30construction documents, which must be approved by the City of El
Segundo before grading permits are issued.
MM4.1 -10 The developer must require by contract specifications
that construction activities that would affect traffic flow on the
arterial system be scheduled to off -peak hours (9:00 AM to 4:00
PM). Contract specifications must be included in the proposed
project construction documents, which must be approved by the
City of El Segundo before grading permits are issued.
MM4.1 -11 The developer must require by contract specifications
that dedicated on -site and off -site left -turn lanes on truck hauling
routes be utilized for movement of construction trucks and
equipment on site and off site to the extent feasible during
construction activities. Contract specifications must be included in
the proposed project construction documents, which must be
approved by the City of El Segundo before grading permits are
issued.
MM4.1 -12 The developer must require by contract specifications
that trackout roads will meet SCAQMD Table XI -C standards to
achieve a 46% reduction in PM10. The construction contractor
must install gravel bed trackout apron (3 inches deep, 25 feet
long, 12 feet wide per lane and edged by rock berm or row of
stakes) to reduce mud /dirt trackout from unpaved truck exit routes.
Contract specifications must be included in the proposed project
construction documents, which must be approved by the City of El
Segundo before grading permits are issued.
MM4.1 -13 When the City issues building or grading permits,
whichever is issued earlier, the developer must notify, by mail,
owners and occupants of all developed land uses within 1,000 feet
of a project site within the Specific Plan providing a schedule for
major construction activities that will occur through the duration of
the construction period. In addition, the notification will include the
identification and contact number for a community liaison and
designated construction manager that would be available on site
to monitor construction activities. The construction manager is
responsible for complying with all project requirements related to
PM10 generation. The construction manager will be located at the
on -site construction office during construction hours for the
duration of all construction activities. Contract information for the
community liaison and construction manager will be located at the
construction office, City Hall, the police department, and a sign on
site.
MM4.1 -14 The developer must require by contract specifications
that the architectural coating (paint and primer) products used
would have a VOC rating that reduces VOC content by 15 percent
or more. Contract specifications must be included in the proposed
project construction documents, which must be approved by the
City of El Segundo before grading permits are issued.