ORDINANCE 1087ORDINANCE NO. 1087
AN ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF EL SEGUNDO, CALIFORNIA,
ADOPTING PRECISE PLAN 85 -3, WITH
CONDITIONS, FOR A PROPOSED OFFICE
PROJECT AT 2301 -2381 ROSECRANS
AVENUE AND 810 -820 SOUTH DOUGLAS
STREET WITHIN SAID CITY.
WHEREAS, an application has been filed by Continental
Development Corporation for Precise Plan 85 -3 in order
to permit a proposed 1,100,000 sq. ft. development for
general office and research and development uses with ,
required parking for 3,667 vehicles, on a 14.7 -acre M -2
(Heavy Manufacturing) zoned site at 2301 -2381 Rosecrans
and 810 -820 South Douglas Street, a legal description of
which is on file in the Planning Department; and
WHEREAS, a Final Environmental Impact Report (EA -084)
has been prepared and the City Council has considered
and certified the Final EIR by adoption of Resolution
No- 3410 ; and
WHEREAS, the Planning Commission of the City of
E1 Segundo, after a public hearing duly held, as adopted
its Resolution No. 2150, recommending to the City
Council the certification of Environmental Impact Report
EA -084, adoption of a statement of overriding
considerations, and approval and adoption of Precise
Plan 85 -3, with conditions; and
WHEREAS, the City Council held a duly noticed public
hearing on July 15, 1986, in the time, form and manner
prescribed by law.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF
EL SEGUNDO, CALIFORNIA, DOES ORDAIN AS FOLLOWS:
1
SECTION 1. The City Council hereby requires certain
changes or alterations in the project to completely or
partially mitigate significant environmental effects
identified in the Final EIR, finds that certain
mitigation measures are the responsibility and
jurisdiction of other public agencies, adopts a
statement of overriding considerations with regard to
unavoidable traffic and air quality effects and finds
that economic, social or other considerations make
infeasible certain mitigation measures and the project
alternatives identified in the Final EIR as enumerated
in Resolution No. 3410 , which is attached hereto.
SECTION 2. The City Council hereby finds that the
proposed office /R &D land uses would not result in
incompatible effects with heavy industrial uses in the
vicinity and zone because there would be no heavy
industrial uses remaining in the area if the site is
redeveloped.
SECTION 3. The City Council hereby finds that the
proposed Precise Plan will be consistent with the
General Plan as amended by Resolution and will implement
the General Plan through standards for high - quality
architecture, extensive landscaping, underground
utilities, open space pedestrian plazas and paths, and
street circulation systems consistent with objectives
for high - quality design. The Precise Plan will limit
building height to 99 feet, which conforms to prevailing
heights of similar projects in the area, and which is
one -half of the M -2 zone maximum. The Precise Plan will
control building bulk through stepbacks, maximum
building coverage criteria of 50% of gross site area,
and placement of buildings which visually screens the
parking structure from view of public streets. The
2
Precise Plan establishes density limits by using a
maximum aggregate floor area -to -site ratio for each
phase: 0.5 FAR Phase I, 1.0 FAR Phase II, and 1.80 FAR
Phase III.
SECTION N. The City Council hereby finds that the
Precise Plan includes improvements for water, sewer,
drainage, solid waste disposal, energy conservation,
streets, public transit and pedestrian facilities
necessary to support the land uses and density proposed
for the site and supporting the General Plan, as
indicated in the following conditions and mitigation
measures.
SECTION 5. The City Council hereby approves and adopts
Precise Plan 85 -3, subject to the following conditions
and mitigation measures:
LAND USE
1. Project construction shall proceed under the
following phasing plan. Any unused density
permitted in any phase may be used in any
subsequent phase.
A. Phase I
Phase I shall permit construction of not to
exceed 310,000 sq. ft. of floor area, plus
related parking, with a floor area ratio not
to exceed 1.75 for Parcel No. 1. The
aggregate FAR for the total site area of 14.0
+ net acres will equal approximately 0.5 after
dedication.
