
D. By executing this document, CONTRACTOR waives any and all claims for
damages that might otherwise arise from CITY's termination under this Section.
9. INDEMNIFICATION.
A. CONTRACTOR indemnifies and holds CITY harmless from and against any
claim, action, damages, costs (including, without limitation, attorney's fees),
injuries, or liability, arising out of this Agreement, or its performance.
Should CITY be named in any suit, or should any claim be brought against it
by suit or otherwise, whether the same be groundless or not, arising out of
this Agreement, or its performance, CONTRACTOR will defend CITY (at
CITY's request and with counsel satisfactory to CITY) and will indemnify
CITY for any judgment rendered against it or any sums paid out in
settlement or otherwise.
B. For purposes of this section "CITY" includes CITY's officers, officials,
employees, agents, representatives, and certified volunteers.
C. It is expressly understood and agreed that the foregoing provisions will survive
termination of this Agreement.
10. INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that
CONTRACTOR will act as an independent contractor and will have control of all work and the
manner in which is it performed. CONTRACTOR will be free to contract for similar service to
be performed for other employers while under contract with CITY. CONTRACTOR is not an
agent or employee of CITY and is not entitled to participate in any pension plan, insurance,
bonus or similar benefits CITY provides for its employees. Any provision in this Agreement
that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the
work or to exercise a measure of control over the work means that CONTRACTOR will follow
the direction of the CITY as to end results of the work only.
11. NOTICES.
A. All notices given or required to be given pursuant to this Agreement will be in
writing and may be given by personal delivery or by mail. Notice sent by mail
will be addressed as follows:
To CITY: City of El Segundo
350 Main Street
Page 5 of 8
3981.,'.A
El Segundo, CA 90245
To CONTRACTOR: Johnson Controls, Inc.
12393 Slauson Avenue
Whittier, CA 90606
B. When addressed in accordance with this paragraph, notices will be deemed given
upon deposit in the United States mail, postage prepaid. In all other instances,
notices will be deemed given at the time of actual delivery.
C. Changes may be made in the names or addresses of persons to whom notices are
to be given by giving notice in the manner prescribed in this paragraph.
12. TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a
Taxpayer Identification Number.
13. WAIVER. A waiver by CITY of any breach of any term, covenant, or condition contained
in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any
other term, covenant, or condition contained in this Agreement, whether of the same or different
character.
14. CONSTRUCTION. The language of each part of this Agreement will be construed simply
and according to its fair meaning, and this Agreement will never be construed either for or
against either party.
15. SEVERABLE. If any portion of this Agreement is declared by a court of competent
jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the
extent necessary in the opinion of the court to render such portion enforceable and, as so
modified, such portion and the balance of this Agreement will continue in full force and effect.
16. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of
reference only and will not affect the interpretation of this Agreement.
17. WAIVER. Waiver of any provision of this Agreement will not be deemed to constitute a
waiver of any other provision, nor will such waiver constitute a continuing waiver.
18. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance
with the laws of the State of California, and exclusive venue for any action involving this
agreement will be in Los Angeles County.
19. AUTHORITY /MODIFICATION. This Agreement may be subject to and conditioned
upon approval and ratification by the El Segundo City Council. This Agreement is not binding
upon CITY until executed by the City Manager. The Parties represent and warrant that all
necessary action has been taken by the Parties to authorize the undersigned to execute this
Agreement and to engage in the actions described herein. This Agreement may be modified by
written agreement. CITY's city manager may execute any such amendment on behalf of CITY.
Page 6 of 8
3981 .
20. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Agreement,
agreements ancillary to this Agreement, and related documents to be entered into in connection
with this Agreement will be considered signed when the signature of a party is delivered by
facsimile transmission. Such facsimile signature will be treated in all respects as having the
same effect as an original signature.
21. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity
between any provision of this Agreement, its attachments, the purchase order, or notice to
proceed, the provisions of this Agreement will govern and control.
22. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of
reference only and will not affect the interpretation of this Agreement.
23. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood,
explosion, war, terrorist act, embargo, government action, civil or military authority, the natural
elements, or other similar causes beyond the Parties' control, then the Agreement will
immediately terminate without obligation of either party to the other.
24. ENTIRE AGREEMENT. This Agreement and its one attachment constitutes the sole
agreement between CONTRACTOR and CITY respecting heating, ventilation and air
conditioning (HVAC) 100% coverage maintenance contract for City Buildings and additional
repair services as required.. To the extent that there are additional terms and conditions
contained in Exhibit "A" that are not in conflict with this Agreement, those terms are
incorporated as if fully set forth above. There are no other understandings, terms or other
agreements expressed or implied, oral or written.
IN WITNESS WHEREOF the parties hereto have executed this contract the day and year
first hereinabove written.
(signatures on following page)
Page 7 of 8
CITY 4r SEGUNDO
J,
y Manager
ATTEST:
Cindy Mo sen,
City Clerk
3981.�.j
APPROVED T'
MARK D. H ity 11
1
By:
Karl H. Berger, As istant City Attorney
JOHNSON CONTROLS, INC.
Signat8gtt Meeker
Metro General Manager
Title
Taxpayer ID No.
Page 8 of 8
3 9 8 1 .
f •
CITY OF EL SEGUNDO
RFP #09 -13
HVAC Maintenance for City Buildings
Schedule (Section 8)
Please see attached schedules and task lists.
_
a
.j
m
U
0
u
_
ro
_
d
w
e
v
0
a
a�
cn
W
0
U
0
c0
V1 r
3981 . , ,•
n■u
n
n
i
i
3981 . , ,•
3981•.„
C
G
0
U
0
M
O
M
co
co
co
co
L
d
Q.
O
4-
0
d
cn
m
d
C
d
K
C
C
C
C
C
C
C
W
N
N
N
N
N
N
N
d
>
d
J
L
7
7
7
7
7
7
7
>
E
E
E
E
E
E
E
U
a
a
a
d
MM�
W
a
CL
LO
CL
:I)
V
VJ
O
O
M
h
V
`v
CD
Q
_N
ca
iL
E
T
1
■�
Cn
c
cn
J
°
-
W
2
>
N
>
M
�i
O O
>j
■ ■
y
t
ca
U >,
ca N
U
o_ U
>
aa)
LC
U
�.
co C
V
O
�.
V
O
O
�.
a>
W2
L �.
lQ
a
N
�- C
m
U
N
�p
N
U �Q
++
a
�.
L
T
w 0)
>,
0
i
�.
y o
i.
a i
.�.
G
E
tN
cc
cW
co
3ca
E
d
n-
a
a
D°
G
L
a
a.
°>
0.
7 0
QN
o
o
W
a
�*
U
it
�j
it
�k
tk
it
a
Z
H y
~ t
`m
n
Q
a
E
0 V-
o -.
o io
0 0
E
W
7
a
LL M
>0
0c
cr
0a)
�=
r-
U
00
UU
7
a
^E
o
0
■-
L
E
o
0
°
c
c
�
m
o
U
°
E
a)
E
F
v
W
U
N
ik
U
F-
m
n0
N
°�
N
10
CL
U
Q
N
°o
v
v
N
u
w
a
N
u
N
v
d
L
N
v
N
v
rn
a�
'-
U
u'
CD
L
Z
0
Z
a,
a�
—
►-
a
d
o`
d
(D
w
4)
w
d
A
m
� d
co
H
F-
U
U
N
o
0
v
°
u�
o
o
v
O
E
m
n
a
E
V
M
U
a7
>
U
U
w
n
CL
E
O
U
w
O
L
d
Q
O
W
O
V
4)
4)
C
d
X
W
d
>
N
J
d
d
O
U
.M�
R' W
d
L
.Q
J
• � C
V� d
E
CL
_
QCr
W
crn�
W
W
W cn
s L �
O
O N
U
U
3981
CV
N
Cl) Cl) Cl) Cl) M Cl) Cl)
v tz tz t--
N N N N N N N
>
>
?
>
E
E
E
E
E
E
E
CL
a
a
a
a
a
a
I
EL
in
CL
O
U')
LO
V
O
O
V
O
O
Q
y
(6
¢t
E
N
O.
c
N
L
U)
t
U
N
N
>N
>Y
f0
ca
U
t6
n- C
C
N
'y C
A
O- ILC
CL
T
.+N' U
�.
N
d
t
d
£"
L
C W
L
L
L
C c
L
C
L
W L
d
a
��
a
a
a
a
o
a
� O
L a
O
O
C
ik
N #
U) m
n
CD
O
O O
2 >
w
� -6
N
CL
.
U) U)
7
Cl.
O C
O O
C) C)
G7
�2
U
C
U
:3
O
CL
O
c
E
U
1O
m
v
m
O1
Y
C
C
c
N
U
E
cu a
G'
V
>
U
U
co
W
O
U
O
N
N
N
to
'-
N
co
N
N
N
co
10
N
# N
U
V
Q'
�
tY
=
V
V
C)
N
V
U
Q
t
c
°
d
v
_
=
o
o
a
ii
°
o
c
N
cn
O
`
t
°
C
.V_.
H
3
CD
:D
d
N E
m E
>
N
N
C
>
N
_ O
S
R
N
N
Q.
E
O
U
O
L
d
a-
0
W
O
d
v
C
X
w
Z
>
d
J
� O
A+ �
W �
O
U
Q
f
A�
YL
� r
V ♦ O
Q.
Q ��
a
w
i
E
cr
W
tm
F-
L
G
O O
U N
U
3981... j
co
M M co co co co co
N N N N N N N
E
E
E
E
E
E
E
>
>
>
>
>
E
E
E
E
E
E
a
a
a
a
a
a
a
o
CL
=
LO
o
~o
d
M
°
r-_:
r
2
Ln
O
V
O
O
O
fD
V
C
R
N
d
N
L
Q
C
c
O
E
O
O
O
N
=
Q
o
Q
'D
W
or
O_
E«
C
v
o
y
`m
U
x
tm
co
C
U
o
Z'•U
O
c
C
Q
O
d
d
d
<L
R
R
R
` O
�.
R
d
O
w
d
`
C�
t
d
y
d
O U
mL
am
a
n
�a
N
#
#
a o
O U
a
#
0
C
#
E
7
ac N
E N
#
C N
�
O O
a
o'a n
:3
C
� E
Q>
U U
U-
d
Q U
O
a
t
E
E
0
c
U
E
E
o
o
c
E
E
o
o
U
m
a�
m
N#
°
°
.0
N
U
R
U
R
H
d
O
N
N
O_
N
O_
U
N
N
O.
O
y
CL
=
y
C)
u
u
u
a
u
�
u
(0
v
v
Z
Q
CL
=
Z
ID
O.
i
d
•�
CO
(n
7
(n
LL
O
fn
L.L_
In
CO
w
11
E
(n
lL
N
N
M
U
LO
N
V
i4
E
Cl)
N
m
=
O
U
c
D
U
F-
Q
C)
C
Q
E
0
U
0
L.
tv
CL
O
46
m
v
d
m
c
m
X
w
co
d
>
d
J
d
to
at
O
U,
c
v
V ♦ 4)
Q •0
W
E
Q.
■m
W
/ O
O
U N
U
3981 ,
V
M V co M O co M
Q C C C C
N Z N N N N N
E
E
E
E
E
E
°
°
>
E
E
E
E
E
E
a
m
a
a
a
a
a
u
a
°
a
Zo
F
Lo
C>
°'
O
V
O
O
J
V
O
C
V)
N
^'
O_
E
°
o
o
m
°
CL
U
a
`
O N
N
N
E
ar
Q
w
�
E
t
(U
_
,C
cu
0
N
Q
U >.
V
3
U
O
'V
U
c
m
a O
c
a`� m
c
U
cu
d
d
_
Q
c°
d
L
U
d
O
d
Q
d
CL 0
U
a
E
T
c N
ik
O U
#
c t
ik
`
ik
t
ik
7
ik
7
O C
O O
U- Co
O
tnU
Q>
ix D
C) C)
>U
a
2
a�
3
o
�
�
°
y
w
o
O
�
�
3
C
N
E
c
=
c
c
E
E
F°
E
(n
c
L
Lo
in
O
O
O
O
d
N
d
d
Qt
d
d
2
7
a
d
O
IY
C)
`m
N
a
=
N
'n
U-
In
c
co
c
E
°
E
c
>
d
Q
E
O
U
r..
O
L
CD
a
O
v-
0
m
v
m
m
c
tv
X
W
d
4)
d
J
,�J d
ai >
O
L
iwce+.
