CONTRACT 3464C Amendment CLOSED34' 641,,,.,, THIRD AMENDMENT TO AGREEMENT NO. 3464 BETWEEN THE CITY OF EL SEGUNDO AND CALTROP CORPORATION FOR CONSTRUCTION MANAGEMENT SERVICES THIS THIRD AMENDMENT( "Amendment "), is made and entered into on this 27th day of May 2008, by and between the CITY OF EL SEGUNDO, a general law city and Municipal Corporation existing under the laws of California ( "City "), and CALTROP Corporation, (Consultant). 1. Agreement No. 3464 ( "Agreement "), executed by the parties on or about May 6, 2005, is amended to add the services a set forth on Exhibit A hereto: The Consultant will extend construction management services beginning on May 27, 2008 per the costs shown in Exhibit A to the City's satisfaction. For the additional services included in Exhibit A, this Amendment No. 3 provides an increase to the Agreement in an amount not to exceed $73,930 bringing the total agreement amount to $2,148,405. 2. The attached Exhibit A which is incorporated by reference adds to the Consultant's Scope of Services in the Agreement. 3. This Amendment may be executed in any number of counterparts, each of which will be an original, but all of which together constitute one instrument executed on the same date. 4. Except as modified by this Amendment, all other terms and conditions of Agreement No. 3464 remain the same. [Signatures on following page] CITY OF EL SEGUNDO A general law city. Jack Wayt, City Manager A IC X I--(ckgA( L) U-J ATTEST: Cindy F - L �Al 1111 ull 1 IN OWN 5 OF - 9 Ma NV^- •A City Clerk APPROVED AS Mark D. Hensley By: 1 H. Berge Assistant City, 34 6 41e , , ,1 Vice President Linda Marquez, Corporate Secretary 3464 &e e .7 CALTROP Engineering Corporation Amendment #3 To Contract PW 05 -06 City of El Segundo Construction Management Services Caltrop Contract 05244 -01 Dougals Street Gap Closure & Cost Proposal - September 10, 2007 Railroad Grade Separation Project Classification Staff Member Hours Payrate Overhead % Fee Billing Rate Cost Pre - construction Phase (0 Working Days) Project Manager $ 55.00 149.880% 10.00% $ 151.18 $ Resident Engineer $ 55.00 149.880% 10.00% $ 151.18 $ Structures Inspector' $ 46.00 149.880% 10.00% $ 126.44 $ Administrative Assistant' $ 25.00 149.880% 10.00% $ 68.72 $ Subtotal 0 $ Construction Phase (71 Working Days) Project Manager Bijan Salar, PE $ 60.57 149.880% 10.00% $ 166.49 $ Resident Engineer Tyrone Taylor Jr., PE $ 51.93 149.880% 10.00% $ 142.74 $ Structures Inspector' Cary Brobeck $ 43.01 149.880% 10.00% $ 118.22 $ 149.880% 10.00% $ $ 149.880% 10.00% $ $ 0 $ Post - Construction Phase (10 Working Days) Project Manager Bijan Salar, PE 40 $ 60.57 149.880% 10.00% $ 166.49 $ 6,660 Resident Engineer Tyrone Taylor Jr., PE 240 $ 51.93 149.880% 10.00% $ 142.74 $ 34,257 Structures Inspector' Cary Brobeck 240 $ 43.01 149.880% 10.00% $ 118.22 $ 28,373 149.880% 10.00% $ - $ - Subtotal 520 $ 69,290 Misc. Expenses Vehicles 520 $ 7.00 $ 3,640 Laptops 520 $ - $ Cellphoness 520 $ $ - Office Supplies /Mailings/Shipping/...etc $ 1,000 Trailor /Office 0 months $ $ - Subtotal $ 4,640 Subconsultants Coast Surveying, DBE, Inspection & Surveying (as needed) Coast Surveying, DBE, Construction Inspection (as needed) Group Delta, MBE, Materials Tseting PTG - Construction Support Services Limitations S Conditions: Extended Construction duration is estimated at 71 working days with 20 working days for preconstruction S closeout phase. Inspectors will be fully equipped with vehicles, tools and equipment required to perform their tasks. 'Contractor to provide fully equipment appropiate office for the CM team, including cellphone, labtops, printers, copy machine, fax machine ,... etc during construction phase. Details to be included in the Special Provisions. 'Overtime and Weekend work is not included. Overtime is to be charged at 1,5 the above rate. Overtime will be billed separately. Cost proposal is subject to prevailing wage rates and prevailing wage rate changes.