Loading...
71that the food preparation area does not require the installation of grease interceptors, then this condition will not be required. 29. Construction activities must include a storm water pollution prevention plan addressing non -storm water run -off, debris removal, track -out and protection of storm water system. 30. Any diesel - powered generators must be approved by the Fire Department, Environmental Safety Division, and provide for secondary containment, placarding, spill detection and prevention. Underground tanks require additional environmental monitoring requirements. 31. The applicant must provide the Environmental Safety Division of the El Segundo Fire Department an inventory of any and all chemicals used for laundry, pool or house cleaning, emergency generators or other devices. 32. The applicant, or designee, must contact Underground Service Alert before digging or excavating. 33. Any demolition must be screened for asbestos and lead, with proper notifications to South Coast Air Quality Management District (SCAQMD). Public Works Department Conditions 34. All onsite utilities including, without limitation, water, electricity, gas, sewer and storm drains, must be installed underground. Contact Southern California Edison for required service and underground requirements (Mr. John Deng at (310) 783 - 9305). 35. Before the City issues a Certificate of Occupancy, the applicant must ensure that all curb, gutters, asphalt and concrete pavement and driveway aprons fronting 540 East Imperial Avenue and the property frontage along Walnut Avenue will be replaced as required by the Public Works Department. 36. Before the City issues a Certificate of Occupancy, all damaged or off -grade curb, sidewalk and pavement must be removed and replaced as required by the Public Works Department. 37. The applicant must secure any required encroachment permits from the Public Works Department before commencing any work in the public right -of -way.