W
d
/W, N
v
■
AO
YL
W
�.d w
V♦ d
CL
acr
W
E
■
W
W CD
L �
E
O 0
U
m m m m m m m
N N N N N N N
E
E
E
E
E
E
E
E
E
E
E
E
a
a
a
a
a
a
a
a
a.
T-
=
C)
C�
2
2
co
a
a
a
a
a
O
O
O
N
O
N
O
V
V
V
V
V
V
V
N
E
7
C
R
NN
N
NN
c
>N
O
is
m
0
R
a�
!`o
U
`m
3
co
U
m
U
`m
U
=
d
a'
d
!
07
T
=
d
1
d
t
d
t
d
t
T
T
T
O.
E
T
m
T
O_
E
T
O_
T
O_
E
T
N
(m
a
a
C
m
d
U`
C
CL
f1
a
d
a
4
cn
I
CL
a
a
Q.
o
m
:
o
>
m
a
a
m
a
a
a
2
0
0
0
m
2
m
o
m
�
V
=
a
N
fn
O
4)
O
O
=
U
O
V
V
LO
V
C.
O
V
m
O
o
m
cn
in
N
2i
v
N
o
o
c
o_
E
O
LL
-
E
V
_
O
a
`
a
3
m
E
E
J
�
2
m
a
-
n
U
398.1 }
N
Q.
E
O
U
0
L
d
O.
O
W
0
U_
d
d
C
d
K
w
J
O
U
Q
A� N_
,W N
v
Y.
r+
V ♦ O
r
Q\ II'
w
cr
W
`W �
/ E
O 0
V y
7
U
398 .
. o o N
M V co co co M V
a
N Z N
C r C
N N N N
E
E
E
E
E
E
7
7
7
7
7
7
E
E
E
E
E
y
m
a
m
a
a
a
a
a
CL
a
T
F
o
o
`i
S
o
�
3:
0
O
M
O
V
O
(O
V
C
N
C
N
C
N
C
N
C
E
N
E
N
C
O
U
O
U
O
C
O
c
O
U
L
L
U
U
L
`
Q
Q
°'
w
w
Q
'O
_
O
'O
N
x
O
x
D
N>
N 7
x
r
V
U >,
`7
U
*
V
w
L
d
w
U
N
cc
Q C
O
N
_j,
d C
O
A
:N
c
N
CL
T
w m
•C
�+
O)
E
7
...
C
C C
m
C
C
CL
d
C
CL
d
ao
C.
p
Qo
:5
CL
C N
�
F
oU
-
0)
k
S
S 7
E
p
.
S 7
t.- >
C
¢>
d
LYE
reD
Q>
GL
c
E'
N
O
E
v
a�
m
01
N
C
C
(a
LL
N
C
O
_
C
N
E
aS
O
w
O
E
c
N
N
CL
m
F=
U
(a
m
Uc
Fp
m
m
N
p-
co
N
C
N
a
N
y
Vl
�'
O
N
N
N CL
e�pt
i
U
O
U
U
`p
0.'
00
V
c9
U
d'
N
U
V
d'
O
•�
~
N
i
•�
•d
N
d
LL
N
S
N
W
�
LL
=
N
C
0
N
.O.
LL
T
N
LL
>
(n
.p.
LL
S
t
U
o
o
S
N
o
o
v
r
W
U
(n
N
:D
Y
D
E
Q
Q
Q
d
U�
Q
E
O
U
w-
O
L
d
Q
O
4
O
d
U
d
CD
C
N
K
W
d
>
N
J
d
d
O
U
O
//� N_
V♦ N
L
U.
■� C
V/ d
_n.
QQ
W
W
E
CL
cr
W
i � A
ai `m
O N
U
U
M Cl) Cl) Cl) Cl) Cl)
C C C C C C
N N N N N N
co
r
v
N
39 8
N_
r
E
E
E
E
E
E
E
>
>
>
3
3
>
3
E
E
E
E
E
E
a
a
a
a
a
a
a
`�
U~
a
Io
a
Zo
u
o
r
�
0
0
o
Q
v
v
o
c
Q
c
a
E
NN N
O
_
d
n
Z)
U
0
N
1�
co
N
L
U
d
CL
C
=
m
d
Q
W
E
?
0
2
ani
a) t
-
U�
o
m
X
3
U
V
o
O
V
c
D
—
(
d•
U T
V
.N. A
m
�I
�.
U
cc
d
�.
V
.N..
d C
A
•C y
�o
d
T
d
T
Q
1
d
T
7
Q
d
1
d
C
d
O)
d
T
a
..2
a
°
a
=
a
3
a
i
a
C C
=O
o-
Eo
.�
?)
�t
•o
it
�
it
w
Xk
d
it
d
Qk
o ()
Yt
L)
d
� �
a
2 �
o �
y
75
O 'F-
0 0
UU
m O
LL
d
d
S
3
d
L-
Q>
:D
0
0
0
M
T
_
d
d
°o
rn
HU
(D
E
Q)
E
c
c
.a
E
E
aa)
aa)
a
aEi
W
o
N
U
LL.
N
@
N
m
=
N
ca
N
N
N
N
=
Q
N
ca
-
N
m
CL
U
a
v
d
0
u
a`�
0
E
u
T
u
U
v
d
_
2
m
cn
a�
a
Z
U
a
i
N
H
N
LL
U
N
LL
=_
fn
fn
N
U)
LL
CO
to
IL
F-
�
�
m
4_
C
a7
C
F-
fV
N
:3
O
X
O
O'
d
N
C
C
O
C
N
_
�
O
C
U
�
af
0
Q
U
39 81
•
...
a
co
E
0
U
w
0
°
co
co
CD
co
M
M
L-
4)
CL
0
W
0
d
v
C
`
W
N
N
N
N
N
N
N
W�/�
W
N
d
O
'
e� a
E
�
>
Ja
_
0
d
a
a
a
U
a
d
a
a
U
O
a
=
r
N
l0
@
E
°
N
E
co
_
a
N
V
d
E
a.
N
a
a
N
o
o
0
O
d
In
o
V
N
�
c
0
d
�_
W
p
W
m w
fO
m
c
o c
t
d
rn
>
U �
m
■■
U
N
C
T
y
A`
pia
O
U
T
co 7E
c
U
i`v
aO m
U
Q
d7
T
d
T
L
E U
d
`
O_
T
■_
r+
C
O
d
T
`
d
!
N
O_
C
C C
0
C.
U d
d
C
'U O
d .
.0
� o C
N
CL
O U
N
.
C .p
O
~
'_
p O
1- !
Z d
O
N
C d
N
'F
LL d
0 0
O C
tY�
Q
UH
=
w
>U)
a
UU
W
c
c
�
E
CO
N
iiii
•
O
N
m
m
Q
N
O
d
C
~
d
_
E
C
O
C
W
E
E
U
cn
U
m
C
N
d
N
N
cu
O
fl.
N
C
d
OL
Ma
d
d
N
N
N
N
C
d
= U
d
a
L
w
to
z
y
m
'�
O
N
N
c N
iL
a~.
o
N
c
p
to
>
N
LL
�
o.
to
v
Ip-
E
O
d
C
U
n
E
°
N
u�
o
U
�
w
N
9
'
a
a�
a�
O
N
ca
co
U0
U
t
U
U
>
2
Z
U
U
£
E
3
%
#
k
O
±
#
b
$
k
§
w
\
�
c
\
r �
�
�
! 0
. �
W
L
LL
c
E
J
�
�
�
E
.�
. �
cr
uj
�
�
0
0 _
� J
\ \ \ \ \ k
39 d 2 .
co
cq
w
E
E
E
E
e
E
E
{
/
\
\
�
E
E
z
z
a_
a
z
CL
e
E
G
%
b
\
\
7
7
3
\
7
=
e
_
m
L)
(A
}
:t-_
\
\
\
\
}
$
o
U-
\
)
$
$
5
A
)
�
2�
{=
\
m
2 5
:
j
}
1
�«
-
* F
}
1
/
d
ƒ
f
(
\ \
\
/
d
n
{
#±
Cl)
=
t
3
J
_
(D
\
&
_c
/
[
\
=
Q
°
£
§
\ )
8
#
\7
#
2
�%
ƒ
A&
C)_
jƒ
\\
))
) \
LL
)}
.(n
0
2
f
a
2
_
G
2
-
5
7
/
\
/
k
(
§
/
k
q
\
k
§
�
S
/
0
2
0
J
r
-
j
2
t
�
;�
k
■
2
§
2
ƒ
§
E
±
§
$
G
�
e
ƒ
&
@
o
®
'
)
{
%
f
®
±
)
6
\
G
3
$
E
/
$
f
=
A
/
E
c
m
E
/
f
/
\
\
�
U')
/
\
a
{
)
}
\
k
/
u
E
0
U
w
0
L
d
Q
O
4-
0
d
V
d
d
d
X
W
L
d
CD
V
o
U
C� N_
G` N
U
/A d
V+r Ea
Q c
O'
W
W
E
■
cr
W
W �
L
E
E
p
U y
U
Cl) Cl)
V
N N N
M
C
V
N
co M
C t--
N N It
co
N
3981•..:
0
E
E
E
E
E
E
E
E
E
E
E
E
~o
~o
to
LO
N
C,
N
`-
d
d
o
o
a
a
o
CD
U
c9
c
C
O
m
y
U
1
LL
N
•:
C
0
,
U
O_
U
N
"O
t-
=
U
EC
Y N
0
0
U
3 O1
v
LL
v
u E
v
C:
'w
C
i
`m
A
U
CC
U
-
�
a
A
o
a 0
m
Q
d
Q
d1
C O
=
N
in
�.
O'
%�
O'
T
O
T
i
C
o
m
'.'
m
W
L
0
W
a
c W
a
°'
a
Z)
0.
a
U
_
7k
C
i!
C
ik
C
�
o�
N
g
ik
g
#
O
H t
C
��
m
C O
U
Oc
N N
O N
U
U
U
C
i�
n
2
U
T
c0
m
C
N
O
C
C
.
y
6
W
>
>
c
U
c
c
co
E
E
4t
E
C
c
CD
co
_
it
a)
d
3k
o
c
U
m
a)
o
cou
)
m
U
m
a
p
N
O
N
C
d
d
o
=
d
d
N
U
U
c0
i
c
�
d
v
�
�
N
:
y
(ry
H
lA
LL
0
(n
LL
N
(n
C
(n
LL
fp
Lq
a
O
O
{-
4'y
CV
D
_
l0
0
o
a�
o
o
a�
c
c
c
c
cu
J
J
U
U
J
U
Q
E
0
U
w
O
V
d
a
O
w
O
m
U
m
m
V
c
m
X
LL
W
N d
d
O J'
O
U
c
N
N
O
U
W
� r
V ♦ �
� a
Q t
Q'
L1!
�i•J
W
CL
V
W
4) �
L
W F-
L
> E
O
H
U
Cl) Cl) Cl) M co
C C C
N N N N N
3981.,..E
co co
C C
N N
E
E
E
E
E
E
E
>
>
>
>
>
2
E
E
E
£
E
E
E
2?
91
2
ro
E
a
d
a
a
a
a
a
Lo
v
Q
o
0
o
Q
Q
c
2
o
n
a
U
�+
y
E
E
U
C
O
N
:3
a
7
a
«
-
C
C
i
a
o
U-
i
Q
U
2
2
E
U
v
a)
N
`
-10
2
co
N
X
p
y
N
N
j
C
N
O
O
t}
V
LL
V
LL
y
`
a
U
U
a
a
m
o
9
ea
d
T
o
d
Q
m
Q
a16i
N
m
T
cr
m
T
Q
m
T
C U
i
N
`
N
`
`
W
Ld
a.
a
m e
m
a
a
E
m
a
n
E
m
CL
a�E)
d
a
-
U
m
a
C-
U
a
c a)
a`� E
7
7k
=3
E
it
4k
�t
m E
mo
a
n.
m a)
U
U
_'g
m
m
= N
y
y
Q j
W W
2
S
U) U)
a
C
N
�
�
7
p_
a
c
E
m
�
�
N
ca
m
CL
c
�-
c
=
c
=
ci
a
aci
°—'
z
CL
m
CD
a
aEi
U
aEi
U
N
CD
U
U
aEi
U
_
U
m
L
m
la
f6
!u
.-
U
m
CL
Q
N
d
=
y
N
y
N
O
N
N
C
y
N
=
V
U
d'
X
U
d'
(a
U
�-'
V
�'
V
V
Of
CO
Z
N
Q
_U
U
d
Z
Z
d
LL
.0
Vi
LL
~
Vi
Y
U)
LL
C
N
LL
C
U)
LL
N
(Ua
N
LL
O
N
LL
CO
H
V
C
Q
p
D
a
c
N
LL
D
C6
CL
p
p
N
x
O
�O
C
p
N
(U
C
w
U)
w
U
S
Q
E
O
U
w-
0
L
d
CL
0
W
O
U
N
d
C
d
X
W
V �
>
d
L J
d
O)
4)
>
O
U
A
C
N
N
CU
V ♦ �
Q�
W
ii
Cr
W
Q%
L
W
O
O 1
U Q
Cl) Cl) M Cl) Cl) Cl)
C !i-- t
N N N N N N
E
E
E
E
E
E
7
7
7
2
7
E
E
E
E
E
E
E
a
a
a
a
a
a
a
L
LO
C,
Q
Q
Q
v
°
°
C
N
N
C
C
C
O
C?
