75Construction Conditions
60. Before any construction occurs the perimeter of the property must
be fenced with a minimum 6 -foot high fence. The fence must be
covered with a material approved by the Planning and Building
Safety Department to prevent dust from leaving the site.
61. Public sidewalks must remain open at all times.
62. All haul trucks hauling soil, sand, and other loose materials must
either be covered or maintain two feet of freeboard.
63. NOx emissions during construction must be reduced by limiting the
operation of heavy -duty construction equipment to no more than 5
pieces of equipment at any one time.
64. Staging of construction vehicles and vehicle entry and egress to the
site must be approved by the Public Works Department. Temporary
construction driveways must be approved by the Public Works
Department. Temporary construction driveways must be removed
before the City issues a certificate of occupancy.
65. Construction vehicles cannot use any route except the City's
designated Truck Routes.
66. The applicant must develop and implement a construction
management plan, as approved by the Public Works Department,
which includes the following measures recommended by the
SCAQMD:
• Configure construction parking to minimize traffic
interference.
• Provide temporary traffic controls during all phases of
construction activities to maintain traffic flow (e.g., flag
person).
• Re -route construction trucks away from congested streets.
• Maintain equipment and vehicles engines in good condition
and in proper tune as per manufacturer's specifications and
per SCAQMD rules, to minimize dust emissions.
• Suspend use of all construction equipment during second
stage smog alerts. Contact SCAQMD at (800) 242 -4022 for
daily forecasts.
• Use electricity from temporary power poles rather than
temporary diesel or gasoline- powered generators.