Loading...
CONTRACT 3806 Professional Services Agreement CLOSEDAgreement No3 8 0 6 � •_� CONTRACT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF EL SEGUNDO AND RBF CONSULTING This AGREEMENT is entered into this 1st day of January, 2008, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ( "CITY ") and RBF Consulting, a California corporation ( "CONSULTANT "). 1. CONSIDERATION. A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below; B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement; C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed seventy three thousand seven hundred fifty dollars ($73,750) for CONSULTANT's services. CITY may modify this amount as set forth below. Unless otherwise specified by written amendment to this Agreement, CITY will pay this sum as specified in the attached Exhibit "A," which is incorporated by reference. 2. SCOPE OF SERVICES. A. CONSULTANT will perform services listed in the attached Exhibit `B," which is incorporated herein. B. CONSULTANT will, in accordance with generally accepted professional standards of care, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement. 3. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit "A ") the tasks performed, the percentage of the task completed during the billing period, the cumulative percentage completed for each task, the total cost of that work during the preceding Page 1 of 11 3806. , billing month and a cumulative cash flow curve showing projected and actual expenditures versus time to date. 4. POLITICAL REFORM ACT. CONSULTANT agrees that it will be considered a public official subject to the Political Reform Act of 1974 for purposes of this Agreement. CONSULTANT agrees and warrants that it has no financial interests which may be materially affected by the project for which the Initial Study, as specified in the SERVICES, is being prepared. Such financial interests may include, without limitation, interests in business entities, real property, or sources of income exceeding $500 received within the past year. CONSULTANT further warrants that, before executing this Agreement, it reviewed the Political Reform Act of 1974 and the Fair Political Practices Commission regulations, including, without limitation, Chapter 7 of Title 2 of the California Administrative Code, Section 18700, et seq., in order to determine whether any conflict of interest would require CONSULTANT to refrain from performing the SERVICES or in any way attempting to use its official position to influence the governmental decisions underlying the subject environmental clearances. 5. FAMILIARITY WITH WORK. A. By executing this Agreement, CONSULTANT represents that CONSULTANT has i. Thoroughly investigated and considered the scope of services to be performed; ii. Carefully considered how the services should be performed; and iii. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONSULTANT represents that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONSULTANT discover any latent or unknown conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT's own risk until written instructions are received from CITY. C. Although CITY has a duty to the public to independently review any environmental document, including, without limitation a negative declaration or draft EIR, prepared by CONSULTANT, that duty to the public, or the breach thereof, will not relieve CONSULTANT of its duties under this Section or any representation provided by CONSULTANT in this Agreement. 6. KEY PERSONNEL. A. CONSULTANT's key personnel assigned to perform work under this Agreement Page 2 of 11 3806... and their level of responsibility are as follows: Ms. Collette Morse, AICP Environmental Analysis/Project Management Ms. Stephanie Melton, REA Environmental Analysis Mr. Eddie Torres, INCE Air Quality/Noise Analysis Ms. Serine Ciandella, AICP, Kimley Traffic Analysis Horn And Associates B. The resume of each of the individuals identified in this Section are attached to this Agreement, collectively, as Exhibit "C," and incorporated by reference. C. In the event CITY objects to the continued involvement with this Agreement by any of the persons listed in this Section, CONSULTANT agrees that it will replace such persons with individuals that are agreed to by CITY. 7. TERM. The term of this Agreement will be from January 15, 2008, to September 30, 2008. Unless otherwise determined by written amendment between the parties, this Agreement will terminate in the following instances: A. Completion of the work specified in Exhibit `B "; B. Termination as stated in Section 15. 8. TIME FOR PERFORMANCE. CONSULTANT will not perform any work under this Agreement until: A. CONSULTANT furnishes proof of insurance as required by this Agreement; and B. CITY gives CONSULTANT a written Notice to Proceed. C. Should CONSULTANT begin work on any phase in advance of receiving written authorization to proceed, any such professional services are at CONSULTANT's own risk. 9. TIME EXTENSIONS. Should CONSULTANT be delayed by causes beyond CONSULTANT's control, CITY may grant a time extension for the completion of the contracted services. If delay occurs, CONSULTANT must notify CITY within forty -eight hours (48 hours), in writing, of the cause and the extent of the delay and how such delay interferes with the Agreement's schedule. CITY may, but is not required to, extend the completion time, when appropriate, for the completion of the contracted services. 10. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, Page 3 of 11 3606•.,j executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties. 11. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number. 12. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement. 13. PROJECT COORDINATION AND SUPERVISION. A. Collette Morse will be assigned as Project Manager and will be responsible for job performance, negotiations, contractual matters, and coordination with CITY's Project Manager. B. Kimberly Christensen will be assigned as CITY's Project Manager and will be personally in charge of and personally supervise or perform the technical execution of the Project on a day -to -day basis on behalf of CITY and will maintain direct communication with CONSULTANT's Project Manager. 14. WAIVER. CITY's review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT's performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character. 15. TERMINATION. A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination will be in writing. B. CONSULTANT may terminate this Agreement at any time with CITY's mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date. C. Should termination occur, all finished or unfinished documents, data, studies, surveys, drawings, maps, reports and other materials prepared by CONSULTANT will, at CITY's option, become CITY's property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination, not to exceed the total costs under Section 1(C). D. Should the Agreement be terminated pursuant to this Section, CITY may procure Page 4 of 11 06 on its own terms services similar to those terminated. E. By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 16. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT under this Agreement are CITY's property. CONSULTANT may retain copies of said documents and materials as desired, but will deliver all original materials to CITY upon CITY's written notice. CITY agrees that use of CONSULTANT's completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY's own risk. 17. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or city without CITY's prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties. 18. INDEMNIFICATION. A. CONSULTANT agrees to the following: i. Indemnification for Professional Services. CONSULTANT will save harmless and indemnify, including, without limitation, CITY's defense costs (including reasonable attorney's fees), from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, any injuries or damages sustained by any person or property resulting or arising from any negligent or wrongful act, error or omission by CONSULTANT or any of CONSULTANT's officers, agents, employees, or representatives, in the performance of this Agreement. ii. Indemnification for other than Professional Services. CONSULTANT indemnifies and holds CITY harmless from and against any claim, action, damages, costs (including, without limitation, reasonable attorney's fees), injuries, or liability, arising out of this Agreement, or its performance. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONSULTANT will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise. Page 5 of 11 �3 0 6 • . . . Exclusion for CEQA Actions. Notwithstanding the foregoing, CONSULTANT need not indemnify, defend, or hold CITY harmless in CEQA actions initiated pursuant to Public Resources Code §§ 21167 and 21168 where CONSULTANT's work may form the basis of a lawsuit. However, should CONSULTANT's work, as contemplated by this Agreement, contain errors or omissions that results in an adverse ruling against CITY, CONSULTANT agrees to indemnify and hold CITY harmless to the extent provided for in Section 18(A)(i). B. For purposes of this section "CITY" includes CITY's officers, officials and employees, C. It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement. D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 22, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification. 19. ASSIGNABILITY. This Agreement is for CONSULTANT's professional services. CONSULTANT's attempts to assign the benefits or burdens of this Agreement without CITY's written approval are prohibited and will be null and void. 20. INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only. 21. AUDIT OF RECORDS. A. CONSULTANT agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement. CONSULTANT agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement. CONSULTANT Page 6 of 11 3606• further agrees to maintain such records for a period of three (3) years following final payment under this Agreement. B. Upon inspection, CONSULTANT will promptly implement any corrective measures required by CITY regarding the requirements of this Section. CONSULTANT will be given a reasonable amount of time to implement said corrective measures. Failure of CONSULTANT to implement required corrective measures will result in immediate termination of this Agreement. C. CONSULTANT will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement. 22. INSURANCE. A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Tvne of Insurance Limits (combined single Commercial general liability: $1,000,000 Professional Liability $1,000,000 Business automobile liability $1,000,000 Workers compensation Statutory requirement. B. Commercial general liability insurance will meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Commercial General Liability policy will be endorsed to name City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 1185 or 88. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to City. C. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 0106 92, including symbol 1 (Any Auto). D. Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to maintain the insurance in effect for a period of three (3) years after this Agreement expires or is terminated ( "extended insurance "). Such extended insurance will have the same Page 7 of 11 0 6 a coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by City arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. E. CONSULTANT will furnish to City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by City from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." F. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, City may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate. 23. USE OF CONSULTANT. CONSULTANT must obtain CITY's prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation. 24. INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the status on the project, which will include a schedule update and a short narrative description of progress during the past month for each major task, a description of the work remaining and a description of the work to be done before the next schedule update. 25. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: CITY Kimberly Christensen, Planning Manager City of El Segundo Planning & Bldg Dept 350 Main Street El Segundo, CA 90245 -3813 Fax: (310) 322 -4167 CONSULTANT Collette Morse, Senior Associate RBF Consulting 14725 Alton Parkway Irvine, CA 92618 -2027 Fax: (949) 472 -8373 Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 26. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT's bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT's bona fide employee, any fee, Page 8 of 11 3806. commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability. 27. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT's or CITY's obligations under this Agreement. 28. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County or in the Federal District Court in the District of California in which Los Angeles County is located. 29. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. There are three (3) Attachments to this Agreement. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns. 30. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below: A. Exhibit A: Scope of Work; B. Exhibit B: Budget; and C. Exhibit C: Proposal for Services. 31. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party. 32. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 33. AUTHORITY /MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. CITY's city manager, or designee, may execute any such amendment on behalf of CITY. Page 9 of 11 3806 • ,, 6 34. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Agreement, agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 35. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 36. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 37. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' control, then the Agreement will immediately terminate without obligation of either party to the other. 38. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided, subject to adherence to sound professional practices and procedures. 39. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency. [Signatures on next page] Page 10 of 11 3606 • ... IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUND O Jeff Stewart, City Manager ATTEST: Cindy Mortesen, City Clerk APPROVED MARK D. H a By: Kar ` . B ger, Assistant ity Attorney RBF Consulting Gary tron Senior 4Pre Michael J. Burke Executive Vice President Taxpayer ID No. 95- 2247293 P:\Planning & Building Safety \Consultant Ping Services\Environmental Consultants\RBF\Aloft\ 2008.01.15.Prof Svcs Agmnt — Environmental Review — PBS.RBF.Aloft.doc Page 11 of 11 3606. Exhibit A Budget W CQ L N W I- W CD D m 3806- N O O. 6'6 C tm 0-0 a� d— `m N O N 0 N w N C E 3 d ca N C 8 _O 7 C N ` m G N O d 01 d E j N N O O � N N E Q N N U 7 N m a O Y C N m E O y O N N L E 'C o r a 2 2 � I u0i I I � � Q .O a o � � N L N N L co y CL W c c4 y W LL a o x if c coy c m o� a c 43 ca II c N E 0 3 U Y y N 3 � N d > � z v U 3606•,.. Exhibit B Scope Of Work PROPOSAL FOR CONSULTING SERVICES MITIGATED NEGATIVE DECLARATION FOR ALOFT HOTEL - EA 773 /CUP 07 -7 101 CONTINENTAL BOULEVARD Submitted to: City of El Segundo 350 Main Street El Segundo, California 90245 Submitted by: WF CONSULTING In Association with: Kimley -Horn and Associates January 14, 2008 70nr, -4 Aloft Hotel Project Environmental Clearance Document TABLE OF CONTENTS I. PROJECT UNDERSTANDING AND APPROACH ............................ ..............................1 II. SCOPE OF WORK ......................................................................... ..............................2 Task1.0 Technical Studies ....................................................... ............................... 2 Task 2.0 Develop Project Description ....................................... ............................... 7 Task 3.0 Preparation of Initial Study /Environmental Checklist ... ..............................7 Task 4.0 Administrative Draft Initial Study ................................. ............................... 8 Task5.0 Draft Initial Study ........................................................ ............................... 9 Task6.0 Final Initial Study ......................................................... ..............................9 Task7.0 CEQA Notices .............................................................. ..............................9 Task 8.0 Mitigation Monitoring Program .................................... .............................10 Task 9.0 Meetings and Public Hearings .................................... .............................10 Task 10.0 Project Management/Coordination ............................. .............................10 Task 11.0 Environmental Impact Report (Optional Task) ............ .............................11 Task 12.0 Comments and Responses (Optional Task) ............... .............................11 III. BUDGET ESTIMATE ........................................................................ .............................12 IV. PROJECT SCHEDULE ..................................................................... .............................15 Proposal to City of El Segundo i • 3606 Aloft Hotel Project Environmental Clearance Document I. PROJECT UNDERSTANDING AND APPROACH The City of El Segundo is seeking to retain an environmental and traffic consultant team to prepare an environmental clearance document (Mitigated Negative Declaration) for the proposed Aloft Hotel located at 101 Continental Boulevard. The project proposes development of an approximately 61,104 square foot, six -story hotel on a 10.58 -acre site. The hotel is proposed to consist of 167 rooms, a 566- square foot conference room, a 700 - square foot caf6, and a 1,059- square foot bar area. The hotel is also proposed to include a pool and fitness area. Currently, the property consists of an asphalt parking lot and a Xerox office building is located on the southeast portion of the parcel. The following scope of work reflects the work program for the RBF Consulting (RBF) Team to prepare the environmental document for the proposed project. RBF has assumed that a Mitigated Negative Declaration would be necessary, but the outcomes of some of the technical reports could necessitate the preparation of an EIR, which would require a separate scope of work. RBF is assuming that the site plans, floor plans and other illustrations, as well as technical studies generated by the commercial developerwould be available in electronic form and forwarded to RBF for use in the environmental document. Proposal to City of El Segundo 3806 Aloft Hotel Project Environmental Clearance Document II. SCOPE OF WORK Assumptions The RBF Team has assumed that no modifications to the project description would occur after the development of the project description as part of Task 2.0. Any modifications to the project description after it has been approved by City Staff would constitute a change in the work program, and would require a modification to the scope and fee. Any modifications to the work program would be performed on a time and materials basis as extras to the contract. Task 1.0 Technical Studies A number of plans or studies will need to be prepared for the proposed project. RBF is assuming that the developer will provide the following plans or studies: • Site Plan (electronic file) • Grading Plan (electronic file) • Lighting Plan, if deemed necessary by the City • Photometric Analysis of Lighting Plan, if deemed necessary by the City • Landscape Plan • Water Quality Management Plan • Hydrology and Drainage Analysis, if deemed necessary by the City • Water Quality Management Report, if deemed necessary by the City • Geology and Soils Analysis, if deemed necessary by the City In addition, the following technical studies will be prepared for the proposed project: Traffic Air Quality Noise 1.1 Traffic Kimley -Horn and Associates (K -H) will prepare the traffic study for the proposed project. The Traffic Study will address the traffic - related impacts of the proposed Aloft Hotel in the City of El Segundo. The study will address the following conditions: • Existing Conditions • Opening Year Without and With Project The study will evaluate project impacts during the morning and evening peak hours on a typical weekday at up to 12 area intersections, to be agreed upon with City Staff. Proposal to City of El Segundo 2 ' ' 3666. ..} Aloft Hotel Project Environmental Clearance Document K -H will prepare a study that complies with the Los Angeles County Congestion Management Plan (CMP). The following Scope of Services is based on our understanding of the project issues and the study requirements of the City of El Segundo. Project Initiation ■ Obtain a complete project description and a to -scale copy of the project site plan, including building and hardscape footprints; room count; square footage of ancillary uses, such as meeting rooms and restaurant areas; site layout; project entrances, including interface with the Xerox office building to the south; parking supply; vehicle flow lines; and any other site features that will affect the flow of traffic into and out of the site. Traffic Impact Analysis • Obtain current weekday morning and evening peak hour traffic count data for the study intersections. • Develop project trip generation estimates for the proposed project, using the Institute of Transportation Engineers (ITE) Trip Generation (7th Edition). Trip generation assumptions will take into account the potential internal trip capture and trip synergy between the hotel and the surrounding office buildings. We will confer with staff on trip generation assumptions before proceeding with the analysis. • Develop trip distribution and assignment assumptions. • Submit trip generation and trip distribution assumptions to City Staff and the project team for concurrence. • Distribute the project traffic to the surrounding street system. • Obtain approved and pending project information from the City of El Segundo and surrounding cities. • Develop Opening Year peak hour forecasts at the study intersections. • Conduct intersection analysis for Opening Year Without Project conditions. • Add the project's peak hour traffic to each study intersection, and conduct intersection analysis for Opening Year With Project conditions. Identify any project impacts, and project mitigation, if necessary. • Provide a discussion of and supporting data and analysis for CMP