2 (2);4„ .
between lines 30 feet Northerly and 30 feet Southerly from the
produced center line of Franklin Avenue, as shown on Sheet 2 of
said plans.
Third: The grading and paving with asphaltic concrete, re-
moval of certain trees, fences, concrete wall and slab, construc-
tion of cement concrete pipe storm drains, catch basin, manhole
and appurtenant work in connection therewith; in the first
ALLEY
lying north of Franklin Avenue, between the first Alley lying
west of Eucalyptus Drive and Sheldon Street, and between Penn
Street and Sierra Street, as shown on Sheets 5 and 27 of said
plans.
Fourth: The grading and paving with asphaltic concrete and
appurtenant work in connection therewith; in the first
ALLEY
and prolongation thereof, lying east of Main Street, between E1
Segundo Boulevard and a line 20 feet Northerly from and concen-
tric with the Southerly line of Grand Avenue, as shown on Sheet
6 of said plans; and in the first
ALLEY
lying east of Standard Street, between El Segundo Boulevard, and
the produced Northerly line of the first alley lying North of
Franklin Avenue, as shown on Sheet 7 of said plans; and in the
first
ALLEY
lying east of Penn Street, between E1 Segundo Boulevard and the
first alley lying North of Franklin Avenue, as shown on Sheet
14 of said plans; and in the Northerly 5 feet of
EL SEGUNDO BOULEVARD
between lines 15 feet Westerly and 15 feet Easterly from the pro-
duced center line of the first alley lying east of Main Street;
and the first alley lying east of Standard Street; and the first
- 2 -