CC RESOLUTION 4574RESOLUTION NO. 4574
A RESOLUTION ADOPTING A NEW FEE SCHEDULE FOR
RECOVERING COSTS INCURRED FROM PROVIDING
VARIOUS PUBLIC SERVICES.
BE IT RESOLVED by the Council of the City of El Segundo as follows:
SECTION 1: The City Council finds as follows:
A. The City Council may establish fees for services under various provisions
of California law including, without limitation, Business & Professions
Code § 16000; Government Code §§ 36936.1, 43000, 54344, 65104,
65456, 65874, 65909.5, 65943, 66013, 66014, 66451.2; and Health &
Safety Code §§ 510, 17951, 17980.1, 19852.
B. Pursuant to Government Code § 66016, the City made data available
regarding the cost, or estimated cost, of providing services for various
fees ten (10) days before the public hearing held on October 21, 2008.
C. On October 21, 2008, City Council heard public testimony and considered
evidence in a public hearing held and noticed in accordance with
Government Code § 66016.
D. At the recommendation of the City's Departments and the City Manager,
the City Council believes that it is in the public interest to establish the
recommended fees to recover the costs of public services.
SECTION 2: The Fees, attached as Exhibit "A" and incorporated into this Resolution as
if fully set forth, are approved and adopted.
SECTION 3: Unless otherwise revised, the fees established by this Resolution will be
automatically adjusted on an annual basis at the beginning of each fiscal year based on
the average percentage change over the previous calendar year to the City's costs for
administering the services set forth in Exhibit "A." The first fee adjustment cannot be
made before a minimum of ten (10) months after the effective date of this Resolution.
SECTION 4: This Resolution is exempt from review under the California Environmental
Quality Act (Cal. Pub. Res. Code §§ 21000, et seq.; "CEQA ") and CEQA regulations
(Cal. Code Regs. tit. 14, §§ 15000, et seq.) because it establishes, modifies, structures,
restructures, and approves rates and charges for meeting operating expenses;
purchasing supplies, equipment, and materials; meeting financial requirements; and
obtaining funds for capital projects needed to maintain service within existing service
areas. This Resolution, therefore, is categorically exempt from further CEQA review
under Cal. Code Regs. tit. 14, § 15273.
SECTION 5: Pursuant to Government Code § 66017, all fees related to the Planning
and Building Safety Department set forth in this Resolution will become effective on
January 1, 2009 and will remain effective unless repealed or superseded.
SECTION 6: For all other fees, this Resolution will become effective on January 1,
2009 and will remain effective unless repealed or superseded.
SECTION 7: The City Clerk will certify to the passage and adoption of this Resolution;
will enter the same in the book of original Resolutions of said City; and will make a
minute of the passage and adoption thereof in the record of proceedings of the City
Council of said City, in the minutes of the meeting at which the same is passed and
adopted.
PASSED AND ADOPTED this 21st d of be 2 08/
Kelly McDowell, '
Mayor
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF EL SEGUNDO
I, Cindy Mortesen, City Clerk of the City of El Segundo, California, hereby certify that
the whole number of members of the City Council of the City is five; that the foregoing
Resolution No. 4574 was duly passed and adopted by said City Council, approved and
signed by the Mayor of said City, and attested to by the City Clerk of said City, all at a
regular meeting of said Council held on the 21st day of October 2008, and the same
was so passed and adopted by the following roll call vote:
AYES:
McDowell, Busch, Brann, Fisher, Jacobson
NOES:
None
ABSENT:
None
ABSTAIN:
None
ATTEST:
Cindy Mo esen, XIF
City Clerk
Aor
APPROVED AS TX F060:
Mark D. Hensle /) nTA
Kayr H. Berger
Assistant City Atjorney
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
CITY SERVICS CITY PAOPOSED FE
PLANNING SERVICES
S -001
ADMINISTRATIVE USE PERMIT
$3,345 per application /$1,670 per application (50% fee) for
properties in the Downtown Specific Plan Area
S -002
MINOR CONDITIONAL USE PERMIT
$3,345 per application /$1,670 per application (50% fee) for
properties in the Downtown Specific Plan Area
5 -003
MAJOR CONDITIONAL USE PERMIT
$6,855 per application/$3,425 per application (50% fee) for
properties in the Downtown Specific Plan Area
S -004
ARCHITECTURAUDESIGN REVIEW
$450 per application /$225 per application (50% fee) for
properties in the Downtown Specific Plan Area
S -005
VARIANCE REVIEW
$6,855 per application
S -006
ADJUSTMENT REVIEW
$2.570 per application /$1,285 per application (50% tee) for
fence height adjustment on properties in the R -1, R -2 and R -3
Zones
S -007
ZONE TEXT AMENDMENT/ZONE CHANGE
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -008
PRE- APPLICATION REVIEW
$3,410 per application.
This fee gets the applicant two meetings with staff. Half of this
fee will be credited towards any future fees for this project.
S -009
TRAFFIC STUDY REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -010
OFF -SITE PARKING COVENANT
$300 per application
S -011
PARKING DEMAND /SHARED PARKING STUDY
$3,285 per study plus actual costs for Traffic Engineer
S -012
GENERAL PLAN AMENDMENT REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
5 -013
SPECIFIC PLAN REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -014
SPECIFIC PLAN AMENDMENT REVIEW
Deposit determined by staff oath charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -015
SPHERE OF INFLUENCE AMENDMENT
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -016
ANNEXATION REQUEST REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
5 -017
CFD ANNEXATION REQUEST REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -018
DEVELOPMENT AGREEMENT REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -019
COASTAL DEVELOPMENT PERMIT
$770 per application
S -020
PLANNED RESIDENTIAL DEVELOPMENT REV
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008.09
10/16/2008
PAOPOSED FE
S -021
FISCAL IMPACT ANALYSIS
In House:
New.
Single -Use Residential - $750 Single -Use Commercial -
$1,500
Single -Use Industrial - $1,500
Two -Use Mixed - $2,000 Three Use Mixed - $2,500
Amendment:
Sin le -Use Protect - 250 Two -Use Project- Three Use -
S -022
SMOKY HOLLOW FLOATING ZONE PROC.
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -023
SMOKY HOLLOW SITE PLAN
$2,060 per application - < 15,000 square feet
$4,180 per application - >= 15,000 square feet
S -024
DENSITY BONUS AGREEMENT REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -025
ENVIRON. CATEGORICAL EXEMPTION
$130 per a lication
S -026
ENVIRON INITIAL STUDY /NEG DEC /RECIR
$3,545 per application if prepared only by City staff/Deposit
determined by staff with charges at the fully allocated hourly
rates for all personnel involved plus any outside or contract
costs.
S -027
ENVIRONMENTAL IMPACT REPORT REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -028
MITIGATION MONITORING
Minor - $465 per project
Major - Deposit determined by staff with charges at the fully
allocated hourly rates for all personnel involved plus any outside
or contract costs.
S -029
PRECISE PLAN MODIFICATION REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -030
TENTATIVE PARCEL MAP REVIEW
$4,475 per map
(Any County procesing fees are paid directly to the County by
the applicant)
S -031
TENTATIVE TRACT MAP REVIEW
$4,845 per map plus $370 per lot for every lot over 5
(Any County procesing fees are paid directly to the County by
the applicant)
S -032
VESTING TENTATIVE TRACT MAP REVIEW
$4,845 per map plus $370 per lot for every lot over 5
(Any County procesing fees are paid directly to the County by
the applicant)
S -033
RESUBMITTED MAP REVIEW
$1,135 per ma
S -034
LOT LINE ADJUSTMENT
$1,365 per application
S -035
LOT MERGER
$1,365 per a lication
S -036
REVERSION TO ACREAGE
$5,245 per application
S -037
CERTIFICATE OF COMPLIANCE REVIEW
$1.510 per application
S -038
RECIPROCAL ACCESS EASEMENT
51,345 per application plus actual costs for City Attorney
S -039
CCBR REVIEW
$1,350 per application plus actual costs for City Attorney
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
10/16/2008
Cl
MY PROPOSED FEE
7040
HISTORIC RESOURCE NOMINATION REVIEW
$7,195 per application
S -041
ADMIN DETERMINATION - DIR DECISION
$1,110 per a lication
S -042
ADMIN DETERMINATION - PC DECISION
$1,650 per application
S -043
SIGN PLAN REVIEW
$110 per application
S -044
MASTER SIGN PROGRAM
Minor - $580 per application
Major - Deposit determined by staff with charges at the fully
allocated hourly rates for all personnel involved plus any outside
or contract costs.
S -045
LARGE FAMILY DAY CARE PERMIT
$220 per application plus $100 if a public hearing is requested.
S -046
MOVED BUILDING SITE PLAN REVIEW
$1,030 per a lication
S -047
ZONING CONFORMANCE LETTER/REVIEW
$745 per letter
S -048
MODIF. TO DISCRETIONARY APPROVAL
$3,250 per application
S -049
TIME EXTENSION REVIEW
$1,255 per application
S -050
APPEAL TO THE PLANNING COMMISSION
Resident - $1,100 per appeal for 50% cost recovery
Non - Resident - $2,200 per appeal for 100% cost recovery
S -051
APPEAL TO THE CITY COUNCIL
Resident - $1,550 per appeal for 50% cost recovery
Non- Resident - $3,100 per appeal for 100% cost recovery
Inside the Coastal Appeal Zone - No Charge per State law
S -052
STREET ADDRESS CHANGE
$545 per a lication
S -053
GENERAL PLAN MAINTENANCE
10% of all Building & Safety permit fees
S -054
TEMPORARY USE PERMIT
$745 per application /No fee for special events (including block
parties) on properties in the R -1, R -2, and R -3 Zones.
S -055
ENTERTAINMENT PERMIT
$670 per a lication
S -056
ADULT USE PLANNING PERMIT
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -057
AMPLIFIED SOUND PERMIT
$110 per application
S -058
ANIMAL PERMIT
$340 per application
S -059
ANIMAL PERMIT RENEWAL
$170 per renewal
S -060
ANIMAL PERMIT APPEAL
Resident - $805 per appeal for 50% cost recovery
Non - Resident - $1,610 per appeal for 100% cost recovery
S -061
BUSINESS ZONING CLEARANCE
Home Occupation - $110 per application
Other Businesses - $55 per application
S -062
PUBLIC NOTICING
$120 per notice or deposit with actual costs, at the discretion of
icily staff.
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
-CrTY SORVICE CrrY PROPOSED E
ENGINEERING SERVICES
S -063
ENCROACHMENT PERMIT
House Sewer Lateral Connection to Existing Sewer Main - $225
House Sewer Conenction to Existing Sewer Lateral - $145
S -064
EXCAVATION PERMIT
Permit Issuance - $30
Inspection - $2.85 per linear foot of excavation or trench with a
minimum of $140
Plan Check - $300
plus performance bond at a level determined by City staff
S -065
UTILITY STREET CUT PERMIT
Permit Issuance - $30
Inspection - $2.85 per linear foot of excavation or trench with a
minimum of $140
Plan Check - $300
plus performance bond at a level determined by City staff
S -066
ENCROACHMENT LICENSE AGREEMENT
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -067
STREET CLOSURE REVIEW
$215 per application
S -068
NEWSRACK PERMIT
New - $105 per newsrack
Annual Renewal - $50 per newsrack
S -069
NEWSRACK IMPOUNDMENT
$90 per newsrack + $5 per day for storage
S -070
FINAL PARCEL MAP CHECK
$665 per map
(Any County procesing tees are paid directly to the County by
the applicant)
S -071
FINAL TRACT MAP PLAN CHECK
$1,565 or Actuals on 10 or grcatcr lots.
S -072
FINAL MAP AMENDMENT
$155 per application
(Any County procesing fees are paid directly to the County by
the applicant)
S -073
PUBLIC IMPROVEMENT PLAN CHECK
Percent of Construction Valuation.
$04100,000 - 3%
$100,0014500,000 - 2% of the construction value over
$100,000
$500,001+ - 1% of the construction value over $500,000
S -074
PUBLIC IMPROVEMENT INSPECTION
Percent of Construction Valuation:
$04100,000 - 1.5%
$100,001 4500,000 - 1 %, of the construction value over
$100,000
$500,001+ - 0.5% of the construction value over $500,000
S -075
CERTIFICATE OF CORRECTION ISSUANCE
$1,505 per a lication
S -076
RECORD OF SURVEY PLAN CHECK
$382.50 per plan
S -077
EASEMENT PROCESSING
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -078
QUITCLAIM REVIEW
None
S -079
SURETY b SUBORDINATION REVIEW
$382 per plan
S -080
LIEN REMOVAL
$155 per lien
S -081
DRAINAGE STUDY REVIEW
Minor - $460
Major - Deposit determined by staff with charges at the fully
allocated hourly rates for all personnel involved plus any outside
or contract costs.
S -082
STOCKPILE /BORROW SITE PLAN CHECK
$340 per plan
S -083
MINOR PLAN CHECK REVISION
$305 per sheet
S -084
STREET NAME CHANGE
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
A
cly SEMIC9
RO
7085
ALLEY /STREET VACATION REVIEW
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -086
ASSESS. DISTRICT FORMATION RESEARCH
Deposit determined by staff Meth charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -087
CITY PROPERTY ACQUISITON PROC.
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -088
WIDE & OVERLOAD PERMIT
Daily - $16 per permit
Annual - $90 per permit
Fees are set by State Law.
S -089
BLUEPRINT COPY SERVICE
In House - $2.50
Outside - Actual Costs
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
A CITY SEPINE CITY PROPOSED
BUILDING SAFETY SERVICES
S -090
BUILDING PLAN CHECK SERVICES
See Schedules B -1 and B -2, Attached
S -091
BUILDING INSPECTION SERVICES
See Schedules B -1 and B -2, Attached
S -092
MAP /PLAN /FILE SCANNING SERVICES
$1.20 per sheet -8 112' x 11'
$1.80 per sheet -larger
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
ilili I: Uigl- a4a
FIRE SERVICES
S -093
ANNUAL BUSINESS FIRE INSPECTION
100,000 - 499.999 square feet - $650
500,000 - 5,000,000 square feet - $1,300
S -094
ANNUAL BUSINESS FIRE REINSPECTION
100,000 - 499,999 square feet - $200
500,000 + square feet - $400
S -095
ANNUAL FIRE PERMIT
$95 per permit
S -096
TEMPORARY FIRE PERMIT
$505 per permit
S -097
FIRE HIGH RISE INSPECTION
$1.02 per 100 square feet
S -098
FIRE SPRINKLER PLAN CHECK/INSPECT.
Valuation based on Tables in Appendix B of this Report
These revenues should be in separate revenue accounts.
S -099
FIRE ALARM PLAN CHECK/INSPECTION
Valuation based on Tables in Appendix B of this Report
These revenues should be in separate revenue accounts.
S -100
FIRE EXTINGUISHING SYSTEM PC /INSP
Valuation based on Tables in Appendix B of this Report
These revenues should be in separate revenue accounts.
S -101
FIRE PROTECTION TESTING
$465 per system
S -102
STATE MANDATED FIRE INSPECTION
$125 per inspection
S -103
SPECIAL FIRE EQUIP INSP /APPROVAL
$775 per request plus any outside costs
S -104
HAZARDOUS MATERIALS INSP. PROGRAM
Range I - $382
Range II - $428
Range III - $564
S -105
CHEMICAL ACCIDENT RELEASE PREV PROG
100 -1,000 Pounds:
1 chemical - $1,370 2 chemicals - $1,825 3+ chemicals -
$2,280
1,000- 10,000 Pounds:
1 chemical - $1,480 2 chemicals - $2,055 3+ chemicals -
$2,735
10.000+ Pounds.
S -106
HAZARDOUS WASTE GENERATOR PERMIT
Smalll (6 -19 employees) - $800
Intermediate (20 -100 employees) - $1,100
Advanced (101 -500 employees) - $1,600
Permit By Rule - $1,300
Conditional Authorization - $1,000
Conditionally Exempt - $125
Large Quantity Generator - $125
5.107
NEW INDUSTRIAL WASTE PERMIT/INSPECT
New Permit Application* Sewer - $480 Off -Site - $480 On -Site -
$935
New Sewer Plan. 112 - $570 3/4 - $800 5/6 - $1,255
New On -Site Plan: 1/2 - $725 3/4 - $1,010 5/6 - $1,580
New Off -Site Plan: 1/2 - $625 3/4 - $875 5/6 - $1,370
Closure Inspection
S -108
REVISED INDUSTRIAL WASTE PERMIT /INS
Revise Permit Application - $230
Revise Sewer Plan:
1/2 - $440 3/4 - $610 5/6 - $950
Revise On -Site Plan:
1/2 - $550 3/4 - $760 5/6 - $1.180
Revise Off•Sile Plan:
1/2 - $440 314 - $610 5/6 - $950
S -109
INDUSTRIAL WASTE ANNUAL INSPECTION
Class 1 - $244
Class 2 - $488
Class 3 - $732
Class 4 - $976
Class 5 - $1,220
Class 6 - $2,928
S -110
UNDERGROUND TANK PERMIT
Annual Permit Maintenance - $770 plus $140 for each add ,l tank
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
10/16/2008
ED FEE
S -111
ABOVE GROUND LIQUID TANK INSPECTION
0- 10,000 gallon - $62.50
10,001- 100,000 gallon - $125
100,001,000,000 gallons - $250
1,000,001 + 10,000,000 gallons - $1.000
10,000,001- 100,000,000 gallon - $5,000
100,000,001+ gallon - $18.750
5 -112
REVIEW OF RISK MANAGEMENT PLAN
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
S -113
FIRE STORMWATER INSPECTION
Restaurant - $165
Automotive - $165
1 Acre - $200
2 -5 Acres - $235
More than 5 Acres - $330
S -114
HAZARDOUS MATERIALS RESPONSE
Charge the fully allocated hourly rates for all personnel involved
plus any outside or contract costs.
S -115
NEW CONSTR. FIRE RE- INSPECTION
Charges at the fully allocated hourly rates for all personnel
involved plus any outside or contract costs.
5 -116
AFTER-HOURS FIRE INSPECTION
Deposit determined by staff with charges at the fully allocated
hourly rates for all personnel involved plus any outside or
contract costs.
10/16/2008
Fee Study Summary
Schedule- Exhibit A
CITY OF EL SEGUNDO
FEE SUMMARY REPORT
FY 2008 -09
R 6 C f ff P OPOS D FE
ADMINISTRATIVE SERVICES
S -117
NEW BUSINESS LICENSE PROCESSING
$40 per application
S -118
BUSINESS LICENSE RENEWAL PROCESSING
$40 per renewal
S -119
FILM PERMIT PROCESSING
Permit Application Fee - $640
Revision /Rider - $175
Public Right-of -Way Usage - $750 per day per location
Police Personnel - Actual Costs
Fire Personnel - Actual Costs
Public Works Personnel - Actual Costs
S -120
COPY SERVICE
First 5 copies - No Charge
Each additional copy - $0.20 per copy
S -121
DOCUMENT CERTIFICATION
$3 per document
S -122
VIDEO /AUDIO COPYING
$10 per tape /disk
S -123
INITIATIVE PROCESSING
$200 per application
Fee is limited by State Law
10/16/2008
CITY OF EL SEGUNDO
BUILDING & SAFETY FEE SCHEDULE
BUILDING PERMIT FEES
SERVICE
RESIDENTIAL BUILDING PERMITS
Building Permit Under $500 Valuation
Building Permit $501 - $2,000 Valuation
Building Permit $2,001 - $25,000 Valuation
Building Permit $25,001 - $50,000 Valuation
Building Permit $50,0014100,000 Valuation
Building Permit $100,0014500,000 Valuation
Building Permit $500,001 41,000,000 Valuation
Building Permit Over $1,000,000 Valuation
RESIDENTIAL BUILDING PLAN CHECK
Building Plan Check Under $500 Valuation
Building Plan Check $501 - $2,000 Valuation
Building Plan Check $2,001 - $25,000 Valuation
Building Plan Check $25,001 450,000 Valuation
Building Plan Check $50,001- $100,000 Valuation
Building Plan Check $100,001 4500,000 Valuation
Building Plan Check $500,00141,000,000 Valuation
Building Plan Check Over $1,000,000 Valuation
CURRENT PROPOSED
FEE FEE
$15.00
$15 + $2 for each $100 over $500
$45 + $9 for each $1,000 over $2,000
$252 + $6.50 for each $1,000 over $25,000
$414.50 + $4.50 for each $1,000 over $50,000
$639.50 + $3.50 for each $1,000 over $100,000
$2,039.50 + $3 for each $1,000 over $500,000
$3,539.50 + $2.50 for each $1,000 over $1,000,000
$7.50
$7.50 + $1 for each $100 over $500
$22.50 + $4.50 for each $1,000 over $2,000
$126 + $3.25 for each $1,000 over $25,000
$207.25 + $2.25 for each $1,000 over $50,000
$319.75 + $1.75 for each $1,000 over $100,000
$1,019.75 + $1.50 for each $1,000 over $500,000
$1,769.75 + $1.25 for each $1,000 over $1,000,000
SCHEDULE B -1
$18.00
$18 + $2.40 for each $100 over $500
$54 + $10.80 for each $1,000 over $2,000
$302.40 + $7.80 for each $1,000 over $25,000
$481.80 + $5.40 for each $1,000 over $50,000
$751.80 + $4.20 for each $1,000 over $100,000
$2,431.80 + $3.60 for each $1,000 over $500,000
$4,231.80 + $3 for each $1,000 over $1,000,000
$9.00
$9 + $1.20 for each $100 over $500
$27 + $5.40 for each $1,000 over $2,000
$151.20 + $3.90 for each $1,000 over $25,000
$248.70 + $2.70 for each $1,000 over $50,000
$383.70 + $2.10 for each $1,000 over $100,000
$1,223.70 + $1.80 for each $1,000 over $500,000
$2,123.70 + $1.50 for each $1,000 over $1,000,000
I
m
w
J
D
0
w
U
w
J
w
U
m
W U
LL
O w
z H- LL
LL
w
Q
cn(1)w
Jasa
uj
LL zz
}05p
~ D D
U m m
0
W
U
O LL LL
a.
O LL
Q
CL
f-
Z
W UJ
it
O' LL
D
U
w
U
>I
W
°°888800§
' H N Ld O O O O
�HN(n 000
>
in 44 (AO
O m H H
S O O O > >
O pO O pO d
H O S S 00
y L
6044
O m U U L L H
d) m m U U
(P O d m U
(vj 0
H Nt O 0 -.0-' 2
+ CD N w O w
H co
N H -H + �tt0o
H + H + O VV!! M
00 + O N + H
tl- O N O) O +
Y! N Qj M N 0
Ci t- O N
0�tH6s�m ci
fA CO) OO
H uj
H
0 0 80 S S S S
q in O S 0 0 0
6 m 60 N S 0 S S
> �HH— Un O
O 41 " " H H �-
O O > > m y �
00 0 O O O m AD
O Q O Q 00 O
Cc
OLHH c-?
L
H
.2 U L L H
m U U LL L H
O m m U U
M Z m 0 m m_
H O m O U
+ o o m
04 4- ° .
N H H H
H + + + H d! M
O + + H
(o (O (o (o +
H (n co (o
H H 00 00 S
H N CD
H
C
O
C O
O O 0 7 m O
c -is @ >is
FU- c o >
o«.— m>
? >0$go 0Oo> O>0(5C 8OS a > O O O in r —
0
000(n(n -64 64 0
Z Lf) - - O
D y V O O S 69
m r O S O
O C wy C5 00
mC wN69
>
0(n44��0
wcLaaaa.cLmmm
w��vvv�vv
Z m m m m m m m m
O
z
co 00055� Oo
OU9io000_HOO_oo_
OHN (n 0000
N
44 (14 (n 000
> , 69H� 0
O m i 69 H!
> m d H
O > > m 0)
O O > >
p O 0 d
L� 0 0 0 O
H 0 0
N L to H .- r o
U L L H H
"O m U too.
U L L
i 41 m m m L
O N m U
O w0 O
H, M O w w
+ N (o 0 * 0) w
(o N (o �: N M
O H c)) t-
(O + fAHH44 6
H t + + t H
OO(n(nin +
O N O) st tip M
0
C•) LO S S -q:
H (o (o N
H H 60
8 H
O S O 0 0 0 S S
f9 N (On S S S
> i 69 H .- (n O
O N H H
> 0) m
S C) O O H
>> m
O O
O O S pp O O
r O
y L H H r r
Z U L t H L H
w d m m U U H
N" 0 N m m L
(o o - " m m U
� o 0 o o m
et (D It .... ..._
+ 6 O N Cl w
M 0 + + .+}
Hot :_:II
o Lo N 00 00 M
69 tr)H CM S
H � �
H
C
C
O '0 lYC m .O
Y C p m 7 W> 0
7
U m > O m
w m m>> O o O>
_' Co o 00 S C 00 0
z >oo.o0o(°n -o
O O �n �n — 44600
d S O NH 64 69
0
69 N O O
Z m("OSSQD ` n
0 0 (A O O O m
< <n N N to — (n >
J D 69 69 69 H 69 69 0
U U U U U U U )
m L L L L L t L L
Q 00 U U U U U U
F- c c c c c c c c
Z (C m m m m m m m
wan.aa.aaaa
c c c c c c c c
W v'_v'v M_ v'v m m
Ix
ZmmOOmm0000m
O
z
m
w
J
o
w
x
U
i
i
1
aO0 mmmm
'
W
J
LL
O
m
w
CL d(L
x
m
�
U
c
c c
p 1-- F-
1
W U
uj
LU
m
O LL W
m m
} LL
m
W
r r
:D
LL
'
E 0
T 7 o
T V
0 o 0
V) U)
0 0 o
Jaaa
co 00 cc
tL z z
o
o00
'
5 5
ca co
a
O
W
0 W
OW
aLL
O
Ix
CL
N
Z
W W
of w
X LL
D
U
W
U
cc
w
U
aO0 mmmm
i d) CD
L
0 0 ,- m m m m
LL
V! M L L L 7r-
m
m
CL d(L
c 0 0 0 0 0
0 0
m
�
i�xx xx
c
c c
p 1-- F-
L3 v v
m O O
m
a
m m
d
m
m
r r
�
m
C
E 0
T 7 o
T V
0 o 0
m
0 0 o
C
co 00 cc
SL 0 m E v
U V
o
�
CL
Pp0 to
N
0
a
C6
O c p m y
m
O
'€
v
0
m o
CL m m m m
0
add m
0
x
0
z E
40
a .« a m
E
0 0- o
CL
D
rw
J
a E m L G
L
Cl)
. a
co
O
w
0 0 0 m m m m
U
�
Q a 6 w w w w
vivlfH TTT T
L L L L
0 0 0 0
xxxx
O O
m
m
LL
m
m
m
m
c
m
�
L
f0
x
T
d
A
A�
LL
m
�
m
C
E 0
T 7 o
T V
Q.
m
E
c e`o E o
m a •` :'
o
o
SL 0 m E v
U V
o
�
CL
Pp0 to
T
C6
O c p m y
m
O
'€
U V N
'—
(n E m
d
m o
CL m m m m
add m
O r0U 4) to
x
w c c
z E
E
a .« a m
E
0 0- o
CL
D
0 d
J
a E m L G
L
m
. a
O O O O Q w
V �
O
O
U
�
CITY OF EL SEGUNDO
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
ELECTRICAL PERMITS
SCHEDULE B -2
Current Fee RCS Freoeposed City Proposed Fee
Permit Issuance
$15.00
$28.00
No Change to proposed
Supplemental Permit Issuance
$15.00
$21.00
No Change to proposed
Residential Appliances, up to 1 hp
$4.00
$28.00
$14.00 (SFR)
Non - Residential Appliances, up to 1 hp
$8.00
$28.00
No Change to proposed
Electrical Sign
$15.00
$133.00
No Change to proposed
Power Apparatus (Ratings in HP, KW, KVA, or KVAR
up to 5
$6.50
$114.00
$75.00
5 -20
$10.00
$114.00
$75.00
21 -50
$15.00
$114.00
$75.00
51-100
$33.00
$114.00
$75.00
100+
$50.00
$188.00
No Change to proposed
Temporary Power Pole
$20.00
$37.00
No Change to proposed
Services, Switchboards, Control Centers, & Panels
up to 600 volts
u p to 200 amps
SFR
$12.00
$56.00
$28.00 (SFR)
Non -SFR
$12.00
$133.00
No Change to proposed
201 -400 amps
SFR
$20.00
$56.00
$28.00 (SFR)
Non -SFR
$20.00
$133.00
No Change to proposed
401 -1,200 amps
$36.00
$315.00
No Change to proposed
over 1,200 amps
$45.00
$315.00
No Change to proposed
greater than 600 volts
$60.00
$342.00
No Change to proposed
Switchboards
First Section Standing Panel
$35.00
N/A
No Change to proposed
Additional Sections
$30.00
N/A
No Change to proposed
Page 1 of 6
CITY OF EL SEGUNDO
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
ELECTRICAL PERMITS
SCHEDULE B -2
RCS Proposed
Current Fee Fee City Proposed Fee
Over 600 Volt Section
$60.00
N/A
No Change to proposed
Additional Sections
$55.00
N/A
No Change to proposed
Receptacle, Switch, and Lighting Outlet, per fixture
$0.50
$7.00
$3.50 (SFR)
Lighting Fixture, per fixture
$0.50
$7.00
$3.50 (SFR)
Pole or Platform Mounted Fixtures, per fixture
$3.00
$19.00
No Change to proposed
Swimming Pool
$0.00
$111.00
$55.50 (SFR)
Meter Change
$0.00
$37.00
No Change to proposed
Miscellaneous Conduits and Conductors (per 100 linear feet
$0.00
$28.00
$30.00
Inspections not specified
Hourly Rate
Hourly Rate
No Change to proposed
Reinspections
Hourly Rate
Hourly Rate
No Change to proposed
After Hours Inspection (4 hour minimum)
OT Hourly Rate
OT Hourly Rate
No Change to proposed
!Overtime Hourly Rate is 120% of the Regular Hourly Rate
I i
i i
Page 2 of 6
CITY OF EL SEGUNDO
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
PLUMBING PERMITS
SCHEDULE B -2
Current Fee RCS Fee Proposed City Proposed Fee
Permit Issuance
$15.00
$28.00
No Change to proposed
Supplemental Permit Issuance
$15.00
$21.00
No Change to proposed
Plumbing Fixtures and Vents
SFR
$10.00
$11.00
No Change to proposed
Non -SFR
$10.00
$27.00
No Change to proposed
Repair or Alteration of Drainage or Vent Piping
$5.00
$28.00
$14.00 (SFR)
Grease Interceptor
$25.00
$237.00
$125.00
Piping
Single Family Residential (per dwelling unit)
$8.00
$37.00
$18.50 (SFR)
Multi Family Residential (per dwelling unit
$8.00
$114.00
Reie
Single Family Residential (per dwelling unit)
$8.00
$56.00
$28.00 (SFR)
Multi Familv Residential (per dwelling unit
$8.00
$56.00
Lawn Sprinklers, Vacuum Breakers, and Backflow Protection Dev.