Compliance. • Develop a summary of project parking requirements for the project. The parking summary will include a discussion of shared parking synergies and potential reduction in parking for the hotel, due to the proximity of adjacent and nearby office uses. Proposal to City of El Segundo 3 3006 • .' O Aloft Hotel Project Environmental Clearance Document • Prepare an evaluation of the adequacy of the proposed parking supply for peak operating conditions. • Evaluate the proposed site access and on -site circulation provisions. • Prepare a stand -alone traffic study summarizing our analysis methodology, study findings, and recommendations. • Assist in preparation of Responses to Comments (up to 8 hours). Project Meetings /Public Hearings ■ Attend up to two project team meetings and two Public Hearings. Traffic Scope Assumptions To -scale site plans and a complete project description, available on -site and off -site improvement plans, record drawings, and existing aerial photographs or topographic maps will be provided to Kimley -Horn. Any changes or revisions to the site plan or project description once the analysis has begun will require additional or changed analysis, which will constitute additional services, and will require an adjustment to the project schedule and budget. If issues not specifically listed here arise as a result of comments or concerns by citizens or City Staff, they will be evaluated as a separate work authorization, for a fee to be mutually agreed upon prior to initiating work. 1.2 Air Quality RBF will prepare the air quality report for the proposed project. Existing Conditions The City of El Segundo is located within Source Receptor Area 3 within the South Coast Air Basin. RBF will describe the meteorological conditions and discuss ambient air monitoring data collected for the nearest monitoring station. A description of the regulatory framework relating to air quality (i.e., California Clean Air Act, Air Quality Management Plan, etc.) will also be provided. Construction - Related Emissions Equipment exhaust and fugitive dust emissions resulting from construction activities will be quantified using URBEMIS2007. Based on landform /grading /demolition /excavation data and assumptions provided by the project Applicant (i.e., number /type of equipment needed for grading activities, project phasing, etc.), the analysis will estimate equipment exhaust emissions utilizing the latest emission factors as prescribed by the California Air Resources Board (GARB) and the EMFAC2007 and OFFROADS2007 models. Emissions from soil hauling activities will also be quantified, if necessary. Fugitive dust emissions will be quantified based upon the area to be graded per day. Construction pollutant emissions will be compared to SCAQMD thresholds and Proposal to City of El Segundo 4 ' ' 3806 . , a y Aloft Hotel Project Environmental Clearance Document mitigation measures will be recommended to reduce the significance of emissions, where feasible. RBF will also qualitatively discuss naturally occurring asbestos impacts as they relate to the proposed construction activities. Localized Significance Thresholds Consistent with the SCAQMD environmental justice program and policies for sites under five acres, localized air quality impacts on nearby sensitive receptors will be evaluated. Long -Term Emissions RBF will quantify vehicular and area source emissions then provide a comparison to the SCAQMD thresholds of significance. The emissions will be quantitatively derived utilizing the EMFAC2007 and URBEMIS2007 models. Project consistency with regional air quality plans, including the 2007 Air Quality Management Plan for the South Coast Air Basin, will be evaluated. RBF will address cumulative air quality impacts based upon a list of cumulative projects supplied by the City. RBF will also qualitatively address global warming issues as they pertain to the global warming initiative (Assembly Bill 32), which was signed into law by Governor Schwarzenegger on September 2006. 1.3 Noise RBF will evaluate potential noise impacts of the proposed project, focusing on changes in noise levels in the project area due to traffic changes along area roadways, on -site stationary noise sources, and overall changes in ambient noise levels associated with increased human activity. Existing Conditions RBF will review applicable State and City noise and land use compatibility criteria for the project area. Noise standards regulating noise impacts will be discussed for land uses on and adjacent to the project sites. RBF will conduct a site visit along the project sites and at adjacent land uses. During the site visit, RBF will conduct short-term noise level measurements along the project area. Noise monitoring equipment will consist of a BrUel & Kjaer model 2250 sound level meter (SLM) equipped with Bruel & Kjaer pre - polarized freefield microphone. The results of the noise measurements will be post - processed and graphically illustrated with the Briiel & Kjaer Noise Explorer software. The noise monitoring survey will be conducted at up to three separate locations to establish baseline noise levels in the project area. Noise recording lengths are anticipated to require approximately 10 minutes at each location. The noise measurements will evaluate noise exposure due to traffic while accounting for local topography, shielding from existing structures, and variations in travel speed. Construction - Related Noise Construction would occur during implementation of the proposed project. Noise impacts from construction sources will be analyzed based on the equipment, length of a specific construction Proposal to City of El Segundo 5 ' ' ' 3806. Aloft Hotel Project Environmental Clearance Document task, equipment power type (gasoline or diesel engine), horsepower, load factor, and percentage of time in use. The construction noise impacts will be evaluated in terms of maximum levels (Lmax) and hourly equivalent continuous noise levels (Leq) and the frequency of occurrence at adjacent sensitive locations. Analysis requirements will be based on the sensitivity of the area and the Noise Ordinance specifications of the City of El Segundo. RBF will provide a discussion of off -site truck hauling, if required, for construction - related soil import or export, focusing on haul routes affecting sensitive receptors. Stationary Noise Sources Potential effects of existing off -site noise sources will be evaluated based on the City's land use compatibility standards. Compliance with applicable noise standards will be evaluated, with recommended mitigation measures included where appropriate. Stationary sources include those that may be associated loading docks, trash compactors, and HVAC units. Traffic Noise The proposed project is anticipated to generate new vehicular traffic trips from future growth. On- site and off -site noise impacts from vehicular traffic will be assessed using the U.S. Federal Highway Traffic Noise Prediction Model (FHWA -RD -77 -108). The analysis will focus on noise impacts associated with the development of the proposed project. Model input data will include average daily traffic volumes, day /night percentages of autos, medium and heavy trucks, vehicle speeds, ground attenuation factors, and roadway widths. The 24 -hour weighted Community Noise Equivalent Levels (CNEL) will be presented in a tabular format. Traffic parameters necessary for the model input will be obtained from the traffic study. Traffic noise perceived at the proposed hotel units will be assessed with FHWA's Traffic Noise Model (TNM) 2.5. This scope assumes that architectural mitigation will not be developed (i.e., window glazing specifications, soundwall design, etc.). Data Needs for the Air Quality and Noise Reports • Traffic Study that includes (Levels of Service, intersection ICU or V/C ratios, Peak Hour Turning Movements, Daily Trip Generation Rates, average daily traffic volumes, and methodology utilized for cumulative impacts); • Detailed narrative regarding proposed construction activities, equipment utilized, and phasing schedule; • Detailed project description that includes a narrative regarding on -site activities, daily truck deliveries, specifications for the backup and emergency generators (if utilized); and • Electronic site plan and grading plan. Task 1.0 Deliverables: • Traffic Impact Analysis • Air Quality Analysis • Noise Analysis Proposal to City of El Segundo 6 ` ' ' 3 0 06. 