1923 DEC 11 CC MINL1'Segundo, Cal. December 11th, 1923.
A-regular meeting of the Board of Trustees of the City of El Segundo,
California was called to order at 7 :30 o'clock P. M. on the above date in the
Cannoil Chamber of the City Ball of said City by the City Clerk, the President
of the Board being absent. Trustee Binder was unanimously chosen Bresident
pro -tem and immediately assumed the duties of the President.
ROIL CALL.
Trustees Presents Binder, Rueger and Smiley.
Trustees Absents Bryson and Gerow.
. . . READING OF MINUTES OF PREVIOUS MWING.
W
.8-161
The minutes of the regular meeting held on the 4th day of December, 1928,
were read. No errors or omissions being noted, they were approved as read upon
motion of Trustee Smiley, seconded by Trustee Rueger, which carried.
Acne.
Sane,
None.
WRITTEN COMMUNICATION&
ORAL COMMUNICATIONS.
REPORTS OF STANDING COMMITTTZS.
REPORTS OF OFFICERS AND SPECIAL COSKITTNBS.
The City Attorney reported having visited personally a Vre Learned in
Los Angeles, who is the owner of two lots in Block 78 of EL Segundo on which no
contribution had been made toward the cost of improving the alley in said Block,
and that Mr. Learned had agreed to make the necessary contribution if Mr. F.
L. Gregory, who had been circulating the petition would again present the same to
him.
The City Clerk reported that he had obtained prices on trash cans from
three different sources and that finding the same could be supplied through the
Daniels -Mur" Hardware Cam:pany as reasonably as elsewhere, an order for six
cans similar to those at present in use had been placed with said company.
The City Clerk reported that the measurements of the 300 gallon asphalt
tank spin, which the Board had requested prices, had been filed with him late
this date and that he had been unable tb procure prices for this meeting but
would do so for the next meeting of the Board.
SPECIAL ORDER OF BUSINESS.
The receiving of bids for laying and installing east iron pipe and fittings.
gate valves and fire hydrants for the City of E1 Segundo, having heretofore been
made a special order of business for the hour of S OO o'clock P. Y. this date,
pursuant to previous action of the Board and notices to that effect duly published,
the President arose and announced the hour of 7:89 o'clock P. M. and stated that if
any person or persons present desired to file bids for said work as requested in
the notice calling for bids, they should present the as= immediately.
The hour of SOO o'clock P. M. having arrived and all bids being in, the
President declared that the bids for laying and installing east iron pipe and
fittings, gate valves and fire hydrants for the City of M Segundo as advertised
for were closed. Moved by Trustee Rueger, seconded by Trustee Smiley, that the
Board proceed to open and publicly declare all bids receiving for laying and in-
stalling cast iron pipe and fittings, gate valves and hydrants for the City of
E1 Segundo, Carried.
9162,
O�
�►► �o+cr�wivro.om�a►cn�1+wH�L
1
er►►1d�p� i'Z,Xis s,S,2,i sis'i'i = cm
h pH�pr% r
wi► W rmr40 q �+ f5'r� �a
to ,°+o fi•►+ $
� O O � : ta + • � • • • g • A • � ♦ � • • • CDO b
co 0 80006600080§66§66 pOS c� i• N r �S w t•pA 7rr ► � S O r o
.
, �. ��• :p . •
to 1p
"Pt .
ceii%S y•
500 �
0 0 •
to to to
C-721C
0 of
�
a p t ,
. �
r
CD g.
t
� d
+ o o o
ab Ob
to
S S °o w cl
o
w
G 0
• as O r
pl• o� s
0
ka-
4+ 0 • � y
b �O
p v a • • • o p " a g o i
yy
7
'
n o pK
a
e
K w o •d
wg
0
a
c
b o ° w
10
o
o�
•
p A
a r m
o - y
� p p
P
C+
o4+ C
wer
O w
r
a p a
W C*
�oo
o p
0 o b•
c ,VI
9
P
ate.