Each Lawn Sprinkler System per Valve
$5.00
$9.00
No Change to proposed
Each Vacuum Breaker or Backflow Protection Device
$5.00
$9.00
No Change to proposed
Backflow Protection Device greater than 6"
$25.00
$167.00
No Change to proposed
Gas System
For Each S stem
Less than 2"
$15.00
$56.00
$28.00 (SFR)
2" or more
$50.00
$133.00
No Change to proposed
For Each Outlet over 5
$3.00
$11.00
$5.50 (SFR)
Water Heater
$8.00
$28.00
$14.00 (SFR)
Solar Water Heating system
$15.00
$56.00
$28.00 (SFR)
Sewer
0 -25 linear feet
$15.00
$28.00
No Change to proposed
each additional 100 linear feet
$0.00
$28.00
No Change to proposed
Swimming Pool
$75.00
$83.00
No Change to proposed
In- Ground Spa
$30.00
$37.00
No Change to proposed
Page 3 of 6
CITY OF EL SEGUNDO SCHEDULE B -2
BUILDING 8 SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
Pool /Spa Heater
$0.00
$28.00
No Change to proposed
Miscellaneous
$30.00
$56.00
No Change to proposed
Inspections not specified
Hourly Rate
Hourly Rate
No Change to proposed
Reinspections
Hourly Rate
Hourly Rate
No Change to proposed
After Hours Inspection (4 hour minimum)
OT Hourly Rate
OT Hourly Rate
No Change to proposed
Overtime Hourly Rate is 120% of the Regular Hourly Rate
Page 4 of 6
CITY OF EL SEGUNDO
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
MECHANICAL PERMITS
SCHEDULE B -2
Current Fee RCS Fee Proposed City Proposed Fee
Permit Issuance
$15.00
$28.00
No Change to proposed
Supplemental Permit Issuance
$15.00
$21.00
No Change to proposed
Forced -Air or Gravity -Type Furnace or Burner
$8.00
$47.00
$23.50 (SFR)
Floor Furnace - Installation or Relocation
$8.00
$37.00
$18.50 (SFR)
Suspended /Recessed Wall /Floor Mounted Heater -
Install /Reloc
$8.00
$37.00
No Change to proposed
Fireplace
$8.00
$76.00
$38.00 (SFR)
Appliance Vents per each Inlet/Outlet
$5.00
$13.00
$6.50 (SFR)
Air Handling Units
SFR
$15.00
$56.00
$28.00 (SFR)
Non -SFR
$15.00
$133.00
$75.00
Single Register Ventilation Fan
$5.00
$9.00
No Change to proposed
Independent Venting System
$14.00
$37.00
No Change to proposed
Hood served by Mechanical Exhaust
$8.00
$133.00
No Change to proposed
Boilers, Compressors, and Absorption Systems
0 -3 HP or 0- 100,000 Btu/h
$25.00
$114.00
$75.00
3 -15 HP or 100,001- 500,000 Btu/h
$25.00
$133.00
$75.00
15 -30 HP or 500,001- 1,000,000 Btu/h
$25.00
$237.00
$100.00
30 -50 HP or 1,000,001- 1,750,000 Btu/h
$35.00
$342.00
$125.00
50+ HP or 1,750,001+ Btu/h
$75.00
$447.00
$150.00
Incinerator /Kiln
$0.00
$56.00
No Change to proposed
Alteration to Duct Work not otherwise noted
$10.00
$4.00
$10.00
Miscellaneous
$30.00
$56.00
No Change to proposed
Inspections not specified
Hourly Rate
Hourly Rate
No Change to proposed
Page 5 of 6
CITY OF EL SEGUNDO
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
MECHANICAL PERMITS
SCHEDULE B -2
Current Fee RCS Proposed City Proposed Fee
Reinspections
Hourly Rate
Hourly Rate
No Change to proposed
After Hours Inspection (4 hour minimum)
OT Hourly Rate
OT Hourly Rate
No Change to proposed
Overtime Hourly Rate is 120% of the Regular Hourly Rate
Page 6 of 6
evenue
� ost
pecialiStS, LLc
Serving Local Governments Since 1975
Cost of Services Study
for the
City of El Segundo
AUGUST 2008
Prepared by:
Revenue & Cost Specialists, LLC
1519 East Chapman Ave, Suite C
Fullerton, CA 92831
www.revenuecost.com
(714) 992 -9020
Copyright, 2008 by Revenue & Cost Specialists
Table of Contents
EXECUTIVE SUMMARY ................ ............................... 1
CHAPTERI .......................... ............................... 3
BACKGROUND ....................... ............................... 3
Proposition 13 ................... ............................... 3
Proposition4 .................... ............................... 3
Proposition 218 .................. ............................... 4
Underlying Report Goal ............ ............................... 4
StudyPhases .................... ............................... 4
Terminology ..................... ............................... 5
CHAPTE RII .......................... ............................... 7
INTERNAL SUPPORT SERVICES ........ ............................... 7
Cost Allocation Plans - Historical Perspective .......................... 7
Federal Government Creates the Process ....................... 7
Gann Initiative Institutionalizes Overhead for Services .............. 7
Types of INTERNAL SUPPORT SERVICES ........................... 8
General City Overhead ............ ............................... 8
Departmental Administration ........ ............................... 8
Cost Allocation Plan Methodology .... ............................... 9
Internal Service Costs ............. ............................... 9
Schedule 1 - Internal Service Costs ........................... 10
Allocation Factors ............... ............................... 14
Schedule 2 - List of Allocation Factors ......................... 15
Summary of Internal Support Services .............................. 19
CHAPTERIII ........................ ............................... 21
FULLY - BURDENED HOURLY RATES .... ............................... 21
Costs Recognized by Proposition 4 .................... . ............ 21
Cost Elements in the Fully- Burdened Hourly Rate ...................... 21
Salary......................... ............................... 22
Benefits....................... ............................... 22
Employee Benefit Groups ......... ............................... 23
Schedule 3 - Fringe Benefits .. ............................... 23
"General" versus "Specific" Costs ... ............................... 23
Operating Expenses ............. ............................... 24
Overhead Expenses ............. ............................... 24
Available Work -Hours ............ ............................... 24
Results of Knowing the Fully- Burdened Hourly Rates ................... 24
Summary...................... ............................... 25
Table of Contents (cont.)
CHAPTERIV ........................ ............................... 27
PUBLIC SERVICES - OVERVIEW ........ ............................... 27
Public Services ................. ............................... 27
Personal Choice Public Services .... ............................... 28
Distinguishing Between Comm -Supp & Personal Choice Public Services ... 28
Summary...................... ............................... 29
CHAPTER V ......................... ............................... 31
PERSONAL CHOICE PUBLIC SERVICES . ............................... 31
Service Groups ................. ............................... 31
Service Center Detail Found in Appendix A ...... . .................... 31
General Commentary on Chapter Tables ............................ 32
Suggestions For Services Analyzed . ............................... 32
Special Circumstances ...... ............................... 33
Planning Services ............... ............................... 34
Engineering Services ............. ............................... 37
Building Safety Services .......... ............................... 39
Fire Services ................... ............................... 40
Administrative Services ........... ............................... 42
Summary of Personal Choice Public Services ......................... 43
Result of Adoption .......... ............................... 43
Taxpayer Equity Achieved .... ............................... 43
A Master Fee Resolution .......... ............................... 43
Policy Regarding "New" Services .... ............................... 43
Conclusion ..................... ............................... 44
CHAPTER VI ........................ ............................... 45
ACTIONPLAN ....................... ............................... 45
Internal Support Services .......... ............................... 45
Public Services ................. ............................... 45
Personal Choice Public Services .... ............................... 46
Community- Supported Public Services .............................. 46
Summary...................... ............................... 47
APPENDIX A - PERSONAL CHOICE PUBLIC SERVICE DETAIL
APPENDIX B - BUILDING SAFETY DETAILED FEE RECOMMENDATIONS
EXECUTIVE SUMMARY
A. The cumulative effect of the three taxpayer initiatives, Propositions 13,4 & 218, has
been to significantly change California local government finance. In order for cities
to provide basic services, it is necessary to cut -back on the taxes used for non -basic
services and to explore ways to make all services as efficient and effective as
possible. This report provides information which the City Council, staff and citizens
of El Segundo can use in this process.
B. The City is currently using about $2.2 Million in taxes to support PERSONAL
CHOICE PUBLIC SERVICES' that could or should be supported by their fees. To
make the determination that there has not been an unintentional subsidy, the City
Council should review each subsidized service in Appendix A so that it can make
a finding that there is a social welfare, public safety or other reason to continue the
subsidy.
C. Being supported by fees merely means that the cost of the service is "in -line" with
the fee charged for the service. Raising the fee is only one way to bring the two into
line. The cost may be reduced. The service may be discontinued. A non -user may
wish to support the service for the recognition. The real issue to be addressed is
whether there is a reason for the City Council to have the general taxpayer
subsidize a particular service for a "personal choice" user.
D. In addition to the current costs that are identified by this Report, the City is incurring
an obligation to maintain or replace its infrastructure. The implementation of GASB
34 has identified many millions more in annual costs that should be added to the
City's tax services.
See Chapter IV for an explanation of the term "Personal Choice" and how it differs from "Fee Service."
CHAPTER I
BACKGROUND
To fully understand this Report and its suggestions for local government financial
management, it is necessary for the reader to understand the reasons why local
government financial management has changed over the last twenty -five years.
This Report would not exist today without the taxpayer rebellion begun in 1978 by Howard
Jarvis. Prior to that date, city councils had the ability to set the local property tax rate.
There was no pressure on management to operate more efficiently as the "well was full."
When asked to pay for a service, taxpayers could legitimately say that they paid taxes to
cover that service.
Beginning in the mid - sixties, property values in the large urban areas of California began
annual double -digit increases. This was a windfall to local governments as they were
getting annual double -digit increases in property tax revenue without the stigma of having
raised the rate. Although some local governments acted responsibly by lowering their tax
rate, most did not. The significant annual tax increases were noticed by everyone, but it
was Howard Jarvis who focused the resentment into a movement and, almost single -
handed, pushed through the voter adoption of Proposition 13.
Proposition 13
The proposition, which became Article XIIIA of the State Constitution, established a limit
on the growth of the property tax. But, more importantly, it empowered voters who did not
like the direction that local government was taking. Unfortunately, there is still no
consensus on what that direction should be.
Proposition 4
After the passage of Proposition 13, the California Taxpayers Association, the California
Chamber of Commerce, the National Tax Limitation Committee and the California
Association of Realtors banded together, contributed money, hired constitutional attorneys
to draft a more thorough proposition, and hired Paul Gann, who was an associate of
Howard Jarvis, to be the proposition's spokesperson. The result was Proposition 4, which
is more commonly referred to as the "Gann Spirit of 13 'Let's Finish the Job' Initiative ". It
was adopted by 74.3% of the voters of California on November 6, 1979, and became
3
City of E/ Segundo Cost of Services Study
effective on July 1, 1980, retroactive to Fiscal Year 1978 -79.
This proposition, which became Article XIIIB of the State Constitution, had a more
significant fiscal impact than Prop. 13 as it addressed all city revenues and established a
limit on the growth of tax revenues.
Because of Proposition 4, fee services cannot exceed the "costs reasonably borne" by the
City in providing the service. If the fee exceeds the cost, the excess fee is defined to be a
special tax which Proposition 13 requires be approved by two- thirds of the voters.
Proposition 218
This proposition, which is now Articles XIIIC & D, was adopted in November of 1996. The
immediate impact of this proposition was to limit the use of assessment districts and
restrict transfers of monies into the general fund from utility funds2. However, the long term
effect may be to make local government legislative bodies irrelevant, as all of its tax and
fee decisions can be overruled by the voters.
Underlying Report Goal
A major underlying goal of this Report is to provide information and guidance to the City
Council on how the City can continue as a viable financial entity, finance the services and
facilities that its citizens and business enterprises have come to expect, and yet in the long
run be able to live within the limits imposed by voter - adopted Articles XIIIA, B, C & D.
This is a watershed period for California local government. The voters are on a track which
could ultimately result in either the destruction of local government or its reconstruction as
a paragon of efficiency and effectiveness which is in harmony with the voters. This Report
takes the position that the latter track can only be achieved by improved information on
what government does and how it does it. Consequently, it is one more tool that the City
Council and staff can use in the continuing process of communication with the public.
Study Phases
To accomplish our goal, the work encompassed by this Report involved four basic phases,
which are discussed in the following Chapters:
Under Article XIII D, local government fees and charges must reasonably represent the cost of providing a service
(Howard Jarvis Taxpayers Association at al., v. City of Roseville, Case No. C036295, Cal.App. V, April 12, 2002).
Roseville's "in -lieu franchise fee" of 4% on each utility was not tied to the City's cost of providing services to the utilities.
S1
61,
I
r:: _.
Chapter
l -
P
1. Identify, fully cost, and allocate the INTERNAL SUPPORT SERVICES that are
provided to the rest of the organization. The result of this phase is the division of all
City activities into two service groups. The first group is comprised of activities, the
INTERNAL SUPPORT SERVICES, that exist to support the second group. The
second group is comprised of activities, PUBLIC SERVICES, which provide services
to either the community as a whole or to individuals. Examples of INTERNAL
SUPPORT SERVICES are: the City Council, the City Manager, the City Clerk,
Finance and the City Attorney.
�`"� %"'�
2. Identify and fully cost the hours in the departments providing PUBLIC
SERVICES. This phase will show how staff positions can be thought of as time
resources for the City. How each unit of time can be fully costed and assigned to a
particular service which is provided to the public. The result of this phase is the
FULLY - BURDENED HOURLY RATE for staff positions providing PUBLIC
SERVICES.
3. Identify all City- provided PUBLIC SERVICES and categorize them into two major
subgroups: (a) services that are provided to the public at large where there is
presently no practical way to measure the consumption of the service
(COMMUNITY- SUPPORTED PUBLIC SERVICES); and, (b) services that are
provided, or could be provided, for a fee subject to the City Council's desire to fully
or partially subsidize it for social, safety or welfare reasons (PERSONAL- CHOICE
PUBLIC SERVICES). This phase (Chapter IV) will also discuss the difficulty in
categorizing some services as either "community" or "personal" and will offer some
techniques that could be used to distinguish between the two groups.
4. Fully cost the PERSONAL CHOICE PUBLIC SERVICES and present the results so
that the City staff, the City Council and the public are aware of the source of monies
used to support each service and can make reasoned decisions whether the service
or certain service recipients should be subsidized by the taxes paid by the entire
community.
Terminology
The above section uses the term, PERSONAL CHOICE, to define services where others
might use the term, FEE SERVICES. As more fully discussed in Chapter IV, the distinction
is that the City Council decides whether a service is paid for by taxes or charged to the
user as a FEE SERVICE. If a city were to have sufficient tax revenues, there could
potentially be no fee services. The term, PERSONAL CHOICE, is used to distinguish a
5
City of E/ Segundo Cost of Services Study
service received by an identifiable person or group from services that are used by the
community as a whole. It might be argued that the City requires a permit, for example, and
that the user has no choice. However, the permit applicant is doing something unique that
every other resident in the City is not doing and so, the question becomes - should
everyone in the City contribute part of their tax dollars to subsidize the service received by
this unique individual? Fortunately, we elect city councils to make these tough decisions.
0
CHAPTER II
INTERNAL, SUPPORT SERVICES
INTERNAL SUPPORT SERVICES are the vital glue that holds an organization together
so that the staff is not a loose, uncoordinated confederation of expensive parts. It is also
referred to as "overhead ", "administration" or "indirect cost ". At one extreme, the services
provide the coordinative and analytical capability necessary to research and respond to
City policy and operational issues, and then to execute those policies quickly and to report
the results accurately. At the other extreme, the services provide the day -to -day equipment
or facilities required for the rest of the organization to function effectively.
The purpose of this Chapter is to show how these services were identified, fully - costed and
allocated to the remainder of the City organization. The technique used by RCS to achieve
this purpose is referred to as a "cost allocation plan" or CAP, for short. This chapter will
include several schedules from the complete Plan which has been provided to the City in
a separate volume.
Cost Allocation Plans - Historical Perspective
Federal Government Creates the Process. During the 1960's when the federal government
was sharing increasing amounts of revenue with local governments, the local concern was
that the grants were impacting administrative departments without the grant compensating
the local agency for this impact. Consequently, the federal government established a
process that local agencies could use to compute this impact and which the federal
government would accept for overhead reimbursement. This process was called a Cost
Allocation Plan and is identified with the various reference numbers that it has received
over the years: A -87, OASCA 0 and FMC 74 -4.
Gann Initiative Institutionalizes Overhead for Services. Even though the federal
government recognized the overhead costs of grant programs, the on -going overhead for
regular operations was not widely computed by local governments until California voters
adopted Proposition 4, the Gann Initiative, in November of 1979. This proposition (Article
XII1B) states that overhead and administration are part of the "costs reasonably borne" in
charging for a service. This distinction was necessary because a fee in excess of the "costs
reasonably borne" is considered to be a tax and to require a two- thirds vote to be legitimate
according to the Jarvis Initiative (Proposition 13, State Constitution Article XIIIA).
7
City of El Segundo Cost of Services Study
Types of INTERNAL SUPPORT SERVICES
Two types of INTERNAL SUPPORT SERVICES are in use by El Segundo:
General City Overhead
Departmental Administration
Each is now discussed in its turn.
General City Overhead
Costs in this category would be for the general administration of the City, such as the
following:
City Council
City Treasurer
City Manager
City Clerk
City Attorney
Finance
Information Systems
Personnel
Government Buildings
Equipment Maintenance
Each service is very important to the smooth functioning of the City. But, their primary
function is to support other departments and not to provide an end -user service to the
public. Where they do perform an end -user service, the cost related to that service has
been removed from the costs allocated to other departments.
Departmental Administration
This group can be as simple as part of the time of the department head and departmental
secretary to division managers. Again, the purpose of these services is to insure the
smooth functioning of the department and not to provide an end -user service to the public.
Some of these costs were allocated through the CAP. In other cases, a percentage
overhead was calculated for the department or division and then added to the CAP costs
to establish the total overhead for a departmental position. Departmental overhead will also
be discussed in the next chapter.
Chapter 11- Internal Support Services
Cost Allocation Plan Methodology
RCS took the following steps to allocate the above numerated internal services to all other
services through the Cost Allocation Plan:
1. Calculated the Costs for each internal service
2. Identified departments receiving each internal service
3. Selected a method for allocating the costs ( #1) to other departments ( #2)
4. Reviewed the Allocations for Reasonableness
Internal Service Costs
The result of allocating the City Overhead is found on the following Schedule 1. 40� - -/
This schedule is also found as TAB 1 in the Full Cost Allocation Plan which has been
provided to the City as a separate Report.
0
CITY OF EL SEGUNDO SCHEDULE A
Final Allocation Summary Report Total
FY 2007 -2008 Schedule 1
Page 1 of 4
Suborg #
Suborg Name
Final Allocation
001 - 1000 -1301
CITY CLERK
$618.09
001 - 2000 -2101
CITY MANAGER
$72,716.66
001 - 2000 -2504
BUSINESS SERVICES
$220,033.88
001 - 2000 -2505
INFORMATION SYST.
$2,689.70
001 - 2000 -6601
COMMUNITY CABLE
$180,980.26
001 - 2400 -2402
PLANNING
$417,923.94
001 - 2400 -2403
BUILDING SAFETY
$420,406.82
001 - 2600 -4101
ENGINEERING
$300,987.83
001 - 2600 -4201
STREET SERVICES
$140,894.12
001 - 2600 -4202
STREET MAINTENANCE
$303,540.31
001 - 2600 -4205
PW TRAFFIC SAFETY
$125,374.99
001 - 2600 -4206
SOLID WASTE RECYCLING
$185,016.41
001 - 26004302
STORM DRAINS
$78,272.97
001 - 2600 -4801
PUBLIC WORKS ADMIN
$2,057.96
001 - 3100 -3101
POLICE ADMIN.
$1,196,227.42
001 - 3100 -3102
PATROL & SAFETY SERVICES
$959,587.34
001 - 3100 -3103
CRIME INVESTIGATION
$288,765.23
001 - 3100 -3104
TRAFFIC SAFETY
$146,842.29
001 - 3100 -3106
POLICE COMM REL
$17,457.93
001 - 3100 -3107
PUBLIC SAFETY COMMUNICATIONS
$269,542.56
001 - 3100 -3108
ANIMAL CONTROL
$21,970.13
001 - 3200 -3201
FIRE ADMINISTRATION
$79,588.94
001 - 3200 -3202
FIRE SUPPRESSION
$1,277,390.49
1
July 18. 2008
CITY OF EL SEGUNDO SCHEDULE A
Final Allocation Summary Report - Total
FY 2007 -2008 Schedule 1
Page 2 of 4
Suborg #
Suborg Name
Final Allocation
001 - 3200 -3203
FIRE PARAMEDIC
$335,490.85
001- 3200 -3204
FIRE PREVENTION
$70,493.70
001 - 3200 -3205
FIRE ENVIR SAFETY
$57,771.67
001 - 3200 -3255
FIRE EMERGENCY SERVICES
$112,169.17
001 - 5000 -5101
RECREATION & PARKS ADMIN
$98,807.57
001 - 5000 -5102
PARKS OPERATIONS
$448,339.14
001 - 5000 -5201
RECREATION OPERATIONS
$206,912.54
001 - 5000 -5202
AQUATICS
$127,988.08
001 - 5000 -5203
CULTURAL ARTS
$30,758.51
001 - 5000 -5204
SPORTS
$27,529.90
001 - 5000 -5205
TEEN CENTER
$76,967.04
001 - 5000 -5206
JOSLYN SENIOR CENTER
$76,266.09
001 - 5000 -5208
FARMERS MARKET
$5,230.88
001 -5000 -5209
CONTRACT CLASSES
$30,773.51
001 - 5000 -5210
SPECIAL EVENTS
$10,519.96
001 - 5000 -5212
RECREATION TRIPS
$481.50
001 - 5000 -6101
LIBRARY ADMINISTRATION
$464,240.58
001 - 5000 -6102
LIBRARY SUPPORT SERVICES
$81,889.58
001 - 5000 -6103
LIBRARY YOUTH SERVICES
$81,342.68
001 - 5000 -6104
LIBRARY PUBLIC /INFO SERVICES
$73,320.07
104- 3100 -3104
TRAFFIC SAFETY GRANT
$8,637.72
106 - 2600 -0000
STATE GAS TAX
$11,873.54
109 - 3100 -3105
ASSET FORFEITURE
$126,844.26
111 - 2400 -2743
CDBG SENIOR IN -HOME CARE
$1,229.09
2
July 18, 2008
CITY OF EL SEGUNDO
!Final Allocation Summary Report - Total
FY 2007 -2008
SCHEDULE A
Schedule 1
Page 3 of 4
Suborg #
Suborg Name
Final Allocation
111 - 2400 -2747
CDBG JUVENILE DIVERSION
$795.94
111- 2400 -2748
CDBG MINOR HOME REPAIR
$2,102.93
'111- 2400 -2778
CDBG DELIVERED MEALS
$1,843.70
111- 2400 -2779
CDBG GENERAL ADMIN
$1,112.52
111- 2400 -2781
CDBG ADA CONCRETE RAMPS
$1,005.01
112- 5000 -5292
PROP A DIAL -A -RIDE
$155,288.59
112 - 5000 -5293
PROP A SHUTTLE
$3,589.00
112 - 5000 -5294
PROP A RECREATION TRIPS
$1,878.53
112- 5000 -5295
PROP A ADMINISTRATION
$46,947.42
112 - 5000 -5297
PROP A MTA BUY -DOWN
$442.62
112 - 5000 -5298
PROP A CTIP /MAX
$1,688.43
1.14- 5000 -5292
PROP C DIAL -A -RIDE
$668.51
114 - 5000 -5293
PROP C SHUTTLE
$12,689.99
114- 5000 -5295
PROP C ADMINISTRATION
$49,230.90
115 - 2400 -0000
AIR POLLUTION REDUCTION
$3,051.88
116 - 2400 -0000
RESIDENTIAL SOUND INSULATION
$127,079.31
117 - 2400 -8601
HYPERION MITIGATION
$17,086.75
120 - 3100 -0000
COPS /SLESF GRANT
$18,911.17
202 - 2000 -0000
ASSESSMENT DISTRICT #73
$2,288.66
301 - 0000 -0000
CAPITAL IMPROVEMENTS FUND
$73,601.83
405 - 2600 -0000
FACILITIES MAINT FUND
$14,422.26
501 - 2600 -7102
WATER OPERATIONS
$519,134.26
502 - 2600 -4301
WASTEWATER
$272,102.38
503 - 5000 -5301
GOLF COURSE ADMIN
$24,701.68
503 - 5000 -5302
GOLF FOOD AND BEVERAGE
$19,581.13
503 - 5000 -5304
GOLF PRO SHOP
$16,527.99
3
July 18, 2008
A
CITY OF EL SEGUNDO
Final Allocation Summary Report - Total
FY 20072008
Suborg # Suborg Name
503 - 5000 -5305 GOLF COURSE MAINTENANCE
503 - 5000 -5306 GOLF DRIVING RAGE
503 - 5000 -5307 GOLF GENERAL & ADMIN
503 - 5000 -5308 GOLF LESSONS
SCHEDULE A
Schedule 1
Page 4 of 4
Finai Allocation
$23,655.15
$5,917.21
$34,381.77
$2,138.35
$10,728,629.77
0
4 July 18. 2008
r.
City of B Segundo Cost of Services Study
Allocation Factors
Going from the cost of general overhead to the costs allocated to end -user departments
and divisions was accomplished by using an overhead allocation factor. Each factor was
related to the work effort of its particular overhead element. The ratio of the factor specific
to each end -user department to the total of the factors for all departments became the ratio
for allocating each overhead element. These factors are described on the following
Schedule 2.
14
CITY OF EL SEGUNDO SCHEDULE C
Summary of Allocation Factors
FY 2007 -2008 Schedule 2
Page 1 of 4
CITY COUNCIL
CAP -001 CITY COUNCIL SERVICES 50 %-# OF AGENDA ITEMS /50 % -% OF BUDGET
CITY TREASURER
CAP -005 TREASURER SERVICES
CITY CLERK
CAP -010
CAP -011
CAP-011A
CAP -012
CAP -013
CAP -014
CITY COUNCIL SUPPORT
CONTRACT PROCESSING
BID PROCESSING
ELECTIONS SUPPORT
GENERAL LIABILITY CLAIMS
DEPARTMENT SUPPORT
ELECTIONS
CAP -015 ELECTION SERVICES
CITY MANAGER
CAP -020
CITY COUNCIL SUPPORT
CAP -021
CITY ADMINISTRATION
CAP -022
INFO SERVICES SUPPORT
CAP -023
CABLE TV SUPPORT
CAP -024
ECONOMIC DEVELOPMENT
CASH BALANCE - 9/30/07
ALLOCATE TO CITY COUNCIL
# OF CONTRACTS
# OF BIDS
ALLOCATE TO ELECTIONS
ADJUSTED BUDGET
ADJUSTED BUDGET (PUB SAF ADMIN ONLY)
ALLOCATE TO CITY COUNCIL
ALLOCATE TO CITY COUNCIL
ADJUSTED BUDGET
ALLOCATE TO INFORMATION SYSTEMS
ALLOCATE TO COMMUNITY CABLE
ADJUSTED BUDGET
1 July 18, 2008
CITY ATTORNEY
CAP -030
CAP -031
CAP -032
CAP -033
CAP -034
CAP -034A
CITY OF EL SEGUNDO
Summary of Allocation Factors
FY 2007 -2008
CITY COUNCIL LEGAL SVCS
CONTRACT LEGAL SVCS
HUMAN RES. LEGAL SVCS
LABOR NEGOT. LEGAL SVCS
LIABILITY LEGAL SERVICES
CODE ENFORCE LEGAL SVCS
FINANCE ADMINISTRATION
CAP -035
CITY ADMINISTRATION
CAP -036
BUDGET PREP /COORD
CAP -037
TREASURY SERVICES
CAP -038
GENERAL LIABILITY SUPPORT
CAP -039
FINANCE DEPT ADMIN
FINANCE ACCOUNTING SERVICES
CAP -040
GENERAL ACCOUNTING
CAP -041
ACCOUNTS PAYABLE
CAP -042
PROP A SUPPORT
CAP -043
PROP C SUPPORT
CAP -044
BUDGET PREP /COORD
SCHEDULE C
Schedule 2
Page 2 of 4
ALLOCATE TO CITY COUNCIL
# OF CONTRACTS
# OF FULL TIME EQUIVALENT EMPLOYEES
# OF REPRESENTED EMPLOYEES
ADJUSTED BUDGET
ALLOCATE TO PLANNING
ADJUSTED BUDGET
ADJUSTED BUDGET
CASH BALANCE - 9/30/07
ADJUSTED BUDGET
# OF FINANCE FTE'S
ADJUSTED BUDGET
# OF INVOICE TRANSACTIONS
ALLOCATE TO PROP A
ALLOCATE TO PROP C
ADJUSTED BUDGET
2 July 18, 2008
CITY OF EL SEGUNDO
Summary of Allocation Factors
FY 2007 -2008
INFORMATION SYST.
CAP -050
PC USER SUPPORT
CAP -051
NETWORK SUPP /IS PROJECTS
CAP -052
GIS SERVICES
CAP -053
TELECOMMUNICATIONS SUPP
CAP -054
INFO SYSTEMS ADMIN
HUMAN RESOURCES
CAP -060
RECRUIT SELECT & STAFF
CAP -061
EMPLOYEE /EMPLOYER REL.
