Loading...
CC RESOLUTION 4415RESOLUTION NO. 4415 A RESOLUTION OF THE EL SEGUNDO CITY COUNCIL TO CERTIFY AN ENVIRONMENTAL IMPACT REPORT SUBMITTED BY MAR VENTURES, INC. AND THE CITY OF EL SEGUNDO FOR ENVIRONMENTAL ASSESSMENT NO. 631 AND GENERAL PLAN AMENDMENT NO. 03-4 & 03 -5, FOR THE SEPULVEDA/ROSECRANS SITE REZONING AND PLAZA EL SEGUNDO DEVELOPMENT PROJECT (REDUCED TRAFFIC GENERATION ALTERNATIVES). The City Council of the City of El Segundo does resolve as follows SECTION 1 The City Council finds and declares that A On November 17, 2003, Mar Ventures, Inc filed an application for an Environmental Assessment (EA -631), General Plan Amendment (GPA No 03-4), Zone Change (ZC No 03 -2) and Subdivision (SUB 03 -7, Vesting Tentative Tract Map No 061630) to redesignate and rezone an approximately 54 9 -acre property at the northeast corner of Sepulveda Boulevard and Rosecrans Avenue On June 28, 2004 and July 26, 2004, Mar Ventures, Inc filed additional applications requesting a Zone Text Amendment (ZTA No 04 -2) and Development Agreement (DA No 03 -1) If these matters are approved, the applicant proposes to develop a 425,000 square foot shopping center, known as Plaza El Segundo, B On November 13, 2003, the City of El Segundo filed an application for a General Plan Amendment (GPA No 03 -5) and Zone Change (ZC No 03- 3) to redesignate and rezoning an approximately 30 -acre property at the northeast corner of Sepulveda Boulevard and Rosecrans Avenue from Heavy Industrial (M -2) to Commercial Center (C-4) On April 26, 2004, the City of El Segundo filed an application requesting a Zone Text Amendment (ZTA No 04 -1) to amend the El Segundo Municipal Code, C The applications from Mar Ventures, Inc and the City of El Segundo were reviewed by the City's Planning and Building Safety Department for, in part, consistency with the General Plan and conformity with the El Segundo Municipal Code ( "ESMC "), D In addition, the City reviewed the project's environmental impacts under the California Environmental Quality Act (Public Resources Code §§ 21000, et seq., "CEQA"), the regulations promulgated thereunder (14 Cal Code of Regulations § §15000, et seq , the "CEQA Guidelines "), E An Initial Study was prepared pursuant to the requirements of CEQA The Initial Study demonstrated that the project could cause significant environmental impacts Accordingly, a Draft Program /Project -1- Environmental Impact Report ( "DEIR ") was prepared and circulated for public review and comment between October 5, 2004 and November 19, 2004, F The Planning and Budding Safety Department completed its review and scheduled a special public hearing regarding the application before the Planning Commission for November 15, 2004, G On November 15, 2004 the Commission held a special public hearing to receive public testimony and other evidence regarding the applications including, without limitation, information provided to the Commission by City Staff, public testimony, and representatives of Mar Ventures, Inc., and continued the public hearing to December 15, 2004, H On December 15, 2004, the Planning Commission held the continued public hearing and adopted Resolution No. 2575 recommending City Council approval of Environmental Assessment No 631, Development Agreement No 03 -1, General Plan Amendment No 03-4 & 03 -5, Zone Change No 03 -2 & 03 -3, Zone Text Amendment No 04 -1, and Subdivision No 03 -7 (Vesting Tentative Tract No 061630), On February 15, 2005 the City Council held a public hearing and considered the information provided by City staff, public testimony and Mar Ventures, Inc; and, J. This Resolution and its findings are made based upon the testimony and evidence presented to the Council at its February 15, 2005 hearing including, without limitation, the staff report submitted by the Planning and Building Safety Department SECTION 2 Factual Findings The City Council finds that the following facts exist A The approximately 110 -acre irregularly shaped subject property is located in the southern portion of the City of El Segundo The site is comprised of 13 separate parcels of varying sizes, ranging from 1 8 acres to 29 2 acres The entire subject property is roughly bounded by Hughes Way to the north, Douglas Street to the east, Rosecrans Avenue to the south, and Sepulveda Boulevard to the west B The majority of the site was historically devoted to industrial chemical manufacturing facilities Honeywell International, Inc and General Chemical, and their predecessors in interest, had operational facilities on the site until 2003 At that time the facilities were closed and demolished for resale and reuse Remediation activities for on -site soil contamination has also commenced on the Honeywell International property. -2- C A 7 -acre portion of the site along Rosecrans Avenue is currently used by Air Products Inc for the production of industrial gases Air Products also owns an 8 9 -acre vacant parcel of land in the interior of the project site D Other current uses of the project site include a lumber yard operated by Learned Lumber on land leased from the Los Angeles County Metropolitan Transportation Authority (MTA) at the east end of the project site Foundation remains from a brass foundry building are located in the north east end of the project site on a portion of an 11 -acre property owned by H Kramer & Company Additionally, the elevated Metro Green Line light rail traverses the property in a north -south alignment near the east end of the project site E The proposed redesignation and rezoning of the Sepulveda /Rosecrans Site Rezoning would change the General Plan land use designation of approximately 85 8 gross acres of the 110 -acre subject property to a new Commercial Center designation and rezone the area to a new Commercial Center (C -4) Zone F As applied to the whole of the Sepulveda /Rosecrans Site Rezoning, the proposed Commercial Center land use designation and C -4 zoning would permit up to 850,000 square feet of commercial shopping center development within approximately 85 8 -acre site The proposed FAR for the Commercial Center land use designation is 02751. G The existing lumber distribution use (Learned Lumber) that is presently located within the Sepulveda /Rosecrans Rezoning Site would also retain its current Light Industrial (M -1) zoning classification The land on which the lumber yard sits is expected to be reconfigured in the future to accommodate the realignment of the Burlington Northern Santa Fe railroad tracks It is anticipated that the size of the lumber yard will remain comparable to today H As part of the Sepulveda /Rosecrans Site Rezoning the Air Products facility may also relocate to a new smaller facility on the portion of the project site that will remain zoned Heavy Industrial (M -2) The Sepulveda /Rosecrans Site Rezoning project anticipates possible expansion of an existing recreational vehicle (RV) storage facility located on H Kramer & Company property within the boundaries of the Sepulveda /Rosecrans Site Rezoning project area J The applicants are not requesting entitlements for 66 7 gross acres that are part of the Sepulveda /Rosecrans Site Rezoning, but not included with the proposed Plaza El Segundo development The Program DEIR -3- identifies the additional environmental evaluation required for developing those 66.7 acres K The proposed Plaza El Segundo would be constructed on approximately 43 3 gross acres within the Sepulveda /Rosecrans Site Rezoning and would implement the new C -4 zoning on that portion of the site The proposed Plaza El Segundo would be located on approximately 37 3 gross acres located north of the Union Pacific Railroad tracks and approximately 4 7 gross acres located immediately at the northeast corner of Sepulveda Boulevard and Rosecrans Avenue L The proposed Plaza El Segundo project is a shopping center of up to 425,000 square feet The shopping center would contain large retail stores, specialty retail, and other uses which could include a spa, and a variety of sit -down restaurants and limited fast food restaurants The types of retail tenant categories could include a Whole Foods grocery store, home improvement, department store, electronics and appliances, home furnishings, pet supply, books, soft goods and sporting goods M The proposed shopping center would consist of several one- and two - story buildings with a maximum height of 65 feet. All development within the proposed Plaza El Segundo would conform to the C-4 development standards N The proposed FAR for this development would be 0 2756 1 based on 425,000 square feet of development on 38 1 net acres The proposed subdivision of the Plaza El Segundo site would include 20 parcels These parcels would range from 0.5 to 5 5 acres in size. As a result, FARs on individual parcels may range from approximately 0 00 1 to 0 49 1 O. Under the proposed Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative, the standards of the proposed C -4 zone would be modified to limit the mix of land uses permitted within the 70.8 net acre portion of the proposed Sepulveda /Rosecrans Rezoning Site that would be redesignated in the General Plan for Commercial Center use and rezoned to Commercial Center (C-4) in order to reduce total traffic generation from the Site Total permitted square footage within the proposed Sepulveda /Rosecrans Rezoning Site would remain the same (850,000 total square feet), but the mix of uses would be limited to the following 590,000 square feet of shopping center, 185,000 square feet of large scale retail, 50,000 square feet of grocery store, 10,000 square feet of fast food restaurants, and 15,000 square feet of sit -down restaurants Total traffic generation under this alternative would be reduced by approximately 11 7% in the p m peak hour and approximately 8 8% on a daily basis All other components of the proposed Sepulveda /Rosecrans Site Rezoning, including the construction of new roadways, relocation of -4- railroad rights -of -way, and stormwater retention basin would remain the same as the proposed Sepulveda /Rosecrans Site Rezoning under this alternative P Under the Plaza El Segundo Reduced Traffic Generation Alternative, the Plaza El Segundo Development site boundaries and total proposed square footage would remain the same (425,000 square feet), but the mix of uses within the proposed Plaza El Segundo Development would be modified to result in an approximately 17% reduction in p m peak hour traffic generation and an approximately 13% reduction in daily traffic generation The mix of uses that would be contained within the proposed Plaza El Segundo Development under the Reduced Traffic Generation Alternative would include 165,000 square feet of shopping center, 185,000 square feet of large scale retail, a 50,000 square -foot grocery store, 10,000 square feet of fast food restaurants, and 15,000 square feet of sit -down restaurants The proposed land uses and density would be within the requirements of the proposed C -4 zone All other components of the proposed Plaza El Segundo Development, including the construction of new roadways (Park Place east of Sepulveda Boulevard and Allied Way within the Plaza El Segundo Development site) and storm water retention basin would remain the same as the proposed Plaza El Segundo Development under this alternative Q The proposed C -4 Zone would provide for the transfer of density rights within the development area to insure that the overall density of the site is consistent with the C-4 Zoning Any donor parcels for FAR purposes will have covenants recorded stating the maximum FAR permitted on the parcel R The full bwldout of the Sepulveda /Rosecrans Site Rezoning includes an extension of Park Place (a four -lane east -west street) from its current terminus at Nash Street that would connect to Sepulveda Boulevard The roadway extension would include a signalized intersection at Sepulveda Boulevard south of Hughes Way The roadway would also include a grade separation structure to allow the roadway to pass beneath the Union Pacific Railroad and realigned Burlington Northern Santa Fe Railroad tracks that bisect the project site S Primary ingress and egress to the proposed Plaza El Segundo would be provided from Sepulveda Boulevard via a new traffic signal halfway between Hughes Way and Rosecrans Avenue The eastern leg of this intersection will be served by the new east -west Park Place roadway extension, constructed to El Segundo roadway standards consistent with the adopted Circulation Element T A second new roadway extension would be constructed to roadway standards consistent with the Circulation Element of the City's General -5- Plan in a north -south alignment to connect the new segment of Park Place to Hughes Way via Allied Way, which presently terminates at the northern boundary of the Sepulveda /Rosecrans Rezoning Site U The Plaza El Segundo portion of the Sepulveda /Rosecrans Site Rezoning is proposed to be constructed as one phase Construction is expected to commence in 2005 and to be completed in 2007 V An interim on -site stormwater retention pond would be constructed within the proposed Plaza El Segundo site to retain storm water runoff Portions of an existing 42 -inch reclaimed water line that crosses the site from north to south approximately 5 to 7 feet below the existing ground surface may be relocated The proposed Plaza El Segundo would connect into the existing water and sewer lines W Parking for the Plaza El Segundo portion of the Sepulveda/ Rosecrans Site Rezoning is proposed to be located in surface parking lots that will surround the proposed shopping center buildings Based on a total of 425,000 square feet, including 400,000 square feet of commercial /retail space and 25,000 square feet of restaurant floor area in the Plaza El Segundo development as described in the Environmental Impact Report, 1,363 parking spaces are required The developer proposes to provide 2,164 parking spaces, which exceeds the City's parking requirements SECTION 3 Environmental Assessment The City Council makes the following environmental findings A The Draft EIR was completed in compliance with CEQA, Guidelines § 15090 A Program /Project Draft Environmental Impact Report (DEIR) was prepared for this protect pursuant to the requirements of CEQA A Notice of Preparation of the Draft EIR was prepared and circulated for public review from November 26, 2003 to December 26, 2003 A Revised Notice of Preparation was also prepared and circulated for public review from March 25, 2004 to April 30, 2004. The public review and comment period for the Draft EIR began on October 5, 2004 and ended on November 19, 2004 A Notice of Completion was filed with the State Clearinghouse on October 5, 2004, B The City received twenty -two comment letters on the DEIR from public agencies, groups and individuals, C A Final Environmental Impact Report ( "FEIR ") was prepared, which includes the DEIR, comments regarding the DEIR and written responses to such comments, a summary of changes to the DEIR, and all technical appendices, M D The FEIR for the proposed Project, entitled 'Report Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development Final Environmental Impact Report", prepared by Christopher A Joseph and Associates under contract to the City and under the supervision of the City Planning and Building Safety Department on January 7, 2005 (State Clearinghouse No 2003121037), is incorporated by reference; E The City, acting as lead agency, has reviewed and edited as necessary the Draft EIR and the Final EIR to reflect its own independent judgment to the extent of its ability, including reliance on City technical personnel from other departments as well as professional consultants retained by the City in order to provide technical advice an assistance in evaluating environmental impacts associated with the Project, F Pursuant to Public Resources Code § 210821(c)(3), the City Council independently reviewed and analyzed the FEIR Based upon that review and analysis, and recommendations made by the City's Planning Agency as set forth in Planning Commission Resolution No 2575, the City Council finds the FEIR is an accurate and complete statement of the potential environmental impacts resulting from the Project The FEIR reflects the City's independent judgment as lead agency, G Pursuant to CEQA Guidelines § 15091, any changes or alterations required for the Project, or incorporated into the Project, which avoid or substantially lessen the significant environmental effect are identified for the FEIR Any potential changes or alterations that may be made to the proposed mitigation measures are addressed and analyzed in the FEIR, H The DEIR and FEIR were made available for public review and comment in the time and manner prescribed by CEQA, The FEIR generally concluded that, with mitigation, the Project would not have a significant, adverse effect on the environment Those mitigation measures are desirable and feasible, J The FEIR also identified three project- related environmental impacts that cannot be mitigated i Traffic impacts at several intersections, u Operational and temporary construction related air quality impacts, and ui Temporary construction related noise impacts 7- K The FEIR also identified three cumulative environmental impacts that cannot be mitigated. i Solid waste impacts, n Population and housing impacts, and ui Regional traffic impacts L Based upon a review of all relevant matters in the record, the City Council finds that the proposed construction of planned roadway and intersection improvements will improve the overall circulation system of the City and reduce long -term air quality impacts Therefore, the temporary construction impacts are offset by the long -term benefits, M In accordance with § 15091 of the CEQA Guidelines, the record on which the City Council's findings are based is located at the Planning and Building Safety Department, City of El Segundo, 350 Main Street, El Segundo, California 90245 The custodian of records is the Director of Planning and Budding Safety, N There is no evidence that the project will have the potential for an adverse effect on wildlife resources or the habitat on which the wildlife depends, because the project is in a built -out urban environment, O The City reviewed the FEIR for the project and considered the public record on the project, including, without limitation, the following 1 Staff reports prepared by the Planning and Budding Safety Department and the DEIR and FEIR prepared by Christopher A Joseph & Associates for the City, 2 Staff presentations at public hearings and meetings, 3 All applicable regulations and codes; 4 Public comments, both written and oral, received and /or submitted at or prior to the public hearings and meetings, supporting or opposing the proposed project, and, 5 All related documents received and /or submitted at or before the public hearings, P Because of the facts identified in this Resolution, specifically the creation of significant unavoidable environmental impacts as described above, the FEIR found that a Statement of Overriding Considerations would be 12 required in order for the project to be approved SECTION 4 General Plan The proposed project conforms with the City's General Plan as follows A The General Plan contains a number of relevant Goals, Objectives, and Policies in the Economic Development Element The goal of Objective ED1 -1 is building "support and cooperation among the City of El Segundo and its businesses and residential communities for the mutual benefits derived from the maintenance and expansion of El Segundo's economic base " The benefits of the development will be shared and supported by all constituencies in the City The development will provide significant fiscal benefit to the City by generating additional business license and sales tax revenue for the City's General Fund B According to Policy ED1 -1.2, long -run efforts for economic development should focus on "diversification of El Segundo's economic base in order to meet quality of life goals " The project will add to the diversification of the economic base in the City by providing for a new larger format retail uses that do not currently exist in the City Therefore, these uses will meet quality of life goals by benefiting the residential and business communities with more diverse retail uses not currently available in the City. C Objective ED1 -2 also directs diversification of the economic base "on targeted industries that meet the City's criteria for job creation, growth potential, fiscal impact and fit with local resources." The City's Economic Development Advisory Council (EDAC) prepared a list of targeted industries, which was approved by the City Council These industries are eligible for certain financial incentives because they meet the criteria described in Objective ED1 -2 The retail and restaurant uses would be on the list of targeted industries that the City is recruiting in order to meet its diversification efforts Therefore, the proposed project does meet the diversification criteria established in the General Plan, by the EDAC, and the City Council D Due to the City's tax structure, a significant portion of the fiscal benefit derived from most proposed development would be attributed to the number of employees in a new development The Sepulveda /Rosecrans Site Rezoning is proposed to generate approximately 1,904 full time jobs in El Segundo when fully developed Of these, approximately 952 jobs would be more immediately generated by the development of the Plaza El Segundo portion of the development Currently there is virtually no permanent employment on the Plaza El Segundo site and limited employment on the Air Products and Learned Lumber sites Therefore, the project meets the job creation Objective (ED1 -2) in the General Plan M E Policies ED1 -2 1 and ED1 -2 2, both seek to promote land uses, which improve the City's retail and commercial tax base The stated purpose of the Commercial Center Land Use Designation is to provide for retail and other commercial services which provide a fiscal benefit to the City The Fiscal Impact Analysis for the Plaza El Segundo development concluded that the project could generate an estimated annual net fiscal benefit (project revenue versus City costs) ranging from approximately $1,082,049 to $1,611,424 in the first year operation rising to a range of $1,307,922 to $1,958,987 in the eighth year of operation F The proposed project meets the City's policy of seeking balance between enhanced economic development and available resources and infrastructure capacity (Policies ED1 -2.3 and LU7 -1 2). As adequate resources are currently available within the City to serve the proposed project or will be developed as part of the project, as supported by the Draft EIR, a substantial new commitment of resources or infrastructure is not required The project also proposes several roadway improvements to ensure that the project would not overburden the existing roadway infrastructure Based on this, the proposed project is consistent with Policy ED1 -2 3 G Implementation of the proposed project will meet relevant goals and policies with regard to the Land Use Element The project will help the tax base through the development of new commercial uses without adversely affecting the viability of downtown (Goal LU4). The types of products and services expected to be provided for the most part are not already available in El Segundo The Plaza El Segundo portion of the development is likely to include electronics goods, a department store, home furnishings, pet supplies and other merchandise in stores which due to their size will be able to provide a different range of products than the smaller stores in downtown H Objective LU4 -1 encourages high quality retail facilities in proximity to major employment centers The Sepulveda /Rosecrans Rezoning Site is immediately adjacent to the 2,000,000 square -foot Continental Park office development, the 2,000,000 square -foot Raytheon campus and other office buildings along the Rosecrans Avenue commercial corridor The proposed project will provide additional services to these employment centers The project will be conditioned to require maintenance and permanent upkeep on all the landscaping developed in conjunction with the project as required by Policy LU4 -1 1 J Any development on the Sepulveda /Rosecrans Rezoning Site would be required to meet all health and safety and environmental regulations and -10- would be built to meet all current seismic safety standards, as overseen by the City of El Segundo's Building Safety Division. The appropriate regulatory agencies, including the Regional Water Quality Control Board (LARWQCB) would be required to approve remediation of the existing soil and water contamination on the Sepulveda /Rosecrans Rezoning Site (Policy LU4 -1 2 and Policy LU4 -1 4) K The redesignation and rezoning of the Sepulveda /Rosecrans Rezoning Site would allow for the productive reuse of an area that was previously and is currently utilized, on a limited basis, for chemical manufacturing and industrial uses Any proposed development would comply with all the zoning regulations and development standards for the C-4 Zone (Policy LU4 -2 1) L Although the Sepulveda /Rosecrans Site Rezoning is not located within a quarter -mile of a Green Line Station, two are located within relatively close proximity The Douglas /Rosecrans Station is located approximately 0 4 miles east and El Segundo /Nash Station is located approximately 0 5 miles north (Policy LU4-4 4) which will help encourage transit ridership to the project M. The redesignation and rezoning of the Sepulveda /Rosecrans Rezoning Site would allow for the development for a blighted former industrial /chemical use area into a new shopping /retail opportunity for the surrounding area This redevelopment would occur through the combined efforts of the City of El Segundo and private applicants and would conform to the new C -4 development standards (Objective LU5 -3) N The Sepulveda /Rosecrans Rezoning Site is only partially served by water and sewer lines Additional facilities will be installed as development is approved on a project by project basis (Policy LU7 -1 2) O As development on the site is approved, stormwater retention basin(s) would be required to contain the stormwater runoff The size of these basin(s) would depend on the size of the individual developments and would be determined through completing a hydrology study (Policy LU7 - 1 4) P All new on -site utilities required for development(s) on the Sepulveda /Rosecrans Rezoning Site will be placed underground with the construction of the individual project (Policy LU7 -2 3) Q Landscaping, in compliance with the development standards for the Commercial Center (C -4) Zone, would be required for any development on the Sepulveda /Rosecrans Rezoning Site (Policy 7 -2 5) -11- R The proposed protect will be required to have strategic safety plans and a fire life safety plan in place (Policy LU 7 -1 1 and Policy LU 7-12) All on- site utilities will be placed underground (Policy LU7 -2.3) S The Sepulveda /Rosecrans Site Rezoning will include the construction of two new roadways that are included in the 2004 Circulation Element update Master Plan of Streets The extension of Park Place and Allied Way will be built to the standards contained in the General Plan (Policy C1 -1 2, Policy C1 -1 4, and Policy C1 -1 11) T Access to development on the Sepulveda /Rosecrans Rezoning Site would be provided from Sepulveda Boulevard and Rosecrans Avenue Additional access will be provided from Allied Way and potentially from a road connecting Sepulveda Boulevard with Nash Street via Park Place This would allow emergency vehicle access to the site from all four sides of the subject property (Policy C1 -1 10) U Any new roadway links proposed for the Sepulveda /Rosecrans Rezoning Site would be constructed in accordance with the City of El Segundo roadway standards (Policy C1 -1 10 and Policy C1 -1 11) V The Sepulveda /Rosecrans Site Rezoning will include the widening of Sepulveda Boulevard on the east side of the street to provide acceleration and deceleration lanes to serve the project The developer will dedicate property for the lane widening (Policy C1 -1 14). W The Traffic Study for the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development was conducted in June 2004 This traffic study analyzed the potential traffic related impacts associated with the full buildout of the Sepulveda /Rosecrans Rezoning Site under the new C -4 Zone and recommended mitigation measures as required by Policy C1 -1 14 X The names of Park Place and Allied Way will be retained for the extensions of the two streets ensuring uniformity of street naming on a continuous roadway link (Policy C1- 1.18). Y Future development of the Sepulveda /Rosecrans Rezoning Site would include landscaping, internal walkways and other amenities (e g , pedestrian benches, gathering places, etc) which would facilitate pedestrian movements and ensure that any future uses were accessible and visitor friendly (Policy C2 -1.3) Z Future development on the Sepulveda /Rosecrans Rezoning Site would incorporate sidewalks along project boundaries and any new roadways (Policy C2 -1 4) -12- AA The Plaza El Segundo development will have sidewalks around the perimeter and other internal pedestrian walkways with linkages to surrounding properties and public transit stops (Policies C2 -1 3, C2 -1 6, and C2 -3 3) BB While future development projects on the Sepulveda /Rosecrans Rezoning Site, other than the Plaza El Segundo Development, are currently unknown, most projects of this type provide on -site amenities such as internal bicycle lanes or pathways that lead to the adjacent roadway system, bicycle racks or lockers that are distributed throughout the site and on -site shower facilities and clothes lockers for employees It is therefore, assumed that future developments on the Sepulveda /Rosecrans Rezoning Site would provide these types of amenities (Policy C2-22) The Plaza El Segundo development will be required to provide bicycle racks and /or bicycle lockers that are distributed throughout the site CC The proposed project will adhere to any applicable regulations regarding preferential parking areas or promotion of ride share (Policy C2 -5 1) The proposed project will provide sufficient on -site parking and loading (Policy C3 -2 1 and C1 -3 2) as required by the El Segundo Municipal Code DD Parking would be provided on the Sepulveda /Rosecrans Rezoning Site in accordance with the City of El Segundo's parking requirements for the Commercial Center (C-4) Zone (Policy C3 -2 1) EE Policy C3 -1.1 requires all project- related transportation impacts to be mitigated, where feasible, by the developer The traffic impact study identified a number of intersections in the City that would require mitigation and identified mitigation measures to address the traffic impacts However, because two of the proposed mitigation measures are infeasible due to right -of -way constraints, not all traffic impacts can be mitigated to an insignificant level. In order for the City Council to approve the project with significant impacts, the City Council must adopt a Statement of Overriding Considerations finding that there are positive aspects of the project, that when taken as a whole, outweigh the unavoidable negative environmental impacts FF Implementation of the proposed project will meet the policies of the City's Open Space and Recreation Element as the Development Agreement includes a contribution by the developer to the City to assist the City in developing and improving the recreational aquatics facilities in the City This would help potentially expand the recreational opportunities for residents and employees in the City (Goal OS1, Objective OS1 -1, and Objective OS1 -3) -13- GG The construction of plumbing to accommodate the use of reclaimed water for irrigation systems, when available, and the application of the City's Water Conservation in Landscape regulations (Title 10- Chapter 2 of the ESMC), as required by mitigation measures M 2 -4, M2 5, M2 6, M 2 -10, M2 -13, and M2 -16 and Condition of Approval No 8, would be consistent with and further Policies CN2 -5, CN2 -7, CN2 -12. HH All development on the Sepulveda /Rosecrans Rezoning Site, including the Plaza El Segundo development, would be required to include a comprehensive and coherent design for the development, including landscaping and amenities, in order to improve the existing aesthetic appearance of the site (Policy CN2 -7) II All development on the Sepulveda /Rosecrans Rezoning Site, including the Plaza El Segundo development, would be required to include facilities capable of holding stormwater runoff resulting from the development Additionally, reclaimed water would be used to the extent possible in the irrigation of the landscaping (Policy CN2 -11) JJ All development on the Sepulveda /Rosecrans Rezoning Site would be required to utilize reclaimed water for landscaping to the extent feasible (Policy CN2 -12) KK The project would provide a comprehensive and coordinated design of the entire project site, including landscape amenities to substantially improve the aesthetic appearance of the site and the surrounding area as encouraged by Policy CN5 -6 LL The project has identified and is currently under Los Angeles Regional Water Quality Control Board (LARWQCB) orders to remediate sod and ground water contamination as contemplated by Goal CN3 and Policy CN3 -2 to protect groundwater from contamination MM The implementation of transportation demand management programs, as required by Mitigation Measure L -8 (bike, ndeshare matching, and transit options), and as required by Chapters 15 -16 and 15 -17 of the El Segundo Municipal Code will demonstrate compliance with air quality objectives to encourage alternative commuting strategies (AQ1 -1), reduce vehicle trips (AQ3 -1 1, AQ3 -1 2), and promote non - motorized transportation (AQ4 -1 1) NN Approximately $250,000 in Traffic Impact Mitigation Fees based upon current applicable fees (and potentially additional fees if the City amends its current Traffic Mitigation Fees) and over $5,000,000 in costs for off -site traffic mitigation measures must be paid to the City to offset development -14- impacts (AQ5 -12) related to the proposed Plaza El Segundo Development project 00 The protect will implement a number of traffic improvements, as required by mitigation measures L -1, L -3, L -4, L -5, L -7, L -8, L -9, L -10, L -11, L -13, L -15, L -17, L -18 and L -19 which will improve traffic flow (Policy AQ 7 -1 1, AQ 7 -2 1) PP Mitigation measure M 5 -1 provides that the proposed project will incorporate energy conservation devices (i e , motion - sensitive light activation switches, etc ) consistent with City (Policy AQ12 -1 2) QQ. Implementation of the proposed project, subject to mitigation measures I- 1, 1 -2, 1 -3, 1-4, and 1 -5 which address construction hours, equipment mufflers, construction equipment staging, and noise barriers, will be consistent with relevant policies of the City's Noise Element (Policies N1- 2 1, N1 -2 1B, N1 -2 1C, N1 -3 1, N1 -3 5, and Program N1 -2 1A). RR The development on the Sepulveda /Rosecrans Rezoning Site will end eighty years of industrial use by several companies which will significantly reduce the quantity of many hazardous materials that have been handled on the site (Objective PS3 -1) SS The developer will remediate soil and groundwater contamination under the authority of the LARWQCB (Policy PS4 -1 1) TT Public Safety Element Policy PS6 -1.2 to continue efforts to reduce fire hazards would be furthered by preparation of fire life safety plans (mitigation measures K1 -2, K1 -5, K 1 -7, and K -1 10) and the reduction of fire prone industrial facilities UU As required by mitigation measures K1 -3 and K 1 -8, fire access roads will be provided throughout the Sepulveda /Rosecrans Rezoning Site (Policy PS6 -1 2E) VV As a re -use of a previously developed industrial site, that will be remediated to the satisfaction of the appropriate regulatory agencies and will not pose any health hazard to employees, patrons or visitors to the site, the project is consistent with Policy HM3 -1.1 requiring compliance with hazardous materials handling laws Mitigation measure G -1 and G -2 will ensure that site contamination is remediated -15- SECTION 5 Approvals A The City Council adopts Findings of Facts and a Statement of Overriding Considerations as set forth in Exhibit "A ", which are incorporated into this Resolution by reference B In accordance with the requirements of Public Resources Code Section 21081(a) and 21081 6, the City Council adopts a Mitigation Monitoring and Reporting Program (MMRP) as set forth in attached Exhibit "B," which is incorporated into this Resolution by reference The City Council hereby adopts each of the mitigation measures expressly set forth herein as conditions of approval of the project The other project conditions of approval and compliance with applicable codes, policies, and regulations will further assure that the environmental impacts of the proposed project will not be greater than set forth in the FEIR and these findings C The City Council amends the land use designations ( "commercial designations ") and the proposed Land Use Plan ( "Southeast Quadrant' subsection) of the Land Use Element of the General Plan to reflect the change of the area bounded by Hughes Way on the north, Douglas Street on the east, Rosecrans Avenue on the south, and Sepulveda Boulevard on the west from Heavy Industrial to Commercial Center The corresponding changes as set forth in attached Exhibit "C are incorporated into this resolution by reference. D The City Council amends the 1992 General Plan Summary of Existing Trends Buildout (Exhibit LU -3) of the Land Use Element to reflect the change of the area bounded by Hughes Way on the north, Douglas Street on the east, Rosecrans Avenue on the south, and Sepulveda Boulevard on the west from Heavy Industrial to Commercial Center The corresponding changes to the Land Use Element as set forth in attached Exhibit "D," which is incorporated into this Resolution by reference E The City Council amends the General Plan Land Use Map to reflect the change of the area bounded by Hughes Way on the north, Douglas Street on the east, Rosecrans Avenue on the south, and Sepulveda Boulevard on the west from Heavy Industrial to Commercial Center The corresponding changes to the Land Use Map as set forth in attached Exhibit "E," which is incorporated into this Resolution by reference F Subject to the conditions listed on the attached Exhibit "F," which are incorporated into this Resolution by reference, the City Council certifies the Environmental Impact Report of Environmental Impacts for Environmental Assessment No 631, Development Agreement No 03 -1, General Plan Amendment No 03 -4 & 03 -5, Zone Change No 03 -2 & 03 -3, Zone Text Amendment No 04 -1, and Subdivision No 03 -7, and, adopts the Sepulveda -16- Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative in the FEIR SECTION 6 Reliance on Record Each and every one of the findings and determinations in this Resolution are based on the competent and substantial evidence, both oral and written, contained in the entire record relating to the project The findings and determinations constitute the independent findings and determinations of the City Council in all respects and are fully and completely supported by substantial evidence in the record as a whole SECTION 7 Limitations The City Council's analysis and evaluation of the project is based on the best information currently available It is inevitable that in evaluating a project that absolute and perfect knowledge of all possible aspects of the project will not exist One of the major limitations on analysis of the project is the City Council's lack of knowledge of future events In all instances, best efforts have been made to form accurate assumptions Somewhat related to this are the limitations on the City's ability to solve what are in effect regional, state, and national problems and issues The City must work within the political framework within which it exists and with the limitations inherent in that framework SECTION 8 Summanes of Information All summaries of information in the findings, which precede this section, are based on the substantial evidence in the record The absence of any particular fact from any such summary is not an indication that a particular finding is not based in part on that fact SECTION 9 This Resolution will remain effective until superseded by a subsequent resolution SECTION 10 According to the El Segundo Municipal Code, a copy of this Resolution shall be mailed to Mar Ventures, Inc , and to any other person requesting a copy SECTION 11 This Resolution is the City Council's final decision and will become effective immediately upon adoption PASSED, APPROVED AND ADOPTED this 1st day of March 2005. 1� C� Kelly McDow II, Mayor -17- ATTEST STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) SS CITY OF EL SEGUNDO ) I, Cindy Mortesen, City Clerk of the City of El Segundo, California, do hereby certify that the whole number of members of the City Council of said City is five, that the foregoing Resolution No 4415 was duly passed and adopted by said City Council, approved and signed by the Mayor, and attested to by the City Clerk, all at a regular meeting of said Council held on the 1st day of March, 2005, and the same was so passed and adopted by the following vote AYES McDowell, Boulgarides, Busch, Jacobson NOES None ABSENT Gaines ABSTAIN. None (�f�Abyww C91.) Cindy Mbrtesen, City Clerk APPROVED AS TO FORM Mark D Hensley, City Attorney P \Planning & Building Safety\PROJECTS \626 - 650 \EA - 631 \Council Agenda Packef\Final Approved Documents\EA- 631 reso cc RGA doc M CITY COUNCIL RESOLUTION No. 4415 Exhibit A After receiving, reviewing, and considering all the information in the administrative record for Environmental Assessment No 631, Development Agreement No 03 -1, General Plan Amendment No 03 -4 & 03 -5, Zone Change No 03 -2 & 03 -3, Zone Text Amendment No 04 -1, and Subdivision No 03 -7 (Vesting Tentative Tract No 061630), including, without limitation, the factual information and conclusions set forth in this Resolution and its attachment, the City Council finds, determines, and declares for the Sepulveda /Rosecrans Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative as follows FINDINGS REQUIRED BY CEQA. Public Resources Code § 21081 and CEQA Guidelines § 15091 require the City, before approving a project, to identify significant impacts of the protect and, if significant impacts are identified, make one or more of three allowable findings based upon substantial evidence in the record for each significant impact A The first allowable finding is that "changes or alterations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR" (CEQA Guidelines § 15091(a)(1)) B The second allowable finding is that "such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding Such changes have been adopted by such other agency or can and should be adopted by such other agency" (CEQA Guidelines § 15091(a)(2)) C The third allowable finding is that "specific economic, social, or other considerations make unfeasible the mitigation measures or Project alternatives identified in the Final EIR" (CEQA Guidelines § 15091(a)(3)) II. FINDINGS REGARDING THE POTENTIAL ENVIRONMENTAL EFFECTS OF THE PROJECT. A. Potential Impacts Found to be Insignificant by the Initial Study. The Initial Study identified the following environmental effects as not potentially significant Accordingly, the City Council finds that the Initial Study, the FEIR, and the record of proceedings for the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Reduced Traffic Generation Alternative Development project with respect to the areas listed below 1 Agricultural Resources 2 Mineral Resources B Although the Initial Study identified the following environmental effects as potentially significant, the City Council finds that the Initial Study, the FEIR, and the record of proceedings in this matter do not identify or contain substantial evidence identifying significant environmental effects of the Project with respect to the areas listed below for the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative 1 Aesthetics a) Facts /Effects (1) Scenic Vista The Sepulveda /Rosecrans Rezoning Site was previously developed with a variety of industrial and chemical manufacturing uses, which are currently in various stages of demolition and site remediation Two industrial uses (Air Products and Learned Lumber) are currently active within the Sepulveda /Rosecrans Rezoning Site An industrial gas production facility and RV storage area would be permitted under the proposed C -4 zoning, as would continuation of the existing lumber distribution facility use in its current location (2) Scenic Vista The Sepulveda /Rosecrans Rezoning Site is located in an urbanized area, with no prominent natural visual features or other attributes that would qualify the site or project vicinity as scenic Buildings in the vicinity of the Sepulveda /Rosecrans Rezoning Site range in height from one story to approximately ten stories In addition, there are no scenic highways or corridors in the protect area Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza Del Segundo Protect would not result in a substantial adverse effect on a scenic vista (3) Scenic Resources While the Sepulveda /Rosecrans Rezoning Site does contain areas of vegetation, it does not contain any scenic resources such as trees, rock outcroppings, or historic buildings that could be affected by the proposed Sepulveda /Rosecrans Rezoning and Plaza Del Segundo Protect Additionally, the Sepulveda /Rosecrans Rezoning Site is not located within a State or County designated scenic highway The closest highways to the protect site are California Highway No 1 (Sepulveda Boulevard), the Century Freeway (1 -105), and the San Diego Freeway (1 -405), none of which are designated as scenic highways in the vicinity of the Sepulveda /Rosecrans Rezoning Site Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza Del Segundo Protect would not substantially damage scenic resources, including, but not limited to trees, rock outcroppings, and historic buildings within a state scenic highway (4) Shade /Shadow There are no sensitive uses (e g , residences) immediately adjacent to the project site Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza Del 2 Segundo Project would not result in any significant shade /shadow impacts b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning or Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development project with respect to Aesthetics 2 Air Quality a) Facts /Effects (1) Objectionable Odors Construction and operation activities associated with the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development are not likely to produce objectionable odors Most objectionable odors are typically associated with industrial projects involving the use of chemicals, solvents, petroleum products, and other strong smelling elements used in manufacturing processes, as well as sewage treatment facilities and landfills These types of uses would not be allowed under the new Commercial (C-4) zoning and the proposed Plaza Eel Segundo does not include any of these types of uses (2) Objectionable Odors An industrial gas production facility would be permitted within the Sepulveda /Rosecrans Rezoning Site under the proposed C -4 zoning, as would continuation of the existing lumber distribution facility use in its current location However, these uses do not generate objectionable odors, While the previous uses on the Sepulveda /Rosecrans Rezoning Site included chemical manufacturing processes, remediation of conditions resulting from these processes would not generate odors (3) Objectionable Odors The proposed Plaza El Segundo Development would include a variety of fast food and sit -down type restaurants which may produce odors as a result of cooking processes However, these odors would be minimized through the various permitting processes required for restaurants No significant impacts are anticipated as a result of the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Project b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development protect with respect to Air Quality Biological Resources a) Facts /Effects (1) Tree Preservation The Sepulveda /Rosecrans Rezoning Site does not contain any trees or vegetation that are considered by any local policies or ordinances to be protected Additionally, there are no local tree preservation policies or ordinances within the City of El Segundo Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance No impact is anticipated (2) Habitat Conservation Plans The Sepulveda /Rosecrans Rezoning Site is located in a highly urbanized area and was previously developed with industrial and chemical manufacturing uses There are no known locally designated natural communities on the Sepulveda /Rosecrans Rezoning Site or in the immediate vicinity There are no conservation plans in the City of El Segundo Therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Protect is not subject to, and therefore would not conflict with, the provisions of any adopted Habitat Conservation Plan, Natural Conservation Community Plan, other approved local, regional, or state habitat conservation plan There are no such conservation plans in the City of El Segundo No impact is anticipated b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence 4 identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to Biological Resources Cultural Resources a) Facts /Effects (1) Historic Resources The Sepulveda /Rosecrans Rezoning Site was previously developed with industrial and chemical manufacturing uses The Sepulveda /Rosecrans Rezoning Site has been disturbed and the existing structures have either been demolished or are in the process of being demolished There are no known historic resources located on the Sepulveda /Rosecrans Rezoning Site Implementation of the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not cause a substantial adverse change in the significance of a historical resource No impact is anticipated (2) Human Remains There are no known human remains within the boundaries of the Sepulveda /Rosecrans Rezoning Site Development of the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Project is not anticipated to disturb any human remains including those interred outside of formal cemeteries No significant impacts are anticipated b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to Cultural Resources — Human Remains Geology and Soil a) Facts /Effects (1) Earthquake Faults The Sepulveda /Rosecrans Rezoning Site is located within the seismically active Southern California region and is subject to similar risks as other developments of comparable size and type located in the region Active faults known to exist in the vicinity of the City of El Segundo include the San Andreas, Newport- Inglewood, Elysian, San Fernando, Sierra Madre, and Verdugo Faults The Newport- Inglewood Fault is located approximately 3 miles from the protect site Algwst -Paolo zones are fault surface rupture zones According to the City of El Segundo General Plan Draft EIR, no active faults or Alquist -Paolo zones are located within the City of El Segundo Therefore, the risk of surface rupture due to faulting is minimal No impacts to the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development are anticipated (2) Landslides The Sepulveda /Rosecrans Rezoning Site and the surrounding areas are predominantly flat, with no large hills or slopes No landslides exist on the Sepulveda /Rosecrans Rezoning Site or in the project vicinity The Sepulveda /Rosecrans and Plaza El Segundo Protect is not at risk of impacts from landslides No impact is anticipated (3) Septic Tanks The Sepulveda /Rosecrans Rezoning Site is located in an urbanized area and would be connected to the existing sewer infrastructure No septic tanks or alternative waste water systems would be utilized on the Sepulveda /Rosecrans Rezoning Site No impact associated with the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Protect is anticipated b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to Geology and Soils 6 Hazards and Hazardous Materials a) Facts /Effects (1) School Proximity The Sepulveda /Rosecrans Rezoning Site is not located within one - quarter mile of an existing or proposed school Proposed development under the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not emit hazardous emissions and would use and store only limited quantities of packaged hazardous substances No acutely hazardous materials would be handled on the Sepulveda /Rosecrans Rezoning Site During cleanup /remediation of the Sepulveda /Rosecrans Rezoning Site, contaminated soil will be handled in accordance with all applicable federal and state laws and regulations Therefore, no impact associated with the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development is anticipated 2 (2) Airport Land Use Plan The Sepulveda /Rosecrans Rezoning Site is not located within the boundaries of the Los Angeles International Airport's (LAX) land use plan The Sepulveda /Rosecrans Rezoning Site is not located within 2 miles of any other airport Therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not result in a safety hazard for people residing or working in the project area No impacts are anticipated (3) Private Airstrip The Sepulveda /Rosecrans Rezoning Site is not located within the vicinity of a private airstrip and therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not result in a safety hazard for people in the project area No impact is anticipated (4) Emergency Response Plan Development of the Sepulveda /Rosecrans Rezoning Site would be required to conform to all applicable City of El Segundo emergency response and /or emergency evacuation plans With full development of the Sepulveda /Rosecrans Rezoning Site under the proposed Sepulveda /Rosecrans Rezoning, the Sepulveda /Rosecrans Rezoning Site would be accessible from Sepulveda Boulevard, Rosecrans Avenue, Park Place, and Allied Way The Plaza El Segundo Development would be accessible to emergency vehicles from Sepulveda Boulevard, Rosecrans Avenue and Allied Way The proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would be required to comply with all applicable Fire Department and Public Works Department regulations pertaining to emergency access and evacuation With adherence to City regulations, impacts associated with the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would be less than significant (5) Wildland Fires The Sepulveda /Rosecrans Rezoning Site is located in an urbanized area and is not situated near any wildlands No impact related to wildfires would occur as a result of the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FOR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to Hazards and Hazardous Materials 7 7 Hydrology and Water Quality a) Facts /Effects (1) Flooding (Housing)_ The Sepulveda /Rosecrans Rezoning Site is not located within a 100- or 500 -year floodplam and the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development does not involve the construction of housing. No flood impacts on housing are anticipated (2) Flood Flows The Sepulveda /Rosecrans Rezoning Site is not located within a 100- or 500 -year floodplam The proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not place structures within a 100 -year flood hazard area which would impede or redirect flood flows No flood impact is anticipated (3) Levee or Dam Failure The Sepulveda /Rosecrans Rezoning Site is not located in a 100 or 500 year floodplam Additionally, there are no waterways or major dams located near the City of El Segundo' or the protect site Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam (4) Seiche, Tsunami, Mudflows. The relatively flat Sepulveda /Rosecrans Rezoning Site is located approximately 1 5 miles east of the Pacific Ocean The Sepulveda /Rosecrans Rezoning Site does not contain any enclosed bodies of water and is not located near any other large bodies of water Therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not be subject to inundation by seiches, tsunami, or mudflows, b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to Hydrology and Water Quality Land Use a) Facts /Effects ' E1 Segundo General Plan — 1992, Public Safety Element H di C) 9 Noise a) (1) Divide Established Community The proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not disrupt the physical arrangement of any established community The Sepulveda /Rosecrans Rezoning Site was previously developed with a variety of chemical and industrial uses The Sepulveda /Rosecrans Rezoning Site is divided by two railroad spurs belonging to the Union Pacific Railroad (UPRR) and the Burlington Northern Santa Fe (BNSF) Railroad, which run through the middle of the site These railroad spurs would remain with implementation of the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development The Sepulveda /Rosecrans Rezoning Site is located adjacent to other commercial and industrial land uses Therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not physically divide an established community (2) Habitat Conservation Plans The Sepulveda /Rosecrans Rezoning Site is located within an urbanized area containing a variety of commercial and industrial uses The Sepulveda /Rosecrans Rezoning Site is not included within and therefore would not conflict with any established habitat conservation plan or natural community conservation plan Therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not conflict with any applicable habitat conservation plan or natural communities conservation plan No impacts would occur Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to land use Facts /Effects (1) Airport Noise The Sepulveda /Rosecrans Rezoning Site is not located within the boundaries of the Los Angeles International Airport's land use plan Therefore, the Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not expose people residing or working in the project area to excessive noise levels No impacts are anticipated 0 (2) Private Airstrip Noise The Sepulveda /Rosecrans Rezoning Site is not located within the vicinity of a private airstrip Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not expose persons to excessive noise levels associated with a private airstrip No impact is anticipated b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to noise 10 Population, Housing, and Employment a) Facts /Effects (1) Replacement Housing The Sepulveda /Rosecrans Rezoning Site does not contain any residential land uses As such, the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not result in the displacement of persons or homes No impact is anticipated (2) Replacement Housing The Sepulveda /Rosecrans Rezoning Site does not contain any residential land uses As such, implementation of the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not result in the displacement of persons or homes Therefore, construction of replacement housing is not required No impact