Loading...
68with one Kiosk located in the senior portion of the project and the second kiosk located in the assisted living facility to the satisfaction of the Director of Planning and Building Safety. One kiosk must be provided in Option 2 in the senior housing /multi - family portion of the project site to the satisfaction of the Director of Planning and Building Safety. 9. Trash and recycling enclosures must be provided and shown on the site plan that are sufficiently large enough to store the necessary bins required for the regular collection of commercial solid waste and recyclable materials. The site plan with the location and dimensions of the trash and recycling enclosure and an elevation view of the enclosure must be provided to the Planning and Building Safety Department for review and approval before the City issues building permits. Separate trash and recycling facilities must be provided for each of the three components of Option 1 (senior housing, assisted living and multi - family). Separate trash and recycling enclosures must be provided for the multi - family portion of Option 2. 10. Ground level mechanical equipment, refuse collectors, storage tanks, generators, and other similar facilities must be screened from view with dense landscaping and walls of materials and finishes compatible with the overall design of the project and any ancillary buildings. 11. Exterior lighting must be designed to minimize off -site glare. 12. The building must be designed to comply with all ESMC standards for the attenuation of interior noise. 13. Before the City issues a Certificate of Occupancy the applicant must provide the Planning and Building Safety Department a status report on the Leadership in Energy and Environmental Design (LEED) certification process that includes the GBCI scorecard. The Director of Planning and Building Safety will determine if the items identified on the scorecard and report, show a good faith effort to obtain LEED certification and warrant release of this condition. Within one month of receiving LEED certification, the applicant must furnish proof of certification to the Planning and Building Safety Department. 14. The applicant agrees to set aside 15% of the total number of units constructed for Option 1. The units must be distributed as follows: 31% of the total 15% for the extremely low income senior household category; 31 % of the 15% for the very low income senior -3-