CAP -062
LABOR CONTRACT NEGOTIATE
CAP -063
WORKERS COMP /SAFETY
CAP -064
CITY RECEPTION SERVICES
CAP -065
HUMAN RESOURCES ADMIN
FINANCE FISCAL SERVICES
CAP -070
PURCHASING SERVICES
CAP -071
BENEFIT ADMINISTRATION
CAP -072
BUDGET PREP /COORD
CAP -073
PAYROLL SERVICES
CAP -074
FINANCIAL ANALYSIS
CAP -075
CONTRACT PROCESSING
CAP -076
GENERAL LIABILITY ADMIN
SCHEDULE C
Schedule 2
Page 3 of 4
# OF NETWORK CONNECTIONS (POLICE ADJ)
# OF NETWORK CONNECTIONS
ESTIMATE OF GIS USAGE
# OF NETWORK CONNECTIONS
ALLOCATE TO INFO SYSTEMS
# OF RECUITMENTS - 3 YEARS
# OF FULL TIME EQUIVALENT EMPLOYEES
# OF REPRESENTED EMPLOYEES
WORKERS COMP CHARGES
# OF FULL TIME EQUIVALENT EMPLOYEES
ALLOCATE TO HUMAN RESOURCES
# OF PURCHASE ORDERS
# OF BENEFITTED EMPLOYEES
ADJUSTED BUDGET
# OF PAYCHECKS - 1 PAY PERIOD
ADJUSTED BUDGET
# OF CONTRACTS
ADJUSTED BUDGET
3 July 18. 2008
CITY OF EL SEGUNDO
Summary of Allocation Factors
FY 2007 -2008
ANON- DEPARTMENTAL
CAP -080
NON - DEPARTMENTAL
CAP -081
CITY HALL DEBT SERVICE
CAP -082
GEN. FUND LIABILITY EXP
CAP -083
RETIREE BENEFITS
GOVERNMENT BUILDINGS
CAP -100
BUILDING MAINTENANCE
CAP -101
CITY HALL CUSTODIAL
CAP -102
POLICE CUSTODIAL
CAP -103
FIRE ADMIN CUSTODIAL
CAP -104
CITY YARD CUSTODIAL
CAP -105
WATER YARD CUSTODIAL
EQUIPMENT MAINTENANCE
CAP -110
EQUIPMENT MAINTENANCE
CAP -111
EQUIPMENT FUEL COSTS
CAP -112
EQUIPMENT PARTS /SERVICES
CAP -113
GOVERNMENT BLDGS SUPPORT
CAP -114
STREET SERVICES SUPPORT
CAP -115
SOLID WASTE SUPPORT
PUBLIC WORKS ADMIN
CAP -120 PUBLIC WORKS ADMIN
SCHEDULE C
Schedule 2
Page 4 of 4
ADJUSTED BUDGET
CITY HALL SQUARE FOOTAGE
GENERAL FUND ADJUSTED BUDGET
# OF BENEFITTED EMPLOYEES
SQUAREFOOTAGE
CITY HALL SQUARE FOOTAGE
POLICE SQUARE FOOTAGE
# OF FIRE ADMIN /PREY FTE'S
ALLOCATION OF SPACE USED
ALLOCATE TO WATER
LABOR COSTS
FUEL COSTS
PARTS /SUBLET COSTS
ALLOCATE TO GOVERNMENT BUILDINGS
ALLOCATE TO STREET SERVICES
ALLOCATE TO SOLID WASTE
# OF PUBLIC WORKS FTE'S
4 Ally 18, 2008
Chapter 11- Infernal Support Services
Summary of Internal Support Services
At the conclusion of this process, all INTERNAL SUPPORT SERVICES allocated
through the Cost Allocation Plan have been assigned to departments and activities
providing PUBLIC SERVICES. These costs will appear as an element of the fully -
burdened hourly rates (Chapter III) or as a "specific" charge to a service (also discussed
in Chapter III).
19
City of El Segundo Cost of Services Study
(THIS PAGE INTENTIONALLY BLANK)
20
CHAPTER III
FULLY-BURDENED HOURLY RATES
All labor for hire in the private sector is based on a flat hourly rate. For example, a plumber
who is fixing a sink for a homeowner may quote an hourly rate of $70. As consumers, we
understand that the plumber is not making $70 an hour but that all of the costs associated
with his /her trip to the homeowner are factored into that rate. This chapter shows how RCS
has calculated a similar hourly rate for staff that provide PUBLIC SERVICES.
Costs Recognized by Proposition 4
In Chapter I, it was mentioned that the authors of Proposition 4 included the California
Association of Realtors and the California Chamber of Commerce; in effect, the pillars of
business. Therefore, it is not surprising that they recommended a business - oriented
approach to the costs of governmental services. For example:
"The phrase `costs reasonably borne by such entity in providing the
regulation, product, or service' is intended to incorporate all appropriations
by an entity for reasonable costs appropriate for the continuation of the
service over time. This includes ongoing expenses such as operation costs
and a reasonable allocation for overhead and administration, but it also
includes reasonable allocation for start-up costs and future capacity. Thus,
reasonable allocations for capital replacement, expansion of services, and
repayment of related bond issuances would be considered `costs reasonably
borne'."'
Cost Elements in the Fully- Burdened Hourly Rate
The fully- burdened hourly rate (FBHR) for a position which provides PUBLIC SERVICES
is comprised of the following elements:
- Salary
- Benefits
' "Summary of Proposed Implementing Legislation and Drafter's Intent with Regard to Article XIIIB of the California
Constitution (Proposition 4, November 6, 1979) "; Spirit of 13, Inc.; 1980; California Chamber of Commerce; page 6.
21
City of E/ Segundo Cost of Services Study
and a proportionate share of the activity's "general ":
Operating Expenses
- Overhead Expenses
When these costs are added together for a position, the result is the total cost of that
position to the City. The fully- burdened hourly rate for that position is calculated by taking
the total cost of the position and dividing it by the number of hours that the position is
available for work (i.e. "the available- work - hours ").
Salary
This includes the annual salary of the position. If there are multiple people with the same
position title, then this includes their total salary so that the cost of individuals at different
pay steps is averaged over all people with the same title. The salary cost should also
include any benefit that is unique to that position such as a car allowance unless that
benefit is included with the other benefits.
Benefits
There are three categories of employee benefits: hour, dollar and percentage. The hour
benefits are discussed under the topic of "available work hours." Dollar benefits refer to any
benefit where the cost is a flat amount irrespective of the employee's salary. Examples of
dollar benefits are:
Group Medical Insurance
Percentage benefits refer to benefits where the cost is determined by multiplying the
employee's salary by a percentage rate. Examples of percentage benefits are:
Retirement Contribution
Medicare
Workers' Compensation Insurance
Social Security
22
Chapter /// - Fully- Burdened Hourly Rates
Employee Benefit Groups
The following Schedule 3 lists the various groupings of employees for which a unique
fringe benefit rate was calculated.
Schedule 3
CITY OF EL SEGUNDO
FRINGE BENEFIT RATES
FISCAL YEAR 2007 -2008
"General" versus "Specific" Costs
Specific costs are "driven" by a specific PUBLIC SERVICE. Consequently, specific costs
should be allocated directly to the service rather than included as an element of the FBHR.
To include specific costs in the hourly rate would result in those costs being spread to all
work performed by those staff positions so that the cost of the specific service would be
understated and all other services by those positions would be overstated.
Examples of specific costs are:
1. Contracted plan check service for a particular permit application.
2. Advertising the public hearing of a planning application.
3. Special maintenance expenditures for a particular building or facility.
Once the specific costs have been allocated directly to the appropriate PUBLIC SERVICE,
the costs which remain are "general" costs and necessary for the associated positions to
function properly. These costs are included in the FBHR of those positions.
23
BENEFIT
AVAIL.
EMPLOYEE GROUP
RATE
WK -HRS
CLERICAL
28.15%
1,668
OTHER
30.94%
1,668
MANUAL
34.99%
1,668
POLICE
49.79%
1,668
FIRE (SHIFT)
48.64%
2,556
FIRE (40 HOURS/WEEK)
48.64%
1,668
PART TIME BENEFITTED
28.15%
1,000
PART TIME NON - BENEFITTED
8.46%
1,000
"General" versus "Specific" Costs
Specific costs are "driven" by a specific PUBLIC SERVICE. Consequently, specific costs
should be allocated directly to the service rather than included as an element of the FBHR.
To include specific costs in the hourly rate would result in those costs being spread to all
work performed by those staff positions so that the cost of the specific service would be
understated and all other services by those positions would be overstated.
Examples of specific costs are:
1. Contracted plan check service for a particular permit application.
2. Advertising the public hearing of a planning application.
3. Special maintenance expenditures for a particular building or facility.
Once the specific costs have been allocated directly to the appropriate PUBLIC SERVICE,
the costs which remain are "general" costs and necessary for the associated positions to
function properly. These costs are included in the FBHR of those positions.
23
City of El Segundo Cost of Services Study
Operating Expenses
The general operating expenses for a particular department/activity are spread to the
FBHR in the same ratio as the general operating expenses are to the total salaries for that
particular department/activity.
Overhead Expenses
General overhead expenses are spread similar to general operating expenses and are
derived from the calculation of INTERNAL SUPPORT SERVICE costs discussed in
Chapter II plus any divisional overhead percentage.
Available Work -Hours
After computing the individual elements of cost for positions in a
department/division /activity providing PUBLIC SERVICES, the total cost for each position
is divided by the total number of available work -hours for that position.
In order to compute the number of available work - hours, RCS started with the total
possible work -hours in a yearwhich is 2,080 hours. From this possible total, RCS subtracts
hours for the following benefits:
Holidays
% ! A-1- Vacations
Sick Leave
Morning /Afternoon Breaks
Start Up /Down Time
Ththours that remain are referred to as the available work - hours. No consideration is
given to the possibility of "slack" or "idle" time because those hours can be controlled by
the department/activity manager. The average number of available work -hours used for the
various employee groups was shown on Schedule 3 above.
Results of Knowing the Fully- Burdened Hourly Rate (FBHR)
The following are possible results of knowing the FBHR of employees:
Knowing the hourly cost of an employee will cause a good manager to think of
dollars when monitoring the activity (or inactivity) of an employee.
24
Chapter 111 - Fully- Burdened Hourly Rates
Knowing the cost of participants should make those who call meetings aware of
their cost. How often do thousand dollar meetings resolve hundred dollar issues?
Those who routinely arrive late to meetings, keeping others from starting the
meeting on time, can know the cost to the organization of their tardiness.
Those who talk to customers on the phone or at the counter can measure the cost
of the conversation that went beyond the necessary communication of information.
These examples are only a small number of possible results and some may not even apply
to the City of El Segundo.
Summary
In this Chapter, Internal Service Costs developed in Chapter II were added to the other
elements of the personnel costs to develop a fully- burdened hourly rate (FBHR) for each
staff position that is providing PUBLIC SERVICES.
In the next Chapter, RCS will more fully define the PUBLIC SERVICES and set the stage
for calculating their cost by using the FBHR developed here.
P41
City of El Segundo Cost of Services Study
(THIS PAGE INTENTIONALLY BLANK)
NIV
CHAPTER IV
PUBLIC SERVICES m OVERVIEW
For this Report the City's PUBLIC SERVICES are separated into two groups:
COMMUNITY - SUPPORTED PUBLIC SERVICES
PERSONAL CHOICE PUBLIC SERVICES
Public Services
What is a tax service? There is the simple definition — "A tax service is anything that the
City does that I paid my taxes for."
More complicated, academic definitions refer to the social contract and how these services
cannot be measured and that we all use them, etc.
The pragmatic definition of a tax service is: "Anything that the City Council decides to
support by taxes as long as tax revenues are available." Once this fact is realized, there
are no "true" tax services, only services that individual city councils have decided to support
with taxes. In other words, what is a tax service is "backed into" once the amount of tax
revenues are determined.
This makes more sense when we realize how easy it would be to charge for some of the
traditional tax services:
Police Service. More dollars are spent on private security services than on all public police
departments .4 If people are willing to spend their money on "private" police, how would they
feel if we gave them some of their taxes back and asked the public to contract with us for
a specific level of service? Cities that contract with the Sheriff do exactly that. They
contract for specific staffing levels to address specific community concerns.
Fire Service. There are already fire companies in rural areas that contract with property
owners for fire suppression. If you haven't subscribed for the service, they will merely
insure that your fire doesn't spread to neighbors who have subscribed.
"Welcome to the New World of Private Security," Economist, April 19, 1997.
27
City of El Segundo Cost of Services Study
Park Services. Open space is usually considered to be "free" but once improvements are
made it is only a matter of degree or time until the user is charged. The improvement could
merely be providing rescue service to the weekend hiker /climber.
RCS is not suggesting that the City charge for the above services but is merely trying to
illustrate that it is a political decision (probably based on custom or habit) to support a
service, or at least a certain service level, with taxes.
Given these problems with defining what is a "tax service ", it makes more sense to discuss
these services in the context of being COMMUNITY- SUPPORTED PUBLIC SERVICES
which are 100% supported by taxes. The reference to 100% is to exclude from
COMMUNITY - SUPPORTED PUBLIC SERVICES any PERSONAL CHOICE PUBLIC
SERVICES that are partially tax subsidized. This is because, as we will see below, the
issues change when a service is only partially tax supported.
Personal Choice Public Services
PERSONAL CHOICE PUBLIC SERVICES are defined as services where the customer is
identifiable and the service is measurable and can be withheld for non - payment. These
services are not referred to as fee services because the City Council may have made a
decision to totally subsidize the service_
What distinguishes these services from COMMUNITY - SUPPORTED PUBLIC SERVICES
is the implicit requirement that there be a rationale for subsidizing some of these services
but not others. Or, for subsidizing some customer groups but not other customer groups.
Typically the rationale is that there is a social, safety or welfare reason to subsidize.
Proposition 4 was the voter initiative that was most concerned about fee services. The
initiative authors were not concerned what services were subsidized as long as the subsidy
was an explicit decision of the City Council based on knowing the full cost of the service.
Distinguishing Between Community - Supported & Personal Choice Public Services
If one or more of these questions can be answered, "Yes ", for a service, then it has some
of the characteristics of a PERSONAL CHOICE PUBLIC SERVICE:
If the service were discontinued, would less that half of the City's population
complain?
2. If the users of a particular service were told that they all had to consume the same
amount of the service, would more than half of the City's population complain?
Chapter IV - Public Services - Overview
3. If it was a choice between reducing the level of two services or charging for one of
them, would more that half of the City's population agree on which service to
establish a charge?
Summary
In this chapter, we discussed how PUBLIC SERVICES can be separated into
COMMUNITY- SUPPORTED and PERSONAL CHOICE PUBLIC SERVICES. In the next
chapter, we discuss in detail the results of fully costing the PERSONAL CHOICE PUBLIC
SERVICES.
29
City of El Segundo Cost of Services Study
(THIS PAGE INTENTIONALLY BLANK)
30
CHAPTER V
PERSONAL CHOICE PUBLIC SERVICES
The purpose of this Chapter is to present the services which RCS has initially labeled as
PERSONAL CHOICE PUBLIC SERVICES and to suggest the magnitude of tax revenues
that could be diverted from these services to COMMUNITY- SUPPORTED PUBLIC
SERVICES.
City Council has Final Judgment. It must be understood that considerable judgment -- albeit
experienced - -was exercised by RCS in suggesting what services were PERSONAL
CHOICE as opposed to COMMUNITY- SUPPORTED PUBLIC SERVICES and in
suggesting that most PERSONAL CHOICE PUBLIC SERVICES should be paid for by the
service requestor rather than subsidized by the entire community. However, the final
decision on the nature of the service and whether it deserves to be subsidized will have to
be made by the City Council.
Service Groups
RCS has organized PERSONAL CHOICE PUBLIC SERVICES into the following five
service groups for purposes of discussion:
Planning Services
Engineering Services
Building Safety Services
Fire Services
Administrative Services
These groups, explained in turn, are program oriented. Each group includes a table
summarizing the revenues and costs of each service. A Table summarizing the group
tables (Table 6) is found at the end of this Chapter.
Service Center Detail Found in Appendix A
Appendix A, which is in sequence by the Reference Number (Column 1 on each of the
following Tables), includes detail information for each service on two facing pages. The left
page has textual and summary information including RCS's suggested service fee. The
right page has the service cost detail.
31
City of El Segundo Cost of Services Study
General Commentary on Chapter Tables
Each table has eight columns, explained here:
Column 1 is the Report Reference Number.
Column 2 is the title of the service.
Column 3.4 & 5 are the same amounts for revenue, cost and profit (subsidy) found on the
left page of the detail service sheets in Appendix A.
Column 6 is the current percentage of costs recovered from the user fees and charges with
the difference being subsidized by taxes.
Column 7 is the percentage of user fee cost recovery which might be obtainable without
tax subsidy. Of course, decisions regarding tax subsidies to a service is a City Council
policy decision on how to allocate its tax and general revenues.
Column 8 contains the estimated amount of revenues which RCS suggests could be raised
or reduced.
Suggestions For Services Analyzed
It is suggested that the City Council review each of the services in this Chapter for the
following reasons:
1. To confirm or negate the decision that the service is a PERSONAL CHOICE
PUBLIC SERVICE.
2. To insure that any service which has been and which will continue to be
subsidized meets the purpose (e.g. Social Goal) and reporting criteria
established by the City Council.
3. Where services have been unconsciously subsidized, to direct staff to bring
costs into line with the revenue generated by such service.
32
Chapter V - Personal Choice Public Services
Special Circumstance
When a service is marked with a double asterisk-M, the consumer is anticipated to
respond to governmental services like he /she does to private services: marginal users will
be "priced out" until the resulting volume of service provided is in equilibrium to the demand
at the revised price. The City Council will have to decide if such private pricing
methodology is appropriate and, if so, to what extent. However, it must be remembered
that to the extent market forces do not prevail, the general taxpayers will make up the
difference with their taxes. Therefore the revenue will not be as high as a service that did
not have these issues.
When a service is marked with a pound sign ( #), it occurs infrequently; and, therefore, RCS
does not project any possible new revenue for the service.
33
City of El Segundo Cost of Services Study
Planning Services
When basic City planning services are supported by general taxes, there is little reason for
taxes to also finance those PERSONAL CHOICE PUBLIC SERVICES which mainly benefit
a developer or specific property owner. Thus, the expenses distributed across these
service centers are primarily the incremental additional expenses caused by community
development. Were no development to take place, most of these costs could be
eliminated, or at least significantly reduced.
Table 1
Planning Services
34
Possible
Profit
Percent Recovery
New
Ref #
Service Title
Revenue
Cost
(Subsidy)
Current
Suggest
Revenue
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
S -001
ADMINISTRATIVE USE PERMIT
$4,000
$26,768
$(22,768)
14.9%
100.0%
$22,800
S -002
MINOR CONDITIONAL USE PERMIT
$1,350
$6,692
$(5,342)
20.2%
100.0%
$5,300
S-003
MAJOR CONDITIONAL USE PERMIT
$3,740
$27,429
$(23,689)
13.6%
100.0%
$23,700
S -004
ARCHITECTURAUDESIGN REVIEW
$0
$10,774
$(10,774)
0.0%
100.0%
$10,800
S -005
VARIANCE REVIEW
$2,805
$20,572
$(17,767)
13.6%
100.0%
$17,800
S -006
ADJUSTMENT REVIEW
$1,040
$5,142
$(4,102)
20.2%
100.0%
$4,100
S -007
ZONE TEXT AMEND /ZONE CHANGE
NA
NA
NA
NA
100.0%
$0
S -008
PRE- APPLICATION REVIEW
$3,100
$68,187
$(65,087)
4.5%
100.0%
$16,275
S -009
TRAFFIC STUDY REVIEW
NA
NA
NA
NA
100.0%
$0
S -010
OFF -SITE PARKING COVENANT
$705
$1,808
$(1,103)
39.0%
100.0%
$1,100
S -011
PARK DEMAND /SHARE PARK STDY
$465
$9,862
$(9,397)
4.7%
100.0%
$9,400
S -012
GENERAL PLAN AMENDMENT REV
NA
NA
NA
NA
100.0%
$0
S -013
SPECIFIC PLAN REVIEW
NA
NA
NA
NA
100.0%
$0
S -014
SPECIFIC PLAN AMENDMENT REV
NA
NA
NA
NA
100.0%
$0
S -015
SPHERE OF INFLUENCE AMEND
NA
NA
NA
NA
100.0%
$0
S -016
ANNEXATION REQUEST REVIEW
NA
NA
NA
NA
100.0%
$0
S -017
CFD ANNEXATION REQUEST REV
NA
NA
NA
NA
100.0%
$0
S -018
DEVELOPMENT AGREEMENT REV
NA
NA
NA
NA
100.0%
$0
S -019
COASTAL DEVELOPMENT PERMIT
$385
$766
$(381)
50.3%
100.0%
$0 P
S -020
PLANNED RESID. DEVELOP REV
NA
NA
NA
NA
100.0%
$0
S -021
FISCAL IMPACT ANALYSIS
$7,400
$7,400
$0
100.0%
100.0%
$0
S -022
SMOKY HOLLOW FLOATING ZONE
NA
NA
NA
NA
100.0%
$0
S -023
SMOKY HOLLOW SITE PLAN
$6,860
$20,717
$(13,857)
33.1%
100.0%
$13,900
S-024
DENSITY BONUS AGREEMENT REV
NA
NA
NA
NA
100.00/-
$0
S -025
ENVIRON. CATEGORICAL EXEMPT
$3,330
$11,775
$(8,445)
28.3%
100.0%
$8,400
S -026
ENV INIT STUDY /NEG DEC /RECIR
$5,610
$21,281
$(15,671)
26.4%
100.0%
$15,700
S -027
ENVIRON IMPACT REPORT REVIEW
NA
NA
NA
NA
100.0%
$0
S -028
MITIGATION MONITORING
$0
$4,650
$(4,650)
0.0%
100.0%
$4,700
S -029
PRECISE PLAN MODIFICATION REV
NA
NA
NA
NA
100.0%
$0
34
Ref #
(1)
Service Title
(2)
S -030
TENTATIVE PARCEL MAP REVIEW
S -031
TENTATIVE TRACT MAP REVIEW
S -032
VESTING TENT TRACT MAp REV
S -033
RESUBMITTED MAP REVIEW
S -034
LOT LINE ADJUSTMENT
S -035
LOT MERGER
S -036
REVERSION TO ACREAGE
S -037
CERTIF OF COMPLIANCE REVIEW
S -038
RECIPROCAL ACCESS EASEMENT
S -039
CC &R REVIEW
S -040
HISTORIC RESOURCE NOMIN REV
S -041
ADMIN DETERMIN - DIR DECISION
S -042
ADMIN DETERMIN - PC DECISION
5 -043
SIGN PLAN REVIEW
S -044
MASTER SIGN PROGRAM
S -045
LARGE FAMILY DAY CARE PERMIT
S -046
MOVED BUILDING SITE PLAN REV
S -047
ZONING CONFORM LETTER /REV
5 -048
MOD1F. TO DISCRET APPROVAL
S -049
TIME EXTENSION REVIEW
S -050
APPEAL TO THE PLANNING COMM
S -051
APPEAL TO THE CITY COUNCIL
S -052
STREET ADDRESS CHANGE
S -053
GENERAL PLAN MAINTENANCE
S -054
TEMPORARY USE PERMIT
5 -055
ENTERTAINMENT PERMIT
S -056
ADULT USE PLANNING PERMIT
S -057
AMPLIFIED SOUND PERMIT
S -058
ANIMAL PERMIT
5 -059
ANIMAL PERMIT RENEWAL
S -060
ANIMAL PERMIT APPEAL
S -061
BUSINESS ZONING CLEARANCE
S -062
PUBLIC NOTICING
Key to Symbols:
# - Occurs Infrequently
Market Sensitive
Chapter V - Personal Choice Public Services
Table 1
Planning Services
(Continued)
Profit
Revenue Cost (Subsidy►
(3)
$4,050
$7,340
$100
$0
$4,050
$100
$935
$0
$375
$0
$0
$0
$0
$2,800
$0
$750
$0
$1,800
$1,404
$0
$235
$235
$0
$0
$0
$0
$0
$0
$0
$0
$25
$3,175
NA
(4)
$26,847
$41,544
$10,386
$1,134
$8,202
$ 1,367
$5,243
$1,510
$4,040
$1,347
$7,196
$2,222
$1,648
$ 3,876
$1,164
$443
$1,029
$26,090
$9,747
$3,759
$2,199
$3,098
$546
$99,986
$37,323
$10,028
$6,857
$4,430
$675
$338
$1,612
$36,821
NA
(5)
$(22,797)
$(34,204)
$(10,286)
$(1,134)
$(4,152)
$(1,267)
$(4,308)
$(1,510)
$(3,665)
$(1,347)
$(7,1961
$(2,222)
$(1,648)
$(1,076)
$(1,164)
$307
$(1,029)
$124,290)
$(8,343)
$(3,759)
$(1,964)
$(2,863)
$(546)
$(99,986)
$(37,323)
$(10,028)
$(6,857)
$(4,430)
$(675)
Percent Recovery
Current
Suggest
(6)
17►
15.1%
100.0%
17.7%
100.0%
1.0%
100.0%
0.0%
100.0%
49.4%
100.0%
7.3%
100.0%
17.8%
100.0%
0.0%
100.0%
9.3%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
72.2%
100.0%
0.0%
100.0%
169.3%
100.0%
0.0%
100.0%
6.9%
100.0%
14.4%
100.0%
0.0%
100.0%
10.7%
50.0%
7.6%
50.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
0.0%
100.0%
$(338)
0.0%
100.0%
$11,587)
1.6%
50.0%
$(33,646)
8.6%
100.0%
NA
NA
100.0%
Possible
New
Revenue
(8)
$22,800
$34,200
$0
$0
$4,200
$0
$0
$0
$3,700
$O
$O
$2,200
$1,600
$1,100
$1,200
($300)
$0
$24,300
$8,300
$3,800
$0
$0
$0
$100,000
$37,300
$10,000
$0
$4,400
$700
$300
#
#
a
#
$0 #
$33,600
$0
$68,164 $606,530 $(538,366) 11.2% $447,375
35
City of El Segundo Cost of Services Study
City As Impartial Arbiter of Land Use. The City staff, Planning Commission and the City
Council require the processes enumerated in the above list as the price of community
review, input and ultimate acceptance by neighboring properties of land development.
Such municipal review is basically required by State law, assigning the role of impartial
arbiter of land use decisions to local government -- cities and counties.
While it would be grossly unfair, and probably foolhardy and expensive as well, to totally
deny all development, some cities have chosen this course. The City is by law put into the
unenviable position of being the impartial arbiter; a referee over development. Therefore,
it seems logical that the development industry bear the full cost of the services to regulate
its development. Not more than cost, nor less than cost; but only full cost recovery through
fees charged.
Infrequent Services. To avoid overstating possible new revenue, some services are
marked with the pound sign ( #). These services have been included to calculate the current
cost but there may be no demand for some or all of these "marked" services in any single
fiscal year.
Conclusion of Planning Services
If the suggestions made in Appendix A are approved, approximately $447,375 in new
revenue could be realized annually.
36
Chapter V - Personal Choice Public Services
Engineering Services
When basic City engineering services are supported by general taxes, there is little reason
for taxes to also finance those PERSONAL CHOICE PUBLIC SERVICES which mainly
benefit a developer, business, or specific property owner. These services represent the
costs to those specific groups.
'Table 2
Engineering Services
$57,830 $152,503 $(94,673) 37.9% $93,400
Key to Symbols:
# - Occurs Infrequently
37
Possible
Profit
Percent Recovery
New
Ref #
Service Title
Revenue
Cost
(Subsidy)
Current
Suggest
Revenue
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
S -063
ENCROACHMENT PERMIT
$8,570
$5,682
$2,888
150.8%
100.0%
($2,900)
S -064
EXCAVATION PERMIT
$9,570
$11,330
$(1,760)
84.5%
100.0%
$1,800
S -065
UTILITY STREET CUT PERMIT
$18,240
$28,775
$(10,535)
63.4%
100.0%
$10,500
S -066
ENCROACH LICENSE AGREEMENT
NA
NA
NA
NA
100.0%
$0
S -067
STREET CLOSURE REVIEW
$0
$216
$(216)
0.0%
100.0%
$0 #
S -068
NEWSRACK PERMIT
$50
$106
$(56)
47.2%
100.0%
$100
S -069
NEWSRACK IMPOUNDMENT
$105
$90
$15
116.7%
100.0%
$(0)
S -070
FINAL PARCEL MAP CHECK
$420
$4,003
$(3,583)
10.5%
100.0%
$3,600
S -071
FINAL TRACT MAP PLAN CHECK
$280
$6,262
$(5,982)
4.5%
100.0%
$6,000
S -072
FINAL MAP AMENDMENT
$0
$154
$(154)
0.0%
100.0%
$0 #
S -073
PUBLIC IMPROVE PLAN CHECK
$11,200
$32,110
$(20,910)
34.9%
100.0%
$20,900
S -074
PUBLIC IMPROVE INSPECTION
$0
$15,075
$(15,075)
0.0%
100.0%
$15,100
S -075
CERTIFICATE OF CORRECTION
$0
$4,508
$(4,508)
0.0%
100.0%
$4,500
S -076
RECORD OF SURVEY PLAN CHECK
$0
$3,058
$(3,058)
0.0%
100.0%
$3,100
S -077
EASEMENT PROCESSING
NA
NA
NA
NA
100.0%
$0
S -078
QUITCLAIM REVIEW
$0
$307
$(307)
0.0%
100.0%
$0 #
S -079
SURETY & SUBORDINATION REV
$0
$15,290
$(15,290)
0.0%
100.0%
$15,300
S -080
LIEN REMOVAL
$0
$154
$(154)
0.0%
100.0%
$0 #
S -081
DRAINAGE STUDY REVIEW
$0
$461
$(461)
0.0%
100.0%
$0 #
S -082
STOCKPILE /BORROW SITE P/C
$0
$338
$(338)
0.0%
100.0%
$0 #
S -083
MINOR PLAN CHECK REVISION
$0
$15,370
$(15,370)
0.0%
100.0%
$15,400
S -084
STREET NAME CHANGE
NA
NA
NA
NA
100.0%
$0
S -085
ALLEY /STREET VACATION REVIEW
NA
NA
NA
NA
100.0%
$0
S -086
ASSESS. DIST FORM RESEARCH
NA
NA
NA
NA
100.0%
$0
S -087
CITY PROP ACQUISITION PROC
NA
NA
NA
NA
100.0%
$0
S -088
WIDE & OVERLOAD PERMIT
$9,000
$8,778
$222
102.5%
100.0%
$0
S -089
BLUEPRINT COPY SERVICE
$395
$436
$(41)
90.6%
100.0%
$0
$57,830 $152,503 $(94,673) 37.9% $93,400
Key to Symbols:
# - Occurs Infrequently
37
City of E/ Segundo Cost of Services Study
City as Protector of Public Right -of -Way. Many of the services listed above are for review
and inspection of either new public infrastructure or impacts to existing infrastructure. It
is incumbent on the City to review all of these impacts to its infrastructure. The fees
proposed are to recover this review and inspection cost so as to insure that the City's
infrastructure is restored to its original state.