Go
7
N
Cn
N
N
co
in
�
t
E
6
(D
E
_
=
O
X >
co
>
C
C
�
D
D
aFL-
I
O-
A
O-
R
( p�
m
•C
m
(n
l0
U
y
�
w
W
E 0
E
d
d
d
t
CD
a
at
o
°c a)
C
4t
> E
Q.
i-
N
°i vi
UH
Q>
v U)
T
> cz
Cl)
m
m
(D
Q
E
n
E
E
o
a_
Q
3
6
O
m
N
W
W
c
=
C
S
C
E
m
E
�
E
U
U
T
m
_
Q
c0
«
CL
U)
=
Vl
=
N
N
N
N
a'
._
N
N
a'
7
y
V
N
V
.'"'
V
N
U
•�
=
V
V
U)
rj
N
N
dj
fn
fn
LL
�O
(n
LL
YO
fn
LL
O
_
=
O
7
t
L
CD
C
C
N
M
ti
j
t
O
w
(n
U
0
2E
3981..
N
3981.,,
Contract Tasks
Equipment
Customer Tag Task procedures
VFD/VSD /Chiller
Variable Spd Drive (Mech -Lg) Check with appropriate customer representative
Starters - Mechanical - Variable
for operational deficiencies.Check and tighten
Speed -Large
electrical connections.Check for heat
damage.Review event log (if applicable). Replace
coolant and inhibitor.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units -Mixed
AHU (10 -40HP) Trane Multizone Check with appropriate customer representative
Air - Constant Volume-10 -40HP
for operational deficiencies.Check belt(s).Check
coil conditions.Check condensate pan and drain
(if accessible). Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units -Mixed
AHU (10 -40HP) Trane Multizone Check with appropriate customer representative
Air - Constant Volume- 10 -40HP
for operational deficiancies.Check
starter /contactor.Check and tighten electrical
connections. Inspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions. Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units-Mixed
AHU (10 -40HP) Trane Multizone Check with appropriate customer representative
Air - Constant Volume- 10 -40HP
for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units -Mixed
AHU (10 -40HP) Trane Multizone Replace air filters per agreement.
Air - Constant Volume- -10 -40HP
Chillers -Water Cooled-- Scroll--31-
WC Scroll Chiller (31 -75T) Trane Check with appropriate customer representative
75T
50T for operational deficiencies.Check
alignment.Check operation - electrical
interlocks. Inspect control panel - tighten
connections.Check control setpoints.Check drive
condition.Check electrical contacts.Check for
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
represenative.
Chillers -Water Cooled - Scroll -31-
WC Scroll Chiller (31 -75T) Trane Check with appropriate customer representative
75T
50T for operational deficiencies.Conduct refrigerant
leak check.Check compressor oil level (s).Conduct
1/46
Contract Tasks
Equipment Customer Tag Task procedures
Chillers -Water Cooled- Scroll -31-
75T
Chillers -Water Cooled- Scroll -31-
75T
WC Scroll Chiller (31 -75T) Trane
50T
WC Scroll Chiller (31 -75T) Trane
50T
Chillers -Water Cooled - Scroll -31- WC Scroll Chiller (31 -75T) Trane
75T 50T
Chillers -Water Cooled - Scroll -31- WC Scroll Chiller (31 -75T) Trane
75T 50T
Cooling Towers - Evaporative Evap Cooler ( >7.5HP) Frigid Coil
.39 8 1
visual inspection of condenser tubes (head
removal by customer). Inspect starter.Check
crankcase heater.Check and tighten electrical
connections.Check safeties.Check operating
controls.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.lsolate tubes.Drain
water from tubes.Remove head. Mechanically
brush tubes.Replace gasket.Replace head.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies. Lock -out and tag
unit.Remove used oil and recover
refrigerant. Replace oil filter (if applicable).Refill
unit with new manufacturer recommended
oil.Energize unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies. Log unit temperatures
and pressures if load exists.Check oil
heater.Check operating current.Check refrigerant
charge.Check for visible Ieaks.Check operation of
capacity control slide valve.Check operation of oil
heater.Measure operating cu rrent/voltages.Shut
down chiller.Lock -out and tag chiller power and
mark out of service. Lock-out cooler and
condenser pumps (if applicable). Pump down and
isolate (if applicable).Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies. Open any isolation
valves.Visually inspect for evidence of refrigerant
or oil Ieakage.Check refrigerant and oil
Ievels.Check oil sump heater and
temperature.Check and test all operating and
safety controls, adjust as needed.Visually inspect
boards for integrity.Check the starter
operation.Check for open service valves.Confirm
proper condenser and cooler flows.Start the
chiller.Check operation of the oil return
system.Check all operating pressures and
temperatures.Log operating conditions after the
system and unit stabilizes.0 heck approach
temperatures for condition of tube heat transfer
efficiency.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
2/46
3981 . .
Contract Tasks
Equipment Customer Tag
Task procedures
Cooler— Evaporative Cooler— >7.5HP 60T
for operational deficiencies.Check and tighten
electrical connections.Check safeties.Check
temperature controller.Check operation of bypass
valve.Check condenser water flow.Check
operation of spray nozzles.lnspect condition of
tubes.Check starter.Check drive system.
Lubricate as required.Change belt(s) (if
applicable).Check fan condition and
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Cooling Towers — Evaporative Evap Cooler ( >7.5HP) Frigid Coil
Check with appropriate customer representative
Cooler— Evaporative Cooler— >7.5HP 60T
for operational deficiencies.Check electrical
connections.Check temperature controller.0 heck
operation of bypass valve.Check condenser water
flow.Check operation of spray nozzles.Check
drive system.Check belt(s) (if applicable). Check
fan condition and rotation.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps —Water Cooled —Heat WC Heat Pump (6 -10T) / 0001
Check with appropriate customer representative
Pump- -6 -10T
for operational deficiencies. Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check operation of
reversing valve.Check condenser water
flow.Check condition of evaporator coils.Change
belt(s).Check filter(s).Check for proper fan
operation. Lubricate as required.Clean
condensate drain (if accessible).Check backup
heat.Check defrost controls.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps —Water Cooled —Heat WC Heat Pump (6 -10T) / 0001
Check with appropriate customer representative
Pump -6 -10T
for operational deficiencies.Check system
pressures and temperatures.0 heck refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check operation of
reversing valve.Check condenser water
flow.Check condition of evaporator coils.Check
belt(s).Check filter(s).Check for proper fan
operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps —Water Cooled —Heat WC Heat Pump (6 -10T) / 0001
Check with appropriate customer representative
Pump--6 -10T
for operational deficiencies.Clean condensate
3/46
3981 . , - i
Contract Tasks
Equipment Customer Tag
Task procedures
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps —Water Cooled —Heat WC Heat Pump (6 -10T) / 0001
Replace air filters per agreement.
Pump -6 -10T
Boilers— Gas —Hot Boiler ( <120MBH /50HP) Cleaver
Check with appropriate customer representative
Water— <120MBH /50HP Brooks
for operational deficiencies.Check
contactor(s).Check and tighten electrical
connections.Check gas pressure regulator.Check
and clean ignition and flame safeguard.Clean
combustion fan wheel.Check flame
quality.Perform pilot turndown test (if
applicable)Visually inspect combustion chamber,
draft diverter and flue for accumulation of
soot.Check all safeties.Check operating
controls.Lift relief valve to ensure proper
operation.Blow down low water cut- off.Clean low
water cut- off.Check motor and fan bearing(s).
Lubricate as requiredCheck temperature and
pressure. Check make -up water operation.Check
for Ieaks.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Boilers— Gas —Hot Boiler ( <120MBH /50HP) Cleaver
Check with appropriate customer representative
Water— <120MBH /50HP Brooks
for operational deficiencies.Check gas pressure
regulator.Check ignition and flame
safeguard.Check flame quality.Visually inspect
combustion chamber, draft diverter and flue for
accumulation of soot.Check all safeties.Check
relief valves for Ieakage.Assure fuel shutoff.Blow
down low water cut- off.Check motor and fan
bearing(s). Lubricate as required.Check
temperature and pressure.Check electrical
connections. Check make -up water
operation.Check for Ieaks.Check overall condition
of unit.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Boilers— Gas —Hot Boiler ( <120MBH /50HP) Cleaver
Check with appropriate customer representative
Water— 120MBH /50HP Brooks
for operational deficiencies. Isolate tubes.Drain
water from tubes.Remove head. Mechanically
brush tubes.Replace gasket.Replace head.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Boilers —Gas- -Hot Boiler ( <120MBH /50HP) Cleaver
Check with appropriate customer representative
Water— <120MBH /50HP Brooks
for operational deficiencies.Lock and tag out
unit.lsolate and drain boiler.Open covers.Conduct
inspection. Replace covers.Fill system.Prepare
unit for operation.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Boilers — Gas —Hot Boiler ( <120MBH /50HP) Cleaver
Perform combustion analysis procedures.
Water — 120MBH /50HP Brooks
4146
3981 ....
Contract Tasks
Equipment
Customer Tag Task procedures
Pumps - Pump - Chilled
Pump ( <10HP) / 0001 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check amperage
draw.Check for leaks.Check
starter /contactor.Check and tighten electrical
connections.Check cou piing. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) 10001 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
Pump ( <10HP) / 0007 Check with appropriate customer representative
Water -<10HP
for operational deficiencies. Check amperage
draw.Check for Ieaks.Check
starter /contactor.Check and tighten electrical
connections.Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) / 0007 Check with appropriate customer representative
Water -<10HP
for operational deficiencies. Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
Pump ( <10HP) / 0002 Check with appropriate customer representative
Water -<10HP
for operational deficiencies. Check amperage
draw.Check for Ieaks.Check
sta rter/co ntacto r. Check and tighten electrical
connections.Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) / 0002 Check with appropriate customer representative
Water -<10HP
for operational deficiencies. Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump- Chilled
Pump ( <10HP) / 0003 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor. Check and tighten electrical
connections.Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
5/46
3 9 8 1. - Si
Contract Tasks
Equipment Customer Tag Task procedures
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) / 0003 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspeU
coupling.Check for unusual noise and
vibration.Clean area around equipment.. Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
Pump ( <10HP) / 0004 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor.Check and tighten electrical
connections.Check coupling.Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Ctomplete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) 10004 Check with appropriate customer representative
Water -<101-113
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Corriplete
any required maintenance checklists, report '
observations to appropriate customer
representative.
Pumps - Pump - Chilled
Pump ( <10HP) / 0005 Check with appropriate customer representative
Water - <10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor. Check and tighten electrical
connections. Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) / 0005 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
Pump ( <10HP) / 0006 Check with appropriate customer representative
Water - <10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor.Check and tighten electrical
connections. Check coupling.Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
Pump ( <10HP) / 0006 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
6/46
3981..,.6
Contract Tasks
Equipment Customer Tag Task procedures
any required maintenance checklists, report
observations to appropriate customer
representative.
Air Compressors /Air Dryers —Air
Air Compressor ( <5HP) / 0001 Change out Compressor oil per agreement.
Compressor — Commercial —<5HP
Air Compressors /Air Dryers —Air
Air Compressor ( <5HP) / 0001 Check and clean air filters.Check safety relief
Compressor — Commercial- 5HP
valve.Check with appropriate customer
representative for operational deficiencies.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer represenative. Drain tank
and filter bowl.General maintenance.Oil
motor.Check crankcase oil.Check drive.Check air
drier condenser coil.
