3996 A CLOSED01/15/2010 09:29 6306013 p1FEJCE
3996x.
FIRST AMENDMENT TO
AGREEMENT N03996 BETWEEN
THE CITY OF EL SEGUNDO AND
A -1 FENCE COMPANY
THIS AMENDMENT NO. 1 TO MAINTENANCE AGREEMENT ( "AMENDMENT") is made
and entered into this 12th day of January 2010, by and between the CITY OF EL SEGUNDO, a
general law city and municipal corporation existing under the laws of California ( "CITY "), and the
A -1 Fence Company, a for - profit corporation, ( "CONTRACTOR ").
1. Agreement No. 3996 ( "Agreement's, executed by the parties on or about September 4, 2009 is
amended to add the services as set forth on Exhibit A hereto:
The CONTRACTOR will begin performance of these additional services on September 4,
2009. CONTRACTOR will complete each of the tasks included in Exhibit A to City's
satisfaction. If City is not satisfied with such services, the CONTRACTOR will work on such
matter until City approves of the service. For additional services included in Exhibit A, this
Amendment No.l provides an increase to the Agreement in an amount not to exceed $11,794,
as detailed in Exhibit A.
2. The attached Exhibit A which is incorporated by reference add to the CONTRACTOR'S Scope
of Services and fees in the Agreement.
3. This Amendment may be executed in any number or counterparts, each of which will be an
original but all of which together constitutes one instrument executed on the same date.
4. Except as modified by this Amendment, all other terms and conditions of Agreement No. 3996
remain the same.
CITY OF EL SEGUNDO,
a gen 1 w c .
;?0,W-a, ty Manager
Cindy Mortder,
City Clerk
APPROVED
Mark D. Hen
Sy:
K�rl 11 BergerlttVOrney
Assistant City
A -1 FENCE COMPANY
-7"r - . & ";-f,
Z---�-General Manager
• .
FROM : t± SEGUNDO MA I NTENRt; `E FAX N0. :3I0- 414 -0911
�. AIFENCE
11/18/2009 08:43 6396013
,oa
FENCE CopAPANY
`^
Dec. 11 2009 03:39PM P2
PAGE 01
Cre6ca Ave..neim, Ca 92809 6013
2831 iw. Fax (714) 930.9013 • pex (800) 6t1ft-
800) .439 -8014 • eb 5tte: ,K,�I,�,,ayfertca•�m
(714) 630.3390 ' i Uoense,9629260 - W
California f3tato Contractors- J�RE J% 1 r- A ®POSAL- -e - --ZY
FgNCIhtG
f, r
r �
i
3996k.
'�►�Ij7 1 r� / t
I
l
2jP
zip
s -
r— 0 N
(� Other � Existing
ConCretelAG F44rmve and Haul Old Farce. l Y
Q Omaros Meta f / Comer IPOSls
Q Cheftl Lin [-MI Posts
'r Hein r! Plckets,. —r---
�hyls.- � �� ,.. Gate Tramp
Una osat
Gato Post Gate 'rS OA PECIFI A'fitx`16
D SE1E ADDITIONAL jl7TACNMENT9 O CIIf:TOMBP HAS AROViG�O Nf3 ADO1Tl�Np`�- REntJIAEM N
TOTAL PRICE S� � ae on Completion an pre- 40rovad t redll
Terrttrs: dQ% dawd. balance Ott
completion 0A Zero down rdln to standard prar%aes
A. i l enoe WW tum�sn all labor and metedale to porforrn the sporafiI work ai a l the n�al and OM Cu a me manner acco
commonly vied m the trade. This proposal Shea oecome the bfnding caltraol of the psrbr. :upon Cut tamer s t�+:captance and upon the signed
secsptatlo~ of A•'I Fence. ,`��_
_ Accepted art Fwnes Company— = — de, whicr
nditiorw Chet *re or the
AcWtad Cuaton r s ncecpR9ned, tine addldonat term,
ay accepts" this Ptoposel, CURtoreer also aeknorJledgo
become an Integral part of this oontrnct –�--
lid Qi1bb� nd:41 b.ibbU1J A1i -LNUL PAGE 02
ag
• • s
A IL
FENCE COMPANY
2831 E. LA CRESTA AVE., ANAHEIM, CA 92806 • Califomia State Contractors License,#528260
(714) 630 -3390 • (800) 439 -6014 • Fax (714) 630 -6013 • Fax (800) 606 -6013 • Web Site: www.altence.com
BID FORM
FENCING TIME AND MATERIAL
PRICING CATEGORIES
Unit Prices
A. Basic price per foot for 4' high fence including materials and labor:
Price per 4' termination:
$17.22 per linear foot
$130.00 each
B. Price per foot for 6' high fence including all materials and labor:
Price per 6' termination:
$1 5.17 per linear foot
$160.00 each
C. Price per foot for 8' high fence including materials and labor:
Price per 8' termination:
$23.90 per linear foot
$160.00 each
D. Price per foot for 10' high fence including materials and labor:
Price per 10' termination:
$41.18 per linear foot
$187.00 each
L-. Price per foot for each additional foot above 10' high:
Gates:
A. Price for each 4' wide by 4' high gate:
Price per each additional foot is width:
Price per each additional foot in height:
B. Price for each 4' wide by 6' high ,gate:
Price per each additional fool in width.:
Price per each additional foot in height:
$3.' )2 per vertical boot
$429.86 each
$217.85 per linear foot
$46.30 per vertical foot
$526.68 each
$21.83 per linear foot
$47.11 per vertical foot
12/14/2003 08:47 6306013 AIFENCE PAGE 03
Awl
FENCE COMPANY
2831 E. LA CRESTA AVE., ANAHEIM, CA 92806 • California State Contractors License #528260
(714) 630 -3390 • (800) 439.6014 • Fax (714) 630 -6013 • Fax (200) 606 -6013 • Web Site: www.ai fence.com
BID FORM
FENCING TIME AND MATERIAL
Labor Schedule:
A. Cost per hour for additional work not listed above, including foreman,
laborer, truck, operating expenses and supervision:
$257.96 per hour
B. Cost per hour for work not listed above, including all supervision
and operating costs necessary to place an additional laborer on
the work site: (third man)
$72.56 per hour
C. Price per foot for installation through asphalt or concrete:
$2.00 per linear foot
Future Kate Adiustments
Rate increases at the time of annual renewal shall be subject to California
consumer Price index changes for the previous 12 -month period as a ceiling
(Los Angeles Metropolitan Market) .