CC RESOLUTION 867RESOLUTION N0. 867 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL SEGUNDO, CALIFORNIA, ADOPTING SPECIFICATIONS NO, 470129 FOR THE INSTALLA- TION OF WATER PIPE AND APPURTENANCES AND THE FURNISHING OF CERTAIN MATERIALS INCIDENTAL THERETO IN AND FOR SAID CITY. The City Council of the City of E1 Segundo, California, does resolve, declare and determine as follows: SECTION 1. That the following specifications, being and to be known as "Specifications No. 470129 of the City of E1 Segundo, California for the Installation of Water Pipe and Appurtenances and the Furnishing of Certain Materials Incidental Thereto" be, and the same are hereby adopted: "SPECIFICATIONS NO. 470129 FOR THE INSTALLATION OF WATER PIPE AND APPURTENANCES AND THE FURNISHING OF CERTAIN MATERIALS INCIDENTAL THERETO "SECTION I WORK TO BE DONE: The work to be done under these specifications shell con.. sist of furnishing all labor, tools, equipment and certain materials as hereinafter specified, for the complete Installa- tion of water mains and appurtenances and their connection to existing mains, including the excavating and backfilling of the trench, the laying of welded steel pipe and fittings, the setting of gate valves and other appurtenances, all as shown and delineated on the Plan 470130 heretofore approved for said work. 1- SECTION II. MA•rERIALS : All pipe, pipe fittings, valves, and pipe - ooating materials necessary for the completion of the pipe line, excepting welding rod and miscellaneous installing materials, will be supplied by the City trenoheide. The Contractor shall notify the City in advance when materials are needed and arrange to receive them. The Contractor Shall furnish all other material, tools and equipment to satisfactorily complete the work, and shall store and handle all material, tools and equipment on the ,fob site. Pipe will be delivered in 24 foot lengths. Gate valves to be installed hereunder will be Rensselaer, List 13-A, hub end gate valves and will be furnished by the City trenchside. The Contractor will be held responsible for any breakage or other damage through carelessness In handling or cutting pipe, fittings or any other material furnished by the City under these specifications. In case of such breakage or damage the City will supply additional material, but will deduct the cost of such material from the amount due the contractor before the final payment. the price for all material necessary to be furnished by the Contractor for a complete installation and construction of the work as shown on the plans, except, for that material expressly specified herein as to be furnished by the City, shall be included in the price bid for the relative items of work, and no other payment shall be made for such material. SECTION III CONSTRUCTION. Excavations The excavation shall include the removal of all earth and other material to such a depth as to provide a minimum cover of thirty inches (30 ") measured between the top of the pipe and the surface of the street or right of way as that 2- surface existed before excavation was made. Trenches shall be of sufficient width to provide ample space for the proper laying of the pipe. The bottom of the trench shall be true and even to provide a uniform bearing along the full length of the pipe. All existing pipes, conduits, sewers and /or other struot- ures encountered during the excavation of the trench shall be carefully protected by the Contractor, and in the event of Injury, they shall be restored by him without additional com- pensation, to as good a condition as that in which they were found. Where existing driveways occur, the Contractor shall make provisions for trench crossings at these points by means of backfills or temporary bridges, as directed by the Engineer. Laying of Pine: All pipe shall be laid in a straight line. The bottom of the trench shall be dug to a uniform grade, in order that the pipe shall be laid on a firm foundation with a solid bearing the full length of the pipe. The Contractor shall remove any and all dirt, foreign matter or other debris from the inside of the pipe and clean the ends of all foreign matter such as rust, scale, paint, oil, or slag produced by oxyacetylene welding. The pipe shall be lined on rollers or dollies placed on skids set to uniform grade whenever necessary so that long strings of pipe may be easily rolled. A sufficient number of taok. welds shall be employed to assure proper alignment of pipe during the process of making the weld. All tack welds shall be thoroughly fused into the parent metal and the spacing between points after the taok -welds have cooled shall not be less than 1/16" nor more than 1/8 ". XELAING Pipe 8" or larger in diameter shall be welded using the electric welding process. All welds must be made in such a 3- manner that they will develop the full strength of the parent metal, and shall withstand a reverse bend test; that is, with the inside surface of the pipe in tension, thorugh an angle of 90 degrees, without showing any signs of fracture. TESTING OF WELDS The Contractor shall out out and deliver