3
B. Phase II
Phase II shall permit additional construction
not to exceed in the aggregate 600,000 sq. ft.
of floor area, plus related parking, with a
floor area ratio not to exceed 1.80 for Parcel
No. 2 and 1.0 in aggregate.
i) No building permits shall be issued for
Phase II until the following has
occurred:
a) A TSM Plan shall be approved by the
Planning Director incorporating the
TSM program measures required by
Condition No. 33. If phasing
permits, after one year of issuance
of the Certificate of Occupancy for
Phase I, the applicant shall also
demonstrate performance of the TSM
goal for Phase I either through
counts that verify project - related
p.m. peak hour trips do not exceed
Draft EIR less 20% or that Average
Vehicle Ridership (AVR) meets or
exceeds 1.43. The applicant may
select either method of measurement
which shall be used consistently and
be changed only with consent of the
Planning Director.
ii) No Certificate of Occupancy shall be
issued for Phase II until the following
has occurred:
4
1
a) Completion of subdivision
improvements (Condition Nos. 3 -23) ,
except as otherwise permitted on a
phased bases for each subdivision
improvement.
C. Phase III -A
Phase III shall permit additional construction
not to exceed 960,000 sq. ft. in the
aggregate, plus related parking, with a floor
area ratio not to exceed 1.57, provided the
following has occurred:
i) Performance of TSM goal for Phases I and
II demonstrated either through counts
that verify project - related p.m. peak
hour trips do not exceed Draft EIR less
20% or AVR meets or exceeds 1.43. The
applicant may select either method of
measurement which shall be used
consistently and be changed only with
consent of the Planning Director.
ii) In order to phase the project to the
scheduled construction of the Century
Freeway, the building permit for
Phase III shall not issue prior to
January 1, 1990 but may be issued at any
time thereafter. Applicant is entitled
to submit building plans at any time
prior to that date.
5
iii) Applicant shall pay traffic mitigation
fees as required by Condition No. 34.
This constitutes applicant's commitment
for capital traffic improvements.
D. Phase III -B
Phase III shall permit additional construction
not to exceed 1,100,000 sq. ft. in the
aggregate, plus related parking, with a floor
area ratio not to exceed 1.80, provided the
following has occurred:
i) Performance of TSM goal for Phases I and
II demonstrated either through counts
that verify project - related p.m. peak
hour trips do not exceed Draft EIR less
20% or AVR meets or exceeds 1.43. The
applicant may select either method of
measurement which shall be used
consistently and be changed only with
consent of the Planning Director.
ii) In order to phase the project to the
scheduled construction of the Century
Freeway, the building permit for
Phase III shall not issue prior to
January 1, 1990 but may be issued at any
time thereafter. Applicant is entitled
to submit building plans at any time
prior to that date.
0
iii) Applicant shall pay traffic mitigation
fees as required by Condition No. 34.
This constitutes applicant's commitment
for capital traffic improvements.
iv) Commitment from LACTC for route adoption
of the E1 Segundo light rail extension.
v) No building permit shall be issued until
construction of the Douglas Street
extension has commenced and has a
completion date prior to projected
occupancy for Phase III -B, and no
Certificate of Occupancy for Phase III -B
shall be issued until construction of
Douglas Street extension is completed.
2. At completion, the project shall include a minimum
of 1.5% of total floor area in retail /restaurant
uses. Retail /restaurant floor area shall not be
required until construction of Phase III; however,
the applicant shall provide employee recreation and
picnic /dining areas in each phase. Furthermore,
the applicant shall guarantee to the City of
El Segundo sales tax revenues for each phase,
beginning one year from issuance of the Certificate
of Occupancy for each phase and payable at the end
of the calendar year as follows:
Floor area for $100 sales
each phase X 1.5% X SF X 1%
VA
Estimated
Sales Tax
Revenue To
City
Any actual sales tax revenues generated at point -of -sale
on the site shall offset this obligation. As phasing
permits, placement of the Phase III retail uses shall be
cognizant of the future light rail station location and
pedestrian access points. This obligation shall be
removed upon construction of all required retail floor
area and issuance of Certificate of Occupancy.
