Loading...
4EXHIBIT "K City of El Segundo Sewer System Management Plan Development Plan and Schedule Page 1 of 2 Required Sections Description of Activities to Achieve Desired Goals Completion Target Completion Date Date Date Develop SSMP Plan and Prepare the SSMP development plan schedule 11/02/2007 10/02/2007 Schedule Section 1 - Goals Define the goals of the SSMP 11/02/2007 10/02/2007 a) Identify the name of the responsible or authorized representative as 11/02/2007 10/02/2007 described in section J of the Order. b) Identify the administrative and maintenance positions responsible for implementing specific measures in the SSMP program, including lines of Section 2 - Organization authority by organization chart. Structure c) Identify the chain of communication for reporting SSOs, from receipt of a complaint or other information, to reporting the SSOs to the State and Regional Water Board and other agencies such as the County Health Department and the Office of Emergency Services. Identify all legal authorities possessed by the City of El Segundo to : 05/02/2009 04/02/2009 a) Prevent illicit discharges into the City sanitary sewer system; b) Require that sewers and connections be properly designed and constructed; Section 3 - Legal Authority c) Ensure access for maintenance, inspection, or repairs of mainline sewers; d) Limit the discharge of fats, oil, and grease (FOG) and other debris that may cause blockages, and e Enforce any violation of its sewer ordinances. Identify procedures in place or to be implemented for the following: 05/02/2009 04/02/2009 a) Maintaining an up -to -date map of the sewer system; b) Providing routine preventative operation and maintenance by staff and contractors, including a system for scheduling more frequent cleaning and maintenance at known problem areas; Section 4 - Operation and c) Providing a system to document scheduled and conducted activities; Maintenance Program d) Identifying and prioritizing system deficiencies and implementing short and long term rehabilitation actions; e) Providing training to staff on a regular basis and requiring contractors to be appropriately trained; and f) Providing equipment and replacement part inventories; including identification of critical replacement parts. Identify the following: 08/02/2009 07/02/2009 a) Design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations, and other appurtenances; and Section 5 - Design and for the rehabilitation and repair of existing sanitary sewer systems; and Performance Provision b) Procedures and standards for inspecting and testing the installation of new sewers, pumps, and other appurtenances and for rehabilitation and repair ro'ects. Develop or affirm the existence of an overflow response plan that includes the following: 05/02/2009 04/02/2009 a) Proper and timely notification procedures of SSOs to primary responders; b) Procedure to ensure timely and appropriate response and containment of SSOs; c) Procedures to ensure prompt notification of SSOs to appropriate regulatory agencies and other potentially affected entities; Section 6 - Overflow d) Procedures to ensure that staff and contractors are aware of and follow the Emergency Response plan and are appropriately trained; Plan e) Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities; and f) A program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the United States and to minimize or correct any adverse impact on the environment resulting from the SSOs. Page 1 of 2