is anticipated b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to population and housing 10 11 Public Services a) Facts /Effects (1) Public Schools, The proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development do not include any residential uses that could directly increase the population within the City of El Segundo and increase existing demands for public schools However, the potential indirect population increase from the new jobs created by the protect may increase existing demands for public schools The protect site is located in the Wiseburn Elementary School District and the Centinela Valley School District It is anticipated that full development (850,000 square feet) of the Sepulveda /Rosecrans Rezoning Site under the proposed Sepulveda /Rosecrans Rezoning would generate approximately 25 students (see Table 1) The proposed Plaza El Segundo Development would account for 12 of the 25 students As seen in Table 1 of the Revised Initial Study, very few students would be generated by the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development The number of students generated would constitute a less than significant impact on the schools Payment of required school impact fees to the Wiseburn and Centmela Valley School Districts would ensure that there are no impacts to public schools from the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development (2) Libraries The City of El Segundo has one main library located at 111 W Manposa Avenue No residential uses are proposed as part of the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development Therefore, the proposed Sepulveda /Rosecrans Rezoning and Plaza Ell Segundo Development would not result in a direct increase in library use as a result of new city residents A slight increase in use may occur as a result of new jobs, but the increase is anticipated to be less than significant and no new or expanded library facilities would be required Additionally, developers within the Sepulveda /Rosecrans Rezoning Site would be required to pay a City library service mitigation fee of $0 03 per square foot of development Impacts would be less than significant b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FOR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the 11 12 13 Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to public services Recreation a) Facts /Effects (1) Parks No residential uses would be permitted under the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development Therefore, no increase in the City's permanent population would be anticipated and no direct impacts to parks and recreation facilities would occur The proposed new General Plan designation and rezoning of the Sepulveda /Rosecrans Rezoning Site would result in increased employment of approximately 1,904 persons This increase in employment could result in an indirect increase in demand for recreation and parks services A potential indirect impact to parks and recreation may occur as a result of employees of the protect utilizing existing facilities However, employees typically do not enjoy long periods of time during work hours to make use of park or recreational facilities (1) Parks Many of the employees from the Sepulveda /Rosecrans Rezoning Site and Plaza El Segundo Development are likely to be residents of El Segundo, Manhattan Beach, and other nearby communities that currently make use of the area parks and recreational facilities Therefore, the increase in employment as a result of the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development would not generate sufficient demand to result in the need for new or physically altered facilities or cause substantial physical deterioration of existing facilities to occur or be accelerated Impacts to recreation facilities associated with the proposed Sepulveda/Rosecrans Site Rezoning and Plaza El Segundo Development would be less than significant b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to recreation Transportation and Circulation a) Facts /Effects 12 (1) Air Traffic Patterns Due to the nature and scope of the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development, implementation of the project would not have the potential to result in a change in air traffic patterns at LAX or any other airport in the area No impact is anticipated (2) Emergency Access With full development of the Sepulveda /Rosecrans Rezoning Site under the proposed Sepulveda /Rosecrans Rezoning, the Sepulveda /Rosecrans Rezoning Site would be accessible from Sepulveda Boulevard, Rosecrans Avenue, Park Place, and Allied Way The proposed Plaza El Segundo Development would be accessible to emergency vehicles from Sepulveda Boulevard, Rosecrans Avenue and Allied Way This would provide emergency access to the Sepulveda /Rosecrans Rezoning Site from all directions The proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would be required to comply with all applicable Fire Department and Public Works Department regulations regarding emergency access and evacuation With adherence to City regulations, impacts would be less than significant b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to transportation and circulation 14 Utilities and Service Systems a) Facts /Effects (1) Wastewater Treatment Wastewater generated by the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would be of similar quality to that generated by other commercial projects, for which wastewater is treated by standard (primary, secondary, and tertiary) treatment processes Improvements associated with the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would comply with all applicable wastewater treatment requirements of the Regional Water Quality Control Board The proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development would not dispose of industrial wastes into the wastewater system 13 (2) Solid Waste Regulations Disposal of solid waste generated by the proposed Sepulveda /Rosecrans Rezoning and Plaza El Segundo Development construction and operation phases will be subject to the requirements of applicable federal, state, and local statutes and regulations as enforced by the City of El Segundo Budding Safety Division Impacts related to solid waste disposal would be less than significant b) Mitigation (1) No mitigation measures are required to reduce impacts below a level of significance for the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development C) Findinq (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development with respect to utilities and service systems A The City Council finds that although the following environmental effects were identified as potentially significant in the FEIR, changes or alterations within the responsibility and jurisdiction of other public agencies and not the City have been adopted by such other agencies or can and should be adopted by such other agency to avoid or lessen the potential significant environmental effects listed below to a level of insignificance 1 Aesthetics a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) As a result of new construction at the previous low density, and now largely vacant, Sepulveda /Rosecrans Rezoning Site, the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development would be visible from multiple locations Views of the Sepulveda /Rosecrans Rezoning Site would likely be available from more off -site locations than at present as existing fencing and landscaping would be removed Existing off -site trees and vegetation would screen some public views of the project from these locations The increased visibility of the Sepulveda /Rosecrans Rezoning Site from these locations would not be a significant impact because the surrounding area is already urbanized, and future development on the Sepulveda /Rosecrans Rezoning Site would comply with the development standards of the City of El Segundo to provide a consistent design and landscaping that would present a pleasing visual appearance 14 (2) The height and mass of any commercial development proposed on the Sepulveda /Rosecrans Rezoning Site would be consistent with surrounding commercial, industrial and office uses The appearance of retail development would represent a noticeable improvement over existing remnant industrial facilities Impacts associated with the change in visual character that could be associated with the proposed Sepulveda /Rosecrans Site Rezoning would be less than significant (3) A greater number of view lines through the site would be opened up as a result of removing fencing and landscaping along the boundary of the Sepulveda /Rosecrans Rezoning Site, although some of these view lines could be blocked by future buildings This effect would be less than significant because no views of scenic resources would be affected (4) The Proposed Circulation Element Update Draft EIR requires analysis of potential impacts related to increased night lighting for later projects that would implement the proposed Circulation Element Update Improvements to the Sepulveda Boulevard /Rosecrans Avenue intersection that would be required in order to address potential traffic impacts of the proposed Sepulveda /Rosecrans Rezoning would constitute a project that implements the Circulation Element Update policies Based upon the analysis below, construction of this component of the proposed Circulation Element Update would not result in new effects related to night lighting that were not examined in the Program EIR for the proposed Circulation Element Update (5) Increased on -site lighting associated with the permitted uses would increase on -site lighting levels substantially from the currently low levels of light emitted from the project area Additionally, enhanced street lighting could be provided in conjunction with potential improvements to the Sepulveda /Rosecrans intersection The resulting lighting levels would be consistent with existing ambient light levels on Rosecrans Avenue and Sepulveda Boulevard and would be less than significant In addition, the impacts of increased street lighting at the Sepulveda /Rosecrans intersection would be minimal compared to the effects of increased lighting of the Sepulveda /Rosecrans Rezoning Site The closest sensitive receptors are separated from the Sepulveda /Rosecrans Rezoning Site by Sepulveda Boulevard, Rosecrans Avenue, and commercial developments along Rosecrans Avenue These intervening uses would block light generated by development on the Sepulveda /Rosecrans Rezoning Site and therefore, impacts to sensitive receptors from lighting would be less than significant (6) Development of the Sepulveda /Rosecrans Rezoning Site to the levels allowed under the new Commercial Center (C -4) zoning would substantially increase the amount of reflective materials located on the Sepulveda /Rosecrans Rezoning Site from the current levels However, the resulting levels of glare 15 would be consistent with the existing levels currently found on Rosecrans Avenue and Sepulveda Boulevard In addition, use of non - reflective materials in the construction of any proposed developments would ensure that these glare impacts would be less than significant Potential glare impacts to sensitive receptors would be less than significant for the same reasons identified above Plaza El Segundo Development (7) The proposed Plaza El Segundo Development would be visible from multiple locations The increased visibility of the Plaza El Segundo Development would not be a significant impact because the surrounding area is already urbanized, and proposed development would consist of an attractive shopping center with a consistent design and landscaping that would present a pleasing visual appearance The height and mass of proposed development would be consistent with surrounding commercial, industrial and office uses The proposed Plaza El Segundo Development would be visually compatible with the office and retail buildings located along Hughes Way and Rosecrans Avenue The appearance of the proposed shopping center development would represent a noticeable improvement over existing remnant industrial facilities Impacts associated with the change in visual character of the area as a result of development of Plaza El Segundo would be less than significant (8) The development of the low intensity Plaza El Segundo Site has the potential to substantially alter the nighttime lighting characteristics of the Plaza El Segundo site and vicinity Due to the high ambient level of night lighting that presently exists in the areas surrounding the Plaza El Segundo site, and the distance of the sensitive receptors from the Plaza El Segundo site, night - lighting impacts of the proposed Plaza El Segundo Development would be less than significant (9) Development of the Plaza El Segundo Development would substantially increase the amount of reflective materials located on the Plaza El Segundo Site from the current levels However, the resulting levels of glare would be consistent with the existing levels currently found on Rosecrans Avenue and Sepulveda Boulevard and would be less than significant with the use of non - reflective materials in the construction of the Plaza El Segundo Development b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda / Rosecrans Site Rezoning 16 (1) Expansive areas of highly reflective materials, such as mirrored glass, must not be permitted Non - reflective building materials must be used to the maximum extent possible to reduce potential glare impacts (B -1) (2) Lighting must be designed to minimize off -site glare (B -2) Plaza El Segundo (3) Expansive areas of highly reflective materials, such as mirrored glass, must not be permitted Non - reflective building materials must be used to the maximum extent possible to reduce potential glare impacts (B -3) (4) Lighting must be designed to minimize off -site glare (B-4) d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Project with respect to Aesthetics (2) Changes or incorporated into the Plaza El Segundo substantially lessen identified in the FEIR Air Quality a) Facts /Effects alterations have been required in, or Rosecrans /Sepulveda Site Rezoning and Development project which avoid or the significant environmental effect as Sepulveda /Rosecrans Site Rezoning (1) Maximum daily emissions from a typical construction project associated with the Proposed Sepulveda /Rosecrans Site Rezoning will not exceed SCAQMD's daily thresholds for Sox (2) Between 2007 and 2012, emissions from construction activity may occur simultaneously with operational emissions associated with the proposed Plaza El Segundo Combined emissions would not exceed the SCAQMD's thresholds for SOx Impacts associated with SOx emissions would be below the significance threshold and less than significant (3) State and federal 1 -hour and 8 -hour CO standards would not be exceeded under the proposed Sepulveda /Rosecrans Site Rezoning and CO levels would be well below the more stringent state standards Thus, impacts with respect to CO concentrations would be less than significant (4) The proposed Sepulveda /Rosecrans Site Rezoning would be consistent with the 2003 AQMP 17 Plaza El Segundo (5) Maximum daily emissions associated with the construction of the proposed Plaza El Segundo Development will not exceed SCAQMD's daily thresholds for CO, NOx, and PM10 Therefore, emissions of these pollutants would fall below the significance thresholds (6) Impacts associated with CO concentrations in 2012 under the full build out of the Sepulveda /Rosecrans Rezoning Site would be less than significant The number of vehicles at the analyzed intersections in 2007 would be less than those occurring during 2012 Therefore, the State and federal 1 -hour and 8 -hour CO standards would not be exceeded as a result of traffic generated by the proposed Plaza El Segundo Thus, impacts with respect to CO hotspots would be less than significant (7) The proposed Plaza El Segundo would also be consistent with the 2003 AQMP b) Subsequent Environmental Documentation (1) Prior to implementation of specific development protects, impacts associated with construction emissions must be examined in light of this Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration This examination must provide quantified estimates of construction emissions based upon the specific site, schedule, and construction equipment utilization characteristics of the proposed development and compare the estimated emissions to the SCAQMD thresholds for construction emissions The analysis must incorporate the mitigation measures identified below as appropriate, along with any other mitigation measures identified by the protect- specific analysis (C- 1) C) Mitigation Sepulveda /Rosecrans Site Rezonin Construction Emissions The following is a list of feasible control measures that the SCAQMD recommends for construction emissions of PM10 These mitigation measures must be implemented for all areas where construction activities associated with the proposed Sepulveda /Rosecrans Site Rezoning would occur Fugitive Dust, PM10 Compliance with SCAQMD Rule 403, including but not limited to the following 18 (1) Prior to implementation of specific development projects, impacts associated with construction emissions must be examined This examination must provide quantified estimates of construction emissions based upon the specific site, schedule, and construction equipment utilization characteristics of the proposed development and compare the estimated emissions to the SCAQMD thresholds for construction emissions The analysis must incorporate the mitigation measures identified below as appropriate, along with any other mitigation measures identified by the project- specific analysis (C -1) (2) The construction area and vicinity (500 -foot radius) must be swept (preferably with water sweepers) and watered at least twice daily Site wetting must occur often enough to maintain a 10 percent surface sod moisture content throughout all earth moving activities (C -2). (3) All unpaved roads, parking and staging areas must be watered at least once every two hours of active operations (C -3) (4) Site access points must be swept/washed within thirty minutes of visible dirt deposition (C -4) (5) On -site stockpiles of debris, dirt or rusty material must be covered or watered at least twice daily (C -5) (6) All haul trucks hauling soil, sand, and other loose materials must either be covered or maintain two feet of freeboard (C -6) (7) All haul trucks must have a capacity of no less than twelve and three - quarter (12 75) cubic yards (C -7) (8) At least 80 percent of all inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind drive fugitive dust (C -8) (9) Operations on any unpaved surfaces must be suspended when winds exceed 25 mph (C -9) (10) Traffic speeds on unpaved roads must be limited to 15 miles per hour (C -10) (11) Operations on any unpaved surfaces must be suspended during first and second stage smog alerts (C -11) (12) For all construction emissions, the following measure must apply The applicant must develop and implement a construction management plan, as approved by the City of El Segundo, which includes the following measures recommended by the SCAQMD, or equivalently effective measures approved by the SCAQMD 19 a Configure construction parking to minimize traffic interference b Provide temporary traffic controls during all phases of construction activities to maintain traffic flow (e g , flag person) c Schedule construction activities that affect traffic flow on the arterial system to off -peak hours to the degree practicable d Re -route construction trucks away from congested streets e Consolidate truck deliveries when possible f Provide dedicated turn lanes for movement of construction trucks and equipment on- and off -site g Maintain equipment and vehicle engines in good condition and in proper tune as per manufacturer's specifications and per SCAQMD rules, to minimize exhaust emissions h Suspend use of all construction equipment operations during second stage smog alerts Contact the SCAQMD at (800) 242 -4022 for daily forecasts i Use electricity from power poles rather than temporary diesel- or gasoline- powered generators t Use methanol- or natural gas - powered mobile equipment and pile drivers instead of diesel if readily available at competitive prices k Use propane- or butane- powered on -site mobile equipment instead of gasoline if readily available at competitive prices (C -12) Plaza El Segundo Construction Emissions The following is a list of feasible control measures that the SCAQMD recommends for construction emissions of PM10 These mitigation measures must be implemented during construction activities associated with the proposed Plaza El Segundo, Fugitive Dust, PM10 (13) The construction area and vicinity (500 -foot radius) must be swept (preferably with water sweepers) and watered at least twice daily Site wetting must occur often enough to maintain a 10 percent surface sod moisture content throughout all earth moving activities (C -13) 20 (14) All unpaved roads, parking and staging areas must be watered at least once every two hours of active operations (C -14) (15) Site access points must be swept/washed within thirty minutes of visible dirt deposition (C -15) (16) On -site stockpiles of debris, dirt or rusty material must be covered or watered at least twice daily (C -16) (17) All haul trucks hauling sod, sand, and other loose materials must either be covered or maintain two feet of freeboard (C -17) (18) All haul trucks must have a capacity of no less than twelve and three - quarter (12 75) cubic yards (19) At least 80 percent of all inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind drive fugitive dust (C -19) (20) Operations on any unpaved surfaces must be suspended when winds exceed 25 mph (C -20) (21) Traffic speeds on unpaved roads must be limited to 15 miles per hour (C -21) (22) Operations on any unpaved surfaces must be suspended during first and second stage smog alerts (C -22) (23) The applicant must develop and implement a construction management plan, as approved by the City of El Segundo, which includes the following measures recommended by the SCAQMD, or equivalently effective measures approved by the SCAQMD a Configure construction parking to minimize traffic interference b Provide temporary traffic controls during all phases of construction activities to maintain traffic flow (e g , flag person) c Schedule construction activities that affect traffic flow on the arterial system to off -peak hours to the degree practicable d Re -route construction trucks away from congested streets e Consolidate truck deliveries when possible f Provide dedicated turn lanes for movement of construction trucks and equipment on- and off -site g Maintain equipment and vehicle engines in good condition and in proper tune as per manufacturer's specifications and per SCAQMD rules, to minimize exhaust emissions 21 h Suspend use of all construction equipment operations during second stage smog alerts Contact the SCAQMD at (800) 242 -4022 for daily forecasts i Use electricity from power poles rather than temporary diesel- or gasoline- powered generators I Use methanol- or natural gas - powered mobile equipment and pile drivers instead of diesel if readily available at competitive prices k Use propane- or butane - powered on -site mobile equipment instead of gasoline if readily available at competitive prices (C -23) d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to Air Quality (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR (3) With Respect to Mitigation Measures C -2, C -3, C -4, C -5, C -6, C -7, C -8, C -9, C -10, C -11, C -12, C -13, C -14, C -15, C -16, C- 17, C -18, C -19, C -20, C -21, C -22, and C -23, changes or alteration are within the responsibility and jurisdiction of another public agency and not the agency making the finding Such changes have been adopted by such other agency or can and should be adopted by such other agency (4) If mitigation is not adopted by the other jurisdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOC) Biological Resources a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) A small, human - induced marsh was identified at the northwest corner of the Sepulveda /Rosecrans Rezoning Site Subsequent investigation indicated that 030 acres of wetlands falling under the jurisdiction of the LARWQCB may be present in this area Construction activities occurring within a wetland habitat, or loss of wetland habitat could represent a substantial 22 adverse effect on a riparian habitat or sensitive natural community Thus, impacts on wetlands resulting from development of the Sepulveda /Rosecrans Rezoning Site would be potentially significant, subject to the findings of protect- specific subsequent environmental analysis described under Subsequent Environmental Documentation and Mitigation Measures (2) Field surveys identified a number of native and non - native wildlife species that were either observed directly or inferred to utilize the Sepulveda /Rosecrans Rezoning Site Most of these species are common in urban areas and with the exception of the loggerhead shrike would not be considered sensitive species Impacts to other wildlife species that could result from development of the Sepulveda /Rosecrans Rezoning Site would not represent a substantial adverse effect on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U S Fish and Wildlife Service and would therefore be less than significant (3) The Sepulveda /Rosecrans Rezoning Site was assessed as unlikely to play any significant biogeographic role in the movement of animals through the region Thus activity associated with the Sepulveda /Rosecrans Rezoning would not have the potential to interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors or impede the use of native wildlife nursery sites No impacts related to wildlife corridors and habitat linkages would result from potential development on the Sepulveda /Rosecrans Rezoning Site (4) No sensitive plant species were identified on the Sepulveda /Rosecrans Rezoning Site during field surveys Therefore, development of the Sepulveda /Rosecrans Rezoning Site would not impact sensitive plant species No endangered mammal, bird, reptile, amphibian, fish or invertebrate species were detected on the Sepulveda /Rosecrans Rezoning Site Therefore, development of the Sepulveda /Rosecrans Rezoning Site would not impact endangered animal species (5) One threatened bird species, two bird species of special concern, and one bird species covered by the Migratory Bird Treaty Act were either detected on the Sepulveda /Rosecrans Rezoning Site or could potentially use the site, based on known distributions of species white - tailed kite, loggerhead shrike, Belding's savannah sparrow, and burrowing owl The Belding's savannah sparrow is listed as a State Threatened species The white - tailed kite and loggerhead shrike are both listed as California Species of Special Concern The burrowing owl has no formal protected status at this time, as both the state and federal governments have declined to list the species as threatened or endangered, but burrowing owl nests are covered by the Migratory Bird Treaty Act Development activities associated with the 23 Sepulveda /Rosecrans Rezoning Site would have the potential to result in the impacts to these species from Grading activities on -site will generate noise, which is considered detrimental to wildlife utilization of remnant habitat areas over the construction life of the Sepulveda /Rosecrans Site Rezoning The impact, however, is temporal in nature and would be less than significant as long as no endangered or threatened organisms are present on -site during the construction activity Construction personnel have the potential to be destructive to all forms of plant and animal life Small mammals and reptiles are particularly subject to disturbance from harassment, capture, or destruction Such activities that affect the four sensitive species listed above could have a substantial adverse effect on a species identified as a candidate, sensitive, or special status species and would be significant Grading and construction activities within the Sepulveda /Rosecrans Rezoning Site could negatively affect increasingly rare organisms, including those identified above These activities could have a substantial adverse effect on a species identified as a candidate, sensitive, or special status species and would be significant (6) Although the general biological assessment of the Sepulveda /Rosecrans Rezoning Site identified the potential for vernal pools to occur within the Sepulveda /Rosecrans Rezoning Site, a follow -on investigation ruled out this possibility Development of the Sepulveda /Rosecrans Rezoning Site would therefore not affect this sensitive natural community and no impacts related to vernal pools would occur Plaza El Segundo (7) The analysis provided regarding potential jurisdictional wetlands and sensitive species within the Plaza El Segundo Development site is in accordance with the mitigation measures for the Sepulveda /Rosecrans Site Rezoning that require site - specific evaluation of potential wetlands impacts (8) Based upon the assessment of potential jurisdictional wetlands within the proposed Plaza El Segundo Development site, approximately 0 30 acres of wetlands under the jurisdiction of the LARWQCB may exist within the site No waters of the U S or waters of the State are present on the proposed Plaza El Segundo site Therefore, construction of the proposed Plaza El Segundo Development would not impact any ACOE or CFDG jurisdictional wetland areas, but could potentially affect approximately 0 30 acres of LARWQCB jurisdictional wetlands Construction activities occurring within a wetland habitat, or loss of wetland habitat could represent a substantial adverse effect on a riparian 24 habitat or sensitive natural community Thus, impacts on wetlands resulting from potential future development of the proposed Plaza El Segundo Development would be significant (9) The four sensitive bird species detected on the Sepulveda /Rosecrans Rezoning Site or that could potentially use the site could also occur on the proposed Plaza El Segundo site Development activities associated with the proposed Plaza El Segundo Development would have the potential to result in the following impacts to these species • Grading activities on -site will generate noise, which is considered detrimental to wildlife utilization of remnant habitat areas over the construction life of the Plaza El Segundo The impact, however, is temporal in nature and would be less than significant as long as no endangered or threatened organisms are present on -site • Construction personnel have the potential to be destructive to all forms of plant and animal life Such activities that affect the three sensitive species listed above could have a substantial adverse effect on a species identified as a candidate, sensitive, or special status species and would be significant • Grading and construction activities within the proposed Plaza El Segundo site could negatively affect increasingly rare organisms, including white tailed kite, loggerhead shrike, Belding's savannah sparrow, and burrowing owl These activities could have a substantial adverse effect on a species identified as a candidate, sensitive, or special status species and would be significant b) Subsequent Environmental Documentation Subsequent environmental documentation must be prepared for any proposed development project that includes the northwest corner of the proposed Sepulveda /Rosecrans Rezoning Site that has been identified as potentially containing 0 30 acres of jurisdictional wetlands area under the jurisdiction of LARWQCB Impacts to any jurisdictional wetlands that may exist in this area must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must address the following (1) A site specific analysis must be conducted to determine whether the design of the proposed development project would impact any of the 0 30 acres identified as potential jurisdictional wetlands This analysis must be completed prior to the start of construction activities for any proposed development within the Sepulveda /Rosecrans Rezoning Site If jurisdictional wetlands 25 would be affected by the development project, measures must be identified to reduce impacts to less than significant levels (D -1) Subsequent environmental documentation must also be prepared for any proposed development project within the proposed Sepulveda /Rosecrans Rezoning Site to determine the presence /absence of sensitive species, This information must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must address the following (2) Site specific analysis of potential effects to four sensitive bird species (white tailed kite, loggerhead shrike, burrowing owl and Belding's savannah sparrow) must be conducted prior to the start of construction activities for any proposed development within the Sepulveda /Rosecrans Rezoning Site If any of these sensitive species would be affected by the proposed development, measures must be identified to reduce impacts to these species to less than significant levels, including, but not limited to, on -site monitoring by a qualified biologist during grading and /or construction activities (D -2) C) Mitigation (1) A site specific analysis must be conducted to determine whether the design of any proposed development project within the Sepulveda /Rosecrans Rezoning site would impact any of the 0 30 acres identified as potential jurisdictional wetlands This analysis must be completed prior to the start of construction activities for any proposed development within the Sepulveda /Rosecrans Rezoning Site If jurisdictional wetlands would be affected by the development project, measures must be identified to reduce impacts to less than significant levels (D -1) (2) Site specific analysis of potential effects to four sensitive bird species (white tailed kite, loggerhead shrike, burrowing owl and Belding's savannah sparrow) must be conducted prior to the start of construction activities for any proposed development within the Sepulveda /Rosecrans Rezoning Site If any of these sensitive species would be affected by the proposed development, measures must be identified to reduce impacts to these species to less than significant levels, including, but not limited to, on -site monitoring by a qualified biologist during grading and /or construction activities (D -2) (3) All construction personnel must receive copies of all pertinent mitigation measures to reduce impacts to general biological resources and must be instructed on avoiding adverse impacts to birds encountered on -site (D -3) (4) Prior to site remediation or construction grading on parts of the Site where burrowing owls may occur, a qualified biologist must be retained to conduct surveys for burrowing owl to determine if it is resident on -site Surveys must be conducted no more than 30 days prior to commencement of such activities If burrowing owls are determined to be resident, a qualified biologist must oversee site remediation and demolition activities in and around any semi- natural areas which could be occupied by burrowing owls Proposed mitigation measures must be presented to the California Department of Fish and Game and /or U S Fish and Wildlife Service for approval to avoid directly harming the owl if it is present on -site during these activities (D -4) Plaza EI Segundo The following mitigation measures must be required for the Plaza El Segundo Development (5) All construction personnel must receive copies of all pertinent mitigation measures to reduce impacts to general biological resources and must be instructed on avoiding adverse impacts to birds encountered on -site (D -5) (6) Prior to site remediation or construction grading on parts of the Site where burrowing owls may occur, a qualified biologist must be retained to conduct surveys for burrowing owl to determine if it is resident on -site Surveys must be conducted no more than 30 days prior to commencement of such activities If burrowing owls are determined to be resident, a qualified biologist must oversee site remediation and demolition activities in and around any semi- natural areas which could be occupied by burrowing owls Proposed mitigation measures must be presented to the California Department of Fish and Game and /or U S Fish and Wildlife Service for approval to avoid directly harming the owl if it is present on -site during these activities (D -6) (7) Prior to issuance of building permits, evidence must be provided to the City of El Segundo that all necessary approvals for any wetland dredge /fill contemplated by such permit have been obtained from the Regional Water Quality Control Board — Los Angeles Region, or equivalent documentation, or a waiver stating that no permit is presently required pursuant to the regulations of that agency If required, conditions for permit approvals by RWQCB must include, but may not be limited to the following • Mitigation of any unavoidable impacts to wetland values and functions to the satisfaction of the permitting agency • Incorporation of buffers to the wetland areas • On -site treatment of runoff to improve water quality 27 Compliance with best management practices during construction (D -7) d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to Biological Resources (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR (3) With Respect to Mitigation Measures D -1, D -2, D -4, D -6, and D -7, changes or alteration are within the responsibility and jurisdiction of another public agency and not the agency making the finding Such changes have been adopted by such other agency or can and should be adopted by such other agency (4) If mitigation is not adopted by the other jurisdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOC) 4 Geology and Sods a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) No evidence of faulting was observed during the field investigation and no active faults cross the Sepulveda /Rosecrans Rezoning Site or are located in the immediate site vicinity The City of El Segundo does not contain any Alqust -Paolo Earthquake Fault Zones Based on the available geologic data, active or potentially active faults with the potential for surface fault rupture are not known to be located directly beneath or projecting toward the Sepulveda /Rosecrans Rezoning Site Therefore, development of Sepulveda /Rosecrans Rezoning Site would not expose people to significant impacts related to surface fault rupture (2) The Sepulveda /Rosecrans Rezoning Site is located within the Southern California region that is known for its seismic activity Additionally, the location of the Sepulveda /Rosecrans Rezoning Site relative to known active or potentially active faults indicates that it could be subjected to significant ground shaking Compliance with the State of California Building Code, with its local amendments, would ensure that potential seismic and ground shaking impacts would be less than significant i (3) According to the State of California Seismic Hazards Map, the Sepulveda /Rosecrans Rezoning Site is not located in an area at risk for liquefaction Therefore, development of the Sepulveda /Rosecrans Rezoning Site would not expose people to significant liquefaction impacts (4) The Sepulveda /Rosecrans Rezoning Site is not within an area identified as having a potential for slope instability Additionally, the site is not located within an area identified as having a potential for seismic slope instability There are no known landslides near the Sepulveda /Rosecrans Rezoning Site, nor is the Sepulveda /Rosecrans Rezoning Site located in the path of any known or potential landslides. Therefore, the development of Sepulveda /Rosecrans Rezoning Site would not result in or expose people to significant impacts related to slope stability (5) No subsidence associated with fluid withdrawal, peat oxidation, or hydrocompaction has occurred in the City of El Segundo Therefore, development of the Sepulveda /Rosecrans Rezoning Site would not result in or expose people to significant impacts related to subsidence (6) The City of El Segundo is not within an area of known expansive sods Therefore, the Sepulveda /Rosecrans Rezoning Site would not result in or expose people to significant impacts related to expansive soils (7) The Proposed Circulation Element Update Draft EIR requires analysis of potential impacts related to expansive soils for later projects that would implement the proposed Circulation Element Update The proposed connection of Park Place between Sepulveda Boulevard and Nash Street and connection of Park Place to Hughes Way via Allied Way through the Sepulveda /Rosecrans Rezoning Site would constitute a project that implements the Circulation Element Update policies Based upon the analysis above, construction of this component of the proposed Circulation Element Update would not result in new effects related to expansive sods that were not examined in the Program EIR for the proposed Circulation Element Update (8) The City of El Segundo is within an oil field and there are documented producing wells located near the Sepulveda /Rosecrans Rezoning Site Due to the presence of oil and natural gas wells near the Sepulveda /Rosecrans Rezoning Site, there is a potential for methane to be present in the sod Impacts associated with methane levels on the Sepulveda /Rosecrans Rezoning Site would be potentially significant, subject to the findings of project- specific environmental analysis described under Subsequent Environmental Documentation and Mitigation Measures (9) Removal of contaminated soils that may occur on the Sepulveda /Rosecrans Rezoning Site would be separate activity 29 which will be accomplished prior to grading activities For a discussion of soil contamination on the Sepulveda /Rosecrans site and its removal, see Section IV G of this EIR (10) Earth movement activities in and around the unlined depressions could result in an increase of impervious surfaces at the site and expose soils to potential wind -borne erosion Therefore, the potential for erosion as a result of the development of the Sepulveda /Rosecrans Rezoning Site would be significant Plaza El Segundo (11) The proposed Plaza El Segundo Development site would not expose people or structures to potentially adverse effects or otherwise result in significant impacts with respect to surface fault rupture, seismicity and ground shaking, liquefaction and seismic settlement, slope stability, subsidence, expansive sods, landform alteration, budding foundations, or grading Impacts of the proposed Plaza El Segundo Development would be less than significant with respect to these issues (12) The City of El Segundo is within an oil field and there are documented producing wells located near Plaza El Segundo A methane study was conducted to determine the presence or absence of methane on the Plaza El Segundo site This study meets the requirement for subsequent environmental documentation for development on the proposed Plaza El Segundo Site Seventeen methane samples and one duplicate sample were collected from nine locations on the Plaza El Segundo site on January 5, 2004 Methane was detected during the sampling, however, it was not detected at levels that require further analysis or sampling. Therefore, impacts associated with methane would be less than significant on the Plaza El Segundo site (13) Unlined natural depressions could result in an increase of impervious surfaces at the site and expose soils to the effects of wind -borne erosion Therefore, the potential for erosion at the site as a result of the development of Plaza El Segundo would be significant There is also potential for erosion to occur during the grading process during periods of heavy precipitation The development of Plaza El Segundo would result in potentially significant impacts related to erosion b) Subsequent Environmental Documentation Sepulveda /Rosecrans Site Rezoning Subsequent environmental documentation must be prepared for any proposed development on the Sepulveda /Rosecrans Site to determine the presence or absence of methane The subsequent environmental documentation must address the following Ell A methane study must be conducted to determine the levels at which methane is or is not present in the area of any proposed development If methane is determined to be present at or above the levels which require action, then the report shall include recommendations and mitigation measures which shall be followed (E -1) C) Mitigation Sepulveda /Rosecrans Site Rezonm (1) A methane study must be conducted to determine the levels at which methane is or is not present in the area of any proposed development If methane is determined to be present at or above the levels which require action, then the report must include recommendations and mitigation measures which must be followed (E -1) (2) All soil disturbance and travel on unpaved surfaces must be suspended if winds exceed 25 miles per hour (E -2) Plaza El Segundo (3) All soil disturbance and travel on unpaved surfaces must be suspended if winds exceed 25 miles per hour (E -3) d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Project with respect to geology and soils (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR (3) With Respect to Mitigation Measures E -2 and E -3, changes or alteration are within the responsibility and jurisdiction of another public agency and not the agency making the finding Such changes have been adopted by such other agency or can and should be adopted by such other agency (4) If mitigation is not adopted by the other jurisdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOC) 5 Hydrology and Water Quality a) Facts /Effects 31 Sepulveda /Rosecrans Site Rezonm (1) The Proposed Circulation Element Update Draft EIR requires analysis of potential impacts related to drainage and storm drain systems for later projects that would implement the proposed Circulation Element Update The proposed connection of Park Place between Sepulveda Boulevard and Nash Street and connection of Park Place to Hughes Way via Allied Way through the Sepulveda /Rosecrans Rezoning Site would constitute a project that implements the Circulation Element Update policies The analysis provided below includes the master drainage plan and storm drain and detainment system designed required by the Proposed Circulation Element Update Draft EIR Based upon the analysis provided below, construction of this component of the proposed Circulation Element Update would not result in new effects related to drainage that were not examined in the Program EIR for the proposed Circulation Element Update (2) The hydrology calculations demonstrate that the entire Sepulveda /Rosecrans Rezoning Site can be protected from flooding through the use of on -site storm drains in conjunction with an on -site retention basin without increasing discharge rates from the Sepulveda /Rosecrans Rezoning Site At full bwldout the total 50 -year flow discharging into the retention basin is 117 cubic feet per second (cfs) with a total retention volume of 4 acre -feet or 175,000 cubic feet With the construction of the retention basin and the mitigation measures below, the development of the Sepulveda /Rosecrans Rezoning Site at full buddout would not result in significant impacts related to hydrology (3) The Sepulveda /Rosecrans Rezoning Site is not located in a 100 or 500 year floodplain Therefore, the future development of the Sepulveda /Rosecrans Rezoning Site would not result in or expose people or property to significant impacts related to flooding (4) The development of the Sepulveda /Rosecrans Rezoning Site does not involve deep excavations that have the potential to intercept existing Aquifers, nor would it involve additions (with the exception of normal water percolation from rainfall /landscape irrigation) or withdrawals of groundwater Therefore, the proposed Sepulveda /Rosecrans Site Rezoning would not result in significant impacts related to groundwater (5) Since the proposed Sepulveda /Rosecrans Site Rezoning involves clearing, grading, and the excavation of 5 or more acres, a General Construction Activity Storm Water Permit must be obtained from the SWRCB prior to the start of construction The NPDES requires that a NOI be filed with the SWRCB By filing an NOI, the developer agrees to the conditions outlined in the General Permit One of the conditions of the General Permit is the development and the implementation of a SWPPP The SWPPP identifies which structural and nonstructural BMPs will be 32 implemented, such as sandbag barriers, temporary desalting basins near inlets, gravel driveways, dust controls, employee training, and general good housekeeping practices With the implementation of the required BMPs and the mitigation measures listed below, short-term impacts on water quality from construction materials, site grading, and equipment maintenance would be less than significant (6) If not properly designed and constructed, the proposed development could increase the rate of urban pollutant introduction into storm water system As required by the SUSMP, detailed plans for the Sepulveda /Rosecrans Rezoning Site's compliance with the SUSMP will be submitted to the City as part of the development plan approval process prior to issuance of budding and grading permits With compliance with the SUSMP requirements, the project's operational impacts on storm water quality will be less than significant Plaza El Segundo (7) Runoff from the Plaza El Segundo site would drain across the Plaza El Segundo Site to the proposed retention basin located in the eastern portion of the Plaza El Segundo site The total 50- year flow discharging into the retention basin from the portion of the Plaza El Segundo site located north of the railroad tracks is anticipated to be 57 cfs The total volume of the retention basin is 8 09 acre -feet or 352,000 cubic feet for the Plaza El Segundo site The total 50 -year flow discharging from the portion of the Plaza El Segundo site located south of the railroad tracks is 11 cfs Since this does not represent an increase in runoff from the existing condition, no detention is required for this area With the construction of the retention basin and the mitigation measures below, development of Plaza El Segundo would not result in significant impacts related to hydrology (8) Plaza El Segundo is not located in a 100 or 500 year floodplam Therefore, the proposed Plaza El Segundo Development would not result in or expose people or property to significant impacts related to flooding (9) The development of the Plaza El Segundo site does not involve deep excavations that have the potential to intercept existing Aquifers, nor would it involve direct additions or withdrawals of groundwater Therefore, the proposed Plaza El Segundo Development would not result in significant impacts related to groundwater With the implementation of the required BMPs, and the mitigation measures listed below short-term impacts on water quality from construction materials, site grading, and equipment maintenance would be less than significant (10) If not properly designed and constructed, the proposed development on Plaza El Segundo could increase the rate of urban pollutant introduction into storm water system In 33 compliance with the SUSMP requirements, the proposed development on Plaza El Segundo will provide for the treatment/filtration of on -site storm water runoff before it enters the public storm water conveyance system Applicable BMPs will also be selected from those approved sources identified in the Standard Urban Storm Water Mitigation Plan for Los Angeles County and Cities in Los Angeles County Additionally, a preventive maintenance program, including regular street and parking lot sweeping with equipment designed for removal of such compounds, should be provided to reduce the potential water quality impact to a less- than - significant level As noted above, the Plaza El Segundo site will provide structural or treatment control BMPs designed to mitigate storm water runoff With compliance with the SUSMP requirements, the project's operational impacts on storm water quality will be less than significant b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezonin (1) The applicant must prepare hydrology studies for each specific development on the Sepulveda /Rosecrans Rezoning Site. Such studies shall be reviewed and approved by the City of El Segundo and any other applicable agency (F -1) (2) The applicant must prepare runoff studies for each specific development on the Sepulveda /Rosecrans Rezoning Site so that the runoff from one specific project area would not flow onto another specific project area without the owners consent Such studies must be reviewed and approved by the City of El Segundo and any other applicable agency (F -2) (3) The applicant must prepare a master drainage plan for each specific development on the Sepulveda /Rosecrans Rezoning Site. This plan must include detailed hydrology /hydraulic calculations and drainage improvements, showing quantitatively how the project will eliminate the potential for downstream flooding due to increased storm water runoff. These plans will also identify the proposed BMPs to be implemented in compliance with the requirements of the Standard Urban Storm Water Mitigation Plan and the ESMC Such plans must be reviewed and approved by the City of El Segundo and the Los Angeles County Department of Public Works (F -3) (4) The applicant must design, for each specific development on the Sepulveda /Rosecrans Rezoning Site, a conveyance and detainment system to meet the Los Angeles County Department of Public Works limits on the storm drains that would convey the Sepulveda /Rosecrans Rezoning Site's discharge (F-4) 34 (5) The proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development must comply with City of El Segundo Ordinance No 1347 and No 1348, which establishes storm water and urban pollution controls (F -5) (6) The protect owner /developer of a specific development (e g , Plaza El Segundo) on the Sepulveda /Rosecrans site must maintain all structural or treatment control BMPs for the life of the project (F -6) Plaza El Segundo The following mitigation measures have been identified as pertaining specifically to the Plaza El Segundo Development (7) The applicant must prepare a hydrology study for the Plaza El Segundo Site The study must be reviewed and approved by the City of El Segundo and any other applicable agencies (F -7) (8) The applicant must prepare a runoff study for the Plaza El Segundo Site so that the runoff does not flow onto another area without the owners consent The study must be reviewed and approved by the City of El Segundo and the any other applicable agencies (F -8) (9) The applicant must prepare a master drainage plan for the Plaza El Segundo Site This plan must include detailed hydrology /hydraulic calculations and drainage improvements, showing quantitatively how the protect will eliminate the potential for downstream flooding due to increased storm water runoff These plans will also identify the proposed BMPs to be implemented in compliance with the requirements of the Standard Urban Storm Water Mitigation Plan and the ESMC. Such plans must be reviewed and approved by the City of El Segundo and the Los Angeles County Department of Public Works (F -9) (10) The applicant must design a conveyance and detainment system to meet the City of El Segundo's and Los Angeles County Department of Public Works limits on the storm drains that would convey the Plaza El Segundo Site's discharge (F -10) (11) The proposed Plaza El Segundo Development must comply with City of El Segundo Ordinance No 1347 and No 1348, which establishes storm water and urban pollution controls (F -11) (12) The protect owner /developer must maintain all structural or treatment control BMPs for the life of the Plaza El Segundo Development (F -12) d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence 35 identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to hydrology and water quality (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR (3) If mitigation is not adopted by the other jurisdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOC) Hazards and Hazardous Materials a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) The parcels that comprise the proposed Sepulveda /Rosecrans Rezoning Site are known to contain sod and groundwater contamination due to past activities However, at this time, the extent and type of contamination for all the parcels is not known Without this information, based upon previous activities that have taken place on the proposed Sepulveda /Rosecrans Rezoning Site, conditions of site contamination would have the potential to expose workers and visitors to the proposed Sepulveda /Rosecrans Rezoning Site to soil and groundwater contamination levels that are above established remediation thresholds and expose workers and visitors to the proposed Sepulveda /Rosecrans Rezoning Site to cancer and /or non cancer risks that exceed health risk thresholds Thus impacts of the proposed Sepulveda /Rosecrans Site Rezoning related to sod and groundwater contamination would be significant (2) Asbestos and lead surveys have not been conducted for any of the structures that exist on the Sepulveda /Rosecrans Rezoning Site with the exception of the Honeywell International Inc parcels However, it is assumed that these structures contain asbestos containing material and lead due to the age of the facilities Thus demolition and development activities on the proposed Sepulveda /Rosecrans Rezoning Site would have the potential to expose workers to hazards associated with asbestos and lead Impacts of the proposed Sepulveda /Rosecrans Site Rezoning would be significant with respect to asbestos and lead Plaza El Segundo (3) Upon completion of interim remediation of the protect site, potential health risk impacts to individuals from site contamination 36 would be less than significant with respect to the proposed Plaza El Segundo Development Implementation of additional measures to address soil gas and groundwater contamination would not affect the risks associated with construction and operation of the proposed Plaza El Segundo Development since the workers, employees and patrons of the proposed Plaza El Segundo would not be exposed to chemicals that would be remediated through these processes (4) After removal of the asbestos containing materials from the various facilities, the facilities on the Plaza El Segundo site were demolished There are no structures or asbestos containing materials presently located on proposed Plaza El Segundo site Therefore, impacts to individuals or the environment from asbestos fibers would be less than significant Lead -based paint surveys revealed no significant results b) Subsequent Environmental Documentation Seoulveda /Rosecrans Site Rezonin Subsequent environmental documentation must be prepared for any proposed development project within the proposed Sepulveda /Rosecrans Site Conditions related to sod and groundwater contamination must be examined for the proposed development site, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must