Development Services. Other services listed above are part of the development process
with the subdivision of new lots. As with Planning services, it is the cost of development
that would not be incurred otherwise. Such municipal review is basically required by State
law, assigning the role of impartial arbiter of land use decisions to local government -- cities
and counties. Therefore, it seems logical that the development industry bear the full cost
of the services to regulate its development. Not more than cost, nor less than cost; but only
full cost recovery through fees charged.
Infrequent Services. To avoid overstating possible new revenue, some services are
marked with the pound sign ( #). These services have been included to calculate the current
cost but there may be no demand for some or all of these "marked" services in any single
fiscal year.
Conclusion of Engineering Services
If the suggestions made in Appendix A are approved, approximately $93,400 in new
revenue could be realized annually.
Chapter V - Personal Choice Public Services
Building Safety Services
Table 3 lists the services related to the plan check and inspection of construction on private
property within the City.
Table 3
Building Safety Services
$2,361,182 $2,835,578 $(474,396) 83.3% $474,400
Building Plan Check and Inspection is currently being subsidized. The City provides plan
heck and inspection services of actual development. The City is currently undercharging
for plan check and inspection services by about 20 %. Therefore, RCS is proposing that the
City increase its plan check and inspection /permit fees to cover the full costs of providing
the services. in addition, the City charges individual trade permit fees for electrical,
plumbing, and mechanical permits. RCS is also recommending that these fees increase
to cover the actual cost of providing the various plan check and inspection services. All of
the fees are detailed in Appendix B of this Report.
Separate Fund for Accelerated Plan Check Service. The City currently provides, as a
service to its customers, a process to plan check a project quicker than the normal
process. To insure that this process does not affect the applicants who are part of the
normal process, the accelerated process only uses outside contractors or staff during
overtime. The applicant is then charged the full costs of providing this service.
Currently the revenues for the accelerated plan check process are accounted for within the
General Fund. This method makes it less clear which expenses are being charged against
it and therefore harder to match up revenues and expenses. It also makes the General
Fund budget of these departments seem larger than they really are because of the artificial
increase in revenues and expenses related to the accelerated process. Therefore, the City
should set up a separate fund for accelerated plan check services. This will allow the City
to track these revenues and expenses separate from normal revenues and expenses and
not distort the General Fund.
39
Possible
Profit
Percent Recovery
New
Ref #
Service Title
Revenue
Cost
(Subsidy)
Current
Suggest
Revenue
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
S -090
BUILDING PLAN CHECK
$1,304,862
$1,445,181
$(140,319)
90.3%
100.0%
$140,300
S -091
BUILDING INSPECTION
$1,016,320
$1,340,397
$(324,077)
75.8%
100.0%
$324,100
S -092
MAP /PLAN /FILE SCANNING
$40,000
$50,000
$(10,000)
80.0%
100.0%
$10,000
$2,361,182 $2,835,578 $(474,396) 83.3% $474,400
Building Plan Check and Inspection is currently being subsidized. The City provides plan
heck and inspection services of actual development. The City is currently undercharging
for plan check and inspection services by about 20 %. Therefore, RCS is proposing that the
City increase its plan check and inspection /permit fees to cover the full costs of providing
the services. in addition, the City charges individual trade permit fees for electrical,
plumbing, and mechanical permits. RCS is also recommending that these fees increase
to cover the actual cost of providing the various plan check and inspection services. All of
the fees are detailed in Appendix B of this Report.
Separate Fund for Accelerated Plan Check Service. The City currently provides, as a
service to its customers, a process to plan check a project quicker than the normal
process. To insure that this process does not affect the applicants who are part of the
normal process, the accelerated process only uses outside contractors or staff during
overtime. The applicant is then charged the full costs of providing this service.
Currently the revenues for the accelerated plan check process are accounted for within the
General Fund. This method makes it less clear which expenses are being charged against
it and therefore harder to match up revenues and expenses. It also makes the General
Fund budget of these departments seem larger than they really are because of the artificial
increase in revenues and expenses related to the accelerated process. Therefore, the City
should set up a separate fund for accelerated plan check services. This will allow the City
to track these revenues and expenses separate from normal revenues and expenses and
not distort the General Fund.
39
City of El Segundo Cost of Services Study
Fire Services
Table 4, following, lists various service centers mostly representing the full costs
associated with providing fire safety plan review and inspection of businesses within the
City. The services provided by Environmental Safety are targeted towards those
businesses that have a higher level of risk due to the nature of the business.
Table 4
Fire Services
Ref #
(1)
Service Title
(2)
Revenue
(3)
Cost
(4)
Profit
(Subsidy)
(5)
S -093
ANNUAL BUSINESS FIRE INSPECT
$145,000
$326,811
$(181,811
S -094
ANNUAL BUSINESS FIRE REINSP
$0
$10,826
$(10,826
S -095
ANNUAL FIRE PERMIT
$33,250
$29,523
$3,72
S -096
TEMPORARY FIRE PERMIT
$2,565
$13,693
$(11,128
S -097
FIRE HIGH RISE INSPECTION
$103,488
$94,324
$9,16
S -098
FIRE SPRINKLER PC /INSPECT
$145,951
$175,845
$(29,894
S -099
FIRE ALARM PLAN CHECK/INSP
$90,092
$108,545
$(18,453
S -100
FIRE EXTINGUISH SYST PC /INSP
$9,513
$11,461
$(1,948
S -101
FIRE PROTECTION TESTING
$8,800
$18,486
$(9,686
S -102
STATE MANDATED FIRE INSPECT
$0
$1,259
$(1,259
S -103
SPECIAL FIRE EQUIP INSP /APPR
$0
$777
$(777
S -104
HAZARDOUS MAT'LS INSP PROG
$69,496
$232,010
$(162,514
S -105
CHEM ACCID RELEASE PREV PRG
$15,750
$22,009
$(6,259
S -106
HAZ WASTE GENERATOR PERMIT
$37,494
$94,763
$(57,269
S -107
NEW INDUST WASTE PRMT /INSP
$7,566
$12,558
$(4,992
S -108
REVISED INDUST WASTE PMT/INS
$4,402
$6,714
$(2,312
S -109
INDUST WASTE ANNUAL INSPECT
$12,772
$51,316
$(38,544
S -110
UNDERGROUND TANK PERMIT
$22,940
$50,237
$(27,297
S -111
ABOVE GROUND LIQ TANK INSP
$36,800
$83,930
$(47,130
S -112
REV OF RISK MANAGEMENT PLAN
$51,330
$201,842
$(150,512
S -113
FIRE STORMWATER INSPECTION
$6,710
$24,260
$(17,550
S -114
HAZ MATERIALS RESPONSE
NA
NA
N
S -115
NEW CONSTR. FIRE RE- INSPECT
$0
$179
$(179
S -116
AFTER -HOURS FIRE INSPECTION
$0
$525
$(525
Key to Symbols:
# - Occurs Infrequently
- Market Sensitive
.Y
Percent Recovery N
Possible
44.4% 1
100.0% $
$181,800
0.0% 1
100.0% $
$0 "
$803,919 $1,571,893 $(767,974) 51.1% $608,900
Chapter V - Personal Choice Public Services
Conclusion of Fire Services
If the suggestions made in Appendix A are approved, approximately $608,900 in taxes
currently used to subsidize these services could be freed up.
41
City of El Segundo Cost of Services Study
Administrative Services
Miscellaneous service centers fall into this group.
Table 5
Administrative Services
$26,905 $379,060 $(352,155) 7.1% $349,800
Key to Symbols:
# - Occurs Infrequently
Summary of Administrative Services. If the above suggestions were adopted, the City
should generate about $349,800 in additional annual revenue.
42
Possible
Profit
Percent Recovery
New
Ref #
Service Title
Revenue
Cost
(Subsidy)
Current
Suggest
Revenue
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
S -117
NEW BUSINESS LIC. PROC.
$0
$44,447
$(44,447)
0.0%
100.0%
$44,400
S -118
BUSINESS LIC RENEWAL PROC
$0
$295,495
$(295,495)
0.0%
100.0%
$295,500
S -119
FILM PERMIT PROCESSING
$26,725
$36,517
$(9,792)
73.2%
100.0%
$9,800
S -120
COPY SERVICE
$0
$270
$(270)
0.0%
100.0%
$0
S -121
DOCUMENT CERTIFICATION
$0
$183
$(183)
0.0%
100.0%
$200
S -122
VIDEO /AUDIO COPYING
$180
$115
$65
156.5%
100.0%
($100)
S -123
INITIATIVE PROCESSING
$0
$2,033
$(2,033)
0.0%
100.0%
$0 #
$26,905 $379,060 $(352,155) 7.1% $349,800
Key to Symbols:
# - Occurs Infrequently
Summary of Administrative Services. If the above suggestions were adopted, the City
should generate about $349,800 in additional annual revenue.
42
Chapter V - Personal Choice Public Services
Summary of Personal Choice Public Services
The following Table 6 summarizes the recommendations and suggestions made in this
Chapter.
Table 6
Summary
Result of Adoption. If all the recommendations and suggestions made in this Chapter and
in Appendix A are adopted, the City would raise almost $2 Million on an annual basis.
Taxpayer Equity Achieved. By taking such positive actions, the City's financial picture
would be improved, far more equity between taxpayers and fee - payers could be gained,
and fairness between property- related and non - property - related services could be secured.
The above table shows that the City is subsidizing PERSONAL CHOICE PUBLIC
SERVICES with $2,227,564 in tax dollars. Should the City Council feel that tax dollars are
insufficient, this chapter has shown that there are many opportunities to either increase the
fee or lower the cost of PERSONAL CHOICE PUBLIC SERVICES.
A Master Fee Resolution
RCS recommends that the City adopt a Master Fee Resolution which Finance updates and
has the City Council adopt annually. RCS will work with the Finance Department to help
implement this Resolution.
Policy Regarding "New" Services
RCS also recommends that the City Council adopt a policy of not starting any new service
without a cost analysis, using the costing approach utilized in this Report, so as to
43
Possible
Profit
Percent Recovery
New
SERVICE GROUP
Revenue
Cost
(Subsidy)
Current
Suggest
Revenue
PLANNING SERVICES
$68,164
$606,530
($538,366)
11.2%
VAR.
$447,375
ENGINEERING SERVICES
$57,830
$152,503
($94,673)
37.9%
100.0%
$93,400
BUILDING SAFETY SERVICES
$2,361,182
$2,835,578
($474,396)
83.3%
100.0%
$474,400
FIRE SERVICES
$803,919
$1,571,893
($767,974)
51.1%
100.0%
$608,900
ADMINISTRATIVE SERVICES
$26,905
$379,060
($352,155)
7.1%
100.0%
$349,800
TOTAL
$3,318,000
$5,545,564
($2,227,564)
59.8%
$1,973,875
Result of Adoption. If all the recommendations and suggestions made in this Chapter and
in Appendix A are adopted, the City would raise almost $2 Million on an annual basis.
Taxpayer Equity Achieved. By taking such positive actions, the City's financial picture
would be improved, far more equity between taxpayers and fee - payers could be gained,
and fairness between property- related and non - property - related services could be secured.
The above table shows that the City is subsidizing PERSONAL CHOICE PUBLIC
SERVICES with $2,227,564 in tax dollars. Should the City Council feel that tax dollars are
insufficient, this chapter has shown that there are many opportunities to either increase the
fee or lower the cost of PERSONAL CHOICE PUBLIC SERVICES.
A Master Fee Resolution
RCS recommends that the City adopt a Master Fee Resolution which Finance updates and
has the City Council adopt annually. RCS will work with the Finance Department to help
implement this Resolution.
Policy Regarding "New" Services
RCS also recommends that the City Council adopt a policy of not starting any new service
without a cost analysis, using the costing approach utilized in this Report, so as to
43
City of E/ Segundo Cost of Services Study
determine ways in which the service could be fee - financed, if at all possible. This approach
could be used when considering new parks or public buildings, improved police protection,
new recreation programs, social services and any other desired function or service.
Conclusion
RCS is available to discuss the process and results with the City Council. In addition, we
can share our experience of doing this for over two hundred cities as the City Council
determines what action to take.
CHAPTER VI
ACTION PLAN
The purpose of this chapter is to suggest techniques that the City could use to
institutionalize the processes discussed in this Report.
Internal Support Services
Suggested course of action:
Make sure that customer departments (i.e. all "INTERNAL SUPPORT" and "PUBLIC"
service departments) understand that the "internal support service charges" are part of
their budgeted cost.
Encourage "INTERNAL SUPPORT' service units to refine their record - keeping so that
the cost of each "INTERNAL SUPPORT' service has been fairly charged to other
departments.
Promote a dialogue between "INTERNAL SUPPORT" service units and their customers
to insure that "customer" departments believe that there is a service value that favorably
relates to the service cost.
Where ever possible, use private sector prices as a way to measure the efficiency of the
"INTERNAL SUPPORT" service. Use customer satisfaction as the measure of its
effectiveness.
Ultimately, where ever possible, allow customer departments to contract with either the
"INTERNAL SUPPORT" service or the private sector.
Public Services
In general, suggested course of action:
Require that "PUBLIC SERVICE" providers maintain records of their customer demand
patterns and that they use this information to project the demand for their services in the
future.
45
City of El Segundo Cost of Services Study
Require that "PUBLIC SERVICE" providers base their budget requests on the projected
demand for their services.
Establish a monthly reporting system to track actual units of service provided against the
projected demand for the service from #1.
Establish plans in advance for how to handle long -term staffing levels should the actual
service pattern deviate from the projected demand.
Establish plans in advance for how to utilize staff should the short -term actual service
pattern deviate from the projected demand.
Personal Choice Public Services
As much as possible, require that the service costs be 100% recovered from fees
and charges in order to get the maximum feedback from the customer on whether
the value of the service is in line with its fee. The fee can equal the cost by any
combination of lowering the cost and raising the fee.
2. Attempt to measure the efficiency of services by comparing "best practices" from
other agencies.
3. Measure effectiveness of the services by customer surveys.
Community - Supported Public Services
Require that each service develop a capital replacement plan that will maintain the
related City infrastructure at an agreed upon level.
2. Require that the annual budget for each COMMUNITY - SUPPORTED PUBLIC
SERVICE include either an expenditure or a reservation of monies for the annual
infrastructure replacement identified in #1.
3. Measure the efficiency of COMMUNITY - SUPPORTED PUBLIC SERVICES by
comparison with the best practices of other agencies.
4. Measure the effectiveness of the COMMUNITY - SUPPORTED PUBLIC SERVICES
by periodic City Council or public survey.
Let the voters decide on assessment options that are meaningful and where the City
Council is committed to follow the results. A "Yes" vote means the voters want something.
46
Chapter V1- Action Plan
A "No" vote means that they don't want it and let's accept that rather than trying to give the
voters something in spite of the fact that they just voted "No ". This latter habit, all too
common in local government, causes voter skepticism and a tendency to go for another
initiative.
Summary
The City of El Segundo has the opportunity to use the management information in this
Report and computer software along with input from its staff to make significant strides
towards insuring the City's future fiscal health and appearance.
END
47
(THIS PAGE INTENTIONALLY BLANK)
APPENDIX A
PERSONAL CHOICE PUBLIC SERVICE DETAIL
(In Sequence by Reference No.)
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADMINISTRATIVE USE PERMIT
S -001
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review a use that can be approved adminstratively to determine conformance with City codes and standards.
i
i
CURRENT FEE STRUCTURE
$500 per application
REVENUE AND COST COMPARISON
UNIT REVENUE:
$500.00
TOTAL REVENUE: $4,000
UNIT COST:
$3,346.00
TOTAL COST: $26,768
UNIT PROFIT (SUBSIDY):
$(2,846.00)
TOTAL PROFIT (SUBSIDY): $(22,768)
TOTAL UNITS:
8
PCT. COST RECOVERY: 14.94%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3,345 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADMINISTRATIVE USE PERMIT
S -001
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
8
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
15.00
$1,661.10
8
$13,289
PLANNING OFFICE SPECIALIST II
4.25
$294.57
8
$2.357
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
8
$1,041
PLANNING PLANNING MANAGER
5.42
$1,260.26
8
$10,082
TYPE SUBTOTAL
25.17
$3,346.05
$26,768
TOTALS
25.17
$3,346.00
$26,768
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MINOR CONDITIONAL USE PERMIT
S -002
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /ResidenVBusiness
DESCRIPTION OF SERVICE
Evaivate a minor use to determine conformance with City codes and standards, and preprare a staff report to the
Planning Commission.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $675.00 TOTAL REVENUE: $1,350
UNIT COST- $3,346.00 TOTAL COST: $6,692
UNIT PROFIT (SUBSIDY): $(2,671.00) TOTAL PROFIT (SUBSIDY): $(5,342)
TOTAL UNITS: 2 PCT. COST RECOVERY: 20.17%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3,345 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MINOR CONDITIONAL USE PERMIT
S -002
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
2
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER
15.00
$1,661.10
2
$3,322
PLANNING OFFICE SPECIALIST II
4.25
$294.57
2
$589
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
2
$260
PLANNING PLANNING MANAGER
5.42
$1,260.26
2
$2,521
TYPE SUBTOTAL
25.17
$3,346.05
$6,692
TOTALS
25.17
$3,346.00
$6,692
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MAJOR CONDITIONAL USE PERMIT
S -003
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Evaluate a major use to determine conformance with City codes and standards, and prepare staff reports to the
Planning Commission.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $935.00
TOTAL REVENUE: $3,740
UNIT COST: $6,857.25
TOTAL COST: $27,429
UNIT PROFIT (SUBSIDY): $(5,922.25)
TOTAL PROFIT (SUBSIDY): $(23,689)
TOTAL UNITS: 4
PCT. COST RECOVERY: 13.64%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$6,855 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
MAJOR CONDITIONAL USE PERMIT
REFERENCE NO.
S -003
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
4
DEPARTMENT POSITION TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER
1.00 $110.74
4
$443
PLANNING OFFICE SPECIALIST II
4.75
$329.22
4
$1,317
PLANNING PLANNING & BLDG SAFETY DI
1.00 $260.23
4
$1,041
PLANNING PLANNING MANAGER
9.67 $2,248.47
4
$8,994
PLANNING PRINCIPAL PLANNER
23.50 $3,908.52
4
$15,634
TYPE SUBTOTAL 39.92 $6,857.18
TOTALS 39.92 $6,857.25
July 18. 2008
$27,4291
$27,429 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ARCHITECTURAL/DESIGN REVIEW
S -004
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a the design and architectural elements of a project
in the Downtown Specific Plan Area to determine
conformance with City codes and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE: $0
UNIT COST:
$448.92
TOTAL COST: $10,774
UNIT PROFIT (SUBSIDY):
$(448.92)
TOTAL PROFIT (SUBSIDY): $(10,774)
TOTAL UNITS:
24
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$450 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ARCHITECTURAUDESIGN REVIEW
S -004
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
24
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER
0.50
$116.26 24
$2,790
PLANNING PRINCIPAL PLANNER
2.00
$332.64 24
$7,983
TYPE SUBTOTAL
2.50
$448.90
$10,774
TOTALS 2.50 $448.92 $10,774 1
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
VARIANCE REVIEW
S -005
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a proposed variance from the terms of the Zoning Code and prepare a staff report for the Planning
Commission.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $935.00
TOTAL REVENUE: $2,805
UNIT COST: $6,857.33
TOTAL COST: $20,572
UNIT PROFIT (SUBSIDY): $(5,922.33)
TOTAL PROFIT (SUBSIDY): $(17,767)
TOTAL UNITS: 3
PCT. COST RECOVERY: 13.64%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$6,855 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
VARIANCE REVIEW S -005
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 3
DEPARTMENT
POSITION
PLANNING
ASSISTANT PLANNER
PLANNING
OFFICE SPECIALIST II
PLANNING
PLANNING & BLDG SAFETY DI
PLANNING
PLANNING MANAGER
PLANNING
PRINCIPAL PLANNER
TYPE UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
1.00
$110.74
3
$332
4.75
$329.22
3
$988
1.00
$260.23
3
$781
9.67
$2,248.47
3
$6,745
23.50
$3,908.52
3
$11,726
TYPE SUBTOTAL
TOTALS
39.92 $6,857.18
39.92 $6,857.33
July 18, 2008
$20,572 1
$20,572 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADJUSTMENT REVIEW
S -006
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a minor adjustment from the terms of the Zoning Code.
CURRENT FEE STRUCTURE
$375 per application - SFR < '10 units
$375 per application - MFR <= 6 units
$520 per application - SFR >= 10 units
$520 per application - MFR > 6 units
$520 per application - Commercial /Industrial < 15,000 square feet
$1,020 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $520.00 TOTAL REVENUE: $1,040
UNIT COST: $2,571.00 TOTAL COST: $5,142
UNIT PROFIT (SUBSIDY): $(2,051.00) TOTAL PROFIT (SUBSIDY): $(4,102)
TOTAL UNITS: 2 PCT. COST RECOVERY: 20.23%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$2,570 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
19.42
$2,570.92
REFERENCE NO.
ADJUSTMENT REVIEW
TOTALS
S -006
$2,571.00
$5,142
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
2
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COSI
PLANNING ASSISTANT PLANNER
10.50
$1,162.77
2
$2,326
PLANNING OFFICE SPECIALIST 11
4.25
$294.57
2
$589
PLANNING PLANNING & BLDG SAFETY DI
1.00
$260.23
2
$520
PLANNING PLANNING MANAGER
3.67
$853.35
2
$1,707
TYPE SUBTOTAL
19.42
$2,570.92
$5,142
TOTALS
19.42
$2,571.00
$5,142
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ZONE TEXT AMENDMENT /ZONE CHANGE
S -007
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review a request to amend or change the regulations established by zoning maps and the Municipal Code.
CURRENT FEE STRUCTURE
$935 per application - SFR < 10 units
$935 per application - MFR <= 6 units
$1,320 per application - SFR >= 10 units
$1,320 per application - MFR > 6 units
$1,320 per application - Commercial /Industrial < 15,000 square feet
$2,645 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 2
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ZONE TEXT AMENDMENVZONE CHANGE S -007
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 2
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 2 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
so I
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PRE - APPLICATION REVIEW
S -008
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a project submitted before application submittal to discuss any issues which may cause problems during
the formal application process.
CURRENT FEE STRUCTURE
$55 per application - SFR < 10 units
$55 per application - MFR <= 6 units
$80 per application - SFR >= 10 units
$80 per application - MFR > 6 units
$80 per application - CommerciaUlndustrial < 15,000 square feet
$155 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $155.00 TOTAL REVENUE: $3,100
UNIT COST: $3,409.35 TOTAL COST: $68,187
UNIT PROFIT (SUBSIDY). $(3,254.35) TOTAL PROFIT (SUBSIDY): $(65,087)
TOTAL UNITS: 20 PCT. COST RECOVERY: 4.55%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3,410 per application.
This fee gets the applicant two meetings with staff. Half of this fee will be credited towards any future fees for this
project.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PRE - APPLICATION REVIEW
S -008
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
20
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING & BLDG SAFETY DI
4.00
$1,040.92 20
$20,818
PLANNING PLANNING MANAGER
5.00
$1,162.60 20
$23,252
PLANNING PRINCIPAL PLANNER
7.25
$1,205.82 20
$24,116
TYPE SUBTOTAL
16.25
$3,409.34
$68,187
TOTALS
16.25 $3,409.35 $68,1871
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -200$
SERVICE
REFERENCE NO.
TRAFFIC STUDY REVIEW
S -009
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
STUDY
Developer
DESCRIPTION OF SERVICE
Review of a traffic study for a proposed project to determine the traffic impacts related to the project.
CURRENT FEE STRUCTURE
$1,000 deposit with charges at the fully allocated hourly rates for all personnel involved plus any outside or contract
costs.
REVENUE AND COST
COMPARISON
UNIT REVENUE. $0.00
TOTAL REVENUE: $0
UNIT COST: $0.00
TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
TRAFFIC STUDY REVIEW S -009
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
$0 i
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
OFFSITE PARKING COVENANT
S -010
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Business
DESCRIPTION OF SERVICE
Review of an off -site parking covenant for a proposed project to allow it to meet its parking requirements.
CURRENT FEE STRUCTURE
$80 per application - SFR >= 10 units
$80 per application - MFR > 6 units
$80 per application - Commercial /Industrial < 15,000 square feet
$155 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $117.50 TOTAL REVENUE: $705
UNIT COST: $301.33 TOTAL COST: $1,808
UNIT PROFIT (SUBSIDY): $(183.83) TOTAL PROFIT (SUBSIDY): $(1,103)
TOTAL UNITS: 6 PCT. COST RECOVERY: 38.99%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$300 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
OFF -SITE PARKING COVENANT
S -010
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
6
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
PLANNING OFFICE SPECIALIST 11
0.17
$11.78
6
$71
PLANNING PLANNING & BLDG SAFETY DI
0.25
$65.06
6
$390
PLANNING PLANNING MANAGER
0.25
$58.13
6
$349
PLANNING PRINCIPAL PLANNER
1.00
$166.32
6
$998
TYPE SUBTOTAL
1.67
$301.29
$1,808
TOTALS
1.67
$301.33
$1,808
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PARKING DEMAND /SHARED PARKING STUDY
S -011
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
STUDY
Developer
DESCRIPTION OF SERVICE
Review of the parking demand or the shared parking demand generated by a proposed project.
CURRENT FEE STRUCTURE
$80 per application - SFR >= 10 units
$80 per application - MFR > 6 units
$80 per application - Commercial /Industrial < 15,000 square feet
$155 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $155.00 TOTAL REVENUE:
$465
UNIT COST: $3,287.33 TOTAL COST:
$9,862
UNIT PROFIT (SUBSIDY): $(3,'132.33) TOTAL PROFIT (SUBSIDY):
$(9,397)
TOTAL UNITS: 3 PCT. COST RECOVERY:
4.72%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3,285 per study plus actual costs for Traffic Engineer
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
17.17
$3,287.24
REFERENCE NO.
TOTALS
17.17
PARKING DEMAND /SHARED PARKING STUDY
$9,862
S -011
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
3
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COSI
PLANNING OFFICE SPECIALIST II
1.50
$103.97
3
$312
PLANNING PLANNING & BLDG SAFETY DI + Tfaff Eng Deposit
2.50
$650.58
3
$1,952
PLANNING PLANNING MANAGER
5.17
$1,202.13
3
$3,606
PLANNING PRINCIPAL PLANNER
8.00
$1,330.56
3
$3,992
TYPE SUBTOTAL
17.17
$3,287.24
$9,862
TOTALS
17.17
$3,287.33
$9,862
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
GENERAL PLAN AMENDMENT REVIEW
S -012
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Make recommendations regarding a proposed amendment to the City Comprehensive General Plan and prepare
reports to the Planning Commission and City Council.
CURRENT FEE STRUCTURE
$935 per application - SFR < 10 units
$935 per application - MFR <= 6 units
$1,320 per application - SFR >= 10 units
$1,320 per application - MFR > 6 units
$1,320 per application - Commercial /Industrial < 15,000 square feet
$2,645 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $0.00
TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SPECIFIC PLAN REVIEW
S -013
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review, comment on, and take to hearing, a specific plan for development of a specific parcel of property.
CURRENT FEE STRUCTURE
$5,000 deposit with charges at the fully allocated hourly rates for all personnel involved plus any outside or contract
costs.
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE: $0
UNIT COST: $0,00 TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00 TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SPECIFIC PLAN AMENDMENT REVIEW
S -014
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review, comment on, and take to hearing, an amendment to a previously approved specific plan.
CURRENT FEE STRUCTURE
$5,000 deposit with charges at the fully allocated hourly rates for all personnel involved plus any outside or contract
costs.
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $0.00
TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
SPECIFIC PLAN AMENDMENT REVIEW S -014
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18. 2008
$0 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SPHERE. OF INFLUENCE AMENDMENT
S -015
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a proposed amendment to an existing sphere of influence to determine compliance with City codes and
standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $0.00
TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
SPHERE OF INFLUENCE AMENDMENT S-015
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18. 2008
$o I
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ANNEXATION REQUEST REVIEW
S -016
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Non- Resident
DESCRIPTION OF SERVICE
Review and process a reqeust to annex to the City.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside
or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ANNEXATION REQUEST REVIEW S -016
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
$0 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
CFD ANNEXATION REQUEST REVIEW
S -017
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident
DESCRIPTION OF SERVICE
Review and process a request to annex to an existing Community Facilities District.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE:
$0
UNIT COST: $0.00 TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00 TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1 PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
CFD ANNEXATION REQUEST REVIEW S -017
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
$o I
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
DEVELOPMENT AGREEMENT REVIEW
S -018
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
AGREEMENT
Developer
DESCRIPTION OF SERVICE
Develop, negotiate, and enforce agreements to develop land within specific physical requirements.
CURRENT FEE STRUCTURE
$5,000 deposit with charges at the fully allocated hourly rates for all personnel involved plus any outside or contract
costs.
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $0.00
TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
DEVELOPMENT AGREEMENT REVIEW S -018
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18. 2008
$0 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
COASTAL DEVELOPMENT PERMIT
S -019
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a proposed development within the Coastal Zone.
CURRENT FEE STRUCTURE
$385 per application - SFR >= 10 units
$385 per application - MFR > 6 units
$385 per application - Commercial /Industrial < 15,000 square feet
$750 per application - Commercial /industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $385.00
TOTAL REVENUE:
$385
UNIT COST: $766.00
TOTAL COST:
$766
UNIT PROFIT (SUBSIDY): $(381.00)
TOTAL PROFIT (SUBSIDY):
$(381)
TOTAL UNITS: 1
PCT. COST RECOVERY:
50.26%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$770 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
COASTAL DEVELOPMENT PERMIT
REFERENCE NO.
S -019
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME UNIT COST ANN. UNITS
TOTAL COST
PLANNING OFFICE SPECIALIST II
0.50 $34.66 1
$35
PLANNING PLANNING MANAGER
1.00 $232.52 1
$233
PLANNING PRINCIPAL PLANNER
3.00 $498.96 1
$499
TYPE SUBTOTAL
4.50 $766.14
$766
TOTALS 4.50 $766.00 $7661
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PLANNED RESIDENTIAL DEVELOPMENT REV
S -020
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Reviewing a request to deviate from City residential design standards.