�
pW
t
� d
+ o o o
ab Ob
to
S S °o w cl
o
w
G 0
• as O r
pl• o� s
0
ka-
4+ 0 • � y
b �O
p v a • • • o p " a g o i
yy
7
'
n o pK
a
e
K w o •d
wg
0
a
c
b o ° w
10
o
o�
•
p A
a r m
o - y
� p p
P
C+
o4+ C
wer
O w
r
a p a
W C*
�oo
o p
0 o b•
c ,VI
9
P
ate.
a)
The Board then proceeded to open and publicly declare all bids received for
laying and installing oast iron pipe and fittings, gate valves and fire hydrants for
the City of M Segundo as contemplated in the notice calling therefor, which said bids
were bubmitted on regular forms provided therefor and were found and determined by
said Board to be as follows, to-wit:
Bid of Is B. Weber as follows:
"1. For tronohi.ng, backfilling, laying and installing with fittings
and as specified, 2000 lineal feet of 10" Be & Be Cast iron Pipe:
0 $0.45 per foot $800.00 Total.
2. For trenching, backfilling, laying and installing with fittings anti
as specified, 7460 lineal feet of 8" Be & S. Cast Iron Pipe;
0 $0935 per foot _ $2611.00 Total
3. For trenching, backfilling, laying and installing with fittings and.
as specified, 7250 lineal feet of 6" Be & S. Cast Iron Pipe;
0 4 0930 per foot _ $2175.00 Total
4. For trenching, backfilling, laying and installing with fittings and,
as specified, 12000 lineal feet of 4" Be & 3. Cast Iron Pipe;
0 $ 0.25 per foot . $3000.00 Total
5. For trenching, baokfilling, laying and installing with fittings and
as specified, 2000 lineal feet of 2" Standard Screw Pipe;
0 4 0.20 per foot _ $400.00 Total
6. For installing 3 - 10" Gate Valves as specified;
0 $10.00 each $30.00 Total
7. For installing 12 - 8" Gate Valves as specified;
4 $8.00 each $96.00 _ Total
8. For installing 18 - 6" Gate Valves as specified;
0 $6.00 each $108.00 Total
9. For installing 56 - 4" Gate Valves as spesified;
0 $4.00 each $224.00 Total
10. Per installing 10 -8" Gate Valves as specified;
0 $2.00 oac4 - $20.00 Total
11. For installing 10 Fire Hydrants with 6" connection to main, as specified;
0 $35.00 each $350.00 Total
12. For installing 37 Fire Hydrants with 4" connections to main, as specified;
a $25M $925.00 Total
13. For making 4 oonnections
0 $35.00 each
14. For making 3 connections
0 $30.00 each
15. For making 6 oonneotions
0 $25600 each
to old 10" mains as specified;
$140.00 Total
to old 8" mains as specified;
$90.00 Total
to old 6" mains as specified;
$150.00 Total
16. For making 20 connections to old 4" mains as specified;
0 $20.00 each $400.00 Total
17. For making 26 connections- to old 2" mains as specified;
0 $10000 each $260.00 Total
(Signed) L. B. Weber, 115 Ashland Ave.,
Ocean Park, Calif."
Said bid was accompanied by Certified Chook No. 19, drawn on the Pacific -
Southwest Trust & Savings Bank in amount of $120040 payable to City of 31 Segundo.