SUBDIVISION IMPROVEMENTS
Applicant shall perform or cause to be performed at
applicant's expense, the following:
3. Design, construct and dedicate to the City of
El Segundo a new 14 -foot wide continuous
deceleration /right- turn -only lane along the north
side of Rosecrans and the east side of Douglas
Street, beginning approximately at the easterly
property line and continuing to the proposed
driveway on Douglas. The design and specifications
shall be approved by the Director of Public Works
and any dedication shall be included in the final
parcel map prior to recordation.
4. Provide a bus stop and shelter immediately west of
Aviation in conjunction with the above
deceleration /right -turn lane (no separate turnout
is recommended), to the satisfaction of the City
Traffic Engineer.
5. Provide suitable easement or dedication and
construct concrete curb, gutter and five -foot wide
(minimum) concrete sidewalk along Rosecrans and
Douglas frontages. Meandering sidewalks may be
provided. Walks shall connect to handicap ramps at
all intersections to satisfaction of the Director
of Public Works.
6. If determined necessary by the City Traffic
Engineer, the project driveway on Douglas Street
shall be signalized to accommodate the expected
high volumes of exiting vehicles. If not requested
within one year from issuance of the Certificate of
Occupancy for Phase III, this obligation shall be
released.
7. Install a pedestrian crosswalk and pedestrian
signal heads immediately to the north of the
project's Douglas Street driveway, to the
satisfaction of the Director of Public Works.
8. Furnish and install required street signs, (i.e.
parking restriction, etc.), to the satisfaction of
the Director of Public Works, and remove and
replace all broken, cracked, off -grade or damaged
curb, gutter, sidewalk, pavement, and driveways.
Driveways not utilized for the project shall be
removed.
9. Bear the cost of installing emergency vehicle
preemptive signalization at the intersections of
Rosecrans /Aviation, Douglas / Rosecrans and a third
intersection to be selected jointly by the City
Traffic Engineer and Fire Chief. This shall be
considered the applicant's fair -share contribution
to the City's OPTICOM system, and shall not exceed
$18,000. Payment shall be made within 60 days of
the City's request. Payment constitutes
satisfaction of this condition.
9
10. Modify and relocate traffic signals and pavement
striping as required by the City Traffic Engineer
to accommodate the project access and subdivision
improvements (bond or improve).
11. For the purpose of ensuring vehicular and
pedestrian safety and emergency vehicle access, the
applicant shall submit a site circulation plan
showing on and off -site vehicular access,
movements, signals and crosswalks for review and
approval by the Director of Public Works, the Fire
Department, and the Police Department prior to the
issuance of a building permit. If restructuring of
the median islands along Rosecrans Avenue is
necessary, this shall be provided by the applicant
in order to permit access by emergency vehicles.
Said circulation plan may be submitted for each
phase.
12. Participate on a fair -share basis in the cost of
the traffic signal interconnect and upgrade project
on Rosecrans Avenue between Sepulveda Boulevard and
Inglewood Avenue. Participation shall consist of
applicant depositing a fair -share amount (not to
exceed $10,000) with the City upon notification
that traffic timing plans for interconnection have
been completed and traffic signal equipment has
been identified, based on the project's percentage
contribution to existing traffic volumes on
Rosecrans Avenue between Aviation and Douglas.
Public Works shall coordinate the timing of traffic
signal modifications to extent feasible in order to
10
maximize cost savings. Payment shall be made
within 60 days of the City's request. Payment
shall constitute satisfaction of this condition.
13. Plant street trees as required and approved by
Recreation and Parks Department. At the discretion
of the Director of Recreation and Parks, on -site
specimen trees may be substituted for required
street trees to satisfy this condition.
14. Design and install a street lighting system along
street frontages to the satisfaction of the
Director of Public Works.
15. Construct a new minimum ten -inch water main line in
Douglas Street between Rosecrans Avenue and Park
Place. Replace 271 + feet of the existing eight -
inch water main line in Rosecrans with a ten -inch
water main line to the satisfaction of the Director
of Public Works.
16. Each lot shall have a separate house connection to
the County Sanitation District's sanitary sewer
main, to the satisfaction of Director of Public
Works.
17. Design and construct surface water drainage
facilities for collection and disposal to the
satisfaction of the Director of Public Works.