address the following (1) A full characterization of all the parcels that comprise that protect site must be undertaken The City must require that this process be initiated by requiring the project applicant to conduct a Phase I Environmental Site Assessment (ESA) or equivalent investigation and analysis for the specific project site that would be occupied by the proposed development The Phase I ESA or equivalent document must be prepared by a licensed professional (Registered Environmental Assessor or equivalent) and submitted to the City for review (G -1) (2) If indicated by the initial investigation, the City must require the preparation of subsequent Phase 11 investigation(s) and submission to the Los Angeles Regional Water Quality Control Board and /or other appropriate agency The project applicant must provide to the City copies of all materials submitted to the LARWQCB or any other regulatory agency (G -2) (3) Remediation of any environmental conditions identified in the Phase I and Phase II site assessments or investigations must be accomplished to the standards established and agreed upon by the appropriate regulatory agency(ies) for the contemplated development, prior to the issuance of grading or building permits 37 for the protect The protect applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency (G -3) (4) If the future development protect would include any part of Sepulveda /Rosecrans Rezoning Site that currently contains structures, an asbestos and lead survey must be conducted to determine the presence or absence of these substances Removal of these substances shall be conducted in accordance with all applicable rules and regulations (G-4) C) Mitigation: Further mitigation measures for site specific protects would be identified by the Mitigation Measures described below Before development is allowed on any part of the Sepulveda /Rosecrans Rezoning Site, the part of the site proposed for development would need to be remediated to the standards required for commercial development by LARWQCB (1) A full characterization of all the parcels that comprise a specific protect site must be undertaken The City must require that this process be initiated by requiring the protect applicant to conduct a Phase I Environmental Site Assessment (ESA) or equivalent investigation and analysis for the specific protect site that would be occupied by the proposed development The Phase I ESA or equivalent document must be prepared by a licensed professional (Registered Environmental Assessor or equivalent) and submitted to the City for review (G -1) (2) If indicated by the initial investigation, the City must require the preparation of subsequent Phase II investigation(s) and submission to the Los Angeles Regional Water Quality Control Board and /or other appropriate agency The protect applicant must provide to the City copies of all materials submitted to the LARWQCB or any other regulatory agency (G -2) (3) Remediation of any environmental conditions identified in the Phase I and Phase II site assessments or investigations must be accomplished to the standards established and agreed upon by of the appropriate regulatory agency(ies) for the contemplated development, prior to the issuance of grading or budding permits for the protect The protect applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency (G -3) (4) If the future development protect would include any part of Sepulveda /Rosecrans Rezoning Site that currently contains structures, an asbestos and lead survey must be conducted to determine the presence or absence of these substances Removal of these substances must be conducted in accordance with all applicable rules and regulations (G -4) KE 7 Ul Plaza El Segundo (5) Remedial investigations, health risk assessments for the contemplated development and final soils remedial action plans for the Plaza El Segundo portion of the project site must be completed and approved to the standards established and agreed upon by the LARWQCB prior to the start of any protect activities The protect applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency (G-5) (6) Remediation of shallow sod of the Plaza El Segundo Development portion of the protect site must be accomplished to the standards for commercial development established and agreed upon in conjunction with the LARWQCB and a shallow soil closure letter must be issued by the LARWQCB prior to issuance of grading permits for construction of the proposed Plaza El Segundo Development The project applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency (G -6) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to hazards and hazardous materials (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FOR (3) If mitigation is not adopted by the other jurisdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOC) Land Use a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) The rezoning of a 708 net acre portion of the Sepulveda /Rosecrans Rezoning Site from Heavy and Light Industrial to Commercial Center would allow for the development of commercial and retail uses Any future development on the site would be required to meet the zoning and development standards associated with the C -4 designation Compatibility with the surrounding land uses would be ensured through compliance with these development standards The existing uses (e g , 39 lumberyard, Air products facility, and RV storage) would continue to operate and would be consistent with the M -1 and M -2 zones Therefore, no land use compatibility issues are anticipated as a result of future development on the Sepulveda /Rosecrans Rezoning Site (2) The Sepulveda /Rosecrans Site Rezoning would be consistent with the applicable adopted plans and policies, including the El Segundo General Plan and SCAG's RCPG Future development on the Sepulveda /Rosecrans Rezoning Site would be consistent with both the General Plan and the RCPG Therefore, no land use impacts are associated with the Sepulveda /Rosecrans Site Rezoning (3) Public comments on the Sepulveda /Rosecrans Site Rezoning contend that the proposed protect would provide retail sales and services that could compete with downtown El Segundo business and that the impacts of increased competition could result in urban blight and decay in the downtown commercial area of El Segundo (4) As discussed in Response to Comment No 10 -2 in the FEIR, due to the size of stores that would be included in the proposed Plaza El Segundo Development, a different range of products would be provided, compared to the smaller stores in Downtown, which are more focused on the local residential market As such, proposed development on the Sepulveda /Rosecrans Rezoning Site would not be anticipated to adversely affect businesses presently located in downtown El Segundo such that any potentially significant blight or decay, or other significant physical environmental impacts would ensue as a result of the protect Plaza El Segundo (5) The Plaza El Segundo Development would include a mix of large retail stores, specialty retail and other uses including a fitness center /spa, and fast food and sit -down restaurants The shopping center would replace the former chemical manufacturing and industrial uses that had previously occupied the Plaza El Segundo site and would be compatible with the surrounding commercial, industrial, public facilities, and open space uses The proposed development would conform to the development standards of the new Commercial Center (C-4) Zone (6) None of the adjacent uses are considered sensitive and the placement of the proposed Plaza El Segundo Development adjacent to them would not interfere with the daily operation of these uses The closest residential use, located in the City of Manhattan Beach approximately a quarter mile southwest of the intersection of Sepulveda Boulevard and Rosecrans Avenue In addition, the proposed development would be landscaped in accordance with the development standards established for the EE Commercial Center, C-4, Zone, which would work to create a buffer between the proposed development and the adjacent land uses Impacts related to land use compatibility resulting from the development of Plaza El Segundo would be less than significant (7) Additional information regarding noise impacts to the surrounding area during construction and operation (vehicular) can be found in Section IV I Traffic impacts associated with the operation of the proposed Plaza El Segundo Development are discussed in Section IV L These analyses show that with implementation of the identified mitigation measures, the project would not result in significant, short-term or long -term, land use compatibility impacts (8) The proposed Plaza El Segundo Development would not conflict with any of the applicable policies of the El Segundo General Plan and would work to implement a number of those policies A General Plan Amendment is proposed to change the land use designation from Heavy Industrial to Commercial Center The explanations provided under the Sepulveda /Rosecrans Site Rezoning discussion (see Table IV H -1 of the Draft EIR) are applicable to the proposed Plaza El Segundo Development with the following exceptions • Policy 3 03 The proposed Plaza El Segundo Development is anticipated to provide approximately 952 lobs to the local economy (9) Overall, the proposed development of the Plaza El Segundo Development would be consistent with applicable City and regional planning policies (10) Public comments on the Plaza El Segundo Development contend that the Plaza El Segundo Development would provide retail sales and services that could compete with downtown El Segundo business and that the impacts of increased competition could result in urban blight and decay in the downtown commercial area of El Segundo (11) As indicated in Response to Comment No. 10 -3 in the FEIR, the Draft Development Agreement for the proposed Plaza El Segundo Development establishes restrictions on the size and types of uses allowed on the project site. Since the types of uses proposed for the project site would not be available in downtown El Segundo and vice versa, it is not anticipated that the stores on the project site would adversely affect businesses located in downtown El Segundo Additionally, the goods and services to be provided by the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development would not compete with the stores and business of Downtown El Segundo due to the size and nature of the businesses Consequently, the 41 development of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development would not lead to a downward spiral of vacancies, deterioration, or blight in the downtown El Segundo commercial district b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required c) Mitigation Sepulveda /Rosecrans Site Rezoning (1) Because no significant impacts related to land use have been identified, no mitigation measures are required Plaza El Segundo (2) Because no significant impacts related to land use have been identified, no mitigation measures are required d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to land use (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FOR Noise a) Facts /Effects Sepulveda /Rosecrans Site Rezoning Operational Noise (1) The incremental increase in noise from traffic is expected to be less than 1 dB(A) at both sensitive receptor locations Thus, traffic- related operational noise impacts for the Sepulveda /Rosecrans Site Rezoning are anticipated to be less than significant All other sensitive receptors in the area would experience lower increases in noise levels as a result of vehicular traffic because the analyzed roadways represent the highest levels of project- related traffic The potential increase in noise levels would not be audible at these locations and thus the impact would be less than significant 42 (2) The Sepulveda /Rosecrans Site Rezoning would have the potential to generate noise from day -to -day activities During project operation, it is anticipated that the primary sources of noise occurring with the Sepulveda /Rosecrans Rezoning Site would be loading dock and parking lot activity All these activities will be similar and consistent with activities occurring at the immediately adjacent non - residential uses These activities would be within ambient noise levels and thus would not change the existing noise environment As such, impacts related to parking lot and loading dock noise would be less than significant Plaza El Segundo Operational Noise (3) Noise increases associated with the Plaza El Segundo Development traffic generation would not be perceptible along any of the modeled roadways in the vicinity of the project, where sensitive receptors are located Therefore, impacts from traffic associated with the Plaza El Segundo Development would be less than significant (4) During project operation, it is anticipated that the primary sources of noise occurring with the Plaza El Segundo site would be loading dock and parking lot activity All these activities will be similar and consistent with activities occurring at the immediately adjacent non - residential uses These activities would be within ambient noise levels and thus would not change the existing noise environment As such, impacts related to parking lot and loading dock noise would be less than significant b) Subsequent Environmental Documentation Sepulveda /Rosecrans Site Rezoning Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda /Rosecrans site, The subsequent environmental documentation must address the following (1) A project - specific construction noise analysis must be prepared that calculates, based on project - specific parameters and identification of the site - specific sensitive receptors that could be affected by construction activities, the noise levels that would be experienced at sensitive receptors located adjacent to that site If noise levels resulting from construction activity would result in temporary construction noise levels that exceed 65 dBA at a sensitive receptor, or cause an incremental increase of 5 dBA over the existing ambient sound level, it the existing ambient sound level at the sensitive receptor location is 65 dBA or more, then the study must identify feasible mitigation measures to be applied to that project from the list of mitigation measures provided below (1 -1) 43 C) Mitigation Sepulveda /Rosecrans Site Rezoning The following mitigation measures are required to minimize construction related noise impacts associated with the Sepulveda /Rosecrans Site Rezoning (1) A project- specific construction noise analysis must be prepared that calculates, based on project - specific parameters and identification of the site - specific sensitive receptors that could be affected by construction activities, the noise levels that would be experienced at sensitive receptors located adjacent to that site If noise levels resulting from construction activity would result in temporary construction noise levels that exceed 65 dBA at a sensitive receptor, or cause an incremental increase of 5 dBA over the existing ambient sound level, if the existing ambient sound level at the sensitive receptor location is 65 dBA or more, then the study must identify feasible mitigation measures to be applied to that project from the list of mitigation measures provided below • Construction contracts must specify that all construction equipment shall be equipped with mufflers and other applicable noise attenuation devices • During construction phases, the contractor must store and maintain equipment as far as possible from the adjacent receptor property locations to the southwest, north and east of the Sepulveda /Rosecrans Rezoning Site • As stated in the City of El Segundo Municipal Code, construction must be restricted to the hours of 7 00 a m to 6 p m Monday through Saturday, and prohibited at anytime on Sunday or a Federal holiday • Temporary plywood noise barriers must be constructed along the northern and eastern property lines of the Sepulveda /Rosecrans Rezoning Site during construction, which must be high enough to block the line -of -sight between the Sepulveda /Rosecrans Rezoning Site and receptor property locations to the southwest, north and east (1 -1) Plaza El Segundo The follow mitigation measures are required to minimize construction related noise impacts associated with the Plaza El Segundo Development (2) Construction contracts must specify that all construction equipment must be equipped with mufflers and other applicable noise attenuation devices (1 -2) 44 (3) During construction phases, the contractor must store and maintain equipment as far as possible from the adjacent receptor property locations to the north and east of the Plaza El Segundo site (1 -3) (4) As stated in the City of El Segundo Municipal Code, construction must be restricted to the hours of 7 00 a m to 6 p m Monday through Saturday, and prohibited at anytime on Sunday or a Federal holiday (1-4) (5) Temporary plywood noise barriers must be constructed along the 4 5 acre portion of the Plaza El Segundo site south of the UPRR tracks during construction, which must be high enough to block the line -of -sight (a minimum of 8 feet above existing grade) between the Plaza El Segundo site and receptor property locations to the southwest, north and east (1 -5) d) Finding (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to noise (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR 9 Population, Housino, and Employment a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) Construction of the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development would result in increased employment opportunities in the construction field, which could potentially result in increased permanent population and demand for housing in the vicinity of the Sepulveda /Rosecrans Rezoning Site However, the employment patterns of construction workers in Southern California are such that it is not likely that they would relocate their households as a consequence of the construction employment associated with the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development (2) Operation of the development permitted under the proposed Sepulveda /Rosecrans Site Rezoning would provide employment for approximately 1,904 persons by protect completion in the year 2012 Employment resulting from the proposed Sepulveda /Rosecrans Site Rezoning would be 45 consistent with SCAG protections for the City of El Segundo and the South Bay Cities Subregion through 2015 Therefore, impacts associated the Sepulveda /Rosecrans Site Rezoning related to employment would be less than significant (3) The City of El Segundo is a jobs rich city, with far more employment opportunities than the available housing stock can accommodate From the SCAG data presented in Section IV J it can be seen that the vast majority of employees in the City of El Segundo commute to work from other communities, and will continue to do so in the future While the Sepulveda /Rosecrans Site Rezoning is expected to generate approximately 1,904 new lobs, for several reasons, it is not expected to generate a demand for 1,904 housing units It is reasonable to expect, therefore, that many of the new employees will be drawn from the local labor force in the City of El Segundo and surrounding communities (4) It is expected that the maximum housing demand generated by the project could be accommodated by the existing housing stock within the average 9 7 -mile commute distance from the Sepulveda /Rosecrans Rezoning Site, without generating demand for new housing construction Therefore, the proposed Sepulveda /Rosecrans Site Rezoning would result in less than significant impacts related to housing Plaza El Segundo (5) Operation of the proposed Plaza El Segundo would provide employment for approximately 952 persons The Plaza El Segundo's estimated employee generation would account for approximately 6 8 percent of SCAG's forecasted total employment growth for the City of El Segundo during this period Employment resulting from the proposed Plaza El Segundo Development would be consistent with SCAG projections for the City of El Segundo and the South Bay Cities Subregion through 2010 Therefore, the Plaza El Segundo would result in a less than significant impact regarding employment (6) The additional housing demand associated with the proposed Sepulveda /Rosecrans Site Rezoning would be accommodated by existing housing supply in the South Bay Cities Subregion and surrounding cities to the north and northeast of the Sepulveda /Rosecrans Rezoning Site, The proposed Plaza El Segundo would implement the proposed C -4 zoning on a portion of the Sepulveda /Rosecrans Rezoning Site Thus the proposed Plaza El Segundo would not pose additional issues related to increased employment and housing demand The proposed Plaza El Segundo would result in less than significant impacts related to housing b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required 46 C) Mitigation Sepulveda /Rosecrans Site Rezoning (1) As no significant impacts on population, housing and employment associated with the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo would occur, no mitigation measures are required There are no available mitigation measures to address the incremental contribution of the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo to the significant cumulative impact related to population growth and housing demand Plaza El Segundo (2) As no significant impacts on population, housing and employment associated with the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo would occur, no mitigation measures are required There are no available mitigation measures to address the incremental contribution of the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo to the significant cumulative impact related to population growth and housing demand d) Findinci (1) No significant impacts were identified and no mitigation measures were required No impact is anticipated to employment or population growth as a result of implementing the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development (2) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to population, housing, and employment (3) Changes or incorporated into the Plaza El Segundo substantially lessen identified in the FEIR 10 Public Services — Fire Protection a) Facts /Effects alterations have been required in, or Rosecrans /Sepulveda Site Rezoning and Development project which avoid or the significant environmental effect as Sepulveda /Rosecrans Site Rezoning 47 (1) Emergency access to the Sepulveda /Rosecrans Rezoning Site would be provided at several driveways along Sepulveda Boulevard, Rosecrans Avenue and from Allied Way Internal fire access roadways would be provided throughout the Sepulveda /Rosecrans Rezoning Site Emergency response times are not anticipated to be significantly impacted by project traffic, as the Sepulveda /Rosecrans Rezoning Site is located less than one mile southwest of ESFD Station No 2 and within two miles of the proposed relocation site for Station No 2 Additional City streets and public fire hydrants would be provided on the Sepulveda /Rosecrans Rezoning Site The provision of street continuation through the site is proposed as part of the Sepulveda /Rosecrans Rezoning Protect, which would improve access to the southern edge of the City Water flow and fire hydrants would be provided in accordance with ESFD Regulations, and installation of automatic fire sprinklers and a complete life- safety alarm system within each building shall be undertaken in accordance with the requirements of the Uniform Fire Code to further preclude the need for additional fire protection The proposed Sepulveda /Rosecrans Rezoning would not require new or physically altered fire protection facilities in order to maintain acceptable fire service ratios, response times, or other performance standards and would have a less than significant impact on fire protection services (2) A Fire Service Mitigation Fee of $0 14 per gross square foot is required and would be provided by future development within the proposed Sepulveda /Rosecrans Rezoning Site in order to address fire service impacts The Fire Service Mitigation Fee is set by the City at a level which adequately reflects the impacts on fire services caused by new development Plaza El Segundo (3) Because the full development permitted under the proposed Sepulveda /Rosecrans Rezoning would not significantly impact fire protections services, the proposed Plaza El Segundo would also result in less than significant impacts on fire protection services (4) The proposed Plaza El Segundo Development would be responsible for paying the Fire Service Mitigation Fee of $0 14 per gross square foot set forth in the El Segundo Municipal Code. The Fire Service Mitigation Fee is set by the City at a level which adequately reflects the impacts on fire services caused by new development b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required 4B C) Mitigation Sepulveda /Rosecrans Site Rezoning Although impacts of the proposed Sepulveda /Rosecrans Site Rezoning would be less than significant with respect to fire protection facilities, the City of El Segundo imposes the following standard conditions of project approval to offset protect impacts (1) The applicant must pay the City of El Segundo a Fire Service Mitigation Fee of $0 14 per gross square foot of building area prior to the issuance of a certificate of occupancy (K -1 1) (2) A fire life safety plan, which must include definitive plans and specifications, must be submitted to the El Segundo Fire Department (ESFD) for review and approval prior to commencement of construction of any portion of the proposed development (K -1 2) (3) The applicant must provide fire access roadways to and throughout the property and submit a layout plan to the ESFD for approval (K-1 3) (4) The applicant must provide water flow and on -site fire hydrants as required by the ESFD (K -1 4) (5) The following installations require separate Fire Department approval The applicant must submit separate plans for Fire Department review Automatic fire sprinklers, • Fire alarm system, Underground fire service mains, Fire Pumps, • Emergency generators, and Any aboveground including elevator (K -1 5) Plaza El Segundo or underground storage tank sumps and condensation tanks Although impacts of the proposed Plaza El Segundo Development would be less than significant with respect to fire protection facilities, the City of El Segundo imposes the following standard conditions of protect approval to offset protect impacts 49 11 (6) The applicant must pay the City of El Segundo a Fire Service Mitigation Fee of $0.14 per gross square foot of building area prior to the issuance of a certificate of occupancy (K -1 6) (7) A fire life safety plan, which must include definitive plans and specifications, must be submitted to the El Segundo Fire Department (ESFD) for review and approval prior to commencement of construction of any portion of the proposed development (K -1 7) (8) The applicant must provide fire access roadways to and throughout the property and submit a layout plan to the ESFD for approval (K -1 8) (9) The applicant must provide water flow and on -site fire hydrants as required by the ESFD (K -1 9) (10) The following installations require separate Fire Department approval The applicant must submit separate plans for Fire Department review Automatic fire sprinklers, • Fire alarm system, • Underground fire service mains, Fire Pumps, Emergency generators, and Any aboveground or underground storage tank including elevator sumps and condensation tanks (K -1 10) d) Findings (1) The City Council finds that the FOR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to fire services (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development protect which avoid or substantially lessen the significant environmental effect as identified in the FEIR Public Services — Police Protection a) Facts /Effects Sepulveda /Rosecrans Site Rezonln (1) The additional commercial uses on the Sepulveda /Rosecrans Rezoning Site that would be permitted under the proposed C -4 zone could potentially generate an increase in the number of service calls Responses to thefts, vehicle burglaries, damage to vehicles, traffic- related incidents, and crimes against persons are anticipated to result from an increase in traffic on adjacent streets and an increase in transient occupancy (2) ESPD has not identified any need for new or altered facilities that would be required to serve development permitted under the proposed Sepulveda /Rosecrans Site Rezoning Therefore, impacts to police services associated with development of the proposed Sepulveda /Rosecrans Rezoning Site would be less than significant In addition, development permitted under the proposed Sepulveda /Rosecrans Site Rezoning would be required to pay the required Police Service Mitigation Fee, which has been set by the City at a level which reflects the impacts on police services caused by new development Plaza El Segundo (3) Because the full development permitted under the proposed Sepulveda /Rosecrans Rezoning would not significantly impact police services, the proposed Plaza El Segundo would also result in less than significant impacts on police services The proposed Plaza El Segundo Development would incorporate a security plan into the protect design, to include visible budding addresses, limited entrances and exits, low profile landscaping, adequate lighting, and provisions for security personnel The security plan would work to reduce crime and thus reduce police service calls and need for new or physically altered police facilities Additionally, as stated above, payment of the Police Service Mitigation Fee, which has been set by the City at a level which reflects the impacts on police services caused by new development, would also be required b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezoning Although impacts of the proposed Sepulveda /Rosecrans Site Rezoning would be less than significant with respect to police facilities, the City of El Segundo imposes the following standard conditions of project approval to offset project impacts 51 (1) The applicant must pay the City of El Segundo a Police Service Mitigation Fee of $0 11 per gross square foot of budding area prior to the occupancy of each budding (K 2 -1) (2) A strategic security plan, which plans and specifications, must be subm Police Department (ESPD) for review commencement of construction of any Sepulveda /Rosecrans Site Rezoning a Development The strategic security plan limited to, the following items must include definitive tted to the El Segundo and approval prior to iortion of the proposed id Plaza El Segundo must include, but not be • Depending on the size of the structure and its location in relation to the streets, the size of the displayed address may vary from a minimum of 4" to as much as 24" Budding entrances and exits must be limited in number and located in a manner to increase security and visibility of the budding, • All landscaping must be low profile especially around perimeter fencing, windows, doors and entryways taking special care not to limit visibility and provide climbing access • Adequate street, walkway, building and parking lot lighting shall be provided to enhance security Provisions for on -site security personnel (K 2 -2) Plaza El Segundo Although impacts of the proposed Plaza El Segundo Development would be less than significant with respect to police facilities, the City of El Segundo imposes the following standard conditions of protect approval to offset protect impacts (3) The applicant must pay the City of El Segundo a Police Service Mitigation Fee of $0 11 per gross square foot of building area prior to the occupancy of each building (K 2 -3) (4) A strategic security plan, which must include definitive plans and specifications, must be submitted to the El Segundo Police Department (ESPD) for review and approval prior to commencement of construction of any portion of the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development The strategic security plan must include, but not be limited to, the following items Depending on the size of the structure and its location in relation to the streets, the size of the displayed address may vary from a minimum of 4" to as much as 24" 52 Budding entrances and exits must be limited to keep control and visibility of the building All landscaping must be low profile especially around perimeter fencing, windows, doors and entryways taking special care not to limit visibility and provide climbing access Adequate street, walkway, building and parking lot lighting must be provided to enhance security Provisions for on -site security personnel (K 2 -4) d) Findings (1) The City Council finds that the FOR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to police protection (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR. 12 Transportation and Traffic a) Facts /Effects Sepulveda/Rosecrans Site Rezoning (1) The proposed Sepulveda /Rosecrans Site Rezoning would significantly impact 13 intersections during the a m peak hour, p m peak hour or Saturday mid -day peak hour (or combinations of the above) (2) The Sepulveda /Rosecrans Site Rezoning is estimated to contribute approximately 240 trips in the southbound direction on the San Diego Freeway between the 1 -105 interchange and El Segundo Boulevard During the afternoon peak hour, this number of trips would cause the D/C ratio to increase by 0 02, with a resulting LOS of F(0), which would constitute a significant impact at this location The remaining freeway segments would not be significantly impacted by the proposed Sepulveda /Rosecrans Site Rezoning Plaza El Segundo (3) The proposed Plaza El Segundo Development would significantly impact a total of seven intersections during the a m 53 peak hour, p m peak hour or Saturday mid -day peak hour (or combinations of the above) (4) The proposed Plaza El Segundo Development is estimated to contribute approximately 162 trips in the southbound direction on the San Diego Freeway between the 1 -105 interchange and El Segundo Boulevard During the afternoon peak hour, this number of trips would cause the D/C ratio to increase by 0 01, with a resulting LOS of F(0), which would be a less than significant impact at this location The remaining freeway segments would not be significantly impacted by the proposed Plaza El Segundo Development b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezonm The following mitigation measures are required to reduce traffic impacts from the full implementation of the proposed C-4 zone under the Sepulveda /Rosecrans Site Rezoning Physical Roadway Improvements (1) El Segundo Boulevard and Sepulveda Boulevard Convert the existing eastbound right -turn only lane to a shared through /right -turn lane There exists three receiving lanes on the east leg of the intersection In addition, modify the raised center median to convert the westbound shared through left -turn lane to a dedicated second left turn lane and additional through lane (L- 1) (2) El Segundo Boulevard and Aviation Boulevard Not required for Plaza El Segundo Reduced Traffic Generation Alternative (3) Park Place and Nash Street Provide a new traffic signal at this location Widen and restripe the eastbound and westbound directions to provide one left -turn lane, one through lane, and one right -turn only lane (L -3) (4) Park Place and Douglas Street Provide a new traffic signal at this location (L-4) (5) Rosecrans Avenue and Sepulveda Boulevard On the westbound approach of Rosecrans Avenue dedicate additional right -of -way on the north side of Rosecrans Avenue to provide a free flow right -turn lane and third left -turn lane Sepulveda Boulevard south of Rosecrans Avenue may need to be widened to accommodate the third left -turn lane, depending on the specific design of this lane This widening could take place within the 54 existing Sepulveda Boulevard right -of -way Widen the east side of Sepulveda Boulevard along the project frontage to provide the acceptance lane for the free westbound right -turn lane This additional lane on Sepulveda should be improved to the new Park Place connection where a right turn lane will be provided This intersection's jurisdiction is shared with Manhattan Beach and Caltrans Coordination and concurrence of these agencies for implementation of these improvements would be required (L -5) (6) Rosecrans Avenue and Continental Way Not required for Plaza El Segundo Reduced Traffic Generation Alternative (7) Rosecrans Avenue and Douglas Street On the westbound approach, widen the north side of Rosecrans Avenue to provide a dedicated westbound right -turn lane This intersection's jurisdiction is shared with Manhattan Beach Coordination and concurrence of this agency for implementation of this improvement would be required This improvement is included as part of the current Rosecrans /Aviation Widening (discussed under "Future Highway System Improvements ") but will be guaranteed by the project (L -7) Site Trip Reductions (8) Project applicants must promote rideshare programs (bikes, rideshare matching and transit options) as required by the City of El Segundo Transportation Demand Management Program (TDM) In addition to the traditional TDM program, project applicants must promote access to the Commute View System which is being implemented by the City to provide information on congested routes to provide additional trip reduction measures The Commute View System is an advanced traveler information system which provides real time travel time information, incident information, and general traffic conditions through a variety of devices such as the cable, internet, cell phone and wireless PDA This will provide commuters the ability to make informed decisions regarding the route, time of travel and mode of transportation Project applicants must include or share in a transit connection system to promote use of the existing Metro Green Line service, remote employee lot during seasonal peaks and local circulator service Based upon estimate usage patterns and trial studies, an approximately three percent reduction in trips to and from the site during peak periods is anticipated with these enhancements (L -8) Intelligent Transportation Systems Connections/Upgrades (9) The South Bay area will be enhanced with an area -wide signal system upgrade prior to project completion in 2012 This system is already funded and will be implemented with or without the proposed project The improvement will provide for intelligent transportation systems (ITS) which provide real time adjustment to signal timing based upon current conditions thereby increasing capacity along major corridors ITS system enhancements are 55 currently being tested and evaluated which provide further enhanced capacity These enhancements provide advanced communication upgrades to the users of the roadway systems Items include Advanced Traveler Information System (ATIS) and Advanced Traffic Management Systems (ATMS) ATIS provides commuters with information to make route and time of day decisions The enhanced ATIS system that would be included within the South Bay ITS system will enable private sector partners to disseminate freeway and arterial traffic information to the public via paid subscription services ATMS manages the traffic system on surrounding streets Applicants for development projects within the proposed Sepulveda /Rosecrans Rezoning Site must provide for connectivity to the systems described above Project applicants must provide access to information disseminated by the ATIS system to patrons and employees by including at least one television monitor or equivalent equipment that is compatible with and connected to the ATIS system and that displays current commuter information from the ATIS system during all hours that the development is open for business. The monitor or equivalent equipment shall be placed in a centralized location within the development, shall be specifically identified on directory maps of the facility, shall be specifically and clearly identified as the location for obtaining current travel information and shall be identified elsewhere throughout the development with signage that directs patrons to the location Project applicants must also facilitate dissemination of information provided by the ATIS system to project employees by working with project tenants to offer fully or partially subsidized monthly subscriptions to employees (currently estimated at full cost of $5.00 per month per user) Project applicants (or successors in interest) must provide any new project tenant with information regarding subscription programs available to employees and costs thereof and shall encourage tenants to provide subsidized monthly subscriptions to their employees However, because there is no guarantee that subscription subsidies will be provided by future tenants of developments within the Sepulveda /Rosecrans Rezoning Site, no additional credit for these subscriptions can be taken except for the enhancements provided by the South Bay ITS system as presently designed (7 %, see discussion under "Future Highway System Improvements" above) (L -9) Local Street - Freeway Inter -Ties (10) This mitigation measure is applicable to buldout of the Sepulveda /Rosecrans Rezoning Site beyond the Plaza El Segundo Project Development Applicants for development projects within the Sepulveda /Rosecrans Rezoning Site (excluding the Plaza El Segundo Project) shall fund or construct upgrades and enhancements to the El Segundo and /or South Bay ITS systems, and /or the Caltrans ITS system that singly or in combination cause an increase of 3% in the capacity of the street 56 system served by these ITS systems The 3% increase shall be measured from the calculated capacity of the system based upon existing lane configurations, plus a 10% increase on street in the City of El Segundo, and 7% increase on streets outside the City of El Segundo to reflect the El Segundo and South Bay ITS systems, respectively The upgrades /enhancements shall be selected from the following menu and approved by the relevant jurisdictional agency expansion of the fiber optic communication system, expansion of wireless communication components, provision of software components, supplemental advance system detectors, changeable message signs, closed circuit television cameras, or any other reasonably feasible upgrade or enhancement approved by the relevant jurisdictional agency The applicant shall participate in any applicable fair share fee mitigation program that will otherwise fund the foregoing upgrades /enhancements and shall receive credit for all fair share payments (L -10) Project parking/egress information system for key access/egress corridors (11) Project applicants must provide parking /egress information systems in the manner of Changeable Message Signs (CMS) along key access /egress corridors of Sepulveda Boulevard, Rosecrans Avenue, and Park Place Currently, Los Angeles County is installing CMS on major streets in the South Bay area and locations for additional CMS would be identified in coordination with Los Angeles County A centrally located kiosk system must be included in project design that can disseminate roadway conditions along the major routes This information would be utilized by the employee or patron to determine the least congested access /egress route to /from the project, thereby minimizing delay on the roadway systems Based upon recent studies in the South Bay area under trial conditions, implementation of this measure is anticipated to improve capacity at the site adjacent intersections by three percent, along major corridors of Rosecrans Avenue, Sepulveda Boulevard, and El Segundo Boulevard by two percent, and the balance of the study intersections by one percent (L -11) Plaza El Segundo From the list of mitigation measures required to address the complete implementation of the C-4 zone on the proposed Sepulveda /Rosecrans Rezoning Site, the following specific mitigation measures must be required to address the traffic impacts of the proposed Plaza El Segundo Development Physical Roadway improvements (12) El Segundo Boulevard and Sepulveda Boulevard — Convert the existing eastbound nght -turn only lane to a shared through /right -turn lane There exists three receiving lanes on the east leg of the intersection In addition, modify the raised center 57 median to convert the westbound shared through left -turn lane to a dedicated second left turn lane and additional through lane (L- 13) (13) El Segundo Boulevard and Aviation Boulevard — Not required for Plaza El Segundo Reduced Traffic Generation Alternative (14) Rosecrans Avenue and Sepulveda Boulevard — On the westbound approach of Rosecrans Avenue dedicate additional right -of -way on the north side of Rosecrans Avenue to provide a free flow right -turn lane Widen the east side of Sepulveda Boulevard along the project frontage to provide the acceptance lane for the free westbound right -turn lane This additional lane on Sepulveda should be improved to the new Park Place connection where a right turn lane will be provided This intersection's jurisdiction is shared with Manhattan Beach and Caltrans Coordination and concurrence of these agencies for implementation of these improvements would be required (L -15) (15) Rosecrans Avenue and Continental Way-- Not required for Plaza El Segundo Reduced Traffic Generation, Site Trip Reductions (16) The project applicant must promote rideshare programs (bikes, rideshare matching, and transit options) as required by the City of El Segundo Transportation Demand Management Program (TDM) In addition to the traditional TDM program and to provide additional trip reduction measures, the project applicant must promote access to the Commuter View System which is being implemented by the City to provide information on congested routes The project applicant must provide a transit connection system that may be shared with other nearby retail projects to promote rise of the existing Metro Green Line service, remote employee lot during seasonal peaks and local circulator service Based upon typical usage patterns, an approximately three percent reduction in trips to and from the site during peak periods is anticipated with these enhancements (L -17) Intelligent Transportation System Connections/Upgrades (17) The South Bay area will be enhanced with an area -wide signal system upgrade prior to project completion in 2012 This system is already funded and will be implemented with or without the proposed project The improvement will provide for intelligent transportation systems (ITS) which provide real time adjustment to signal timing based upon current conditions thereby increasing capacity along major corridors ITS system enhancements are currently being tested and evaluated which provide further enhanced capacity These enhancements provide advanced communication upgrades to the users of the roadway systems Items include Advanced Traveler Information System (ATIS) and 9E Advanced Traffic Management Systems (ATMS) ATIS provides commuters with information to make route and time of day decisions The enhanced ATIS system that would be included within the South Bay ITS system will enable private sector partners to disseminate freeway and arterial traffic information to the public via paid subscription services ATMS manages the traffic system on surrounding streets Applicants for development projects within the proposed Sepulveda/Rosecrans Rezoning Site must provide for connectivity to the systems described above Project applicants must provide access to information disseminated by the ATIS system to patrons and employees by including at least one television monitor or equivalent equipment that is compatible with and connected to the ATIS system and that displays current commuter information from the ATIS system during all hours that the development is open for business The monitor or equivalent equipment shall be placed in a centralized location within the development, shall be specifically identified on directory maps of the facility, shall be specifically and clearly identified as the location for obtaining current travel information and shall be identified elsewhere throughout the development with signage that directs patrons to the location Project applicants must also facilitate dissemination of information provided by the ATIS system to project employees by working with project tenants to offer fully or partially subsidized monthly subscriptions to employees (currently estimated at full cost of $5 00 per month per user) Project applicants (or successors in interest) must provide any new project tenant with information regarding subscription programs available to employees and costs thereof and shall encourage tenants to provide subsidized monthly subscriptions to their employees However, because there is no guarantee that subscription subsidies will be provided by future tenants of developments within the Sepulveda /Rosecrans Rezoning Site, no additional credit for these subscriptions can be taken except for the enhancements provided by the South Bay ITS system as presently designed (7 %, see discussion under "Future Highway System Improvements" above) (L -18) d) Findings (1) Implementation of the mitigation measures would reduce traffic- related impacts from Sepulveda /Rosecrans Site Rezoning to less than significant levels with the exception of El Segundo Boulevard and Sepulveda Boulevard during the p m peak hour and Rosecrans Avenue and Aviation Boulevard for the Saturday mid -day peak hour (2) In addition, improvements at three intersections require coordination and concurrence of Caltrans and /or other agencies for the Sepulveda /Rosecrans Site Rezoning In the event that the concurrence of other jurisdictions cannot be obtained, impacts at these intersections would be significant and unavoidable (3) Implementation of the mitigation measures would reduce traffic- related impacts from the Plaza El Segundo Development to less than significant levels with the exception of the intersection of El Segundo Boulevard and Sepulveda Boulevard (4) In addition, improvements at two intersections require coordination and concurrence of Caltrans and /or other agencies for the Plaza El Segundo Development In the event that the concurrence of other jurisdictions cannot be obtained, impacts at these intersections would be significant and unavoidable (5) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to transportation and traffic (6) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR (7) If mitigation is not adopted by the other junsdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOC) 13 Utilities - Sewer a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) The estimated sewage generation associated with the proposed Sepulveda /Rosecrans Site Rezoning would be 242,750 gpd Sewage generation would be associated with the proposed Plaza El Segundo uses and additional development up to the levels permitted under the proposed C -4 zone Continuation of the existing lumber yard in its current location would not result in any net change in sewage generation from this use The production process associated with the industrial gas production facility permitted under the proposed C-4 zone does not generate sewage Expansion of the existing RV storage facility onto the proposed Sepulveda /Rosecrans Rezoning Site would not involve generation of sewage As such, these facilities would not require additional infrastructure or generate demand for sewage conveyance and treatment (2) As there is no sewer infrastructure directly serving the Sepulveda /Rosecrans Rezoning Site, a significant impact to sewage service would be created unless it is mitigated by the M addition of sewer infrastructure directly serving the Sepulveda /Rosecrans Rezoning Site (3) Additionally, a large portion of the site is not located within County Sanitation Districts of Los Angeles County jurisdiction, and would therefore need to be annexed into County Sanitation District 5 prior to project approval Upon annexation, local sewer infrastructure would carry sewage to County Sanitation Districts of Los Angeles County infrastructure and ultimately to the JWPCP According to the Los Angeles County Sanitation Districts, sewer service will be provided up to the levels legally permitted Because JWPCP has sufficient treatment capacity to accommodate the sewage flows associated with the existing development, there would be no impacts associated with sewage treatment Once the necessary infrastructure is established in conjunction with development that occurs within the proposed Sepulveda /Rosecrans Rezoning Site in accordance with the proposed C -4 zone, there would be a less than significant impact on sewer capacity and treatment services Plaza El Segundo (4) The analysis regarding sewer service and infrastructure within the Plaza El Segundo Development site is in accordance with the mitigation measure for the Sepulveda /Rosecrans Rezoning that requires project specific evaluation of potential sewer impacts and no further analysis beyond that set forth in the following mitigation measures is required The analysis demonstrates that this component of the proposed Sepulveda /Rosecrans Site Rezoning would not result in new effects related to sewer service and infrastructure that were not examined in the Program EIR for the proposed Sepulveda /Rosecrans Site Rezoning (5) The proposed Plaza El Segundo would generate an estimated 104,625 gpd of sewage As there is no sewer infrastructure directly serving the Plaza El Segundo site, the proposed Plaza El Segundo would include the construction of sewer infrastructure providing sufficient capacity to handle sewage flows that would be generated by the proposed Plaza El Segundo According to the Los Angeles County Sanitation Districts, sewer service will be provided up to the levels legally permitted Because JWPCP has sufficient treatment capacity to accommodate the sewage flows associated with the existing development, there would be no impacts associated with sewage capacity or treatment Once the necessary infrastructure is constructed, there would be a less than significant impact on sewer capacity and treatment services b) Subsequent Environmental Documentation Sepulveda /Rosecrans Site Rezoning 61 Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda /Rosecrans Rezoning Site This information must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must include the following (1) An analysis of sewer service to the proposed development must be prepared which examines the capacity of existing sewer lines to serve the development, the projected peak sewage generation and must identify new sewer infrastructure required to serve the development (M -1 1) C) Mitigation Sepulveda /Rosecrans Site Rezornn The following mitigation measures are required for the proposed Sepulveda /Rosecrans Site Rezoning to ensure compliance with all code and ordinance requirements (1) An analysis of sewer service to the proposed development must be prepared which examines the capacity of existing sewer lines to serve the development, the projected peak sewage generation, and must identify new sewer infrastructure required to serve the development (M 1 -1) (2) The Sepulveda /Rosecrans Rezoning Site must be annexed to Los Angeles County Sanitation District No 5 (M 1 -2). (3) Project applicants must be required to obtain a sewer connection permit from the Los Angeles County Sanitation Districts (District 5) to obtain sanitary sewer service (M 1 -3) (4) Additional local sewer infrastructure must be provided by the applicant as necessary to connect the Sepulveda /Rosecrans Rezoning Site with existing sewer infrastructure This provision must be coordinated with the project applicant and may be the partial responsibility of the applicant, as determined by the City (M -1 4). (5) The applicant must be required to replace or upgrade the sewer infrastructure on or adjacent to the Sepulveda /Rosecrans Rezoning Site, as needed (M -1 5) (6) Project applicants must comply with the City's Sewer Ordinance No 1093, of the City of El Segundo Municipal Code, Title 12, Chapter I General Provisions, Policies and Procedures (M -1.6). (7) Prior to a building permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo 62 Planning and Budding Safety Development Services Department and the Public Works Department for review and approval (M -1 7) (8) Closed circuit television (CCTV) inspection of existing on- site and adjacent off -site sewer mains must be conducted to determine the present condition of the infrastructure which the Sepulveda /Rosecrans Site Rezoning project will connect to (M- 1 8) (9) All future developments must be discharged to the existing twelve -inch sanitary sewer main in Rosecrans Avenue (M -1 9) (10) New businesses that that generate Fats, Oils, or Greases (e g , restaurants and grocery stores) must be required to install grease interceptors with a minimum 30 minute retention period to ensure these contaminants do not block the sewerage system (M- 1 10) Plaza El Segundo The following mitigation measures are required for the proposed Plaza El Segundo Development to ensure compliance with all code and ordinance requirements (11) The Sepulveda /Rosecrans Rezoning Site must be annexed to Los Angeles County Sanitation District No 5 (M -1 11) (12) The project applicant must be required to obtain a sewer connection permit from the Los Angeles County Sanitation Districts (District 5) to obtain sanitary sewer service (M -1 12) (13) Additional local sewer infrastructure must be provided by the applicant as necessary to connect the Plaza El Segundo Site with existing sewer infrastructure This provision must be coordinated with the project applicant and may be the partial responsibility of the applicant, as determined by the City (M -1.13) (14) The existing 15 -inch sanitary sewer line must be removed and replaced with an 18 -inch line Plans must identify point of connection for the proposed ten -inch sanitary sewer to the existing sanitary sewer main on Allied Way (M -1 14) (15) Project applicants must comply with the City's Sewer Ordinance No 1093, of the City of El Segundo Municipal Code, Title 12, Chapter I General Provisions, Policies and Procedures (M -1 15) (16) Prior to a budding permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department and the Public Works Department for review and approval (M -1 16) (17) Closed circuit television (CCTV) inspection of existing on- site and adjacent off -site sewer mains must be conducted to 63 14 determine the present condition of the infrastructure which the Sepulveda /Rosecrans Site Rezoning protect will connect to (M- 1 17) (18) New businesses that that generate Fats, Oils, or Greases (e g , restaurants and grocery stores) must be required to install grease interceptors with a minimum 30 minute retention period to ensure these contaminants do not block the sewerage system (M- 1 18) d) Findings (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to sewer facilities (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR (3) If mitigation is not adopted by