0,A #. Aloft Hotel Project Environmental Clearance Document Task 2.0 Develop Project Description A critical initial step will be to accurately define the project description. Based on plan alternatives and other project details, RBF will draft a preliminary project description for review and approval by City Staff. Task 2.0 Deliverables: • Draft CEQA Project Description Final CEQA Project Description Task 3.0 Preparation of Initial Study /Environmental Checklist RBF will prepare an Initial Study in accordance with the City's Initial Study Checklist form and /or the most recent Environmental Checklist Form, as amended in the CEQA Guidelines. The Initial Study /Environmental Checklist will include detailed explanations of all checklist determinations and discussions of potential environmental impacts. The analysis shall be in accordance with Sections 15063, 15162, 15167, and 15168 of the CEQA Guidelines. The Initial Study /Environmental Checklist document will include the sections identified below. 3.1 Introduction This section will cite the environmental review requirements of the project, pursuant to CEQA and the City guidelines. The Introduction will include the project location, environmental setting, existing uses on -site and in the vicinity, the Project Description, Project Phasing, relevant background /history information for the General Plan, and zoning requirements. 3.2 Environmental Checklist This section is modeled after Appendix G, Environmental Checklist Form, of the CEQA Guidelines and will include a summary page of project information followed by an explanation of factors considered for potential impacts. The comprehensive El Segundo Initial Study /Environmental Checklist will be presented in a four column layout, identifying: 1) Potentially Significant Impacts, 2) Less Than Significant Impacts Unless Mitigation Incorporated, 3) Less than Significant Impacts, and 4) No Impacts. The section will provide a listing of documentation that will be Incorporated by Reference and notations for all references utilized for the determination. 3.3 Environmental Analysis The Environmental Analysis sections will provide vital supporting information for the conclusions rendered for the Environmental Checklist. This section will review the following issues: ■ Aesthetics: Project conformity with City design standards. ■ Agriculture Resources: Impacts to agricultural resources. ■ Air Quality: Emission impacts in consideration of SCAQMD thresholds. Proposal to City of El Segundo 7 ' ' 3806. ,- ■J Aloft Hotel Project Environmental Clearance Document ■ Biological Resources: Impacts to biological resources. ■ Cultural Resources: Impacts to archaeological and historical resources. ■ Geology /Soils: Seismicity, soils, and erosion potential. ■ Hazards & Hazardous Materials: Hazardous substances and emergency access. ■ Hydrology/Water Quality. Drainage, downstream impacts, and groundwater quality. ■ Land Use /Planning: Address existing policies, consistency and compatibility. ■ Mineral Resources: Impacts to mineral resources. ■ Noise: On and off -site noise levels in consideration of nearby sensitive receptors. ■ Population /Housing: Comparison with local projections and potential for growth inducement. ■ Public Services: Police, fire, and school impacts. ■ Recreation: Impacts on recreational facilities. ■ Transportation/Traffic: Generation rates, turning movement, capacity thresholds, and access. • Utilities/Service Systems: Electricity, solid waste, water, and wastewater systems. ■ Mandatory Findings of Significance: Focused on cumulative impacts. This section will provide a detailed response to each question in the Environmental Checklist, as well as identify mitigation measures to reduce impacts to less than significant levels. RBF's approach to the analysis portion of the document is to provide thorough, detailed and conclusive impact analysis. 3.4 Inventory of Mitigation Measures This section includes a comprehensive listing of all mitigation measures identified in Task 3.3. 3.5 Determination The determination page will conclude the appropriate action based upon the environmental analysis. 3.6 Graphic Exhibits The environmental document will include a maximum of ten (10) exhibits to enhance the written text and clarify the proposed project and potential environmental impacts. Exhibits are anticipated to include: Regional Vicinity Map, Site Vicinity Map, Land Use Plan, and Traffic Exhibits. Task 4.0 Administrative Draft Initial Study RBF will submit the Draft Initial Study for review and comment by the City. RBF will also submit one (1) "check copy" of the final draft document which will incorporate one complete set of comments received from the City. Proposal to F. City of El Segundo 8 38 6 6 Aloft Hotel Project Environmental Clearance Document Task 3.0 & 4.0 Deliverables: - 5 Copies of Administrative Draft Initial Study • 5 Copies of "check copy" of Draft Initial Study Task 5.0 Draft Initial Study RBF will submit the Draft Initial Study to the City, which will be distributed for public review. Task 5.0 Deliverables: • 5 Copies of Draft Initial Study • 1 Camera -Ready Original of Draft Initial Study •. 35 CDs with electronic version of Draft Initial Study, Graphics, and Technical Appendices Task 6.0 Final Initial Study RBF will submit the Final Initial Study to the City following City Council adoption. Task 6.0 Deliverables: • 10 Copies of Final Initial Study • 1 Camera -Ready Original of Final Initial Study • 1 CD with electronic version of Final Initial Study, Graphics, and Technical Appendices Task 7.0 CEQA Notices RBF will be responsible for the preparation of CEQA notices (Notice of Availability /Notice of Intent, Negative Declaration, and Notice of Determination). Assumption RBF has assumed that City Staff will be responsible for public noticing to comply with City requirements, such as posting notices or newspaper notices. Task 7.0 Deliverables: Notice of Availability /Notice of Intent • Negative Declaration Notice of Determination Proposal to City of El Segundo 9 ' ' Aloft Hotel Project Environmental Clearance Document Task 8.0 Mitigation Monitoring Program RBF will prepare the mitigation monitoring program pursuant to Section 21081.6 of CEQA. RBF will submit a draft version for City review and will follow with a finalized mitigation monitoring program. Task 8.0 Deliverables: • 1 Copy of Draft Mitigation Monitoring Program 1 Copy of Final Mitigation Monitoring Program ■ Electronic version of Final Mitigation Monitoring Program Task 9.0 Meetings and Public Hearings RBF anticipates several meetings with City Staff, including progress