CURRENT FEE STRUCTURE
$750 per application - SFR >= 10 units
$750 per application - MFR > 6 units
$750 per application - Commercial /Industrial < 15,000 square feet
$1,180 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007.2008
SERVICE REFERENCE NO.
PLANNED RESIDENTIAL DEVELOPMENT REV S -020
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
So i
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FISCAL IMPACT ANALYSIS
S -021
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a project through the City's Fiscal Impact Analysis Model to determine the fiscal impact of a proposed
project plus any amendment to an already preprared analysis.
CURRENT FEE STRUCTURE
New:
Single -Use Residential - $750
Single -Use Commercial - $1,500
Single -Use Industrial - $1,500
Two -Use Mixed - $2,000
Three Use Mixed - $2,500
Amendment:
Single -Use Project - $250 Two -Use Project - $500 Three -Use Project - $750
REVENUE AND COST COMPARISON
UNIT REVENUE: $7,400.00 TOTAL REVENUE: $7,400
UNIT COST: $7,400.00 TOTAL COST: $7,400
UNIT PROFIT (SUBSIDY): $0.00 TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1 PCT. COST RECOVERY: 100.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
In House:
New:
Single -Use Residential - $750 Single -Use Commercial - $1,500
Single -Use Industrial - $1,500
Two -Use Mixed - $2,000 Three Use Mixed - $2,500
Amendment:
Single -Use Project - $250 Two -Use Project - $500 Three -Use Project - $750
Actual costs if performed by an outside consultant
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
FISCAL IMPACT ANALYSIS S -021
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING $37,000 Over 5 Years 0.00 $7,400.00 1 $7,400
TYPE SUBTOTAL 0.00 $7,400.00 $7,400
TOTALS 0.00 $7,400.00 $7,400
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SMOKY HOLLOW FLOATING ZONE PROC.
S -022
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Business
DESCRIPTION OF SERVICE
Review of a project in the Smoky Hollow Floating Zone to determine conformance with City Codes and standards.
CURRENT FEE STRUCTURE
$1,060 per application - SFR >= 10 units
$1,060 per application - MFR > 6 units
$1,060 per application - Commercial /Industrial < 15,000 square feet
$2,085 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE: $0
UNIT COST: $0.00 TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00 TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
SMOKY HOLLOW FLOATING ZONE PROC. S -022
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
$0
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SMOKY HOLLOW SITE PLAN
S -023
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Business
DESCRIPTION OF SERVICE
Review of a site plan for a project in the Smoky Hollow Zone for conformance with City codes and standards.
CURRENT FEE STRUCTURE
$750 per application - SFR >= 10 units
$750 per application - MFR > 6 units
$750 per application - Commercial /Industrial < 15,000 square feet
$1,180 per application - Commercial/industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $857.50 TOTAL REVENUE: $6,860
UNIT COST: $2,589.63 TOTAL COST: $20,717
UNIT PROFIT (SUBSIDY): $(1,732.13) TOTAL PROFIT (SUBSIDY): $(13,857)
TOTAL UNITS: 8 PCT. COST RECOVERY: 33.11%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$2,060 per application - < 15,000 square feet
$4,180 per application - >= 15,000 square feet
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SMOKY HOLLOW SITE PLAN
S -023
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
8
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COSI
PLANNING PLANNING MANAGER
<15k Sq Ft
2.42
$562.70
6
$3,376
PLANNING PRINCIPAL PLANNER
<15k Sq Ft
9.00
$1,496.88
6
$8,981
TYPE SUBTOTAL
11.42
$2,059.58
$12,357
PLANNING OFFICE SPECIALIST II
15k+ Sq Ft
4.25
$294.57
2
$589
PLANNING PLANNING & BLDG SAFETY DI
15k+ Sq Ft
0.50
$130.12
2
$260
PLANNING PLANNING MANAGER
15k+ Sq Ft
5.42
$1,260.26
2
$2,521
PLANNING PRINCIPAL PLANNER
15k+ Sq Ft
15.00
$2,494.80
2
$4,990
TYPE SUBTOTAL 25.17 $4,179.75 $8,360
TOTALS
36.59 $2,589.63
July 18. 2008
$20,717
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
DENSITY BONUS AGREEMENT REVIEW
S -024
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
AGREEMENT
Developer
DESCRIPTION OF SERVICE
Reviewing a request for a density bonus agreement.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside
or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
DENSITY BONUS AGREEMENT REVIEW S -024
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
$0 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENVIRON. CATEGORICAL EXEMPTION
S -025
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of an application which states that a particular development is categorically exempt from the
requirements
of CEQA.
CURRENT FEE STRUCTURE
$37 per application
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$37.00
TOTAL REVENUE:
$3,330
UNIT COST:
$130.83
TOTAL COST:
$11,775
UNIT PROFIT (SUBSIDY):
$(93.83)
TOTAL PROFIT (SUBSIDY):
$(8,445)
TOTAL UNITS:
90
PCT. COST RECOVERY:
28.28%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$130 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENVIRON. CATEGORICAL EXEMPTION
S -025
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
90
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
0.50
$55.37 90
$4,983
PLANNING OFFICE SPECIALIST II
0.25
$17.33 90
$1,560
PLANNING PLANNING MANAGER
0.25
$58.13 90
$5,232
TYPE SUBTOTAL
1.00
$130.83
$11,775
TOTALS 1.00 $130.83 $11,775
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENVIRON INITIAL STUDY /NEG DEC /RECIR
S -026
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Reviewing and filing a report declaring that the proposed project will have no siginificant impact on the
environment or will have impacts that will be mitigated below a level of siginificance through a Negative Declaration
or Recirculated Negative Dec.
CURRENT FEE STRUCTURE
$935 per application if with no other applications.
$3,650 deposit - SFR < 10 units
$3,650 deposit - MFR <= 6 units
$3,650 deposit - SFR >= 10 units
$3,650 deposit - MFR > 6 units
$3,650 deposit - Commercial /Industrial < 15,000 square feet
$4,105 deposit - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $935.00
TOTAL REVENUE: $5,610
UNIT COST: $3,546.83
TOTAL COST: $21,281
UNIT PROFIT (SUBSIDY): $(2,611.83)
TOTAL PROFIT (SUBSIDY): $(15,671)
TOTAL UNITS: 6
PCT. COST RECOVERY: 26.36%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3,545 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENVIRON INITIAL STUDYMEG DEVRECIR
S -026
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
6
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS
TOTAL COS
PLANNING ASSISTANT PLANNER
17.00
$1,882.58
6
$11,295
PLANNING OFFICE SPECIALIST If
4.25
$294.57
6
$1,767
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
6
$781
PLANNING PLANNING MANAGER
4.67
$1,085.87
6
$6,515
ENGINEERING SR CIVIL ENGINEERING ASSO
1.00
$153.70
6
$922
TYPE SUBTOTAL
TOTALS
27.42 $3,546.84
27.42 $3,546.83
July 18, 2008
$21,281 1
$21,281
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENVIRONMENTAL IMPACT REPORT REVIEW
S -027
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
REPORT
Developer
DESCRIPTION OF SERVICE
Review of a consultant prepoared Environmental Impact Report regarding a proposed development and preparing
a staff report.
CURRENT FEE STRUCTURE
$3,650 deposit - SFR < 10 units
$3,650 deposit - MFR <= 6 units
$3,650 deposit - SFR >= 10 units
$3,650 deposit - MFR > 6 units
$3,650 deposit - Commercial /Industrial < 15,000 square feet
$4,105 deposit - Commercial /industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE: $0
UNIT COST: $0.00 TOTAL COST: $0
UNIT PROFIT (SUBSIDY): $0.00 TOTAL PROFIT (SUBSIDY): $0
TOTAL UNITS: 1 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ENVIRONMENTAL IMPACT REPORT REVIEW S -027
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18. 2008
$0 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MITIGATION MONITORING
S -028
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
PROJECT
Developer
DESCRIPTION OF SERVICE
Monitoring the mitigation measures imposed during the environmental review process.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE: $0
UNIT COST: $422.73 TOTAL COST: $4,650
UNIT PROFIT (SUBSIDY): $(422.73) TOTAL PROFIT (SUBSIDY): $(4,650)
TOTAL UNITS: 11 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Minor - $465 per project
Major - Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PRECISE PLAN MODIFICATION REVIEW
S -029
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a modification to an already existing precise plan to determine compliance with City codes and
standards.
CURRENT FEE STRUCTURE
Residential:
$810 per application - SFR < 10 units
$810 per application - MFR <= 6 units
$1,125 per application - SFR >= 10 units
$1,125 per application - MFR > 6 units
Commercial:
$1,560 per application - Commercial /Industrial < 15,000 square feet
$3,060 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
PRECISE PLAN MODIFICATION REVIEW S -029
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER Deposit 0.00 $0.00 1 $0
TYPE SU8TOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18. 2008
$0 1
CITY OF EL. SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
TENTATIVE PARCEL MAP REVIEW
S -030
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
MAP
Developer
DESCRIPTION OF SERVICE
Review of a tentative parcel map to subdivide one to four lots to assure accuracy and compliance with City codes
and standards.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $675.00 TOTAL REVENUE:
$4,050
UNIT COST: $4,474.50 TOTAL COST:
$26,847
UNIT PROFIT (SUBSIDY): $(3,799.50) TOTAL PROFIT (SUBSIDY):
$(22,797)
TOTAL UNITS: 6 PCT. COST RECOVERY:
15.09%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$4,475 per map
(Any County procesing fees are paid directly to the County by the applicant)
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
TENTATIVE PARCEL MAP REVIEW
S -030
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
6
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
PLANNING OFFICE SPECIALIST II
4.25
$294.57
6
$1.767
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
6
$781
PLANNING PLANNING MANAGER
5.42
$1,260.26
6
$7,562
PLANNING PRINCIPAL PLANNER
14.00
$2,328.48
6
$13,971
ENGINEERING SR CIVIL ENGINEERING ASSO Plus County
3.00
$461.10
6
$2,767
TYPE SUBTOTAL
27.17
$4,474.53
$26,847
TOTALS
27.17 $4,474.50
July 18, 2008
$26,847
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
TENTATIVE TRACT MAP REVIEW
S -031
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
MAP
Developer
DESCRIPTION OF SERVICE
Review a tentative tract map to subdivide 5 or more lots to assure accuracy and compliance with City codes and
standards.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $1,835.00 TOTAL REVENUE:
$7,340
UNIT COST: $10,386.00 TOTAL COST:
$41,544
UNIT PROFIT (SUBSIDY): $(8,551.00) TOTAL PROFIT (SUBSIDY):
$(34,204)
TOTAL UNITS: 4 PCT. COST RECOVERY:
17.67%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$4,475 per map plus $370 per lot for every lot over 4
(Any County procesing fees are paid directly to the County by the applicant)
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
TENTATIVE TRACT MAP REVIEW S -031
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 4
DEPARTMENT
PLANNING
PLANNING
PLANNING
PLANNING
ENGINEERING
POSITION TYPE
OFFICE SPECIALIST II
PLANNING & BLDG SAFETY DI
PLANNING MANAGER
PRINCIPAL PLANNER
SR CIVIL ENGINEERING ASSO 20 Lots + County
TYPE SUBTOTAL
TOTALS
UNIT TIME UNIT COST ANN. UNITS TOTAL COS'
4.25
$294.57
4
$1,178
0.50
$130.12
4
$520
5.67
$1,318.39
4
$5,274
15.00
$2,494.80
4
$9,979
40.00
$6,148.00
4
$24,592
65.42 $10,385.88 $41,544
65.42 $10,386.00 $41,544
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
VESTING TENTATIVE TRACT MAP REVIEW
S -032
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
MAP
Developer
DESCRIPTION OF SERVICE
Review of a vesting tentative tract map to subdivide 5 or more lots with vesting rights to assure compliance with
City codes and standards.
CURRENT FEE STRUCTURE
$100 per map
REVENUE AND COST
COMPARISON
UNIT REVENUE: $100.00
TOTAL REVENUE:
$100
UNIT COST: $10,386.00
TOTAL COST:
$10,386
UNIT PROFIT (SUBSIDY): $(10,286.00)
TOTAL PROFIT (SUBSIDY):
$(10,286)
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.96%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$4,475 per map plus $370 per lot for every lot over 4
(Any County procesing fees are paid directly to the County by the applicant)
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
VESTING TENTATIVE TRACT MAP REVIEW
S -032
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING OFFICE SPECIALIST 11
4.25
$294.57
1
$295
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
1
$130
PLANNING PLANNING MANAGER
5.67
$1,318.39
1
$1,318
PLANNING PRINCIPAL PLANNER
15.00
$2,494.80
1
$2,495
ENGINEERING SR CIVIL ENGINEERING ASSO 20 Lots + County
40.00
$6,148.00
1
$6,148
TYPE SUBTOTAL
65.42
$10,385.88
$10,386
TOTALS
65.42 $10,386.00
July 18. 2008
$10,3861
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
RESUBMITTED MAP REVIEW
S -033
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
MAP
Developer
DESCRIPTION OF SERVICE
Reviewing a proposed change to an already approved tentative map.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$1,134.00
TOTAL COST:
$1,134
UNIT PROFIT (SUBSIDY):
$(1,134.00)
TOTAL PROFIT (SUBSIDY):
$(1,134)
TOTAL UNITS:
1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,135 per map
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
RESUBMITTED MAP REVIEW
S -033
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
3.75
$415.28 1
$415
PLANNING OFFICE SPECIALIST II
0.33
$22.87 1
$23
PLANNING PLANNING & BLDG SAFETY DI
0.67
$174.35 1
$174
PLANNING PLANNING MANAGER
1.58
$367.38 1
$367
ENGINEERING SR CIVIL ENGINEERING ASSO
1.00
$153.70 1
$154
TYPE SUBTOTAL
TOTALS
7.33 $1,133.58
7.33 $1,134.00
July 18, 2008
$1,134
$1,134
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
LOT LINE ADJUSTMENT
S -034
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a proposed change to the property boundary between two lots and checking the drawings of the maps
relating to such change.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Comm ercial/Industrial < 15,000 square feet
$1,835 per application - Commercial/Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE, $675.00 TOTAL REVENUE: $4,050
UNIT COST: $1,367.00 TOTAL COST: $8,202
UNIT PROFIT (SUBSIDY): $(692.00) TOTAL PROFIT (SUBSIDY): $(4,152)
TOTAL UNITS: 6 PCT. COST RECOVERY: 49.38%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,365 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
LOT LINE ADJUSTMENT
S -034
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
6
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
6.00
$664.44
6
$3,987
PLANNING OFFICE SPECIALIST II
0.67
$46.44
6
$279
PLANNING PLANNING MANAGER
2.00
$465.04
6
$2,790
ENGINEERING ASSISTANT CITY ENGINEER
1.00
$191.13
6
$1,147
TYPE SUBTOTAL
9.67
$1,367.05
$8,202
TOTALS
9.67
$1,367.00
$8,202
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
LOT MERGER
S -035
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a proposed removal of the property boundary between two lots and checking the drawings of the maps
relating to such change.
CURRENT FEE STRUCTURE
$100 per application
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$100.00
TOTAL REVENUE: $100
UNIT COST:
$1,367.00
TOTAL COST: $1,367
UNIT PROFIT (SUBSIDY):
$(1,267.00)
TOTAL PROFIT (SUBSIDY): $(1,267)
TOTAL UNITS:
1
PCT. COST RECOVERY: 7.32%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,365 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
LOT MERGER
S -035
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT
POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING
ASSISTANT PLANNER
6.00
$664.44
1
$664
PLANNING
OFFICE SPECIALIST 11
0.67
$46.44
1
$46
PLANNING
PLANNING MANAGER
2.00
$465.04
1
$465
ENGINEERING
ASSISTANT CITY ENGINEER
1.00
$191.13
1
$191
TYPE SUBTOTAL
9.67
$1,367.05
$1,367
TOTALS
9.67
$1,367.00
$1,367
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
REVERSION TO ACREAGE
S -036
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Processing a request to combine more than one lot into one lot to determine compliance with City codes and
standards.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $935.00
TOTAL REVENUE: $935
UNIT COST: $5,243.00
TOTAL COST: $5,243
UNIT PROFIT (SUBSIDY): $(4,308.00)
TOTAL PROFIT (SUBSIDY): $(4,308)
TOTAL UNITS: 1
PCT. COST RECOVERY: 17.83%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$5,245 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
REVERSION TO ACREAGE
S -036
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING OFFICE SPECIALIST 11
4.25
$294.57
1
$295
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
1
$130
PLANNING PLANNING MANAGER
5.42
$1,260.26
1
$1.260
PLANNING PRINCIPAL PLANNER
14.00
$2,328.48
1
$2.328
ENGINEERING SR CIVIL ENGINEERING ASSO Plus County
8.00
$1,229.60
1
$1,230
TYPE SUBTOTAL
32.17
$5,243.03
$5,243
TOTALS
32.17 $5,243.00
July 18. 2008
$5,243
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
CERTIFICATE OF COMPLIANCE REVIEW
S -037
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Prepare a Certificate of Compliance to exempt the applicant from the Subdivision Map Act.
CURRENT FEE STRUCTURE
$675 per application - SFR < 10 units
$675 per application - MFR <= 6 units
$935 per application - SFR >= 10 units
$935 per application - MFR > 6 units
$935 per application - Commercial /Industrial < 15,000 square feet
$1,835 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE:
$0
UNIT COST: $1,510.00 TOTAL COST:
$1,510
UNIT PROFIT (SUBSIDY): $(1,510.00) TOTAL PROFIT (SUBSIDY):
$(1,510)
TOTAL UNITS: 1 PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,510 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
CERTIFICATE OF COMPLIANCE REVIEW S -037
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT
POSITION
PLANNING
ASSISTANT PLANNER
PLANNING
OFFICE SPECIALIST II
PLANNING
PLANNING & BLDG SAFETY DI
PLANNING
PLANNING MANAGER
ENGINEERING
ASSISTANT CITY ENGINEER
TYPE UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
5.00
$553.70 1 $554
0.67
$46.44 1 $46
0.17
$44.24 1 $44
2.08
$483.64 1 $484
2.00
$382.26 1 $382
TYPE SUBTOTAL
TOTALS
9.92 $1,510.28
9.92 $1,510.00
July 18, 2008
$1,510 1
$1,510 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
RECIPROCAL ACCESS EASEMENT
S -038
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of an easement access that involves multiple parcels where two or more parties are sharing the access.
CURRENT FEE STRUCTURE
$125 per application
REVENUE AND COST COMPARISON
UNIT REVENUE: $125.00
TOTAL REVENUE: $375
UNIT COST: $1,346.67
TOTAL COST: $4,040
UNIT PROFIT (SUBSIDY): $(1,221.67)
TOTAL PROFIT (SUBSIDY): $(3,665)
TOTAL UNITS: 3
PCT. COST RECOVERY: 9.28%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,345 per application plus actual costs for City Attorney
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
RECIPROCAL ACCESS EASEMENT
S -038
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
3
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING MANAGER
1.50
$348.78 3
$1,046
PLANNING PRINCIPAL PLANNER + City Atty
6.00
$997.92 3
$2,994
TYPE SUBTOTAL
7.50
$1,346.70
$4,040
TOTALS 7.50 $1,346.67 $4,0401
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
CCBR REVIEW
S -039
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of the proposed Covenants, Conditions, and Restrictions
for a project to determine conformance
with City
codes and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $1,347.00
TOTAL COST:
$1,347
UNIT PROFIT (SUBSIDY): $(1,347.00)
TOTAL PROFIT (SUBSIDY):
$(1,347)
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,350 per application plus actual costs for City Attorney
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
CC &R REVIEW
REFERENCE NO.
S -039
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING PLANNING MANAGER
1.50 $348.78 1 $349
PLANNING PRINCIPAL PLANNER + City Atty
6.00 $997.92 1 $998
TYPE SUBTOTAL
7.50 $1,346.70 $1,347
TOTALS 7.50 $1,347.00 $1,347 1
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
HISTORIC RESOURCE NOMINATION REVIEW
S -040
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of an application to nominate a specific parcel of property as an historic resource to make it eligible for tax
reductions.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $7,196.00
TOTAL COST: $7,196
UNIT PROFIT (SUBSIDY): $(7,196.00)
TOTAL PROFIT (SUBSIDY): $(7,196)
TOTAL UNITS: 1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$7,195 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
HISTORIC RESOURCE NOMINATION REVIEW
S -040
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING OFFICE SPECIALIST II
5.25
$363.88 1
$364
PLANNING PLANNING & BLDG SAFETY DI
3.50
$910.81 1
$911
PLANNING PLANNING MANAGER
18.67
$4,341.15 1
$4,341
PLANNING PRINCIPAL PLANNER
9.50
$1,580.04 1
$1,580
TYPE SUBTOTAL
36.92
$7,195.88
$7,196
TOTALS
36.92
$7,196.00
$7,196
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADMIN DETERMINATION - DIR DECISION
S -041
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a request for an interpretation of a Community Development Director's decision.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $1,111.00
TOTAL COST: $2,222
UNIT PROFIT (SUBSIDY): $(1,111.00)
TOTAL PROFIT (SUBSIDY): $(2,222)
TOTAL UNITS: 2
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,110 per application
July 1a, 2009
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADMIN DETERMINATION - DIR DECISION
S -041
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
2
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
4.50
$498.33
2
$997
PLANNING OFFICE SPECIALIST II
0.25
$17.33
2
$35
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
2
$260
PLANNING PLANNING MANAGER
2.00
$465.04
2
$930
TYPE SUBTOTAL
7.25
$1,110.82
$2,222
TOTALS
7.25
$1,111.00
$2,222
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADMIN DETERMINATION - PC DECISION
S -042
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a request for an interpretation of a Planning Commission decision.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE: $0
UNIT COST: $1,648.00 TOTAL COST: $1,648
UNIT PROFIT (SUBSIDY): $(1,648.00) TOTAL PROFIT (SUBSIDY): $(1,648)
TOTAL UNITS: 1 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,650 per application
Juiy 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADMIN DETERMINATION - PC DECISION
S -042
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
6.50 $719.81 1
$720
PLANNING OFFICE SPECIALIST II
1.25
$86.64 1
$87
PLANNING PLANNING & BLDG SAFETY DI
1.00 $260.23 1
$260
PLANNING PLANNING MANAGER
2.50 $581.30 1
$581
TYPE SUBTOTAL
11.25 $1,647.98
$1,648
TOTALS
11.25 $1,648.00
$1,648
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SIGN PLAN REVIEW
S -043
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Business
DESCRIPTION OF SERVICE
Review of individual signs to determine compliance with City codes and standards.
CURRENT FEE STRUCTURE
$80 per application - SFR >= 10 units
$80 per application - MFR > 6 units
$80 per application - Commercial/Industrial < 15,000 square feet
$155 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $80.00
TOTAL REVENUE:
$2,800
UNIT COST: $910.74
TOTAL COST:
$3,876
UNIT PROFIT (SUBSIDY): $(30.74)
TOTAL PROFIT (SUBSIDY):
$(1,076)
TOTAL UNITS: 35
PCT. COST RECOVERY:
72.24%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$110 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
SIGN PLAN REVIEW S -043
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 35
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER 1.00 $110.74 35 $3,876
TYPE SUBTOTAL 1.00 $110.74 $3,876
TOTALS '1.00 $110.74 $3,876 1
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MASTER SIGN PROGRAM
S -044
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Business
DESCRIPTION OF SERVICE
Review the placement and design of signs for a new project to determine conformance with City codes and
standards, and monitoring of plan.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE: $0
UNIT COST: $388.00 TOTAL COST: $1,164
UNIT PROFIT (SUBSIDY): $(388.00) TOTAL PROFIT (SUBSIDY): $(1,164)
TOTAL UNITS: 3 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Minor - $580 per application
Major - Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
MASTER SIGN PROGRAM
REFERENCE NO.
S -044
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
3
DEPARTMENT POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER
Minor
3.00 $332.22
2
$664
PLANNING OFFICE SPECIALIST II
Minor
0.25
$17.33
2
$35
PLANNING PLANNING MANAGER
Minor
1.00 $232.52
2
$465
TYPE SUBTOTAL
4.25 $582.07
$1,164
PLANNING PLANNING MANAGER
Major - Deposit
0.00 $0.00
1
$0
TYPE SUBTOTAL
0.00 $0.00
$0
TOTALS 4.25 $388.00 $1,164
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
LARGE FAMILY DAY CARE PERMIT
S -045
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Business
DESCRIPTION OF SERVICE
Review of a new Family Day Care operation of more than 6 children
for conformance with City codes and
standards.
CURRENT FEE STRUCTURE
$375 per application plus $100 if a public hearing is requested
REVENUE AND COST
COMPARISON
UNIT REVENUE: $375.00
TOTAL REVENUE: $750
UNIT COST: $221.50
TOTAL COST: $443
UNIT PROFIT (SUBSIDY): $153.50
TOTAL PROFIT (SUBSIDY): $307
TOTAL UNITS: 2
PCT. COST RECOVERY: 169.30%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$220 per application plus $100 if a public hearing is requested.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
LARGE FAMILY DAY CARE PERMIT S -045
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 2
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER 2.00 $221.48 2 $443
TYPE SUBTOTAL 2.00 $221.48 $443
TOTALS
2.00 $221.50
July 18, 2008
$443 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MOVED BUILDING SITE PLAN REVIEW
S -046
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a site plan of a site that is to have
a building moved
to it to determine conformance wwth City codes and
standards
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE: $0
UNIT COST:
$1,029.00
TOTAL COST: $1,029
UNIT PROFIT (SUBSIDY): $(1,029.00)
TOTAL PROFIT (SUBSIDY): $(1,029)
TOTAL UNITS:
1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,030 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
MOVED BUILDING SITE PLAN REVIEW
REFERENCE NO.
S -046
NOTE
TOTAL UNITS
Unit Costs are an Average of Totai Units
1
DEPARTMENT POSITION TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER
5.00 $553.70 1
$554
PLANNING OFFICE SPECIALIST II
1.25
$86.64 1
$87
PLANNING PLANNING MANAGER
1.67
$388.31 1
$388
TYPE SUBTOTAL
7.92 $1,028.65
$1,029
TOTALS 7.92 $1,029.00 $1,029 1
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ZONING CONFORMANCE LETTERIREVIEW
S -047
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
LETTER
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of the zoning of a particular parcel on request where research is required, usually during the due diligence
process of escrow.
CURRENT FEE STRUCTURE
$45 per application - SFR < 10 units
$45 per application - MFR <= 6 units
$60 per application - SFR >= 10 units
$60 per application - MFR > 6 units
$60 per application - Commercial /Industrial < 15,000 square feet
$120 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $51.43 TOTAL REVENUE: $1,800
UNIT COST: $745.43 TOTAL COST: $26,090
UNIT PROFIT (SUBSIDY): $(694.00) TOTAL PROFIT (SUBSIDY): $(24,290)
TOTAL UNITS: 35 PCT. COST RECOVERY: 6.90%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$745 per letter
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ZONING CONFORMANCE LETTER/REVIEW
S-047
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
35
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
5.00
$553.70 35
$19,380
PLANNING OFFICE SPECIALIST II
0.25
$17.33 35
$607
PLANNING PLANNING MANAGER
0.75
$174.39 35
$6.104
TYPE SUBTOTAL
6.00
$745.42
$26,090
TOTALS
6.00 $745.43 $26,0901
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MODIF. TO DISCRETIONARY APPROVAL
S -048
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of a modification to an existing discretionary approval to determine compliance with City codes and
standards.
CURRENT FEE STRUCTURE
Half of Original Fee
REVENUE AND COST COMPARISON
UNIT REVENUE: $468.00
TOTAL REVENUE: $1,404
UNIT COST: $3,249.00
TOTAL COST: $9,747
UNIT PROFIT (SUBSIDY): $(2,781.00)
TOTAL PROFIT (SUBSIDY): $(8,343)
TOTAL UNITS: 3
PCT. COST RECOVERY: 14.40%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3,250 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
MODIF. TO DISCRETIONARY APPROVAL
S -048
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
3
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING OFFICE SPECIALIST II
4.25
$294.57
3
$884
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
3
$390
PLANNING PLANNING MANAGER
3.92
$911.48
3
$2,734
PLANNING PRINCIPAL PLANNER
11.50
$1,912.88
3
$5.738
TYPE SUBTOTAL
20.17
$3,248.85
$9,747
TOTALS 20.17 $3,249.00 $9,747
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
TIME EXTENSION REVIEW
S -049
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review a request to extend the approval period for a development project.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00 TOTAL REVENUE: $0
UNIT COST:
$1,253.00 TOTAL COST: $3,759
UNIT PROFIT (SUBSIDY):
$(1,253.00) TOTAL PROFIT (SUBSIDY): $(3,759)
TOTAL UNITS:
3 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,255 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
TIME EXTENSION REVIEW
REFERENCE NO.
S -049
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
3
DEPARTMENT POSITION TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
4.50 $498.33 3
$1,495
PLANNING OFFICE SPECIALIST II
2.50 $173.28 3
$520
PLANNING PLANNING MANAGER
2.50 $581.30 3
$1,744
TYPE SUBTOTAL
9.50 $1,252.91
$3,759
TOTALS 9.50 $1,253.00 $3,759 1
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
APPEAL TO THE PLANNING COMMISSION
S -050
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPEAL
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review, report on, publish, and perform staff work for an appeal of a City staff decision to the Planning
Commission.