Split Systems —Split System —Split
Carrier VVT 5 Ton Split System Check with appropriate customer representative
System -0 -15T
Unit (East Lower Level) for operational deficiencies.Check system
pressures and temperatures. Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil leaks :Check and tighten
electrical connections.Check condition of
condenser coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Split Systems —Split System —Split
Carrier VVT 5 Ton Split System Check with appropriate customer representative
System -0 -15T
Unit (East Lower Level) for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Split Systems —Split System -Split
Carrier VVT 5 Ton Split System Check with appropriate customer representative
System -0 -15T
Unit (East Lower Level) for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Split Systems —Split System -Split
Carrier VVT 5 Ton Split System Replace air filters per agreement.
System -0 -15T
Unit (East Lower Level)
Split Systems—Split System —Split
Mitsubishi 4 Ton Split System Unit Check with appropriate customer representative
7/46
3981.,,,,E
Contract Tasks
Equipment Customer Tag . Task procedures
System -0 -15T
(Computer Room E.L.L) for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible). Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Split Systems —Split System —Split
Mitsubishi 4 Ton Split System Unit Check with appropriate customer representative
System -0 -15T
(Computer Room E.L.L) for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Split Systems —Split System —Split
Mitsubishi 4 Ton Split System Unit Check with appropriate customer representative
System -0 -15T
(Computer Room E.L.L) for operational deficiencies.Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Split Systems —Split System —Split
Mitsubishi 4 Ton Split System Unit Replace air filters per agreement.
System -0 -15T
(Computer Room E.L.L)
Heat Pumps --Air Cooled —Heat
Lennox AC Heat Pump 5 Ton Check with appropriate customer representative
Pump-- 0 -7.5T
West Lower level for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check bakup
heat.Check defrost controls.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment.Complete any
8 /46
'398 1 • 4 • wd
Contract Tasks
Equipment
Customer Tag Task procedures
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps- -Air Cooled —Heat
Lennox AC Heat Pump 5 Ton Check with appropriate customer representative
Pump- 0 -7.5T
West Lower level for operational deficiencies. Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps —Air Cooled —Heat
Lennox AC Heat Pump 5 Ton Check with appropriate customer representative
Pump- 0 -7.5T
West Lower level for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps —Air Cooled —Heat
Lennox AC Heat Pump 5 Ton Check with appropriate customer representative
Pump- 0 -7.5T
West Lower level for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps —Air Cooled —Heat
Lennox AC Heat Pump 5 Ton Replace air filters per agreement.
Pump- 0 -7.5T
West Lower level
Roof Top Units /Packaged
Carrier 8 Ton Gas /Electric Check with appropriate customer representative
Units —Gas Heat-With
Package Unit (Council Chambers) for operational deficiencies. Check and tighten
Economizer -0 -15T
electrical connections. Check safeties.Check
contactor(s).Clean burner assembly.Check
igniter.Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Carrier 8 Ton Gas /Electric Check with appropriate customer representative
Units —Gas Heat —With
Package Unit (Council Chambers) for operational deficiencies.Check system
Economizer -0 -15T
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
9/46
3981 . , . i
Contract Tasks
Equipment
Customer Tag Task procedures
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 8 Ton Gas /Electric Check with appropriate customer representative
Units -Gas Heat -With
Package Unit (Council Chambers) for operational defrciencies.Clean condensate
Economizer -0 -15T
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 8 Ton Gas /Electric Check with appropriate customer representative
Units -Gas Heat -With
Package Unit (Council Chambers) for operational deficiencies.Spray coil(s) with
Economizer-0 -15T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 8 Ton Gas /Electric Perform combustion analysis procedures.
Units--Gas Heat -With
Package Unit (Council Chambers)
Economizer-0-15T
Roof Top Units /Packaged
Carrier 8 Ton Gas /Electric Replace air filters per agreement.
Units -Gas Heat-With
Package Unit (Council Chambers)
Economizer -0 -15T
Roof Top Units /Packaged
Carrier 7.5 Ton Package A/C Unit Check with appropriate customer representative
Units - Cooling Only -With
(1 st Fl. Comp. Rm.) for operational deficiencies.Check and tighten
Economizer -0 -15T
electrical connections. Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions. Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Carrier 7.5 Ton Package A/C Unit Check with appropriate customer representative
Units - Cooling Only -With
(1st A. Comp. Rm.) for operational deficiencies.Check system
Economizer -0 -15T
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 7.5 Ton Package A/C Unit Check with appropriate customer representative
Units -- Cooling Only -With
(1st Fl. Comp. Rm.) for operational deficiencies.Clean condensate
Economizer- -0 -15T
drain if necessary.Spray coil(s) with chemical
10/4
Contract Tasks
Equipment
Customer Tag Task procedures
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 7.5 Ton Package A/C Unit Check with appropriate customer representative
Units — Cooling Only —With
(1st Fl. Comp. Rm.) for operational deficiencies.Spray coil(s) with
Economizer -0 -15T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 7.5 Ton Package A/C Unit Replace air filters per agreement.
Units — Cooling Only —With
(1st Fl. Comp. Rm.)
Economizer-0 -16T
Roof Top Units /Packaged
MZ -2 Energy Labs 40 Ton RTU Check with appropriate customer representative
Units - -Cooling Only —With
for operational defrciencies.Check and tighten
Economizer- 16 -50T
electrical connections.Check safeties.Check
contactor(s).Change belt {s).Check coil
conditions.Check filter condition.Visually.inspect
damper(s). Lubricate as required.Check for
proper fan ope ration. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Ctean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
MZ -2 Energy Labs 40 Ton RTU Check with appropriate customer representative
Units — Cooling Only-With
for operational deficiencies.Check system
Economizer- 16 -50T
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant leaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
MZ -2 Energy Labs 40 Ton RTU Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Clean condensate
Economizer- 16 -50T
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
MZ -2 Energy Labs 40 Ton RTU Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies. Spray coil(s) with
Economizer- 16 -50T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
MZ -2 Energy Labs 40 Ton RTU Replace air filters per agreement.
Units — Cooling Only-With
- 11/4
3941 .....j
Contract Tasks
Equipment Customer Tag Task procedures
Economizer- 16 -50T
Roof Top Units /Packaged MZ -3 Energy Labs 25 Ton RTU
Check with appropriate customer representative
for operational deficiencies. Check and tighten
Units - Cooling Only -With
Economizer- 16 -50T
electrical connections.0 heck safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged MZ -3 Energy Labs 25 Ton RTU
Check with appropriate customer representative
Units - Cooling Only -With
for operational deficiencies.Check system
temperatures and pressures.Check belt(s).Check
Economizer- 16 -50T
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of '
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged MZ -3 Energy Labs 25 Ton RTU
Check with appropriate customer representative
for operational deficiencies.Clean condensate
Units - Cooling Only -With
Economizer- 16 -50T
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged MZ -3 Energy Labs 25 Ton RTU
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
Units - Cooling Only -With
Economizer- 16 -50T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged MZ -3 Energy Labs 25 Ton RTU
Replace air filters per agreement.
Units - Cooling Only -With
Economizer- 16 -50T
Chillers -Air Cooled-Scroll -0 -30T Trane 30 Ton Air Cooled Chiller
Check with appropriate customer representative
for operational deficiencies.Check compressor oil
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
12/4
Contract Tasks
Equipment Customer Tag Task procedures
Chillers —Air Cooled — Scroll -0 -30T Trane 30 Ton Air Cooled Chiller
Chillers- -Air Cooled- Scroll-0 -30T Trane 30 Ton Air Cooled Chiller
Chillers —Air Cooled — Scroll -0 -30T Trane 30 Ton Air Cooled Chiller
Chillers —Air Cooled — Scroll -0 -30T Trane 30 Ton Air Cooled Chiller
Chillers --Air Cooled—Scroll-0-30T Trane 30 Ton Air Cooled Chiller
3981.,.J;
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s).Visually
inspect starter.Check crankcase heater.Visually
inspect for refrigerant and oil Ieaks.Check
condition of condenser coils.Check condenser fan
blades and motors.Check for proper condenser
fan rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Lock -out and tag
unit.Remove used oil and recover
refrigerant. Replace oil filter (if applicable). Refill
unit with new manufacturer recommended
oil.Energize unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Log unit temperatures
and pressures if load exists.Check oil
heater.Check operating current.Check refrigerant
charge.Check for visible leaks.Check fan
blades.Check for proper fan rotation.Check for
vibration.Check coil conditions.Check refrigerant
charge.Shut down chiller.Lock -out and tag chiller
control power.Lock -out cooler pumps (if
applicable).Pump down and isolate (if
applicable).Ensure chilled water system has
proper glycol content.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Contact customer to ensure unit is powered for
required oil temperature prior to startup.Check
with appropriate customer representative for
operational deficiencies.Check oil Ievel.Check
starter mechanism.Check coil conditions. Check
crankcase heater.Check electrical contacts.Check
fan blades.Check and test all operating and
safety controls, adjust as needed.Visually inspect
boards for integrity.Check for open service
valves.Confirm proper cooler flow.Start
chiller.Check refrigerant charge.Check for
vibrations.Check for proper fan rotation.Check all
operating pressures and temperatures.Log
13/4
39 8 1
Contract Tasks
Equipment Customer Tag
Task procedures
operating conditions after the system and unit
stabilizes.Check approach temperatures for
condition of tube heat transfer efficiency.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Boilers— Gas —Hot Larrs Hot Water Boiler
Check with appropriate customer representative
Water— <120MBH /50HP ( <120MBH /50HP)
for operational deficiencies.Check
contactor(s).Check and tighten electrical
connections.Check gas pressure regulator.Check
and clean ignition and flame safeguard.Clean
combustion fan wheel.Check flame
quality.Perform pilot turndown test (if
applicable)Visually inspect combustion chamber,
draft diverter and flue for accumulation of
soot.Check all safeties.Check operating
controls.Lift relief valve to ensure proper
operation.Blow down low water cut- off.Clean low
water cut- off.Check motor and fan bearing(s).
Lubricate as requiredCheck temperature and
pressure.Check make -up water operation.Check
for Ieaks.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Boilers— Gas —Hot Larrs Hot Water Boiler
Check with appropriate customer representative
Water— <120MBH /50HP ( <120MBH /50HP)
for operational deficiencies. Check gas pressure
regulator.Check ignition and flame
safeguard.Check flame quality.Visually inspect
combustion chamber, draft diverter and flue for
accumulation of soot.Check all safeties.Check
relief valves for Ieakage.Assure fuel shutoff.Blow
down low water cut- off.Check motor and fan
bearing(s). Lubricate as requiredCheck
temperature and pressure.Check electrical
connections.Check make -up water
operation.Check for leaks.Check overall condition
of unit.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Boilers— Gas —Hot Larrs Hot Water Boiler
Check with appropriate customer representative
Water— <120MBH /50HP ( <120MBH /50HP)
for operational deficiencies.lsolate tubes.Drain
water from tubes.Remove head.Mechanically
brush tubes.Replace gasket.Replace head.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Boilers— Gas —Hot Larrs Hot Water Boiler
Check with appropriate customer representative
Water— <120MBH /50HP ( <120MBH /50HP)
for operational deficiencies. Lock and tag out
unit.lsolate and drain boiler.Open covers.Conduct
inspection. Replace covers.Fill system.Prepare
unit for operation.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Boilers —Gas —Hot Larrs Hot Water Boiler
Perform combustion analysis procedures.
Water— <120MBH /50HP ( <120MBH /50HP)
Air Handling Units —Mixed AHU 1 CHW
Check with appropriate customer representative
3981 ..
Contract Tasks
Equipment Customer Tag Task procedures
/Air— uonsiam vowme — iurir
for operauonai aenciencies.t necK oeaks).unecK
coil conditions.Check condensate pan and drain
(if accessible). Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed AHU 1 CHW
Check with appropriate customer representative
Air — Constant Volume —<10HP
for operational deficiencies.Check
starter /contactor.Check and tighten electrical
connections. Inspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings .'Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recom mend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed AHU 1 CHW
Check with appropriate customer representative
Air — Constant Volume —<10HP
for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution. Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units —Mixed AHU 2 CHW
Check with appropriate customer representative
Air — Constant Volume- -<10HP
for operational deficiencies.Check belt(s).Check
coil conditions. Check condensate pan and drain
(if accessible).Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed AHU 2 CHW
Check with appropriate customer representative
Air — Constant Volume —<10HP
for operational deficiencies.Check
starter /contactor.Check and tighten electrical
connections.lnspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
15/4
35 8 1 • .�
Contract Tasks
Equipment Customer Tag Task procedures
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed AHU 2 CHW
Check with appropriate customer representative
for operational deficiencies.Clean condensate
Air — Constant Volume —<10HP
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units —Mixed AHU 2 CHW
Replace air filters per agreement.