These improvements shall be "on- site" and shall be
constructed with each applicable phase of the
development.
18. All utilities shall be placed underground.
11
r
19. Record any necessary reciprocal easement agreements
as required by the Director of Public Works to
share and maintain common utilities, drainage
systems, driveways and pedestrian facilities,
concurrent with the recording of the parcel map.
Provided, however, that such reciprocal easement
agreements may be amended to specify the precise
location of such facilities as constructed.
20. Record reciprocal easement agreements to share and
maintain common fire /life safety systems as
required by the Fire Chief, concurrent with the
recording of the parcel map. Provided, however,
that such reciprocal easement agreements may be
amended to specify the precise location of such
facilities as constructed.
21. Reciprocal easement agreements shall be submitted
to and approved by the City Attorney prior to
recording for their legality, wording,
recordability and enforceability.
22. Prior to recordation of the final map, submit
appropriate improvement bonds and subdivision
agreements for any subdivision improvements not
completed prior to recordation of the final map.
23. Survey boundary monuments shall be located to the
satisfaction of the City Engineer prior to
recordation of the final map.
12
DRAINAGE FACILITIES
24. Enter into an agreement to design and construct
surface water drainage facilities in the vicinity
of the railroad right -of -way to eliminate drainage
problems in the area to the satisfaction of the
Director of Public Works.
TRAFFIC /PEDESTRIAN /CIRCULATION
25. Design and implement an on -site pedestrian
circulation system interconnecting all buildings,
parking structures, pedestrian plazas, and on -site
recreation facilities. On -site pedestrian
facilities shall be grade- separated from the
internal vehicle circulation system. The on -site
pedestrian system shall provide transition to
connect to bus /van stops and public sidewalks, at
grade, and include provision for on -site bicycle
circulation and storage.
26. Enter into an agreement to accommodate the proposed
light rail station by providing a 20 -ft. wide point
of connection from the site's pedestrian path to
the station in the area between the parking
structure and the Phase II building envelope.
27. Provide for pedestrian passage (maximum ten feet
wide) from the site's pedestrian plaza level to the
property line if and when such is located within
100 feet of the site's northeast property line.
28. Contribute up to $50,000 and not to exceed the
actual construction costs of a connecting
pedestrian bridge from the proposed light rail
13
station platform to the site property line. That
contribution shall be considered a regional -
serving improvement and be credited to applicant's
traffic mitigation fee.
29. Provide a shuttle bus turnout along Douglas Street
in proximity to the proposed light rail station
with pedestrian connection.
30. Construction of pedestrian /light rail facilities
per Condition Nos. 26, 27, 28 and 29 shall be
guaranteed through recordation of an Agreement
Affecting Real Property stating that applicant will
construct facilities or deposit cash sum within 60
days after being requested to do so by the Director
of Public Works. Facilities will not be required
prior to Phase II construction. If the light rail
route is not adopted for implementation by LACTC
prior to ten years from recording the final map,
developer shall be released from obligations
required under conditions 26 through 30.
31. When Douglas Street is extended and a future
transit station is constructed, provide a grade -
separate pedestrian way between the site and the
west side of Douglas (Phase III) upon notification
from the City that said pedestrian access is
required to maintain optimum operating capacity of
Douglas Street. This shall be considered a region -
serving improvement and be credited to applicant's
traffic mitigation fee.
14
TRANSPORTATION SYSTEMS MANAGEMENT
32. The developer (applicant) shall comply with the
City of El Segundo TSM Developer Ordinance Chapter
20.55, and prior to issuance of a building permit
shall submit plans for the project which shall
incorporate physical TSM support facilities
consisting of preferential parking for rideshare
vehicles for 15% of required parking stalls; van
pool /shuttle loading areas; on -site pedestrian and
bicycle lockers and showers; on -site employee
services which may include recreation, child care,
a n d c o n v e n i e n c e s e r v i c e s; a b u s
pullout /deceleration lane on Rosecrans; on -site
grade separation pedestrian circulation plaza
system and provision for connection with future LRT
station. The TSM Plan shall be in compliance with
Condition Nos. 2, 4, and 25 -31. Construction of
physical facilities shall occur on a phased basis
as identified in said conditions.
