4 (2)BUNGALOW DRIVE
between lines 25 feet Westerly and 25 feet Easterly from the
produced center line of Bungalow Drive, as shown on Sheet 19 of
said plans; and in the Southerly 11 feet of
WisMI-IMMIIiJ?
between lines 30 feet Westerly and 30 feet Easterly from the
produced center line of Arena Street, as shown on Sheet 9 of said
plans; and in the Southerly 11 feet of
GRAND AVENUE
between lines 33 feet Westerly and 33 feet Easterly from the
produced center line of Sierra Street, as shown on Sheet 15 of
said plans; and in the Southerly 11 feet of
GRAND AVENUE
between lines 40 feet Westerly and 40 feet Easterly from the
produced center line of Center Street, as shown on Sheet 20 of
said plans.
Eighth: The grading, paving with asphaltic concrete, re-
moval of certain fences and appurtenant work in connection there-
with; in the first
ALLEY
lying East of Arena Street, between E1 Segundo Boulevard and the
first alley lying North of Franklin Avenue, as shown on Sheet 10
of said plans.
Ninth: The grading, paving with asphaltic concrete, remove
trees, construction of cement concrete curb, driveways, cement
concrete pipe storm drain, catch basin, manhole and appurtenant
work in connection therewith; in
SHELDON STREET
between E1 Segundo Boulevard and a line 25 feet Northerly from
and parallel with the center line of Franklin Avenue, as shown on
Sheets 11 and 23 of said plans.