n
x:64
Bid of Marko Natisk as follows:
"I. For trenching, backfilling, laying and installing with fittings and
- as specified, 2000 lineal feet of 10" Be & S. Cast Iron Pipe;
O 75 Cents per Foot _ $15000 Total,
29 For trenching, backfilling, laying and installing with fittings and
as specified, 7460 lineal feet of 8" Be & S. Cast Iron Pipe;
O 60 Cents per Foot $4476.00 Total
39 For trenohing, baokfilling, laying and installing with fittings and
as specified, 7250 lineal feet of 6" Be & S. Cast Iron Pipe;
O 50 Cents per Foot $3625.00 Total,
4. For trenching, backfilling, laying and installing with fittings and
as specified, 129000 lineal feet of 4" Be & S. Cast Iron Pipe;
O 35 Cents per Foot $4200.00 Total,
5. For trenching, baakfilling, laying and installing with fittings and
as specified, 2000 lineal feet of 2" Standard Serew Pipe;
O 25 Cents per Foot $500.00 Total
4. For installing 3 - 10" Gate Valves as specified;
O $10.00 each - $30.00 Total
7. For installing 12 - 8" Gate Valves as specified;
O $6.00 each - $96.00 Total
8. For installing 16 - 6" Gate Valves as specified;
O $5.00 each $90.00 Total
9. For installing 56 - 4 "-pate Valves as specified;
O $4.50 each $252.00 Total
10. F6r installing 10 - 2" Gate Valves as specified;
O $1.00 each _ $10.00 Total
11. For installing 10 Fire,Hydrants with 6" connestion to main, as specified;
O $20.00 each $200.00 Total
12. For installing 37 Fire - Hydrants with 4" connections to main, -as spesified;
O $17.00 each $629.00 Total
13. For making 4 sonnections to old 10" mains as specified; -
O $25.00 each $100.00 Total
14. For making 3 sonnections to old 8" mains as specified;
O $25.00 each _ $75.00 Total
15. For making 6 connections to old 6" mains as specified;
O $20.00 each _ $120900 Total
16. For making 20 sonnsotions to old 4" mains as specified;
O $15.00 each _ $300.00 Total
17. For making 26 connections to old 2" mains as specified;
O $8.00 each _ $208.00 Total.
(Signed) Marko Natick,
1436 West Slat Street,
Los Angeles, Cal."
Said bid was accompanied by Bidder's Bond with the Fidelity and Deposit
Company of Marland, as surety, in the s® of $1750.00.
'77
NOW
1654
Bid of V. d. Thompson, as tollowss
1 -
"1. For trenching, baokfilling, laying and installing with fittings and
as specified, 2000 lineal feet of 10" Be & S. Cast Iron Pipe;
O .38{ per foot _ $760.00 Total
2. For trenching, baokcfilling, laying and installing with fittings and
as specified, 7460 lineal feet of 8" B. & Be Cast Iran Pipe;
O .36f per foot $2685.60 Total
3. For trenching, backfilling, laying and installing with fittings and
as specified, 7250,11neal feet of 6" Be & S. Cast Iron Pipe;
O .34 per foot $2175.00 Total
4. For trenching, backfilling, laying and installing with fittings and
as specified, 12,000 lineal feet of 4" Be & S. Cast Iran Pipe;
O .23E per foot _ $2760.00 Total
5. For trenching, backfilling, laying and installing with fittings and
as specified, 2000 lineal feet of 2" Standard Screw Pipe;
O .190 per foot _ $380.00 Total
6. For installing 3 - 10" Gate Valves as specified;
O $6075 -each $20.25 Total
7. For installing 12 - 8" Gate Valves as specified;
0 $6.25 • each $75.00 Total
8. For installing 18 - 6" Gate Valves as specified;
O $5020 each _ $93.60 Total
•. For installing 56 - 4" Gate Valves as specified;
O $4.80 each $266.80 Total
10. For installing 10 - 2" Gate Valves as specified;
O $3.00 -each _ 430.00 Total
11. For installing 10 Fire Hydrants with 6" connection to main, as specified;
O $15000 each $150900 Total
129 For installing 37 Fire Hydrants with 4" connections to main, as specified;
O $15.00 each - 4555.00 Total
13. For making 4 connections to old 10" =sins as specified;
O $25000 each $100.00 Total
14. For making 3 connections to old 8" mains as specified;
O 422.00 each _ $66.00 Total
15. For making 6 connections to old 6" mains as specified;
O 418.00 each $108.00 Total
16. For making 20 connections to old 4" mains as specified;
O $15.00 each 4300.00 Total
17. For making 26 connections to old 2" mains as specified;
O $6.00 each $156.00 Total.
(Signed) V. L. Thompson."
Said bid was accampanied by Bidder's Bond with the National Surety Company
as Surety in the sum of $1500900.