CURRENT FEE STRUCTURE
Resident - $50
Non - Resident:
$170 per application - SFR < 10 units
$170 per application - MFR <= 6 units
$235 per application - SFR >= 10 units
$235 per application - MFR > 6 units
$235 per application - Commercial /Industrial < 15,000 square feet
$460 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $235.00
TOTAL REVENUE: $235
UNIT COST: $2,199.00
TOTAL COST: $2,199
UNIT PROFIT (SUBSIDY): $(1,964.00)
TOTAL PROFIT (SUBSIDY): $(1,964)
TOTAL UNITS: 1
PCT. COST RECOVERY: 10.69%
SUGGESTED FEE FOR COST RECOVERY OF: 50%
Resident - $1,100 per appeal for 50% cost recovery
Non - Resident - $2,200 per appeal for 100% cost recovery
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
APPEAL TO THE PLANNING COMMISSION
S -050
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER
9.00
$996.66
1
$997
PLANNING OFFICE SPECIALIST II
4.00
$277.24
1
$277
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12
1
$130
PLANNING PLANNING MANAGER
3.42
$795.22
1
$795
TYPE SUBTOTAL
16.92
$2,199.24
$2,199
TOTALS
16.92
$2,199.00
$2,199
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
APPEAL TO THE CITY COUNCIL
S -051
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPEAL
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review, report on, publish, and perform staff wok on an appeal of a Planning Commission decision to the City
Council,
CURRENT FEE STRUCTURE
Resident - $50
Non - Resident:
$170 per application - SFR < 10 units
$170 per application - MFR <= 6 units
$235 per application - SFR >= 10 units
$235 per application - MFR > 6 units
$235 per application - Commercial/Industrial < 15,000 square feet
$460 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $235.00
TOTAL REVENUE: $235
UNIT COST: $3,098.00
TOTAL COST: $3,098
UNIT PROFIT (SUBSIDY): $(2,863.00)
TOTAL PROFIT (SUBSIDY): $(2,863)
TOTAL UNITS: 1
PCT. COST RECOVERY: 7.59%
SUGGESTED FEE FOR COST RECOVERY OF: 50%
Resident - $1,550 per appeal for 50% cost recovery
Non - Resident - $3,100 per appeal for 100% cost recovery
Inside the Coastal Appeal Zone - No Charge per State law
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
APPEAL TO THE CITY COUNCIL S -051
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
PLANNING
OFFICE SPECIALIST II
PLANNING
PLANNING & BLDG SAFETY DI
PLANNING
PLANNING MANAGER
PLANNING
PRINCIPAL PLANNER
TYPE UNIT TIME UNIT COST ANN. UNITS
4.00 $277.24 1
0.50 $130.12 1
4.42 $1,027.74 1
10.00 $1,663.20 1
TYPE SUBTOTAL 18.92 $3,098.30
TOTALS 18.92 $3,098.00
1
TOTAL COS
$277
$130
$1,028
$1,663
$3,098
July 18, 2008
$3,098
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
STREET ADDRESS CHANGE
S -052
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Resident/Business
DESCRIPTION OF SERVICE
Processing a request for a street address on an existing parcel.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$546.00
TOTAL COST:
$546
UNIT PROFIT (SUBSIDY):
$(546.00) TOTAL PROFIT (SUBSIDY):
$(546)
TOTAL UNITS:
1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$545 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
STREET ADDRESS CHANGE
S -052
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
INFORMATION SYST. GIS SPECIALIST
2.00
$204.60 1
$205
PLANNING OFFICE SPECIALIST II
0.50
$34.66 1
$35
PLANNING PLANNING MANAGER
0.50
$116.26 1
$116
BUILDING SAFETY BUILDING SAFETY DIR.
1.00
$190.10 1
$190
TYPE SUBTOTAL
4.00
$545.62
$546
TOTALS
4.00
$546.00
$546
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
GENERAL PLAN MAINTENANCE
S -053
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
PERMIT
Developer
DESCRIPTION OF SERVICE
Maintenance and update of the General Plan.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$32.89
TOTAL COST:
$99,986
UNIT PROFIT (SUBSIDY):
$(32.89)
TOTAL PROFIT (SUBSIDY):
$(99,986)
TOTAL UNITS:
3,040
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
10% of all Building & Safety permit fees
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
GENERAL PLAN MAINTENANCE S-053
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 3,040
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING $1 Mil Over 10 Years 0.00 $32.89 3,040 $99,986
TYPE SUBTOTAL 0.00 $32.89 $99,986
TOTALS 0.00 $32.89 $99,9861
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
TEMPORARY USE PERMIT
S -054
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Comm Group /Business
DESCRIPTION OF SERVICE
Review of a request for a temporary use of a site, such as holiday lots, special events, carnivals, and construction
trailers, to determine compliance with City codes and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE: $0
UNIT COST: $746.46
TOTAL COST: $37,323
UNIT PROFIT (SUBSIDY): $(746.46)
TOTAL PROFIT (SUBSIDY): $(37,323)
TOTAL UNITS: 50
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$745 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
TEMPORARY USE PERMIT S -054
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 50
DEPARTMENT
POSITION
PLANNING
ASSISTANT PLANNER
PLANNING
PLANNING MANAGER
ENGINEERING
SR CIVIL ENGINEERING ASSO
STREET SERVICES
STREET MAINT SUPERVISOR
POLICE ADMIN.
POLICE SERGEANT
FIRE SUPPRESSION
FIRE BATTALION CHIEF
TYPE UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
3.50
$387.59
50
$19,380
0.50
$116.26
50
$5,813
0.25
$38.43
50
$1,922
0.50
$47.30
50
$2,365
0.50
$83.60
50
$4,180
0.50
$73.27
50
$3,664
TYPE SUBTOTAL 5.75 $746.45 $37,323 ,
TOTALS 5.75 $746.46 $37,3231
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENTERTAINMENT PERMIT
S -055
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Comm Group /Business
DESCRIPTION OF SERVICE
Review of a request for live music
or dancing in the City to determine compliance with City codes and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE: $0
UNIT COST:
$668.53
TOTAL COST: $10,028
UNIT PROFIT (SUBSIDY):
$(668.53)
TOTAL PROFIT (SUBSIDY): $(10,028)
TOTAL UNITS:
15
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$670 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ENTERTAINMENT PERMIT S -055
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 15
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
PLANNING ASSISTANT PLANNER 3.25 $359.91 15 $5,399
PLANNING OFFICE SPECIALIST 11 0.83 $57.53 15 $863
PLANNING PLANNING MANAGER 1.08 $251.12 15 $3,767
TYPE SUBTOTAL
TOTALS
5.16 $668.56
5.16 $668.53
July 18, 2008
$10,0281
$10,0281
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ADULT USE PLANNING PERMIT
S -056
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Business
DESCRIPTION OF SERVICE
Review of an adult use within the City to determine compliance with City codes and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $6,857.00
TOTAL COST:
$6,857
UNIT PROFIT (SUBSIDY): $(6,857.00)
TOTAL PROFIT (SUBSIDY):
$(6,857)
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ADULT USE PLANNING PERMIT S -056
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT
POSITION
PLANNING
ASSISTANT PLANNER
PLANNING
OFFICE SPECIALIST II
PLANNING
PLANNING & BLDG SAFETY DI
PLANNING
PLANNING MANAGER
PLANNING
PRINCIPAL PLANNER
TYPE UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
1.00
$110.74
1
$111
4.75
$329.22
1
$329
1.00
$260.23
1
$260
9.67
$2,248.47
1
$2,248
23.50
$3,908.52
1
$3,909
TYPE SUBTOTAL
TOTALS
39.92 $6,857.18
39.92 $6,857.00
July 18, 2008
$6,857 1
$6,8571
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
AMPLIFIED SOUND PERMIT
S -057
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Developer /Business
DESCRIPTION OF SERVICE
Review a request for an event or project
that uses amplified sound to determine compliance with City codes and
standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE: $0
UNIT COST:
$110.75
TOTAL COST: $4,430
UNIT PROFIT (SUBSIDY):
$ (110.75)
TOTAL PROFIT (SUBSIDY): $(4,430)
TOTAL UNITS:
40
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY
OF: 100%
$110 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
AMPLIFIED SOUND PERMIT S -057
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 40
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER 1.00 $110.74 40 $4,430
TYPE SUBTOTAL 1.00 $110.74 $4,430
TOTALS
1.00 $110.75
July 18, 2008
$4,430 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ANIMAL PERMIT
S -058
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPLICATION
Resident/Business
DESCRIPTION OF SERVICE
Review of a request to house more than the standard number
of animals allowed by the Municipal Code.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$337.50
TOTAL COST:
$675
UNIT PROFIT (SUBSIDY):
$(337.50)
TOTAL PROFIT (SUBSIDY):
$(675)
TOTAL UNITS:
2
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$340 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ANIMAL PERMIT S -058
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 2
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER 2.00 $221.48 2 $443
PLANNING PLANNING MANAGER 0.50 $116.26 2 $233
TYPE SUBTOTAL 2.50 $337.74 $675
TOTALS 2.50 $337.50 $6751
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ANIMAL PERMIT RENEWAL
S -059
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
RENEWAL
Resident/Business
DESCRIPTION OF SERVICE
Processing the annual renewal of an animal permit.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$169.00
TOTAL COST:
$338
UNIT PROFIT (SUBSIDY):
$(169.00)
TOTAL PROFIT (SUBSIDY):
$(338)
TOTAL UNITS:
2
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$170 per renewal
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ANIMAL. PERMIT RENEWAL S -059
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 2
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER 1.00 $110.74 2 $221
PLANNING PLANNING MANAGER 0.25 $58.13 2 $116
TYPE SUBTOTAL 1.25 $168.87 $338
TOTALS 1.25 $169.00 $338 i
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ANIMAL PERMIT APPEAL
S -060
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
APPEAL
Resident/Business
DESCRIPTION OF SERVICE
Review of an appeal of a staff decision relating to an animal permit.
CURRENT FEE STRUCTURE
$25 per appeal
REVENUE AND COST COMPARISON
UNIT REVENUE: $25.00 TOTAL REVENUE:
$25
UNIT COST: $1,612.00 TOTAL COST:
$1,612
UNIT PROFIT (SUBSIDY): $(1,587.00) TOTAL PROFIT (SUBSIDY):
$(1,587)
TOTAL UNITS: 1 PCT. COST RECOVERY:
1.55%
SUGGESTED FEE FOR COST RECOVERY OF: 50%
Resident - $805 per appeal for 50% cost recovery
Non - Resident - $1,610 per appeal for 100% cost recovery
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ANIMAL PERMIT APPEAL
S -060
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS
TOTAL COST.
PLANNING ASSISTANT PLANNER
5.00
$553.70 1
$554
PLANNING OFFICE SPECIALIST 11
2.75
$190.60 1
$191
PLANNING PLANNING & BLDG SAFETY DI
0.50
$130.12 1
$130
PLANNING PLANNING MANAGER
3.17
$737.09 1
$737
TYPE SUBTOTAL
11.42
$1,611.51
$1,612
TOTALS
11.42
$1,612.00
$1,612
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
BUSINESS ZONING CLEARANCE
S -061
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
BUSINESS
Business
DESCRIPTION OF SERVICE
Review of the zoning of a proposed new business operating within the City.
CURRENT FEE STRUCTURE
$5 per application - SFR < 10 units
$5 per application - MFR <= 6 units
$5 per application - SFR >= 10 units
$5 per application - MFR > 6 units
$5 per application - Commercial /Industrial < 15,000 square feet
$15 per application - Commercial /Industrial > 15,000 square feet
REVENUE AND COST COMPARISON
UNIT REVENUE: $5.00 TOTAL REVENUE:
$3,175
UNIT COST: $57.99 TOTAL COST:
$36,821
UNIT PROFIT (SUBSIDY): $(52.99) TOTAL PROFIT (SUBSIDY):
$(33,646)
TOTAL UNITS: 635 PCT. COST RECOVERY:
8.62%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Home Occupation - $110 per application
Other Businesses - $55 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
BUSINESS ZONING CLEARANCE
S -061
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
635
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
PLANNING ASSISTANT PLANNER
Business
0.50
$55.37 605
$33,499
TYPE SUBTOTAL
0.50
$55.37
$33,499
PLANNING ASSISTANT PLANNER
Home Occupation
1.00
$110.74 30
$3,322
TYPE SUBTOTAL
1.00
$110.74
$3,322
TOTALS 1.50 $57.99 $36,821 1
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PUBLIC NOTICING
S -062
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
PLANNING
NOTICE
Developer /Resident/Business
DESCRIPTION OF SERVICE
Processing an advertisement in the newspaper where it is required by City codes and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$120 per notice or deposit with actual costs, at the discretion of City staff.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENCROACHMENT PERMIT
S -063
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PERMIT
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of physical encroachments of private uses into the public right -of -way which require a site inspection.
CURRENT FEE STRUCTURE
Permit Issuance: $50 - Residential $140 - Non - Residential /Commercial
Inspection:
Sidewalk - $1 per linear foot with a minimum of $85 per location
Street Curb /Curb Gutter - $1 per linear foot with a minimum of $85 per location
Driveway - $85 without a depressed curb $140 with a depressed curb
House Sewer Lateral Connection to Existing City Sewer Main - $225
House Sewer Connection to Existing Sewer Lateral - $145
Temporary Encroachment - $115
REVENUE AND COST COMPARISON
UNIT REVENUE: $186.30 TOTAL REVENUE: $8,570
UNIT COST: $123.52 TOTAL COST: $5,682
UNIT PROFIT (SUBSIDY): $62.78 TOTAL PROFIT (SUBSIDY): $2,888
TOTAL UNITS: 46 PCT. COST RECOVERY: 150.83%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Permit Issuance: $30
Inspection:
Sidewalk - $2 per linear foot with a minimum of $95 per location
Street Curb /Curb Gutter - $2 per linear foot with a minimum of $95 per location
Driveway - $95
House Sewer Lateral Connection to Existing City Sewer Main - $95
House Sewer Connection to Existing Sewer Lateral - $45
Temporary Encroachment - $95
plus performance bond at a level determined by City staff
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENCROACHMENT PERMIT
S -063
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
46
DEPARTMENT POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING ENGINEERING TECH.
0.33
$30.33
46
$1,395
TYPE SUBTOTAL
0.33 $30.33
$1,395
ENGINEERING PUBLIC WORKS INSPECTOR
Sewer Lat Connect
1.00 $94.22
1
$94
TYPE SUBTOTAL
1.00 $94.22
$94
ENGINEERING PUBLIC WORKS INSPECTOR
Sewer Connect To Lat
0.50 $47.11
1
$47
TYPE SUBTOTAL
0.50 $4711
$47
ENGINEERING PUBLIC WORKS INSPECTOR
Other
1.00 $94.22
44
$4,146
TYPE SUBTOTAL
1.00 $94.22
$4,146
TOTALS
2.83 $123.52
$5,682
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
EXCAVATION PERMIT
S -064
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PERMIT
Developer /Resident/Business
DESCRIPTION OF SERVICE
Review of an excavation into the public right -of -way which requires a site inspection.
CURRENT FEE STRUCTURE
Permit Issuance:
Residential - $50
Non - Residential /Commercial - $140
Inspection - $0.50 per linear foot of excavation or trench with a minimum of $50
REVENUE AND COST COMPARISON
UNIT REVENUE: $145.00 TOTAL REVENUE: $9,570
UNIT COST: $171.67 TOTAL COST: $11,330
UNIT PROFIT (SUBSIDY): $(26.67) TOTAL PROFIT (SUBSIDY): $(1,760)
TOTAL UNITS: 66 PCT. COST RECOVERY: 84.47%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Permit Issuance - $30
Inspection - $2.85 per linear foot of excavation or trench with a minimum of $140
Plan Check - $300
plus performance bond at a level determined by City staff
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
EXCAVATION PERMIT
S -064
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
66
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
ENGINEERING ENGINEERING TECH.
0.33
$30.33 66
$2,002
ENGINEERING PUBLIC WORKS INSPECTOR Per 50 Lin Feet
1.50
$141.33 66
$9,328
TYPE SUBTOTAL
1.83
$171.66
$11,330
TOTALS
1.83 $171.67 $11,3301
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
UTILITY STREET CUT PERMIT
S -065
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PERMIT
Business
DESCRIPTION OF SERVICE
Review of street cuts into the public right -of -way by a private utility company which require a site inspection.
CURRENT FEE STRUCTURE
Permit Issuance - $140
Inspection - $.50 per linear foot of trench with a minimum of $50 per location
Annual Permit for routine maintenance work - $2,000 per year
REVENUE AND COST
COMPARISON
UNIT REVENUE: $190.00
TOTAL REVENUE: $18,240
UNIT COST: $299.74
TOTAL COST: $28,775
UNIT PROFIT (SUBSIDY): $(109.74)
TOTAL PROFIT (SUBSIDY): $(10,535)
TOTAL UNITS: 96
PCT. COST RECOVERY: 63.39%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Permit Issuance - $30
Inspection - $2.85 per linear foot of excavation or trench with a minimum of $140
Plan Check - $300
plus performance bond at a level determined by City staff
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
UTILITY STREET CUT PERMIT S -065
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 96
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
ENGINEERING ENGINEERING TECH. 0.33 $30.33 96 $2,912
ENGINEERING PUBLIC WORKS INSPECTOR 1.50 $141.33 96 $13,568
TYPE SUBTOTAL
ENGINEERING SR CIVIL ENGINEERING ASSO Plan Review
TYPE SUBTOTAL
TOTALS
1.83 $171.66
2.00 $307.40
2.00 $307.40
3.83 $299.74
$16,479
40 $12,296
$12,296
$28,775
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ENCROACHMENT LICENSE AGREEMENT
S -066
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
AGREEMENT
Developer/Resident/Business
DESCRIPTION OF SERVICE
Review of an agreement to grant a encroachemnt license into the future.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE:
$0
UNIT COST: $0.00 TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00 TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1 PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
ENCROACHMENT LICENSE AGREEMENT S -066
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS—
ENGINEERING ASSISTANT CITY ENGINEER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18, 2008
$0 I
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
STREET CLOSURE REVIEW
S -067
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
APPLICATION
Developer /Comm Group /Business
DESCRIPTION OF SERVICE
Review of a request to temporarily
close a City Street for such
things as a bolck party or a development - related
closure.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE: $0
UNIT COST:
$216.00
TOTAL COST: $216
UNIT PROFIT (SUBSIDY):
$(216.00)
TOTAL PROFIT (SUBSIDY): $(216)
TOTAL UNITS:
1
PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY
OF: 100%
$215 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
STREET CLOSURE REVIEW
S -067
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
ENGINEERING CIVIL ENGINEERING ASSOC
0.50
$55.10
1
$55
ENGINEERING ENGINEERING TECH.
0.33
$30.33
1
$30
STREET SERVICES STREET MAINT SUPERVISOR
0.50
$47.30
1
$47
POLICE ADMIN. POLICE SERGEANT
0.50
$83.60
1
$84
TYPE SUBTOTAL
1.83
$216.33
$216
TOTALS
1.83
$216.00
$216
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
NEWSRACK PERMIT
S -068
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
NEWSRACK
Business
DESCRIPTION OF SERVICE
Review of a new newsrack to insure that the site and placement of the newsrack is appropriate under City codes
and standards.
CURRENT FEE STRUCTURE
$50 per newsrack per year
REVENUE AND COST COMPARISON
UNIT REVENUE:
$50.00
TOTAL REVENUE:
$50
UNIT COST:
$106.00
TOTAL COST:
$106
UNIT PROFIT (SUBSIDY):
$(56.00)
TOTAL PROFIT (SUBSIDY).
$(56)
TOTAL UNITS:
1
PCT. COST RECOVERY:
47.17%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
New - $105 per newsrack
Annual Renewal - $50 per newsrack
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
NEWSRACK PERMIT
S -068
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
1
DEPARTMENT POSITION TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
ENGINEERING ENGINEERING TECH.
0.50
$45.96 1
$46
ENGINEERING PUBLIC WORKS INSPECTOR
0.33
$31.09 1
$31
PUBLIC WORKS ADMIN DIRECTOR OF PUBLIC WORKS
0.17
$29.44 1
$29
TYPE SUBTOTAL
1.00
$106.49
$106
TOTALS
1.00 $106.00
July 18. 2008
$106 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
NEWSRACK IMPOUNDMENT
S -069
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
NEWSRACK
Business
DESCRIPTION OF SERVICE
Impoundment of an improperly placed or non - permitted newsrack.
CURRENT FEE STRUCTURE
Impoundment - $60 per newsrack
Release - $45 per newsrack + $5 per day for storage
REVENUE AND COST COMPARISON
UNIT REVENUE: $105.00 TOTAL REVENUE:
$105
UNIT COST: $90.00 TOTAL COST:
$90
UNIT PROFIT (SUBSIDY): $15.00 TOTAL PROFIT (SUBSIDY):
$15
TOTAL UNITS: 1 PCT. COST RECOVERY:
116.67%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$90 per newsrack + $5 per day for storage
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FINAL PARCEL MAP CHECK
S -070
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
MAP
Developer
DESCRIPTION OF SERVICE
Review of a final parcel map of one to four lots for conformance with the Subdivision Map Act and with City codes
and standards.
CURRENT FEE STRUCTURE
$70 per map
REVENUE AND COST COMPARISON
UNIT REVENUE: $70.00 TOTAL REVENUE:
$420
UNIT COST: $667.17 TOTAL COST:
$4,003
UNIT PROFIT (SUBSIDY): $(597.17) TOTAL PROFIT (SUBSIDY):
$(3,583)
TOTAL UNITS: 6 PCT. COST RECOVERY:
10.49%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$665 per map
(Any County procesing fees are paid directly to the County by the applicant)
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FINAL PARCEL MAP CHECK
S -070
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
6
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS.
PLANNING ASSISTANT PLANNER
3.00
$332.22
6
$1.993
PLANNING PLANNING & BLDG SAFETY DI
0.25
$65.06
6
$390
PLANNING PLANNING MANAGER
0.50
$116.26
6
$698
ENGINEERING SR CIVIL ENGINEERING ASSO
Plus County
1.00
$153.70
6
$922
TYPE SUBTOTAL
4.75
$667.24
$4,003
TOTALS
4.75
$667.17
$4,003
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FINAL TRACT MAP PLAN CHECK
S -071
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
MAP
Developer
DESCRIPTION OF SERVICE
Review of a final tract map of 5 or more lots for conformance with the Subdivision Map Act and with City codes
and standards.
CURRENT FEE STRUCTURE
$70 per map
REVENUE AND COST
COMPARISON
UNIT REVENUE: $70.00
TOTAL REVENUE:
$280
UNIT COST: $1,565.50
TOTAL COST:
$6,262
UNIT PROFIT (SUBSIDY): $(1,495.50)
TOTAL PROFIT (SUBSIDY):
$(5,982)
TOTAL UNITS: 4
PCT. COST RECOVERY:
4.47%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,565 per map
(Any County procesing fees are paid directly to the County by the applicant)
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FINAL TRACT MAP PLAN CHECK
S -079
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
4
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
PLANNING PLANNING & BLDG SAFETY DI
0.25
$65.06
4
$260
PLANNING PLANNING MANAGER
1.50
$348.78
4
$1,395
PLANNING PRINCIPAL PLANNER
6.00
$997.92
4
$3,992
ENGINEERING SR CIVIL ENGINEERING ASSO
Plus County
1.00
$153.70
4
$615
TYPE SUBTOTAL
8.75
$1,565.46
$6,262
TOTALS
8.75
$1,565.50
$6,262
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FINAL MAP AMENDMENT
S -072
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a proposed amendment to an already approved and recorded final parcel or tract map.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $154.00
TOTAL COST:
$154
UNIT PROFIT (SUBSIDY): $(154.00)
TOTAL PROFIT (SUBSIDY):
$(154)
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$155 per application
(Any County procesing fees are paid directly to the County by the applicant)
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
FINAL MAP AMENDMENT S -072
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING SR CIVIL ENGINEERING ASSO Plus County 1.00 $153.70 1 $154
TYPE SUBTOTAL 1.00 $153.70 $154
TOTALS
1.00 $154.00
July 18, 2008
$154 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PUBLIC IMPROVEMENT PLAN CHECK
S -073
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PLAN
Developer
DESCRIPTION OF SERVICE
Review of the plans for any addition to the City's infrastructure by a private party.
CURRENT FEE STRUCTURE
$70 per sheet
REVENUE AND COST
COMPARISON
UNIT REVENUE: $1,400.00
TOTAL REVENUE:
$11,200
UNIT COST: $4,013.75
TOTAL COST:
$32,110
UNIT PROFIT (SUBSIDY): $(2,613.75)
TOTAL PROFIT (SUBSIDY):
$(20,910)
TOTAL UNITS: 8
PCT. COST RECOVERY:
34.88%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Percent of Construction Valuation:
$0- $100,000 - 3%
$100,001 - $500,000 - 2% of the construction value over $100,000
$500,001 + - 1 % of the construction value over $500,000
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PUBLIC IMPROVEMENT PLAN CHECK
S -073
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
8
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS
TOTAL COS'r
ENGINEERING ASSISTANT CITY ENGINEER
<$100k
16.00
$3,058.08
2
$6,116
TYPE SUBTOTAL
16.00
$3,058.08
$6,116
ENGINEERING ASSISTANT CITY ENGINEER
$100k - $500k
19.00
$3,631.47
2
$7,263
TYPE SUBTOTAL
19.00
$3,631.47
$7,263
ENGINEERING ASSISTANT CITY ENGINEER
$500k - $1 Mil
23.00
$4,395.99
2
$8,792
TYPE SUBTOTAL
23.00
$4,395.99
$8,792
ENGINEERING ASSISTANT CITY ENGINEER
$1 Mil+
26.00
$4,969.38
2
$9,939
TYPE SUBTOTAL
26.00
$4,969.38
$9,939
TOTALS
84.00 $4,013.75
July 18, 2008
$32,110
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
PUBLIC IMPROVEMENT INSPECTION
S -074
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PROJECT
Developer
DESCRIPTION OF SERVICE
Inspection of any additions to the Citys infrastructure by a private party.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $1,884.38
TOTAL COST:
$15,075
UNIT PROFIT (SUBSIDY): $(1,884.38)
TOTAL PROFIT (SUBSIDY):
$(15,075)
TOTAL UNITS: 8
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Percent of Construction Valuation:
$04100,000 - 1.5%
$100,001 4500,000 - 1% of the construction value over $100,000
$500,001+ - 0.5% of the construction value over $500,000
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
PUBLIC IMPROVEMENT INSPECTION S -074
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 8
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING PUBLIC WORKS INSPECTOR 20.00 $1,884.40 8 $15,075
TYPE SUBTOTAL 20.00 $1,884.40 $15,075
TOTALS 20.00 $1,884.38 $15,075 1
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
CERTIFICATE OF CORRECTION ISSUANCE
S -075
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of corrections to a recorded parcel or tract map.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $1,502.67
TOTAL COST:
$4,508
UNIT PROFIT (SUBSIDY): $(1,502.67)
TOTAL PROFIT (SUBSIDY):
$(4,508)
TOTAL UNITS: 3
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,505 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
CERTIFICATE OF CORRECTION ISSUANCE S -075
NOTE TOTAL. UNITS
Unit Costs are an Average of Total Units 3
DEPARTMENT
POSITION
PLANNING
ASSISTANT PLANNER
PLANNING
OFFICE SPECIALIST 11
PLANNING
PLANNING & BLDG SAFETY DI
PLANNING
PLANNING MANAGER
ENGINEERING
SR CIVIL ENGINEERING ASSO
TYPE UNIT TIME
UNIT COST ANN. UNITS TOTAL COST
3.00
$332.22
3
$997
0.67
$46.44
3
$139
0.17
$44.24
3
$133
2.00
$465.04
3
$1.395
4.00
$614.80
3
$1,844
TYPE SUBTOTAL
TOTALS
9.84 $1,502.74
9.84 $1,502.67
July 18, 2008
$4,5081
$4,5081
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
RECORD OF SURVEY PLAN CHECK
S -076
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PLAN
Developer
DESCRIPTION OF SERVICE
Review a record of survey plan submitted through the County to insure that it meets all appropriate City
requirements.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$1,529.00
TOTAL COST:
$3,058
UNIT PROFIT (SUBSIDY): $(1,529.00)
TOTAL PROFIT (SUBSIDY):
$(3,058)
TOTAL UNITS:
2
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$1,530 per plan
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL_ WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
RECORD OF SURVEY PLAN CHECK S -076
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE
ENGINEERING ASSISTANT CITY ENGINEER Plus County
I
TYPE SUBTOTAL
TOTALS
2
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
8.00 $1,529.04 2 $3,058
8.00 $1,529.04 $3,058
8.00 $1,529.00
July 18, 2008
$3,058 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
EASEMENT PROCESSING
S -077
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of the creation of a new easement for dedication and recordation purposes.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY): $0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
EASEMENT PROCESSING S -077
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING ASSISTANT CITY ENGINEER Deposit 0.00 $0.00 1 $0
TYPE SUBTOTAL 0.00 $0.00 $0
TOTALS
0.00 $0.00
July 18. 2008
$0 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
QUITCLAIM REVIEW
S -078
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
APPLICATION
Developer
DESCRIPTION OF SERVICE
Review of a quitclaim of City rights to a property on request of a private party.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00 TOTAL REVENUE:
$0
UNIT COST:
$307.00 TOTAL COST:
$307
UNIT PROFIT (SUBSIDY):
$(307.00) TOTAL PROFIT (SUBSIDY):
$(307)
TOTAL UNITS:
1 PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY
OF: 100%
$305 per application
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
QUITCLAIM REVIEW S -078
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING SR CIVIL ENGINEERING ASSO 2.00 $307.40 1 $307
TYPE SUBTOTAL 2.00 $307.40 $307
TOTALS
2.00 $307.00
July 18, 2008
$307 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SURETY & SUBORDINATION REVIEW
S -079
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
MAP /LOT
Developer
DESCRIPTION OF SERVICE
Review of the adequacy of the existing warranty to modify sureties or subordinate bonds or liens guaranteeing
the
installation of public improvemetns to City requirements and standards.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE:
$0
UNIT COST: $1,911.25 TOTAL COST:
$15,290
UNIT PROFIT (SUBSIDY): $(1,911.25) TOTAL PROFIT (SUBSIDY):
$(15,290)
TOTAL UNITS: 8 PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100 0/6
$1,910 per map /lot
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
SURETY & SUBORDINATION REVIEW S -079
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 8
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING ASSISTANT CITY ENGINEER 10.00 $1,911.30 8 $15,290
TYPE SUBTOTAL 10.00 $1,911.30 $15,290
TOTALS
10.00 $1,911.25 $15,290
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
LIEN REMOVAL
S -080
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
LIEN
Developer
DESCRIPTION OF SERVICE
Removal of a lien on a parcel on request.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$154.00
TOTAL COST:
$154
UNIT PROFIT (SUBSIDY):
$(154.00)
TOTAL PROFIT (SUBSIDY):
$(154)
TOTAL UNITS.