the other jurisdiction(s), the impact would remain significant and unavoidable and the City Council this includes the impact within the ambit of the Statement of Overriding Considerations (SOO) Utilities - Water, a) Facts /effects Sepulveda /Rosecrans Site Rezoning (1) The estimated water consumption associated with the proposed Sepulveda /Rosecrans Site Rezoning would be 291,300 gpd Continuation of the existing lumber yard in its current location would not result in any net change in water consumption from this use The production process associated with the industrial gas production facility permitted under the proposed C-4 zone does not use water Expansion of the existing RV storage facility onto the proposed Sepulveda /Rosecrans Rezoning Site would not involve additional water consumption As such, these facilities would not require additional infrastructure or generate demand for water supply or infrastructure Given the anticipated land uses at the Sepulveda /Rosecrans Rezoning and Site, and the water consumption rate of 291,300 gpd, impacts to water supply would be less than significant (2) As minimal water distribution infrastructure exists on the Sepulveda /Rosecrans Rezoning Site, provision of water supply infrastructure would be included in development permitted under the proposed C-4 zone Additional water infrastructure would be 64 required to serve future development within the Sepulveda /Rosecrans Rezoning Site Additionally, because new infrastructure is required to adequately serve the Sepulveda /Rosecrans Rezoning Site, temporary disruptions may occur, lasting up to four hours at a time, during construction of new infrastructure and subsequent connection As the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development requires the expansion of existing water infrastructure, a significant impact to water service would occur (3) A water needs assessment determined that the City of El Segundo has sufficient water supplies to supply to proposed project Plaza El Seoundo (4) The analysis provided below regarding water service and infrastructure within the Plaza El Segundo Development site is in accordance with the measures for the Sepulveda /Rosecrans Site Rezoning that require protect specific evaluation of potential water service impacts and no further analysis of this issue is required beyond that set forth in the following paragraphs, would be required for the Plaza El Segundo Development The analysis demonstrates that this component of the proposed Sepulveda /Rosecrans Site Rezoning would not result in new effects related to water service and infrastructure that were not examined in the Program EIR for the proposed Sepulveda /Rosecrans Site Rezoning (5) The proposed Plaza El Segundo would consume an estimated 125,550 gpd of water The Department of Public Works has sufficient water to supply the proposed Plaza El Segundo Development's estimated demands at the site Impacts to water supply would therefore be less than signfcant (6) As minimal water distribution infrastructure exists on the Plaza El Segundo site, provision of required infrastructure would be included as part of the proposed Plaza El Segundo Development Additionally, because new infrastructure is required to adequately serve the Plaza El Segundo site, temporary disruptions may occur, lasting up to four hours at a time, during construction of new infrastructure and subsequent connection As the proposed Plaza El Segundo Development requires the expansion of existing water infrastructure, a significant impact to water service would occur (7) Development of the proposed Plaza El Segundo would implement the proposed C-4 zoning on a portion of the proposed Sepulveda /Rosecrans Rezoning Site and would be within the parameters used to develop the water supply assessment for the proposed Sepulveda /Rosecrans Site Rezoning I& al C) Subsequent Environmental Documentation Sepulveda /Rosecrans Site Rezoning Subsequent environmental documentation shall be prepared for development projects proposed to be constructed on the Sepulveda /Rosecrans Rezoning Site This information shall be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation shall include the following (1) An analysis of water service to the proposed development must be prepared which examines the capacity of existing water lines to serve the development and the projected water demand and must identify new water infrastructure required to serve the development (M 2 -1) Mitigation Sepulveda /Rosecrans Site Rezoning The following mitigation measures must be implemented to address significant impacts related to water distribution infrastructure (1) An analysis of water service to the proposed development must be prepared which examines the capacity of existing water lines to serve the development and the projected water demand and must identify new water infrastructure required to serve the development (M 2 -1) (2) New streets must be connected through the Sepulveda /Rosecrans Rezoning Site to adjacent existing streets, with no gaps or disconnects, so as to allow connections to existing infrastructure contained in the existing streets (M 2 -2) (3) Water distribution mains must be installed in the through streets in order to complete the existing water grid and provide water distribution to the interior of the Sepulveda /Rosecrans Rezoning Site Connecting pipes should be a minimum of ten inches (M 2 -3) (4) New water lines must be connected to the existing water line located in Allied Way to provide a continuous public water line beginning from Sepulveda Boulevard to an existing line in Allied Way (M 2 -4) (5) Development on the proposed Sepulveda /Rosecrans Rezoning Site must include dual water connections to allow for landscaping to be irrigated by reclaimed water (M 2 -5) .. (6) Reclaimed water must be used as the water source to irrigate landscaped areas on the Sepulveda /Rosecrans Rezoning Site (M 2 -6) (7) Efficient irrigation systems must be installed which minimize runoff and evaporation and maximize the water which will reach plant roots (e g drip irrigation, automatic sprinklers equipped with moisture sensors) (M 2 -7) (8) Automatic sprinkler systems must be set to irrigate landscaping during early morning hours or during the evening to reduce water losses from evaporation Sprinklers must also be reset to water less often in cooler months and during the rainfall season so that water is not wasted by excessive landscape irrigation (M 2 -8) (9) Selection of drought - tolerant, low water consuming plant varieties must be used to reduce irrigation water consumption (M 2-9) (10) Protect applicants must comply with the City's Conservation Program, Ordinance No 1194, of the City of El Segundo Municipal Code, Title 10 -Parks and Recreation, Chapter 2 Water Conservation in Landscaping and Resolution No 3806 (M 2 -10) • Prior to a budding permit being issued the protect applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department for review and approval relative to compliance with the City's Water Conservation Ordinance and Guidelines for Water Conservation in Landscaping Plaza El Seoundo The following mitigation measures shall be implemented to address significant impacts related to water distribution infrastructure (11) Water distribution mains must be installed in the eastward extension of Park Place and the extension of Allied Way to Park Place in order to complete the existing water grid and provide water distribution to the interior of the Plaza El Segundo site Connecting pipes must be a minimum of ten inches (M 2 -11). (12) Development on the proposed Plaza El Segundo Site must include dual water connections to allow for landscaping to be irrigated by reclaimed water (M 2 -12) (13) Reclaimed water must be used as the water source to irrigate landscaped areas on the Plaza El Segundo Development (M 2 -13) 67 (14) Efficient irrigation systems must be installed which minimize runoff and evaporation and maximize the water which will reach plant roots (e g, drip irrigation, automatic sprinklers equipped with moisture sensors) (M 2 -14) (15) Automatic sprinkler systems must be set to irrigate landscaping during early morning hours or during the evening to reduce water losses from evaporation Sprinklers must also be reset to water less often in cooler months and during the rainfall season so that water is not wasted by excessive landscape irrigation (M 2 -15) (16) Selection of drought - tolerant, low water consuming plant varieties must be used to reduce irrigation water consumption (M 2 -16) (17) The project applicant must comply with the City's Conservation Program, Ordinance No 1194, of the City of El Segundo Municipal Code, Title 10 -Parks and Recreation, Chapter 2 Water Conservation in Landscaping and Resolution No 3806 • Prior to a building permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department for review and approval relative to compliance with the City's Water Conservation Ordinance and Guidelines for Water Conservation in Landscaping (M 2 -17) d) Findings (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to water service (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR 15 Utilities — Solid Waste a) Facts /effects Sepulveda /Rosecrans Site Rezoning (1) The existing structures on the Sepulveda /Rosecrans Rezoning Site have been or are in the process of being demolished Approximately 75 percent of the solid waste generated during construction as a result of the Rezoning has been recycled and salvaged Through the remainder of construction such solid waste would continue to be recycled and M salvaged at this rate Materials not recycled would be disposed of at local landfills The amount of solid waste generated by the construction of the Sepulveda /Rosecrans Site Rezoning project would not be significant as it would not create a need for new facilities, systems or supplies, or substantial alterations to local or regional solid waste disposal facilities (2) The estimated solid waste generation associated with the proposed Sepulveda /Rosecrans Site Rezoning would be approximately 4,250 pounds per day Continuation of the existing lumber yard in its current location would not result in any net change in solid waste generation The production process associated with the industrial gas production facility permitted under the proposed C-4 zone does not generate solid waste Expansion of the existing RV storage facility onto the proposed Sepulveda /Rosecrans Rezoning Site would not involve additional solid waste generation As such, these facilities would not generate demand for solid waste disposal facilities (3) Although existing landfills in Los Angeles County are near capacity, potential landfill expansion could accommodate the protected growth for the region The Sepulveda /Rosecrans Rezoning Site would be required to comply with the City's SSRP, which the City has implemented as a means of achieving the goals and requirements of AB 939 Therefore, long term operational impacts to landfills and solid waste service would be less than significant Plaza El Segundo (4) With the recycling of most of the solid waste generated by the construction phase of the Plaza El Segundo, short-term construction impacts to landfills and solid waste service would be less than significant (5) The development at Plaza El Segundo would generate approximately 2,125 pounds of solid waste per day Solid waste generated on -site would be disposed in accordance with all applicable federal, state and local regulations related to solid waste The Plaza El Segundo site would be required to comply with the City's SSRP, which the City has implemented as a means of achieving the goals and requirements of AB 939 Therefore, long term operational impacts to landfills and solid waste service would be less than significant b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezoning .• d) Development of the proposed Sepulveda /Rosecrans Site Rezoning project must comply with all applicable City, County, and State requirements regulating solid waste disposal Cumulative impact is the responsibility of local, regional, and state agencies and therefore no protect level mitigation measures are available The City of El Segundo imposes the following standard conditions of project approval to offset project impacts (1) Where economically feasible, the proposed Sepulveda /Rosecrans Site Rezoning protect must incorporate the use of recycled materials in building materials, furnishing operations and building maintenance (M 3 -1) (2) The proposed Sepulveda /Rosecrans Site Rezoning protect must recycle all construction debris in a practical, available, and accessible manner, to the maximum extent feasible, during the demolition and construction phases (M 3 -2) (3) The design of the proposed Sepulveda /Rosecrans Site Rezoning protect must allocate space for a recycling collection area for use by both on -site employees and visitors, the design of which will adhere to siting requirements in the City's recycling ordinance The design of the collection area will facilitate source separation and collection of additional materials that may be designated as recyclable by the City in the future (M 3 -3) Plaza El Segundo (4) Where economically feasible, the proposed Plaza El Segundo Development must incorporate the use of recycled materials in building materials, furnishing operations and building maintenance (M 3 -4) (5) The proposed Plaza El Segundo Development must recycle all construction debris in a practical, available, and accessible manner, to the maximum extent feasible, during the demolition and construction phases (M 3 -5) (6) The design of the proposed Plaza El Segundo Development must allocate space for a recycling collection area for use by both on -site employees and visitors, the design of which will adhere to siting requirements in the City's recycling ordinance The design of the collection area will facilitate source separation and collection of additional materials that may be designated as recyclable by the City in the future (M 3 -6) Findinqs (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to solid waste 70 (2) Changes or incorporated into the Plaza El Segundo substantially lessen identified in the FEIR 16 Utilities — Natural Gas a) Facts /effects alterations have been required in, or Rosecrans /Sepulveda Site Rezoning and Development protect which avoid or the significant environmental effect as Sepulveda /Rosecrans Site Rezoning (1) The estimated natural gas consumption associated with the proposed Sepulveda /Rosecrans Site Rezoning would be approximately 82,166 cf per day Continuation of the existing lumber yard in its current location would not result in any net change in natural gas consumption The production process associated with the industrial gas production facility would utilize less natural gas than the existing Air Products facility located within the proposed Sepulveda /Rosecrans Rezoning Site, Expansion of the existing RV storage facility onto the proposed Sepulveda /Rosecrans Rezoning Site would not involve additional natural gas consumption As such, these facilities would not generate additional demand on natural gas supplies and infrastructure According to the Southern California Gas Company, the demand for natural gas of the proposed Sepulveda /Rosecrans Site Rezoning can be accommodated by the existing natural gas supply available and infrastructure in the project area Therefore, natural gas impacts from the development of the proposed Sepulveda /Rosecrans Site Rezoning would be less than significant Plaza El Segundo (2) The estimated natural gas consumption by the Plaza El Segundo is approximately 41,083 cf per day According to the Southern California Gas Company, the demand for natural gas at the Plaza El Segundo can be accommodated by the existing natural gas supply available and infrastructure in the project area Therefore, natural gas impacts from the development of the proposed Plaza El Segundo would be less than significant b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezoning (1) As no significant natural gas service impacts have been identified, no mitigation measures are required Plaza El Segundo 71 (2) As no significant natural gas service impacts have been identified, no mitigation measures are required d) Findings (1) The City Council finds that the FOR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to natural gas service /supply 17 Utilities — Electricity a) Factsieffects Sepulveda /Rosecrans Site Rezonin (1) The estimated electricity consumption associated with the proposed Sepulveda /Rosecrans Site Rezoning would be approximately 39,321 kilowatt hours (kwh) per day Continuation of the existing lumber yard in its current location would not result in any net change in electricity consumption The production process associated with the industrial gas production facility would utilize less electricity than the existing Air Products facility located within the proposed Sepulveda /Rosecrans Rezoning Site Expansion of the existing RV storage facility onto the proposed Sepulveda /Rosecrans Rezoning Site would not involve additional electricity consumption As such, these facilities would not generate additional demand on electricity supplies and infrastructure SCE has indicated that they can accommodate the electricity demands of the proposed Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo protect Therefore, impacts related to electricity would be less than significant Plaza El Segundo (2) The estimated electricity consumption by the Plaza El Segundo is approximately 23,544 kwh per day SCE has indicated that they can accommodate the electricity demands of the proposed Plaza El Segundo Therefore, impacts related to electricity would be less than significant b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezoning Although the proposed Sepulveda /Rosecrans Site Rezoning protect would not result in any significant electricity impacts, the City of El Segundo imposes the following standard conditions of protect approval to offset protect impacts 72 (1) The applicant must consult with SCE during the design process of the proposed Sepulveda /Rosecrans Site Rezoning project regarding potential energy conservation measures for the protect Examples of such energy conservation measures include • Design windows (i e , tinting, double pane glass, etc) to reduce thermal gain and loss and thus cooling loads during warm weather, and heating loads during cool weather • Install thermal insulation in walls and ceilings that exceed requirements established by the State of California Energy Conservation Standards • Install high - efficiency lamps for all internal streetlights and outdoor security lighting • Time control interior and exterior lighting These systems must be programmed to account for variations in seasonal daylight times • Finish exterior walls with light- colored materials and high - emissivity characteristics to reduce cooling loads Finish interior walls with light- colored materials to reflect more light and thus increase lighting efficiency (M 5 -1) (2) All on -site electrical lines must be placed underground, except for high voltage transmission lines located along Rosecrans Avenue (M 5 -2) (3) Electrical transformers must be screened from view from the public right -of -way (M 5 -3) Plaza El Segundo Although the proposed Plaza El Segundo Development would not result in any significant electricity impacts, the City of El Segundo imposes the following standard conditions of project approval to offset project impacts (4) The applicant must consult with SCE during the design process of the proposed Plaza El Segundo Development regarding potential energy conservation measures for the project Examples of such energy conservation measures include • Design windows (e g , tinting, double pane glass, etc) to reduce thermal gain and loss and thus cooling loads during warm weather, and heating loads during cool weather Install thermal insulation in walls and ceilings that exceed requirements established by the State of California Energy Conservation Standards 73 18 Install high - efficiency lamps for all internal streetlights and outdoor security lighting Time control interior and exterior lighting These systems must be programmed to account for variations in seasonal daylight times Finish exterior walls with light - colored materials and high emissivity characteristics to reduce cooling loads Finish interior walls with light- colored materials to reflect more light and thus increase lighting efficiency (M 5 -4) (5) All on -site electrical lines must be placed underground, except for high voltage transmission lines along Rosecrans Avenue (M 5 -5) (6) Electrical transformers must be screened from view from the public right -of -way (M 5 -6) d) Findings (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to electricity (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development project which avoid or substantially lessen the significant environmental effect as identified in the FEIR Cultural Resources a) Facts /effects Sepulveda /Rosecrans Site Rezoning (1) The Proposed Circulation Element Update Draft EIR requires analysis of potential impacts related to cultural resources for later projects that would implement the proposed Circulation Element Update The proposed connection of Park Place between Sepulveda Boulevard and Nash Street and connection of Park Place to Hughes Way via Allied Way through the Sepulveda /Rosecrans Rezoning Site would constitute a project that implements the Circulation Element Update policies, The analysis provided below meets the requirement for a records search to be conducted prior to development of Circulation Element facilities within the Sepulveda /Rosecrans Site Based upon the analysis, construction of this component of the proposed Circulation Element Update would not result in new effects related 74 to cultural resources that were not examined in the Program EIR for the proposed Circulation Element Update (2) As no known archaeological resources are known to exist on the Sepulveda /Rosecrans Rezoning Site, no impacts to archaeological resources are anticipated as a result of future developments It is not anticipated that any developments on the Sepulveda /Rosecrans Rezoning Site would encounter archaeological resources during construction activities (3) No paleontological resources are known to exist on the Sepulveda /Rosecrans Rezoning Site Therefore, no impacts to paleontological resources are anticipated as a result of the proposed Sepulveda /Rosecrans Site Rezoning protect (4) One historic resource has been identified on the Sepulveda /Rosecrans Rezoning Site This resource has been identified as the brass foundry foundation located on the H Kramer portion of the Sepulveda /Rosecrans Rezoning Site Future development on the H Kramer portion of the Sepulveda /Rosecrans Rezoning Site could significantly impact this resource Further evaluation is necessary to determine whether this resource is eligible for listing on the California or National Registers Plaza El Seoundo (5) The records search provided above is in accordance with the mitigation measures for the Sepulveda /Rosecrans Site Rezoning that requires site specific evaluation of potential cultural resources issues and no further analysis of this is beyond that set forth in the preceding section would be required for the proposed Plaza El Segundo Development The analysis demonstrates that construction of this component of the proposed Sepulveda /Rosecrans Site Rezoning would not result in new effects related to cultural resources that were not examined in the Program EIR for the proposed Sepulveda /Rosecrans Site Rezoning (6) As no known archaeological resources are known to exist on the Plaza El Segundo Site, no impacts to archaeological resources are anticipated Therefore, it is not anticipated that any archaeological resources would be encountered during construction activities associated with the Plaza El Segundo (7) No paleontological resources are known to exist on the Plaza El Segundo Site Therefore, no impacts to paleontological resources are anticipated as a result of the proposed Plaza El Segundo Development (8) No historic resources have been identified on the Plaza El Segundo Site All structures associated with the former industrial uses have been demolished and the Plaza El Segundo site is 75 currently undergoing sod characterization Therefore, the Plaza El Segundo Development would not impact any historic resources and no mitigation measures are required b) Subsequent Environmental Documentation_ Sepulveda /Rosecrans Site Rezoning Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda /Rosecrans Rezoning Site The subsequent environmental documentation must include the following (1) A records search and /or Phase I Archaeological Survey must be conducted by a qualified archaeologist prior to the start of construction activities (including grading) for any development on the Sepulveda /Rosecrans Rezoning Site If the survey identifies resources within the construction area, follow on studies shall be conducted in accordance with the recommendations of the records search prior to commencement of construction (N -1) (2) Further analysis of Cultural Resource 19- 186856 is required, that meets the requirements of CEQA Guidelines Section 15064 5(a)(2), to determine potential eligibility for the California or National Register of Historic Places prior to any construction activities occurring on the H Kramer portion of the Sepulveda /Rosecrans Rezoning Site If further analysis identifies that the resource is eligible, then the recommendations identified in that analysis must be followed (N -2) C) Mitigation Sepulveda /Rosecrans Site Rezonin The following mitigation measure must be required for any future development on the Sepulveda /Rosecrans Rezoning Site (1) A records search and /or Phase I Archaeological Survey must be conducted by a qualified archaeologist prior to the start of construction activities (including grading) for any development on the Sepulveda /Rosecrans Rezoning Site If the survey identifies resources within the construction area, follow on studies must be conducted in accordance with the recommendations of the records search prior to commencement of construction (N -1) (2) Further analysis of Cultural Resource 19- 186856, that meets the requirements of CEQA Guidelines Section 15064 5(a)(2), is required to determine potential eligibility for the California or National Historic Register of Historic Places prior to any construction activities occurring on the H Kramer portion of the Sepulveda /Rosecrans Rezoning Site If further analysis identifies that the resource is eligible, then the recommendations identified in that analysis must be followed and measures identified to reduce impacts to less than significant levels (N -2) 76 (3) In the event that archaeological or paleontological resources are encountered during the course of grading or construction, all development must temporarily cease in these areas until the resources are properly assessed and subsequent recommendations are determined by a qualified archaeologist/paleontologist (N -3) Plaza El Segundo (4) In the event that archaeological or paleontological resources are encountered during the course of grading or construction, all development must temporarily cease in these areas until the resources are properly assessed and subsequent recommendations are determined by a qualified archaeologist/paleontologist (N-4) d) Findings (1) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying significant environmental effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development with respect to cultural resources (2) Changes or alterations have been required in, or incorporated into the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development protect which avoid or substantially lessen the significant environmental effect as identified in the FEIR The City Council finds that in response to each adverse impact identified below, changes or alterations have been required or incorporated in the Protect, which lessen the significant adverse environmental impact However, these impacts cannot be totally avoided or reduced to a level of insignificance if the Protect is implemented Air Quality a) Facts /Effects Sepulveda /Rosecrans Site Rezoning Construction Emissions (1) Maximum daily emissions from a typical construction project associated with the Proposed Sepulveda /Rosecrans Site Rezoning will exceed SCAQMD's daily thresholds for CO, ROG, NOx, and PM10 Therefore, emissions of these pollutants would result in significant short -term impacts (2) Between 2007 and 2012, emissions from construction activity may occur simultaneously with operational emissions 77 associated with the proposed Plaza El Segundo Combined emissions would exceed the SCAQMD's thresholds for CO, ROG, NOx and PM10, which would constitute a significant impact Operational Emissions (3) Operation of the proposed Sepulveda /Rosecrans Site Rezoning in the buddout year of 2012 is anticipated to result in emissions that exceed the SCAQMD significance thresholds for four of the five criteria pollutants CO, PM10, ROG, and NOx. Thus, a significant impact related to these four criteria pollutants would occur Plaza El Segundo Construction Emissions (4) Maximum daily emissions associated with the construction of the proposed Plaza El Segundo Development will exceed SCAQMD's daily thresholds for ROG and NOx Therefore, emissions of these pollutants would result in significant short-term impacts Operational Emissions (5) Operation of the proposed Plaza El Segundo is anticipated to result in emissions that exceed SCAQMD significance thresholds for four of the five criteria pollutants CO, PM10, ROG, and NOx Thus, a significant impact related to these four criteria pollutants is anticipated b) Subsequent Environmental Documentation (1) Prior to implementation of specific development projects, impacts associated with construction emissions must be examined in light of this Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration This examination must provide quantified estimates of construction emissions based upon the specific site, schedule, and construction equipment utilization characteristics of the proposed development and compare the estimated emissions to the SCAQMD thresholds for construction emissions The analysis must incorporate the mitigation measures identified below as appropriate, along with any other mitigation measures identified by the project- specific analysis (C- 1) C) Mitigation. Sepulveda /Rosecrans Site Rezonin Construction Emissions 78 The following is a list of feasible control measures that the SCAQMD recommends for construction emissions of PM10 These mitigation measures must be implemented for all areas where construction activities associated with the proposed Sepulveda /Rosecrans Site Rezoning would occur Fugitive Dust, PM10 Compliance with SCAQMD Rule 403, including but not limited to the following (1) Prior to implementation of specific development projects, impacts associated with construction emissions must be examined This examination must provide quantified estimates of construction emissions based upon the specific site, schedule, and construction equipment utilization characteristics of the proposed development and compare the estimated emissions to the SCAQMD thresholds for construction emissions The analysis must incorporate the mitigation measures identified below as appropriate, along with any other mitigation measures identified by the project- specific analysis (C -1) (2) The construction area and vicinity (500 -foot radius) must be swept (preferably with water sweepers) and watered at least twice daily Site wetting must occur often enough to maintain a 10 percent surface soil moisture content throughout all earth moving activities (C -2) (3) All unpaved roads, parking and staging areas must be watered at least once every two hours of active operations (C -3) (4) Site access points must be swept/washed within thirty minutes of visible dirt deposition (C -4) (5) On -site stockpiles of debris, dirt or rusty material must be covered or watered at least twice daily (C -5) (6) All haul trucks hauling soil, sand, and other loose materials must either be covered or maintain two feet of freeboard (C -6) (7) All haul trucks must have a capacity of no less than twelve and three - quarter (12 75) cubic yards (C -7) (8) At least 80 percent of all inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind drive fugitive dust (C -8) (9) Operations on any unpaved surfaces must be suspended when winds exceed 25 mph (C -9) (10) Traffic speeds on unpaved roads must be limited to 15 miles per hour (C -10) 79 (11) Operations on any unpaved surfaces must be suspended during first and second stage smog alerts (C -11) (12) For all construction emissions, the following measure must apply The applicant must develop and implement a construction management plan, as approved by the City of El Segundo, which includes the following measures recommended by the SCAQMD, or equivalently effective measures approved by the SCAQMD a. Configure construction parking to minimize traffic interference b Provide temporary traffic controls during all phases of construction activities to maintain traffic flow (e g , flag person) c Schedule construction activities that affect traffic flow on the arterial system to off -peak hours to the degree practicable d Re -route construction trucks away from congested streets e. Consolidate truck deliveries when possible f Provide dedicated turn lanes for movement of construction trucks and equipment on- and off -site g Maintain equipment and vehicle engines in good condition and in proper tune as per manufacturer's specifications and per SCAQMD rules, to minimize exhaust emissions h Suspend use of all construction equipment operations during second stage smog alerts Contact the SCAQMD at (800) 242 -4022 for daily forecasts i Use electricity from power poles rather than temporary diesel- or gasoline- powered generators l Use methanol- or natural gas - powered mobile equipment and pile drivers instead of diesel if readily available at competitive prices k Use propane- or butane - powered on -site mobile equipment instead of gasoline if readily available at competitive prices (C -12) Operational Emissions Regional emissions of CO, ROG, PM10, and NOx are associated with vehicular traffic No feasible mitigation measures are W available to reduce vehicle travel and related tail pipe exhaust emissions associated with the proposed Sepulveda /Rosecrans Site Rezoning Plaza El Segundo Construction Emissions The following is a list of feasible control measures that the SCAQMD recommends for construction emissions of PM10 These mitigation measures must be implemented during construction activities associated with the proposed Plaza El Segundo Fugitive Dust, PM10 (13) The construction area and vicinity (500 -foot radius) must be swept (preferably with water sweepers) and watered at least twice daily Site wetting must occur often enough to maintain a 10 percent surface soil moisture content throughout all earth moving activities (C -13) (14) All unpaved roads, parking and staging areas must be watered at least once every two hours of active operations (C -14) (15) Site access points must be swept/washed within thirty minutes of visible dirt deposition (C -15) (16) On -site stockpiles of debris, dirt or rusty material must be covered or watered at least twice daily (C -16) (17) All haul trucks hauling soil, sand, and other loose materials must either be covered or maintain two feet of freeboard (C -17) (18) All haul trucks must have a capacity of no less than twelve and three - quarter (12 75) cubic yards (C -18) (19) At least 80 percent of all inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind drive fugitive dust (C -19) (20) Operations on any unpaved surfaces must be suspended when winds exceed 25 mph (C -20) (21) Traffic speeds on unpaved roads must be limited to 15 miles per hour (C -21) (22) Operations on any unpaved surfaces must be suspended during first and second stage smog alerts (C -22) (23) The applicant must develop and implement a construction management plan, as approved by the City of El Segundo, which includes the following measures recommended by the SCAQMD, or equivalently effective measures approved by the SCAQMD 81 d) a Configure construction parking to minimize traffic interference b Provide temporary traffic controls during all phases of construction activities to maintain traffic flow (e.g , flag person) C Schedule construction activities that affect traffic flow on the arterial system to off -peak hours to the degree practicable d Re -route construction trucks away from congested streets e Consolidate truck deliveries when possible f Provide dedicated turn lanes for movement of construction trucks and equipment on- and off -site g Maintain equipment and vehicle engines in good condition and in proper tune as per manufacturer's specifications and per SCAQMD rules, to minimize exhaust emissions h Suspend use of all construction equipment operations during second stage smog alerts Contact the SCAQMD at (800) 242 -4022 for daily forecasts i Use electricity from power poles rather than temporary diesel- or gasoline - powered generators l Use methanol- or natural gas - powered mobile equipment and pile drivers instead of diesel if readily available at competitive prices k Use propane- or equipment instead of competitive prices (C -23). Operational Emissions butane - powered on -site mobile gasoline if readily available at Regional emissions of CO, ROG, PM10, and NOx are associated with vehicular traffic No feasible mitigation measures are available to reduce vehicle travel and related tad pipe exhaust emissions associated with the proposed Sepulveda /Rosecrans Site Rezoning Finding Sepulveda /Rosecrans Site Rezoning (1) The City finds that incorporation of such changes or alterations are within the responsibility and jurisdiction of the City The City finds that although the temporary construction related air 82 quality CO, ROG, NOx, and PM10 impact will remain significant and unavoidable, no feasible mitigation measures are available to avoid or lessen the impact below a level of significance The Project benefits set forth in the Statement of Overriding Considerations outweigh this significant unavoidable impact (2) The City finds that incorporation of such changes or alterations are within the responsibility and jurisdiction of the City The City finds that although the operational related air quality CO, PM10, ROG, and NOx impact will remain significant and unavoidable, no feasible mitigation measures are available to avoid or lessen the impact below a level of significance The Project benefits set forth in the Statement of Overriding Considerations outweigh this significant unavoidable impact Plaza El Segundo (3) The City finds that incorporation of such changes or alterations are within the responsibility and jurisdiction of the City The City finds that although the temporary construction related air quality ROG and NOx impact will remain significant and unavoidable, no feasible mitigation measures are available to avoid or lessen the impact below a level of significance The Project benefits set forth in the Statement of Overriding Considerations outweigh this significant unavoidable impact (4) The City finds that incorporation of such changes or alterations are within the responsibility and jurisdiction of the City The City finds that although the operational related air quality CO, PM10, ROG, and NOx impact will remain significant and unavoidable, no feasible mitigation measures are available to avoid or lessen the impact below a level of significance The Project benefits set forth in the Statement of Overriding Considerations outweigh this significant unavoidable impact Noise a) Facts /Effects Sepulveda /Rosecrans Site Rezoning Construction Noise (1) The non - residential receptor property locations located at the closest northern (FedEx facility) and eastern (Pacific Theatre) edges of the proposed Sepulveda /Rosecrans Rezoning Site would be significantly impacted due to an increase in ambient noise levels at these locations of 26 0 and 14 0 decibels, respectively (2) In addition, construction activity on the proposed Sepulveda /Rosecrans Rezoning Site would cause the ambient noise levels at the Oak Avenue residential locations to exceed 65 dBA As such, construction noise impacts associated with the 83 proposed Sepulveda /Rosecrans Rezoning Site would be significant Plaza El Segundo Construction Noise (3) Ambient noise levels will not increase at the Oak Avenue location as a result of construction noise sources from the Plaza El Segundo site This analysis reflects the greater distance between the Oak Avenue residential and the main part of the Plaza El Segundo Development site However, when construction activities are taking place on the 4 7 acre portion of the Plaza El Segundo Development site located immediately northeast of the Sepulveda /Rosecrans intersection, the effects would be the same as for construction activities occurring under the proposed Sepulveda /Rosecrans Site Rezoning and a significant impact related to construction noise would occur (4) Construction activities on the proposed Plaza El Segundo Development site would impact the receptor locations located to the north and east of the Plaza El Segundo site, due to their proximity Specifically, ambient noise levels at these locations will experience temporary and occasional increases of 13 to 19 decibels (13 decibels at the Pacific Theatre and 19 decibels at the FedEx facility) Impacts to these receptor locations would be significant b) Subsequent Environmental Documentation Sepulveda /Rosecrans Site Rezoning Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda /Rosecrans site The subsequent environmental documentation must address the following (1) A project- specific construction noise analysis must be prepared that calculates, based on project- specific parameters and identification of the site - specific sensitive receptors that could be affected by construction activities, the noise levels that would be experienced at sensitive receptors located adjacent to that site If noise levels resulting from construction activity would result in temporary construction noise levels that exceed 65 dBA at a sensitive receptor, or cause an incremental increase of 5 dBA over the existing ambient sound level, if the existing ambient sound level at the sensitive receptor location is 65 dBA or more, then the study must identify feasible mitigation measures to be applied to that project from the list of mitigation measures provided below (1 -1) C) Mitigation Sepulveda /Rosecrans Site Rezoning M The following mitigation measures are required to minimize construction related noise impacts associated with the Sepulveda /Rosecrans Site Rezoning (1) A project- specific construction noise analysis must be prepared that calculates, based on project- specific parameters and identification of the site - specific sensitive receptors that could be affected by construction activities, the noise levels that would be experienced at sensitive receptors located adjacent to that site If noise levels resulting from construction activity would result in temporary construction noise levels that exceed 65 dBA at a sensitive receptor, or cause an incremental increase of 5 dBA over the existing ambient sound level, if the existing ambient sound level at the sensitive receptor location is 65 dBA or more, then the study must identify feasible mitigation measures to be applied to that project from the list of mitigation measures provided below • Construction contracts must specify that all construction equipment shall be equipped with mufflers and other applicable noise attenuation devices • During construction phases, the contractor must store and maintain equipment as far as possible from the adjacent receptor property locations to the southwest, north and east of the Sepulveda /Rosecrans Rezoning Site • As stated in the City of El Segundo Municipal Code, construction must be restricted to the hours of 7 00 a m to 6 p m Monday through Saturday, and prohibited at anytime on Sunday or a Federal holiday • Temporary plywood noise barriers must be constructed along the northern and eastern property lines of the Sepulveda /Rosecrans Rezoning Site during construction, which must be high enough to block the line -of -sight between the Sepulveda /Rosecrans Rezoning Site and receptor property locations to the southwest, north and east (1 -1) Plaza El Seoundo The follow mitigation measures are required to minimize construction related noise impacts associated with the Plaza El Segundo Development, (2) Construction contracts must specify that all construction equipment must be equipped with mufflers and other applicable noise attenuation devices (1 -2) (3) During construction phases, the contractor must store and maintain equipment as far as possible from the adjacent receptor property locations to the north and east of the Plaza El Segundo site (1 -3) (4) As stated in the City of El Segundo Municipal Code, construction must be restricted to the hours of 7 00 a m to 6 p m Monday through Saturday, and prohibited at anytime on Sunday or a Federal holiday (1 -4) (5) Temporary plywood noise barriers must be constructed along the 4 5 acre portion of the Plaza El Segundo site south of the UPRR tracks during construction, which must be high enough to block the line -of -sight (a minimum of 8 feet above existing grade) between the Plaza El Segundo site and receptor property locations to the southwest, north and east (1 -5) d) Finding Sepulveda /Rosecrans Site Rezornn (1) Temporary construction noise impacts at the FedEx and Pacific Theatres locations would be significant and unavoidable even with the implementation of all feasible mitigation measures Plaza El Segundo (2) Temporary construction noise impacts at the FedEx facility would be significant and unavoidable even with the implementation of all feasible mitigation measures (3) The City finds that incorporation of such changes or alterations are within the responsibility and jurisdiction of the City The City finds that although the temporary construction related noise impacts will remain significant and unavoidable, no feasible mitigation measures are available to avoid or lessen the impact below a level of significance The Project benefits set forth in the Statement of Overriding Considerations outweigh this significant unavoidable impact Transportation and Circulation a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) The proposed Sepulveda /Rosecrans Site Rezoning would significantly impact two intersections during the p m peak hour or Saturday mid -day peak hour These intersections are Sepulveda Boulevard/El Segundo Boulevard in the p m peak hour and Rosecrans Avenue /Aviation Boulevard in the Saturday mid -day peak period (2) The Sepulveda /Rosecrans Site Rezoning is estimated to contribute approximately 240 trips in the southbound direction on the San Diego Freeway between the 1 -105 interchange and El M Segundo Boulevard During the afternoon peak hour, this number of trips would cause the D/C ratio to increase by 0 02, with a resulting LOS of F(0), which would constitute a significant impact at this location (3) Significant impacts were identified for the southbound 1- 405 between the 1 -105 Interchange and El Segundo Boulevard for the Sepulveda /Rosecrans Site Rezoning The nearest arterial CMP monitoring stations are located at the intersections of Rosecrans Avenue and Sepulveda Boulevard and El Segundo Boulevard and Sepulveda Boulevard These intersections would be significantly impacted by the Sepulveda /Rosecrans Site Rezoning Impacts of the proposed Sepulveda /Rosecrans Site Rezoning with respect to the CMP would be significant Plaza El Segundo (4) The proposed Plaza El Segundo Development would significantly and unavoidably impact one intersection during p m peak hour (Sepulveda Boulevard/El Segundo Boulevard) (5) The proposed Plaza El Segundo Development is estimated to contribute approximately 162 trips in the southbound direction on the San Diego Freeway between the 1 -105 interchange and El Segundo Boulevard During the afternoon peak hour, this number of trips would cause the D/C ratio to increase by 0 01, with a resulting LOS of F(0), which would be a less than significant impact at this location (6) The nearest arterial CMP monitoring stations are located at the intersections of Rosecrans Avenue and Sepulveda Boulevard and El Segundo Boulevard and Sepulveda Boulevard These intersections would be significantly impacted by the proposed Plaza El Segundo Development Impacts of the proposed Plaza El Segundo Development with respect to the CMP would be significant b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required. C) Mitigation Sepulveda /Rosecrans Site Rezoning (1) El Segundo Boulevard and Sepulveda Boulevard Convert the existing eastbound right -turn only lane to a shared through /right -turn lane There exists three receiving lanes on the east leg of the intersection In addition, modify the raised center median to convert the westbound shared through left -turn lane to a dedicated second left turn lane and additional through lane (L- 1) 87 Plaza El Segundo From the list of mitigation measures required to address the complete implementation of the C -4 zone on the proposed Sepulveda /Rosecrans Rezoning Site, the following specific mitigation measures must be required to address the traffic impacts of the proposed Plaza El Segundo Development (2) El Segundo Boulevard and Sepulveda Boulevard — Convert the existing eastbound right -turn only lane to a shared through /right -turn lane There exists three receiving lanes on the east leg of the intersection In addition, modify the raised center median to convert the westbound shared through left -turn lane to a dedicated second left turn lane and additional through lane (L- 13) d) Finding Sepulveda /Rosecrans Site Rezoning (1) Because no additional mitigation measures are available, impacts would be significant and unavoidable at the two intersections where the City's level of service standard would be exceeded (2) The two intersections that would exceed the City's level of service threshold, even after implementation of all feasible intersection improvements, are Sepulveda Blvd /El Segundo Blvd Aviation Blvd /Rosecrans Ave (3) There is no mechanism available for providing fair share contributions to mitigate freeway impacts Therefore impacts to one freeway segment (southbound San Diego Freeway between the 1 -105 interchange and El Segundo Boulevard) would be significant and unavoidable (4) In addition, improvements at three intersections require coordination and concurrence of Caltrans and /or other agencies In the event that the concurrence of other jurisdictions cannot be obtained, impacts at these intersections would be significant and unavoidable Plaza El Seaundo (5) Because no additional mitigation measures are available, impacts would be significant and unavoidable at one intersection where the City's level of service standard would be exceeded (6) The intersection that would exceed the City's level of service threshold, even after implementation of all feasible intersection improvements, are M Sepulveda Blvd /El Segundo Blvd (7) In addition, improvements at two intersections require coordination and concurrence of Caltrans and /or other agencies In the event that the concurrence of other jurisdictions cannot be obtained, impacts at these intersections would be significant and unavoidable (8) The City finds that incorporation of such changes or alterations are within the responsibility and jurisdiction of the City The City finds that although the transportation and circulation impact will remain significant and unavoidable, no feasible mitigation measures are available to avoid or lessen the impact below a level of significance The Project benefits set forth in the Statement of Overriding Considerations outweigh this significant unavoidable impact E. Insignificant Cumulative Impacts. The City Council finds that the FEIR and the record of proceedings in this matter do not identify or contain substantial evidence which identifies significant adverse cumulative environmental effects associated with the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative in conjunction with the related Projects identified in Section III B of the DEIR (collectively, the 'Related Projects ") with respect to the areas listed below 1 Aesthetics 2 Air Quality 3 Agricultural Resources 4 Biological Resources 5 Cultural Resources 6 Geology and Sods 7 Hydrology and Water Quality 8 Hazards and Hazardous Materials 9 Land Use 10 Mineral Resources 11 Noise 12 Public Services 13 Recreation 14 Utilities 99 a) Sewer b) Water c) Natural Gas d) Electricity F. The City Council finds that although the following cumulative environmental effects were identified as potentially significant in the FEIR for the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative, changes or alterations within the responsibility and jurisdiction of other public agencies and the City have been adopted by such other agencies or can and should be adopted by such other agency to avoid or lessen the potential significant environmental effects listed below to a level of insignificance 1 Transportation and Circulation a) Facts /Effects Sepulveda /Rosecrans Site Rezonin (1) Traffic resulting from the 52 related projects could contribute to potential future deterioration at the study intersections This cumulative analysis was based on a worst -case set of assumptions where all of the related projects were constructed and built to the intensity currently envisioned In addition, none of the traffic enhancements which may be associated with the 52 related projects were included in the analysis It is likely that traffic conditions would be better than noted in the EIR analysis (2) The Sepulveda /Rosecrans Site Rezoning would contribute to a potentially significant cumulative impact at nine intersections located wholly or partly within the City of El Segundo (3) The cumulative effects identified are anticipated to occur with or without the project with the exception of the impact at the Park Place and Nash Street, Park Place and Douglas Street, and Rosecrans Avenue and Douglas Street intersections These impacts are reduced to a level of insignificance with traffic improvements proposed with the exception of p m peak hour period at Rosecrans Avenue and Douglas Street This is a worst - case analysis which does not include specific improvement measures which may be required of the cumulative projects, therefore, conditions are anticipated to be better than stated in the Draft EIR 11 Plaza El Segundo (4) The Sepulveda /Rosecrans Site Rezoning would contribute to a significant cumulative impact at seven intersections located wholly or partly within the City of El Segundo (5) The cumulative effects identified are anticipated to occur with or without the protect with the exception of the impact at the Rosecrans Avenue and Douglas Street intersection (p m peak hour) and the Rosecrans Avenue and Sepulveda Boulevard intersection during the Saturday mid -day peak These impacts are reduced to a level of insignificance with traffic improvements proposed by the Sepulveda /Rosecrans Site Rezoning protect with the exception of the p m peak period at Rosecrans Avenue and Douglas Street This is a worst case analysis which does not include specific improvement measures which may be required of the cumulative protects, therefore, conditions are anticipated to be better than noted However, the incremental effect of the proposed Plaza El Segundo Development, in connection with the effects of past, present and probable future projects would be cumulatively considerable at seven intersections located wholly or partly within the City of El Segundo b) Subsequent Environmental Documentation (1) No subsequent environmental documentation is required C) Mitigation Sepulveda /Rosecrans Site Rezonin (1) In order to assist in addressing future cumulative traffic deterioration, the City of El Segundo through its Traffic Congestion Mitigation Fee Ordinance will require the developer of a specific protect to make a "fair share" contribution for programmed roadway improvements In addition, project implementation of the signal system enhancements described above will benefit the entire system and reduce cumulative impacts along the roadway corridors (L -12) Plaza El Segundo (2) In order to assist in addressing future cumulative traffic deterioration, the protect applicant must comply with the City of El Segundo Traffic Congestion Mitigation Fee Ordinance and make a "fair share" contribution for programmed roadway improvements In addition, protect implementation of the signal system enhancements described above will benefit the entire system and reduce cumulative impacts along the roadway corridors (L -19) d) Finding Sepulveda /Rosecrans Site Rezoning 91 (1) Payment of the El Segundo Traffic Mitigation Fee would reduce impacts related to cumulative traffic growth at intersections that are wholly or partly within the City of El Segundo to less than significant Plaza El Segundo (2) Payment of the El Segundo Traffic Mitigation Fee would reduce impacts related to cumulative traffic growth at intersections that are wholly or partly within the City of El Segundo to less than significant (3) The City Council finds that the FEIR and the record of proceedings do not identify or contain substantial evidence identifying a significant cumulative contribution to any significant unavoidable environmental effects of the Protect with respect to Transportation and Traffic. G. Significant Unavoidable Cumulative Impacts. The City Council finds that in response to each impact identified below, changes or alterations have been required or incorporated into the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative, which lessen the significant adverse environmental impact However, these impacts cannot be totally avoided or reduced to a level of insignificance if the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative are implemented The Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative contribution to these impacts would be cumulatively considerable under CEQA Population. Housing, and Employment a) Facts /Effects Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo (1) A review of the related protects listed in Table III -1 of the Draft EIR, confirms the protections for slow housing growth in the region, only 10,628 new housing units are currently proposed In addition, approximately 62,646 jobs would be created by the same list of cumulative projects (see Table IV J -3 of the EIR) (2) Based on the substantial disparity between projected subregional job growth and housing construction, there will be a significant cumulative impact on population growth and housing demand b) Mitigation Sepulveda /Rosecrans Site Rezoning F, (1) There are no available mitigation measures to address the incremental contribution of the proposed Sepulveda /Rosecrans Site Rezoning to the significant cumulative impact related to population growth and housing demand Plaza El Segundo (2) There are no available mitigation measures to address the incremental contribution of the proposed Plaza El Segundo to the significant cumulative impact related to population growth and housing demand C) Finding (1) The City Council finds that although mitigation can be incorporated into the Protect to reduce the severity of the Protect - specific population growth and housing demand impacts, no feasible mitigation measures exist to address significant and unavoidable cumulative population and growth and housing demand impacts The Protect benefits set forth in the Statement of Overriding Considerations outweigh these significant unavoidable impacts 2 Transportation and Traffic a) Facts /Effects Sepulveda /Rosecrans Site Rezoning (1) The impacts of cumulative traffic growth were incorporated into the traffic modeling for the Protect (2) There is no mechanism available for providing fair share contributions to improvements that would mitigate cumulative traffic impacts at six intersections located wholly outside the City of El Segundo Therefore, cumulative traffic impacts would be significant and unavoidable at the following intersections (although such impacts would exist with or without the protect) • Rosecrans Avenue and Hindry Avenue, p m peak hour • Rosecrans Avenue and 1-405 SB Off -Ramp, a m and p m peak hour • Marine Avenue and Sepulveda Boulevard, a m and p m peak hour • Marine Avenue and Aviation Boulevard, a m and p m peak hour • Manhattan Beach Boulevard and Sepulveda Boulevard, a m and p m peak hour 93 Manhattan Beach Boulevard and Aviation Boulevard, a m and p m peak hour (3) No sub - regional traffic impact fee has been established or proposed for "fair- share" contributions to regional transportation improvements that might reduce the severity of cumulative traffic impacts Plaza El Segundo (4) There is no mechanism available for providing fair share contributions to improvements that would mitigate cumulative traffic impacts at six intersections located wholly outside the City of El Segundo Therefore, cumulative traffic impacts would be significant and unavoidable at the following intersections • Rosecrans Avenue and Hindry Avenue, p m peak hour • Rosecrans Avenue and 1 -405 SB Off -Ramp, a m and p m peak hour • Marine Avenue and Sepulveda Boulevard, a m and p m peak hour • Marine Avenue and Aviation Boulevard, a m, and p m peak hour • Manhattan Beach Boulevard and Sepulveda Boulevard, a m and p m peak hour • Manhattan Beach Boulevard and Aviation Boulevard, a m and p m peak hour b) Finding (1) The City Council finds that although mitigation can be incorporated into the Project to reduce the severity of the Project- specific traffic impact, no feasible mitigation measures exist to address significant and unavoidable cumulative traffic impacts outside the City of El Segundo The Protect benefits set forth in the Statement of Overriding Considerations outweigh these significant unavoidable cumulative impacts 3 Solid Waste a) Fact/Effects (1) Implementation of the Sepulveda /Rosecrans Site Rezoning in conjunction with the various related projects identified in Section III B of the Draft EIR as well as cumulative growth in the County of Los Angeles would further increase demand on landfill capacity Additional capacity to accommodate the cumulative disposal needs of the proposed Sepulveda /Rosecrans Site Rezoning and related protects is the responsibility of local, county, 94 and state solid waste management agencies and may become available as these agencies develop solutions to meet the future disposal needs at a regional level (e g , expanding existing landfills, transporting waste to other landfills, converting waste to energy, recycling and waste reduction) (2) Similar to the proposed Sepulveda /Rosecrans Site Rezoning, the related projects would be subject to the source reduction and recycling requirements established by the local jurisdiction in accordance with AB 939 (1 e , divert 50 percent of the solid waste generated from landfills through waste reduction, recycling and composting) As with the proposed Sepulveda /Rosecrans Site Rezoning, future projects would be required to participate in recycling programs, thus reducing the amount of solid waste to be disposed of at the landfills described above (3) However, because the precise solutions to meeting the need for landfill capacity are not known and are the responsibility of other agencies, the incremental contribution of the Sepulveda /Rosecrans Site Rezoning, in conjunction with the contributions of related projects, would be cumulatively considerable b) Finding (1) The City Council finds that while mitigation is not needed to reduce Project- specific solid waste impacts, no feasible mitigation measures exist to address significant and unavoidable cumulative impacts caused by solid waste generation The Project benefits set forth in the Statement of Overriding Considerations outweigh these significant unavoidable impacts H. Project Alternatives. 