166E
Bid of Wine D. Walsh, as followas
1
"l. For trenching, backfilling, laying and installing with fittings and
as specified, 2000 lineal feet of 10" Be & S. Cast Iron Pipe;
0 .60¢ per Foot - $1200.00. Total
29 For trenching, backfilling,
laying and installing with fittings sad
as
specified, 7460 - lineal feet of 8" Be & S. Cast Iron Pipe;
0
.450 per Foot
$3357.00. Total
3. For
trenching, backfilling,
laying and installing with fittings and
as
specified, 7250-lineal feet of 6" Be & S. Cast Iron Pipe;
0
9380 per foot
- $2755900, Total
4. For
trenching, baakfilling,
laying and installing with fittings and
as
specified, 12*000 lineal
feet of 4" Be & Be Cast Iron Pipe;
O
.38¢ per foot
$4560.00. Total
5. For
trenching, backfilling,
laying and installing with fittings and
as
specified, 2000 lineal feet of 2" Standard Screw Pipe;
0
.220 per foot
$440.00 Total
6. For installing 3 - 10" Gate Valves as specified;
O $5.50 eaah • $16.50 Total
7. For installing 12 - 8" Gate Valves as specified;
O $5.00 each - $60.00 - Total
8. For installing 18 - 6" Gate Valves as specified;
0 $4.00 each - $72.00. Total
9. For installing 56 - 4" Gate Valves as specified;
0 $340 each- $196.00 Total
10. For installing 10 - 2" Gate Valves as specified;
0 $2.00 each - - $20.00. Total
11. For installing 10 Fire Hydrants with 6" connection to main, as specified;
O $12.00 each _ $120.Q0 Total
12. For installing 37 Fire Hydrants with 4" connections to main, as.specified;
O $10000 each $370.00 Total
13. For making 4 oonnections to old 10" mains its specified;
0 $25.00 each $100.00 Total
14. For making 3 connections to old 8" mains as specified;
O $12.00 each. $36.09 Total
15. For making 6 connections
to old 6" mains as specified;
0 $12.00 sash
$72.00 Total
16. For mating 20 connections
to old 4" mains as specified;
O $12.00 each
- #40.00 Total
17. For mating 26 connections
to old 2" mains as specified;
0 $5.00 each•
_ $130.00 Total.
(Signed) 1me D. Walsh,
4157 Briton,
Los Angeles, Cal."
Said bid was accompanied by Cashier's Check No. 172139, dated Dso. 11th, 19239
drawn on the Merchants National Bank in the snm of $1500.009 payable to the City of
31 Segundo.
1
z
_ 1%IA
Bid of Nelson & Frick, as followse
211. For trenching, backfilling, laying and installing with fittings, and
as specified, $000 lineal feet of 10" B. & S. Cast Iron Pipe;
0 .43 per foot _ $860.00 Total
20 For trenching, backlilling, laying and installing with fittings, and
as specified, 7460 lineal feet of 8" B. & S. Cast Iron Pipe;
0 .36 per foot $2685.00 Total
30 For trenching, backfilling, laying and installing with fittings, and
as specified, 7250 lineal feet of 6" Be & Be Cast Iran Pipe;
0 .29 per foot _ $2102.50 Total
4. For trenching, backfilling, laying and installing with fittings, and
as specified, 12,000 lineal feet of 4" B. & S. Cast Iron Pipe;
0 .24 per foot - $2880.00 Total
59 For trenching, baokfilling, laying and installing with fittings, and
as specified, 2000 lineal feet of 2" Standard Screw Pipe; '
0 .4 per foot - $280.00 Total
6. For installing 3 - 10" Gate Valves as specified;
0 47.00 each - $21000 Total
7. For installing 12 - e" Gate Valves as specified;
0 $6.00 each - $72.00 Total
89 For installing 18 - 6" Gate Valves as specified;
0 $5.00 each $90000 Total
9. For installing 56 - 4" Gate Valves as specified;
0 $4.00 each _ $224.00 Total
10. For installing 10 - 2" Gate Valves as specified;
0 $2.00 each _ $20.00 Total
11. For installing 10 Fire Hydrants with 6" connection to main, as specified;
0 $19.00 each $190.00 Total
129 For installing 37 Fire Hydrants with 4" connection to main, as speoified;
0 $17.00 each $629.00 Total
13. For making 4 connections to old 10" mains as specified;
O $12.00 each _ $48.00 Total
14. For mold ng 3 connections to old 8" mains as specified;
O $10.00 each $30.00 Total
15. For making 6 connections to old 6" mains as specified;
0 $8000 each - $48.00 Total
16. For making 20 connections to old 4" mains as specified;
0 $6.00 each 4120000 Total
179 For making 26 connections to old 2" mains as specified;
0 $4.00 each - $104.00 Total.
