26possible. Contract provisions incorporating the above requirements must be included as part of the project's construction documents, which must be reviewed and approved by the Planning and Building Safety Department. MM4.3 -4 The developer must require by contract specifications that heavily loaded trucks used during construction must be routed away from residential streets to the extent possible. Contract specifications must be included in the proposed project construction documents, which must be reviewed by the City before grading permits are issued. MM4.3 -5 Residential units must be designed and constructed to ensure that interior noise levels from exterior transportation sources — including aircraft and vehicles on adjacent roadways — cannot exceed 45 dBA CNEL. In order to ensure that all dwelling units achieve an adequate noise reduction to achieve an interior noise level of 45 dBA CNEL, the following features must be included in the building design and construction of all dwelling units: (1) upgraded dual - glazed windows, (2) mechanical ventilation /air conditioning, (3) exterior wall /roof assemblies free of cut -outs or openings, and (4) ceiling insulation in the top floor of each building to reduce aircraft noise by at least 20 dBA. Before a building permit is issued, the developer must submit architectural plans and a detailed acoustical analysis study prepared by a qualified acoustical consultant demonstrating that interior noise levels in all residential units would be 45 dBA CNEL or less to the Planning and Building Safety Department for review and approval. C) Finding: The City Council finds that with implementation of identified mitigation, potentially significant noise impacts (as identified above) would be reduced to a less- than - significant level as identified in the FEIR. 8. Trans portation/Traf is (Initial Study and DEIR) a) Facts /Effects: (1) Emergency Access. Implementation of either Option of the proposed project would not result in inadequate emergency access. However, to ensure that either Option of the proposed project would not result in inadequate emergency access, site plans, site construction, and the actual structures would be subject to review and approval by the El Segundo Fire Department before building occupancy to ensure that required fire protection safety features, including building sprinklers and emergency access, are implemented. Additionally, implementation of mitigation measure MM HAZ -4 would ensure that emergency response teams for the City of El Segundo, including the El Segundo Police Department and El Segundo Fire Department, would be notified of lane closures during construction activities in the project area and that W