meeting and public hearings. Ms. Morse, along with other key project team personnel, will also be available to attend meetings with affected jurisdictions, agencies, and organizations as needed to identify issues and assess impacts. RBF assumes that City Staff will arrange the public meetings and provide appropriate materials. For budgeting purposed, RBF has assumed four hours per staff member for progress meetings and six hours per staff member for public hearings. Should the City determine that additional meetings beyond the following three meetings and public hearings are necessary, services will be provided under a separate scope of work on a time and materials basis (preliminary estimate is $750 per meeting, for each RBF staff member in attendance). The following is an outline of anticipated meeting attendance needs. Task 9.0 Meetings: • Two (2) meetings with City Staff to provide written and oral progress reports, resolve issues, review - comments on documents, and 'receive any necessary direction from City Staff. • One (1) public hearing Task 10.0 Project Management/Coordination Ms. Collette Morse, AICP, will be responsible for management and supervision of the Project Team, as well as consultation with the City. Ms. Morse will coordinate with all technical staff, consultants, support staff and word processing toward the timely completion of the environmental document. Task 10.0 Deiiverables: • Ongoing Project Coordination Proposal to City of El Segundo 10 ' ' ' 3606•..J Aloft Hotel Project Environmental Clearance Document Task 11.0 Environmental Impact Report (Optional Task) Based upon the findings of the Initial Study and in accordance with Article 7 of the CEQA Guidelines, the City of El Segundo may find that significant and unavoidable environmental impacts may occur and an Environmental Impact Report (EIR) should be prepared. If selected as an option, RBF will prepare a further refined Scope of Work for the preparation of an EIR. The EIR Scope of Work would also include tasks for meeting time, project management, noticing, Draft and Final EIR, and reproduction costs (additional technical studies may also be required). Task 12.0 Comments and Responses (Optional Task) After the close of the required public review period for the mitigated negative declaration, RBF, K -H and City Staff will review the comment letters received during the public review period and determine if it is necessary to produce written responses to the comments. If so, this task is considered outside the scope of this contract and would be completed on a time and materials basis. Proposal to City of El Segundo 3-806•...: Aloft Hotel Project Environmental Clearance Document III. BUDGET ESTIMATE A budget estimate is provided on the following page. Proposal to City of El Segundo 12 ' ' ' W Q cn W W D m O O f� M r• O �A CO O) I� O) N �• N 00 O YY N f0 � N r C ti co f0 d' N V! fA O Vi to Vi Oj � M � W. f.9 CO .- N C"% fR Cl9 CH IA ul C+9 N9 CF? b9 i9 N N N " � N mil_. PINIOI OINIOI IN �IOINI ICI I I IMI0, INtf)I 1 "1 1N1"'I�I 1 I� TI 1101111 I I I °I ui CN 0 0 ri Y N N C 0= 0 E H C N cn C O -US O cn �9 Na C O O O 3 as aI - d� d N O d d f6 w y C 7 = E 3 y Z f6 ` N C N O_ U � d � C 8 N fC Q N O d O) N 75 N 5 N lC O � V H E � N d 7 � 'p 2 W W C m E Q u u N . E � ` N N Q d Y � t Z < 5 � a a � � d a o � 5 L d C CL F m � CL Z D u 3 u LL d f � N a� M d I v I O C I 9• I c N I N G E 1 D Q 2 � z° v i 3806• i 7 C 0= E H C N C O -US O N w mN aNgrmm _ :+ am �w d Q N C N .y V N C7 {0 = C V - C' O C IC C �' V C O y d O = 0 O V N N G N P a Q N � C� 1 d "- O f0 CFF G 'O .0 w O d +r C 1 O O O �% 'C C O ._ �Q C COI •� O CN '2 O C Os Ct O .�>-�N w Y N 0 V C C ;� �p 7 W .�0 J {m J 7 C a iE a U)i 0;44. >> a� °? m to m w A p O aZ L off. =WW' =o� =w�dg� 41 ,� r N M d � �' M N M M In M f0 M ' L C W •t' 2 w a. �... d CM M a C LL V 2 =i a 7 J C C p J 0 0 0 0 0 0 o 0 0 o 0 E 0 H p a a m N H p H r N M Y9 tC 1► OD O> C~ ♦ • �9 Na C O O O 3 as aI - d� d N O d d f6 w y C 7 = E 3 y Z f6 ` N C N O_ U � d � C 8 N fC Q N O d O) N 75 N 5 N lC O � V H E � N d 7 � 'p 2 W W C m E Q u u N . E � ` N N Q d Y � t Z < 5 � a a � � d a o � 5 L d C CL F m � CL Z D u 3 u LL d f � N a� M d I v I O C I 9• I c N I N G E 1 D Q 2 � z° v i 3806• i S 106 • ...I Aloft Hotel Project Environmental Clearance Document STATEMENT OF FINANCIAL CONDITIONS Progress billings will be forwarded based on payment criteria established by the City. These billings will include the fees earned for the billing period. The City shall make every reasonable effort to review invoices within fifteen (15) working days from the date of receipt of the invoices and notify Consultant in writing of any particular item that is alleged to be incorrect. The fees proposed herein shall apply until September 30, 2008. Due to annual increases in costs associated with inflation, staff wage increases and increases in direct costs, Consultant will increase those portions of the contract fee for which work must still be completed after September 30, 2008 by ten - percent (10 %). Deviations or modifications from the Scope of Work will result in potential re- evaluation of the associated fees. Items not specifically stated in the proposal will be considered an additional work item. All work will be performed at a "Not to Exceed" contract price, which will become the fixed price upon completion of negotiations with the staff authorized to negotiate and agreement. The total budget includes all miscellaneous costs for travel /mileage, reproduction, telephone, postal, delivery, reference materials and incidental expenses. Proposal to City of El Segundo 14 ' ' ' 3806 - .'".' Aloft Hotel Project Environmental Clearance Document IV. PROJECT SCHEDULE The following schedule is preliminary in nature and would be revised to meet both the City's desired timeline Consultants Authorized to Begin Work Traffic Study Submitted to RBF Air Quality and Noise Studies Prepared by RBF Administrative Draft Initial Study to City Staff Administrative Draft Initial Study Returned to Consultant Draft Initial Study Submitted to City Public Review Period (assumes 30 -day) Public Hearing Proposal to City of El Segundo 15 January 17, 2008 February 15, 2008 February 29, 2008 March 14, 2008 March 28, 2008 April 11, 2008 April 14 — May 13, 2008 M-ED 3 0 6 • » ., Exhibit C Resumes � I1i G ,5uU6- City of El Segundo Statement of Qualifications for On -Call Environmental Review Services 5.0 PROJECT TEAM The following are brief background descriptions for the key professionals who would be responsible for preparing CEQA and NEPA compliance studies. Glenn Lajoie, AICP Project Assignment. Project Management/QA -QC Mr. Lajoie is the Environmental Planning Manager and oversees a team of 21 professionals in Irvine. Mr. Lajoie's primary responsibilities include oversight of daily operations, management of projects, staff mentoring and instruction, scheduling, and business development. With 20 years of practical experience, Mr. Lajoie is a recognized leader in CEQA and NEPA studies (EIR's, EIS's, Negative Declarations, Environmental Assessments), as well as other policy planning documents, including General Plans, Area Plans, Specific Plans, and due diligence studies. Projects have ranged from private entitlement applications related to residential and commercial projects as well as a variety of water, wastewater, highway, and redevelopment projects throughout California. Project responsibilities include analysis, technical review and management of environmental and policy planning documentation for compliance