56CC RESOLUTION 4772HÄÁ@¸Á%8OXþMitigation Monitoring and Reporting Program
Mitigation Reporting Checklist
Vedlcdton of Comprance
MI./ MoNorkrg and Mcn ori,g Party Resporabfe
CondNo. MifgoNonMeasure/Conclbno(Approvd ReponigProcess Missions forMordorkg A 1111111:1113 Date Remaks
MM HAZ-3 Before project implementation, the developer must Submission of Form Prior to issuance of Federal Aviation
submit Form 7460-1 Notice of Proposed 7460-1 and project review grading permit. Administration
Construction or Alternation) to the Federal Aviation and approval.
Administration for project review and approval.
MM4.3-1 The developer's contractor must refrain from Visual Inspection During grading and City of El Segundo-
engaging in all construction-related activities, construction Planning and
including the delivery of construction materials, the Building Safety
loading and unloading of construction equipment, Department
starting the engine ignition, and the repair and
servicing of construction equipment and vehicles
between the hours of 6:00 PM and 7:00 AM Monday
through Saturday, or at any time on Sunday or a
federal holiday. Construction noise levels must not
exceed the noise and vibration standard set in El
Segundo Municipal Code 7-2-4(C) and
7-2-10(D). If construction activities result in the
generation of noise that exceeds the noise and
vibration standards set forth by the El Segundo
Municipal Code, a noise permit must be obtained
from the City of El Segundo before commencing
any construction activities.
MM4.3-2 The developer's construction contracts must require Grading Plan and Before issuance of City of El Segundo-
implementation of the following construction best Building Plan Processing grading permits Planning and
management practices BMPs) by all construction Building Safety
contractors and subcontractors working in or around Director
the project site to reduce construction noise levels:
Not less than 10 days before the start of
construction, the developer must mail a written
notification to owners and occupants of all
developed properties within 1,000 feet of the
project site. The notification must provide a
schedule of major construction activities that will
occur throughout the duration of the
City of El Segundo 540 East Imperial Avenue Specific Plan Project EIR MMRP 17