33. Applicant shall agree in an Agreement Affecting
Real Property to implement a TSM Plan for project
employees. The TSM Plan shall include demand
management programs and policies including an on-
site employee transportation coordinator(s),
informational and promotional services, a
comprehensive commute services package including
rideshare and transit services and incentives,
preferential parking program for rideshare
vehicles, and periodic surveys and monitoring
reports. Incentives shall not include, except on a
voluntary basis, monetary subsidies.
15
The program shall incorporate measures designed to
achieve a minimum 20% reduction in the p.m. peak
commute trips to the site as shown in the EIR or a
1.43 average vehicle ridership goal, as specified
in the City of E1 Segundo TSM Ordinance. The TSM
Plan shall be approved by the Director of Planning
prior to issuance of Certificate of Occupancy for
Phase I core and shell or issuance of the building
permit for Phase II, whichever occurs first. The
TSM Plan implementation may be shared or assumed by
tenants as required by the City's TSM Employer
Ordinance (Chapter 20.56), upon execution of
written agreements in a form and substance
satisfactory to the Director of Planning and the
City Attorney.
In addition, the applicant shall use its best
efforts to incorporate in the TSM plan measures to
achieve a twenty -five (25 %) percent reduction in
p.m. peak hour trips to the site. In the event,
that in any one ( 1 ) year following the first full
year of operation of a TSM program, the applicant
is unable to achieve at least a twenty -three (23 %)
percent reduction in p.m. peak hour trips to the
site, the applicant shall pay an additional traffic
mitigation fee of five ($.05) cents per occupied
square foot of the project for each percentage
point less than twenty -three (23 %) percent, up to a
maximum of three (3 %) percent, or fifteen ($.15)
cents per occupied square foot per year. This
obligation shall be limited to a period of five (5)
years from the effective date of the precise plan
ordinance or until construction of the Douglas
Street extension has been completed, whichever
first occurs.
16
�wr
TRAFFIC MITIGATION FEE
34. Applicant shall pay to the City of E1 Segundo a
one -time traffic improvement fee in the amount of
$1.00 per square foot of building floor area for
the initial 310,000 sq. ft. of building area, $1.50
for the next 290,000 sq. ft. of building area,
$4.00 for the next 360,000 sq. ft. of building
area, and $6.00 for the remaining floor area
permitted under Phase III -B. The purpose of the
traffic improvement fee is to fund traffic system
improvements to mitigate the adverse impacts on
traffic circulation attributable to the project.
Payments shall be made prior to the issuance of
building permits for each phase in proportion to
the building floor area for each phase. Payments
for Phase III may be apportioned in equal quarterly
amounts over a five -year period, at applicant's
discretion. The one -time traffic improvement fee
shall be reduced by the following amounts:
A. Phase I:
i) The amount of applicant's actual fair -
share contribution to the Rosecrans
Avenue traffic signal interconnect and
upgrade project (Condition No. 12).
ii) The estimated cost of that portion of the
deceleration lane required for a bus stop
(approximately 14 feet x 60 feet) and the
17
cost of the bus shelter. Cost estimates
shall be verified by the Director of
Public Works.
iii) Applicant may deduct actual expenses up
to $45,000 of the fee for Phase I upon
executing an agreement to assume the
costs of preliminary investigations and
reports necessary for the formation of a
traffic improvement benefit assessment
district for properties within a benefit
area to be defined along the Rosecrans
corridor. The City shall approve the
scope of work and consultant for said
studies.
B. Phase II /Phase III:
i) An additional amount of actual expenses
up to $45,000 for actual costs incurred
in preliminary reports and investigations
for the traffic improvement benefit
assessment district upon acceptance by
the City of said studies.
ii) Upon direction and agreement of affected
cities, an additional amount up to
$70,000 of the fee for Phase II may be
deducted for actual costs incurred by
applicant in establishing a Traffic
Improvement Benefit Assessment District
for properties along Rosecrans corridor.
iii) Up to $50,000 for the actual construction
cost of any pedestrian bridge structure
from property line to the proposed light
rail transit station per Condition No.