with CEQA/NEPA, implementation of public participation programs, and assistance to various public and private sector clients in meeting the requirements of local, State, and Federal agencies. Relevant project management experience includes the North Downtown Lancaster Neighborhood Revitalization/Transit Village Plan and EIR /EA; the Long Point Coastal Development Plan EIR in Rancho Palos Verdes; the Hotel del Coronado Specific Plan EIR in Coronado; the Cambria Desalination Facility EIR; the Costa Mesa General Plan Update and EIR; the North Village Specific Plan Program EIR in Mammoth Lakes; the Marymount College Facilities Expansion EIR in Rancho Palos Verdes; the Grand Canal Entertainment Center EIR in Bakersfield; and the Escondido Performing Arts and Justice Center EIR in Escondido. Mr. Lajoie also oversees on -call environmental services assignments in Long Beach, Westminster and in Cambria. Mr. Lajoie is the Project Manager for a current EIR in Long Beach involving projects within the Downtown and Central Long Beach Redevelopment Plan areas and recently served as Project Director for the recent Beverly Hills Gardens and Montage Hotel EIR. Collette L. Morse, AICP Project Assignment. Project Management/QA -QC Collette Morse has a B.A. in Geography /Ecosystems from UCLA. She is directly responsible for the management, preparation and coordination of environmental studies prepared in accordance with the CEQA and NEPA. She has been involved in the preparation of hundreds of environmental documents, including EIRs, Negative Declarations, and Environmental Assessments, for both public and private sector clients in her 20+ years of environmental planning experience. For the City of Santa Clarita, she has managed the Henry Mayo Newhall Memorial Hospital Master Plan EIR, Lyons Canyon Ranch EIR, UCLA Film and Television Archives MND, Soledad Village EIR, and the Mancara Residential Project EIR. She is currently working on or has recently completed the Beverly Hills Gardens and Montage Hotel EIR, Fox Plaza EIR (mixed use residential /commercial project) in Riverside, Redlands Malls Redevelopment Project EIR (mixed use project: 220 du, 220,000 sf retail), San Gabriel Center EIR (mixed use: 159 du, 18,000 sf retail), Alexan Pacific Grove MND (mixed use project: 280 luxury apartments and 4,200 square feet of retail) in Orange, Centerstone Specific Plan and Initial Study (33 du project) in Cypress, the Wicker Drive Specific Plan and Initial Study (42 du project) in Cypress, and the Grindlay /Orange Specific Plan and Initial Study (9 du and JN 00- 000300.10P • 29 • October 9, 2007 City ofleg do ' Statement of Qualifications for �. On -Call Environmental Review Services office building project) in Cypress. In addition to her work at RBF, Ms. Morse presently serves as AICP Commissioner for Region VI, and recently served as Past - President on the CCAPA Board of Directors. Starla Hack Project Assignment., Project Manager /Senior Analyst Starla Hack graduated from the University of California, Riverside, with a Bachelor of Arts Degree in Business Economics and from California State Polytechnic University, Pomona with a Masters Degree in Urban and Regional Planning with specializations in Community Development and Environmental Planning. In her responsibilities as an environmental analyst, Ms. Hack is involved in the preparation and coordination of environmental studies /documents prepared in accordance with the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). Ms. Hack has been involved in the preparation of numerous environmental documents that include Initial Studies, Mitigated Negative Declarations, Environmental Impact Reports, Environmental Assessments as well as other policy planning documents including General Plans and Specific Plans. Ms. Hack's relevant experience includes participation in the preparation of the Cerritos General Plan and EIR, Carson General Plan and EIR, Placentia General Plan and EIR and North Downtown Neighborhood Revitalization /Transit Village Plan EIR/EA and Dana Point Harbor Revitalization EIR. She is currently working on the Glendora General Plan Update, Lancaster Capital Residential Project and Lancaster Northeast Gateway Corridors Plan. Ms. Hack currently serves as the Project Analyst for a current EIR in Long Beach involving projects within the Downtown and Central Long Beach Redevelopment Plan areas. Rita Garcia Project Assignment., Senior Environmental Analyst Rita Garcia graduated from California State Polytechnic University, Pomona, with a Bachelor of Science degree in Urban and Regional Planning. In her responsibilities as Senior Environmental Analyst, Ms. Garcia is involved in the preparation, daily monitoring and coordination of CEQA documents, ensuring their timely completion reflective of the highest standard of professional care. With over 12 years in the environmental field, Ms. Garcia has extensive experience with projects involving sensitive planning and environmental issues including land use compatibility, noise, traffic /circulation, and population /housing /employment. She has had significant involvement with environmental analyses of numerous large -scale program -level projects including the Long -Point Resort EIR which involves sensitive aesthetic, biological, cultural, geological and public health /safety issues, and the North Village 1999 Specific Plan Amendment EIR, which involved sensitive population, housing, public services /utilities issues. Her UCR experience includes the Pierce Hall Addition IS /MND and the Physical Science 1 Building IS /MND. Additional professional experience includes various large -scale EIR's such as the Robinson Ranch North Program EIR, the Alberhill /Lake Elsinore Sports and Entertainment Center Program EIR, the FedEx Distribution Center FEIR, the Hotel del Coronado Master Plan EIR, the Big Sky Ranch EIR, and the Route 101 /Airport North Interchange EIR. Ms. Garcia will serve as the Project Coordinator /Senior Environmental Analyst for this project. JN 00- 000300.10P a 30 a October 9, 2007 GAT Y O� SkG13 'E64 City of El Segundo Statement of Qualifications for on -Call Environmental Review Services Eddie Torres Project Assignment: Project Manager, Air /Noise Specialist Mr. Torres prepares Environmental and Planning studies for public and private sector clients under the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). Eddie draws on his background and understanding of environmental constraints to provide technical CEQA and NEPA compliance review and environmental documentation, in addition to research, analysis, and writing. Mr. Torres has been involved in a wide range of environmental planning projects, including environmental documents for major infrastructure and land development projects, air quality and noise studies, community participation programs, highly controversial hillside development projects, state -of- the -art visual analyses, facility siting and due diligence studies, and technical support for the California Energy Commission facility siting process. Mr. Torres has experience with noise monitoring using Type I rated instruments, as well as sophisticated noise modeling using FHWA -RD -77 -108, SOUND2000 and Traffic Noise Model 2.0. Additionally, Mr. Torres has the ability to provide full range noise measurement spectragraphs utilizing the Larson Davis Data Noise Analysis software (DNA). Additionally, Mr. Torres provides air quality studies for virtually all of his CEQA/NEPA documents, having experience with 24 -hour carbon monoxide