1 Alternatives Eliminated From Further Consideration Various alternatives to the Proposed Action were considered and dismissed without further study because they faded to accomplish the objectives of the Project or were otherwise not feasible CEQA Guidelines § 15126 6(c) requires EIRs to identify any alternatives that were considered by the lead agency but were rejected as infeasible during the scoping process, and briefly explain the reasons underlying the lead agency's determination Alternatives involving residential development were dismissed as being infeasible for two reasons First, it may not be possible to remediate the Sepulveda /Rosecrans Rezoning Site to the levels required in order to develop residential uses In the event that it is possible, it is likely cost prohibitive Second, the City of El Segundo does not permit residential developments east of Sepulveda Boulevard because the City cannot adequately support residential developments in this area with City services 95 Sepulveda /Rosecrans Site Rezoning a) No Protect Alternative (1) Description Under the proposed Sepulveda /Rosecrans Site Rezoning No Project Alternative, the Sepulveda /Rosecrans Rezoning Site would remain under its current Industrial General Plan designation and zoning classifications Reasonably foreseeable activities that would occur within the proposed Sepulveda /Rosecrans Rezoning Site under the No Protect Alternative include 1) characterization and remediation activities that are currently ongoing on a portion of the proposed Sepulveda /Rosecrans Rezoning Site would continue under the oversight of the cognizant regulatory agencies, 2) existing operative uses within the proposed Sepulveda /Rosecrans Rezoning Site (Air Products, Learned Lumber) would remain in their current locations, and 3) no new development would occur on the proposed Sepulveda /Rosecrans Rezoning Site No new development is anticipated because, other than the existing operating uses, there is no known interest in development of the proposed Sepulveda /Rosecrans Rezoning Site, other than the proposed Plaza El Segundo Development The proposed Sepulveda /Rosecrans Site Rezoning No Protect Alternative therefore assumes the continuation of existing conditions on the proposed Sepulveda /Rosecrans Rezoning Site as well as development of the related protects described in Section III B (Related Protects) of the EIR (2) Comparison to Protect Under the Sepulveda /Rosecrans Site Rezoning No Protect Alternative, no additional traffic would be generated The existing uses on the Sepulveda /Rosecrans Rezoning Site would remain in their present locations and there would be no change in current operations Traffic generated by these uses would remain unchanged Aesthetics, air quality, biological resources, geology and soils (except soil erosion impacts), hydrology, land use, noise, population, housing and employment, public service, transportation and traffic, utilities, and cultural resources impacts would be less than the proposed Sepulveda /Rosecrans Site Rezoning and less than significant Hazards and hazardous materials impacts of the No Protect alternative would be greater than the proposed Sepulveda /Rosecrans Site Rezoning because only a portion of the Sepulveda /Rosecrans Rezoning Site would be characterized and remediated (3) Findings The City Council rejects this alternative because it does not meet the objectives of the Sepulveda /Rosecrans Site Rezoning to reuse and redevelop the site to provide commercial facilities needed by the City of El Segundo This alternative would not facilitate the productive reuse of a former industrial site This alternative would not provide improve traffic circulation by providing major road improvements that would provide significant overriding benefits to the community, This alternative would not provide for employment opportunities or generate significant local revenues through business license fees, property taxes and sales taxes b) Reduced Traffic Generation Alternative (1) Description Under the proposed Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative, the standards of the proposed C-4 zone would be modified to limit the mix of land uses permitted within the 70 8 net acre portion of the proposed Sepulveda /Rosecrans Rezoning Site that would be redesignated in the General Plan for Commercial Center use and rezoned to Commercial Center (C-4) in order to reduce total traffic generation from the Site Total permitted square footage within the proposed Sepulveda /Rosecrans Rezoning Site would remain the same (850,000 total square feet), but the mix of uses would be limited to the following 590,000 square feet of shopping center, 185,000 square feet of large scale retail, 50,000 square feet of grocery store, 10,000 square feet of fast food restaurants, and 15,000 square feet of sit -down restaurants Total traffic generation under this alternative would be reduced by approximately 11 7% in the p m peak hour and approximately 8 8% on a daily basis All other components of the proposed Sepulveda /Rosecrans Site Rezoning, including the construction of new roadways, relocation of railroad rights -of -way, and stormwater retention basin would remain the same as the proposed Sepulveda /Rosecrans Site Rezoning under this alternative (2) Comparison to Project Under this alternative, it is estimated that the development on the Sepulveda /Rosecrans Rezoning Site would generate a total of approximately 25,859 daily trips, 1,033 trips in the a m peak hour, 2,346 trips during the p m peak hour, and 3,379 trips during the Saturday mid -day peak period Of the 25 study intersections analyzed, it is anticipated that the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative would significantly impact 13 intersections during the a m peak hour, p m peak hour, or Saturday mid -day peak, or combinations thereof (see Table VI -1 of the Draft EIR) The same number of impacted intersections and the same specific intersections as identified would be impacted under the alternative as under the proposed Sepulveda /Rosecrans Site Rezoning protect Therefore, traffic impacts associated with the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative would be the same as those associated with the proposed Sepulveda /Rosecrans Site Rezoning and would be significant and unavoidable Air quality would be less than the proposed Sepulveda /Rosecrans Site Rezoning and less than significant, but would remain significant and unavoidable Utility impacts related to sewer, water and electricity would be slightly less than the proposed Sepulveda /Rosecrans Site Rezoning The project- related utility impacts would remain less than significant Aesthetics, biological resources, geology and sods, hazards and hazardous materials, hydrology, land use, noise, population, housing and employment, public services, utilities (solid waste and natural gas), and cultural resources impacts would be the same as than the proposed Sepulveda /Rosecrans Site Rezoning The short-term noise and traffic impacts would be significant and unavoidable (3) Findings 97 The City Council adopts this alternative because it meets the protect objectives of the Sepulveda /Rosecrans Site Rezoning to reuse and redevelop the site to provide commercial facilities needed by the City of El Segundo described in Chapter II (Page II -14) of the Final EIR while reducing the traffic impacts by a significant amount (117% in the p m peak period and 8 8 % of daily trips) C) Alternative Land Use Alternative (1) Description Under the proposed Sepulveda /Rosecrans Site Rezoning Alternate Land Use Alternative, the existing zoning of the Sepulveda /Rosecrans Rezoning Site would be modified to allow development of proposed Sepulveda /Rosecrans Rezoning Site with industrial uses at a maximum floor area ratio (FAR) of 0 42 1 This would result in the development of approximately 1,548,000 square feet of industrial park within the proposed Sepulveda /Rosecrans Rezoning Site and represents a reduction in the development density permitted under the existing zoning of the Sepulveda /Rosecrans Rezoning Site The current zoning would allow a 0 6 FAR (2,211,142 square feet of industrial uses) Roadway extensions through the proposed Sepulveda /Rosecrans Rezoning Site would be provided, although likely in a different configuration than under the proposed Sepulveda /Rosecrans Site Rezoning Storm water detention facilities would be provided that would be sufficient to handle storm water runoff generated under this alternative and railroad rights -of -way would be relocated as necessary (2) Comparison to Protect Under the Sepulveda /Rosecrans Site Rezoning Alternate Land Use Alternative, the Sepulveda /Rosecrans Rezoning Site would be permitted to be developed with up to 1,548,000 square feet of industrial park Under this alternative, it is estimated that the development on the Sepulveda /Rosecrans Rezoning site would generate a total of approximately 10,774 daily trips, 1,300 in the a m peak hour, 1,331 trips in the p m peak hour, and 542 trips during the Saturday mid -day peak hour This is less traffic than would be produced by the proposed Sepulveda /Rosecrans Site Rezoning However, an increase in the amount of truck traffic in the area is anticipated under this alternative Under this alternative, 9 intersections would still be significantly impacted during the a m peak hour, p m peak hour or Saturday mid -day peak hour, or combinations thereof (Table VI -7) This is four less significantly impacted intersections than under the proposed Sepulveda /Rosecrans Site Rezoning Therefore, traffic impacts associated with the Sepulveda /Rosecrans Site Rezoning Alternate Land Use Alternative would be less than the proposed Sepulveda /Rosecrans Site Rezoning project Air quality impacts would be less than the proposed Sepulveda /Rosecrans Site Rezoning, but would remain significant and unavoidable Operational noise impacts would be slightly less than the Plaza El Segundo development Public services (police protection) and utility (sewer and water) impacts would be less than the proposed Sepulveda /Rosecrans Site Rezoning The protect- related impacts would remain less than significant M Biological resources, geology and sods, land use, construction noise, and cultural resources would be the same as the proposed Sepulveda /Rosecrans Site Rezoning The short-term noise and traffic impacts would be significant and unavoidable Aesthetics, air quality (construction and operational emissions), hydrology, hazards and hazardous materials, population, housing and employment, public services (fire protection), and utility impacts (solid waste, natural gas, and electricity) would be slightly greater than the Sepulveda /Rosecrans Site Rezoning, but would remain as insignificant impacts The sewer and water usage would increase by negligible amounts The project- related impacts would remain less than significant (3) Findings The City Council rejects this alternative because it does not meet the objectives of the Sepulveda /Rosecrans Site Rezoning to reuse and redevelop the site to provide commercial facilities needed by the City of El Segundo to the same extent as the proposed project, This alternative would not provide improve traffic circulation by providing major road improvements that would provide significant overriding benefits to the community This alternative would not provide for employment opportunities or generate significant local revenues through business license fees, property taxes and sales taxes to the same extent as the proposed project d) Rezoning of Plaza El Segundo Development Site Only (1) Description Under this alternative, the City would not take action with respect to the proposed Sepulveda /Rosecrans Site Rezoning project, but rather would approve the General Plan Amendment and rezoning of the proposed Plaza El Segundo Development site to the new Commercial Center land use designation and Commercial Center (C -4) zone Uses presently located within the proposed Sepulveda /Rosecrans Rezoning Site, but outside the boundary of the proposed Plaza El Segundo Development would remain the same No new development is anticipated in this portion of the Sepulveda /Rosecrans Rezoning Site because, other than the existing operating uses, there is no known interest in development of the proposed Sepulveda /Rosecrans Rezoning Site, other than the proposed Plaza El Segundo Development (2) Comparison to Protect Under this alternative, impacts would be the same as identified throughout this EIR for the proposed Plaza El Segundo Development The only difference from the analysis presented in this EIR would relate to land use compatibility Under the alternative, the uses adjacent to the proposed Plaza El Segundo Development would be industrial, rather than ultimately commercial, as would occur under the proposed Sepulveda /Rosecrans Site Rezoning Placing commercial and industrial land uses adjacent to one another would not result in land use conflicts and no impacts related to land use compatibility would occur Impacts of this alternative would be similar to the proposed Sepulveda /Rosecrans Site Rezoning with respect to land use compatibility and the same as the proposed Plaza El Segundo Development for all other impacts .. (3) Findings The City Council rejects this alternative because it does not meet the objectives of the Sepulveda /Rosecrans Site Rezoning to reuse and redevelop the site to provide commercial facilities needed by the City of El Segundo to the same extent as the proposed project This alternative would not provide improve traffic circulation by providing major road improvements that would provide significant overriding benefits to the community because it would not include the extension of Park Place though to Nash Street This alternative would not provide for employment opportunities or generate significant local revenues through business license fees, property taxes and sales taxes to the same extent as the proposed project Plaza El Segundo a) No Project Alternative (1) Description Under the Plaza El Segundo No Project Alternative, the proposed Plaza El Segundo Development site would remain under its current Industrial General Plan designations and zoning classifications Reasonably foreseeable activities that would occur within the proposed Plaza El Segundo Development site under the No Project Alternative would include 1) characterization and remediation activities that are currently ongoing on a portion of the proposed Plaza El Segundo Development site would continue under the oversight of the cognizant regulatory agencies, and 2) no new development would occur on the proposed Plaza El Segundo Development site No new development is anticipated because there is no known interest in development of the proposed Plaza El Segundo Development site, other than the proposed Plaza El Segundo Development The proposed Plaza El Segundo No Project Alternative therefore assumes the continuation of existing conditions on the proposed Plaza El Segundo Development site as well as development of the related projects described in Section III B (Related Projects) of the EIR (2) Comparison to Project Under the Plaza El Segundo No Project Alternative, no additional traffic would be generated The existing uses on the Plaza El Segundo site would remain in their present locations and there would be no change in current operations Traffic generated by these uses would remain unchanged Aesthetics, air quality, biological resources, geology and soils (except sod erosion impacts), hydrology, hazards and hazardous materials, land use, noise, population, housing and employment, public services, transportation and traffic, utilities, and cultural resources impacts would be less than the proposed Plaza El Segundo site and less than significant (3) Findings The City Council rejects this alternative because it does not meet the objectives of the Plaza El Segundo Development to reuse and redevelop the site to provide commercial facilities needed by the City of El Segundo This alternative would not facilitate the productive reuse of a former industrial site This alternative would not provide improve traffic circulation by providing major road improvements that would provide significant overriding benefits to the community This alternative would not 100 provide for employment opportunities or generate significant local revenues through business license fees, property taxes and sales taxes b) Reduced Traffic Generation Alternative (1) Description Under the Plaza El Segundo Reduced Traffic Generation Alternative, the Plaza El Segundo site boundaries and total proposed square footage would remain the same (425,000 square feet), but the mix of uses within the proposed Plaza El Segundo would be modified to result in an approximately 17% reduction in p m peak hour traffic generation and an approximately 13% reduction in daily traffic generation The mix of uses that would be contained within the proposed Plaza El Segundo under the Reduced Traffic Generation Alternative would include 165,000 square feet of shopping center, 185,000 square feet of large scale retail, 50,000 square foot grocery store, 10,000 square feet of fast food restaurants, and 15,000 square feet of sit -down restaurants The proposed land uses and density would be within the requirements of the proposed C -4 zone All other components of the proposed Plaza El Segundo, including the construction of new roadways (Park Place east of Sepulveda and Allied Way within the Plaza El Segundo site) and storm water retention basin would remain the same as the proposed Plaza El Segundo Development under this alternative (2) Comparison to Project Under the Plaza El Segundo Reduced Traffic Generation Alternative, the size of the proposed development would be the same, however, the mix of uses would be different in order to reduce the amount of traffic generated Under this alternative, it is estimated that the development on the Plaza El Segundo site would generate a total of approximately 16,645 daily trips, with 779 a m peak hour trips, 1,477 p m peak hour trips, and 2,205 Saturday mid -day peak period trips Of the 25 study intersections analyzed, it is anticipated that the Plaza El Segundo Reduced Traffic Generation Alternative would significantly impact six intersections during the a m peak hours, p m peak hour, Saturday mid -day peak hour, or combinations thereof (see Table VI -14) This is one less impacted intersection than would be impacted under the proposed Plaza El Segundo protect Therefore, traffic impacts associated with the Plaza El Segundo Reduced Traffic Alternative would be less than those under the proposed Plaza El Segundo project Air quality would be less than the proposed Sepulveda /Rosecrans Site Rezoning and less than significant, but would remain significant and unavoidable Operational noise impacts would be slightly less than the Plaza El Segundo development Utility impacts related to sewer, water and electricity would be slightly less than the proposed Sepulveda /Rosecrans Site Rezoning The protect- related utility impacts would remain less than significant Aesthetics, biological resources, geology and soils, hydrology, hazards and hazardous materials, land use, construction noise, population, housing and employment, public services, and utility impacts (solid waste and natural gas), and cultural resources would be the same as than the proposed Sepulveda /Rosecrans Site Rezoning The short-term noise and traffic impacts would be significant and unavoidable 101 (3) Findings The City Council adopts this alternative since it meets all of the protect objectives described in Chapter II (Page II -14) of the Final EIR while reducing the traffic impacts by a significant amount (17% in p m peak period and 13% of daily trips) C) Alternative Land Use Alternative (1) Description Under the Plaza El Segundo Alternate Land Use Alternative, the proposed Plaza El Segundo Development site would be developed with industrial uses at a floor area ratio (FAR) of 0 42 1 This would result in the development of an approximately 730,000 square foot industrial park within the proposed Plaza El Segundo Development site Roadway extensions through the proposed Plaza El Segundo Development site would be provided, although likely in a different configuration than under the proposed Plaza El Segundo Storm water detention facilities would be provided that would be sufficient to handle storm water runoff generated under this alternative (2) Comparison to Project Under the Plaza El Segundo Alternate Land Use Alternative, the Sepulveda /Rosecrans Rezoning Site would be developed with up to 730,000 square feet of industrial park uses Under this alternative, it is estimated that the development would generate approximately 5,081 daily trips, 613 a m peak hour trips, 628 p m peak hour trips, and 256 Saturday mid -day peak period trips This is less traffic than would be produced under the proposed Plaza El Segundo Development, although truck traffic would increase under this Alternative However, under this alternative, three intersections would be significantly impacted during the a m peak hour, p m peak hour, Saturday mid -day peak hour, or combination thereof (Table VI -21) This is four fewer than would be significantly impacted under the proposed Plaza El Segundo Development Therefore, traffic impacts associated with the Plaza El Segundo Alternate Land Use Alternative would be lower than the proposed Plaza El Segundo Development Air quality impacts would be less than the proposed Plaza El Segundo development, but would remain significant and unavoidable Operational noise and public services (police), utility (sewer, water and electricity) impacts would be lower than the Plaza El Segundo development Geology and soils, land use, and cultural resources would be the same as than the proposed Sepulveda /Rosecrans Site Rezoning Aesthetics, air quality (short -term construction emissions), biological resources, hydrology, hazards and hazardous materials, short -term construction noise, population, housing and employment, public services (fire), utility (solid waste and natural gas) impacts would be greater than the Plaza El Segundo development, but would remain as insignificant impacts (3) Findings The City Council rejects this alternative because it does not meet the objectives of the Plaza El Segundo Development to reuse and redevelop the site to provide commercial facilities needed by the City of EI Segundo to the same extent as the 102 proposed project This alternative would not provide improve traffic circulation by providing major road improvements that would provide significant overriding benefits to the community This alternative would not provide for employment opportunities or generate significant local revenues through business license fees, property taxes and sales taxes to the same extent as the proposed project d) Rezoning of Plaza El Segundo Development Site Only (1) Description There is no equivalent alternative for the Plaza El Segundo site because this alternative would approve only the Plaza El Segundo portion of the Sepulveda Rosecrans Site Rezoning (2) Comparison to Project There is no equivalent alternative for the Plaza El Segundo site because this alternative would approve only the Plaza El Segundo portion of the Sepulveda Rosecrans Site Rezoning so no comparison is necessary (3) Findings There is no equivalent alternative for the Plaza El Segundo site because this alternative would approve only the Plaza El Segundo portion of the Sepulveda Rosecrans Site Rezoning so no findings are necessary Findings Regarding Alternatives a) Reasonable Range of Alternatives The City Council finds that that (a) the FEIR describes a reasonable range of alternatives to the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development, which could feasibly attain most of the basic objectives of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development and would avoid or substantially lessen any significant effects of the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development, and (b) the City Council evaluated the comparative merits of the alternatives b) Environmentally Superior Alternative CEQA Guidelines § 15126 6 requires that an analysis of alternatives to the Project identify one alternative as the environmentally superior alternative Furthermore, if the environmentally superior alternative is the "No Project' alternative, the EIR must also identify the environmentally superior alternative from among the other alternatives Sepulveda Rosecrans Site Rezoning The No Project Alternative would be environmentally superior to the proposed Sepulveda /Rosecrans Site Rezoning, as it would avoid the significant and unavoidable impacts of the proposed Sepulveda /Rosecrans Site Rezoning related to traffic, construction and operational air emissions and construction noise However, the No Project Alternative would not meet any of the objectives of the proposed Sepulveda /Rosecrans Site Rezoning 103 The Reduced Traffic Generation Alternative would be environmentally superior to the proposed Sepulveda /Rosecrans Site Rezoning as it would reduce the traffic impacts of the proposed Sepulveda /Rosecrans Site Rezoning and reduce significant and unavoidable operational air emissions compared to the proposed Sepulveda /Rosecrans Site Rezoning, although not to less than significant levels The Reduced Traffic Generation Alternative would meet most of the objectives of the proposed Sepulveda /Rosecrans Site Rezoning The Rezoning of Plaza El Segundo Development Site Alternative would be environmentally superior to the proposed Sepulveda /Rosecrans Site Rezoning as it would constitute a reduced project (425,000 total square feet) compared to the full buildout of the proposed Sepulveda /Rosecrans Site Rezoning (850,000 square feet) As such, impacts of this alternative would be lower with respect to all issue areas since the alternative would be smaller and would utilize less site area than would the proposed Sepulveda /Rosecrans Site Rezoning The Rezoning of Plaza El Segundo Development Site Alternative would not meet the objectives of the proposed Sepulveda /Rosecrans Site Rezoning, but would meet the objectives of the Plaza El Segundo Development Therefore, the Reduced Traffic Generation Alternative would be the environmentally superior alternative because it would reduce impacts compared to the proposed Sepulveda/Rosecrans Site Rezoning and meets most of the project objectives Plaza El Segundo The No Project Alternative would be environmentally superior to the proposed Plaza El Segundo Development, as it would avoid the significant and unavoidable impacts of the proposed Plaza El Segundo Development related to traffic, construction and operational air emissions and construction noise However, the No Project Alternative would not meet any of the objectives of the proposed Plaza El Segundo Development The Reduced Traffic Generation Alternative would be environmentally superior to the proposed Plaza El Segundo Development as it would reduce the traffic impacts of the proposed Plaza El Segundo Development and reduce significant and unavoidable operational air emissions compared to the proposed Plaza El Segundo Development, although not to less than significant levels The Reduced Traffic Generation Alternative would meet most of the objectives of the proposed Plaza EI Segundo Development The City Council has determined to adopt the Environmentally Superior Alternative, in substantially the same form as analyzed in the Final EIR, rather than the project as proposed 111. GROWTH- INDUCING IMPACTS OF THE PROPOSED ACTION AND SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES. The City Council finds on the basis of the FOR and the record of proceedings for the Rosecrans /Sepulveda Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative that A Growth Inducing Impacts Sepulveda /Rosecrans Site Rezoning The Sepulveda/Rosecrans Site Rezoning would foster economic growth by adding new employees and customers to the Sepulveda /Rosecrans Rezoning Site, who could, 104 in turn, patronize other local businesses and services in the area Additionally, as described in Section IV J (Population, Housing & Employment), short -term employment opportunities would be provided during the construction of developments on the Sepulveda /Rosecrans Rezoning Site With the full implementation of the site rezoning, the developments would provide employment for approximately 1,904 persons The Sepulveda /Rosecrans Site Rezoning does not include housing and therefore would not include (direct) permanent population growth Should the Sepulveda /Rosecrans Site Rezoning cause newly - generated employees to relocate to the City of El Segundo or the surrounding community, it is expected that the maximum (worst - case) housing demand generated by the Sepulveda /Rosecrans Site Rezoning could be accommodated by the existing housing stock within the average 9 7 -mile commute distance from the protect site, without generating demand for new housing construction Therefore, no significant population, housing or employment impacts would be created by the Sepulveda /Rosecrans Site Rezoning The protect site is located within a highly developed urban setting Off -site water mains, sewer mains, storm drains, and utility infrastructure adjacent to the site would adequately service the Sepulveda /Rosecrans Site Rezoning Further, with mitigation, the Sepulveda/Rosecrans Site Rezoning would be adequately served by existing public services such as fire /emergency and police in the vicinity of the Sepulveda /Rosecrans Rezoning Site The Sepulveda /Rosecrans Site Rezoning would not induce growth in an area that is not already developed with infrastructure to accommodate such growth Therefore, the Sepulveda /Rosecrans Site Rezoning would not result in significant growth inducing impacts Plaza El Segundo As described in Section IV J (Population, Housing & Employment), short -term employment opportunities would be provided during the construction of the Plaza El Segundo Upon completion of the Plaza El Segundo, it would provide employment for approximately 952 persons The Plaza El Segundo Development does not include housing and therefore would not include (direct) permanent population growth Should the Plaza El Segundo Development cause newly- generated employees to relocate to the City of El Segundo or the surrounding community, it is expected that the housing demand could be accommodated by the existing housing stock within the average 9 7 -mile commute distance Therefore, no significant population, housing or employment impacts would be created by the Plaza El Segundo Development The Plaza El Segundo site is located within a highly developed urban setting Off -site water mains, sewer mains, storm drains, and utility infrastructure adjacent to the site would adequately service the Plaza El Segundo Further, with mitigation, the Plaza El Segundo Development would be adequately served by existing public services such as fire /emergency and police The Plaza El Segundo Development would not induce growth in an area that is not already developed with infrastructure to accommodate such growth Therefore, the Plaza El Segundo Development would not result in significant growth inducing impacts B Significant Irreversible Environmental Changes Sepulveda /Rosecrans Site Rezoning The type and level of construction associated with the proposed Sepulveda /Rosecrans Site Rezoning would consume limited, slowly renewable, and non- renewable resources Such resources would include the following construction supplies lumber and other forest products, aggregate materials used in concrete and asphalt such as sand, gravel, and stone, metals such as steel, copper, and lead; petrochemical construction materials 105 such as plastics, and water Fossil fuels such as gasoline and oil would also be consumed in the use of construction vehicles and equipment Subsequent use and maintenance of the proposed Sepulveda /Rosecrans Site Rezoning would also require the long -term consumption of these nonrenewable resources at reduced levels typical for commercial development These would include energy resources such as electricity and natural gas, as well as petroleum -based fuels required for the increased number of vehicle trips to be generated by the protect The proposed Sepulveda /Rosecrans Site Rezoning would add traffic to local roads, and would result in long -term increases in ambient air pollution and noise levels Potential irreversible damage from environmental accidents associated with the protect are unlikely and would be avoided by compliance with the mitigation measures proposed in this EIR as well as existing city, county, state, and federal safety regulations Plaza El Segundo Similar to that discussed above, the proposed Plaza El Segundo Development would consume limited, slowly renewable, and non - renewable resources during construction Such resources would include the following construction supplies lumber and other forest products, aggregate materials used in concrete and asphalt such as sand, gravel, and stone, metals such as steel, copper, and lead, petrochemical construction materials such as plastics, and water Fossil fuels such as gasoline and oil would also be consumed in the use of construction vehicles and equipment Subsequent use and maintenance of the proposed Plaza El Segundo would also require the long -term consumption of these nonrenewable resources These would include energy resources such as electricity and natural gas, as well as petroleum - based fuels required for the increased number of vehicle trips to be generated by the Plaza El Segundo The proposed Plaza El Segundo would add traffic to local roads, and would result in long -term increases in ambient air pollution and noise levels Potential irreversible damage from environmental accidents associated with the protect are unlikely and would be avoided by compliance with the mitigation measures proposed in this EIR as well as existing city, county, state, and federal safety regulations IV. STATEMENT OF OVERRIDING CONSIDERATIONS. The City Council finds on the basis of the FEIR and the record of proceedings in this matter that the unavoidable significant impacts of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development Reduced Traffic Generation Alternative are acceptable when balanced against the benefits of the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development Reduced Traffic Generation Alternative This determination is based on the following factors and the substantial public, social, economic, and environmental benefits flowing from the Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo Development Reduced Traffic Generation Alternative as identified in the FEIR and the record of proceedings in the matter Each benefit set forth below constitutes an overriding consideration warranting approval of each protect, independent of other benefits, despite each and every avoidable impact (a) Development of a property that is substantially vacant and is currently underutilized (b) The protect would facilitate the environmental remediation of existing subsurface soil and groundwater contamination on and around the property associated with the previous use of the protect site 106 (c) Re- designation and rezoning of industrial property for more productive commercial uses (d) Elimination of blighted areas and providing an attractive urban destination (e) Increasing and further stabilizing the City's tax base through development of new commercial businesses (f) Providing both short-term construction employment and long -term permanent employment (approximately 1,904 jobs for the Rosecrans/ Sepulveda Site Rezoning of which approximately 952 jobs would be associated with the Plaza El Segundo Development ) within the City of El Segundo (g) Increase in employment opportunities for the City's residents (h) The Plaza El Segundo Development will add to the diversification of the economic base in the City by providing for new larger format retail uses that do not currently exist in the City (1) The development will provide significant fiscal benefit to the City by generating additional business license and sales tax revenue for the City's General Fund �) The development will Increase City revenues through the generation of taxes that outweigh the City's cost of services (k) The Plaza El Segundo Development will generate an annual net fiscal benefit (revenues versus City expenses) that would range from approximately $1 082,049 to $1,611,424 in the first year of operation, rising to a range of approximately $1,307,922 to $1,958,987 in the eighth year of operation (1) The Sepulveda /Rosecrans Site Rezoning is immediately adjacent to the 2,000,000 square -foot Continental Park office development, the 2,000,000 square -foot Raytheon campus, and other office buildings along the Rosecrans Avenue commercial corridor The proposed project will provide additional retail uses and services to these employment centers (m) Development of a project that is consistent with the Elements of the General Plan (n) The project would provide a comprehensive and coordinated design of the entire project site, including landscape amenities to substantially improve the aesthetic appearance of the site and the surrounding area (o) The project would reduce the maximum permitted floor area ratio on the property from 0 6 1 to 0 275 1 (p) Funding on -site and off -site Circulation Element planned improvements, including new and widened roadways, intersections, signals, medians and landscaping in the project vicinity at no cost to the City (q) The Project will include the construction of two new roadways (Park Place and Allied Way extensions) that will further the City's goal of implementing 107 the 2004 Circulation Element Master Plan of Streets and improving the circulation system in the southeast quadrant of the City (r) The Sepulveda /Rosecrans Site Rezoning will include the widening of Sepulveda Boulevard on the east side of the street to provide acceleration and deceleration lanes to serve the project and widening a portion of the north side of Rosecrans Avenue to provide a dedicated right -turn lane The developer will dedicate property for the lane widening providing a public benefit to the entire City (s) Expansion of the planned ITS network that will increase its effectiveness in relieving congestion (t) Contribution of $1,500,000 to the City aquatic related recreational uses (u) Contribution of approximately $250,000 to enhance, promote and maintain the public improvements adjacent to businesses and property owners in the Downtown Specific Plan area of El Segundo (v) Contribution of approximately $250,000 in traffic impact mitigation fees to offset the impacts of the project on public roadway infrastructure (w) Contribution of approximately $119,000 in police, fire, and library, mitigation fees to offset the impacts of the project on public services. (x) A development agreement, including all of the consideration and benefits received by the City thereunder, which provides the City with certainty respecting the development process, including but not limited to the potential uses that will be developed on the property V. RECIRCULATION. A Facts 1 The City received comments on the DEIR from members of the public and from public agencies in both written and oral form The FEIR contains written responses to all comments ( "Responses to Comments ") received on the DEIR as of December 15, 2005. Some comments were incorporated into the FEIR as factual corrections and minor changes The FEIR includes all factual corrections and minor changes to the DEIR All comments and testimony received prior to and at the City Council's public hearing have been considered B Findm Pursuant to CEQA Guideline § 15088 5 and Public Resources Code § 21092 1, and based on the FEIR and the record of proceedings in for the Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development, the City Council finds that 1 Factual corrections and minor changes are set forth as additions and corrections to the DEIR, and 2 The factual corrections and minor changes to the DEIR are not substantial changes in the DEIR that would deprive the public of a meaningful opportunity to comment on a substantial adverse environmental effect of the 108 Rosecrans /Sepulveda Site Rezoning and Plaza El Segundo Development, a feasible way to mitigate or avoid such an effect, or a feasible Project alternative, and 3 The factual corrections and minor changes to the DEIR will not result in new significant environmental effects or substantially increase the severity of the significant effects previously disclosed in the DEIR, and 4 The factual corrections and minor changes to the DEIR will not involve mitigation measures or alternatives which are considerably different from those analyzed in the DEIR that would substantially reduce one or more significant effects on the environment, and 5 The factual corrections and minor changes to the DEIR do not render the DEIR so fundamentally inadequate and conclusory in nature that meaningful public review and comment would be precluded Thus, the City Council finds that none of the conditions set forth in CEQA Guideline § 15088 5 or Public Resources Code § 21092 1 requiring recirculation of a draft environmental impact report were met The City Council further finds that incorporation of the factual corrections and minor changes to the DEIR into the FEIR does not require that the FEIR to be recirculated for public comment VI. SUBSTANTIAL EVIDENCE. The City Council finds and declares that substantial evidence for each and every finding made herein is contained in the FEIR, which is incorporated herein by this reference, and in the record of proceedings in the matter To the extent applicable, each of the other findings made by the City Council In connection with its approval of the entitlement applications listed in Section I above are also Incorporated herein by this reference P \Planning & Building Safety\ PROJECTS \626- 650 \EA - 631 \Council Agenda PacketTinal Approved Documents \EA - 631 CEQA Resolution findings Exh A RTGA doc 109 CITY COUNCIL RESOLUTION No. 4415 Exhibit B IX. MITIGATION MONITORING AND REPORTING PROGRAM MITIGATION MONITORING AND REPORTING PROGRAM PROCEDURES Section 21081 6 of the Public Resources Code requires a Lead Agency to adopt a `reporting or monitoring program for the changes to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment' (Mitigation Monitoring Program, Section 15097 of the CEQA Guidelines provides additional direction on mitigation monitoring or reporting) The Planning and Building Safety Department for the City of El Segundo is the Lead Agency for the Sepulveda/Rosecrans Site Rezoning and Plaza El Segundo Development An Environmental Impact Report has been prepared to address the potential environmental impacts of the proposed project Where appropriate, this environmental document identified project design features or recommended mitigation measures to avoid or to reduce potentially significant environmental impacts of the proposed project This Mitigation Monitoring and Reporting Program (MMRP) is designed to monitor implementation of requirements for subsequent environmental documentation' and mitigation measures identified for the Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and the Plaza El Segundo Reduced Traffic Generation Alternative Development The MMRP is subject to review and approval by the Lead Agency as part of the certification of the EIR and adoption of project conditions The required subsequent environmental documentation and mitigation measures are listed separately and categorized by impact area, with an accompanying identification of the following • Monitoring Phase, the phase of the project during which the mitigation measure must be monitored, Pre- Construction, including the design phase Construction Post- Construction • The Implementing Party, the agency with the power to implement the mitigation measure, • The Enforcement Agency, the agency with the power to enforce the mitigation measure, and i In addition to mitigation measures, requirements for the preparation of subsequent environmental analysis and documentation are identified in the EIR These requirements are intended to provide guidance for environmental review offuture projects that would implement the Sepulveda/Rosecrans Site Rezoning, using the Program EIR Because these requirements would also work to mitigate or avoid significant effects on the environment in accordance with PRC Section 210816, they have been included in this MMRP Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -I Final Environmental Impact Report City of El Segundo February 2005 • The Monitoring Agency, the agency to which reports involving feasibility, compliance, implementation and development are made The MMRP performance must be monitored annually to determine the effectiveness of the measures implemented in any given year and re- evaluate the mitigation needs for the upcoming year I. AESTHETICS Subsequent Environmental Documentation No subsequent environmental documentation is required for the Sepulveda/Rosecrans Site Rezoning and Plaza El Segundo Development Mitigation Measures Sepulveda/Rosecrans Site Rezoning Impacts related to visual character and light and glare would be less than significant under the proposed Sepulveda/Rosecrans Site Rezoning and Plaza El Segundo Development No mitigation measures are required However, the following measures are recommended as Conditions of Approval to ensure that potential impacts from glare are less than significant B -1 Expansive areas of highly reflective materials, such as mirrored glass, must not be permitted Non - reflective building materials must be used to the maximum extent possible to reduce potential glare impacts Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Planning and Building Safety Department Monitoring Agency: Planning and Building Safety Department B -2 Lighting must be designed to minimize off -site glare Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Pre - construction, Construction Applicant Planning and Building Safety Department Planning and Building Safety Department Impacts related to visual character and light and glare would be less than significant under the Plaza El Segundo Development No mitigation measures are required However, the following measures are recommended as Conditions of Approval to ensure that potential impacts from glare are less than significant Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -2 Final Environmental Impact Report City of El Segundo February 2005 B -3 Expansive areas of highly reflective materials, such as mirrored glass, must not be permitted Non - reflective building materials must be used to the maximum extent possible to reduce potential glare impacts Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Planning and Building Safety Department Monitoring Agency: Planning and Building Safety Department B -4 Lighting must be designed to minimize off -site glare Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: II. AIR QUALITY Subsequent Environmental Documentation Pre- construction, Construction Applicant Planning and Building Safety Department Planning and Building Safety Department Subsequent environmental documentation must be prepared for any future development project proposed within the Sepulveda/Rosecrans Rezoning Site to identify emissions associated with construction of that specific development The subsequent environmental documentation must address the following C -1 Prior to implementation of specific development projects, impacts associated with construction emissions must be examined in light of this Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration This examination must provide quantified estimates of construction emissions based upon the specific site, schedule and construction equipment utilization characteristics of the proposed development and compare the estimated emissions to the SCAQMD thresholds for construction emissions The analysis must incorporate the mitigation measures identified below as appropriate, along with any other mitigation measures identified by the project- specific analysis Mitigation Measures SepulveddlRoseerans Site Rezoning C -1 Prior to implementation of specific development projects, impacts associated with construction emissions must be examined This examination must provide quantified estimates of construction emissions based upon the specific site, schedule and construction equipment utilization charactenstics of the proposed development and compare the estimated emissions to the SCAQMD thresholds for construction emissions SepulvedalRosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -3 Final Environmental Impact Report City of El Segundo February 2005 The analysis must incorporate the mitigation measures identified below as appropriate, along with any other mitigation measures identified by the project- specific analysts Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning and Building Safety Department Monitoring Agency: Planning and Building Safety Department Construction C -2 The construction area and vicinity (500 -foot radius) must be swept (preferably with water sweepers) and watered at least twice daily Site wetting must occur often enough to maintain a 10 percent surface soil moisture content throughout all earth moving activities Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -3 All unpaved roads, parking and staging areas must be watered at least once every two hours of active operation Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C-4 Site access points must be swept/washed within thirty minutes of visible dirt deposition Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -5 On -site stockpiles of debris, dirt or rusty materials must be covered or watered at least twice daily Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -4 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Agency: Planning and Building Safety Department, Public Works Department C -6 All haul trucks hauling soil, sand, and other loose materials must either be covered or maintain two feet of freeboard Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -7 All haul trucks must have a capacity of no less than twelve and three- quarter (12 75) cubic yards Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -8 At least 80 percent of all inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind driven fugitive dust Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -9 Operations on any unpaved surfaces must be suspended when winds exceed 25 mph Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -10 Traffic speeds on unpaved roads must be limited to 15 miles per hour Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -5 Final Environmental Impact Report City of E1 Segundo February 2005 C -11 Operations on any unpaved surfaces must be suspended during first and second stage smog alerts Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -12 The applicant must develop and implement a construction management plan, as approved by the City of El Segundo, which includes the following measures recommended by the SCAQMD, or equivalently effective measures approved by the SCAQMD a Configure construction parking to minimize traffic interference b Provide temporary traffic controls during all phases of construction activities to maintain traffic flow (e g , flag person) c Schedule construction activities that affect traffic flow on the arterial system to off - peak hours to the degree practicable d Re -route construction trucks away from congested streets e Consolidate truck deliveries when possible f Provide dedicated turn lanes for movement of construction trucks and equipment on- and off -site g Maintain equipment and vehicle engines in good condition and in proper tune as per manufacturer's specifications and per SCAQMD rules, to minimize exhaust emissions h Suspend use of all construction equipment operations during second stage smog alerts Contact SCAQMD at (800) 242 -4022 for daily forecasts Use electricity from power poles rather than temporary diesel- or gasoline- powered generators Use methanol- or natural gas - powered mobile equipment and pile drivers instead of diesel if readily available at competitive pnces k Use propane- or butane- powered on -site mobile equipment instead of gasoline if readily available at competitive prices Sepulveda /Roseerans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -6 Final Environmental Impact Report City of El Segundo February 1005 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Construction Pre - construction, Construction Applicant South Coast Air Quality Management District Planning and Building Safety Department, Public Works Department C -13 The construction area and vicinity (500 -foot radius) must be swept (preferably with water sweepers) and watered at least twice daily Site wetting must occur often enough to maintain a 10 percent surface soil moisture content throughout all earth moving activities Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -14 All unpaved roads, parking and staging areas must be watered at least once every two hours of active operation Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: C -15 Site access points must I Construction Applicant South Coast Air Quality Management District Planning and Building Safety Department, Public Works Department e swept/washed within thirty minutes of visible dirt deposition Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -16 On-site stockpiles of debris, dirt or rusty materials must be covered or watered at least twice daily Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development page IX-7 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Agency: Planning and Building Safety Department, Public Works Department C -17 All haul trucks hauling soil, sand, and other loose materials must either be covered or maintain two feet of freeboard Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -18 All haul trucks must have a capacity of no less than twelve and three - quarter (12 75) cubic yards Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -19 