promptly to the Cityls Inspector complete welds or coupons from any place In any weld the Inspector marks. If the coupon tested meets these requirements specified under WELDING, the Contractor will weld a piece of the same type and kind of metal into the place from which the coupons were cut. If the test coupon does not meet with these specifications, the entire weld shall be out from the line and rewelded in a manner satisfactory to the Inspector. The City will pay the cost of cutting coupons and cost of rewelding wherever coupons tested meet the above specifications, but if the coupons fail to meet the specifications, the expense shall be borne by the Contractor. PROTECTION OF OPEN ENDS Thp open ends of all strings of pipe, three ,points or more in length, shall be securely closed with wooden plugs or other means approved by the Engineer, to prevent the entrance of dirt, debris, or water into the pipe line. PLACING OF GATE VALVES The location of all gate valves shall be approved in the field by the Engineer. VALVES: Valves shall be set plumb. Joints at valves shall be lead points. The Contractor shall not be required to install valve boxes and covers. This work will be done by the City. Sterilization and Tests: Careful inspection shall be made during the progress of the installation in order to eliminate 4- the possibility of any foreign matter getting into the pipe. As each point is laid, HTH shall be placed therein in such a quantity, which will provide not less than (10) parts per million (1,000,000) of free chlorine, when the pipe is filled with water, as hereinafter provided. Before the trench is backfilled, the entire installs-. tion to be tested shall be filled with water under no pressure for the purpose of dissolving said HTH and thereby steriliz- ing the installation. The entire installation shall satisfactorily withstand a hydrostatic test at one hundred (100) pounds per square inch pressure for a period of one (1) hour without showing any leak. Baekfilling_ Immediately on completion of the above test, unless otherwise directed by the Engineer, all trenches and excavations shall be backfilled. The backfilling shall include the refilling and the consolidation of the fill in trenches and excavations up to the subgrade of the street or alley Improvements or to the original surface of the ground as the same existed before the excavation was made. Where the excavations do not supply sufficient material for making the fill, the Contractor shall supply the deficiency. No extra compensation shall be made for the supplying of such deficiency. Backfilling shall be done with good sound earth, sand or gravel, and no oil cake, macadam, bituminous pavement, concrete, rook or other lumpy material shall be used in making baekfill, unless the lumps are well scattered, do not exceed four inches (4 ") in diameter, and are not placed within one foot (10) of the surface. No material of a spongy, perish- able or otherwise improper nature shall be used in backfill- ing. 5.. All timber and debris shall be removed from the excavation. The baekfill shall be made to six inches (6 ") below street or alley grade or below the original surface of the ground by using shovels, scrapers, buckets or any other means the Contractor may elect, and shall be thoroughly consolidated by flooding. During flooding bars shall be used continuously in the manner directed by the Engineer, to facilitate the entry of the water into all parts of the baekfill. The backfill shall then be completed to the limits hereinbefore specified. Water will be furnished by the City to the Contractor without charge, HTH will also be furnished without charge. RESURFACING OF STREETS AND ALLEYS: The resurfacing of streets and alleys will be done by the CS ty. . CONCRETE THRUST BLOCKS: Concrete Thrust Block shall be constructed against fittings where shown on the plans and /or directed by the Engineer. All concrete blocks shall be placed on a firm.foundation against undisturbed earth. of: The concrete mix for concrete thrust blocks shall consist One Part of Portland Cement, Three Parts of Sand, and Five Parts of Rook, and shall be mixed in an approved type batch -mixer or by hand In a water -tight box in an approved manner. The slump for concrete when tested as provided for Slump Test by the American Society for Testing Materials shall not exceed two inches (2 "). Concrete Thrust Blocks shall be of the dimensions shown on the plans and /or directed by the Engineer and shall be paid for at the price per cubic foot bid. 6- SECTION IV RESPONSIBILITY: When a contract for the work herein specified Is executed, the Contractor shall assume the entire responsi- bility of the fob and shall hold the City of El Segundo, California, its officers, agents and /or employees free from any liability for damage of any nature whatsoever which may arise or occur in connection with the doing of said work. SUB CONTRACTOR: None of the work specified herein shall be sublet without the written consent of said City Council, and, If any part should be sublet with such consent, the sub. contractor will be considered only