Air — Constant Volume —<10HP
Air Handling Units —Mixed AHU 3 CHW
Check with appropriate customer representative
for operational deficiencies.Check belt(s).Check
Air — Constant Volume —<10HP
coil conditions.Check condensate pan and drain
(if accessible).Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units - -Mixed AHU 3 CHW
Check with appropriate customer representative
Air — Constant Volume —<10HP
for operational deficiencies. Check
starter /contactor.Check and tighten electrical
connections. Inspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed AHU 3 CHW
Check with appropriate customer representative
for operational deficiencies.Clean condensate
Air — Constant Volume — <1 0HP
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment:Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units —Mixed AHU 3 CHW
Replace air filters per agreement.
Air — Constant Volume —<10HP
Fans — Supply /Return — Constant Return Fan Unit ( <10HP)
Check operation of control system and
dampers.Check safties.Check sheaves and
Volume —<10HP
pulleys for wear and alignment.Check step
controller (as applicable).Check and tighten bolts,
set screws and collars.Check supply and control
air pressures.Check thermal cutout on electric
heaters (as applicable).Check with appropriate
16/4
Contract Tasks
Equipment
Customer Tag
Fans - Supply /Return - Constant Return Fan Unit ( <10HP)
Volume -<10HP
Fans - Supply /Return - Constant Return Fan Unit ( <10HP)
Volume -<10HP
VFDNSD /Chiller Variable Spd Drive (Mech -Sm) 1
Starters - Mechanical - Variable
Speed -Small
VFDNSD /Chiller Variable Spd Drive (Mech -Sm) 2
Starters - Mechanical - Variable
Speed--Small
Pumps - Pump- Chilled CHW Pump ( <10HP) 1
Water -10HP
398 1
Task procedures
customer representative for operational
deficiencies.Clean area around equipment.Clean
starter and cabinet.Complete any required
maintenance checklists, report observations to
appropriate customer represenative.Check and
tighten wiring and electrical connections. Inspect
fan wheel and shaft for wear.Log operating
conditions system stabilizer.Lube fan shaft and
motor bearings. Motor /lead megohm test.Test high
static pressure.Check belt guard.Test low static
pressure.Test low temperature safety
devices.Check belts and adjust tension.Perform
Annual Comprehensive maintenance tasks in
addition to inspection and testing
procedures.Check condition of contacts.Check
contactors for free and smooth operation.Check
damper wear, security and Iinkage.Check fan and
blade(s).Check fan and motor bearings.
Check sheaves and pulleys for wear and
alignment.Check supply and control air
pressures.Check with appropriate customer
representative for operational deficiencies.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer represenative.Check and
tighten wiring and electrical connections. Inspect
fan wheel and shaft for wear.Test high static
pressure.Check belt guard.Test low static
pressure.Test low temperature safety
devices.Check belts and adjust tension.Check
condition of contacts.Check contactors for free
and smooth operation.Check fan and
blade(s).Check fan and motor bearings.
Check with appropriate customer representative
for operational deficiencies.Clean condensate
drain if necessary.Spray coils) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.Check for heat
damage.Review event log (if applicable). Replace
coolant and inhibitor.Ciean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.Check for heat
damage.Review event log (if applicable). Replace
coolant and inhibitor.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
_. ... 17/4
r i .)
3981 • 64aA
Contract Tasks
Equipment
Customer Tag Task procedures
starter /contactor.Check and tighten electrical
connections.Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Comptete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
CHW Pump ( <10HP) 1 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Comptete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
CHW Pump ( <10HP) 2 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor. Check and tighten electrical
connections. Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps -Pump- Chilled
CHW Pump ( <10HP) 2 Check with appropriate customer representative
Water - <10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
HW Pump ( <10HP) 1 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor. Check and tighten electrical
connections.Check coupling. Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps - Pump - Chilled
HW Pump ( <10HP) 1 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Pumps - Pump - Chilled
HW Pump ( <10HP) 2 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter /contactor. Check and tighten electrical
connections.Check coupling.Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Comptete
any required maintenance checklists, report
observations to appropriate customer representati
Pumps- Pump-Chilled
HW Pump ( <10HP) 2 Check with appropriate customer representative
Water -<10HP
for operational deficiencies.Check for 18/4
3961 �.
Contract Tasks
Equipment Customer Tag
Task procedures
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged Carrier 10 Ton PAC
Check with appropriate customer representative
for operational deficiencies.Check and tighten
Units — Cooling Only- With
Economizer -0 -15T
electrical connections. Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged Carrier 10 Ton PAC
Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Check system
temperatures and pressures.Check belt(s).Check
Economizer -0 -15T
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant leaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged Carrier 10 Ton PAC
Check with appropriate customer representative
for operational deficiencies.Clean condensate
Units — Cooling Only —With
drain if necessary.Spray coil(s) with chemical
Economizer -0 -15T
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged Carrier 10 Ton PAC
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
Units — Cooling Only —With
Economizer- -0 -15T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged Carrier 10 Ton PAC
Replace air filters per agreement.
Units — Cooling Only- With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 6 Ton PAC
Check with appropriate customer representative
for deficiencies.Check and tighten
Units — Cooling Only -With
Economizer -0 -15T
operational
electrical connections. Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
19/4
Contract Tasks
Equipment Customer Tag Task procedures
Roof Top Units /Packaged Carrier 6 Ton PAC
Units — Cooling Only —With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 6 Ton PAC
Units — Cooling Only -With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 6 Ton PAC
Units — Cooling Only —With
Economizer-0 -15T
Roof Top Units /Packaged Carrier 6 Ton PAC
Units — Cooling Only —With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 5 Ton PAC
Units — Cooling Only —With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 5 Ton PAC
Units — Cooling Only -With
Economizer -0 -15T
proper fan operation. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check system
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Check with appropriate customer representative
for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Replace air filters per agreement.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation.Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies. Check system
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
20/4
39 8 1 . a it 14
Contract Tasks
Equipment
Customer Tag Task procedures
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
re commendations. Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Clean condensate
Economizer -0 -15T
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Spray ooil(s) with
Economizer -0 -15T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Replace air filters per agreement.
Units — Cooling Only —With
Economizer- -0 -15T
Condensing Units
Carrier 20 Ton Condensing Unit Check with appropriate customer representative
for operational deficiencies.Check compressor oil
w /Compressor -Air
Cooled— Condensing Unit-- 11 -20T
(Basement)
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 20 Ton Condensing Unit Check with appropriate customer representative
w /Compressor —Air
(Basement) for operational deficiencies.Check system
Cooled— Condensing Unit- 11 -20T
pressures and temperatures. Check refrigerant
charge.Check compressor oil level (s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 20 Ton Condensing Unit Check with appropriate customer representative
w /Compressor —Air
(Basement) for operational deficiencies.Spray coil(s) with
Cooled-- Condensing Unit- 11 -20T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
21/4
3981.;;
Contract Tasks
Equipment Customer Tag
Task procedures
any required maintenance checklists, report
observations to appropriate customer
representative.
Air Handling Units —Mixed York MZ AHU (10 -40HP) & RA
Fan (Basement)
Check with appropriate customer representative
for operational deficiencies.Check belt(s).Check
Air — Constant Volume- 10 -40HP
coil conditions.Check condensate pan and drain
(if accessible). Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed York MZ AHU (10 -40HP) & RA
Check with appropriate customer representative
Air — Constant Volume- 10 -40HP Fan (Basement)
for operational deficiencies. Check
starter /contactor.0 heck and tighten electrical
connections. Inspect pilot and safeties {as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed York MZ AHU (10 -40HP) & RA
Fan (Basement)
Check with appropriate customer representative
for operational deficiencies.Clean condensate
Air — Constant Volume- 10 -40HP
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units —Mixed York MZ AHU (10 -40HP) & RA
Replace air filters per agreement.
Air — Constant Volume- 10 -40HP Fan (Basement)
Chillers- -Air Cooled — Scroll -0 -30T AC Scroll Chiller (0 -30T) / 0001
Check with appropriate customer representative
for operational deficiencies.0 heck compressor oil
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Chillers —Air Cooled — Scroll -0 -30T AC Scroll Chiller (0 -30T) / 0001
Check with appropriate customer representative
for operational deficiencies. Check system
pressures and temperatures. Check refrigerant
charge: Check compressor oil level(s).Visually
22/4
3981.,. +1
Contract Tasks
Equipment Customer Tag Task procedures
23/4
inspect starter.Check crankcase heater.Visually
inspect for refrigerant and oil Ieaks.Check
condition of condenser coils.Check condenser fan
blades and motors.Check for proper condenser
fan rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Chillers -Air Cooled - Scroll -0 -30T AC Scroll Chiller (0 -30T) / 0001
Check with appropriate customer representative
for operational deficiencies. Lock -out and tag
unit.Remove used oil and recover
refrigerant. Replace oil filter (if applicable). Refill
unit with new manufacturer recommended
oil.Energize unit.Clean area around
equipment.-Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Chillers -Air Cooled - Scroll -0 -30T AC Scroll Chiller (0 -30T) 10001
Check with appropriate customer representative
for operational deficiencies.Log unit temperatures
and pressures if load exists.Check oil
heater.Check operating current.Check refrigerant
charge.Check for visible Ieaks.Check fan
blades.Check for proper fan rotation.Check for
vibration.Check coil conditions.Check refrigerant
charge.Shut down chiller. Lock -out and tag chiller
control power.Lock -out cooler pumps (if
applicable).Pump down and isolate (if
applicable). Ensure chilled water system has
proper glycol content.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Chillers -Air Cooled - Scroll -0 -30T AC Scroll Chiller (0 -30T) / 0001
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Chillers -Air Cooled - Scroll -0 -30T AC Scroll Chiller (0 -30T) / 0001
Contact customer to ensure unit is powered for
required oil temperature prior to startup.Check
with appropriate customer representative for
operational deficiencies.Check oil level.Check
starter mechanism.Check coil conditions.Check
crankcase heater.Check electrical contacts.Check
fan blades.Check and test all operating and
safety controls, adjust as needed.Visually inspect
boards for integrity.Check for open service
valves.Confirm proper cooler flow.Start
chiller.Check refrigerant charge.Check for
vibrations.Check for proper fan rotation.Check all
operating pressures and temperatures.Log
operating conditions after the system and unit
stabilizes. Check approach temperatures for
condition of tube heat transfer efficiency. Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
23/4
39 8 1 • t! .A
Contract Tasks
Equipment Customer Tag Task procedures
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #1 (Roof) Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Check and tighten
Economizer -0 -15T
electrical connections.Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operati on. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #1 (Roof) Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Check system
Economizer -0 -15T
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant leaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #1 (Roof) Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies.Clean condensate
Economizer -0 -15T
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #1 (Roof) Check with appropriate customer representative
Units — Cooling Only —With
for operational deficiencies. Spray coil(s) with
Economizer -0 -15T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Units — Cooling Only —With
Economizer -0 -15T
Roof Top Units /Packaged
Units — Cooling Only —With
Economizer -0 -15T
Carrier 5 Ton PAC Unit #1 (Roof) Replace air filters per agreement.
Carrier 4 Ton PAC Unit #3 (Roof) Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation.Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendation s.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
24/4
.S!J81 . 6 ,.r
Contract Tasks
Equipment
Customer Tag Task procedures
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Carrier 4 Ton PAC Unit #3 (Roof) Check with appropriate customer representative
for operational deficiencies.Check system
Units — Cooling Only —With
temperatures and pressures.Check belt(s).Check
Economizer -0 -15T
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 4 Ton PAC Unit #3 (Roof) Check with appropriate customer representative
for operational deficiencies.Clean condensate
Units — Cooling Only —With
drain if necessary.Spray coil(s) with chemical
Economizer -0 -15T
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 4 Ton PAC Unit #3 (Roof) Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
Units — Cooling Only —With
chemical solution.Rinse coil(s) thoroughly with
Economizer -0 -15T
water.Clean area around equip ment.Complate
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 4 Ton PAC Unit #3 (Roof) Replace air filters per agreement.