At least 80 percent of all inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind driven fugitive dust Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -20 Operations on any unpaved surfaces must be suspended when winds exceed 25 mph Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -21 Traffic speeds on unpaved roads must be limited to 15 miles per hour Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -8 Final Environmental Impact Report City of El Segundo February 2005 C -22 Operations on any unpaved surfaces must be suspended during first and second stage smog alerts Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department C -23 The applicant must develop and implement a construction management plan, as approved by the City of El Segundo, which includes the following measures recommended by the SCAQMD, or equivalently effective measures approved by the SCAQMD a Configure construction parking to minimize traffic interference b. Provide temporary traffic controls during all phases of construction activities to maintain traffic flow (e g, flag person) c Schedule construction activities that affect traffic flow on the arterial system to off- peak hours to the degree practicable d Re -route construction trucks away from congested streets e Consolidate truck deliveries when possible f Provide dedicated turn lanes for movement of construction trucks and equipment on- and off -site g Maintain equipment and vehicle engines in good condition and in proper tune as per manufacturer's specifications and per SCAQMD rules, to minimize exhaust emissions It Suspend use of all construction equipment operations during second stage smog alerts Contact SCAQMD at (800) 242 -4022 for daily forecasts Use electricity from power poles rather than temporary diesel- or gasoline- powered generators I Use methanol- or natural gas - powered mobile equipment and pile drivers instead of diesel if readily available at competitive prices k Use propane- or butane- powered on -site mobile equipment instead of gasoline if readily available at competitive prices Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -9 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Pre - construction; Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management District Monitoring Agency: Planning and Building Safety Department, Public Works Department III. BIOLOGICAL RESOURCES Subsequent Environmental Documentation Subsequent environmental documentation must be prepared for any proposed development project that includes the northwest corner of the proposed Sepulveda/Rosecrans Rezoning Site that has been identified as potentially containing 0 30 acres of jurisdictional wetlands area under the jurisdiction of LARWQCB Impacts to any jurisdictional wetlands that may exist in this area must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must address the following D -1 A site specific analysis must be conducted to determine whether the design of the proposed development project would impact any of the 0 30 acres identified as potential jurisdictional wetlands This analysis shall be completed prior to the start of construction activities for any proposed development within the Sepulveda/Rosecrans Rezoning Site If jurisdictional wetlands would be affected by the development project, measures shall be identified to reduce impacts to less than significant levels Subsequent environmental documentation must also be prepared for any proposed development project within the proposed SepulvedafRosecrans Rezoning Site to determine the presence /absence of sensitive species This information must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must address the following D -2 Site specific analysis of potential effects to four sensitive bird species (white tailed kite, loggerhead shrike, burrowing owl and Belding's savannah sparrow) must be conducted prior to the start of construction activities for any proposed development within the Sepulveda/Rosecrans Rezoning Site If any of these sensitive species would be affected by the proposed development, measures must be identified to reduce impacts to these species to less than significant levels, including, but not limited to, on -site monitoring by a qualified biologist during grading and/or construction activities Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -10 Final Environmental Impact Report City of El Segundo February 2005 In the preparation of subsequent environmental documentation, as described above, it is not necessary to re -survey any area that has already been addressed in this EIR or may be surveyed in the course of preparing subsequent environmental documentation for later projects Mitigation Measures Sepulveda/Rosecrans Site Rezoning D -1 A site specific analysis must be conducted to determine whether the design of the proposed development project would impact any of the 0 30 acres identified as potential jurisdictional wetlands This analysis shall be completed prior to the start of construction activities for any proposed development within the Sepulveda(Rosecrans Rezoning Site If jurisdictional wetlands would be affected by the development project, measures shall be identified to reduce impacts to less than significant levels Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Los Angeles Regional Water Quality Control Board Monitoring Agency: Planning Division D -2 Site specific analysis of potential effects to four sensitive bird species (white tailed kite, loggerhead shrike, burrowing owl and Belding's savannah sparrow) must be conducted prior to the start of construction activities for any proposed development within the Sepulveda/Rosecrans Rezoning Site If any of these sensitive species would be affected by the proposed development, measures must be identified to reduce impacts to these species to less than significant levels, including, but not limited to, on -site monitoring by a qualified biologist during grading and/or construction activities Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: California Department of Fish and Game Monitoring Agency: Planning Division D -3 All construction personnel must receive copies of all pertinent mitigation measures to reduce impacts to general biological resources and must be instructed on avoiding adverse impacts to birds encountered on -site Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division D4 Prior to site remediation or construction grading on parts of the Site where burrowing owls may occur, a qualified biologist must be retained to conduct surveys for burrowing Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -11 Final Environmental Impact Report City of El Segundo February 2005 owl to determine if it is resident on -site Surveys must be conducted no more than 30 days prior to commencement of such activities If burrowing owl is determined to be resident, a qualified biologist must oversee site remediation and demolition activities in and around any semi - natural areas which could be occupied by burrowing owl Proposed mitigation measures must be presented to the California Department of Fish and Game and/or U S Fish and Wildlife Service for approval to avoid directly harming the owl if it is present on -site during these activities Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: California Department of Fish and Game; United States Fish and Wildlife Service Monitoring Agency: Planning Division Plaza El Segundo Development D -5 All construction personnel must receive copies of all pertinent mitigation measures to reduce impacts to general biological resources and must be instructed on avoiding adverse impacts to birds encountered on -site Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division D -6 Prior to site remediation or construction grading on parts of the Site where burrowing owls may occur, a qualified biologist must be retained to conduct surveys for burrowing owl to determine if it is resident on -site Surveys must be conducted no more than 30 days prior to commencement of such activities If burrowing owl is determined to be resident, a qualified biologist must oversee site remediation and demolition activities in and around any semi - natural areas which could be occupied by burrowing owl Proposed mitigation measures must be presented to the California Department of Fish and Game and/or U S Fish and Wildlife Service for approval to avoid directly harming the owl if it is present on -site during these activities Monitoring Phase: Pre- construction, Construction Implementation Party: Applicant Enforcement Agency: California Department of Fish and Game, United States Fish and Wildlife Service Monitoring Agency: Planning Division D -7 Prior to issuance of building permits, evidence must be provided to the City of El Segundo that all necessary approvals for any wetland dredge /fill contemplated by such Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -12 Final Environmental Impact Report City of E1 Segundo February 2005 permit have been obtained from the Regional Water Quality Control Board — Los Angeles Region or equivalent documentation, or a waiver stating that no permit is presently required pursuant to the regulations of that agency If required, conditions for permit approval by LARWQCB must include, but may not be limited to the following • Mitigation of any unavoidable impacts to wetland values and functions to the satisfaction of the permitting agency, • Incorporation of buffers to the wetland areas, • On -site treatment of runoff to improve water quality, and • Compliance with best management practices during construction Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: IV. GEOLOGY AND SOILS Subsequent Environmental Documentation Pre- construction Applicant Los Angeles Regional Water Quality Control Board Planning Division Subsequent environmental documentation must be prepared for any proposed development on the Sepulveda/Rosecrans Rezoning Site to determine the presence or absence of methane The subsequent environmental documentation must address the following E -1 A methane study must be conducted to determine the levels at which methane is or is not present in the area of any proposed development If methane is determined to be present at or above levels which require action, then the report must include recommendations and mitigation measures which must be followed Mitigation Measures SepulvedaJRosecrans Site Rezoning E -1 A methane study must be conducted to determine the levels at which methane is or is not present in the area of any proposed development If methane is determined to be present at or above levels which require action, then the report must include recommendations and mitigation measures which must be followed Monitoring Phase: Pre - construction Implementation Party: Applicant Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -13 Final Environmental Impact Report City of El Segundo February 2005 Enforcement Agency: Planning and Building Safety Department Monitoring Agency: Building Safety Division E -2 All soil disturbance and travel on unpaved surfaces must be suspended if winds exceed 25 miles per hour Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Construction Applicant South Coast Air Quality Management District Building Safety Division, Public Works Department E -3 All soil disturbance and travel on unpaved surfaces must be suspended if winds exceed 25 miles per hour Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: South Coast Air Quality Management Distnct Monitoring Agency: Building Safety Division, Public Works Department V. HYDROLOGY AND WATER QUALITY Subsequent Environmental Documentation No subsequent environmental documentation is required Mitigation Measures Sepulveda/Rosecrans Site Rezoning Construction F -1 The applicant must prepare hydrology studies for each specific development on the Sepulveda/Rosecrans Rezoning Site Such studies must be reviewed and approved by the City of El Segundo and any other applicable agency Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Building Safety Division, Public Works Department F -2 The applicant must prepare runoff studies for each specific development on the Sepulveda/Rosecrans Rezoning Site so that the runoff from one specific project area would not flow onto another specific project area without the owners consent Such Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -14 Final Environmental Impact Report City of El Segundo February 2005 studies must be reviewed and approved by the City of E1 Segundo and any other applicable agency Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Building Safety Division, Public Works Department F -3 The applicant must prepare a master drainage plan for each specific development on the Sepulveda/Rosecrans Rezoning Site This plan must include detailed hydrology/hydraulic calculations and drainage improvements, showing quantitatively how the project will eliminate the potential for downstream flooding due to increased storm water runoff These plans will also identify the proposed BMPs to be implemented in compliance with the requirements of the Standard Urban Storm Water Mitigation Plan and the ESMC Such plans must be reviewed and approved by the City of el Segundo and the Los Angeles County Department of Public Works Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Building Safety Division, Public Works Department F4 The applicant must design, for each specific development on the Sepulveda/Rosecrans Rezoning Site, a conveyance and detainment system to meet the Los Angeles County Department of Public Works limits on the storm drains that would convey the Sepulveda/Rosecrans Rezoning Site's discharge Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department F -5 The proposed Sepulveda/Rosecrans Site Rezoning and Plaza E1 Segundo Development must comply with the City of El Segundo Ordinance No 1347 and No 1348, which establishes storm water and urban pollution controls Monitoring Phase: Pre- construction, Construction, Post - Construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Public Works Department Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -15 Final Environmental Impact Report City of El Segundo February 2005 Operation F -6 The project owner /developer of a specific development (e g, Plaza El Segundo) on the Sepulveda/Rosecrans site must maintain all structural or treatment control BMPs for the life of the project Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department, El Segundo Fire Department Monitoring Agency: Building Safety Division, Public Works Department, El Segundo Fire Department Plaza El Segundo Development Construction F -7 The applicant must prepare a hydrology study for the Plaza El Segundo site The study must be reviewed and approved by the City of El Segundo and any other applicable agencies Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Building Safety Division, Public Works Department F -8 The applicant must prepare a runoff study for the Plaza El Segundo site so that the runoff does not flow onto another area without the owners consent The study must be reviewed and approved by the City of El Segundo and any other applicable agencies Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Building Safety Division, Public Works Department F -9 The applicant must prepare a master drainage plan for the Plaza El Segundo site This plan must include detailed hydrology/hydraulic calculations and drainage improvements, showing quantitatively how the project will eliminate the potential for downstream flooding due to increased storm water runoff These plans will also identify the proposed BMPs to be implemented in compliance with the requirements of the Standard Urban Storm Water Mitigation Plan and the ESMC. Such plans must be reviewed and approved by the City of El Segundo and the Los Angeles County Department of Public Works Monitoring Phase: Pre - construction Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -16 Final Environmental Impact Report City of El Segundo February 2005 Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Public Works Department F -10 The applicant must design a conveyance and detainment system to meet the City of El Segundo's and Los Angeles County Department of Public Works limits on the storm drains that would convey the Plaza El Segundo site's discharge Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Public Works Department F -11 The proposed Plaza El Segundo Development must comply with the City of El Segundo Ordinance No 1347 and No 1348, which establishes storm water and urban pollution controls Monitoring Phase: Pre - construction, Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Public Works Department Operation F -12 The project owner /developer must maintain all structural or treatment control BMPs for the life of the Plaza El Segundo Development Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, El Segundo Fire Department Monitoring Agency: Public Works Department, El Segundo Fire Department VI. HAZARDS AND HAZARDOUS MATERIALS Subsequent Environmental Documentation Subsequent environmental documentation must be prepared for any proposed development project within the proposed Sepulveda/Rosecrans Rezoning Site Conditions related to soil and groundwater contamination must be examined for the proposed development site, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must address the following Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -17 Final Environmental Impact Report City of El Segundo February 1005 G -1 A full characterization of all the parcels that comprise that project site must be undertaken The City must require that this process be initiated by requiring the project applicant to conduct a Phase I Environmental Site Assessment (ESA) or equivalent investigation and analysis for the specific project site that would be occupied by the proposed development The Phase I ESA or equivalent document must be prepared by a licensed professional (Registered Environmental Assessor or equivalent) and submitted to the City for review G -2 If indicated by the initial investigation, the City must require the preparation of subsequent Phase 11 mvestigation(s) and submission to the Los Angeles Regional Water Quality Control Board and/or other appropriate agency The project applicant must provide to the City copies of all materials submitted to the LARWQCB or any other regulatory agency G -3 Remediahon of any environmental conditions identified in the Phase I and Phase 11 site assessments or investigations must be accomplished to the standards established and agreed upon by the appropriate regulatory agency(ies) for the contemplated development, prior to the issuance of grading or building permits for the project The project applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency. G -4 If the future development project would include any part of the Sepulveda/Rosecrans Rezoning Site that currently contains structures, an asbestos and lead survey must be conducted to determine the presence or absence of these substances Removal of these substances must be conducted in accordance with all applicable rules and regulations Mitigation Measures Sepulveda/Rosecrans Site Rezoning G -1 A full characterization of all the parcels that comprise that project site must be undertaken The City must require that this process be initiated by requiring the project applicant to conduct a Phase I Environmental Site Assessment (ESA) or equivalent investigation and analysis for the specific project site that would be occupied by the proposed development The Phase I ESA or equivalent document must be prepared by a licensed professional (Registered Environmental Assessor or equivalent) and submitted to the City for review Monitoring Phase: Pre- construction Implementation Party: Applicant Enforcement Agency: Planning Division, El Segundo Fire Department Monitoring Agency: Planning Division Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -18 Final Environmental Impact Report City of E1 Segundo February 2005 G -2 If indicated by the initial investigation, the City must require the preparation of subsequent Phase II investigation(s) and submission to the Los Angeles Regional Water Quality Control Board and/or other appropriate agency The project applicant must provide to the City copies of all materials submitted to the LARWQCB or any other regulatory agency Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Los Angeles Regional Water Quality Control Board, Planning Division Monitoring Agency: Planning Division G -3 Remediation of any environmental conditions identified in the Phase I and Phase II site assessments or investigations must be accomplished to the standards established and agreed upon by the appropriate regulatory agency(ies) for the contemplated development, prior to the issuance of grading or building permits for the project The project applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division, Los Angeles Regional Water Quality Control Board Monitoring Agency: Planning Division G-4 If the future development project would include any part of the Sepulveda/Rosecrans Rezoning Site that currently contains structures, an asbestos and lead survey must be conducted to determine the presence or absence of these substances Removal of these substances must be conducted in accordance with all applicable rules and regulations Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Pre- construction, Construction Applicant Building Safety Division Building Safety Division G -5 Remedial investigations, health risk assessments for the contemplated development and soils remedial action plans for the Plaza El Segundo portion of the project site must be completed and approved to the standards established and agreed upon in conjunction with the LARWQCB prior to the start of any project activities The project applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -19 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division, Los Angeles Regional Water Quality Control Board Monitoring Agency: Planning Division G -6 Remediation of shallow soil of the Plaza El Segundo Development site must be accomplished to the standards for commercial development established and agreed upon in conjunction with the LARWQCB and a shallow soil closure letter must be issued by the LARWQCB prior to the issuance of grading permits for construction of the proposed Plaza El Segundo Development The project applicant must provide to the City copies of any materials received from the LARWQCB or any other regulatory agency Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division, Los Angeles Regional Water Quality Control Board Monitoring Agency: Planning Division VII. LAND USE Subsequent Environmental Documentation No subsequent environmental documentation is required Mitigation Measures Sepulveda/Rosecrans Site Rezoning No mitigation measures are required Plaza El Segundo Development No mitigation measures are required Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -20 Final Environmental Impact Report City of El Segundo February 2005 VIII. NOISE Subsequent Environmental Documentation Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda/Rosecrans site The subsequent environmental documentation must address the following- I -1 A project- specific construction noise analysis must be prepared that calculates, based on project- specific parameters and identification of the site - specific sensitive receptors that could be affected by construction activities, the noise levels that would be experienced at sensitive receptors located adjacent to that site If noise levels resulting from construction activity would result in temporary construction noise levels that exceed 65 dBA at a sensitive receptor, or cause an incremental increase of 5 dBA over the existing ambient sound level, if the existing ambient sound level at the sensitive receptor location is 65 dBA or more, then the study must identify feasible mitigation measures to be applied to that project from the list of mitigation measures provided below Mitigation Measures Sepulveda/Rosecrans Site Rezoning I -1 A project- specific construction noise analysis must be prepared that calculates, based on project- specific parameters and identification of the site - specific sensitive receptors that could be affected by construction activities, the noise levels that would be experienced at sensitive receptors located adjacent to that site If noise levels resulting from construction activity would result in temporary construction noise levels that exceed 65 dBA at a sensitive receptor, or cause an incremental increase of 5 dBA over the existing ambient sound level, if the existing ambient sound level at the sensitive receptor location is 65 dBA or more, then the study must identify feasible mitigation measures to be applied to that project from the list of mitigation measures provided below • Construction contracts must specify that all construction equipment must be equipped with mufflers and other applicable noise attenuation devices • During construction phases, the contractor must store and maintain equipment as far as possible from the adjacent receptor property locations to the southwest, north, and east of the Sepulveda/Rosecrans Rezoning Site • As stated in the City of El Segundo Municipal Code, construction must be restricted to the hours of 7 00 a in to 6 p in Monday through Saturday, and prohibited at anytime on Sunday or a Federal holiday SepulvedalRosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -21 Final Environmental Impact Report City of El Segundo February 1005 • Temporary plywood noise barriers must be constructed along the property lines of the Sepulveda/Rosecrans Rezoning Site during construction, which must be high enough to block the line -of -site between the Sepulveda/Rosecrans Rezoning Site and receptor property locations to the southwest, north, and east Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division Plaza El Segundo Development I -2 Construction contracts must specify that all construction equipment must be equipped with mufflers and other applicable noise attenuation devices Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division I -3 During construction phases, the contractor must store and maintain equipment as far as possible from the adjacent receptor property locations to the north and east of the Plaza El Segundo Site Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division I -4 As stated in the City of El Segundo Municipal Code, construction must be restricted to the hours of 7 00 a in to 6 p in Monday through Saturday, and prohibited at anytime on Sunday or a Federal holiday Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Building Safety Division Monitoring Agency: Building Safety Divsion I -5 Temporary plywood noise barriers must be constructed along the property lines of the 4 5 net acre portion of the Plaza El Segundo site south of the UPRR tracks during construction, which must be high enough to block the line -of -site (a minimum of 8 feet above existing grade) between the Plaza El Segundo site and receptor property locations to the southwest, north, and east Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development page 1X -22 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Construction Applicant Planning Division Building Safety Division IX. POPULATION, HOUSING, AND EMPLOYMENT Subsequent Environmental Documentation No subsequent environmental documentation is required Mitigation Measures Sepulveda/Rosecrans Site Rezoning No mitigation measures are required Plaza El Segundo Development No mitigation measures are required X. PUBLIC SERVICES Fire Protection Subsequent Environmental Documentation No subsequent environmental documentation is required Mitigation Measures Sepulveda /Rosecrans Site Rezoning K 1 -1 The applicant must pay the City of El Segundo a Fire Service Mitigation Fee of $0 14 per gross square foot of building area prior to the issuance of a certificate of occupancy Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division K 1 -2 A fire life safety plan, which must include definitive plans and specifications, must be submitted to the El Segundo Fire Department (ESFD) for review and approval prior to commencement of construction of any portion of the proposed development Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -23 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant El Segundo Fire Department El Segundo Fire Department K 1 -3 The applicant must provide fire access roadways to and throughout the property and submit a layout plan to the ESFD for approval Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant El Segundo Fire Department El Segundo Fire Department K 1-4 The applicant must provide water flow and on -site fire hydrants as required by the ESFD Monitoring Phase: Pre - construction, Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, El Segundo Fire Department Monitoring Agency: El Segundo Fire Department K 1 -5 The following installations require separate Fire Department approval The applicant must submit separate plans for Fire Department review • Automatic fire sprinklers, • Fire alarm system, • Underground fire service mains, • Fire pumps, • Emergency generators, and • Any aboveground or underground storage tank including elevator sumps and condensation tanks Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Pre - construction Applicant El Segundo Fire Department El Segundo Fire Department K 1 -6 The applicant must pay the City of El Segundo a Fire Service Mitigation Fee of $0 14 per gross square foot of building area prior to the issuance of a certificate of occupancy SepulvedalRosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -24 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division K 1 -7 A fire life safety plan, which must include definitive plans and specifications, must be submitted to the El Segundo Fire Department (ESFD) for review and approval prior to commencement of construction of any portion of the proposed development Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant El Segundo Fire Department El Segundo Fire Department K 1 -8 The applicant must provide fire access roadways throughout the property and submit a layout plan to the ESFD for approval Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre- construction Applicant El Segundo Fire Department El Segundo Fire Department K 1 -9 The applicant must provide water flow and on -site fire hydrants as required by the ESFD Monitoring Phase: Pre - construction, Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, El Segundo Fire Department Monitoring Agency: El Segundo Fire Department K 1 -10 The following installations require separate Fire Department approval The applicant must submit separate plans for Fire Department review • Automatic fire sprinklers, • Fire alarm system, • Underground fire service mains, • Fire pumps, • Emergency generators, and • Any aboveground or underground storage tank including elevator sumps and condensation tanks Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -25 Final Environmental Impact Report Cary of El Segundo February 2005 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Police Protection Subsequent Environmental Documentation Pre - construction Applicant El Segundo Fire Department El Segundo Fire Department No subsequent environmental documentation is required Mitigation Measures SepulvedalRosecrans Site Rezoning K 2 -1 The applicant must pay the City of El Segundo a Police Service Mitigation Fee of $0 11 per gross square foot of building area prior to the occupancy of each building Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division K 2 -2 A strategic security plan, which must include definitive plans and specifications, must be submitted to the El Segundo Police Department (ESPD) for review and approval prior to commencement of construction of any portion of the proposed Sepulveda/Rosecrans Site Rezoning and Plaza El Segundo Development The strategic security plan must include, but not be limited to, the following item • Depending upon the size of the structure and its location in relation to the streets, the size of the displayed address may vary from a minimum of 4" to as much as 24" • Building entrances and exits must be limited in number and located in a manner to increase security and visibility of the building • All landscaping must be low profile especially around perimeter fencing, windows, doors and entryways taking special care not to limit visibility and provide climbing access • Adequate street, walkway, building and parking lot lighting must be provided to enhance security • Provisions for on -site security personnel Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -26 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Pre - construction Applicant El Segundo Police Department El Segundo Police Department K 2 -3 The applicant must pay the City of El Segundo a Police Service Mitigation Fee of $0 11 per gross square foot of building area prior to the occupancy of each building Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division K 2-4 A strategic security plan, which must include definitive plans and specifications, must be submitted to the El Segundo Police Department (ESPD) for review and approval prior to commencement of construction of any portion of the proposed Sepulveda/Rosecrans Site Rezoning and Plaza El Segundo Development The strategic security plan must include, but not be limited to, the following item • Depending upon the size of the structure and its location in relation to the streets, the size of the displayed address may vary from a minimum of 4" to as much as 24" • Building entrances and exits must be limited in number and located in a manner to increase security and visibility of the building • All landscaping must be low profile especially around perimeter fencing, windows, doors and entryways taking special care not to limit visibility and provide climbing access • Adequate street, walkway, building and parking lot lighting must be provided to enhancesecurity • Provisions for on -site security personnel Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: El Segundo Police Department Monitoring Agency: El Segundo Police Department XI. TRANSPORTATION AND TRAFFIC Subsequent Environmental Documentation Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -27 Final EnvuonmentalImpact Report City of El Segundo February 2005 No subsequent environmental documentation is required Mitigation Measures Sepulveda/Rosecrans Site Rezoning Physical Roadway Improvements L -1 El Segundo Boulevard and Sepulveda Boulevard Convert the existing eastbound right - turn only lane to a shared through/nght -turn lane There exists three receiving lanes on the east leg of the intersection In addition, modify the raised center median to convert the westbound shared through left -turn lane to a dedicated second left turn lane and additional through lane Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Caltrans Monitoring Agency: Public Works Department, Caltrans L -2 El Segundo Boulevard and Aviation Boulevard Not required for Sepulveda/Rosecrans Site Rezoning Reduced Traffic Generation Alternative L -3 Park Place and Nash Street Provide a new traffic signal at this location Widen and restnpe the eastbound and westbound directions to provide one left -turn lane, one through lane, and one right -turn only lane Monitoring Phase: Pre- construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department L -4 Park Place and Douglas Street Provide a new traffic signal at this location Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department L -5 Rosecrans Avenue and Sepulveda Boulevard On the westbound approach of Rosecrans Avenue dedicate additional nght -of -way on the north side of Rosecrans Avenue to provide a free flow right -turn lane and third left -turn lane Sepulveda Boulevard south of Rosecrans Avenue may need to be widened to accommodate the third left -turn lane, depending on the specific design of this lane This widening could take place within the existing Sepulveda Boulevard right -of -way Widen the east side of Sepulveda Boulevard Sepulveda / Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development page IX-28 Final Environmental Impact Report City of El Segundo February 2005 along the project frontage to provide the acceptance lane for the free westbound right - turn lane This additional lane on Sepulveda should be improved to the new Park Place connection where a right turn lane will be provided This intersection's jurisdiction is shared with Manhattan Beach and Caltrans Coordination and concurrence of these agencies for implementation of these improvements would be required Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Caltrans, City of Manhattan Beach Public Works Department Monitoring Agency: Public Works Department, Caltrans, City of Manhattan Beach Public Works Department L -6 Rosecrans Avenue and Continental Way Not required for DepulvedalRosecrans Site Rezoning Reduced Traffic Generation Alternative L -7 Rosecrans Avenue and Douglas Street On the westbound approach, widen the north side of Rosecrans Avenue to provide a dedicated westbound right -turn lane This intersection's jurisdiction is shared with Manhattan Beach Coordination and concurrence of this agency for implementation of this improvement would be required This improvement is included as part of the current Rosecrans/Aviation Widening (discussed above under "Future Highway System Improvements ") but will be guaranteed by the project Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, City of Manhattan Beach Public Works Department Monitoring Agency: Public Works Department, City of Manhattan Beach Public Works Department Site Trip Reductions L -8 Project applicants must promote ndeshare programs (bikes, rdeshare matching and transit options) as required by the City of El Segundo Transportation Demand Management Program (TDM) In addition to the traditional TDM program, project applicants must promote access to the Commute View System which is being implemented by the City to provide information on congested routes to provide additional trip reduction measures The Commute View System is an advanced traveler information system which provides real time travel time information, incident information, and general traffic conditions through a variety of devices such as the cable, internet, cell phone and wireless PDA This will provide commuters the ability to make informed decisions regarding the route, time of travel and mode of transportation Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -29 Final Environmental Impact Report City of El Segundo February 2005 Project applicants must include or share in a transit connection system to promote use of the existing Metro Green Line service, remote employee lot during seasonal peaks and local circulator service Based upon estimate usage patterns and trial studies, an approximately three percent reduction in trips to and from the site during peak periods is anticipated with these enhancements Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division Monitoring Agency: Public Works Department, Planning Division Intelligent Transportation Systems ConnectionslUpgrades L -9 The South Bay area will be enhanced with an area -wide signal system upgrade prior to project completion in 2012 This system is already funded and will be implemented with or without the proposed project The improvement will provide for intelligent transportation systems (ITS) which provide real time adjustment to signal timing based upon current conditions thereby increasing capacity along major corridors ITS system enhancements are currently being tested and evaluated which provide further enhanced capacity These enhancements provide advanced communication upgrades to the users of the roadway systems Items include Advanced Traveler Information System (ATIS) and Advanced Traffic Management Systems (ATMS) ATIS provides commuters with information to make route and time of day decisions The enhanced ATIS system that would be included within the South Bay ITS system will enable private sector partners to disseminate freeway and arterial traffic information to the public via paid subscription services ATMS manages the traffic system on surrounding streets Applicants for development projects within the proposed Sepulveda/Rosecrans Rezoning Site must provide for connectivity to the systems described above Project applicants must provide access to information disseminated by the ATIS system to patrons and employees by including at least one television monitor or equivalent equipment that is compatible with and connected to the ATIS system and that displays current commuter information from the ATIS system during all hours that the development is open for business The monitor or equivalent equipment shall be placed in a centralized location within the development, shall be specifically identified on directory maps of the facility, shall be specifically and clearly identified as the location for obtaining current travel information and shall be identified elsewhere throughout the development with signage that directs patrons to the location Project applicants must also facilitate dissemination of information provided by the ATIS system to project employees by working with project tenants to offer fully or partially subsidized monthly subscriptions to employees (currently estimated at full cost SepulvedalRosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX-30 Final Environmental Impact Report City of El Segundo February 2005 of $S 00 per month per user), Project applicants (or successors in interest) must provide any new project tenant with information regarding subscription programs available to employees and costs thereof and shall encourage tenants to provide subsidized monthly subscriptions to their employees However, because there is no guarantee that subscription subsidies will be provided by future tenants of developments within the Sepulveda/Rosecrans Rezoning Site, no additional credit for these subscriptions can be taken except for the enhancements provided by the South Bay ITS system as presently designed (7 %, see discussion under "Future Highway System Improvements" above) Monitoring Phase: Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division, Los Angeles County Public Works Department Monitoring Agency: Public Works Department, Planning Division, Los Angeles County Public Works Department Local Street - Freeway Inter -Ties L -10 This mitigation measure is applicable to buildout of the Sepulveda/Rosecrans Rezoning Site beyond the Plaza El Segundo Project Development Applicants for development projects within the Sepulveda/Rosecrans Rezoning Site (excluding the Plaza El Segundo Project) shall fund or construct upgrades and enhancements to the El Segundo and/or South Bay ITS systems, and/or the Caltrans ITS system that singly or in combination cause an increase of 3% in the capacity of the street system served by these ITS systems The 3% increase shall be measured from the calculated capacity of the system based upon existing lane configurations, plus a 10% increase on street in the City of El Segundo, and 7% increase on streets outside the City of El Segundo to reflect the El Segundo and South Bay ITS systems, respectively The upgrades /enhancements shall be selected from the following menu and approved by the relevant jurisdictional agency expansion of the fiber optic communication system, expansion of wireless communication components, provision of software components, supplemental advance system detectors, changeable message signs, closed circuit television cameras, or any other reasonably feasible upgrade or enhancement approved by the relevant junsdictional agency The applicant shall participate in any applicable fair share fee mitigation program that will otherwise fund the foregoing upgrades /enhancements and shall receive credit for all fair share payments Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Caltrans, County of Los Angeles Department of Public Works Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX-31 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Agency: Public Works Department, Caltrans, County of Los Angeles Department of Public Works Project Parking /Egress Information System for Key AccessiEgress Corridors L -11 Project applicants must provide parking /egress information systems in the manner of Changeable Message Signs (CMS) along key access /egress corridors of Sepulveda Boulevard, Rosecrans Avenue, and Park Place Currently, Los Angeles County is installing CMS on major streets in the South Bay area and locations for additional CMS would be identified in coordination with Los Angeles County A centrally located kiosk system must be included in project design that can disseminate roadway conditions along the major routes This information would be utilized by the employee or patron to determine the least congested access /egress route to /from the project, thereby minimizing delay on the roadway systems Based upon recent studies in the South Bay area under trial conditions, implementation of this measure is anticipated to improve capacity at the site adjacent intersections by three percent, along major corridors of Rosecrans Avenue, Sepulveda Boulevard, and El Segundo Boulevard by two percent, and the balance of the study intersections by one percent Monitoring Phase: Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division Monitoring Agency: Public Works Department, Planning Division Improvements for Cumulative Growth L -12 In order to assist in addressing future cumulative traffic deterioration, the City of El Segundo through its Traffic Congestion Mitigation Fee Ordinance will require the developer of a specific project to make a "fair share" contribution for programmed roadway improvements In addition, project implementation of the signal system enhancements described above will benefit the entire system and reduce cumulative impacts along the roadway corridors Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division, Public Works Department Monitoring Agency: Planning Division, Public Works Department Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -32 Final Environmental Impact Report City of E1 Segundo February 1005 Plaza El Segundo Development Physical Roadway Improvements L -13 El Segundo Boulevard and Sepulveda Boulevard — Convert the existing eastbound right - turn only lane to a shared through/right-turn lane There exists three receiving lanes on the east leg of the intersection In addition, modify the raised center median to convert the westbound shared through left -turn lane to a dedicated second left turn lane and additional through lane Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Caltrans Monitoring Agency: Public Works Department, Caltrans L -14 El Segundo Boulevard and Aviation Boulevard — Not required for Plaza El Segundo Reduced Traffic Generation Alternative L -15 Rosecrans Avenue and Sepulveda Boulevard — On the westbound approach of Rosecrans Avenue dedicate additional right -of -way on the north side of Rosecrans Avenue to provide a free flow nght -tum lane Widen the east side of Sepulveda Boulevard along the project frontage to provide the acceptance lane for the free westbound right -turn lane This additional lane on Sepulveda should be improved to the new Park Place connection where a right turn lane will be provided This intersection's jurisdiction is shared with Manhattan Beach and Caltrans Coordination and concurrence of these agencies for implementation of these improvements would be required Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Caltrans Monitoring Agency: Public Works Department, Caltrans L -16 Rosecrans Avenue and Continental Way — Not required for Plaza El Segundo Reduced Traffic Generation Alternative Site Trip Reductions L -17 The project applicant must promote rideshare programs (bikes, rideshare matching, and transit options) as required by the City of El Segundo Transportation Demand Management Program (TDM) In addition to the tradition TDM program and to provide additional trip reduction measures, the project applicant must promote access to the Commuter View System winch is being implemented by the City to provide information on congested routes The project applicant must provide a transit connection system Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -33 Final Environmental Impact Report City of El Segundo February 2005 must be established and/or shared with other nearby retail projects to promote use of the existing Metro Green Line service, remote employee lot during seasonal peaks and local circulator sernce Based upon typical usage patterns, an approximately three percent reduction in trips to and from the site during peak periods is anticipated with these enhancements Monitoring Phase: Post - Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division Monitoring Agency: Public Works Department, Planning Division Intelligent Transportation System Connecttons/Upgrades L -18 The South Bay area will be enhanced with an area -wide signal system upgrade prior to project completion in 2012 This system is already funded and will be implemented with or without the proposed project The improvement will provide for intelligent transportation systems (ITS) which provide real time adjustment to signal timing based upon current conditions thereby increasing capacity along major corridors ITS system enhancements are currently being tested and evaluated which provide further enhanced capacity These enhancements provide advanced communication upgrades to the users of the roadway systems Items include Advanced Traveler Information System (ATIS) and Advanced Traffic Management Systems (ATMS) ATIS provides commuters with information to make route and time of day decisions The enhanced ATIS system that would be included within the South Bay ITS system will enable private sector partners to disseminate freeway and arterial traffic information to the public via paid subscription services ATMS manages the traffic system on surrounding streets Applicants for development projects within the proposed Sepulveda/Rosecrans Rezoning Site must provide for connectivity to the systems descnbed above Project applicants must provide access to information disseminated by the ATIS system to patrons and employees by including at least one television monitor or equivalent equipment that is compatible with and connected to the ATIS system and that displays current commuter information from the ATIS system during all hours that the development is open for business The monitor or equivalent equipment shall be placed in a centralized location within the development, shall be specifically identified on directory maps of the facility, shall be specifically and clearly identified as the location for obtaining current travel information and shall be identified elsewhere throughout the development with signage that directs patrons to the location Project applicants must also facilitate dissemination of information provided by the ATIS system to project employees by working with project tenants to offer fully or partially subsidized monthly subscriptions to employees (currently estimated at full cost Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX-34 Final Environmental Impact Report City of E1 Segundo February 2005 of $5 00 per month per user) Project applicants (or successors in interest) must provide any new project tenant with information regarding subscription programs available to employees and costs thereof and shall encourage tenants to provide subsidized monthly subscriptions to their employees However, because there is no guarantee that subscription subsidies will be provided by future tenants of developments within the Sepulveda/Rosecrans Rezoning Site, no additional credit for these subscriptions can be taken except for the enhancements provided by the South Bay ITS system as presently designed (7 %, see discussion under "Future Highway System Improvements" above) Monitoring Phase: Construction, Post - Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division, Los Angeles County Public Works Department Monitoring Agency: Public Works Department, Planning Division, Los Angeles County Public Works Department Improvements for Cumulative Growth L -19 In order to assist in addressing future cumulative traffic deterioration, the project applicant must comply with the City of El Segundo Traffic Congestion Mitigation Fee Ordinance and make a "fair share" contribution for programmed roadway improvements In addition, project implementation of the signal system enhancements described above will benefit the entire system and reduce cumulative impacts along the roadway corridors Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: XII. UTILITIES Sewer Subsequent Environmental Documentation Pre - construction Applicant Planning Division, Public Works Department Planning Division, Public Works Department Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda/Rosecrans Rezoning Site This information must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must include the following Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -35 Final Environmental Impact Report City of El Segundo February 2005 M 1 -1 An analysis of sewer service to the proposed development must be prepared which examines the capacity of existing sewer lines to serve the development, the projected peak sewage generation and shall identify new sewer infrastructure required to serve the development Mitigation Measures Sepulveda/Rosecrans Site Rezoning M 1 -1 An analysis of sewer service to the proposed development must be prepared which examines the capacity of existing sewer lines to serve the development, the projected peak sewage generation and must identify new sewer infrastructure required to serve the development Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant Public Works Department Public Works Department M 1 -2 The Sepulveda/Rosecrans Rezoning Site must be annexed to Los Angeles County Sanitation District No 5 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant Public Works Department, Sanitation Districts Public Works Department Los Angeles County M 1 -3 Project applicants must be required to obtain a sewer connection pemut from the Los Angeles County Sanitation Districts (District 5) to obtain sanitary sewer service Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant Public Works Department, Sanitation Districts Public Works Department Los Angeles County M 1-4 Additional local sewer infrastructure must be provided by the applicant as necessary to connect the Sepulveda/Rosecrans Rezoning Site with existing sewer infrastructure This provision must be coordinated with the project applicant and may be the partial responsibility of the applicant, as determined by the City Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -36 Final Environmental Impact Report City of El Segundo February 2005 Enforcement Agency: Public Works Department; Los Angeles County Sanitation Districts Monitoring Agency: Public Works Department M 1 -5 The applicant must be required to replace or upgrade the sewer infrastructure on or adjacent to the Sepulveda/Rosecrans Rezoning Site, as needed Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Los Angeles County Sanitation Districts Monitoring Agency: Public Works Department M 1 -6 Project applicants must comply with the City's Sewer Ordinance No 1093, of the City of El Segundo Municipal Code, Title 12, Chapter I General Provisions, Policies, and Procedures Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant Public Works Department Public Works Department M 1 -7 Prior to a building permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department and the Public Works Department for review and approval Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant Planning Division, Works Department Planning Division, Works Department Building Safety Division, Public Building Safety Division, Public M 1 -8 Closed circuit television (CCTV) inspection of existing on -site and adjacent off -site sewer mains must be conducted to determme the present condition of the infrastructure which the Sepulveda/Rosecrans Site Rezoning project will connect to Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction City of El Segundo Public Works Department Public Works Department M 1 -9 All future developments must be discharged to the existing twelve -inch sanitary sewer main in Rosecrans Avenue Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -37 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Construction Applicant Public Works Department Public Works Department M 1 -10 New businesses that generate Fats, Oils, or Greases (e g, restaurants and grocery stores) must be required to install grease interceptors with a minimum 30 minute retention period to ensure these contaminants do not block the sewerage system Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Construction Applicant Building Safety Division, Public Works Department Building Safety Division; Public Works Department M 1 -11 The Sepulveda/Rosecrans Rezoning Site must be annexed to Los Angeles County Sanitation District No 5 Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre- construction Applicant Public Works Department, Sanitation Districts Public Works Department Los Angeles County M 1 -12 The project applicant must be required to obtain a sewer connection permit from the Los Angeles County Sanitation Districts (District 5) to obtain sanitary sewer service Monitoring Phase: Pre- construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Los Angeles County Sanitation Districts Monitoring Agency: Public Works Department M 1 -13 Additional local sewer infrastructure must be provided by the applicant as necessary to connect the Plaza El Segundo site with existing sewer infrastructure This provision must be coordinated with the project applicant and may be the partial responsibility of the applicant, as determined by the City Monitoring Phase: Pre - construction; Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Los Angeles County Sanitation Districts Monitoring Agency: Public Works Department Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -38 Final Environmental Impact Report City of El Segundo February 2005 M 1 -14 The existing 15 -inch sanitary sewer line must be removed and replaced with an 18 -inch line Plans must identify the point of connection for the proposed ten -inch sanitary sewer to the existing sanitary sewer main on Allied Way Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Los Angeles County Sanitation Districts Monitoring Agency: Public Works Department M 1 -15 Protect applicants must comply with the City's Sewer Ordinance No 1093, of the City of El Segundo Municipal Code, Title 12, Chapter I General Provisions, Policies, and Procedures Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department M 1 -16 Prior to a building permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department and the Public Works Department for review and approval Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Pre - construction Applicant Planning