monitoring (using digital and analog measurement systems), as well as pollutant modeling using URBEMIS2002, CALINE4, and EMFAC2002. Mr. Torres has the ability to implement a full analysis methodology per Environmental Protection Agency, California Air Resources Board, Air Pollution Control District/Air Quality Management District and Caltrans /FHWA guidelines. Richard Beck Project Assignment: Regulatory As the Regulatory Manager at RBF, Mr. Beck focuses on due diligence planning activities. Mr. Beck has several years of experience with regulatory permit processing, which includes Sections 404 and 401 of the Clean Water Act (CWA), the California Porter - Cologne Act, Sections 1600 -1616 of the California Fish and Game Code, and the California Coastal Act. Mr. Beck delineates State and Federal jurisdiction and acts as a liaison between public and private sector clients and regulatory agencies. Having dealt with numerous regulatory projects ranging in size from less than 1.0 -acre to more than 1,600- acres, Mr. Beck is experienced with isolated drainages, wetlands, ephemeral drainages, coastal resources, and jurisdictional flood control facilities. As a key component of the regulatory process, Mr. Beck also assists in the preparation of environmental documents with respect to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). Bob Matson Project Assignment: Transportation and Circulation Mr. Matson has managed and prepared over 400 traffic impact studies for planning and environmental projects. He is a Board Member of Spectrumotion Transportation Management Association, and holds certificates in Fundamentals of Traffic Engineering, Congestion Mitigation, Managing Traffic Growth on Urban Streets, and Urban Street Design, all from the University of California Institute of Transportation Studies. Mr. Matson has prepared traffic impact studies for U.S. Navy San Mateo and Bayview Housing Projects, Multiplex Theatre and Restaurant (1,700 seats, City of Downey), Westpark Planned Community (3,800 units, City of Irvine), John Wayne Airport Expansion traffic impact monitoring, Newport Ridge Planned Community (2,500 homes in Newport Beach), El Sobrante Landfill Expansion (Riverside County), Mission Oaks Business Park A 00- 000300.10P • 31 • uctober u, luu i 3806 -. City of El Segundo Statement of Qualifications for On -Call Environmental Review Services o �� SEGV�4 (Camarillo), Northwood Planned Community (3,000 units in Irvine), and Southern California Veterans Home (Barstow). Mr. Matson will prepare the traffic analysis for incorporation into the EIR. Rebecca Kinney, P.E. Project Assignment. Hydrology and Drainage Ms. Kinney has extensive experience in all phases of Army Corps of Engineers Planning Work, including, Project Study Plans, Reconnaissance and Feasibility Studies, 1135 work, and Section 206 work. In 1994, as an intern with the Army Corps of Engineers, Sacramento District, Ms. Kinney assisted in the development of a pilot 1135 project which investigated constructing fish groins along the Sacramento River. Ms. Kinney is also experienced in channel restoration design work including hydrologic and hydraulic modeling and PS &E work. Ms. Kinney has also served as a regulatory agent for the application of 404 Corps of Engineers, 401 California Regional Water Quality Control Board, and 1601/1603 California of Department of Fish and Game permits. She received Wetland Delineation training by the Wetland Training Institute. Her knowledge of both engineering and environmental requirements make her an asset to any multi - disciplinary team. SUBCONSULTANTS BONTERRA CONSULTING (subconsultant) BonTerra Consulting is an environmental planning and natural resources management corporation serving public and private sector clients throughout southern and central California. The three principals of the firm have over 56 years of collective, hands -on experience in environmental planning, impact assessment, natural resources management, and city and regional planning studies for local, state, and federal agencies and private- sector clients, including developers of new community, architects, engineers, universities, and aerospace, telecommunications, and waste management organizations. Typical project experience includes master - planned communities; parks, golf courses, and recreational facilities; entertainment theme parks; urban infrastructure systems such as transportation corridors, highways, and bridges, airports, landfills, material recovery facilities (MRFs), and wastewater and water supply facilities; and urban in -fill projects, including office complexes, mixed -use employment and retail business parks, and commercial /retail centers. BonTerra Consulting has the technical background, experience, and necessary permits to provide biological and cultural resource services for both public -and private- sector clients throughout southern and central California. Ecologists have the technical expertise to conduct sensitive - species surveys, resource agency permitting, biological assessments, and constraints analysis, CEQA and NEPA documentation, construction monitoring, and other biological services. D. SCOTT MAGORIEN, GEOLOGIST ( subconsultant) For the past 25 years, Mr. Magorien has served as the principal geologic investigator for numerous projects throughout California. The scope of services to these cities involves the review of geologic /geotechnical consultants' reports from the standpoint of their adequacy in addressing issues associated with active faulting, slope stability /landslide mitigation, liquefaction analyses, impacts of proposed grading /landform modification on soil erosion, groundwater conditions, as well as other geologic hazards and geotechnical constraints. JN 00- 000300.10P 9 32 • October 9, 2ou/ 3806 City of El Segundo Statement of Qualifications for rtm-On -Call Environmental Review Services KIMLEY -HORN ASSOCIATES (subconsultant) Kimley Horn and Associates, Inc. (K -H) is a transportation engineering and planning firm with over 1,000 employees in 41 offices nationwide, including our offices in Orange and Los Angeles, California. Because transportation planning has been the mainstay of Kimley Horn's practice for over 30 years, the firm has the hands on experience, qualified personnel, and technical resources to meet the needs of the City. On every project, K -H recognizes the need to respond with sensitivity to local issues, while making sound engineering decisions and recommendations. Transportation planning is a specialty at Kimley Horn. Key members of our staff have performed General Plan Update and Circulation Element services for cities throughout southern California. Kimley Horn has the capacity to develop comprehensive recommendations for the Circulation Element, to examine alternatives, and to present those alternatives to the public or to City decision makers. Kimley Horn was founded by experts in traffic engineering and transportation planning, and these disciplines continue to be at the cornerstone of our practice. Kimley Horn staff has provided a wide range of transportation and traffic services to hundreds of municipalities, counties, and states. Our range of services includes traffic impact analyses, urban and regional transportation planning, traffic signal warrant studies, traffic signal system design and implementation, signal synchronization, signing /striping and traffic control plans, and seeking innovative programs to obtain financing for transportation improvements. JN 00- 000300.10P • 33 • October 9, 2007