Units- Cooling Only —With
Economizer -0 -15T
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for operational deficiencies.Check compressor oil
w /Compressor —Air
Cooled—Condensing Unit -0 -10T
Unit #5 (Roof)
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections. Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment. Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for operational deficiencies.Check system
w /Compressor —Air
Cooled— Condensing Unit -0 -10T
Unit #5 (Roof)
pressures and temperatures. Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil leaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
25/4
3981.
Contract Tasks
Equipment
Customer Tag Task procedures
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for operational deficiencies.Spray coit(s) with
w /Compressor —Air
Cooled— Condensing Unit -0 -10T
Unit #5 (Roof)
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment:Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Condensing Units
Carrier 4 Ton HP Condensing Unit Check with appropriate customer representative
for operational deficiencies.Check compressor oil
w /Compressor —Air
Cooled— Condensing Unit -0 -10T
#1 (Roof)
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 4 Ton HP Condensing Unit Check with appropriate customer representative
w /Compressor —Air
#1 (Roof) for operational defciencies.Check system
pressures and temperatures.Check refrigerant
Cooled— Condensing Unk -0 -10T
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 4 Ton HP Condensing Unit Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
w /Compressor —Air
Cooled— Condensing Unit -0 -10T
#1 (Roof)
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Condensing Units
Carrier 4 Ton HP Condensing Unit Check with appropriate customer representative
for operational deficiencies.Check compressor oil
w /Compressor —Air
Cooled— Condensing Unit -0 -10T
#2 (Roof)
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 4 Ton HP Condensing Unit Check with appropriate customer representative
26/4
3981 . t,,,,
Contract Tasks
Equipment
Customer Tag Task procedures
w /Compressor -Air
#2 (Roof) for operational deficiencies.Check system
pressures and temperatures. Check refrigerant
Cooled- Condensing Unit-0 -10T
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 4 Ton HP Condensing Unit Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
w /Compressor -Air
Cooled- Condensing Unit -0 -10T
#2 (Roof)
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for deficiencies.Check compressor oil
w /Compressor -Air
Cooled- Condensing Unit -0 -10T
Unit #4 (Roof) operational
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for operational deficiencies.Check system
w /Compressor -Air
Cooled- Condensing Unit-0 -10T
Unit #4 (Roof)
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections. Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
w /Compressor -Air
Unit #4 (Roof)
chemical solution.Rinse coil(s) thoroughly with
Cooled - Condensing Unit -0 -10T
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for deficiencies. Check compressor oil
w /Compressor -Air
Cooled- Condensing Unit- -0 -10T
Unit #3 (Roof) operational
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
27/4
3981 ei•
Contract Tasks
Equipment
Customer Tag Task procedures
tighten electrical connections. Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
w /Compressor —Air
Unit #3 (Root) for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
Cooled— Condensing Unit -0 -10T
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 2.5 Ton HP Condensing Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
w /Compressor —Air
Cooled— Condensing Unit -0 -10T
Unit #3 (Roof)
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #2 (Roof) Check with appropriate customer representative
for operational deficiencies.Check and tighten
Units — Cooling Only —With
Economizer -0 -15T
electrical connections.Check safeties.Check
contactor(s).Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #2 (Roof) Check with appropriate customer representative
Units -- Cooling Only —With
for operational deficiencies.Check system
temperatures and pressures.Check belt(s).Check
Economizer- -0 -15T
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommendations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
28/4
3981 ., 0j
Contract Tasks
Equipment Customer Tag Task procedures
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #2 (Roof) Check with appropriate customer representative
Units - Cooling Only -With
for operational deficiencies.Clean condensate
Economizer -0 -15T
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #2 (Roof) Check with appropriate customer representative
Units - Cooling Only -With
for operational deficiencies. Spray coil(s) with
Economizer -0 -15T
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton PAC Unit #2 (Roof) Replace air filters per agreement.
Units - Cooling Only -With
Economizer -0 -15T
Fan Coil Units -Fan Coil
Carrier 4 Ton HP FCU #1 (Ceiling) Check with appropriate customer representative
Unit - Ceiling Mounted- 0 -7.5T
for operational deficiencies. Check belt(s) (if
applicable)Check coil conditions.Check
condensate pan and drain (if accessible).Check
filter condition.Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units -Fan Coil
Carrier 4 Ton HP FCU #1 (Ceiling) Check with appropriate customer representative
Unit - Ceiling Mounted- 0 -7.5T
for operational deficiencies.Check
starter /contactor.Check and tighten electrical
connections.lnspect pilot and safeties (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible). Check safeties.Change
belt(s) (if applicable) Check valve(s).Check and
lubricate fan and motor bearings.Check for proper
fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units -Fan Coil
Carrier 4 Ton HP FCU #1 (Ceiling) Replace air filters per agreement.
Unit - Ceiling Mounted- 0 -7.5T
Fan Coil Units -Fan Coil
Carrier 4 Ton HP FCU #2 (Ceiling) Check with appropriate customer representative
Unit - Ceiling Mounted- 0 -7.5T
for operational deficiencies. Check belt(s) (if
appli cable) Check coil conditions. Check
condensate pan and drain (if accessible).Check
filter condition.Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendation s.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units -Fan Coil
Carrier 4 Ton HP FCU #2 (Ceiling) Check with appropriate customer representative
Unit- Ceilina Mounted- 0 -7.5T
for operational deficiencies. Check 29/4
3981•.,•. -A
Contract Tasks
Eauinment Customer Tag Task procedures
...... .,......y ....,.. .,... ., , .,, .
'
'
starter /contactor.Check and tighten electrical
connections.lnspect pilot and safeties (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safeties.Change
belt(s) (if applicable)Check valve(s).Check and
lubricate fan and motor bearings.Check for proper
fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units —Fan Coil
Carrier 4 Ton HP FCU #2 (Ceiling) Replace air filters per agreement.
Unit'-Ceiling Mounted- 0 -7.5T
Fan Coil Units —Fan Coil
Lennox 2.5 Ton HP FCU #3 Check with appropriate customer representative
for operational deficiencies.Check belt(s) (if
Unit — Ceiling Mounted- 0 -7.5T
(Ceiling)
applicable)Check coil conditions.Check
condensate pan and drain (if accessible).Check
filter condition.Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units -Fan Coil
Lennox 2.5 Ton HP FCU #3 Check with appropriate customer representative
for operational deficiencies. Check
Unit — Ceiling Mounted- 0 -7.5T
(Ceiling)
starter /contactor.Check and tighten electrical
connections. Inspect pilot and safeties (as
applicable). Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safeties.Change
belt(s) (if applicable)Check valve(s).Check and
lubricate fan and motor bearings.Check for proper
fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units —Fan Coil
Lennox 2.5 Ton HP FCU #3 Replace air filters per agreement.
Unit — Ceiling Mounted-- 0 -7.5T
Fan Coil Units —Fan Coil
(Ceiling)
Lennox 2.5 Ton HP FCU #4 Check with appropriate customer representative
Unit — Ceiling Mounted- 0 -7.5T
(Ceiling) for operational deficiencies.Check belt(s) (if
applicable)Check coil conditions.Check
condensate pan and drain (if accessible).Check
filter condition.Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Fan Coil Units --Fan Coil
Lennox 2.5 Ton HP FCU #4 Ch pappropriate o rrepresentative
oerat deficiencies.Check
Unit - Ceiling Mounted- 0 -7.5T
(Ceiling)
30/4
39 8 1. ,. . j
Contract Tasks
E ui ment Customer Tag Task procedures
q p
k d ti hten electrical
Fan Coil Units -Fan Coil
Unit- - Ceiling Mounted- 0 -7.5T
Fan Coil Units -Fan Coil
Unit - Ceiling Mounted- 0 -7.5T
Fan Coil Units -Fan Coil
Unit - Ceiling Mounted- 0 -7.5T
Fan Coil Units-Fan Coil
Unit - Ceiling Mounted- 0 -7.5T
Misc Mech Equip -Unit Heater -Unit
Heater -All
Lennox 2.5 Ton HP FCU #4
(Ceiling)
Lennox 2.5 Ton HP FCU #5
(Ceiling)
Lennox 2.5 Ton HP FCU #5
(Ceiling)
starter /contactor.Chec an g
connections.lnspect pilot and safeties (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safeties.Change
belt(s) (if applicable)Check valve(s).Check and
lubricate fan and motor bearings.Check for proper
fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations. Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Replace air filters per agreement.
Lennox 2.5 Ton HP FCU #5
(Ceiling)
Reznor Unit Heater #1 (Equipment
Bay)
Check with appropriate customer representative
for operational deficiencies.Check belt(s) (if
applicable)Check coil conditions.Check
condensate pan and drain (if accessible).Check
filter condition.Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check
starter /contactor.Check and tighten electrical
connections.lnspect pilot and safeties (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible). Check safeties.Change
belt(s) (if applicable)Check valve(s).Check and
lubricate fan and motor bearings.Check for proper
fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommendations, Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Replace air filters per agreement.
Check with appropriate customer representative
for operational deficiencies.Cycle thermostat and
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Misc Mech Equip -Unit Heater -Unit Reznor Unit Heater #4 (Equipment Check with appropriate representative
Heater -All Bay) operational dec enc es Cycle thermostat
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
31/4
Contract Tasks
.Equipment Customer Tag Task procedures
t' s to a ropriate customer
observa on pp
representative.
Misc Mech Equip —Unit Heater —Unit
Bay; or Unit Heater #2 (Equipment Check with appropriate representative
ope at onadec eni es.Cy le thermostat and
Heater —All
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment. Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Misc Mech Equip —Unit Heater —Unit
Bay; or Unit Heater #3 (Equipment Check e with
onalpdefc etn ies.Cycle thermostat and
Heater —All
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Misc Mech
Lennox Upflow Furnace #1 Check with appropriate customer representative
for deficiencies.Check electrical
Equip—Furnace—Furnace—All
operational
connections.Visual inspection of alignment (as
applicable).Check filter(s)Change belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Misc Mech
Lennox Upflow Furnace #1 Check with appropriate customer representative
for deficiencies.Check electrical
Equip- - Furn ace — Furnace —AII
operational
connections.Visual inspection of alignment (as
applicable).Check filter(s)Check belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Misc Mech
Lennox Upflow Furnace #1 Replace air filters per agreement.
Equip—Furnace—Furnace—All
Lennox Upflow Furnace #3 Check with appropriate customer representative
Misc Mech
for operational deficiencies.Check electrical
Equip—Furnace—Furnace—All
connections.Visual inspection of alignment (as
applicable). Check filter(s)Change belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Misc Mech
Lennox Upflow Furnace #3 Check with appropriate customer representative
for deficiencies.Check electrical
Equip—Furnace—Furnace—All
operational
connections.Visual inspection of alignment (as
applicable).Check filter(s)Check belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
32/4
Contract Tasks
Customer Tag Task procedures
Equipment
maintenance checklists, report observations to
appropriate customer representative.
Misc Mech
Equip-Furnace-Furnace-All
Misc Mech
Equip -Fu rn ace- Furnace -AII
Misc Mech
Equip-Furnace-Furnace-All
Misc Mech
Equip-Furnace-Furnace-All
Misc Mech Equip -Unit Heater -Unit
Heater-All
Misc Mech Equip-Unit Heater -Unit
Heater-All
Misc Mech Equip -Unit Heater -Unit
Heater-All
Condensers -Air
Cooled-Condenser-0-20T
Lennox Upflow Furnace #3
Lennox Upflow Furnace #2
Lennox Upflow Furnace #2
Lennox Upflow Furnace #2
Sterling Horiz. Unit Heater #1
(Equipment Bay)
Sterling Horiz. Unit Heater #3
(Equipment Bay)
Sterling Horiz. Unit Heater #2
(Equipment Bay)
Replace air filters per agreement.
Check with appropriate customer representative
for operational deficiencies.Check electrical
connections.Visual inspection of alignment (as
applicable).Check filter(s)Change belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable) .Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Check electrical
connections.Visual inspection of alignment (as
applicable).Check filter(s)Check belt(s) (as
applicable). Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Replace air filters per agreement.
