Loading...
3996 A CLOSED01/15/2010 09:29 6306013 p1FEJCE 3996x. FIRST AMENDMENT TO AGREEMENT N03996 BETWEEN THE CITY OF EL SEGUNDO AND A -1 FENCE COMPANY THIS AMENDMENT NO. 1 TO MAINTENANCE AGREEMENT ( "AMENDMENT") is made and entered into this 12th day of January 2010, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation existing under the laws of California ( "CITY "), and the A -1 Fence Company, a for - profit corporation, ( "CONTRACTOR "). 1. Agreement No. 3996 ( "Agreement's, executed by the parties on or about September 4, 2009 is amended to add the services as set forth on Exhibit A hereto: The CONTRACTOR will begin performance of these additional services on September 4, 2009. CONTRACTOR will complete each of the tasks included in Exhibit A to City's satisfaction. If City is not satisfied with such services, the CONTRACTOR will work on such matter until City approves of the service. For additional services included in Exhibit A, this Amendment No.l provides an increase to the Agreement in an amount not to exceed $11,794, as detailed in Exhibit A. 2. The attached Exhibit A which is incorporated by reference add to the CONTRACTOR'S Scope of Services and fees in the Agreement. 3. This Amendment may be executed in any number or counterparts, each of which will be an original but all of which together constitutes one instrument executed on the same date. 4. Except as modified by this Amendment, all other terms and conditions of Agreement No. 3996 remain the same. CITY OF EL SEGUNDO, a gen 1 w c . ;?0,W-a, ty Manager Cindy Mortder, City Clerk APPROVED Mark D. Hen Sy: K�rl 11 BergerlttVOrney Assistant City A -1 FENCE COMPANY -7"r - . & ";-f, Z---�-General Manager • . FROM : t± SEGUNDO MA I NTENRt; `E FAX N0. :3I0- 414 -0911 �. AIFENCE 11/18/2009 08:43 6396013 ,oa FENCE CopAPANY `^ Dec. 11 2009 03:39PM P2 PAGE 01 Cre6ca Ave..neim, Ca 92809 6013 2831 iw. Fax (714) 930.9013 • pex (800) 6t1ft- 800) .439 -8014 • eb 5tte: ,K,�I,�,,ayfertca•�m (714) 630.3390 ' i Uoense,9629260 - W California f3tato Contractors- J�RE J% 1 r- A ®POSAL- -e - --ZY FgNCIhtG f, r r � i 3996k. '�►�Ij7 1 r� / t I l 2jP zip s - r— 0 N (� Other � Existing ConCretelAG F44rmve and Haul Old Farce. l Y Q Omaros Meta f / Comer IPOSls Q Cheftl Lin [-MI Posts 'r Hein r! Plckets,. —r--- �hyls.- � �� ,.. Gate Tramp Una osat Gato Post Gate 'rS OA PECIFI A'fitx`16 D SE1E ADDITIONAL jl7TACNMENT9 O CIIf:TOMBP HAS AROViG�O Nf3 ADO1Tl�Np`�- REntJIAEM N TOTAL PRICE S� � ae on Completion an pre- 40rovad t redll Terrttrs: dQ% dawd. balance Ott completion 0A Zero down rdln to standard prar%aes A. i l enoe WW tum�sn all labor and metedale to porforrn the sporafiI work ai a l the n�al and OM Cu a me manner acco commonly vied m the trade. This proposal Shea oecome the bfnding caltraol of the psrbr. :upon Cut tamer s t�+:captance and upon the signed secsptatlo~ of A•'I Fence. ,`��_ _ Accepted art Fwnes Company— = — de, whicr nditiorw Chet *re or the AcWtad Cuaton r s ncecpR9ned, tine addldonat term, ay accepts" this Ptoposel, CURtoreer also aeknorJledgo become an Integral part of this oontrnct –�-- lid Qi1bb� nd:41 b.ibbU1J A1i -LNUL PAGE 02 ag • • s A IL FENCE COMPANY 2831 E. LA CRESTA AVE., ANAHEIM, CA 92806 • Califomia State Contractors License,#528260 (714) 630 -3390 • (800) 439 -6014 • Fax (714) 630 -6013 • Fax (800) 606 -6013 • Web Site: www.altence.com BID FORM FENCING TIME AND MATERIAL PRICING CATEGORIES Unit Prices A. Basic price per foot for 4' high fence including materials and labor: Price per 4' termination: $17.22 per linear foot $130.00 each B. Price per foot for 6' high fence including all materials and labor: Price per 6' termination: $1 5.17 per linear foot $160.00 each C. Price per foot for 8' high fence including materials and labor: Price per 8' termination: $23.90 per linear foot $160.00 each D. Price per foot for 10' high fence including materials and labor: Price per 10' termination: $41.18 per linear foot $187.00 each L-. Price per foot for each additional foot above 10' high: Gates: A. Price for each 4' wide by 4' high gate: Price per each additional foot is width: Price per each additional foot in height: B. Price for each 4' wide by 6' high ,gate: Price per each additional fool in width.: Price per each additional foot in height: $3.' )2 per vertical boot $429.86 each $217.85 per linear foot $46.30 per vertical foot $526.68 each $21.83 per linear foot $47.11 per vertical foot 12/14/2003 08:47 6306013 AIFENCE PAGE 03 Awl FENCE COMPANY 2831 E. LA CRESTA AVE., ANAHEIM, CA 92806 • California State Contractors License #528260 (714) 630 -3390 • (800) 439.6014 • Fax (714) 630 -6013 • Fax (200) 606 -6013 • Web Site: www.ai fence.com BID FORM FENCING TIME AND MATERIAL Labor Schedule: A. Cost per hour for additional work not listed above, including foreman, laborer, truck, operating expenses and supervision: $257.96 per hour B. Cost per hour for work not listed above, including all supervision and operating costs necessary to place an additional laborer on the work site: (third man) $72.56 per hour C. Price per foot for installation through asphalt or concrete: $2.00 per linear foot Future Kate Adiustments Rate increases at the time of annual renewal shall be subject to California consumer Price index changes for the previous 12 -month period as a ceiling (Los Angeles Metropolitan Market) .