(Signed) Nelson' and Brick,
7030 Holmes.Ave.,
Florenc6tia Park,
Los Angeles."
Said bid was accampanied by Bidder's Bond with the National Surety Company
as Surety in the an of $1050 40.payable to-the City of S1 Segundo.
Z
z
Bid of Sidney Smith, as follows:
"I* For trenching, backfilling, laying and installing with fittings and as
specified, 2000 lineal feet of 10" Be & S. Cast Iron Pipe;
O $1.00 per foot _ $2000.00 Total
2. For trenching, backfilling, laying and installing with fittings, and
as specified, 7460 lineal feet of 8" Be & S. Cast Iron Pipe;
O $.75 per foot $5595.00 Total
3. For trenching, backfilling, laying and installing with fittings, and
as specified, 7250 lineal feet of 6" Be & S. Cast Iron Pipe; •
O $45.00 per foot $3262950 Total
4. For trenching, backfilling, laying and installing with fittings, and
as specified, 12,000 lineal feet of 4" Be & S. Cast Iron Pips;
O $35.00 per foot- _ $4200.00 Total
5. For trenching, backfilling, laying and installing with fittings, and
as specified, 2000 lineal feet of 2" Standard Screw Pipe;
O $ .20 per foot _ #400.00 Total
6. For installing 3 - 10" Gate Valves as specified;
O $15.00 each _ $45.00 Total
7. For installing 12 - 8" Gate Valves as specified;
O $7.50 each $90.00 Total
8. For installing 18 - 6" Gate Valves as specified;
O $6.00 each _ $108.00 Total
9. For installing 56 - 4# Gate Valves as specified;
O $5.00 each $280.00 Total
109 For installing 10 - 2" Gate Valves as specified;
O $2.50 each _ $25.00 Total
11. For installing 10 Fire Hydrants with 6" correction to main•, as specified;
O $20.00 each $200.00 Total
12. For installing 37 Fire Bydrants with 4" connections to main, as specified;
O $15.00 each $555.00 Total
No For making 4 connections to old 10" main as specified;
O $25.00 each _ $100.00 Total
14. For making 3 connections to old 8" mains as specified;
O $25.00 each $75.00 Total
15. For making 6 connections to old 6" main as specified;
O $25.00 each $150.00 Total
16. For making 20 connections to old 4" mains as specified; -
O $20900 each $400.00 Total
17. For makinig 26 connections to old 2" mains as specified;
0 $5.00 each $130000 Total
Extra work not included in this bid, at cost plus 10 per sent.
Total Bid - $179615.50
(Signed) Sidney Smith, Contr.
2025 Bay Street,
Los Angeles."
Said bid was accompanied by Bidder's Bond with the United States Fidelity
& Guaranty Compare; as Surety in the sum of $500040. '
Bid of Co B. Green as follows:
A $2.00 each
"l.
For trenching, backfilling,
laying and installing with fittings and
For - installing 10 Fire
as specified, 2000 lineal feet of 10" Be & S. Cast Iron Pipe;
as specified;
A $ 950 per feet
_ $1000000 Total
20
For trenching, backtilling,
laying and installing with fittings and
For installing 37 Fire
as specified, 7460 lineal feet of 8" Be &/S. Cast Iron Pipe;
as specified;
A $ .375 per foot
$2797.50 Total
30
For trenching, backfilling,
laying and installing with fittings and
For making 4 connections to old 10" mains as specified;
as specified, 7250 lineal feet of 6" Be & S. Cast Iron Pipe;
A $ .33 per foot
$2392.50 Total
4.
