5EXHIBIT "K City of El Segundo Sewer System Management Plan Development Plan and Schedule Page 2 of 2 Required Sections Description of Activities to Achieve Desired Goals Completion Target Completion Date Date Date Develop new or identify existing FOG control Program that includes: 05/02/2009 04/02/2009 a) An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG; b) A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area; c) Legal authority to prohibit discharges to system and measures to prevent SSOs caused by FOG; d) Requirements to install grease removal devices and design standards for the Section 7 - Fats, Oil, and removal devices, including record keeping and reporting requirements; Grease Control e) Authority to inspect grease producing facilities, enforcement authorities and whether the City has sufficient staff to inspect and enforce the FOG ordinance; f) Identify sections of the sewer systems subject to grease blockages and establish cleaning maintenance schedule for each section; and g) Source control measures for all sources of FOG discharge to the sewer systems. Develop or affirm the existence of a Capital Improvement Plan (CIP) that includes the 08/02/2009 07/02/2009 following: a) Steps to evaluate portions of the sewer system which are experiencing or contributing to SSOs caused by hydraulic deficiencies; Section 8 - System b) Short and long term CIP to address identified hydraulic deficiencies including Evaluation and Capacity prioritization, alternative analysis, and schedule. The CIP may include Assurance Plan increases in pipe size, plastic lining of sewers, infiltration /inflow reduction, and upgrading of pumping systems for redundancy, reliability, and emergency storage; and c A schedule of completion for deficiencies identified in the CIP. Develop or identify existing system to do the following: 08/02/2009 07/02/2009 a) Maintain relevant information that can be used to establish and prioritize appropriate SSMP activities; Section 9 - Monitoring, b) Monitor the implementation and where appropriate, measure the Measurement, and effectiveness of each element of the SSMP; Program Modification c) Assess the success of the preventative maintenance program; d) Update program elements as appropriate, based on monitoring or performance evaluations; and e Identify and illustrate SSO trends, including frequency, location and volume. Section 10 - SSMP Develop an internal SSMP periodic audit system that focuses on evaluating the 08/0212009 07/02/2009 Program Audits effectiveness and deficiencies of the SSMP and steps to correct them. Develop or identify effective means of communicating with the public on the 08/02/2009 07/02/2009 Section 11 - development, implementation, and performance of the SSMP. The communication Communication Program system shall be open to public input in the development and implementation of the SSMP. Prepare SSMP incorporating comments where appropriate, and submit to Administration 08/02/2009 07/02/2009 Complete Final SSMP for approval and to the SWRCB and RWQCB as required. Page 2 of 2