Lennox 5 Ton AC Condenser Unit
#2
Check with appropriate customer representative
for operational deficiencies. Cycle thermostat and
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Check with appropriate customer representative
for operational deficiencies.Cycle thermostat and
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Check with appropriate customer representative
for operational deficiencies.Cycle thermostat and
check for proper operation.Check fan
operation.Check for unusual noise or
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.Check coil
conditions.Check starter.Check condenser fan
motor(s) and blade (s).Lubricate as
required.Check for proper fan rotation.Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
33/4
.9 81
Contract Tasks
Equipment Customer Tag Task procedures
e ui ment Complete any required maintenance
Condensers —Air Lennox 5 Ton AC Condenser Unit
Cooled — Condenser -0 -20T #2
Condensers —Air Lennox 5 Ton AC Condenser Unit
Cooled— Condenser -0 -20T #2
Condensers —Air Lennox 5 Ton AC Condenser Unit
Cooled— Condenser -0 -20T #1
Condensers —Air Lennox 5 Ton AC Condenser Unit
Cooled— Condenser -0 -20T #1
Condensers —Air Lennox 5 Ton AC Condenser Unit
Cooled — Condenser -0 -20T #1
Roof Top Units /Packaged Carrier 5 Ton G/E PAC # 1
Units —Gas Heat —With
Economizer -0 -15T
4 p
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check coil
conditions.Visually check starter.Check
condenser fan motor(s) and blade(s).Check for
proper fan rotation.Visually inspect for refrigerant
Ieaks.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.Check coil
conditions.Check starter.Check condenser fan
motor(s) and biade(s).Lubricate as
required.Check for proper fan rotation .Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies. Check coil
conditions.Visu ally check starter.Check
condenser fan motor(s) and blade(s).Check for
proper fan rotation.Visually inspect for refrigerant
Ieaks.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections.�,heck safeties.Check
contactor(s).Clean burner assembly.Check
igniter.Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation. Lubricate beadngs.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
34/4
69 8 1 1#
Contract Tasks
Equipment Customer Tag Task procedures
Re ort re commendations. Check overall
wea, . p
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC # 1
Check with appropriate customer representative
for operational deficiencies.Check system
Heat—With
Units —Gas H eat—
temperatures and pressures.Check belt(s).Check
Economizer
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment. Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units/Packaged
Carrier 5 Ton G/E PAC # 1
Check with appropriate customer representative
for operational deficiencies.Clean condensate
eat —With
Units —Gas H eat—
drain if necessary.Spray coil(s) with chemical
Economizer
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC # 1
Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
Heat—With
Units —Gas H eat—
chemical solution.Rinse coil(s) thoroughly with
Economizer-0-1
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC # 1
Perform combustion analysis procedures.
Units —Gas Heat —With
Economizer -0 -15T
Carrier 5 Ton G/E PAC#1
Replace air filters per agreement.
Roof Top Units/Packaged
Units —Gas Heat- -With
Economizer -0 -15T
Rheem 5 Ton G/E PAC # 1
Check
Roof Top Units /Packaged
o erationaldef c envies Check and tighten
Units —Gas Heat —With
electrical connections.Check safeties.Check
Economizer--0 -15T
contactor(s).Clean burner assembly.Check
igniter.Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan ope ration. Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment. Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Roof Top Units /Packaged
Rheem 5 Ton G/E PAC # 1
fr iappropriate ito r representative
o operational deficiencies. Check system
Heat —Wth
temperatures and pressures.Check belt(s).Check
Economiz er -0 -15T
35/4
39 81 • ,.A
Contract Tasks
Equipment Customer Tag Task procedures
k flt condition Check
Roof Top Units /Packaged Rheem 5 Ton G/E PAC # 1
Units —Gas Heat —With
Economizer -0 -15T
Roof Top Units /Packaged Rheem 5 Ton G/E PAC # 1
Units —Gas Heat —With
Economizer -0 -15T
Roof Top Units /Packaged Rheem 5 Ton G/E PAC # 1
Units —Gas Heat —With
Economizer -0 -15T
Roof Top Units /Packaged Rheem 5 Ton G/E PAC # 1
Units —Gas Heat —With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 5 Ton G/E PAC # 2
Units —Gas Heat —With
Economizer -0 -15T
Roof Top Units /Packaged Carrier 5 Ton G/E PAC # 2
Units —Gas Heat —With
Economizer -0 -15T
coil conddrons.Chec i er
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Check with appropriate customer representative
for operational deficiencies.Clean condensate
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Perform combustion analysis procedures.
Replace air filters per agreement.
Check with appropriate customer representative
for operational deficiencies.Check and tighten
electrical connections. Check safeties.Check
contactor(s).Clean burner assembly.Check
igniter.Change belt(s).Check coil
conditions.Check filter condition.Visually inspect
damper(s). Lubricate as required.Check for
proper fan operation.Lubricate bearings.Check
condenser fan motors and blades.Check for
visible refrigerant Ieaks.Clean condensate pan
and drain.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check system
temperatures and pressures.Check belt(s).Check
coil conditions.Check filter condition.Check
economizer (if applicable)Check for proper fan
operation.Check condenser fan motors and
blades.Check for visible refrigerant Ieaks.Check
condensate drain.Check for unusual noises,
vibration and wear. Report
recommend ations.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
36/4
391 •.:.�
Contract Tasks
Equipment
Customer Tag
Task procedures
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC # 2
Check with appropriate customer representative
for operational deficiencies.Clean condensate
Units -Gas Heat -With
drain if necessary.Spray coil(s) with chemical
Economizer -0 -15T
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC # 2
Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
Units-Gas Heat -With
chemical solution.Rinse coil(s) thoroughly with
Economizer-0-15T
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC # 2
Perform combustion analysis procedures.
Units -Gas Heat -With
Economizer -0 -15T
Roof Top Units /Packaged
Carrier 5 Ton G/E PAC#2
Replace air filters per agreement.
Units -Gas Heat -With
Economizer -0 -15T
Standard 10 Ton DX Chiller Barrel
Check with appropriate customer representative
Refrigeration
for operational deficiencies.Check and tighten
Equipment - Compressor - Compress
electrical connections.Check refrigerant
or-All
charge.Check crankcase heater.Clean area
around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Refrigeration
Standard 10 Ton DX Chiller Barrel
Check with appropriate customer representative
for operational deficiencies.Check
Equipment - Compressor - Compress
condenser.Check pressures.Check refrigerant
or-All
charge.Check crankcase heater.Clean area
around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 10 Ton Condensing Unit
Check with appropriate customer representative
for deficiencies.Check compressor oil
w /Compressor -Air
Cooled- Condensing Unit--0 -10T
operational
level(s),Inspect starter.Check crankcase
heater.Conduct refrigerant leak test.Check and
tighten electrical connections.Check
safeties.Check operating controls.Check
contactor(s).Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Condensing Units
Carrier 10 Ton Condensing Unit
Check with appropriate customer representative
for deficiencies.Check system
w /Compressor -Air
operational
pressures and temperatu res. Check refrigerant
Cooled- Condensing Unit -0 -10T
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections. Check condition of condenser
coits.Check condenser fan blades and
37/4
Contract Tasks
Equipment customer Tag Task procedures
o r
to s Check for proper condenser fan
Condensing Units Carrier 10 Ton Condensing Unit
w /Com press or-Air
Cooled- Condensing Unit -0 -10T
Pumps- Pump-Chilled Chilled Water Pump
Water -<10HP
Pumps - Pump - Chilled Chilled Water Pump
Water -<10HP
Controls - DDC-Digital Chiller Control System
Thermostat - Digital Thermostat -All
Air Handling Units -Mixed Roof Mounted CHW AHU #1
Air - Constant Volume - <10HP
Air Handling Units -Mixed Roof Mounted CHW AHU #1
Air - Constant Volume -<10HP
39 8 1 • 4i *A
m.
rotation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.S pray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Check with appropriate customer representative
for operational deficiencies.Check amperage
draw.Check for Ieaks.Check
starter/contactor-Check and tighten electrical
connections.Check coupling.Lubricate
bearing(s).Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer representati
Check with appropriate customer representative
for operational deficiencies.Check for
Ieaks.Check pressures.Visually inspect
coupling.Check for unusual noise and
vibration.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Check in with appropriate customer
representative for operational deficiences.Inspect
for proper operation.Check program (if
programmable thermostat). Report any
discrepencies to the customer.
Check with appropriate customer representative
for operational deficiencies.Check belt(s).Check
coil conditions.Check condensate pan and drain
(if accessible).Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check
starter /contactor.Check and tighten electrical
connections.lnspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible). Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
38/4
3981.,,,
Contract Tasks
Equipment
Customer Tag Task procedures
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units -Mixed
Roof Mounted CHW AHU #1 Check with appropriate customer representative
for operational deficiencies.Clean condensate
Air - Constant Volume -<10HP
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units -Mixed
Roof Mounted CHW AHU #1 Replace air filters per agreement.
Air - Constant Volume -<10HP
Air Handling Units-Mixed
Roof Mounted CHW AHU #2 Check with appropriate customer representative
for deficiencies.Check belt(s).Check
Air-Constant Volume -<10HP
operational
coil conditions.Check condensate pan and drain
(if accessible).Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units -Mixed
Roof Mounted CHW AHU #2 Check with appropriate customer representative
for operational deficiencies.0 heck
Air- Constant Volume -<10HP
starter /contactor.Check and tighten electrical
connections. Inspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recommend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units -Mixed
Roof Mounted CHW AHU #2 Check with appropriate customer representative
for operational deficiencies.Clean condensate
Air -- Constant Volume -<10HP
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units -Mixed
Roof Mounted CHW AHU #2 Replace air filters per agreement.
Air - Constant Volume -<10HP
Air Handling Units -Mixed
Roof Mounted CHW AHU #3 Check with appropriate customer representative
deficiencies.Check belt(s).Check
Air - Constant Volume - <10HP
for operational
coil conditions.Check condensate pan and drain
(if accessible).Check filter condition.Visually
inspect damper(s).Check for proper fan
operation.Check for unusual noises, vibration and
^
39/4
3981 ..1-0 A
Contract Tasks
Equipment Customer Tag Task procedures
wear. Report recommendations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed
Roof Mounted CHW AHU #3 Check with appropriate customer representative
for operational deficiencies.Check
Air — Constant Volume —<10HP
starter /contactor-Check and tighten electrical
connections. Inspect pilot and safeties (as
applicable).Check flame quality (as
applicable).Check coil conditions.Check filter
condition.Check and clean condensate pan and
drain (if accessible).Check safety control
setpoints.Check damper operation and lubricate
as required.Change belt(s).Check valve(s).Check
and lubricate fan and motor bearings.Check for
proper fan rotation.Check condition of blower
assembly.Check for unusual noises, vibration and
wear. Report recom mend ations.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Air Handling Units —Mixed
Roof Mounted CHW AHU #3 Check with appropriate customer representative
for operational defrciencies.Clean condensate
Air — Constant Volume —<10HP
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Air Handling Units —Mixed
Roof Mounted CHW AHU #3 Replace air filters per agreement.
Air — Constant Volume — <1 0HP
Heat Pumps —Air Cooled —Heat
Rooftop Packaged Heat Pump Check with appropriate customer representative
for deficiencies.Check system
Pump- 0 -7.5T
Unit #1 operational
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check bakup
heat.Check defrost controls.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps —Air Cooled —Heat
Rooftop Packaged Heat Pump Ch operational c h appropriate
enc es Check system representative
Pump- 0 -7.5T
Unit #1
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check condition of
condenser coils.Check operation of reversing
_. 40/4
Contract Tasks
Equipment Customer Tag Task procedures
Ch k condenser fan blades and
valve. ec c
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps —Air Cooled —Heat
Rooftop Packaged Heat Pump Check
for operational ppdefc eteciestomer representative
Pump-0-7.5T
Unit #1
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps --Air Cooled—Heat
Rooftop Packaged Heat Pump Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
Pump-0 -7.5T
Unit #1
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps --Air Cooled —Heat
Rooftop Packaged Heat Pump Replace air filters per agreement.
Pump- 0 -7.5T
Heat Pumps —Air Cooled —Heat
Unit #1
Rooftop Packaged Heat Pump Check with appropriate customer representative
for deficiencies.Check system
Pump-0 -7.5T
Unit #2 operational
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections. Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check bakup
heat.Check defrost controls.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps —Air Cooled —Heat
Rooftop Packaged Heat Pump Check with appropriate customer representative
for operational deficiencies.Check system
Pump- 0 -7.5T
Unit #2
pressures and temperatures. Check refrigerant
charge.Check compressor oil Ievel(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil leaks.Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
41/4
j�'OV1 •.j.0,A%
Contract Tasks
Equipment customer Tag Task procedures
t ante checklists report observations to
main en
appropriate customer representative.
