68with one Kiosk located in the senior portion of the project and the
second kiosk located in the assisted living facility to the satisfaction
of the Director of Planning and Building Safety. One kiosk must be
provided in Option 2 in the senior housing /multi - family portion of the
project site to the satisfaction of the Director of Planning and
Building Safety.
9. Trash and recycling enclosures must be provided and shown on the
site plan that are sufficiently large enough to store the necessary
bins required for the regular collection of commercial solid waste
and recyclable materials. The site plan with the location and
dimensions of the trash and recycling enclosure and an elevation
view of the enclosure must be provided to the Planning and
Building Safety Department for review and approval before the City
issues building permits. Separate trash and recycling facilities must
be provided for each of the three components of Option 1 (senior
housing, assisted living and multi - family). Separate trash and
recycling enclosures must be provided for the multi - family portion of
Option 2.
10. Ground level mechanical equipment, refuse collectors, storage
tanks, generators, and other similar facilities must be screened
from view with dense landscaping and walls of materials and
finishes compatible with the overall design of the project and any
ancillary buildings.
11. Exterior lighting must be designed to minimize off -site glare.
12. The building must be designed to comply with all ESMC standards
for the attenuation of interior noise.
13. Before the City issues a Certificate of Occupancy the applicant
must provide the Planning and Building Safety Department a status
report on the Leadership in Energy and Environmental Design
(LEED) certification process that includes the GBCI scorecard. The
Director of Planning and Building Safety will determine if the items
identified on the scorecard and report, show a good faith effort to
obtain LEED certification and warrant release of this condition.
Within one month of receiving LEED certification, the applicant
must furnish proof of certification to the Planning and Building
Safety Department.
14. The applicant agrees to set aside 15% of the total number of units
constructed for Option 1. The units must be distributed as follows:
31% of the total 15% for the extremely low income senior
household category; 31 % of the 15% for the very low income senior
-3-