28.
iv) A grade- separated pedestrian bridge over
Douglas Street per Condition No. 31.
C. If a Traffic Improvement Benefit Assessment
District is established, payments made by
applicant for any portion of the above one-
time traffic improvement fee (including the
amounts paid for items listed in A and B
above) and the value of dedication or
improvements designated by the City as
regional- serving shall be credited to payment
of any assessment on the project.
D. The applicant shall agree to participate with
other property owners on a fair -share basis in
potential future traffic control program
utilizing traffic control personnel on
Rosecrans and /or Aviation. The amount of
participation shall be credited to the traffic
mitigation fee collected only during those
periods in which required traffic mitigation
fees are being paid.
DESIGN STANDARDS AND AMENITIES
35. Submit a Landscape and Open Space Master Plan for
review and approval by the Director of Planning
prior to issuance of any building permit. The
Landscape and Open Space Master Plan shall serve as
19
1
a guide to future phased development. Although not
intended to be a detailed plan, it will contain the
following major design elements: major planting
areas, open space areas, pedestrian and bicycle
circulation element, recreation facilities,
schematic location of plazas, water features, and
schematic gateway treatment at the easterly end of
the Rosecrans frontage.
36. Submit landscape and irrigation detail plans for
each phase in conformance with the Landscape Master
Plan prior to issuance of building permits, for
each phase, subject to the approval of the Director
of Planning, Director of Recreation and Parks, and
the Chief of Police.
The project's irrigation system shall be automated
and shall be operated and maintained to dispense
water efficiently as dictated by a program designed
to satisfy the variety of needs of the project's
plant materials.
37. The project's architecture and site plan shall be
consistent in quality and character with
Continental Park Plaza (located at 2101-
2141 Rosecrans) and the building at 841 Apollo
Street. The project shall provide ground level
plazas with water features for each building, upper
floors with step backs, coordinating colors and use
of dark glazing (not mirrored surfaces); height
limit of 99 feet (excluding penthouses for
equipment as permitted by the Zoning Ordinance).
20
38. Submit an exterior signage program by phase to the
Planning Director for approval prior to issuance of
any Certificate of Occupancy for each phase for the
purpose of ensuring that signs do not impede
traffic and pedestrian safety, and that major signs
are compatible with surrounding areas and the
aesthetic objectives of the General Plan.
39. For that portion visible from residential areas to
the east, parking structure illumination shall be
limited to the interior and entryways. Shielded
lighting shall be used where appropriate to direct
lighting on -site.
40. Exterior security and recreation lighting shall be
directed toward the site and will be directed away
from adjacent land uses and roadways.
41. On -site parking shall be provided in conformance
with the Zoning Ordinance requirements in effect on
the date the first building permit is issued for
the project, including at least 80% of Code -
required spaces shall be standard 8 -1/2 x 18 feet
dimensions. The total number of Code - required
parking spaces may be reduced in Phase II and /or
Phase III as permitted by the City's TSM Ordinance.
Provide no more than one space per 250 square feet
of floor area devoted to office and general retail
uses.
42. Building envelope for parcel 3 shall be revised to
provide a minimum 25 -foot setback from the future
right -of -way along Douglas Street (following
ti dedication of deceleration lane required by
Condition No. 3).
21
RECREATION
43. Design and implement a recreation plan in
compliance with the City's Industrial Development
Recreation Standards and Guidelines dated
September 14, 1984, and the Noble /White recreation
plan dated March 7, 1986, to include the following
facilities subject to the approval of the Director
of Recreation and Parks:
* Men and women's shower and locker room
facilities in each phase
* Four or more picnic or lunch areas
Lighted volleyball court
* Executive basketball courts (four half -court
surface areas, approximately 30' x 421)
* Indoor workout room (approximately 400 square
feet)
* One- quarter mile exercise par course with
seven stations
* Two shuffle board courts
* Bicycle and walking paths and secure bicycle
parking.
Facilities developed under this plan shall be
available free of charge to all employees on the
site, and their future availability shall be
ensured through the execution of an Agreement
Affecting Real Property between the applicant and
the City of E1 Segundo.