1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$155 per lien
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
LIEN REMOVAL S -080
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
ENGINEERING SR CIVIL ENGINEERING ASSO 1.00 $153.70 1 $154
TYPE SUBTOTAL 1.00 $153.70 $154
TOTALS
1.00 $154.00 $1541
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
DRAINAGE STUDY REVIEW
S -081
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
STUDY
Developer
DESCRIPTION OF SERVICE
Review of a drainage study to determine compliance with City codes and standards, as well as NPDES
requirements.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00 TOTAL REVENUE:
$0
UNIT COST: $461.00 TOTAL COST:
$461
UNIT PROFIT (SUBSIDY): $(461.00) TOTAL PROFIT (SUBSIDY):
$(461)
TOTAL UNITS: 1 PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Minor - $460
Major - Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
DRAINAGE STUDY REVIEW S -081
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
ENGINEERING SR CIVIL ENGINEERING ASSO Deposit It Larger 3.00 $461.10 1 $461
TYPE SUBTOTAL 3.00 $461.10 $461
TOTALS
3.00 $461.00
July 18. 2008
$461 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
STOCKPILE /BORROW SITE PLAN CHECK
S -082
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
ENGINEERING
PLAN
Developer
DESCRIPTION OF SERVICE
Review of the plan of a stockpile operation which stockpiles, removes, or borrows earth on a temporary basis.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $338.00
TOTAL COST:
$338
UNIT PROFIT (SUBSIDY): $(338.00)
TOTAL PROFIT (SUBSIDY):
$(338)
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$340 per plan
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FIRE ALARM PLAN CHECK/INSPECTION
S -099
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
646
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
FIRE PREVENTION FIRE MARSHAL
Plan Check
1.00
$194.26
156
$30,305
TYPE SUBTOTAL
1.00
$194.26
$30,305
FIRE PREVENTION FIRE MARSHAL
New - Inspection
1.50
$291.39
100
$29,139
FIRE PREVENTION FIRE PREVENTION SPEC.
T.I.- Inspection
1.00
$125.90
390
$49,101
TYPE SUBTOTAL
2.50
$417.29
$78,240
TOTALS 3.50 $168.03 $108,5451
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FIRE EXTINGUISHING SYSTEM PC /INSP
S -100
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE PREVENTION
PLAN
Developer /Resident/Business
DESCRIPTION OF SERVICE
Plan review and inspection of new fire extinguishing systems to determine compliance with City codes and
standards.
CURRENT FEE STRUCTURE
Valuation based on Tables in Appendix B of this Report
REVENUE AND COST
COMPARISON
UNIT REVENUE. $121.96
TOTAL REVENUE: $9,513
UNIT COST: $146.94
TOTAL COST: $11,461
UNIT PROFIT (SUBSIDY): $(24.98)
TOTAL PROFIT (SUBSIDY): $(1,948)
TOTAL UNITS: 78
PCT. COST RECOVERY: 83.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Valuation based on Tables in Appendix B of this Report
These revenues should be in separate revenue accounts.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FIRE EXTINGUISHING SYSTEM PCIINSP
S -100
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
78
DEPARTMENT POSITION
TYPE
UNIT TIME
UNIT COST ANN. UNITS TOTAL COS
FIRE PREVENTION FIRE MARSHAL
Plan Check
1.00
$194.26 24
$4,662
TYPE SUBTOTAL
1.00
$194.26
$4,662
FIRE PREVENTION FIRE PREVENTION SPEC.
Inspection
1.00
$125.90 54
$6,799
TYPE SUBTOTAL
1.00
$125.90
$6,799
TOTALS 2.00 $146.94 $11,461 1
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FIRE PROTECTION TESTING
S -101
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE PREVENTION
PERMIT
Business
DESCRIPTION OF SERVICE
Review and inspection of an occupancy's existing
fire protection systems on a five year time frame to determine
compliance with City codes and standards.
CURRENT FEE STRUCTURE
$220 per system
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$220.00
TOTAL REVENUE: $8,800
UNIT COST:
$462.15
TOTAL COST: $18,486
UNIT PROFIT (SUBSIDY):
$(242.15)
TOTAL PROFIT (SUBSIDY): $(9,686)
TOTAL UNITS:
40
PCT. COST RECOVERY: 47.60%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$465 per system
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
FIRE PROTECTION TESTING S -101
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 40
DEPARTMENT POSITION TYPE
FIRE PREVENTION FIRE PREVENTION SPEC. Time Per System
FIRE ENVIR SAFETY ADMIN SPECIALIST
TYPE SUBTOTAL
TOTALS
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
3.50 $440.65 40 $17,626
0.25 $21.51 40 $860
3.75 $462.16 $18,4861
3.75 $462.15 $18,4861
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
STATE MANDATED FIRE INSPECTION
S -102
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE PREVENTION
INSPECTION
Business /Public Agency
DESCRIPTION OF SERVICE
Inspection of fire hazards that are required by the State Fire Marshal.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$125.90
TOTAL COST:
$1,259
UNIT PROFIT (SUBSIDY):
$(125.90)
TOTAL PROFIT (SUBSIDY):
$(1,259)
TOTAL UNITS:
10
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$125 per inspection
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
STATE MANDATED FIRE INSPECTION S -102
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 10
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
FIRE PREVENTION FIRE PREVENTION SPEC. 1.00 $125.90 10 $1,259
TYPE SUBTOTAL 1.00 $125.90 $1,259
TOTALS 1.00 $125.90 $1,2591
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
SPECIAL FIRE EQUIP INSP /APPROVAL
S -103
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE PREVENTION
REQUEST
Developer /Business
DESCRIPTION OF SERVICE
Review of new fire protection equipment on request.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$777.00
TOTAL COST:
$777
UNIT PROFIT (SUBSIDY):
$(777.00)
TOTAL PROFIT (SUBSIDY):
$(777)
TOTAL UNITS:
1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$775 per request plus any outside costs
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
SPECIAL FIRE EQUIP INSP /APPROVAL S -103
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 1
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
FIRE PREVENTION FIRE MARSHAL 4.00 $777.04 1 $777
TYPE SUBTOTAL 4.00 $777.04 $777
TOTALS
4.00 $777.00
July 18. 2008
$777 1
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
HAZARDOUS MATERIALS INSP. PROGRAM
S -104
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
BUSINESS
Business
DESCRIPTION OF SERVICE
Review and inspection of occupancies every three years which store hazardous materials to determine compliance
with City and State codes and standards.
CURRENT FEE STRUCTURE
Range I - $112
Range II - $256
Range III - $506
Range IV - $1,177
Range V - $1,342
REVENUE AND COST COMPARISON
UNIT REVENUE: $344.04
TOTAL REVENUE:
$69,496
UNIT COST: $1,148.56
TOTAL COST:
$232,010
UNIT PROFIT (SUBSIDY): $(804.52)
TOTAL PROFIT (SUBSIDY):
$(162,514)
TOTAL UNITS: 202
PCT. COST RECOVERY:
29.95%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Range I - $955
Range II - $1,070
Range III - $1,410
Range IV - $1,640
Range V - $1,755
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
HAZARDOUS MATERIALS INSP. PROGRAM
REFERENCE NO.
S -104
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
202
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL CO
FIRE ENVIR SAFETY
ADMIN SPECIALIST
27 H/Y Send Letters
0.13
$11.50
202
$2,323
FIRE ENVIR SAFETY
ADMIN SPECIALIST
2/3 Of 3 Mo Data Ent
1.38
$118.82
202
$24,002
FIRE ENVIR SAFETY
ADMIN SPECIALIST
33% Of 1 Mo FollowUp
0.23
$19.59
202
$3,957
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
4 D/M 3 Mo Follow -Up
0.53 $121.94
202
$24,632
TYPE SUBTOTAL
2.28 $271.85
$54,914
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Range 1
3.00 $684.21
100
$68,421
TYPE SUBTOTAL
3.00 $684.21
$68,421
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Range II
3.50 $798.25
39
$31,132
TYPE SUBTOTAL
3.50 $798.25
$31,132
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Range III
5.00 $1,140.35
39
$44,474
TYPE SUBTOTAL
5.00 $1,140.35
$44,474
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Range IV
6.00 $1,368.42
22
$30,105
TYPE SUBTOTAL
6.00 $1,368.42
$30,105
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Range V
6.50 $1,482.46
2
$2,965
TYPE SUBTOTAL
6.50 $1,482.46
$2,965
TOTALS 26.28 $1,148.56 $232,010 1
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
CHEMICAL ACCIDENT RELEASE PREV PROG
S -105
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
BUSINESS
Business
DESCRIPTION OF SERVICE
Review of an occupancy's chemical accident release prevention program on an every three year basis to
determine compliance with City and State codes and standards.
CURRENT FEE STRUCTURE
100 -1,000 Pounds:
1 chemical - $250 2 chemicals - $500 3+ chemicals - $1,000
1,000- 10,000 Pounds:
1 chemical - $500 2 chemicals - $1,000 3+ chemicals - $2,000
10,000+ Pounds:
1 chemical - $1,500 2 chemicals - $3,000 3+ chemicals - $6,000
REVENUE AND COST COMPARISON
UNIT REVENUE: $1,750.00 TOTAL REVENUE: $15,750
UNIT COST: $2,445.44 TOTAL COST: $22,009
UNIT PROFIT (SUBSIDY): $(695.44) TOTAL PROFIT (SUBSIDY): $(6,259)
TOTAL UNITS: 9 PCT. COST RECOVERY: 71.56%
SUGGESTED FEE FOR COST RECOVERY OF: 100 %.
100 -1,000 Pounds:
1 chemical - $1,370 2 chemicals - $1,825 3+ chemicals - $2,280
1,000- 10,000 Pounds:
1 chemical - $1,480 2 chemicals - $2,055 3+ chemicals - $2,735
10,000+ Pounds:
1 chemical - $2,055 2 chemicals - $3,195 3+ chemicals - $5,020
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
CHEMICAL ACCIDENT RELEASE PREV PROG
REFERENCE NO.
S -105
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
9
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
100 -1K Lb 1 Chem
6.00 $1,368.42
1
$1,368
TYPE SUBTOTAL
6.00 $1,368.42
$1,368
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
100 -1k Lb 2 Chem
8.00 $1,824.56
1
$1,825
TYPE SUBTOTAL
8.00 $1,824.56
$1,825
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
100 -1k Lb 3+ Chem
10.00 $2,280.70
1
$2,281
TYPE SUBTOTAL
10.00 $2,280.70
$2,281
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1k -10k Lb 1 Chem
6.50 $1,482.46
1
$1,482
TYPE SUBTOTAL
6.50 $1,482.46
$1,482
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1k -10k Lb 2 Chem
9.00 $2,052.63
1
$2,053
TYPE SUBTOTAL
9.00 $2,052.63
$2,053
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1k -10k Lb 3+ Chem
12.00 $2,736.84
1
$2,737
TYPE SUBTOTAL
12.00 $2,736.84
$2,737
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
10k+ Lb 1 Chem
9.00 $2,052.63
1
$2.053
TYPE SUBTOTAL
9.00 $2,052.63
$2,053
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
10k+ Lb 2 Chem
14.00 $3,192.98
1
$3.193
TYPE SUBTOTAL
14.00
$3,192.98
$3,193
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
10k+ Lb 3+ Chem
22.00 $5,017.54
1
$5,018
TYPE SUBTOTAL
22.00
$5,017.54
$5,018
TOTALS
96.50 $2,445.44
July 18, 2008
$22,009
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
HAZARDOUS WASTE GENERATOR PERMIT
S -106
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
PERMIT
Business
DESCRIPTION OF SERVICE
Review and inspection of hazardous waste generators every three years within the City to determine compliance
with City and State codes and standards.
CURRENT FEE STRUCTURE
Silver /Universal Waste Only Generator - $109
0 -5 employees - $381
Small) (6 -19 employees) - $412
Intermediate (20 -100 employees) - $564
Advanced (101 -500 employees) - $740
Complex (501+ employees) - $1,257
Permit By Rule - $1,012
Conditional Authorization - $747
Conditionally Exempt - $109
REVENUE AND COST
COMPARISON
UNIT REVENUE: $426.07
TOTAL REVENUE: $37,494
UNIT COST: $1,076.85
TOTAL COST: $94,763
UNIT PROFIT (SUBSIDY): $(650.78)
TOTAL PROFIT (SUBSIDY): $(57,269)
TOTAL UNITS: 88
PCT. COST RECOVERY: 39.57%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Silver /Universal Waste Only Generator - $230
1 -5 employees - $515
Small) (6 -19 employees) - $910
Intermediate (20 -100 employees) - $1,480
Advanced (101 -500 employees) - $1,940
Complex (501+ employees) - $2,625
Permit By Rule - $1,940
Conditional Authorization - $1,140
Conditionally Exempt - $910 Large Quantity Generator - $910
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
HAZARDOUS WASTE GENERATOR PERMIT
REFERENCE NO.
S -106
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
88
DEPARTMENT
POSITION
TYPE
UNIT TIME UNII-, COST ANN. UNITS TOTAL COST
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Silver/Waste Only
1.00 $228.07
1
$228
TYPE SUBTOTAL
1.00 $228.07
$228
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1 -5 Employees
2.25 $513.16
8
$4,105
TYPE SUBTOTAL
2.25 $513.16
$4,105
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
6 -19 Employees
4.00 $912.28
45
$41,053
I
TYPE SUBTOTAL
4.00 $912.28
$41,053
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
20 -100 Employees
6.50 $1,482.46
8
$11,860
TYPE SUBTOTAL
6.50 $1,482.46
$11,860
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
101 -500 Employees
8.50 $1,938.60
2
$3,877
TYPE SUBTOTAL
8.50 $1,938.60
$3,877
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
500+ Employees
11.50 $2,622.81
6
$15,737
TYPE SUBTOTAL
11.50
$2,622.81
$15,737
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Permit By Rule
8.50 $1,938.60
1
$1,939
TYPE SUBTOTAL
8.50 $1,938.60
$1,939
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Conditional Auth.
5.00 $1,140.35
2
$2,281
TYPE SUBTOTAL
5.00 $1,140.35
$2,281
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Conditional Exempt
4.00 $912.28
1
$912
TYPE SUBTOTAL
4.00
$912.28
$912
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Lge Quantity Gen
4.00 $912.28
14
$12,772
July 18, 2008
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
HAZARDOUS WASTE GENERATOR PERMIT S -106
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 88
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COS
TYPE SUBTOTAL 4.00 $912.28 ;12,772
TOTALS
55.25 $1,076.85
July 18, 2008
$94,7631
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
NEW INDUSTRIAL WASTE PERMIT /INSPECT
S -107
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
PERMIT
Business
DESCRIPTION OF SERVICE
Review and inspection of new industrial waste uses within the City to determine compliance with City and State
codes and standards.
CURRENT FEE STRUCTURE
New Permit Application: Sewer - $219 Off -Site - $323 On -Site - $342
New Sewer Plan: 1 - $331 2 - $414 3 - $519 4 - $572 5 - $837 6 - $1,074
New On -Site Plan: 1 - $448 2 - $560 3 - $715 4 - $793 5 - $1,168 6 - 1,510
New Off -Site Plan: 1 - $361 2 - $444 3 - $560 4 - $619 5 - $915 6 - $1,174
Closure Inspection - $114
Wastewater Sampling - $170
Site Remediation - Actual Costs
Special Inspection and Off -Hours Inspection - Actual Costs
Additional Plan Review - Actual Costs
REVENUE AND COST
COMPARISON
UNIT REVENUE: $540.43
TOTAL REVENUE: $7,566
UNIT COST: $897.00
TOTAL COST: $12,558
UNIT PROFIT (SUBSIDY): $(356.57)
TOTAL PROFIT (SUBSIDY): $(4,992)
TOTAL UNITS: 14
PCT. COST RECOVERY: 60.25%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
New Permit Application: Sewer - $480 Off -Site - $480 On -Site - $935
New Sewer Plan: 1/2 - $570 314 - $800 5/6 - $1,255
New On -Site Plan: 1/2 - $725 3/4 - $1,010 5/6 - $1,580
New Off -Site Plan: 1/2 - $625 3/4 - $875 5/6 - $1,370
Closure Inspection - $1,185
Wastewater Sampling - $685 plus actual lab costs
Site Remediation - Actual Costs
Special Inspection and Off -Hours Inspection - Actual Costs
Additional Plan Review - Actual Costs
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
NEW INDUSTRIAL WASTE PERMIT /INSPECT
REFERENCE NO.
S -107
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
14
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
FIRE ENVIR SAFETY
ADMIN SPECIALIST
New Sewer
0.25
$21.51
1
$22
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Sewer
2.00 $456.14
1
$456
TYPE SUBTOTAL
2.25 $477.65
$478
FIRE ENVIR SAFETY
ADMIN SPECIALIST
New Off -Site
0.25
$21.51
1
$22
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Off -Site
2.00 $456.14
1
$456
TYPE SUBTOTAL
2.25 $477.65
$478
FIRE ENVIR SAFETY
ADMIN SPECIALIST
New On -Site
0.25
$21.51
1
$22
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New On -Site
4.00 $912.28
1
$912
TYPE SUBTOTAL
4.25 $933.79
$934
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Sewer PC 1/2
2.50 $570.18
1
$570
TYPE SUBTOTAL
2.50 $570.18
$570
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Sewer PC 3/4
3.50 $798.25
1
$798
TYPE SUBTOTAL
3.50 $798.25
$798
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Sewer PC 5/6
5.50 $1,254.39
1
$1.254
TYPE SUBTOTAL
5.50 $1,254.39
$1,254
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New On -Site PC 112
3.17
$722.98
1
$723
TYPE SUBTOTAL
3.17 $722.98
$723
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New On -Site PC 3/4
4.42
$1,008.07
1
$1,008
TYPE SUBTOTAL
4.42 $1,008.07
$1,008
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New On -Site PC 5/6
6.92 $1,578.24
1
$1,578
TYPE SUBTOTAL
6.92 $1,578.24
$1,578
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Off -Site PC 112
2.75 $627.19
1
$627
July 18, 2008
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
NEW INDUSTRIAL WASTE PERMIT /INSPECT
REFERENCE NO.
S -107
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
14
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
TYPE SUBTOTAL
2.75 $627.19
$627
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Off -Site PC 3/4
3.83
$873.51
1
$874
TYPE SUBTOTAL
3.83 $873.51
$874
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Off -Site PC 5/6
6.00
$1,368.42
1
$1,368
TYPE SUBTOTAL
6.00 $1,368.42
$1,368
FIRE ENVIR SAFETY
ADMIN SPECIALIST
Closure Inspection
0.50 $43.02
1
$43
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Closure Inspection
5.00 $1,140.35
1
$1,140
TYPE SUBTOTAL
5.50 $1,183.37
$1,183
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Wastewater Sampling
3.00 $684.21
1
$684
TYPE SUBTOTAL
3.00 $684.21
$684
TOTALS 55.84 $897.00 $12,558
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
REVISED INDUSTRIAL WASTE PERMIT /INS
S -108
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
PERMIT
Business
DESCRIPTION OF SERVICE
Review and inspection of revisions to new industrial waste uses within the City to determine compliance with City
and State codes and standards.
CURRENT FEE STRUCTURE
Revise Permit Application:
Sewer - $143 Off -Site - $195 On -Site - $206
Revise Sewer Plan:
1 - $258 2 - $317 3 - $400 4 - $444 5 - $644 6 - $825
Revise On -Site Plan:
1 - $348 2 - $431 3 - $548 4 - $607 5 - $902 6 - $1,162
Revise Off -Site Plan:
1 - $258 2 - $317 3 - $400 4 - $444 5 - $644 6 - $825
REVENUE AND COST
COMPARISON
UNIT REVENUE: $440.20
TOTAL REVENUE: $4,402
UNIT COST: $671.40
TOTAL COST: $6,714
UNIT PROFIT (SUBSIDY): $(231.20)
TOTAL PROFIT (SUBSIDY): $(2,312)
TOTAL UNITS: 10
PCT. COST RECOVERY: 65.56%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Revise Permit Application - $230
Revise Sewer Plan:
112 - $440 3/4 - $610 5/6 - $950
Revise On -Site Plan:
1/2 - $550 3/4 - $760 516 - $1,180
Revise Off -Site Plan:
1/2 - $440 3/4 - $610 5/6 - $950
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REVISED INDUSTRIAL WASTE PERMIT /INS
REFERENCE NO.
S -108
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
10
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Permit Revision
1.00 $228.07
1
$22B
TYPE SUBTOTAL
1.00 $228.07
$228
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Sewer Plan Revis 112
1.92 $437.89
1
$438
TYPE SUBTOTAL
1.92 $437.89
$438
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Sewer Plan Revis 3/4
2.67 $608.95
1
$609
TYPE SUBTOTAL
2.67 $608.95
$609
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Sewer Plan Revis 5/6
4.17
$951.05
1
$951
TYPE SUBTOTAL
4.17
$951.05
$951
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
On -Site PI Revis 112
2.42 $551.93
1
$552
TYPE SUBTOTAL
2.42 $551.93
$552
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
On -Site PI Revis 3/4
3.33 $759.47
1
$759
TYPE SUBTOTAL
3.33
$759.47
$759
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
On -Site PI Revis 5/6
5.17 $1.179.12
1
$1,179
TYPE SUBTOTAL
5.17
$1,179.12
$1,179
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Off -Site PI Rvis 1/2
1.92 $437.89
1
$438
TYPE SUBTOTAL
1.92 $437.89
$438
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Off -Site PI Rvis 3/4
2.67 $608.95
1
$609
TYPE SUBTOTAL
2.67 $608.95
$609
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Off-Site PI Rvis 5/6
4.17
$951.05
1
$951
July 18. 2008
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
INDUSTRIAL WASTE ANNUAL INSPECTION S -109
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
FIRE ENVIRON SAFETY INSPECTION Business
DESCRIPTION OF SERVICE
Review and annual inspection of existing industrial waste users within the City in compliance with NPDES permit
requirements.
CURRENT FEE STRUCTURE
Class 1 - $114
Class 2 - $227
Class 3 - $340
Class 4 - $453
Class 5 - $681
Class 12 - $1,359
Class X - $170
UNIT REVENUE:
$354.78
TOTAL REVENUE:
$12,772
UNIT COST:
$1,425.44
TOTAL COST:
$51,316
UNIT PROFIT (SUBSIDY):
$(1,070.66)
TOTAL PROFIT (SUBSIDY):
$(38,544)
TOTAL UNITS:
36
PCT. COST RECOVERY:
24.89%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Class 1 - $455
Class 2 - $910
Class 3 - $1,370
Class 4 - $1,825
Class 5 - $2,735
Class 12 - $5,475
Class X - $685
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
INDUSTRIAL WASTE ANNUAL INSPECTION
REFERENCE NO.
S -109
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
36
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class 1
2.00 $456.14
18
$8,211
TYPE SUBTOTAL
2.00 $456.14
$8,211
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class 2
4.00 $912.28
1
$912
TYPE SUBTOTAL
4.00 $912.28
$912
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class 3
6.00 $1.368.42
3
$4,105
TYPE SUBTOTAL
6.00 $1,368.42
$4,105
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class 4
8.00 $1,824.56
1
$1,825
TYPE SUBTOTAL
8.00 $1,824.56
$1,825
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class 5
12.00 $2,736.84
11
$30,105
TYPE SUBTOTAL
12.00 $2,736.84
$30,105
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class 12
24.00 $5,473.68
1
$5,474
TYPE SUBTOTAL
24.00 $5,473.68
$5,474
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Class X
3.00 $684.21
1
$684
TYPE SUBTOTAL
3.00
$684.21
$684
TOTALS 59.00 $1,425.44 $51,316
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
UNDERGROUND TANK PERMIT
S -110
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
PERMIT
Business
DESCRIPTION OF SERVICE
Review and inspection of the installation and removal of underground storage tanks to determine compliance with
City codes and standards.
CURRENT FEE STRUCTURE
Annual Permit Maintenance - $570 plus $30 for each additional tank
Operating Permit Transfer - $85
New Construction Plan Clearance - $725 plus $275 for each additional tank
Closure Application - $725 plus $310 for each additional tank
Complex Site Investigation - $1,200
Permit Addendum - $85
Voluntary Cleanup Oversight - $75 per hour
Secondary Containment Testing Oversight - $460 plus $220 for each additional tank
REVENUE AND COST COMPARISON
UNIT REVENUE: $409.64 TOTAL REVENUE: $22,940
UNIT COST: $897.09 TOTAL COST: $50,237
UNIT PROFIT (SUBSIDY): $(487.45) TOTAL PROFIT (SUBSIDY): $(27,297)
TOTAL UNITS: 56 PCT. COST RECOVERY: 45.66%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Annual Permit Maintenance - $1,190 plus $115 for each add'I tank
Operating Permit Transfer - $725
New Construction Plan Clearance - $1,140
Closure Application - $2,095 plus $230 for each additional tank or deposit
Complex Site Investigation - Deposit with actual costs
Permit Addendum - $480
Voluntary Cleanup Oversight - Deposit with actual costs
Secondary Containment Testing Oversight - $500 plus $570 for each tank plus $570 for each re- inspection per tank
after the first 2 inspections
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
UNDERGROUND TANK PERMIT
REFERENCE NO.
S -110
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
56
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COS
FIRE ENVIR SAFETY
ADMIN SPECIALIST
Annual Permit 20 H/Y
0.61
$52.14
33
$1,721
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Annual Permit
5.00 $1,140.35
33
$37,632
TYPE SUBTOTAL
5.61 $1,192.49
$39,352
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Ann Permit 2nd+ Tank
0.50 $114.04
12
$1,368
TYPE SUBTOTAL
0.50 $114.04
$1,368
FIRE ENVIR SAFETY
ADMIN SPECIALIST
Sec Cont Test Permit
0.50 $43.02
4
$172
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Sec Cont Test Permit
2.00 $456.14
4
$1,825
TYPE SUBTOTAL
2.50 $499.16
$1,997
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Sec Cont Test Tank
2.50 $570.18
4
$2,281
TYPE SUBTOTAL
2.50 $570.18
$2,281
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Sec Cont Test Re -Ins
2.50 $570.18
1
$570
TYPE SUBTOTAL
2.50 $570.18
$570
FIRE ENVIR SAFETY
ADMIN SPECIALIST
Op Permit Transfer
0.50 $43.02
1
$43
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Op Permit Transfer
3.00 $684.21
1
$684
TYPE SUBTOTAL
3.50
$727.23
$727
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New Const Plan Clear
5.00 $1,140.35
1
$1,140
TYPE SUBTOTAL
5.00
$1,140.35
$1,140
FIRE ENVIR SAFETY
ADMIN SPECIALIST
Closure - 1st Tank
0.50 $43.02
1
$43
FIRE ENVIR SAFETY
ENVIRON SAFETY MANAGER
Closure - 1st Tank
9.00 $2,052.63
1
$2,053
TYPE SUBTOTAL
9.50 $2,095.65
$2,096
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Closure Add'I Tank
1.00 $228.07
1
$228
TYPE SUBTOTAL
1.00 $228.07
$228
July 18, 2008
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
UNDERGROUND TANK PERMIT
REFERENCE NO.
S -110
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
56
DEPARTMENT POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COSI
FIRE ENVIR SAFETY ADMIN SPECIALIST
Permit Addendum
0.25
$21.51 1
$22
FIRE ENVIR SAFETY ENVIRON. SAFETY MANAGER
Permit Addendum
2.00 $456.14 1
$456
TYPE SUBTOTAL
2.25 $477.65
$478
FIRE ENVIR SAFETY ENVIRON. SAFETY MANAGER
Compl Site Inv - Dep
0.00 $0.00 1
$0
TYPE SUBTOTAL
0.00 $0.00
$0
FIRE ENVIR SAFETY ENVIRON. SAFETY MANAGER
Ovrsght Cleanup -Dep
0.00
$0.00 1
$0
TYPE SUBTOTAL
0.00 $0.00
$0
TOTALS 34.86 $897.09
July 18, 2008
$50,237
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
ABOVE GROUND LIQUID TANK INSPECTION
S -111
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
TANK
Business
DESCRIPTION OF SERVICE
Review and inspection of above ground liquid storage tanks to determine compliance with City and State codes
and standards.
CURRENT FEE STRUCTURE
0- 10,000 gallons - $100 per facility
10,001- 100,000 gallons - $200 per facility
100,001- 1,000,000 gallons - $400 per facility
1,000,001 - 10,000,000 gallons - $1,600 per facility
10,000,001 - 100,000,000 gallons - $8,000 per facility
100,000,001 or more gallons - $30,000 per facility
REVENUE AND COST COMPARISON
UNIT REVENUE: $237.42 TOTAL REVENUE:
$36,800
UNIT COST: $541.48 TOTAL COST:
$83,930
UNIT PROFIT (SUBSIDY): $(304.06) TOTAL PROFIT (SUBSIDY):
$(47,130)
TOTAL UNITS: 155 PCT. COST RECOVERY:
43.85%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
New:
0- 10,000 gallon - $1,370 10,001- 50,000 gallon - $2,280
50,001- 100,000 gallon - $2,735 100,000+ gallon - $3,650
Existing:
0- 10,000 gallon - $910
10,001- 50,000 gallon - $1,825 + $230 per tank after 1st tank
50,001- 100,000 gallon - $2,280 + $230 per tank after 1st tank
100,000+ gallon - $3,420 + $230 per tank after 1st tank
Removal:
0- 10,000 gallon - $1,140 10,000+ gallon -Deposit with actual costs
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
ABOVE GROUND LIQUID TANK INSPECTION
REFERENCE NO.
S -111
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
155
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New <10k Gal
6.00 $1,368.42
1
$1,368
TYPE SUBTOTAL
6.00 $1,368.42
$1,368
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New 10k -50k Gal
10.00 $2,280.70
1
$2,281
TYPE SUBTOTAL
10.00 $2,280.70
$2,281
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New 50k -100k Gal
12.00 $2,736.84
1
$2,737
TYPE SUBTOTAL
12.00 $2,736.84
$2,737
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
New 100k+ Gal
16.00 $3,649.12
1
$3,649
TYPE SUBTOTAL
16.00 $3,649.12
$3,649
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Existing <IOk Gal
4.00 $912.28
14
$12,772
TYPE SUBTOTAL
4.00 $912.28
$12,772
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Existing 10k -50k Gal
8.00 $1,824.56
9
$16,421
TYPE SUBTOTAL
8.00 $1,824.56
$16,421
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Existing 50 -100k Gal
10.00 $2,280.70
1
$2,281
TYPE SUBTOTAL
10.00 $2,280.70
$2,281
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Existing 100k+ Gal
15.00 $3,421.05
4
$13,684
TYPE SUBTOTAL
15.00 $3,421.05
$13,684
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
Removal <10k Gal
5.00 $1,140.35
1
$1,140
TYPE SUBTOTAL
5.00 $1,140.35
$1,140
FIRE ENVIR SAFETY
ENVIRON SAFETY MANAGER
Remov 10k+ Hourly
0.00 $0.00
1
$0
TYPE SUBTOTAL
0.00 $0.00
$0
FIRE ENVIR SAFETY
ENVIRON SAFETY MANAGER
Existing Add'I Tank
1.00 $228.07
121
$21.596
July 18, 2008
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
REVIEW OF RISK MANAGEMENT PLAN
S -112
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
APPLICATION
Business
DESCRIPTION OF SERVICE
Review of the CALARP Risk Management Plan to determine compliance with City codes and standards.