For trenching, backtilling,
laying and installing with fittings and
as specified, 129000 lineal
feet of 4" Be & S. Cast Iron Pipe;
_ $45.00
A $ 930 per feet
_ $3600.00 Total
5.
For trenching, baokfilling,
laying and installing wifh fittings and
as specified, 2000 lineal feet of 2" Standard Screw Pipe;
A $ 920 per foot
_ $400.00 Total
6.
For installing 3 - 10" Gate
Valves as specified;
A $7.50 each
$22.50 Total
7.
For installing 12 - 8" Gate
Valves as specified;
A *6.00 each
_ $72.00 Total
8.
For installing 18 - 6" Gate
Valves as specified;
A $4.50 each
_ $81.00 Total
99
For installing 56 - 4" Gate
Valves as specified;
A $3.00 each _
_ $168.00 Total
10. For installing 10 - 2" Gate Valves as specified;
15. For making 6 connections to old 6" mains as specified;
A $10.00 each _ - $60.00 Total
16. For making 20 connections to old 4" mains as specified;
A $8000 each $160.00 Total
17. For making 26 connections to old 2" mains as specified;"
A $6.00 each _ $156.00 Total.
(Signed) C.B. Green,
418-19 Western Mt. Life Building,
Los Angeles, Calif._
Ph. 823760."
Said bid was accompanied by CashierAs Check Bo. 196189 drawn on the Citizens
National Bank in the sum of $1200.00 payable to the City of E1 Segamdo.
A $2.00 each
$20.00
Total
119
For - installing 10 Fire
Hydrants with 6" connection to main,
as specified;
A $18.00 each
_ $180000
Total
12.
For installing 37 Fire
Hydrants with 4" connections to main,
as specified;
A $1240 each
_ $444.00
Total.
13.
For making 4 connections to old 10" mains as specified;
A $20000 each
_ $80.00
Total
149
For making 3 connections to old 8" mains as specified;
A $15.00 each
_ $45.00
Total
15. For making 6 connections to old 6" mains as specified;
A $10.00 each _ - $60.00 Total
16. For making 20 connections to old 4" mains as specified;
A $8000 each $160.00 Total
17. For making 26 connections to old 2" mains as specified;"
A $6.00 each _ $156.00 Total.
(Signed) C.B. Green,
418-19 Western Mt. Life Building,
Los Angeles, Calif._
Ph. 823760."
Said bid was accompanied by CashierAs Check Bo. 196189 drawn on the Citizens
National Bank in the sum of $1200.00 payable to the City of E1 Segamdo.
El zo
Bid
of George Mitchell Co. as follows:
"1.
For trenching, backfilling,
laying and installing vjAh fittings, and
as specified, 2000 lineal feet of 10" Be & S. Cast Iron Pipe;
A $1.10 per foot
$2210.00 -Total
2.
For trenshing, backfilling,
laying and installing with fittings, and
as specified, 7460 lineal feet of 8" Be & S. Cast Iron Pipe;
A $ .47 per foot
_ $3506.20 - Total
3.
For trenching, backfilling,
laying and installing with fittings and
as specified, 7250 lineal feet of 6" Be & S. Cast Iron Pipe;
0 $ .40 per foot
_ $2900.00 • Total
4.
For trenching, backfilling,
laying and installing with fittings and
as specified, 129000 lineal
feet of 4" Be & S. Cast Iron Pipe;
0 $ .33 per foot
$396040• Total
5. For trenching, baakfilling, laying and installing with fittings and
as. specified, 2000 lineal feet of 2" Standard Sarew Pipe;
0 $ .20 per foot $400.00 Total
6. For installing 3 - 10" Gate Valves as specified;
A $12000 each $36.00 Total
7. For installing 12 - 8" Gate Valves as specified; -
0 $10.00 each $120.00 Total
8. For installing 18 - 6" Gate Valves as specified;
0 $8000 each - $144000 Total
9. For installing 56 - 4" Gate Valves as specified;
0 $5.00 each $280.00 Total
10. For installing 10 - 2" Gate Valves as specified;
0 $3.00 each $30.00 Total
11. For installing 10 Fire Hydrants with 6" sonaeation to main, as specified;
0 $25.00 each $250.00 Total
12. For installing 37 Fire I�ndrants with 4" connectionto main, as specified;
0 $15.00 eaah $555000 Total
13. For making 4 connections to old 10" mains as specified; -
0 $50.00 each $200.00 Total
14. For making 3 connections to old 8" mains as specified;
0 $50.00 each $150.00 Total
15. For makings 6 connections to old 6" mains as specified;
0 $50.00 each $300.00 Total
16. For making 20 connections to old 4" mains as specified;
0 $40.00 each $800.00 Total
17. For making 26 connections to old 2" mains as specified;
0 $35.00 each $910000 Total
(Signed) Goo. Mitchell Co.