as any employee of the Contractor. REVISIONS: Any revision in or departure from these specifica- tions materially affecting construction must be approved by said City Council. Where any such revisions increase the cost of materials and /or labor, a proper adjustment and agreement shall be reached by a consultation between said City Council and a representative of the Contractor. TIME: The Contractor shall commence work within thirty (30) days after the execution of the contract and shall agree to complete the work within thirty (30) days thereafter. GENERAL: Before submitting a bid, bidder shall have viewed the site. There will be included in the contract the customary clauses which said City includes in contracts for city work such as those relating to hours of labor, prevailing wages, insurance, workmen's compensation and liability. PREVAILING WAGE: The prevailing wage scale which has been determined by said City Council and which shall be a part of the contract for the work specified herein is as follows: CLASSIFICATION Carpenter Cement Finisher Field Cost Clerk 7- RATE PER HOUR $ 1.65 1.775 1.40 Fitters, Plumbers and Welders Fitter 82.00 Fitter Welder 2.00 Plumber 2.00 Plumber Welder 2600 Fitter Helper (Pipeline) 1.25 Fitter Helper (Industrial) 1.35 Laborers Caulker (Non - Metallic Pipe) 1.325 Cribber and Shorer 1.50 Laborer 1.20 Pipelayer (Non - Metallio Pipe) 1145 Pneumatic Tool Operator 1.35 Sandblast Nozzleman 1.575 Wrapnper, Pot Tender and Form Man 1.35 6 -inch Pipe and over 1.475 Operators Boring Machine 1.775 Compressor 1.45 Pipe Cleaning or Treating Machine 1.90 Tractor 1.70 Trencher 1.775 Oiler 1.325 Truck Drivers Job Truck 1.40 Truck and Semi Lowbed Trailer 1.50 Supervisors Supervisor 2.50 Job Foreman #1 2.25 #2 2.00 #3 1.75 Craft Foreman -171 above journeyman's rate for six basic trades Fitter Foreman 2.25 Plumber Foreman 2.25 General Foreman of Fitters or Plumbers 50� above journeyman's rate. Overtime shall be One and One -Half times the above rates. Sundays and Holidays shall be considered as overtime. The Minimum of per diem wages as above set forth, contemplate In each instance a working day of eight (8) hours. Saturday is treated not as a legal holiday and work thereon shall not be treated as overtime work, except in those cases where a Saturday falls upon a calendar day the whole of which is declared a legal holiday by law. COnTRACTOR'S LICENSE NUMBER: When submitting a bid, the Contractor shall state the number of his State of California license. PAYMENT: Bidders shall state the unit price for work to be performed under this contract upon a blank proposal furnished free at the Office of the City Clerk or City Engineer of said 139 City. Said bid must be accompanied by a certified or cashier's check, or bidder's bond in an amount not less than ten per cent (10 %) of the amount bid. The check or bidder's bond of the successful bidder will be forfeited to said City in the event such successful bidder, after being awarded the contract, fails to enter into same within ten (10) days after notice of award. The City of E1 Segundo, California, will pay to the Contractor a sum equal to seventy-five percent (75 %) of the total amount earned under the contract within fifteen (15) days after the completion and acceptance of the work by said City Council, the balance or remaining twenty -five percent (25 %) shall be paid thirty -five (35) days after the first payment." SECTION 2. That the City Council does hereby find and determine that the prevailing rates of wages in the City of E1 Segundo for each of the respective crafts and olassifica� tions of labor required in the execution of any contract under the above specifications, are those set forth in the foregoing specifications; and said Council does hereby fix and establish said prevailing rates as the minimum rates to be paid under any contract awarded under said specifications. SECTION 3. That the City Clerk shall certify to the passage and adoption of this resolution; shall enter the same in the book of resolutions of said city, and shall make a minute of the passage and adoption thereof in the records of the proosedings of the City Council of said city in the minutes of the meeting at which the same is passed and adopted. Passed, approved and adopted this 29th day of January, A. D., 1947. i0 or o City of 1 egundo, California. STATE OF CALIFORNIA, ) COUNTY OF LOB ANGELES, ) SS. CITY OF EL SEGUNDO. )) I, Victor D. McCarthy, City Clerk of the City of E1 Segundo, California, do hereby certify that the whale number of members of the City Council of the said city is five; that the foregoing resolution, being Resolution No. 867, was passed and adopted by the said City Council, approved and signed by the Mayor of said city and attested by the City Clerk of said pity, all at a regular meeting of the said Council held on the 29th day of January, A. D., 1947, and that the same was passed and adopted by the following vote, to.-wit: AYES: Councilmen Baker, Peterson, Skelley, Thompson and Mayor Selby; NOES: Councilmen None; ABSENT: Councilmen None. (SEAL) E1 segundo, California. 10.