CURRENT FEE STRUCTURE
$58 per hour for all time spent
REVENUE AND COST COMPARISON
UNIT REVENUE: $5,703.33 TOTAL REVENUE: $51,330
UNIT COST: $22,426.89 TOTAL COST: $201,842
UNIT PROFIT (SUBSIDY): $(16,723.56) TOTAL PROFIT (SUBSIDY): $(150,512)
TOTAL UNITS: 9 PCT. COST RECOVERY: 25.43%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
REVIEW OF RISK MANAGEMENT PLAN
S -112
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
9
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS
TOTAL COST
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
100 -1k Lb 1 Chem
22.50 $5,131.58
1
$5,132
TYPE SUBTOTAL
22.50 $5,131.58
$5,132
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
100 -1k Lb 2 Chem
37.50
$8,552.63
1
$8,553
TYPE SUBTOTAL
37.50 $8,552.63
$8,553
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
100 -1k Lb 3+ Chem
60.00 $13,684.20
1
$13,684
TYPE SUBTOTAL
60.00 $13,684.20
$13,684
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1k -10k Lb 1 Chem
60.00 $13,684.20
1
$13,684
TYPE SUBTOTAL
60.00 $13,684.20
$13,684
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1k -10k Lb 2 Chem
75.00 $17,105.25
1
$17,105
TYPE SUBTOTAL
75.00 $17,105.25
$17,105
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
1k -10k Lb 3+ Chem
90.00 $20,526.30
1
$20,526
TYPE SUBTOTAL
90.00 $20,526.30
$20,526
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
10k+ Lb 1 Chem
90.00 $20,526.30
1
$20,526
TYPE SUBTOTAL
90.00 $20,526.30
$20,526
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
10k+ Lb 2 Chem
150.00 $34,210.50
1
$34,211
TYPE SUBTOTAL
150.00 $34,210.50
$34,211
FIRE ENVIR SAFETY
ENVIRON. SAFETY MANAGER
10k+ Lb 3+ Chem
300.00 $68,421.00
1
$68,421
TYPE SUBTOTAL
300.00 $68,421.00
$68,421
TOTALS
885.00 $22,426.89
$201,842
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FIRE STORMWATER INSPECTION
S -113
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE ENVIRON SAFETY
INSPECTION
Business
DESCRIPTION OF SERVICE
Inspection twice every 5 years of the storm water impacts of various occupancies to determine compliance
with
NPDES standards.
CURRENT FEE STRUCTURE
Restaurant - $45
Automotive - $45
1 Acre - $45
2 -5 Acres - $80
More than 5 Acres - $115
REVENUE AND COST
COMPARISON
UNIT REVENUE:
$48.27
TOTAL REVENUE:
$6,710
UNIT COST:
$174.53
TOTAL COST:
$24,260
UNIT PROFIT (SUBSIDY):
$(126.26)
TOTAL PROFIT (SUBSIDY):
$(17,550)
TOTAL UNITS:
139
PCT. COST RECOVERY:
27.66%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Restaurant - $165
Automotive - $165
1 Acre - $200
2 -5 Acres - $235
More than 5 Acres - $330
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
FIRE STORMWATER INSPECTION
REFERENCE NO.
S -113
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
139
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COST
FIRE ENVIR SAFETY
CONTRACT EMPLOYEE
Prog Admin - Balance
2.03 $73.66
139
$10,239
TYPE SUBTOTAL
2.03 $73.66
$10,239
FIRE ENVIR SAFETY
CONTRACT EMPLOYEE
Restaurant
2.50 $90.93
100
$9,093
TYPE SUBTOTAL
2.50 $90.93
$9,093
FIRE ENVIR SAFETY
CONTRACT EMPLOYEE
Automotive
2.50 $90.93
20
$1,819
TYPE SUBTOTAL
2.50 $90.93
$1,819
FIRE ENVIR SAFETY
CONTRACT EMPLOYEE
i Acre
3.50 $127.30
10
$1,273
TYPE SUBTOTAL
3.50
$127.30
$1,273
FIRE ENVIR SAFETY
CONTRACT EMPLOYEE
2 -5 Acres
4.50 $163.67
5
$818
TYPE SUBTOTAL
4.50 $163.67
$818
FIRE ENVIR SAFETY
CONTRACT EMPLOYEE
6+ Acres
7.00 $254.59
4
$1,018
TYPE SUBTOTAL
7.00 $254.59
$1,018
TOTALS 22.03 $174.53 $24,260
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
HAZARDOUS MATERIALS RESPONSE S -114
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
FIRE ENVIRON SAFETY RESPONSE Business /Non- Resident
DESCRIPTION OF SERVICE
Response to a hazardous material spill in the public right -of -way.
CURRENT FEE STRUCTURE
Actual Costs
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$0.00
TOTAL COST:
$0
UNIT PROFIT (SUBSIDY):
$0.00
TOTAL PROFIT (SUBSIDY):
$0
TOTAL UNITS:
1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Charge the fully allocated hourly rates for all personnel involved plus any outside or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
NEW CONSTR. FIRE RE- INSPECTION S -115
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
FIRE PREVENTION INSPECTION Developer /Resident/Business
DESCRIPTION OF SERVICE
Re- inspection of new fire improvements or occpancies which are required due to the actions of the applicant of
business.
CURRENT FEE STRUCTURE
None
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$179.00
TOTAL COST:
$179
UNIT PROFIT (SUBSIDY):
$(179.00)
TOTAL PROFIT (SUBSIDY):
$(179)
TOTAL UNITS: 1 PCT. COST RECOVERY: 0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Charges at the fully allocated hourly rates for all personnel involved plus any outside or contract costs.
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
AFTER -HOURS FIRE INSPECTION
S -116
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FIRE PREVENTION
INSPECTION
Business
DESCRIPTION OF SERVICE
Inspection of an occupancy which is necessary to be performed after -hours with a four hour minimum.
CURRENT FEE STRUCTURE
Actual Costs
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $525.00
TOTAL COST.
$525
UNIT PROFIT (SUBSIDY): $(525.00)
TOTAL PROFIT (SUBSIDY):
$(525)
TOTAL UNITS: 1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any
outside
or contract costs.
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
NEW BUSINESS LICENSE PROCESSING
S -117
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FINANCE
APPLICATION
Business
DESCRIPTION OF SERVICE
Processing new business license applications.
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$40.48
TOTAL COST:
$44,447
UNIT PROFIT (SUBSIDY):
$(40.48)
TOTAL PROFIT (SUBSIDY):
$(44,447)
TOTAL UNITS:
1,098
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$40 per application
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
BUSINESS LICENSE RENEWAL PROCESSING
S -118
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FINANCE
RENEWAL
Business
DESCRIPTION OF SERVICE
Processing business license renewals and maintenance of the business license system.
CURRENT FEE STRUCTURE
None
REVENUE AND COST
COMPARISON
UNIT REVENUE: $0.00
TOTAL REVENUE:
$0
UNIT COST: $43.79
TOTAL COST:
$295,495
UNIT PROFIT (SUBSIDY): $(43.79)
TOTAL PROFIT (SUBSIDY):
$(295,495)
TOTAL UNITS: 6,748
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$40 per renewal
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
BUSINESS LICENSE RENEWAL PROCESSING S -118
NOTE TOTAL UNITS
Unit Costs are an Average of Total Units 6,748
DEPARTMENT POSITION
BUSINESS SERVICES
ACCOUNTS SPECIALIST It
BUSINESS SERVICES
BUSINESS SERVICES MGR
BUSINESS SERVICES
LICENSE PERMIT SPEC II
BUSINESS SERVICES
REVENUE INSPECTOR
BUSINESS SERVICES
$9.77
TYPE
Remainder Of Time
60% Of 4 Months
Remainder Of Time
90% Of 4 Months
Contract Services
TYPE SUBTOTAL
TOTALS
UNIT TIME UNIT COST ANN. UNITS TOTAL COS'
0.23
$16.32
6,748
$110,127
0.05
$8.84
6,748
$59,652
0.12
$9.77
6,748
$65,928
0.07
$7.97
6,748
$53,782
0.00
$0.89
6,748
$6,006
0.48 $43.79 $295,495
0.48 $43.79 $295,495
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE
REFERENCE NO.
FILM PERMIT PROCESSING
S -119
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
FINANCE
APPLICATION
Business
DESCRIPTION OF SERVICE
Review a request to film within the City to determine compliance with City codes and standards.
CURRENT FEE STRUCTURE
Permit Application Fee - $250
Business License Application Fee - $247
Revision'/Rider - $75
Public Right -of -Way Usage - $750 per day per location
Police Personnel - $83 per hour + $5 per hour per vehicle
Fire Personnel - $59 per hour + $5 per hour per vehicle
Public Works Personnel - Actual Costs
REVENUE AND COST
COMPARISON
UNIT REVENUE: $356.33
TOTAL REVENUE: $26,725
UNIT COST: $486.89
TOTAL COST: $36,517
UNIT PROFIT (SUBSIDY): $(130.56)
TOTAL PROFIT (SUBSIDY): $(9,792)
TOTAL UNITS: 75
PCT. COST RECOVERY: 73.19%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
Permit Application Fee - $640
Revision/Rider - $175
Public Right -of -Way Usage - $750 per day per location
Police Personnel - Actual Costs
Fire Personnel - Actual Costs
Public Works Personnel - Actual Costs
- _ .. - -- -- - - - - -- - - -- -- - - -- .July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
SERVICE
FILM PERMIT PROCESSING
REFERENCE NO.
S -119
NOTE
TOTAL UNITS
Unit Costs are an Average of Total Units
75
DEPARTMENT
POSITION
TYPE
UNIT TIME UNIT COST ANN. UNITS TOTAL COS"
BUSINESS SERVICES
BUSINESS SERVICES MGR
0.75
$134.09
50
$6,705
BUSINESS SERVICES
LICENSE PERMIT SPEC II
2.25
$182.14
50
$9,107
INFORMATION SYST.
GIS SPECIALIST
1.00 $102.30
50
$5,115
ENGINEERING
SR CIVIL ENGINEERING ASSO
0.50 $76.85
50
$3,843
POLICE ADMIN.
POLICE SERGEANT
0.50 $83.60
50
$4,180
FIRE PREVENTION
FIRE PREVENTION SPEC.
0.50 $62.95
50
$3,148
TYPE SUBTOTAL
5.50 $641.93
$32,097
BUSINESS SERVICES
BUSINESS SERVICES MGR
RevisioNRider
0.25
$44.70
25
$1,118
BUSINESS SERVICES
LICENSE PERMIT SPEC 11
Revision/Rider
1.00 $80.95
25
$2,024
INFORMATION SYST.
GIS SPECIALIST
Revision /Rider
0.50 $51.15
25
$1,279
TYPE SUBTOTAL 1.75 $176.80 $4,420
TOTALS 7.25 $486.89 $36,517
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
COPY SERVICE S -120
PRIMARY DEPARTMENT UNIT OF SERVICE SR ERVICE RECIPIENT
CITY CLERK COPY esidenUNon- Resident
DESCRIPTION OF SERVICE
Providing copies of various City documents requested by the public.
CURRENT FEE STRUCTURE
First 6 pages - No Charge
Each additional page - $0.15
UNIT REVENUE: $0.00 TOTAL REVENUE:
UNIT COST: $0.54 TOTAL COST:
UNIT PROFIT (SUBSIDY): $(0.54) TOTAL PROFIT (SUBSIDY):
TOTAL UNITS: 500
SUGGESTED FEE FOR COST RECOVERY OF: 100%
First 5 copies - No Charge
Each additional copy - $0.20 per copy
PCT. COST RECOVERY:
$0
$270
$(270)
0.00%
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
DOCUMENT CERTIFICATION S -121
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
CITY CLERK DOCUMENT Resident/Non- Resident
DESCRIPTION OF SERVICE
Certifying the authenticity of a City document on request
CURRENT FEE STRUCTURE
None
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
$0.00
$3.05
$(3.05)
TOTAL UNITS: 60
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$3 per document
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
$0
$183
$(183)
.July 18, 2008
0.00%
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18. 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
VIDEO /AUDIO COPYING S -122
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
CITY CLERK TA-
APE /DISK Resident/Non- Resident
DESCRIPTION OF SERVICE
Providing video or audio copies of such records on request.
CURRENT FEE STRUCTURE
$15 per tape /disk
REVENUE AND COST COMPARISON
UNIT REVENUE: $15.00 TOTAL REVENUE: $180
UNIT COST: $9.58 TOTAL COST: $115
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$10 per tape /disk
$5.42 I TOTAL PROFIT (SUBSIDY):
$65
12 1 PCT. COST RECOVERY: 156.52%
July 18, 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
CITY OF EL SEGUNDO
REVENUE AND COST SUMMARY WORKSHEET
FY 2007 -2008
SERVICE REFERENCE NO.
INITIATIVE PROCESSING S -123
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
CITY CLERK APPLICATION Resident
DESCRIPTION OF SERVICE
Processing a notice of intent with the elections official of the City to propose a City Initiative
CURRENT FEE STRUCTURE
None
REVENUE AND COST COMPARISON
UNIT REVENUE:
$0.00
TOTAL REVENUE:
$0
UNIT COST:
$2,033.00
TOTAL COST:
$2,033
UNIT PROFIT (SUBSIDY):
$(2,033.00)
TOTAL PROFIT (SUBSIDY):
$(2,033)
TOTAL UNITS:
1
PCT. COST RECOVERY:
0.00%
SUGGESTED FEE FOR COST RECOVERY OF: 100%
$200 per application
Fee is limited by State Law
July 18. 2008
CITY OF EL SEGUNDO
COST DETAIL WORKSHEET
FY 2007 -2008
July 18, 2008
APPENDIX B
BUILDING SAFETY
DETAILED FEE RECOMMENDATIONS
m
W
J
W
U
U
W
J
D
0
W
2
U
U)
wm
O W W
ZF-LL
U W
LL
W Q 2'
cn�w
J � �
tl z z
O
} J J
U m m
0
W
U
O W d W
O W
a
H
Z
fr LL
U
W'
U
w
0 o 0 0 0 0 0
0 0 0 0 0 0 0 0
Cn O o 0 0° o
CO EA N CA O O O O
�EANEO000
> � EfA EA r to O
O N E!9 r
O O O O > >
° O O >
0 0
0 0 0
L r o 0 0 0 o
cUa 69 r °-00
O L 69 EA r O
U L L EA r
0 d CU6 C0 9 U U 69
O CU N (Ci R1 L
-Tr O d CU U
O O
ca
N O w O
� O c) O 0,2 'R
+ OD "t O O
ac) _ N CO
EA �� M 699
EA t + + EA ER +
+ +
Can � O O O CO
EA CV r OO 00 r
O CO r r Cl)
69 � � CO
U�l N Cfi
69
O o 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
O N U') 0 0 0 0
EA N m o O O
> U% 69 LO O
O
> d ld
O O O 0 O >> d)
>
0 0 0 0 O O 0 0
L r 0 0 0 0 a
CUO E9 r c:I ct O
N L 69 69 r r 0
U L L EA G-J. r
N w N U U
N � W N lC{ l0 CLj
t Q) a- w O O
Lc) 6A O o -
r+ O N O M
LO Efi CO 4 CC') ER C)
64 Efi Cl) t EP)
t t � CO C.,i
N O to
En Cn O O t
N LO 6 O 9 M O
r CA _ LO
EA CO EA M
[fl to
Cl)
(9
C
O
C O N
C O c
O 0 O N 0> C) f70
M co >oC) >
m > °o o0_ ° ° °oO
>o° -oOEon
O O CO Cn r EPA 6? 0 CD
w CD C) 69 fie d 64 N �i r 0 0
0 N' o 0 0 0 0
Z O O H En O O O (D
C O N N O U') >
0 EA 69 EfA 69 69 to O
m 'E 'E E E 'E E 'E E
Qaaaaa a-
c ccc ccc,
W v v v
Fn m m m m m m m m
Fn W
Of
0 0 0 0 0 0 o
O o 0 0 0 0 0 0
oEO000OOo
O60 N0000(70
ELAN 0000
-
> - EA to LO O
O y EA E9 r
O O > > N 0 to
o_ O O O > >
O O >
0 0 0
0 0
L r o o 0 0 0
mtl9 -:000
N L 6a EA O
U L L 60 ca r
O CD U U .c L 69
N Ri CO U U
O N N W CO L
N O CU N U
O O m
VI It O C) O
CT O O t O r ao
�64�i
°�C1 r.� O,
69 to
N O o t + 6s
ifl N r- o O t
r Cp ~ ~ O
Ln Cl) M h N CO N C,)
EfA E9 M N CV
E9 r r
N
ER
O o 0 0 0 0 0
O O O o O O O O
LO LO 0 0 0 0 0 0
O N LO Cl 0 0 0
69 - E:i N En O O O
> 69 EA LO o
O N i - 69 69 r.
> N N - 69
0 0 0 0 >> i
L 0 0 0 0 0
coo 69 _ r O O 0
a) L 6fA W. r O
U L L E:i U9, r
ON N M 0 U Vi
r " N 0 CO M CLj
Efi O L L N N N
� O _O - - N
O ELO O LO -O O
u-, 4 N N to O �O
ti
��H4� r N
E9 E9
Eon co + Cn + + Ef9
CV C-4 N LO LO t
ti r'- 6N O O CA �
9
N r
Efi ME9 O COO
Ge r
EH
C
C O
C O ;p
C O Cc O O
ca > > CO
C 0 CC{ 7 > 3 ca >
is O O> O O 3>
Y MC)CDCCD ) 00
U >> o0 0 0 0 0
w o OOu) -o
= O o O O r 69 60 o
U C°n °-NER� o
?E»� OOOO A
d C LO CV N CO O >
Ur :D 69 EE9 EA EA 69 69 O
Z U U U U U U U U
U U U U U U U U
C C C C C C C C
m CO ld R m CO m m CO
Qaaaaaaaa-
m
w`o -6 vv_- _ -_`ov_
O 7 7 7 7 7 7 7
mmmmmmmmm
W
of
m
W
J
W
2
U
U)
W
J
0
w
2
U
U)
w m
O LL w
} LL
H
LLJ
H
Q
Cn Cn W
J 06 d
z z
LL
O p o
U m m
O
W
U
O W W
aLL
O
d.
H
z
T W
W LL
D
U
W
U
W
0 0 0 0 0 0 0
°° O O O O O O
°in 000000
4- N tC) 0 0 0 0
f to N to O O O
> " 69 64 r O O
O N - -to69r
O O > > N N 69
O_ O O O > >
0 0 0 0 0 0 0
L O O O O O
0 6i r r C7 C7 °
N L 6i 69 r °
O m U U L L 69
N CO N U U L
COD O m m U
Cl) 0 w o y
e%I0tOo00
+ 00 N 0 O
V O ti 69 Co O
N 69 r 69 + CO
Ki tb ++ 0 N + 699
t` O N O O +
69 N Cn M N O
O CD O M N
fo6i �
69 CD
to
bi
0 0 0 0 0 0 0
° 0 0 0 0 0 0 0
° toOOOOOO
° 64 CN to O O O C
'4 N69Nto000
> -ww-to o
O m - "643,69,-:
O O > > m m
O_ O O O > >
0 0 0 0 0 0
L r 0 0 0 0 0
fU0 69 r c CI °
(U L 69 6► r r 0
O t0 U U L L 69
tD CO CO U U
c') m N W W L
Cff O N C4 U
+ ci O O L
O O 0 0 0`
N 69 to 69 to '
69 + + + 69 69 M
to r CD + + 6i
CD CD (D CD +
69 O CD co
69 co
to 00 00 CO
69 N co
69 V
d9
C
O
c O
C O f0 7 C
O
C 'o Cc 7 @ > l=0
(n c O Cp 7 0> O 7
Co :3 > O o OO o o
W >> o O p 0 0 0
0
o °OOtn o
C7 O o in to - 69 69 O
z 0 O "vi 69 -4 o
p 69 CV , r O O r
J` EA r Cl 0 O O 619
y r 0 0 0 O O
5 0CDLd oo
m c to N N to r to >
J 69 69 69 69 6) 69 O
F- E E
wmmmmmmmm
s c- E- s E- s E-
w :2 2 m m m_ m m m
o 7 .7 .7 .7 .7 .7 .7
Zmmmmm0omm
O
z
0 0 0 0° 0 0
° O o Co o 0 o O
°tna0000a
O N to 0 0 0 0
�tf9N 0000
69 > 69 to r to 0
O CD - L 69 09 r
O O > > N N
_O ° O O > >
O O m
O O O O O O
L O O O O O
tU0 r Ct CIO
O L V> 69 r O
U L L 69 M.-
N N N U U
N N m m
O
c
N U
ui o o m
69 °r°
+ CV CO O --t CA .2
CO N co r N Ch e}
O 69 r CA t• to
CD + 69 bi 69 69 ui
M (O + + + + 69
O O to to to +
O N CA "t st to
N CD Cen O CD
}
6i CMO O COO N
Vi r r {n CT
69 6) 69
69
0 0 0 0 0 0 0
Cl 0 0 0 0 0 0 0
(C. to O O O O O O
°W:�N to OOOO
69 N to O O O
> " 69 69 r In O
O m 6960
> r
O > > W d
O O > > -
O O O m
O O O >
L 0 0 0 0 O
U r O O °
O 69 r O
N L 69 69 r 0
�. U L L bi 69 r
O CO U U L L 69
m m m U U
N- m m W M
co O O O O O
+ Co 00 N O CO
O - cM cA ~ r (N
00 69 r 69 ^ CO t0
O + 69 + 0% b9 �t
69 V 6 +9
C) r CO (D zg
O to rl- M M
r N 00 M
69 V) 69 Cl) st cn
69 : r �t
69 69 :
69
C
C .0
c O
C O T+ ] C
O M 7 (6
C f0 7 f6 > W
f0 7 Z 7
W W W> O O°>
> 0 0 0 0 0 0
U >> O o 0 00 0 0
z o °_0otn o
OO to to r69toO
° O N 69 to
Vr `6or Q o0069
y r o O 0 0 0
zoo °_td000W
c to N N 1n r to >
J_ 69 FA 69 69 to 69 O
D U U U U U U U U
m
Q U U U U U U U U
(O t0 N lC l0 l0 (6 W
waaaCL 0- aaa
O rnrnrnrno�C
Wp_ammm'v'v_v
rf 7 '7 > '7 7 7 7 7
Z m m m m m m m m
O
z
m
W
J
D
❑
W
2
U
U)
w
J
❑
W
U
U)
W U
LU
O a w LU
LL
W H
W
W Q 2
(1) U) W
Jasa
w0(D
LL Z Z
O p
c)mm
❑
w
U) W
O W
CL
O U-
a
Z
O! W
a W
D
U
w
U_
W
U
m
a)
LL
0 a)
)i lO )i
o 0 m .. m
0 0 0 w� cc x
,.
U T
�
d
C 0 0 0 0
d
t i 2 m Z 2
rn rn rn
c c c
O
ovv
() O O
:3
E
m m m
-
(1) a) a)
(D
E
5
000
rn
a)
D)
00 0'\0 0'\0
4)
to
y
0
a�a) E
CL
h
m
N
a
-O� aL
0
O
m
0
0
0
m C c0 j
0
O «- G
u
U U- c V w
I'
U) E E m
in m'E o m m
co
H y a
CL a-
❑ uai a�i (j 0 (ai
O cU �QCan-
CO
W y m m N y m
c E
619
d �-' � m
L
O o O a) 4) 4)
v
a)
O N N
w j j y L >'D
o O O
7
fA fA 09 >. T T T
7 7 7 7
U❑
O O O O
O
2 2 = Z
F- F-
2
O O
m
a)
LL
a)
m
T
7
O
2
m
rn
a)
o!
m
O
0
N_
m
7
O
a)
E
C
N
O
3
m
m
c
y
m
D
�
m
C
�
r
a
E
5
m
L
rn
a)
D)
E
> U
0
to
c M E
$
a�a) E
h
0 0 �'
N
0_
-O� aL
O
m
U 0 vi v
>
0
m C c0 j
>
O «- G
u
U U- c V w
I'
U) E E m
in m'E o m m
m
H y a
CL a-
❑ uai a�i (j 0 (ai
O cU �QCan-
D) U
W y m m N y m
c E
d �-' � m
L
Q v v a o
J '- - `y 'r
v
a)
O N N
w j j y L >'D
n
7
❑F -000W
�wa:2
U❑
O
U)
U
2
a)
m
T
7
O
2
m
rn
a)
o!
m
O
0
N_
m
7
O
a)
E
C
N
O
CITY OF EL SEGUNDO
SCHEDULE B -2
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
CURRENT
PROPOSED
ELECTRICAL PERMITS
Permit Issuance
$15.00
$28
Supplemental Permit Issuance
$15.00
$21
Residential Appliances, up to 1 hp
$4.00
$28
Non - Residential Appliances, up to 1 hp
$8.00
$28
Electrical Sign
$15.00
$133
Power Apparatus (Ratings in HP, KW, KVA, or KVAR)
up to 5
$6.50
$114
5 -20
$10.00
$114
21 -50
$15.00
$114
51-100
$33.00
$114
100+
$50.00
$188
Temporary Power Pole
$20.00
$37
Services, Switchboards, Control Centers, & Panels
up to 600 volts
up to 200 amps
SFR
$12.00
$56
Non -SFR
$12.00
$133
201 -400 amps
SFR
$20.00
$56
Non -SFR
$20.00
$133
401 -1,200 amps
$36.00
$315
over 1,200 amps
$45.00
$315
greater than 600 volts
$60.00
$342
Switchboards
First Section Standing Panel
$35.00
N/A
Additional Sections
$30.00
N/A
Over 600 Volt Section
$60.00
N/A
Additional Sections
$55.00
NIA
Receptacle, Switch, and Lighting Outlet, per fixture
$0.50
$7
Lighting Fixture, per fixture
$0.50
$7
Pole or Platform Mounted Fixtures, per fixture
$3.00
$19
Swimming Pool
$0.00
$111
Meter Reset
$0.00
$37
Miscellaneous Conduits and Conductors (per 100 linear feet)
$0.00
$28
Inspections not specified
Hourly Rate
Hourly Rate
Reinspections
Hourly Rate
Hourly Rate
After Hours Inspection (4 hour minimum)
OT Hourly Rate
OT Hourly Rate
Overtime Hourly Rate is 120% of the Regular Hourly Rate
CITY OF EL SEGUNDO
SCHEDULE B -2
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
CURRENT
PROPOSED
PLUMBING PERMITS
Permit Issuance
$15.00
$28
Supplemental Permit Issuance
$15.00
$21
Plumbing Fixtures and Vents
SFR
$10.00
$11
Non -SFR
$10.00
$27
Repair or Alteration of Drainage or Vent Piping
$5.00
$28
Grease Interceptor
$25.00
$237
Piping
Single Family Residential (per dwelling unit)
$8.00
$37
Multi Family Residential (per dwelling unit)
$8.00
$114
Repipe
Single Family Residential (per dwelling unit)
$8.00
$56
Multi Family Residential (per dwelling unit)
$8.00
$56
Lawn Sprinklers, Vacuum Breakers, and Backflow Protection Dev.
Each Lawn Sprinkler System per Valve
$5.00
$9
Each Vacuum Breaker or Backflow Protection Device
$5.00
$9
Backflow Protection Device greater than 6"
$25.00
$167
Gas System
For Each System
Less than 2"
$15.00
$56
2" or more
$50.00
$133
For Each Outlet
$3.00
$11
Water Heater
$8.00
$28
Solar Water Heating system
$15.00
$56
Sewer
0 -25 linear feet
$15.00
$28
each additional 100 linear feet
$0.00
$28
Swimming Pool
$75.00
$83
In- Ground Spa
$30.00
$37
Pool /Spa Heater
$0.00
$28
Miscellaneous
$30.00
$56
Inspections not specified
Hourly Rate
Hourly Rate
Reinspections
Hourly Rate
Hourly Rate
After Hours Inspection (4 hour minimum)
OT Hourly Rate
OT Hourly Rate
Overtime Hourly Rate is 120% of the Regular Hourly Rate
CITY OF EL SEGUNDO
SCHEDULE B -2
BUILDING & SAFETY FEE SCHEDULE
MECHANICAL, ELECTRICAL, AND PLUMBING PERMIT FEES
CURRENT
PROPOSED
MECHANICAL PERMITS
Permit Issuance
$15.00
$28
Supplemental Permit Issuance
$15.00
$21
Forced -Air or Gravity -Type Furnace or Burner
$8.00
$47
Floor Furnace - Installation or Relocation
$8.00
$37
Suspended /Recessed Wall /Floor Mounted Heater - Install /Reloc
$8.00
$37
Fireplace
$8.00
$76
Appliance Vents per each Inlet/Outlet
$5.00
$13
Air Handling Units
SFR
$15.00
$56
Non -SFR
$15.00
$133
Single Register Ventilation Fan
$5.00
$9
Independent Venting System
$14.00
$37
Hood served by Mechanical Exhaust
$8.00
$133
Boilers, Compressors, and Absorption Systems
0 -3 HP or 0- 100,000 Btu /h
$25.00
$114
3 -15 HP or 100,001- 500,000 Btu /h
$25.00
$133
15 -30 HP or 500,001- 1,000,000 Btu /h
$25.00
$237
30 -50 HP or 1,000,001 - 1,750,000 Btu /h
$35.00
$342
50+ HP or 1,750,001+ Btu /h
$75.00
$447
Incinerator /Kiln
$0.00
$56
Alteration to Duct Work not otherwise noted
$10.00
$4
Miscellaneous
$30.00
$56
Inspections not specified
Hourly Rate
Hourly Rate
Reinspections
Hourly Rate
Hourly Rate
After Hours Inspection (4 hour minimum)
OT Hourly Rate
OT Hourly Rate
Overtime Hourly Rate is 120% of the Regular Hourly Rate