22
The location and phasing of on -site recreation
facilities shall be as specified in the proposed
recreation master plan to be approved by the
Director of Recreation and Parks.
FIRE
44. Pay the City of E1 Segundo a one -time fire /life
safety mitigation fee for each phase in order to
maintain acceptable levels of service as follows:
i) Prior to issuance of Certificate of
Occupancy, 11 cents per square foot of
building floor area to cover increased
operating costs of the Fire Department
attributable to the project as identified
in the Draft EIR;
ii) Prior to issuance of building permit, 11
cents per square foot of building floor
area to be allocated for the purchase of
capital equipment and facilities for fire
suppression and paramedic services as
identified in the City's adopted Capital
Improvement Program.
45. Provide site plans showing access within 150 feet
of the main entrances of each /all buildings from a
public street or approved fire lane and placement
of on -site fire hydrants, subject to the approval
of the Fire Department prior to issuance of
building permits.
23
46. In order to ensure compliance with regulations of
State Fire Marshal and Fire Code, and to mitigate
impacts on Fire Department operations to the best
extent possible, implement the above - approved plans
and the requirements of a Fire /Life Safety Package
submitted to and approved by the El Segundo Fire
Chief prior to issuance of a building permit. The
purpose the Fire /Life Safety Package shall be based
upon guidelines listed in the E1 Segundo Fire
Department's Fire Prevention Bureau Standard P -1 -a,
Project Development Guidelines, revised October
1985 or similar guidelines in effect at the time of
the permit.
POLICE
47. Pay the City of El Segundo a one -time police
services mitigation fee prior to the issuance of a
building permit in the amount of 7 cents per square
foot of building floor area for the entire project,
in order to cover increased demands on the Police
Department attributable to the project and the ten -
year incremental costs of additional personnel
required to maintain current service levels.
48. For each phase, submit detail plans and
specifications for the design treatment affecting
on -site security systems, lighting and landscaping
to the Police Department for review and approval
prior to issuance of any building permit or other
approval of any specific development design in
conformance with said plans and Condition No. 35.
24
LIBRARY
49. The applicant shall agree to participate at such
time as a fair -share formula is developed to
mitigate commercial - industrial impacts on library
services and facilities. The formula shall ha
based upon the percentage of citywide employees who
use the library and the frequency of use by such
employees.
ADMINISTRATIVE
50. The Tentative Parcel Map approval shall not become
final until the effective date of Ordinance(s)
adopting the Precise Plan and General Plan
Amendment approving the project. Applicant shall
be permitted to submit the Parcel Map for County
Engineer plan check prior to that date, but may not
record.
51. Prior to the issuance of any permits, including
grading, foundation or other building permits, the
applicant shall enter into and record an Agreement
with the City running with the land Affecting Real
Property binding on all owners and successors in
interest, which incorporates the conditions of
approval and mitigation measures in a form and
substance satisfactory to the City Attorney.
Applicant shall reimburse City for administrative
costs of City review of said agreement, in an
amount not to exceed $4,000.
52. "Floor area" shall be as defined in Section
20.08.193 of the E1 Segundo Municipal Code.
25
53. Mitigation fees required pursuant to Condition Nos.
34 (traffic) and 44 (fire) shall be adjusted by the
CPI with a base year of January 1, 1988, and with a
maximum annual adjustment of five percent. Once
the mitigation fee pursuant to Condition No. 34
(traffic) has been paid for all phases, applicant
shall be relieved of the obligation to construct
any improvement required hereunder for which
applicant is entitled to a credit but has not as of
the date of full payment received a credit.
ENVIRONMENTAL MITIGATION MEASURES
AIR QUALITY
54. Implement dust control measures required by the
AQMD during construction, including maintaining
adequate soil moisture as well as removing any soil
spillage onto traveled roadways through site
housekeeping procedures.
55. Design construction access to the project site so
as to minimize interference with existing traffic
and prevent truck queuing adjacent to local
receptors. These design measures will be
incorporated into the project construction permit.