Heat Pumps -Air Cooled -Heat
Rooftop Packaged Heat Pump Check customer
for operational r deri encies C can representative
Pump- 0 -7.5T
Unit #2
drain if necessary.Spray coit(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment. Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps -Air Cooled -Heat
Rooftop Packaged Heat Pump Check operational with apropt customer representative
for deer es coil(s)
Pump-0-7.5T
Unit #2
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps -Air Cooled -Heat
Rooftop Packaged Heat Pump Replace air filters per agreement.
Pump- 0 -7.5T
Heat Pumps -Air Cooled -Heat
Unit #2
Carrier 5 Ton Packaged Heat Check with appropriate customer representative
for operational deficiencies.Check system
Pump- 0 -7.5T
Pump Unit pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check bakup
heat.Check defrost controls.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment.Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps -Air Cooled -Heat
Carrier 5 Ton Packaged Heat Check with appropriate customer representative
for operational deficiencies.Check system
Pump- 0 -7.5T
Pump Unit
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil teaks.Check condition of
condenser coits.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps -Air Cooled -Heat
Carrier 5 Ton Packaged Heat Check with appropriate customer representative
for deficiencies.Clean condensate
Pump- 0 -7.5T
Pump Unit operational
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
42/4
Contract Tasks
Equipment Customer Tag Task procedures
h klists re ort observations to
Heat Pumps -Air Cooled-Heat
Pump- 0 -7.5T
Heat Pumps -Air Cooled-Heat
Pump- 0 -7.5T
Split Systems -Split System-Split
System--0 -15T
Split Systems -Split System -Split
System -0 -15T
Split Systems -Split System -Split
System -0 -15T
Split Systems -Split System -Split
System-0 -15T
Split Systems -Split System -Split
System -0 -15T
Carrier 5 Ton Packaged Heat
Pump Unit
Carrier 5 Ton Packaged Heat
Pump Unit
Mitsubishi 4 ton Split System Heat
Pump #1
Mitsubishi 4 ton Split System Heat
Pump #1
maintenance c ec , p
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Replace air filters per agreement.
Mitsubishi 4 ton Split System Heat
Pump #1
Mitsubishi 4 ton Split System Heat
Pump #1
Mitsubishi 4 ton Split System Heat
Pump #2
Check with appropriate customer representative
for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessibte).Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies.Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Replace air filters per agreement.
Check with appropriate customer representative
for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
43/4
S�j 81 - 94
Contract Tasks
Equipment Customer Tag Task procedures
k
',---e heater Visually inspect
Split Systems —Split System —Split
System-0 -15T
Split Systems —Split System —Split
System-0 -15T
Split Systems —Split System- -Split
System -0 -15T
Split Systems —Split System —Split
System -0 -15T
Split Systems —Split System —Split
System -0 -15T
Mitsubishi 4 ton Split System Heat
Pump #2
Mitsubishi 4 ton Split System Heat
Pump #2
Mitsubishi 4 ton Split System Heat
Pump #2
Mitsubishi 4 ton Split System Heat
Pump #3
starter.Chec cran
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Check with appropriate customer representative
for operational deficiencies. Spray coil(s) with
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Mitsubishi 4 ton Split System Heat
Pump #3
Replace air filters per agreement.
Check with appropriate customer representative
for operational deficiencies.Check system
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections.Check condition of
condenser coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check filter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check for
unusual noise and vibration.Check overall
condition of unit.Clean area around
equipment.Complete any required maintenance
checklists, report observations to appropriate
customer representative.
Check with appropriate customer representative
for operational deficiencies. Check system
44/4
3ti 81 • , .
Contract Tasks
Equipment Customer Tag Task procedures
and tem eratures Check refrigerant
pressures p
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check electrical
connections.Check condition of condenser
coils.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check filter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equip ment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Split Systems —Split System —Split
Mitsubishi 4 ton Split System Heat for opera a ith appdefic etnciestomer coils) w thive
System-0 -15T
Pump #3 chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Split Systems —Split System--Split
Mitsubishi 4 ton Split System Heat Replace air filters per agreement.
System -0 -15T
Heat Pumps —Air Cooled —Heat
Pump #3
Carrier 5 Ton Split System Heat Check with appropriate customer representative
for deffciencies.Check system
Pump-0 -7.5T
Pump Unit operational
pressures and temperatures.Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check and tighten
electrical connections. Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Change belt(s).Check fflter(s).Check for
proper fan operation. Lubricate as required.Clean
condensate drain (if accessible).Check bakup
heat.Check defrost controls.Check for unusual
noise and vibration.Check overall condition of
unit.Clean area around equipment-Complete any
required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps —Air Cooled —Heat
Carrier 5 Ton Split System Heat Check with appropriate customer representative
for operational defciencies.Check system
Pump- 0 -7.5T
Pump Unit pressures and temperatures. Check refrigerant
charge.Check compressor oil level(s),Inspect
starter.Check crankcase heater.Visually inspect
for refrigerant and oil Ieaks.Check condition of
condenser coils.Check operation of reversing
valve.Check condenser fan blades and
motors.Check for proper condenser fan
rotation.Check condition of evaporator
coils.Check belt(s).Check fflter(s).Check for
proper fan operation.Check for unusual noise and
vibration.Check overall condition of unit.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
45/4
Contract Tasks
Equipment Customer Tag Task procedures
Ch ck with appropriate customer representative
Heat Pumps -Air Cooled -Heat
Carrier 5 Ton Split System Heat for operational deficiencies.Clean condensate
Pump- 0 -7.5T
Pump Unit
drain if necessary.Spray coil(s) with chemical
solution.Rinse coil(s) thoroughly with water.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Heat Pumps -Air Cooled -Heat
Carrier 5 Ton Split System Heat for operational l appropriate rve
ri enc essomer core with
Pump- 0 -7.5T
Pump Unit
chemical solution.Rinse coil(s) thoroughly with
water.Clean area around equipment.Complete
any required maintenance checklists, report
observations to appropriate customer
representative.
Heat Pumps -Air Cooled -Heat
Carrier 5 Ton Split System Heat Replace air filters per agreement.
Pump- 0 -7.5T
Mech
Pump Unit
pdefic etnc es.Check electrical five
Hayes Furnace &Built Up AH Check
Misc
Equip-Furnace-Furnace-All
operational
connections.Visual inspection of alignment (as
applicable).Check filter(s)Change belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Misc Mech
Hayes Furnace &Built Up AH Check with appropriate customer representative
deficiencies.Check electrical
Equip- Furnace- Furnace -AII
for operational
connections.Visual inspection of alignment (as
applicable).Check filter(s)Check belt(s) (as
applicable).Check drive condition.Check fan
condition.Check flame quality (as
applicable).Check for proper fan rotation.Clean
area around equipment.Complete any required
maintenance checklists, report observations to
appropriate customer representative.
Hayes Furnace & Built Up AH Replace air filters per agreement.
Misc Mech
Equip -F u rn ace- Furnace -AII
46/4
Equipment List by Building
$16,940 annual;
111 411 month; $
1, .
City of El Segundo Library Building $ $ --
111 Mariposa Ave.
El Segundo, CA 90245 $, $7 , 500.00 additional costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
1. Trane Multizone Air Handling Unit
2. Variable Speed Drive
3. Trane 50 ton W/C Chiller
4. Frigid Coil 60 ton Evaporative Condenser / Cooling Tower
5. Packaged Water Source Heat Pump
6. Cleaver Brooks Hot Water Boiler
7. (7) HW, CHW. CW, Pumps
8. Quincy Air Compressor & Air Dryer
El Segundo City Hall $ $1,215.25 month; $ $14 , 583.00 annual;
350 Main St.
El Segundo, CA 90245 $ W-150 additional costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
1. Carrier 5 Ton VVT split system (East Lower Level)
2. Mitsubishi 4 Ton split system (computer room E.L.L.)
3. Lennox 5 Ton split system Heat Pump (West Lower Level)
4. Carrier 8Ton Gas /Electric Packaged unit (Council Chamber)
5. Carrier 7.5 Ton Packaged A/C unit (1st. floor Comp. room)
6. MZ -2 Energy Labs 40 Ton M/Z unit
7. MZ -3 Energy Labs 25 Ton M/Z unit
El Segundo Police Department
348 Main St.
El Segundo, CA 90245
$$911.25 month; $ $10,935.00 annual;
1006,00
$ ! }.�, -:-90 additional costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
1. Trane 30 Ton Air Cooled Chiller
2. Larrs Hot Water Boiler
3. (3) CHW Air Handlers
12
� 81
4. Return Air Fan
5. (2) Variable Speed Drives
6. (2) CHW Pumps
7. (2) HW Pumps
8. Carrier 10 Ton PAC
9. Carrier 6 Ton PAC
10. Carrier 5 Ton PAC
11. Carrier 20 Ton Cond Unit (Basement)
12. York MZ Air Handler and RA Fan (Basement)
El Segundo Fire Station # i $_$385 00 month; $$4,620_nn annual;
314 Main St.
El Segundo, CA 90245 $ $9,985.00 additional costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
1. (2) Carrier 5 Ton PAC (Roof)
2. (1) Carrier 4 Ton PAC (Roof)
3. (2) Carrier 4 Ton HP Cond. Units (Roof)
4. (3) Carrier 2.5 Ton HP Cond. Units (Roof)
5. (2) Carrier 4 Ton HP Fan coils (Ceiling)
6. (3) Lennox 2.5 Ton HP Fan coils (Ceiling)
7. (4) Reznor) Unit Heaters (Equip. Bay)
El Segundo Maintenance Facilities $ :g 79.00 month; $$1 A _nn, annual;
150 Illinois St.
El Segundo, CA $ $0.00 additional costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
1. (2) Lennox 5 Ton Cond. Units
2. (3) Lennox Upflow Furnaces
3. (3) Sterling Horz. Unit Heaters (Equip. Bay)
Joslyn Senior Center $192.50 month; $ $2,310.OQannual;
339 Sheldon St.
El Segundo, CA $ $15,000.00additiona{ costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
13
1. (2) Carrier 5 Ton G/E PAC
2. Rheem 5 Ton G/E PAC
Geo. E. Gordon Community Clubhouse $ $642.00 month;
300 E Pine Ave
j.78 1 • •i• -4
$ $7,704.00 annual;
El Segundo, CA $ $21.198.00 additional costs required to bring
systems up to standard. If additional costs are
necessary you must provide a separate detailed
proposal for any additional repairs.
1. Carrier 10 Ton Condensing Unit
2. Standard 10 Ton DX Chiller Barrel
3. Chilled Water Pump
4. Chiller Control System
5. (3) Roof Mounted CHW Air Handlers
6. (2) Rooftop Packaged Heat Pump Units
7. Carrier 5 Ton Packaged Heat Pump.
8. (3) Mitsubishi 4 Ton split system Heat Pumps
9. Carrier 5 Ton split system Heat Pump
10. Hayes Furnace and Built -Up Air Handier
Note: All building systems related to the above listed equipment there peripheral
components and equipment are part of this contract, with the exception of the Chilled Wate
Piping at the Clubhouse.
Section II - Cost Proposal.
Except as otherwise provided, price proposals must remain consistent through the term of thi.
contract.
1 st. Year $58,640,Q0
2 "d. Year
3`d. Year $62 212.00
Optional Additional (3) Three Years
4th. Year $64,000...00
5th Year $66,000.00
6th. Year $68,000-00
14
3198 1.
Cost of additional service, not part of the contract:
Hourly rate for additional work $ $109.00 hr
I have, read, understood, and agree to the terms and conditions on all pages of this proposal
The undersigned agrees to furnish the commodity or service stipulated on this proposal a:
stated above.
Company Name:
By (Print name & title):
Johnson Controls Inc.
Scott ker METRO Manager
Company Street Address:
S' ature :,
19393 Slauson Ay?,
City, State, Zip:
Date:
Whittier, CA 90606
July 29th, 2009
Phone:
FAX:
_
562 464 -3270
Email:
Web site:
Ja son.D. tevenson JCI -com
rn-
Terms:
Delivery:
__D 21., o days, net IQ-days
60 days ARO
lD-
39 8 1 • 0 a
CITY OF EL SEGUNDO
RFP #09-13 E "
HVAC Maintenance for City Buildings
Alternative Proposals (Section 11)
Library BUildin9
RP air Broken OA Damper $7,500
gly Hall
pie: 7 IJ& to bU ' 000
i-r - V La,w4aw -
Police Department
AC #2 Condenser Coil Replacement $7,000
Fire Station #1
Joslyn Senior Center_
Replace Rheem AC unit $$15,000
Community Center
Replace Mitsubishi Mini Split AC unit S 15,000