Division, Works Department Planning Division, Works Department Building Safety Division, Public Building Safety Division, Public M 1 -17 Closed circuit television (CCTV) inspection of existing on -site and adjacent off -site sewer mains must be connected to determine the present condition of the infrastructure which the Sepulveda/Rosecrans Site Rezoning project will connect to Monitoring Phase: Pre - construction Implementation Party: City of El Segundo Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department M 1 -18 New businesses that generate Fats, Oils, or Greases (e g, restaurants and grocery stores) must be required to install grease interceptors with a minimum 30 minute retention period to ensure these contaminants do not block the sewerage system Monitoring Phase: Construction Implementation Party: Applicant Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -39 Final Environmental Impact Report Cary of El Segundo February 2005 Enforcement Agency: Building Safety Division, Public Works Department Monitoring Agency: Building Safety Division, Public Works Department Water Subsequent Environmental Documentation Subsequent environmental documentation must be prepared for development projects proposed to be constructed on the Sepulveda/Rosecrans Rezoning Site This information must be examined, at the time the development project is proposed, in light of the Program EIR to determine whether a new Initial Study would be required to be prepared leading to either an EIR or Negative Declaration The subsequent environmental documentation must include the following M 2 -1 An analysis of water service to the proposed development must be prepared which examines the capacity of existing water lines to serve the development and projected water demand and must identify new water infrastructure required to serve the development Mitigation Measures Sepulveda /Rosecrans Site Rezoning M 2 -1 An analysis of water service to the proposed development must be prepared which examines the capacity of existing water lines to serve the development and the projected water demand and must identify new water infrastructure required to serve the development Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department M 2 -2 New streets shall be connected through the Sepulveda/Rosecrans Rezoning Site to adjacent existing streets, with no gaps or disconnects, so as to allow connections to existing infrastructure contained in the existing streets Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department M 2 -3 Water distribution mains must be installed in the through streets in order to complete the existing water grid and provide water distribution to the interior of the Sepulveda/Rosecrans Rezoning Site Connecting pipes must be a minimum often inches Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -40 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department M 2 -4 New water lines must be connected to the existing water line located in Allied Way to provide a continuous public water line beginning from Sepulveda Boulevard to an existing line in Allied Way, Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Construction Applicant Public Works Department Public Works Department M 2 -5 Development on the proposed Sepulveda/Rosecrans Rezoning Site must include dual water connections to allow for landscaping to be irrigated by reclaimed water Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Construction Applicant Planning Division, Works Department Planning Division, Works Department Building Safety Division, Public Building Safety Division, Public M 2 -6 Reclaimed water must be used as the water source to irrigate landscaped areas on the Sepulveda/Rosecrans Rezoning Site Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division Monitoring Agency: Public Works Department M2-7 Efficient irrigation systems must be installed which minimize runoff and evaporation and maximize the water which will reach plant roots (e g drip imgation, automatic sprinklers equipped with moisture sensors) Monitoring Phase: Pre - construction, Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Recreation and Parks Department Monitoring Agency: Planning Division, Building Safety Division M 2 -8 Automatic sprinkler systems must be set to irrigate landscaping during early morning hours or during the evening to reduce water losses from evaporation Sprinklers must also be reset to water less often in cooler months and during the rainfall season so that water is not wasted by excessive landscape irrigation SepulvedalRosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -41 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division M 2 -9 Selection of drought- tolerant, low water consuming plant varieties must be used to reduce irrigation water consumption Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Recreation and Parks Department Monitoring Agency: Planning Division, Recreation and Parks Department M 2 -10 Project applicants must comply with the City's Conservation Program, Ordinance No 1194, of the City of El Segundo Municipal Code, Title 10 -Parks and Recreation, Chapter 2 Water Conservation in Landscaping and Resolution No 3806 • Prior to a building permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department for review and approval relative to compliance with the City's Water Conservation Ordinance and Guidelines for Water Conservation in Landscaping Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Pre- construction Applicant Recreation and Parks Department Recreation and Parks Department M 2 -11 Water distribution mains must be installed in the eastward extension of Park Place and the extension of Allied Way to Park Place in order to complete the existing water grid and provide water distribution to the interior of the Plaza El Segundo site Connecting pipes should be a minimum of ten inches Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Public Works Department Monitoring Agency: Public Works Department M 2 -12 Development on the proposed Plaza El Segundo Site must include dual water connections to allow for landscaping to be irrigated by reclaimed water Monitoring Phase: Construction Implementation Party: Applicant Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -42 Final Environmental Impact Report City of El Segundo February 2005 Enforcement Agency: Monitoring Agency: Planning Division, Works Department Planning Division, Works Department Building Safety Division, Public Building Safety Division, Public M 2 -13 Reclaimed water must be used as the water source to irrigate landscaped areas on the Plaza El Segundo Development Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Public Works Department, Planning Division Monitoring Agency: Public Works Department M 2 -14 Efficient irrigation systems must be installed which minimize runoff and evaporation and maximize the water which will reach plant roots (e g drip irrigation, automatic sprinklers equipped with moisture sensors) Monitoring Phase: Pre- construction, Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Recreation and Parks Department Monitoring Agency: Public Works Department, Building Safety Division M 2 -15 Automatic sprinkler systems must be set to irrigate landscaping during early morning hours or during the evening to reduce water losses from evaporation Sprinklers must also be reset to water less often in cooler months and during the rainfall season so that water is not wasted by excessive landscape irrigation Monitoring Phase: Post - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division M 2 -16 Selection of drought- tolerant, low water consuming plant varieties must be used to reduce irrigation water consumption Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Recreation and Parks Department Monitoring Agency: Planning Division, Recreation and Parks Department M 2 -17 The project applicant must comply with the City's Conservation Program, Ordinance No 1194, of the City of El Segundo Municipal Code, Title 10 -Parks and Recreation, Chapter 2 Water Conservation in Landscaping and Resolution No 3806 Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -43 Final Environmental Impact Report City of El Segundo February 2005 • Prior to a building permit being issued the project applicant must submit the Final Working Drawings to the City of El Segundo Planning and Building Safety Department for review and approval relative to compliance with the City's Water Conservation Ordinance and Guidelines for Water Conservation in Landscaping Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Recreation and Parks Department Monitoring Agency: Recreation and Parks Department Solid Waste Subsequent Environmental Documentation No subsequent environmental documentation is required Mitigation Measures Sepulveda /Rosecrans Site Rezoning M 3 -1 Where economically feasible, the proposed Sepulveda/Rosecrans Site Rezoning project must incorporate the use of recycled materials in building materials, furnishing operations and building maintenance Monitoring Phase: Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division M 3 -2 The proposed Sepulveda/Rosecrans Site Rezoning project must recycle all construction debris in a practical, available, and accessible manner, to the maximum extent feasible, during the demolition and construction phases Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Construction Applicant Building Safety Division Building Safety Division M 3 -3 The design of the proposed Sepulveda/Rosecrans Site Rezoning project must allocate space for a recycling collection area for use by both on -site employees and visitors, the design of which will adhere to siting requirements in the City's recycling ordinance The design of the collection area will facilitate source separation and collection of additional materials that may be designated as recyclable by the City in the future Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -44 Final Environmental Impact Report City of El Segundo February 2005 Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division Plaza El Segundo Development M 3 -4 Where economically feasible, the proposed Plaza El Segundo Development must incorporate the use of recycled materials in building materials, furnishing operations and building maintenance Monitoring Phase: Construction, Post - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division M 3 -5 The proposed Plaza El Segundo Development must recycle all construction debris in a practical, available, and accessible manner, to the maximum extent feasible, during the demolition and construction phases Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division M 3 -6 The design of the proposed Plaza El Segundo Development must allocate space for a recycling collection area for use by both on -site employees and visitors, the design of which will adhere to siting requirements in the City's recycling ordinance The design of the collection area will facilitate source separation and collection of additional materials that may be designated as recyclable by the City in the future Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division Natural Gas Subsequent Environmental Documentation No subsequent environmental documentation is required Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -45 Final Environmental Impact Report City of El Segundo February 2005 Mitigation Measures Sepulveda /Rosecrans Site Rezoning No mitigation measures are required Plaza El Segundo Development No mitigation measures are required Electricity Subsequent Environmental Documentation No subsequent environmental documentation is required Mitigation Measures Sepulveda /Rosecrans Site Rezoning M 5 -1 The applicant must consult with SCE during the design process of the proposed Sepulveda/Rosecrans Site Rezoning project regarding potential energy conservation measures for the project Examples of such energy conservation measures include • Design windows (i e , timing, double pane glass, etc ) to reduce thermal gain and loss and thus cooling loads during warm weather, and heating loads during cool weather • Install thermal insulation in walls and ceilings that exceed requirements established by the State of California Energy Conservation Standards • Install high - efficiency lamps for all internal streetlights and outdoor security lighting • Time control interior and exterior lighting These systems must be programmed to account for variations in seasonal daylight times • Finish exterior walls with light- colored materials and high - emissivity characteristics to reduce cooling loads Finish interior walls with light- colored materials to reflect more light and thus increase lighting efficiency Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Planning Division, Building Safety Division, Southern California Edison (SCE) Monitoring Agency: Planning Division, Building Safety Division Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -46 Final Environmental Impact Report City of El Segundo February 2005 M 5 -2 All on -site electrical lines must be placed underground, except for high voltage transmission lines located along Rosecrans Avenue Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Budding Safety Division, Public Works Department, SCE Monitoring Agency: Building Safety Division, Public Works Department M5-3 Electrical transformers must be screened from view from the public right -of -way Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division Plaza El Segundo Development M5-4 The applicant must consult with SCE during the design process of the proposed Plaza El Segundo Development regarding potential energy conservation measures for the project Examples of such energy conservation measures include • Design windows (e g , tinting, double pane glass, etc) to reduce thermal gain and loss and thus cooling loads during warm weather, and heating loads during cool weather • Install thermal insulation in walls and ceilings that exceed requirements established by the State of California Energy Conservation Standards • Install high- efficiency lamps for all internal streetlights and outdoor security lighting • Time control interior and exterior lighting These systems must be programmed to account for variations in seasonal daylight times • Finish exterior walls with light- colored materials and high emissivity characteristics to reduce cooling loads Finish interior walls with light- colored materials to reflect more light and thus increase lighting efficiency Monitoring Phase: Pre - construction, Construction Implementation Party: Applicant Enforcement Agency: Planning Division, Building Safety Division, SCE Monitoring Agency: Planning Division, Building Safety Division Sepulveda / Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -47 Final Environmental Impact Report City of El Segundo February 2005 M 5 -5 All on -site electrical lines must be placed underground, except for high voltage transmission lines located along Rosecrans Avenue Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Building Safety Division, Public Works Department, SCE Monitoring Agency: Building Safety Division, Public Works Department M5-6 Electrical transformers must be screened from view from the public tight -of -way Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division XIIL CULTURAL RESOURCES Subsequent Environmental Documentation Subsequent environmental documentation shall be prepared for development projects proposed to be constructed on the Sepulveda/Rosecrans Rezoning Site The subsequent environmental documentation shall include the following N -1 A records search and/or Phase I Archaeological Survey must be conducted by a qualified archaeologist prior to the start of construction activities (including grading) for any development on the Sepulveda/Rosecrans Rezoning Site If the survey identifies resources within the construction area, follow on studies shall be conducted in accordance with the recommendations of the records search prior to commencement of construction N -2 Further analysis of Cultural Resource 19- 186856 is required, that meets the requirements of CEQA Guidelines Section 15064 5(a)(2), to determine potential eligibility for the California or National Register of Historic Places prior to any construction activities occurring on the H Kramer portion of the Sepulveda/Rosecrans Rezoning Site If further analysis identifies that the resource is eligible, then the recommendations identified in that analysis shall be followed Mitigation Measures Sepulveda/Rosecrans Site Rezoning N -1 A records search and/or Phase I Archaeological Survey must be conducted by a qualified archaeologist prior to the start of construction activities (including grading) for any Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -48 Final Environmental Impact Report City of BI Segundo February 1005 development on the Sepulveda/Rosecrans Rezoning Site If the survey identifies resources within the construction area, follow on studies must be conducted in accordance with the recommendations of the records search prior to commencement of construction Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division N -2 Further analysis of Cultural Resource 19- 186856, that meets the requirements of CEQA Guidelines Section 15064 5(a)(2), is required to determine potential eligibility for the California or National Register of Historic Places prior to any construction activities occurring on the H Kramer portion of the Sepulveda/Rosecrans Rezoning Site If further analysis identifies that the resource is eligible, then the recommendations identified in that analysis must be followed and measures identified to reduce impacts to less than significant levels Monitoring Phase: Pre - construction Implementation Party: Applicant Enforcement Agency: Planning Division Monitoring Agency: Planning Division N -3 In the event that archaeological or paleontological resources are encountered during the course of grading or construction, all development must temporarily cease in these areas until the resources are properly assessed and subsequent recommendations are determined by a qualified archaeologist/paleontologist Monitoring Phase: Implementation Party: Enforcement Agency: Monitoring Agency: Plaza El Segundo Development Construction Applicant Planning Division, Building Safety Division Planning Division, Building Safety Division N-4 In the event that archaeological or paleontological resources are encountered during the course of grading or construction, all development must temporarily cease in these areas until the resources are properly assessed and subsequent recommendations are determined by a qualified archaeologist/paleontologist Monitoring Phase: Construction Implementation Party: Applicant Enforcement Agency: Planning Division, Building Safety Division Monitoring Agency: Planning Division; Building Safety Division Sepulveda/Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -49 Final Environmental Impact Report Cary of E1 Segundo February 2005 P \Planning & Building Safety\PROJECTS \626- 650\EA -631 \Council Agenda PacketTinal Approved Doeurnenls\EA -631 reso cc Exhibit B MMRP RTGA doc Sepulveda /Rosecrans Site Rezoning and Plaza IX Mitigation Monitoring and Reporting Program El Segundo Development Page IX -50 Final Environmental Impact Report CITY COUNCIL RESOLUTION NO. 4415 EXHIBIT C 3 Land Use Element designation allows retail and hotel uses. The site along El Segundo Boulevard, east of Aviation Boulevard (3.8 ac), as well as the site at the northeast corner of Sepulveda Boulevard and Manposa Avenue (3 2 ac) are already in commercial use The site on the southeast corner of Sepulveda Boulevard and Manposa Avenue (7 1 ac) is currently vacant, except for an existing bank building The site at the southeast corner of Sepulveda Boulevard and Imperial Avenue (73 ac) is currently used for office, but the land use designation of General Commercial would allow recycling of the site to a commercial use The area bounded by Nash Street, Maple Avenue, Lairport Street, and Imperial Avenue is designated as light industrial, which is consistent with the uses currently operating in that area, primarily the Hughes facility (50 4 ac) The area bounded generally by Aviation Boulevard, El Segundo Boulevard, and Douglas Street is currently a U S Government Air Force Base (48 5 ac), which is expected to remain for the life of the Plan The Federal Government designation placed on this area will allow the types of uses that are existing The narrow parcel near the northwest intersection of El Segundo Boulevard and Aviation Boulevard (3 93 ac), between El Segundo Boulevard and 124th Street, is a Specific Plan area ( "A124th Street Specific Plan ") which encourages primarily warehousing and storage uses; however, a City Water Facility may also be developed on the site (Ord 1309, GPA 99 -1, 8/17/99) Southeast Quadrant The majority of the southeast quadrant is designated light industrial (356 1309 ac) This category allows for a mixture of light industrial and office uses, similar to what is now existing in some of the business parks between Douglas Street and Aviation Boulevard The southern portion of the quadrant, along Rosecrans Avenue west of Aviation Boulevard, is designated as Urban Mixed -Use South, allowing a mixture of office, hotel, and retail uses. This area totals 70 6 acres The northeast corner of Rosecrans Avenue and Sepulveda - Boulevard (85 884-9 Ac), currently oceopled b n rPre ,,,.,. and Allied Che..,,,,al is designated Commercial Center, allowing a mixture of retail, office and food- service usesate designated or he ,..,i. stfial There is a small commercial piece (0 9 ac) along Sepulveda Boulevard, just south of El Segundo Boulevard (Ord 4415, GPA 03 -4, GPA 03 -5, 3/1/05) The remaining land in the southeast quadrant is designated as public facilities for the Green Line station along El Segundo Boulevard and T H E C I T Y OF EL S E G U N D O • G E N E R A L P L A N 3 -13 CITY COUNCIL RESOLUTION NO. 4415 EXHIBIT C 3 Land Use Element Commercial Neighborhood Commercial Designations Permits neighborhood- serving retail, neighborhood - serving office, and limited residential on a single floor above the commercial ground floor Residential uses are limited to a maximum density of 10 dwelling units per acre This designation is intended to provide integrated neighborhood- serving commercial areas adjacent to the residential neighborhoods The maximum floor area ratio (FAR) is 0 5 Downtown Commercial Permits community serving retail, community serving office, and residential on the floor above street level only if commercial is on the street level Residential uses are limited to a maximum density of 10 dwelling units per acre This designation is intended to provide an integrated community serving commercial area downtown The maximum floor area ratio (FAR) allowed is 10 General Commercial Permits all retail uses, including hotel uses, and major medical facilities, at a maximum floor area ratio (FAR) of 1.0. Office uses are not permitted except for those providing personal services not exceeding 5,000 square feet such as travel and insurance agents Corporate Office Permits a mixture of office and food - serving uses in single -tenant or multi -tenant buildings with limited retail uses permitted in the lobby area Research and development uses are permitted east of Sepulveda Boulevard. Hotels and motels are permitted east of Sepulveda and west of Aviation Boulevards with a discretionary application The maximum allowed floor area ratio (FAR) is 0 8 A maximum FAR of 1.086 is permitted for the property commonly referred to as 888 North Sepulveda Boulevard (Assessor's Parcel Number 4138 - 005 -055), pursuant to Development Agreement No. 00 -2 A maximum FAR of 196 is permitted for the property referred to as 455 Continental Boulevard (Assessor's Parcel Number 4138 - 007 -043) (Reso 4361, GPA 03 -3, 2/3/04, Ord 1331, GPA 00 -2, 3/20/01) Commercial Center Permits a mixture of community-serving retail, restaurants and other commercial service uses in an integrated shopping center design This designation is intended to serve a broad cross section of the City and surrounding= area The maximum floor area ratio (FAR) is limited to 0 275 (Reso 4415, GPA 03 -4, GPA 03 -5, 3/1/05) Smoky Hollow Mixed -Use Permits primarily light industrial uses including light manufacturing, research and development, warehousing, and office uses The maximum floor area ratio (FAR) for newly constructed projects is 0.6 T H E C I T Y OF EL S E G U N D O e G E N E R A L P L A N 3.7 CITY COUNCIL RESOLUTION NO.4415 Page 1 of 1 EXHIBIT "D" 1992 General Plan Summary of Existing Trends Buildout Land Use Category Acres Dwelling Units Square Footage Single - Family Residential 3572 2,858 - -- Two -Family Residential 574 934 - -- Planned Residential 5 7 65 Multi - Family Residential 1197 3,389 - -- Neighborhood Commercial 7 1 85 * 100,000 Downtown Commercial 88 18 * 383,328 General Commercial 443 - -- 1,930,000 Corporate Office 2112 - -- 12,351,000 Commercial Center 858 850,000 Smoky Hollow 941 268 2,019,454 Urban Mixed -Use North 2325 - -- 13,166,010 Urban Mixed -Use South 706 - -- 3,997,936 124th Street Specific Plan 39 1 73,530 Aviation Specific Plan 54 - -- 66,000 Downtown Specific Plan 258 232 * 1,123,848 Corporate Campus Specific Plan 465 - -- 2,550,000 Parking 118 - -- - -- Light Industrial 356 1 - -- 18,529,000 Heavy Industrial 1001 0 1086 8 - -- - -- ** Public Facilities 879 - -- - -- Federal Government 906 - -- - -- Open Space 783 - -- - -- Parks 50.0 - -- - -- Street & Railroad R O W 442,6 - -- - -- Totals 3,494.3 7,850 56,765,106 55 n15,10 Population Projection 1 17,287 Existing construction and recently constructed, renovated commercial centers and legal nonfonforming residential uses at densities that are currently higher than allowed by the land use designations in this plan will not realistically be converted to mixed commercial /residential uses and these buildings are expected to remain for the life of the Plan " The heavy industrial shown on this plan includes the Chevron Refinery and former Southern California Edison Generation Station, Af I nese realities nave processing equipment ana tanks rather man buildings and are expected to remain for the life of the Plan Therefore, no estimated building square footage is shown Source City of El Segundo Planning Department and The Lightfoot Planning Group Amendments Ord 1209, 11093, Ord 1244, 216196 Ord 1272, 6/17197, Ord 1279, 10/7/97, Ord 1309, 8/17/99, Ord 1314, 1217/99, Ord 1309, 8/17199, Ord 1314, 12/7199, Ord 1319, 81112000, Ord 1345, 112102, Ord 1382, 311105 CITY OF EL SEGUNDO * GENERAL PLAN eneral clan exhibit Summary of Existing Trends Buildout LU -3 0. 0 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL The following conditions shall be binding upon Mar Ventures, Inc , the property owner(s) and their successors in interest, including without limitation occupants of the property The following conditions for the City of El Segundo's approval of Environmental Assessment No 631. ( "Project Conditions ") shall be fully complied with as set forth below All mitigation measures in the Environmental Impact Report which are reflected in the Mitigation Monitoring and Reporting Program for the proposed Sepulveda /Rosecrans Site Rezoning Reduced Traffic Generation Alternative and Plaza El Segundo Development Reduced Traffic Generation Alternative are incorporated by this reference into these conditions of approval DEFINITIONS 2 Unless the contrary is stated or clearly appears from the context, the following definitions will govern the construction of the words and phrases used in these conditions A "P B S Director" means the City of El Segundo Director of Planning and Building Safety, or designee B "EIR" means the Final Environmental Impact Report for the proposed Sepulveda /Rosecrans Site Rezoning and Plaza EI Segundo development protect (SCH No. 2003121037), El Segundo, California C "ESMC" means the El Segundo Municipal Code D "Project Area" refers to each of the 20 developable lots on the Plaza El Segundo development Project Site as shown on Vesting Tentative Tract Map No 061630 which comprise the Project Site E "Project Site" refers to the 43 3 -acre site generally located south of Hughes Way, east of Sepulveda Boulevard, west of Douglas Street, and north of Rosecrans Avenue F "Sepulveda /Rosecrans Rezoning Site" refers to the approximately 110 acres generally located south of Hughes Way, east of Sepulveda Boulevard, west of Douglas Street, and north of Rosecrans Avenue which is the subject of a General Plan and Zoning Code Amendment that is being considered concurrently with the land use entitlements for the Project Area and the Project Site G Except as otherwise specified in these Conditions of Approval, conditions must be satisfied before the issuance of a Budding Permit for each budding within the Project Area 311105 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL AESTHETICS Lighting 3 Before the issuance of the first Building Permit in the Project Area, the applicant must submit a Lighting Master Plan for the Project Area for the review and approval of the P B S Director and the Police Chief A Lighting Plan (construction drawings) and Photometric Study, consistent with the Lighting Master Plan must be reviewed and approved by the P B S Director and the Police Department before the issuance of each Building Permit and must be installed before the issuance of each Certificate of Occupancy in the Project Area The Lighting Plan and Photometric Study must demonstrate that the proposed project allows minimum off -site illumination but still complies with Police Department safety requirements The Lighting Master Plan must include, without limitation A Specific details for Foot - candle intensity, B Specific lighting detail for parking areas and structures, pedestrian walkways, and access ways in and around buildings, C On -site light fixtures that have been designed to direct the light downward and internal to the proposed protect site to minimize off -site illumination, D Specific detail regarding the location, type and height of lighting devices, E Specific detail to illustrate compliance with the ESMC, and, F Weather and vandal resistant covers on lighting fixtures 4 Before the issuance of each Certificate of Occupancy, the applicant must provide evidence to the P B S Director and the Police Chief that outdoor lighting design has been installed in compliance with the approved Lighting Master Plan for the building that is the subject of the Certificate of Occupancy Materials and Design 5 Before the issuance of the first Budding Permit in the Project Area, the applicant must submit Final Working Drawings to the P B S Director for design review The applicant must provide a Building Materials Sample Board of the materials, colors, and elevation drawings to be utilized to the P B S Director for review and approval The design review must include, without limitation, the following design guidelines A All colors, textures, and materials on exterior elevation(s) must be coordinated to achieve a continuity of design, B Exterior building materials must be compatible with developments in the vicinity, C At least two primary exterior budding materials (including, without limitation, stucco, stone, rock, and brick) must be used throughout the Plaza El Segundo project, 31]!05 2 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL D The buildings must have contrasting accent features Building materials must be of non - reflective coatings and glazings, E The plans must demonstrate substantial compliance with plans and conditions approved and on file with the Planning and Budding Safety Department Any subsequent modification to the project as approved must be referred to the P.B S Director for a determination regarding the need for Planning Commission review of the proposed modification in accordance with the provisions of the Development Agreement, F All buildings must be in accordance with the Project Site's Conditions, Covenants and Restrictions (CC &R's), G All buildings must utilize energy efficient floor plans and controlled HVAC and heat generating equipment to reduce energy use for cooling and ventilation, H All roof - mounted mechanical equipment and communications devices must be hidden behind building parapets or screens to screen these devices from off -site ground level view, I Ground level mechanical equipment, refuse collectors, storage tanks, monitoring wells, generators, and other similar facilities must be screened from view with dense landscaping and walls of materials and finishes compatible with adjacent buildings, J. Service, storage, maintenance, utilities, loading, and refuse collection and other similar areas must be located out of the view of public roadways and buildings and screened by dense landscaping and solid walls, unless the PBS Director determines such is not practicable No chain link fences may be used for such screening, K Walls along the north property boundary of the Project Site and walls used to screen service and storage areas must be of the same materials, colors, and finishes as adjacent buildings or compatible finishes and colors, L A six -foot high solid wall must be constructed along the southern property line of Lot 15 of Vesting Tentative Tract Map No 061630 for at least a length of 200 feet from the eastern edge of the Sepulveda Boulevard right -of -way and along the northern property line of Lot 19 of Vesting Tentative Tract Map No 061630 for at least a length of 200 feet from the eastern edge of the Sepulveda Boulevard right -of -way A six -foot high wall or a fence constructed of vinyl chain link or other material must be constructed along the remaining property lines of the Project Area abutting the Union Pacific Railroad right -of- way with screening of the right -of -way with the use of landscaping, including, without limitation, vines, hedges and /or trees to the satisfaction of the P B S Director, M Chain -link fences are not permitted, except as described above, and as temporary construction fencing, N Building design will meet the City's standards for the attenuation of interior noise, O All service areas must be located so that service vehicles have clear and convenient access and do not disrupt vehicular and pedestrian circulation, 311105 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL P No loading will be permitted directly from public streets, except in designated areas as approved by City P B S Director, Q All on -site utility systems including without limitation, water, electricity, gas, sewer and storm drains, must be installed underground, R No Certificate of Occupancy may be issued unless there is substantial compliance with the aforementioned development standards and, S The Project Area site plan must be revised to provide sidewalks or other designated pathways following direct and safe routes from the Park Place right -of -way to buildings H through A -7, from the Park Place right -of -way to Pad D, and from the Sepulveda Boulevard right -of -way to Building No 2, and any other budding that may developed that is set back more than 200 feet from a public right -of -way, subject to the review and approval of the P B S Director Landscaping and Irrigation 6 Before the issuance of the first Building Permit in the Project Area, the applicant must submit a Master Landscape and Irrigation Plan for the Protect Area The Master Landscape and Irrigation Plan must be reviewed and approved by the City P B S Director, the Director of Recreation and Parks, and the Police Chief Landscaping for each budding in the Project Area must be installed in accordance with the approved Master Landscape and Irrigation Plan before the issuance of each Certificate of Occupancy The Master Landscape and Irrigation Plan must include, without limitation, the following A All landscaped areas must be provided with a permanent automatic watering or irrigation system, B All on -site landscaped areas must be maintained by the owner in a neat and clean manner at all times, C All landscaped areas must be designed to ensure efficient access to fire hydrants, D Dual plumbing must be installed for reclaimed water irrigation, E All landscaped areas must be irrigated with reclaimed water to the extent reclaimed water is available for use in the Project Area Until such time as reclaimed water is made available, potable water may be utilized for irrigation, F All landscaping and irrigation must comply with the City's Water Conservation regulations and Zoning Code requirements, G All landscaping must be designed to enhance site security in accordance with Police Department policies, H All public rights -of -way abutting the site must be landscaped, I Landscaping that includes trees, vines, and or hedges must be incorporated along property line walls and fences for screening purposes 3/1/05 4 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL All landscaped areas must include a majority of mature landscaping, including trees that are a minimum 24 -inch box size, and, K Landscaping must be installed along property perimeters and evenly distributed throughout the employee /customer parking areas 7 Before the issuance of the first Building Permit in the Project Area, the applicant must provide a Landscape Plan and Architectural Plan (i a construction drawings), consistent with the Master Landscaping Plan, to the P B S Director, Director of Recreation and Parks, and the Police Chief for review and approval The Landscape Plan and Architectural Plan must demonstrate that errant nighttime illumination is generally screened from other potentially sensitive uses, through building design and landscape treatments 8 Where feasible (as determined by the P B S Director), the applicant must comply with the City's Water Conservation Program as set forth in the ESMC and the City's Guidelines for Water Conservation in Landscaping Before the issuance of each Budding Permit in the Project Area, the applicant's Landscape Plans must be submitted to the P B S Director for review and approval Aim Before the issuance of the first Building Permit in the Project Area, the applicant must submit to the P B S Director for review and approval an overall Master Sign Program for the Project Area Before the issuance of a Certificate of Occupancy for each building within the Project Area, the applicant must submit construction sign plans substantially consistent with the approved Master Sign Program for the review and approval of the P B S Director Before the issuance of a Certificate of Occupancy, signs must be installed in accordance with the approved Master Sign Program The overall Master Sign Program must include, without limitation A Compliance with the ESMC, B Not withstanding any other provisions in the ESMC, a maximum of three freestanding or pole signs with a maximum height of 35 feet each are permitted along the Sepulveda Boulevard street frontage of the Protect Area, C Not withstanding any other provisions in the ESMC, a maximum of two freestanding or pole signs with a maximum height of 25 feet are permitted along the Park Place street frontages of the Project Area, D Not withstanding any other provisions in the ESMC, a maximum of two freestanding or pole signs with a maximum height of 25 feet are permitted along the Allied Way street frontages of the Project Area, Not withstanding any other provisions in the ESMC, no freestanding or pole signs, except as described in Condition No 10 below, are permitted along the Rosecrans Avenue frontage of the Project Area, F All signs must be architecturally compatible with the proposed buildings, 3/1/05 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL G All signs must be compatible with the aesthetic objectives of the General Plan, and, H No sign must impede traffic or pedestrian safety 10 Before the issuance of a Certificate of Occupancy for the first building in the Project Area, the applicant must construct and maintain a monument sign at the northeast corner of Sepulveda Boulevard and Rosecrans Avenue announcing the entrance to the City The sign is subject to review and approval by the City Council The sign should be compatible with the design of the Master Sign Program for the Plaza El Segundo development project AIR QUALITY 11 During grading and construction, dust control measures must be required in accordance with the City's Dust Control Ordinance (Chapter 7 -3 of the ESMC) Grading must be discontinued during first -stage smog alerts and suspended when wind velocity exceeds 15 miles per hour All hauling trucks must have loads covered or wetted and loaded below the sideboards to minimize dust 12 The South Coast Air Quality Management District (SCAQMD) has promulgated rules and applicable standards including, without limitation, the following Rule 402 - Nuisances, Rule 403 - Fugitive Dust, and Rule 2202 - On -Road Motor Vehicle Mitigation Options The applicant must use best management practices in compliance with Rule 402 during the operation of construction equipment Construction activities must be limited between the hours of 7 AM to 6 P M , Monday through Saturday, unless such hours are extended pursuant to a Noise Permit issued by the P B S. Director During the construction phase, all unpaved construction areas must be wetted at least twice daily during excavation, grading, and construction and temporary covers for stockpiles must be used to reduce dust emissions by as much as 50 percent The applicant must ensure that all materials transported off -site will be either sufficiently watered or securely covered in compliance with Rule 403 Resultant peak daily exhaust emissions from diesel- and gasoline- powered construction equipment must be monitored to control emission levels that exceed SCAQMD screening thresholds During construction, trucks and vehicles in loading or unloading queues must keep their engines off, when not in use, to reduce vehicle emissions Construction activities must be phased and scheduled to avoid emission peaks, and construction must be discontinued during first- and second -stage smog alerts On -site vehicle speed during construction must be limited to 15 mph Before issuance of a Grading Permit for each Project Area, the applicant must provide a Construction Management Plan to the P B S Director for review and approval relative to compliance with the appropriate SCAQMD standards during the construction phase Daily records of construction hours and activities must be maintained by the applicant throughout the construction phase ENERGY 13 Before the issuance of a Building Permit in the Project Area, the applicant must provide an Energy Conservation Plan to the P B S Director for review and approval The Energy Conservation Plan must incorporate energy conservation features in accordance with the requirements of the City and State Before the issuance of each Certification of Occupancy, the applicant must provide evidence to the P B S Director that the approved energy conservation features have been installed and will be maintained 311105 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 14 If a substation will be constructed, the Applicant must develop plans, projected loads, and a master plan for scheduling to the satisfaction of Southern California Edison, FIRE 15 Before the issuance of a Building Permit in the Project Area, the applicant must provide Fire Life Safety Plans to the P B S Director and the Fire Chief for review and approval, which include, without limitation, the following A Fire lanes, B Fire lane signing, C Fire lane access easements or other recorded documents to the reasonable satisfaction of the City Attorney, D Fire lane accessibility; E Gas detection systems; F Minimum acceptable flow from any fire hydrant must be 2,500 gallon per minute, calculated at 20 psi, G Sprinklers within structures, H Underground looped fire mains, sprinklers, fire pumps, and fire alarms, I Emergency generators, J Any above ground or underground storage tanks including elevator sumps and condensation tanks; K Documentation that the on -site fire mains will be maintained, and, L Before the issuance of each Certificate of Occupancy, the applicant must demonstrate to the Fire Department that the development complies with the Fire Life Safety Plan, and that any required easements were properly dedicated and recorded 16 Before the issuance of a Budding Permit in the Project Area, the applicant must develop and submit an Evacuation Plan and Procedures for review and approval by the Fire Department Before the issuance of each Certificate of Occupancy, the applicant must provide evidence to the P B S Director, and the Fire Department that the approved Evacuation Plan and procedures were implemented or are operational as appropriate 17 Before the issuance of a Grading or Building Permits in the Project Area, the applicant must provide a Construction Safety Plan to the P B S Director and Fire Department for review and approval The Construction Safety Plan must document construction and staff training procedures to ensure that best management practices during project grading and construction will be utilized The Construction Safety Plan must identify an awareness 3/1/05 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL program for the subgrade installation of utilities and the potential for worker exposure to related emissions, especially during excavation Compliance with this measure must be verified by the P B S Director before permit issuance 18 Before the issuance of each Building Permit in the Project Area, all hydrants determined necessary by the Fire Department and the P B S Director must be installed in accordance with approved plans and specifications Fire hydrants must be spaced no greater than 300 feet apart One private hydrant must be provided for each structure and each structure must be sprinklered in accordance with the California Building Code (CBC) and the National Fire Code(NFC) 19 Before the issuance of a Certificate of Occupancy for each building, the applicant must pay a Fire Service Mitigation Fee based upon the applicable Fire Service Mitigation Fee in effect at the time of issuance of a Certificate of Occupancy Currently, the fee is $0 14 per gross square foot of floor area, but the fee is subject to change Compliance with this measure must be verified by the P B S Director before issuance of a Certificate of Occupancy for each budding GEOTECHNICAL (GRADING, TOPOGRAPHY, SOILS AND DRAINAGE) 20 Before the issuance of a Grading Permit for the Project Area or a portion thereof, the applicant must prepare and submit a Grading Plan for review and approval by the P B S Director and the Director of Public Works The Grading Plan must include, without limitation A The Grading Plan must demonstrate compliance with applicable provisions of the ESMC and City policies and requirements, B The Grading Plan must show cross sections for any grading purpose and the location of and extent of existing and planned sewer easements and facilities, C Grading depths must not encroach upon or damage the existing sewer lines on the property, D Haul routes for import/export trucks and other heavy construction related vehicles must be approved by the Director of Public Works, E No haul routes may travel through the City of Manhattan Beach during A M or P M peak hours, F All grading must be accomplished in accordance with the recommendations of a independent Geotechrncal and Geological Report to be submitted by the applicant and reviewed and approved by the City, G The Grading Plan must detail where special restrictions apply due to soil contamination, if applicable, H Additional information, as required through the plan check process, must be included as appropriate, 311105 8 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL Final grading activities must be coordinated with the City Engineer at the time the Grading Permit is issued, and, Compliance with the above measures must be verified by the P B S Director before issuance of each Certificate of Occupancy HAZARDS 21 Before the issuance of a Grading Permit for the Protect Area or a portion thereof, the applicant must submit documentation from the Los Angeles Regional Water Quality Control Board ( "LARWQCB ") evidencing approval of completion of the Interim Remediation Measures and approval of the Final Remedial Action Plan for the Protect Area for the area covered by the Grading Permit 22 The applicant must comply with any permit requirements imposed by the LARWQCB and /or the Department of Toxic Substances Control ( "DTSC "), or any other applicable regulatory agency related to development and /or grading on the site 23 Before the issuance of a Grading Permit, the applicant must provide any appropriate hazardous materials safety training for all City employees needed to implement the protect If required, the training must be related specifically to safety issues that may arise during site grading and construction due to the sod contamination that may exist in the site All training must be completed to the reasonable satisfaction of the P B S Director, and the Fire Chief NOISE 24 During the construction phase of the protect, activities will be allowed between the hours of 7 A M to 6 P.M , Monday through Saturday, and prohibited at any time on Sundays and federal holidays, unless such hours are extended pursuant to a Noise Permit issued by the P B S Director Compliance for the operations phase will meet with the placement, screening, and maintenance standards for all external mechanical equipment The proposed protect must be designed to ensure that noise generated by the proposed protect operations does not exceed the City's noise standards, as established by the ESMC, for on- site or off -site receptors A noise monitor must be designated according to the relevant codes Before issuance of a Grading Permit for each Protect Area, the City must designate a Noise Ordinance Compliance/Verification Monitor. Before the issuance of a Building Permit for each Protect Area, the applicant's Final Working Drawings must be submitted to the P B S Director for review and approval relative to compliance with the City's Noise Ordinance POLICE /SAFETY 25 Before the issuance of the first Building Permit, the applicant must submit an overall Security and Crime Prevention Plan, to the P B S Director and the Police Department for review and approval, which must address, without limitation, the following A Lighting, B Addressing (minimum height of 4" to 24 "), 311105 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL C Telephones, D Trash dumpsters (including space for recyclable materials), E Indoor and outdoor security cameras installed at strategic locations, including employee and other vehicle parking areas, F Parking lots and structures, G Fences, walls, H Security hardware, I Office, J On -site security personnel, K Locker rooms, L An Evacuation Plan and Procedures, M The employment of security personnel who will monitor and patrol the proposed Project Site, including employee and other vehicle parking areas, and coordinate with public safety officials, N The installation of lighting in entryways, elevators, lobbies, and parking areas designed to eliminate potential areas of concealment, O A diagram of the proposed protect, which will include access routes, and any information that might facilitate emergency response, P Compliance with all applicable items on Police Department checklist memo dated April 12, 2004, attached as Exhibit F- 1/C -1, with the exception that parking is permitted on the north side of the Protect Area between the main row of buildings and the northern property line, and, Q All Security and Crime Prevention Plan measures must be installed in conformance with the approved plans and must be operational before the issuance of a Certificate of Occupancy 26 Before issuance of the first building permits, the applicant must submit a photometric light study to the Police Department for review and approval 27 Before the issuance of a Certificate of Occupancy for each building, the applicant must pay a Police Service Mitigation Fee based upon the applicable Police Service Mitigation Fee in effect at the time of issuance of a Certificate of Occupancy Currently, the fee is $0 11 per gross square foot of floor area, but the fee is subject to change Compliance with this measure must be verified by the P B S Director before issuance of a Certificate of Occupancy for each building 3/1105 10 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL PROJECT DESCRIPTION Plans 28 The City of El Segundo requires development project applicants to prepare and submit Final Working Drawings for review and approval. The applicant must provide Final Working Drawings that comply with Policies and Requirements and these conditions of approval The Final Working Drawings must indicate proposed uses, budding sizes and heights, and the specific location of structures, loading docks, staging areas, parking layout, landscaped areas and recreational amenities The Final Working Drawings must include vehicular, pedestrian and bicycle access, on- and off -site circulation, and linkage to other key elements in the site vicinity, including the MTA Green Line The Final Working Drawings must indicate building materials and architectural design elements that will be utilized in the construction of the proposed structures The Final Working Drawings must include information on security lighting and hardware and other detail required for compliance with the City's security, safety and crime prevention standards The Final Working Drawings must demonstrate compliance with the California Building Code, California Mechanical Code, California Plumbing Code, California Fire Code, California Sign Code, and California Electrical Code, and approved Fire Life Safety Systems In addition, the Final Working Drawings must clearly indicate the location of all entrances and exits, including emergency vehicle access All parcel buildings and structures must be located in proximity to the proposed parcel lines such that they meet all requirements for exterior wall and opening protection Additional information, as required through the plan check process, must be included as appropriate Before the issuance of a Budding Permit for the Project Area, the applicant must coordinate with all applicable City and applicable County agencies to prepare and submit Final Working Drawings to be approved by the P B S Director, the Department of Public Works, the Fire Department and the Police Department Before the issuance of a Certificate of Occupancy for each building, the applicant must provide evidence to the P B S Director, the Department of Public Works, the Police Department, and the Fire Department that Code and policy requirement conditions have been met 29 The Plaza El Segundo development project is allowed to develop up to a maximum of 425,000 square feet consisting of a combination of uses as permitted by the Plaza El Segundo Reduced Traffic Generation Alternative described in the Final EIR, the C-4 Zone and as limited by the Development Agreement as long as the total AM, PM peak, daily, and Saturday midday peak trip generation established in the EIR for the project as a whole is not exceeded 30 The maximum project size may be reduced as determined by the vehicle trip generation for each use The Sepulveda /Rosecrans Site Rezoning and Plaza El Segundo development project permit the following vehicle trips MAXIMUM PERMITTED TRIPS AM PM Daily Saturday Midday Sepulveda /Rosecrans Site 1,033 2,346 25,859 3,379 Rezoning Plaza El Segundo Development 779 1,477 16,645 2,205 Project 3/1/05 11 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL The trip generation for each use and budding must be determined using the rates identified below, adjusted for internal capture and pass by discount rate consistent with the traffic study for EA No 631 Shopping Center (per 1,000 sf ) — LU 820 Daily- Ln(T) = 0 65 Ln(A) + 5 83 AM Peak Hour Ln(T) = 0 60 Ln(A) + 2 29, I/13=61 %, O/B =39% PM Peak Hour Ln(T) = 0 66 Ln(A) + 3 40, I/13=48 %, O/B =52% Saturday Ln(T) = 0 65 Ln(A) + 3 77, I/B =52 %, 0/13=48% Grocery Store (per 1,000 so — LU 850 Daily T = 66 95(A) + 1391 56 AM Peak Hour Ln(T) = 1 70 Ln(A) — 1 42, I/B =61 %, O/B =39% PM Peak Hour Ln(T) = 0 79 Ln(A) + 3 20, I/B =51 %, O/B =49% Saturday Ln(T) = 0 74 Ln(A) + 3 47, I/B =51 1, O/B =49% Free Standing Discount Store (per 1,000 so — LU 815 Daily T = 56 02(A) AM Peak Hour T = 0 84 (A), I/13=68 %, 0/13=32% PM Peak Hour T = 5 06 A), I/13=50 %, 0/6 =50% Saturday T = 7 58 (A), I/13=51 %, O/B =49% Electronics Superstore (per 1,000 so — LU 863 Daily T = 45 04 (A) AM Peak Hour T = 3 46 (A), I/B =53 %, O/B =47% PM Peak Hour T = 4 50 (A), I/6 =49 %, O/6 =51% Saturday N /A' Health Club (per 1,000 so — LU 493 Daily T = 43 0 (A) AM Peak Hour' T = 3 06 (A), I/6 =58 %, 0/6 =42% PM Peak Hour T = 5 76 (A), I/13=63 %, 0/6 =37% Saturday [N /A]' Fast -food Restaurant with Drive- Through Window (per 1,000 so — LU 934 Daily T = 496 12 (A) AM Peak Hour T = 53 11 (A), I/B =51 %, O/B =49% PM Peak Hour T = 34 64 (A), I/B =52 %, O/B =48% Saturday T = 59 20 (A), I/B =51 %, 0/6 =49% High- Turnover (Sit -Down) Restaurant (per 1,000 so — LU 932 Daily T = 127 15 (A) AM Peak Hour T = 11 52 (A), I/13=52 %, O/B =48% PM Peak Hour T = 10 92 (A), I/13=61 %, O/B =39% Saturday T = 20 00 (A), I/B =63 %, O/B =37% T = trip ends A = building area in 1,000's of square feet I/B = inbound percentages LU = ITE land use code O/B = outbound percentages Sources Trip Generation, 7th Edition, Institute of Transportation Engineers, 2003 Saturday information unavailable — PM Peak hour utilized 3/1/05 12 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 31 The City of El Segundo requires development protect applicants to prepare and submit a Construction Management Plan for each Protect Area for review and approval by the P B S Director and Director of Public Works The Construction Management Plan must consider all stages of construction, including grading, dirt hauling, employee travel, materials delivery, etc The Construction Management Plan is also required for review and approval by the P B S Director and Department of Public Works for the installation of any utilities, including telecommunication utilities, in the public right -of -way Such a plan must include, without limitation, traffic control measures for any lane closures The Construction Management Plan must identify the types and approximate number of construction vehicles to be utilized and must provide haul routes, staging area information and needed road or lane closures The plan must include, but not be limited to construction hours, construction trader locations, construction and staging areas, construction crew parking, parking /access plan (including truck haul routes), construction methods and schedules No haul routes are permitted through the City of Manhattan Beach during A M and P M peak hours All staging areas must be on -site During construction, the areas of construction must be enclosed by a six - foot high chain link fence, except those areas that have additional fencing requirements Gates of site fencing must be located at driveways and must not open over sidewalk /public right -of -way During construction, trash must be