56. Parking facility ventilation rates shall comply
with Code requirements in order to prevent any
unacceptable occupational air pollution exposure
for employees within parking facilities.
Wei
NOISE
57. Construction and demolition activities shall comply
with the City of El Segundo Noise and Vibration
Regulations Chapter 9.06, including limitations on
hours of activity unless a variance is granted
pursuant to procedures of that chapter.
ENERGY
58. The project shall be designed in as energy-
efficient manner as feasible including, but not
limited, to the following energy conservation
measures:
i) Thermal insulation in compliance with
standards established by the State of
California (Title 24).
ii) Tinted glass, solar reflective glass and
insulated glass shall be evaluated in the
project design and shall be used where
appropriate to reduce heating and cooling
loads.
iii) Fluorescent lighting shall be used where
appropriate rather than less efficient
lighting.
iv) Public area lighting, both interior and
exterior, shall be time - controlled and
limited to that necessary for safety and
27
protection but shall not preclude
reasonable recreation and "ambient"
lighting for facade and landscape
enhancements.
V) Lighting switches and multi- switch
provisions for control by occupants and
building personnel shall be used to
permit optimum energy conservation.
WATER /SEWER /SOLID WASTE CONSERVATION
59• In order to reduce the volume of solid waste
generated by the proposed project and to enhance
collection, recycling and storage capabilities, the
project shall provide trash compactors and
enclosures to the satisfaction of the Director of
Public Works.
60. In order to reduce volume of waste water flows, the
project shall utilize low -flush toilets, lower -
volume water faucets, drinking fountains equipped
with self - closing valves, plumbing fixtures which
will reduce water loss from leakage due to damaged
or faulty washers, and installation of restrictions
on all plumbing fixtures as shown on plans and
specifications to the satisfaction of the Director
of Public Works.
61. Project approval shall expire if the first building
permit (including foundation) is not issued within
24 months from approval by the City Council.
SECTION 6. This Ordinance shall become effective at
midnight on the thirtieth day from and after the final
passage and adoption hereof.
SECTION 7. The City Clerk shall certify to the passage
and adoption of this Ordinance; shall cause the same to
be entered in the book of original Ordinances of said
City; shall make a minute of the passage and adoption
thereof in the records of the meeting at which the same
is passed and adopted; and shall within fifteen days
after the passage and adoption thereof, cause the same
to be published once in the E1 Segundo Herald, a weekly
newspaper of general circulation, published and
circulated within said City of El Segundo and which is
hereby designated for that purpose.
PASSED, APPROVED and ADOPTED this 19th day of August ,
1986.
ay of the City of E1 Segundo
California
(SEAL)
t-M
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF EL SEGUNDO )
I, Ronald L. Hart, City Clerk of the City of E1 Segundo,
California, DO HEREBY CERTIFY that the whole number of members of
the City Council of the said City is five; that the foregoing
ordinance, being Ordinance No. 1087 is a full, true and correct
original of Ordinance No. 1087 of the said City of E1 Segundo,
California, entitled:
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EL SEGUNDO,
CALIFORNIA, ADOPTING PRECISE PLAN 85 -3, WITH CONDITIONS, FOR
A PROPOSED OFFICE PROJECT AT 2301 -2381 ROSECRANS AVENUE AND
810 -820 SOUTH DOUGLASS STREET WITHIN SAID CITY.
which was duly passed and adopted by the said City Council,
approved and signed by the Mayor of said City, and attested by
the City Clerk of said City, all at a regular meeting of the said
Council held on the 19th day of August, 1986, and that the same
was so passed and adopted by the following vote:
AYES: Councilmembers Anderson, Jacobson, Schuldt,
West, and Mayor Siadek
NOES: None
ABSENT: None
I do hereby further certify that pursuant to the provisions
of Section 36933 of the Government Code of the State of
California, that the foregoing Ordinance No. 1087 was dully and
regularly published according to law and the order of the City
Council of said City in the E1 Segundo Herald, a weekly newspaper
of general circulation, printed, published and circulated within
said City and that the same was so published therein on the
following date, to wit: August 28, 1986.
RONALD L. HART,
City Clerk of the
City of E1 Segundo, California
(SEAL)