Ralph $. Reichert,
619 W. Belgrave Ave.,
H ntington Park."
Said bid was accompanied by Bidders Bond No. I.l 1246 with the Now Amsterdam
Casualty Company as Surety in the an of $1750.00.
Bid of A. W. Loeb as follows.
"1. For trenching, backfilling, laying and installing wi &h fittings and
as specified, 2000 lineal feet of 10" Be & Be Cast Iron Pipe;
O $ .85 per foot _ $1700.00 Total
2. For trenching, backfilling, laying and installing. with fittings and
as specified, 7460 lineal feet of 8" Be & S. Cast Iron Pipe; -
0 $- .52 per foot $3879.20 Total
3. For trenching, backfilling, laying and installing with fittings and
as specified, .72M lineal feet of t" Be & 3. Cast Iron Pipe;
O $ .42 per foot $3045900 Total
4. For trenching, baokfilling, laying and installing with fittings and
as specified, 129000 lineal feet of 4" Be & Be Cast Iron Pipe;
O $ .30 per foot - $39600.00 Total
5. For trenching, baokfilling, laying and installing with fittings and
as specified, 2000 lineal feet of 2" Standard Serew Pipe;
0 $ .16 per foot $320.00 Total
6. For installing 3 - 10" Gate Valves as specified;
0 $10.00 each $30.00 Total
7. For installing 12 - 8"
Gate Valves as
specified;
0 $10.00 each _
$80.00
Total
$120.00
Total
8. For installing 18 - 6"
Gate Valves as
specified;
0 $20.00 each
O $10.00 each
15.
For making 6 connections
$180000
Total
9. For installing 56 - 4"
Gate Valves as
specified;
Total
16.
O $10.00 each
to old 4" mains as specified;
$560,.00
Total
10. -For installing 10 - 2"
Gate Valves as
specified;
For making 26 connections
to old 2" mains as specified;
0 $4.00 each
0 $5.00 each
$40.00
Total
11. For installing 10 Fire
Hydrants with 6" connection
to main,
as specified;
0 $15.00 each
459 Be 3rd St.,
$150.00
Total
12. 'For installing 37 Fire
Hydrant -s with 4" connections to main,
as specified;
• O $
$555.00
Total
13.
For making 4 connections
to old 10" mains as specified;
` O $20.00 sach
$80.00
Total
14.
For making 3 connections
to old 8" mains as specified;
$60.00
Total
0 $20.00 each
15.
For making 6 connections
to old 6" mains as specified;
0 $20.00 each
- $120.00
Total
16.
For making 20 connections
to old 4" mains as specified;
O $20.00 each
$400.00
Total
17.
For making 26 connections
to old 2" mains as specified;
0 $5.00 each
$130000
Total.
(Signed) A. !. Loeb,
459 Be 3rd St.,
L. A. "
Said bid was accompanied by Bidder's Bond with the Rational Surety Company as
surety in the sum of $2000.00.
The City Attorney advised the Board that all-of the bids received appeared to
1729
be regular except that Geo. Mitchell COU9WW and Arthur M. Loeb each as principals
had failed to sign the bid bond which accompanied their respective bids. 'He stated
however, that this matter could easily be remedied and that he/would rule that the
Board had the right to consider these bids with others received.
It was then moved by Trustee Rueger, seconded by Trustee Smiley,.that when this
meeting adjourn, it adjourn to Thursday, the 13th day of December, 1923, at the
hour of 11:00 o'clock A. M. and that all bids received this date for laying and
Installing cast iron pipe and fittings, gate valves and fire hydrants for the City of
B1 Segundo be taken -under advisement until said time and date. Carried.