removed from the Project Site regularly and promptly At the end of each construction day, all open trenches must be completely closed or covered, or secured in accordance with Cal OSHA standards All gates and access points to the construction area must be locked and /or fully secured at the end of construction each day The applicant must provide a twenty -four hour, every day contact person /liaison to receive and respond to complaints during construction 32 Before the issuance of a Grading or Building Permit for the Project Area, the applicant must provide evidence to the P B S Director that grading or any construction on property or within easements not owned or controlled by the applicant has been approved by the property owner or easement holder Separate Grading and /or Budding Permit(s) must be obtained by the applicant with the easement holder as co- applicant, if needed 33 Before the issuance of a Budding Permit for the Project Area, the applicant must submit plans and specifications for any new curbs, sidewalks, driveway approaches, wheelchair ramps, and asphalt concrete (A C ) pavement, that must be constructed /reconstructed in the public right -of -way for any missing public segments /areas on the perimeter of the Project Site, as reasonably required by the Director of Public Works Any existing driveways and other paved areas on the perimeter of the Project Site that will not be incorporated into the development must be removed and replaced with standard curb and sidewalk Before issuance of a Certificate of Occupancy for the budding that is the subject of the Building Permit, the applicant must install the required public improvements per the approved plans to the reasonable satisfaction of the Director of Public Works DEDICATIONS AND FEES 34 The applicant must dedicate approximately 3 47 -acres of the "Project Site" to the City for the construction of the extensions of Park Place and Allied Way, as required in Development Agreement No 04 -1 and as depicted on Vesting Tentative Map 061630 Such dedication shall occur through and upon recordation of the Final Map 3/1/05 13 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 35 The applicant must dedicate approximately 0 50 -acres of the "Project Site" to the city for roadway widening along the east side of Sepulveda Boulevard, as required in Development Agreement No 04 -1 and as depicted on Vesting Tentative Map 061630 Such dedication shall occur through and upon recordation of the Final Map 36 Before the issuance of a Certificate of Occupancy Permit for each budding, the applicant must pay a Library Service Mitigation Fee based on the applicable Library Service Mitigation Fee in effect at the time of issuance of a Certificate of Occupancy Currently, the fee is $0 03 per gross square foot of floor area, but the fee is subject to change Compliance with this measure must be verified by the P B S Director before issuance of each Certificate of Occupancy for each budding 37 The applicant may modify the location of the parcel boundaries as approved on Vesting Tentative Tract Map No 061630, consistent with the development standards in the C-4 Zone to accommodate the size and location of the individual buildings, before recordation of Final Tract Map No 061630, provided a maximum of 20 parcels are created 38 Before the recording of the Final Map, the applicant must record a lot tie covenant if any buildings are to be constructed across existing lot lines or if any budding location does not meet the development standards of the Commercial Center (C -4) Zone due to the location of the existing lot lines No Certificates of Occupancy shall be granted for any use or structure until the recording of the Final Map Accordingly, construction that proceeds before the recording of the Final Map is done at the Developer's nsk that a Certificate of Occupancy will not be issued 39 After the recording of the Final Map, the applicant must submit a Lot Line Adjustment application, if necessary, to realign any parcels to match the proposed locations of the buildings to maintain conformity with the development standards in the ESMC 40 The applicant must maintain all existing easements on the site if the easement is still required by its grantee 41 The applicant must provide reciprocal access agreements, subject to review and approval by the City Attorney, between any parcels that do not have independent direct vehicle access to a public right -of -way Such agreements must be recorded before issuance of any Certificate of Occupancy for a budding on an affected parcel 42 Before the issuance of a Rough Grading Permit for the Project Area, the applicant must provide funds in trust to the P B S Director to cover the reasonable costs, including City consultants' and legal costs and fees, of the monitoring of the conditions of approval and adopted mitigation measures associated with rough grading Before the issuance of a Final Grading Permit, the applicant must provide funds in trust to the P B S Director to cover the first year costs, including City consultants' and legal costs and fees, of the monitoring of the conditions of approval and adopted mitigation measures, not associated with rough grading Costs may include, without limitation, costs for traffic reviews, stormwater review, biological resource monitoring, sod remediation review, and review of easements, dedications and other agreements Costs that would be associated with rough grading do not include costs for traffic reviews and review of easements and dedications Annually thereafter, the applicant must replenish funds as deemed necessary by the P B S Director to cover the 311105 14 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL reasonable costs, including City consultants' costs for each year The P B S Director, at his discretion, may hire a consultant to coordinate and monitor compliance 43 Before the issuance of a Grading Permit, Building Permit, or Certificate of Occupancy, as the case may be, the applicant must provide evidence to the P B.S Director that all adopted mitigation measures have been or will be implemented pursuant to the project's mitigation monitoring plan Compliance with this measure must be venfied by the P B S Director CONSTRUCTION REQUIREMENTS 44 All work within the City public right -of -way must be in accordance with the latest edition of the Standards Specifications for Public Works Construction and City of El Segundo Standard Specifications No work must be performed in the public right -of -way without first obtaining a Public Works Encroachment Permit 45 Before the issuance of a Grading or Building Permit for the Project Area, the applicant must provide evidence to the reasonable satisfaction of the P B S Director that all applicable permits from other agencies have been obtained including, without limitation, LARWQCB, Caltrans, State Water Quality Control Board's National Pollution Discharge Elimination Systems (N P D E S) Permit, South Coast Air Quality Management District, and Los Angeles County Department of Public Works 46 Following the receipt of all requisite permits, the applicant must notify the P B S Director of the date that construction will commence 47 At such time deemed necessary by the P B S Director, the applicant must provide an on- site inspection office trailer for the use of City inspection personnel STORMWATER (GROUND HYDROLOGY AND GROUND WATER QUALITY) 48 The Los Angeles Regional Water Quality Control Board has promulgated rules and standards including, without limitation, obtaining an NPDES Permit and regulations related to underground and above ground storage tanks The applicant's compliance with LARWQCB will ensure compliance with the applicable sections of the California Water Code (Section 13260), the Clean Water Act, and the Porter - Cologne Water Quality Control Act The applicant must ensure that any on -site tanks for use in the storage of fuels, wasted oil, solvents or other chemicals, which are located either above ground or underground, must be placed, constructed and maintained in accordance with the requirements of the LARWQCB 49 The applicant must adhere to any relevant requirements of the LARWQCB regarding development of the site The applicant must prepare a Storm Water Pollution Prevention Plan ( SWPPP) which will demonstrate best management practices relevant to compliance with LARWQCB requirements and the California General Construction Permit Before the issuance of a Grading Permit for the proposed project, the applicant must provide a SWPPP to the LARWQCB, the P B.S Director and Fire Department for review and approval relative to compliance with the provisions and requirements of the LARWQCB Before issuance of a Building Permit for each Project Area, the applicant must apply for the appropriate notifications and /or registrations for any on -site storage tanks The applicant must provide a copy to the City of the Notice of Intent required by the LARWCCB 311105 15 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 50 Before the issuance of a final Grading Permit and /or Building Permit for each building in the Protect Area, the applicant must provide a drainage plan for that portion of the Protect Area affected that eliminates pollutants to surface runoff as required by NPDES requirements The drainage plan must be reviewed and approved by the P B S Director and Director of Public Works Before the issuance of a Certificate of Occupancy for each budding, the applicant must demonstrate that the drainage plan has been implemented and is effective to the reasonable satisfaction of the P B S Director and Director of Public Works 51 Before the issuance of a Building Permit for the Protect Area, the applicant must provide evidence to the P B S Director and Director of Public Works that pavement on -site must be adequately applied to prevent sod erosion Further, paved areas on -site must be regularly maintained (i e , all cracks repaired and debris removed on a regular basis) to prevent soil erosion The applicant must install improvements pursuant to the approved plans before final sign -off of the Permit Before the issuance of a Grading or Budding Permit for each building in the Protect Area, the applicant must provide evidence to the P B S Director and Director of Public Works that on -site drainage must be directed to existing storm drains The applicant must install said improvements per the approved plans before final sign -off of the Permit 52 Before the issuance of any Grading or Budding Permit for the Protect Area, the applicant must prepare a Standard Urban Stormwater Mitigation Plan (SUSMP) and provide evidence to the P B S Director and Director of Public Works that the protect area that is the subject of the Grading or Budding Permit complies with City of El Segundo Urban Runoff Pollution Prevention Controls (Title 5 - Health and Sanitation, Chapter 7 - Standards Urban Stormwater Mitigation Plan Implementation of the El Segundo Municipal Code) The applicant must install said improvements per the approved plans before final sign -off of the Permit 53 Before the issuance of a Grading or Budding Permit for each budding in the Protect Area, the applicant must provide evidence to the P B S Director and Director of Public Works that A Collection basins to reduce silts in storm water before runoff drainage to the Los Angeles Flood Control System have been adequately incorporated into the protect design, B On -site catch basins have been designed and constructed to screen out larger matter to prevent flooding of the protect site resulting from debris caught in the drainage canal, C Drainage channels within parking lot and paved areas have been be designed and constructed to direct storm water and /or irrigation run -off to collection basins provided on -site, D On -site drainage and hydrology improvements have been designed in conformance with applicable standards of the City of El Segundo and the Los Angeles County Department of Public Works, including policies in the Public Safety Element of the City's General Plan, E The protect is in compliance with applicable permit requirements of the Los Angeles County Department of Public Works or Los Angeles County Flood Control District, 3/1/05 16 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL F On -site drainage and hydrology improvements have been designed using the necessary hydraulic/hydrology and structural calculations required for permitting by the Los Angeles County of Department of Public Works and, G All on -site development is consistent with a Hydrology and Drainage Study and the Final Working Drawings, as approved by the City, and, H Before the issuance of any subsequent Permit `Final Inspection Approval' for the proposed project, the applicant must provide evidence to the P B S Director and Public Works that all the improvements herein have been constructed in compliance with the appropriate regulations and specifications TRANSPORTATION /CIRCULATION /PARKING 54 If the Los Angeles Congestion Management Plan (CMP) requires the City to track the debits /credits associated with development in the City, before the issuance of the first Building Permit for the Project Site, the applicant must provide Los Angeles County Congestion Management Plan (CMP) Debit/Credit Calculations, and a Phasing Plan for CMP related improvements, to the P B S Director and Public Works for review and approval The calculations must include only programs which meet all the minimum criteria (e g , density) contained in the CMP Before the issuance of a Certificate of Occupancy for the building, the applicant must provide evidence to the P B S Director that the proposed project CMP debits /credits related improvements were implemented and balanced on the Project Site in accordance with the approved phasing plan Compliance with this measure must be verified by the P B S Director before permit issuance As may be applicable, the City will give credit for CMP related improvements towards the applicant's traffic mitigation impact fee, as appropriate 55 Before the issuance of a Building Permit for the Project Area, the applicant must provide a Pedestrian Access /Circulation Plan to the P B S Director, Recreation and Parks Director, and Police Chief for review and approval The Plan must identify the location of pedestrian, bicycle accesses and indicate linkage to other key elements in the site vicinity, and within the project itself, including parking areas, building entrances, bicycle racks, recreational elements, etc The Plan must reflect a safe movement pattern, which does not significantly conflict with vehicular movement and parking access areas Before the issuance of a Certificate of Occupancy for each Project Area, the applicant must provide evidence to the P B S Director, Recreation and Parks Director, and Police Chief that the approved pedestrian and bicycle access features have been installed and will be adequately maintained per the approved plan 56 Before the issuance of each Building Permit in the Project Area, the applicant must submit a detailed Traffic, Circulation and Parking Plan, prepared by a licensed traffic engineer, for review and approval by the Director of Public Works, the P B S Director, the Police Chief, the Fire Chief, and the City's Traffic Engineer Alternatively, such a plan may be submitted for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other The Traffic, Circulation and Parking Plan must include, without limitation, the following A An analysis of the estimated traffic generation for the building(s), 311105 17 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL B Sight distances for each structure and parking area associated with the building(s), C An analysis of the traffic volumes at each driveway or intersection associated with the budding(s) in order to determine if any offsite improvements are warranted (i e , deceleration lanes, left -turn pockets, new or modified traffic signals, etc ) that were not analyzed in the EIR due to the approximation of building locations in the EIR, D Any new traffic signals or modifications to existing traffic signals must be subject to the review and approval of the Los Angeles County Department of Public Works The applicant must pay the applicable county costs to provide plan check and inspection services, E The applicant must dedicate any on -site land required to accommodate any required intersection and roadway improvements (e g , deceleration lanes) and the new Park Place and Allied Way roadway extensions through the recording of the Final Map, which may be after budding permit issuance, but must occur before issuance of a Certificate of Occupancy for any building in the Project Area, F All truck circulation, G Customer /employee parking, H All access points to the project site, which should be aligned with existing driveways and intersections where possible, I Off -site circulation improvements, J All median modifications, if necessary, K All dead end aisles eliminated to satisfy City Codes, L All truck turning radii, M The location of required loading spaces, N An analysis that shows the location and the timing of construction of the required parking for the budding or Project Area, O Pedestrian crossing areas of the public roadways must be called out on the plans and appropriately designated, P All parcels and structures must be connected by an accessible route of travel that meets the requirements of Title 24 of the California Building Code and, Q Final site plan approval for each budding(s) must be contingent upon fulfillment of the above traffic design review requirements All Circulation and Parking Plan improvements which require installation must be installed before the issuance of each Certificate of Occupancy for the building(s) which are the subject of the Traffic, Circulation and Parking Plan Compliance with these requirements must be verified by the Director of 311105 18 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL Public Works, the P B S Director, the Police Chief, the Fire Chief, and the City's Traffic Engineer before the issuance of a Certificate of Occupancy 57 The applicant must install "No Parking" and other traffic signs on the Park Place and Allied Way roadway extensions, as required by the Public Works Department 58 The applicant must provide handicap accessible pedestrian walkways, with a minimum five - foot width Any roadways dedicated to the City as public roadways may have handicap accessible pedestrian walkways within the public right -of -way instead of locating them on private property 59 Before the issuance of the first Building Permit for the Protect Area, the applicant must submit Final Working Drawings to the P B S Director for review and approval that shows that all handicapped, carpool, vanpool, motorcycle, and bicycle parking and other TDM and TSM physical requirements have been provided as required by the City All TDM/TSM physical improvements required by City regulations must be installed before the issuance of each Certificate of Occupancy 60 Before the construction of the portion of the Park Place roadway for the proposed project that would intersect Sepulveda Boulevard and any other improvements on Sepulveda Boulevard, the applicant must secure a Caltrans Encroachment Permit to alter Sepulveda Boulevard as set forth in the EIR The alterations to Sepulveda Boulevard must be in accordance with relevant Caltrans Encroachment Permit requirements and conditions and must be shown on the Final Working Drawings The applicant is responsible for the costs of modifications and construction of all the roadway extensions and widernngs that will be dedicated to the City Before the issuance of a "Final Inspection Approval" of the roadway improvements, the applicant must install the intersection improvements The improvements must be reviewed and approved by the City Traffic Engineer, and P B S Director 61 Prior to the issuance of a Certificate of Occupancy for any building constructed north of the Union Pacific/Burlington Northern Santa Fe Railroad right -of -way in the Protect Area, the new roadways, including any medians, sidewalks, curbs, and gutters must be constructed in accordance with applicable Department of Public Works construction standards for a public roadway with the minimum dimensions required by the Circulation Element of the El Segundo General Plan, and must comply with applicable requirements of the Americans with Disabilities Act (ADA), as well as City requirements for traffic signage, street lighting, drainage plans, and underground utility service, subject to the review and approval of the Director of Public Works The applicant must be responsible for the design and construction of the new roadways 62 The applicant must install off -site traffic related mitigation measures as set forth in the EIR and MMRP at the time when amount of building (floor area or vehicle trips) triggers the impact for which the mitigation measure is based, as documented in the required Traffic, Circulation, and Parking Plan 63 Before the issuance of each Building Permit for the Protect Area, the applicant must submit a temporary lane closure plan for review and approval by the Director of Public Work, Fire Chief and Police Chief if lane closures will be required during construction for a particular building to insure construction vehicles, equipment and supplies do not interfere with local emergency response routes and incidences 311105 19 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 64 Driveway entrances must be clearly marked, as well as different areas of the parking lot, to ensure visiting vehicles do not accidentally enter the truck staging area 65 The applicant must coordinate construction lane closures with the Director of Public Works, Police Chief and Fire Chief 66 Before the issuance of each Certificate of Occupancy for a budding in the Project Area, the applicant must pay a Traffic Impact Mitigation Fee The amount will be based upon the adopted Traffic Impact Mitigation Fee in effect at the time of issuance of a Certificate of Occupancy 67 Shower and lockers for employees must be provided in sufficient number, as determined by the P B S Director for each tenant in the Project Area exceeding 50,000 square feet 68 The applicant must submit a Transportation the requirements of Chapter 15 -17 of the Certificate of Occupancy in the Project Area System Management (TSM) Plan, pursuant to ESMC within 90 days of issuance of the first UTILITIES 69 Before the issuance of the first Budding Permit for the Project Area, the applicant must provide a Utility Plan to the P B S Director and Public Works for review and approval The Utility Plan must demonstrate that all on -site utilities, including fiber optic utility lines from each building to the public right -of -way, are placed underground The applicant must assume the costs for the relocation of all utilities, without limitation, light poles, electrical vaults, and fire hydrants within the Project Area or Project Site Before the issuance of a Certificate of Occupancy for each budding that is the subject of the Budding Permit, the applicant must provide evidence to the P B S Director and the Director of Public Works that the approved Utility Plan improvements has been installed and appropriate access provided per the approved plan 70 Before the issuance of the first Budding Permit for the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that proposed utility service improvements will be of a quality reasonably acceptable to the P B S Director The developer must encourage and promote a high quality, efficient, and sustainable development through the incorporation and utilization of the best and most cost - effective electrical, natural gas, communications, sewage handling, water conservation, and solid waste disposal equipment and systems Compliance with this measure must be verified by the P B.S Director before Budding Permit issuance 71 On -site utilities on private property within the project site, including without limitation, storm drains, stormwater detention basins, water and sewer mains, must be owned and maintained by the developer and a connection point to a public main established 72 Before the issuance of a budding permit, the applicant must obtain utility easements for the utilities located on private property within the Project Area that cross through adjacent private property and /or utilities that are used or shared by two or more parcels 311105 20 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 73 Encroachment Permits for work in the public right -of -way must be obtained from the Engineering Division of the Public Works Department A Grading Permit is also required when import or export of dirt exceeds fifty cubic yards 74 Overload permits are required for dirt and material hauling on City streets 75 No material storage is allowed in the public right -of -way except by Encroachment Permit issued by the Engineering Division of the Public Works Department If material storage is allowed in the public right -of -way, it must be confined to parkway areas and street parking areas, as long as safe and adequate pedestrian and vehicular passage is maintained at all times as determined by the Engineering Division Storage beyond these areas in the public right -of -way requires prior approval of the Public Works Director and must be limited to a maximum period of 24 hours 76 Before the issuance of the first Building Permit for the Project Area, the applicant must submit Street and Public Right -of -Way Improvement Plans for review and approval to the Director of Public Works and P B S Director Said plans must include any required dedications and sidewalks in accordance with City standards necessary for the building that is the subject of the Permit Sidewalks are required on both sides of all public streets within the Project Area Before the issuance of a Certificate of Occupancy for each building that is the subject of the Permit, the applicant must dedicate any required right -of -way and install all sidewalks in accordance with plans and specifications approved by the City Alternatively, the applicant may submit Street and Public Right -of -Way Improvement Plans, if required, for a Project Area or a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 77 The Los Angeles County Sanitation District requires a Buldover Permit for construction over its sewer easements The applicant must demonstrate through its Grading Plans in the Project Area that all alterations to final sewer easements, relocation of sewer manholes, and rights of way must be in accordance with relevant Bwldover Permit(s) to allow the construction of the proposed project and other project components over any sewer easements Before the issuance of the affected Grading Permits for the proposed project, the applicant must provide evidence to the P B S Director that any necessary Bwldover Permit(s) has been obtained or the easement(s) has been relocated 78 Before issuance of the first budding permit the existing sewer laterals that connect tc circuit television (CCTV) to determine the serve the project in the Project Area, the applicant must inspect the City sewer mains in the area with closed condition of the existing infrastructure that will 79 If new sewer laterals are required and constructed in the public right -of -way, they must be a minimum of six inches inside diameter Material must be "vitreous clay pipe " Each lateral must have a six -inch clean -out brought to grade at the property line and securely capped A B9 size box must be placed around the clean -out for protection The box must have a cover properly marked with the word "sewer" If in a traffic area, the cover must be traffic approved All elevations of planned sewer connections must be reviewed and approved by the Director of Public Works before starting construction Existing sewer laterals must be plugged at the sewer mainline and capped at the property line Existing six -inch wyes may be reused if approved by the Director of Public Works Any required sewer laterals must be installed before the issuance of a Certificate of Occupancy for the building to be served 3/1/05 21 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 80 If any off -site upgrades are required due to changes in the proposed peak demands in sewer services, a program for the implementation of the upgrades must be provided to demonstrate capacity availability before occupancy Before the issuance of a Certificate of Occupancy for each budding within a Project Area, the applicant must provide evidence to the P B S Director that adequate sewer capacity is available to accommodate the budding that is the subject of such Certificate of Occupancy Alternatively, the applicant may submit any sewer upgrade plans, if required, for a Project Area or a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 81 If any off -sde upgrades are required due to changes in the proposed peak demands in water and wastewater service, a program for the implementation of the upgrades must be provided to demonstrate capacity availability before occupancy Before the issuance of a Certificate of Occupancy for each building within a Project Area, the applicant must provide evidence to the P B S Director that adequate water and wastewater capacity is available to accommodate the budding that is the subject of such Certificate of Occupancy Alternatively, the applicant may submit any water and wastewater upgrade plans, if required, for a Project Area or a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 82 Before issuance of a first Certificate of Occupancy for any building in the Project Area north of the Union Pacific Railroad right -of -way, the applicant must replace the 15 -inch sewer line located to the north of the project site with an 18 -inch sewer line as depicted on the Phase 1 Utility Layout plan 83 Businesses that generate fats, oils, or greases are required to install grease interceptors with a minimum 30- minute retention period on appropriate sewer connections 84 Before the issuance of a Certificate of Occupancy for each budding within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that the appropriate additional on -site water and wastewater improvements as identified by the El Segundo Water and Wastewater Division, or an equivalent service provider, have been installed Such additional measures must include separate services for potable and fire water systems, a separate water meter for each building, and potable system to be a combined irrigation and domestic, or separated into domestic and irrigation meters Separate fire services with double detector check valves and backflow preventers are required Upon completion of the site plan, the exact size and number of fire lines will be determined Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 85 If any off -site upgrades are required due to changes in the proposed peak demands for telecommunication services, a program for the implementation of the upgrades must be provided to demonstrate capacity availability before occupancy Before issuance of a Certificate of Occupancy for each budding within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that adequate facilities are available to accommodate the budding that is the subject of such Certificate of Occupancy Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 3 /1 /05 22 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL 86 Before the issuance of a Certificate of Occupancy for each building within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that any appropriate additional improvements for on -site telecommunication services as identified by Pacific Bell, or an equivalent service provider, have been installed to accommodate the building that is the subject of such Certificate of Occupancy If the existing facilities serve adjacent properties, the services may require relocation Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 87 If any off -site upgrades are required due to changes in the proposed peak demands in natural gas service, a program for the implementation of the upgrades must be provided to demonstrate capacity availability before occupancy Before the issuance of a Certificate of Occupancy for each budding within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that adequate facilities are available to accommodate the building that is the subject of such Certificate of Occupancy Compliance with this measure must be verified by the P B S Director before permit issuance Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 88 Before the issuance of a Certificate of Occupancy for each budding within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that any appropriate additional on -site natural gas service improvements as identified by The Gas Company, or an equivalent service provider, have been installed to accommodate the building that is the subject of such Certificate of Occupancy Compliance with this measure must be verified by the P B S Director and before the issuance of the Certificate of Occupancy Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 89 If any off -site upgrades are required due to changes in the proposed peak demands for electrical service, a program for the implementation of the upgrades must be provided to demonstrate capacity availability before occupancy Before the issuance of a Certificate of Occupancy for each building within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that adequate facilities are available to accommodate the building that is the subject of such Certificate of Occupancy Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 90 Before the issuance of a Certificate of Occupancy for each building within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that any appropriate additional on -site electrical service improvements as identified by The Edison Company, or an equivalent service provider, have been installed to accommodate the building that is the subject of such Certificate of Occupancy Alternatively, the applicant may submit any improvement plans, if required, for a number of buildings at one time if that group of buildings will be completed within a reasonable time period of each other 3/1/05 23 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL WATER 91 Before the issuance of the first Budding Permit for each building within the Project Area, the applicant must submit Off -site Reclaimed Water Facility Plans to the P B S Director and the Director of Public Works for review and approval Said plans for the off -site improvements must include an approval from West Basin Municipal Water District, the supplier of reclaimed water 92 Before the issuance of a Building Permit for each building within the Project Area, the applicant must submit Final Working Drawings that incorporate On -site Irrigation Plans to the P B S Director and the Director of Public Works for review and approval Such plans must indicate that reclaimed water must be utilized in the irrigation systems for all landscape areas and other uses, as approved by the Department of Public Works, when available from the West Basin Municipal Water District or other supplier of reclaimed water Such plans must include the installation of a dual water line system on -site to accommodate distribution of potable water for landscaping until reclaimed water for landscaping becomes available for the Project Area In addition to the utilization of reclaimed water for irrigation, other water conservation features such as low -flow devices and automated shut -offs must be included throughout the Project Site Water management systems must include both water conservation and wastewater reduction features 93 Before the issuance of a Certificate of Occupancy for each building within the Project Area, the applicant must provide evidence to the P B S Director and the Director of Public Works that the connection with the City's reclaimed water system has been provided, the approved water management systems and water - saving devices have been incorporated into project development, and that the water facilities have been installed per the approved plans If the water provider is unable to make reclaimed water available before the issuance of the Certificate of Occupancy, then potable water may be utilized and the Certificate of Occupancy must be issued 94 The applicant must install a loop water distribution system for the Project Site with service connections to each of the water mains in the streets surrounding the project, subject to the review and approval of the Director of Public Works Before the issuance of each Building Permit in the Project Area, the applicant must submit a construction phasing plan for the water service, which must include, without limitation, how the budding which is the subject of the permit will be connected to the looped water distribution system 95 Before the issuance of a Certificate of Occupancy for each budding within the Project Area, the applicant must pay the applicable water meter installation fees Compliance with this measure must be verified by the P B S Director before issuance of the Certificate of Occupancy 96 Before the issuance of a Building Permit for each building within the Project Area, the applicant must pay the applicable sewer connection fees and charges Compliance with this measure must be verified by the P B S Director before Permit issuance 97 Before the issuance of the first Certificate of Occupancy for a building in the Project Area, those areas not already part of County Sanitation District must be annexed to County Sanitation District No 5 3/1/05 24 CITY COUNCIL RESOLUTION No. 4415 Exhibit "F" CITY COUNCIL ORDINANCE No. 1382 Exhibit "C" CONDITIONS OF APPROVAL INDEMNIFICATION 98 The Developer must defend, indemnify and hold the City and its elected and appointed officials, officers, employees and agents harmless from and against any claims, legal or equitable actions, damages, costs (Including, without limitation, attorney's fees), injuries, or liability of whatsoever kind or nature, arising from the City's approval of the project, including but not limited to the CEQA determination, General Plan Amendment, Zoning Code Amendment and /or the Tentative Tract Map approval 99 Mar Ventures, Inc must acknowledge receipt and acceptance of the Project Conditions by executing the acknowledgement below By signing this document, Mar Ventures, Inc certify that they have read, understood, and agrees to the Project Conditions listed In this document and represents and warrants that It has the authority to execute this document on behalf of the property owner and acknowledges that the conditions set forth above shall run with the land and be binding upon all owners and occupants of the land Mar Ventures. Inc a Allan Mackenzie Its President a Its {If Corporation or similar entity, needs two officer signatures or evidence that one signature binds the company) P \Planning & Building Safety\PROJECTS \626 - 650 \EA - 631 \Council Agenda Packeffinal Approved Documents \Honeywell Conditions of Approval CC RTGA doc 311105 25 CITY COUNCIL RESOLUTION No. 4415 EXHIBIT "F -1" CITY COUNCIL ORDINANCE No. 1382 EXHIBIT "C -1" City of El Segundo Inter - Departmental Correspondence April 12, 2004 To: Jim Hansen, Director of Community, onomic & Development Services From: Jack Wayt, Chief of Police ;7, K-,-- Subject: Environmental Assessment EA -No 631 Address 850 S Sepulveda Blvd Applicant MAR Ventures Property Owner Honeywell, General Chemical, Air Products, Kramer & Co and others The Police Department's has revised some of the comments stated in the December 10, 2003 memo There is also a revision to the lighting requirements listed in the Crime Prevention Checklist The revised Checklist is attached for your convenience As the plans are still in the conceptual stages, it is difficult to make recommendations until specific businesses or types of business are identified and studied as to their relationship with one another. However, in reviewing the schematic master plan, the following are the preliminary comments from the Police Department. • Attached please find a "Crime Prevention Checklist" to use as general, but not site - specific guidelines • Historically, malls and strips centers where parking spaces are to the rear of the businesses experience crime problems. Consumers and employees are not comfortable parking and walking in this area because it is remote and secluded This leaves the area free for legitimized loitering, thus resulting in crimes such as rape, robbery, drug transactions, vandalism, theft and prostitution It is recommended the parking behind buildings Al through A6 be eliminated and moved to the front o If Al and A6 have glass windows surrounding three sides of these businesses, the parking spaces that wrap around them could remain because the windows will provide natural surveillance by store employees • Door viewers, specifically for fire -rated doors, shall be installed in the rear entrance /delivery doors of all businesses • "No loitering" signs should be posted along the backside of the buildings 850 S Sepulveda Blvd Police Department comments Page Two • For the employees' personal safety, individual store leases should not require employees to park in the back during hours of darkness • Trash dumpsters should be placed away from the back doors of the businesses to prevent employee theft • The entire protect shall be lighted with a maintained minimum of one footcandle of light during hours of darkness See the Cnme Prevention Checklist for details • A wall shall be used to separate this protect from the businesses along Hughes and Allied Ways • Depending on the time of delivery, delivery trucks trying to access budding A7 may pose a danger to pedestrians using the rear parking area • The plans note stairs in buildings A4 and A7. If the stairs are not contained within the individual stores, stairwell recommendations listed in the Crime Prevention Check list may be required • Where will the delivery doors be located for the restaurants? • To prevent burglaries, roof ladders should be situated within the individual businesses. • What type of activity will be occurnng at the public amenitiestpark? How will this area be secured after hours to prevent loitering? • The wall along the north side of the property shall continue along the east property line behind budding A -7. This will to keep public amenity users from parking behind A -7, using the open /well -lit parking spaces instead Traffic Division (Sot AI Graham) • For access, easement and traffic flow during peak hours Allied Way should be pushed through or propose to be pushed through to Rosecrans The same should apply from Sepulveda Blvd. to Allied Way City of El Segundo INTER - DEPARTMENTAL CORRESPONDENCE TO: Jim Hansen, Director of Community, Economic & Development Services FROM: Laurie Risk, Crime Prevention Specialist SUBJECT: Police Department Crime Prevention & Security Checklist The following checklist is r. NFRAI INFORMATION on budding security and crime prevention issues from the El Segundo Police Department Because each project is different and unique, no single list could possibly cover every situation It is the project designer's responsibility to obtain specific guidelines from the El Segundo Police on crime prevention as it relates to his /her specific project LIGHTING= Each project will require individual lighting needs according to its usage and location (i a the different lighting needs between a gas station, industrial, commercial, light retail, parking lots or structures, fast food, etc) General lighting guidelines may begin as follows During hours of darkness, a maintained minimum of one footcandle of light on the ground surface shall be provided around all sides of any building(s) and parking structure(s), open parking lots, carports and guest parking Wall packs shall be placed over shipping /receiving doors and trash dumpsters with one footcandle minimum maintained Aisles, passageways and recesses related to and within all sides of the building complex shall be illuminated with a maintained minimum of .25- 50 footcandles during hours of darkness Lighting devices shall be enclosed and protected by weather and vandal resistant covers A PHOTOMETRIC STUDY, WHICH INCLUDES ALL SIDES OF THE BUILDING(S), RECESSED AREAS, SURFACE PARKING LOTS, TRASH ENCLOSURES, DOCK AREAS AND PARKING STRUCTURE(S), MUST BE PROVIDED PRIOR TO ISSUING THE PERMIT. THE PHOTOMETRIC STUDY MUST BE POINT -BY -POINT AND INCLUDE THE LIGHT LOSS FACTOR (.7). LIGHTING LEVELS SHALL BE ADJUSTED ACCORDINGLY TO MEET THE MINIMUM FOOTCANDLES REQUIREMENTS WITHIN EACH AREA OF THE PROJECT. Depending on the size of the project and its location in relation to the street, the address needs may vary from a minimum of 6" to as much as 24" Street numbers should be visible from the street, of contrasting color to the background and illuminated during hours of darkness Any budding (residential, commercial, industrial, retail, etc ) which has alley access, shall have additional addressing on the alley side The alley addressing shall meet the same requirements as stated above FNTRANG S/ X%TS Entrances and exits shall be limited to keep control and visibility of the building EL SEGUNDO POLICE DEPARTMENT CRIME PREVENTION /SECURITY CHECKLIST PAGE TWO BIKE RACK Bike racks shall be located in a busy, well -lit location This will provide optimum security for persons and property I ANDS CAPIN All landscaping shall be low profile around perimeter fencing, windows, doors and entryways taking special care not to limit visibility and provide climbing access Floral or grass ground cover is recommended Bushes shall be trimmed to 1 to 2 feet and away from buildings Dense bushes should not be clumped together, this provides a hiding place for criminal activity Trees should be trimmed up to 7 feet BERMS Although berms are aesthetically pleasing, they do conceal any natural surveillance into a facility and its parking lot by patrol and passersby Berms have always been known to provide criminals with the opportunity for concealment in order to commit crimes Therefore, berms, especially those with landscaping on top would not be recommended Although berms are aesthetically pleasing, they do conceal natural surveillance into a facility by passersby and patrol, and they provide criminals with the opportunity for concealment in order to commit crimes Therefore, berms, especially those with landscaping on top would not be recommended HARDWARE(DOORS/WMDOWS All main entry doors (including entry doors from a garage into a residence) shall be of solid core construction with a minimum thickness of 1 3/4 inches (Commercial, retail and industrial doors may be constructed of metal, 1 WN' thick) Entry doors shall have a deadbolt locking device The deadbolt throw shall have a 1 -inch projection The cylinder guard shall be of case hardened steel, with the outer edge angled or tapered and free spinning The exterior part of the lock shall be connected to the inside portion of the lock with bolts at least 1/4 inch in diameter and constructed of steel The locking mechanism shall contain a minimum of a 5 -pin tumbler Main entry doors with glass constructed in or within 40 inches (including windows along the side of the entry door) of the locking mechanism should either reverse the swing of the door if a window is positioned within 40 inches of the locking mechanism, OR reverse the position of the window to be opposite the locking mechanism, OR all glass should be replaced with polycarbonate materials, or of fully tempered glass, or rated burglary resistant glazing. All doors accessible from a corridor shall be of solid core construction and be equipped with a deadbolt lock A panoramic door viewer (180 -190 degrees) shall be installed in each main entry door, delivery doors and entry doors off a corridor or hallway EL SEGUNDO POLICE DEPARTMENT CRIME PREVENTION /SECURITY CHECKLIST PAGE THREE Strike plates shall be made with a minimum 16 U S gauge steel, bronze or brass and secured to the iamb by a minimum of two screws, off -set and which must penetrate at least 2 inches into solid backing beyond the surface to which the strike plate is attached Sliding glass doors shall have a secondary locking device (i a locked by a key or a twisting /turning device /Charlie bar) This device shall limit any up and down or sideways movement while the window is in the closed /locked position Double or french doors shall have a secondary locking device, such as a cane or flush bolt in addition to a deadbolt The inactive leaf of double door(s) shall be equipped with metal flush bolts having a minimum embedment of 5/8 inch into the head and threshold of the door frame A latch guard shall be placed over double glass entry doors PERIMETER WALLS OR FENCING Perimeter walls shall be a minimum height of 6 feet street side and of solid construction Walls shall limit climbing access (i a concrete walls shall not have vaned sections were decorative blocks allow for stepping over the wall or part of the wall consists of wrought iron) Wood, wrought iron, steel tubular or mesh perimeters shall be 6 feet high and all horizontal members shall be on the inside of the perimeter Where wrought iron or steel tubular fencing is used, the horizontal members shall run along the top and bottom portion of the fence Wrought iron or steel tubular fencing is always recommended around a perimeter as it provides maximum visibility Chainlink fencing shall not have plastic or metal slats weaved within it This limits visibility into the facility TRACH D 1MPQT R¢ Trash dumpsters shall be enclosed with wrought iron or steel tubular fencing All dumpsters not enclosed this way shall be constructed in a way which fully encloses the dumpster (roofing connected to the side walls) Fencing shall be locked and a wall pack or light standard directly over the dumpster This will provide employees maximum visibility when they are taking out trash during hours of darkness. EMPLe)YEEPARKIN As internal theft is a large percentage of the loss to industry, employee parking should not be located by shipping /receiving docks or dumpsters Permanently affixed ladders leading to roofs shall be fully enclosed with sheet metal to a height of 10 feet This covering shall be locked against the ladder with a case - hardened hasp, secured with non - removable screws or bolts Hinges on the cover will be provided with non - removable pins when using pin -type hinges If a padlock is used, it shall have a hardened steel shackle, locking at both heel and toe, and a minimum 5- pin tumbler operation with a non - removable key when in an unlocked position EL SEGUNDO POLICE DEPARTMENT CRIME PREVENTION /SECURITY CHECKLIST PAGE: FOUR DOCK AREA Loading docks shall have wall packs placed directly over the roll -up door Roll -up door(s) should have two interior locking devices located on each side of the door (padlocks or cane bolts can be used) Loading docks shall have wall packs placed directly over the roll -up door Roll -up door(s) should have two interior locking devices located on each side of the door (padlocks or cane bolts can be used) A 1" x5" vision panel can be installed in the roll -up door PARKING LOTS AND PARKING STR I -T IR C Entry and exit should be limited to one area for control and observation If there is more than one entry or exit, a card access system should be used A perimeter wall or fencing should fully enclose the first floor to limit access A transitional lighting plan shall be established, with every level therein Lighting fixtures shall be placed over vehicles vs down aisles Florescent, high- pressure sodium or mercury vapor lighting is recommended Condo parkmg� Units having common parking should have numbered or lettered spaces, which do not correspond to the unit number Parking structures with numerous parking levels extended below the ground floor inhibit police patrol from dispatching additional units for help when dealing with criminal activity Parking structures shall be designed in such a way as to incorporate communication that will enhance two -way radio transmissions Wherever possible, elevators and stairs shall be located on the perimeter to permit natural surveillance from exterior public areas via glass back elevators and glass around stairs and elevator lobbies Openness will enhance natural surveillance and provide natural ventilation Openness on two sides would be an-acceptable minimum, four sides is preferable Exit doors from the parking structure should be "Emergency Only" with panic hardware There should be no hardware on the exterior Lighting of Parking 4tr uatnrn REVISED Passing from light to dark areas creates a problem for drivers because of the eye's inability to adjust rapidly Therefore, a transitional lighting plan within the parking structure shall be established with a maintained minimum of two footcandles of light on the ground surface Light must be put into the edges of parking stalls rather than just onto driving aisles Lighting fixtures should be placed over vehicles vs, down aisles. Florescent, high- pressure sodium or mercury vapor lighting is recommended EL SEGUNDO POLICE DEPARTMENT CRIME PREVENTION /SECURITY CHECKLIST PAGE FIVE Passing from light to dark areas creates a problem for drivers because of the eye's inability to adjust rapidly It is also imperative to get light into the edges of parking stalls rather than just onto driving aisles A transitional lighting plan within the parking structure shall be established with a minimum maintained of two foot candles of light on the surface White staining concrete is a cost - effective method of increasing general brightness, and when applied to ceilings, walls and beam soffits, reflects light, thereby increasing uniformity and creating a sense of well -being SITE DIRF- TORY Large complexes such as, but not limited to, hotels shall have a site directory placed at entrances, stairwells, elevators, in courtyards and in parking lots Appropriate room numbering and lettering shall be affixed to the budding Directories located at entrances and in parking lots shall be large enough for patrol and guests seated in a car to read POOL AREA Pool area shall be enclosed with barred fencing, a minimum of 6 feet high for safety and visibility. TEITEI EPHONES Public phones shall not be located in a remote area of the project Such locations encourage loitering and drug transactions Public telephones shall be "call out' only SFCLMITY CAAIERAs Security cameras should be placed, monitored and recorded by shipping, receiving dock areas, cash handling areas, counting areas, vital access doors, parking lots, cash registers, dnve -up windows and driveways and ANY OTHER AREAS DEEMED NECESSARY Cameras should monitor and record vehicle occupants and the license plate number as they enter /exit, vital access doors, loading docks and lobbies ALARMS A PANIC AL ARMS Panic /robbery alarms shall be installed in, but not limited to, all cash handling areas, registers, box offices, cash counting areas, reception desks or guest counters Contractors who install home security alarms systems, be they audible or monitored by a security company, shall inform the perspective residents that an alarm permit is required by the City of El Segundo and a False Alarm Ordinance is enforced by the El Segundo Police Department SECURITY PERSONNEL Security personnel may be requested to be stationed in certain areas of the project to provide additional or necessary security EL SEGUNDO POLICE DEPARTMENT CRIME PREVENTION /SECURITY CHECKLIST PAGE SIX SAFES OR CQUAMER CACHE DROPS Counter cache units should be installed by registers and a safe in the manager's office Ali safes should be anchored in concrete and cache drops anchored to the counter Signs should be placed on front doors stating the premise has a time drop safe or counter cache drop in use COOLERS All coolers shall be equipped with an interior unlocking or release mechanism in the event employees are locked inside during a robbery RUL ET R SISTANT N OS LR S Depending on the project, bullet resistant enclosures may be required. PUBLIC RESTRDOMS Public restrooms should be locked Entrance can be made by asking for a token or key OUTDOOR B N -H S AND TABLES Outdoor benches and tables should be constructed in such a way (curved) as to limit the number of people seated at one time or for long periods of time This will discourage loitering These benches and tables should be positioned in such a way as to provide natural surveillance of the parking lots _ASH RP dST RS All cash registers shall be clearly visible from the street and bolted down to the counter. MERCHAMDISF QQNDQ1 AS Aisles between gondolas shall be designed so that personnel can clearly see in all directions Gondolas shall not be so high as to obstruct personnel's view of interior _SEATING WALLS Decorative seating walls shall be no higher than 3 feet and should be angled and constructed of material which limits sitting time and deters loitering MENU ORDER BOARDS Menu order boards should be elevated approximately 2 -3 feet Round tube steel pipes should be used as support beams. Depending on the project, certain cashier stations should be elevated for maximum visibility ATMs shall follow those set forth per the California guidelines EL SEGUNDO POLICE DEPARTMENT CRIME PREVENTION /SECURITY CHECKLIST PAGE SEVEN HOTEL KEY CARQ SYSTEM Hotels/motels shall install a changeable electronic key card locking system for guest room and specific rooms (i a laundry, gymnasium, etc ) RU77 -/N ENTRY Depending on the project, a bua -m system may be required to secure specific areas or lobbies O 1NT R TDP FOR CASH REGISTER ORS R107 _ DESKS Counter tops for cash registers and service -type desks with a smooth finish such as glass, polished granite or marble enables evidence technicians to lift fingerprints and palm prints after a crime has been committed PARKING BOOTHS The landscaping around the island of the booth shall be ground cover only. The booth shall be lit on all sides with a minimum of one footcandle of light The lighting shall be installed and angled out in such a way that it does not present a glare on the glass limiting the attendant's visibility to the immediate surrounding area or out to the street A mirror shall be installed on the interior of the booth This will allow the attendant to see who may be coming from behind them A camera(s) should be installed. The camera(s) should be angled in such a way as to capture license plate numbers and facial images as the guests are conversing with the parking attendant A drop safe /time release safe should be installed Signs should then be posted that state a "DROP SAFE (OR TIME RELEASED SAFE) IN USE" If the attendant is taking in tokens and parking tickets only, signs should be posted stating "NO CASH EXCHANGED /TOKENS OR TICKETS ONLY" The attendant should have a radio, phone or panic alarm in which to make contact with security personnel in the event of an emergency. Issues which the Traffic Division would be concerned with, but are not limited to an adequate number of parking spaces per users, location of loading dock areas in relation to project traffic flow or street traffic flow, the project's impact on street traffic (i a additional signals, traffic, signage, etc ), driveways, ingress and egress locations 4/04