UNFINISHED BUSnMSS.
The City Attorney brought up the question of advertiwing for bid$ on Maple
Avenue, whereupon after discussion and it appearing that the water mains to be I&M
In said street would undoubtedly be in by the time of receiving bids, the Board
requested that the City Clerk begin-publication of the Notice Inviting Sealed
Proposals or Bids for doing the work on Maple Avenue under Resolution of Intention
No. 61.
In connection with the preparation of estimates for the improvement of portions
of Hillcrest Avenue and Mariposa Avenue, as suggested by petitions recently filed
with the Board by George Be Renfro and others, the City engineer advised that he
had prepared a statement of his mstifttei, which he is this date placing on file
with the City Clerk, said estimates being as follows:
Paving 3" macadam
Sidewalk 410"
Curbs
Grading
33625. Sq. Ft. O 10¢
10736.24 " " O 24
2722.54 " " O 700
947.4 On. Yds. O 80¢
(Bngr's Tool Expense)
Miscellaneous ( Contingenoies ) 20%
Sidewalk, 5' -0" 11157.94
Curbs 2106.40
Grading 94.9
(Bngr. - Tool Expense)
Miscellaneous (Contingencies )
$3362.50
2576.70
1905.78
_ 757, .92
$8602.90
323.48
Sq. Ft. O .240 2677.91
Lin. " O 70# 1474948
Cu. Yds. O GOO
4228.81
20% M.6A
5073.97
It was thereupon moved by Trustee Smiley, seconded by Trustee Rueger, that the
City Clerk be and he is hereby instructed to notify the petitioners of the Engineer's
report concerning the improvement of portions of Hillorest and Mariposa Avenues.
Carried.
PAYING BILLS.
The following demands, having had the approval of the Committee on Finance
and Records, were read:
H. S. Crocker Co.
Herald Publishing Co.
Mildred Leach
Edward N. Earnest
The Electric Shop
Dr. Be S. Anthony
H. S. Crocker Co.
M. W. Stogdill
Union Rook Co.
Barioer Bros.
I Le i ) ! U !.. .
1004
94.85
44.65
6.20
12.75
2050
204.00
4.96
157.50
276.38
General FMd
Y. C. Mccaslin 8.00
American- LaFrawe Fire
Engine Co.
American- "
Omar Kerschner
United States Rubber Co
C. M. Dr®ond
Standard oil Co.
Pacific Electric Ry. Co
Barker Brose,
187.50
13.28
50.24
275.00
19.84
147.39
81.24
1797.39
A,
Herald Publishing Co.
Grimes- Stassforth State
Pacific Tel. & Tel. Co.
Locals, Dow & Company
B. T. Hutchins
Water
22.50
Co. 3.84
10.65
25.00
6*31
$88.30
H. S. Crocker Company
Pacific Pipe & SUPAY Co.
Hawthorne Lvmber Yard
Iles -yars Publishing Co.
Byron -Jackson Iron Works
E ii
Water Bond Pssnd
174.59
26.54
21.00
6.40
1215.50
$1444.03
Mowed by Trustee Smiley, seconded by Trustee Rueger, that the demands be
allowed and Warrants drawn'on the respective funds covering the same. Carried by the
following votes
Ayess Trustees Rueg+er, Smiley and Binder.
Noss: None.
Absents Trustees Bryson and Gerow.
I= BQSIIMSS.
Moved by Trustee Ruegsr, seconded by Trustee Smiley, that 31 Segundo Grammar
School be granted permission to use sixty of the City's collapsible chairs from
Wednesday to Saturday of this week, no charge to be made for such use, providing
said chairs are returned in good condition. Carried.
No further business appearing to be transacted at this session, it was moved
by Trustee Smiley, seconded by Trustee Rueger, that the meeting adjourn until Thursday,
the 13th day of December, 1923 at the hour of 11,00 o'clock A. M. Carried.
Approved,
A-
President�Board of Trustees.
Respectfully submitted,
City Clerk.