Loading...
CONTRACT 7590 Public Works Contract Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 CITY OF EL SEGUNDO RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT PROJECT NO.: PW 25-13 MANDATORY PRE-BID MEETING DAY, MARCH 05, 2026, AT 10 AM BIDS DUE WEDNESDAY, APRIL 01, 2026 AT 11:00 AM Agreement No. 7590 MANDATORY PRE-BID MEETING LOCATION: Agreement No. 7590 Agreement No. 7590 SPECIAL INSTRUCTIONS TO CONTRACTORS II-B-24 II-B-27 ONLY CONTRACTORS ABLE TO OBTAIN AND FURNISH THE REQUIRED COVERAGE AND ENDORSEMENT “ISO” FORMS SHOULD CONSIDER SUBMITTING A BID PACKAGE. Agreement No. 7590 TABLE OF CONTENTS SECTION I – LEGALPAGE Agreement No. 7590 SECTION II – GENERAL REQUIREMENTSPAGE Agreement No. 7590 SECTION II – GENERAL REQUIREMENTS (Continued)PAGE Agreement No. 7590 Agreement No. 7590 SECTION III – SPECIAL PROVISIONSPAGE III-A-1 TO A-11 EXHIBITS Agreement No. 7590 NOTICE INVITING SEALED BIDS FOR THE RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT IN THE CITYOF EL SEGUNDO PROJECTNO.: PW 25-13 WEDNESDAY, April 01, 2026 PW 25- 13October 21, 2025 March 05, 2026 at 10:00amRecreation Park Teen Center mandatory5:00pmMarch 16, 2026 Agreement No. 7590 The Contractor’s duty to pay State prevailing wages can be found under Labor Code Section 1770 et. Seq. and Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment. ContractorSubcontractor Contractor Agreement No. 7590 “SEALED BIDS FOR PROJECT NO.: PW 25-13 RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" ten percent (10%) Contractor A or B Contractor Subcontractors ninety (90) calendar days. Agreement No. 7590 BIDDING INSTRUCTIONS Agreement No. 7590 https://www.elsegundo.org/government/departments/public-works/request-public- works-bid Agreement No. 7590 Questions Due by MARCH 16, 2026 Questions Answered by MARCH27, 2026 Agreement No. 7590 Bidders are required to submit one (1) original set of the proposal forms. Agreement No. 7590 10.5 The Bid Form, Bid Security, and all other documents required to be submitted with the Bid must be enclosed in a sealed opaque envelope. The envelope must be addressed to the CityClerk. The envelope must be identified with theBidder’s name and address, and identify the Projectfor which the Bid is submitted., as follows:“SEALED BIDS FOR PW 25-13: RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT. DO NOT OPEN WITH REGULAR MAIL.” Proposals may be mailed or delivered by messenger. Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 PROPOSAL RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT PROJECT NO.: PW 25-13 TO THE CITY OF EL SEGUNDO: BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. BIDDER'S BIDDER Agreement No. 7590 EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE BIDDER AFFIRMATIVE ACTION CERTIFICATION BIDDER BIDDER NONCOLLUSION DECLARATION BIDDER Agreement No. 7590 BID SCHEDULE RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT PROJECT NO.: PW 25-13 ITEM UNIT DESCRIPTIONUNITQTYAMOUNT NO.PRICE BASE BID ITEMS Mobilization/Demobilization 1 Hazardous Materials Allowance: 2 3 Interior Furniture Allowance Entire Site Electrical Utilities 4 5 Site Lighting TEEN CENTER Superstructure 6 Exterior Enclosure 7 Roofing 8 Interior Construction 9 Agreement No. 7590 Interior Finishes 10 Plumbing 11 HVAC 12 13 Fire Protection Electrical 14 Equipment Furnishing 15 Selective Building Demolition 16 Agreement No. 7590 TEEN PLAZA Site Preparation 17 Site Improvements 18 Sports Equipment 19 Fences and Gates 20 21 Landscape: Miscellaneous: 22 Site Mechanical Utilities 23 Underground Infiltration System 24 SKATEPARK ( Earthwork and Site Preparation 25 Drainage 26 Agreement No. 7590 Skatepark Construction: 27 Concrete Color and Pool Coping 28 Water Tower Feature: 29 NOTE: 1)THE AWARD TO THE APPARENT LOWEST BIDDER IS BASED ON THE TOTAL OF BASE BID ITEMS ONLY. ALTERNATIVE BID ITEMS SHALL NOT BE CONSIDERED AS PART OF THE LOWEST BID. 2)THE AWARDED BIDDER SHALL BE REQUIRED TO SUBMIT A DETAILED SCHEDULE OF VALUES FOR ALL BID ITEMS AT THE TIME OF THE PRE- CONSTRUCTION MEETING. SUBMISSION OF THE SCHEDULE OF VALUES IS NOT REQUIRED AS PART OF THE BID PROPOSAL. ninety (90) calendar days. Agreement No. 7590 ALTERNATIVE BID ITEMS RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT PROJECT NO.: PW 25-13 ITEM UNIT DESCRIPTIONUNITQTYAMOUNT NO.PRICE ALTERNATIVE BID ITEMS Site Lighting: A Skatepark-Water Tower B Agreement No. 7590 BIDDER'S INFORMATION BIDDER Agreement No. 7590 BIDDER'S INFORMATION (CONTINUED) _______________________________________________________ _______________________________________________________ Agreement No. 7590 IN WITNESS WHEREOF, BIDDER BIDDERNAME AND CONTACT INFORMATION NOTARY PUBLIC _________________________________________________________ Agreement No. 7590 PROPOSAL GUARANTEE BID BOND RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT KNOW ALL MEN BY THESE PRESENTS that, , BIDDER, , SURETY, DOLLARS ($), BIDDER , and agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH BIDDER BIDDER IN WITNESS WHEREOF BIDDER* __________________________________________________________ __________________________________________________________ __________________________________________________________ SURETY* __________________________________________________________ __________________________________________________________ __________________________________________________________ NOTARY PUBLIC *BIDDER/SURETY Agreement No. 7590 CONTRACTOR'S LICENSE DECLARATION 1. BIDDER'S 2. BIDDER'S 3. BIDDER Signature Typed Name Title Company Name Agreement No. 7590 NON-COLLUSION DECLARATION Agreement No. 7590 WORKER’S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) BIDDER PROPOSAL Agreement No. 7590 BIDDER’S CERTIFICATION OF SUBCONTRACTORS RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT Agreement No. 7590 BIDDER 1. Project Owner: _________________________________________________ 2. Project Owner: _________________________________________________ 3. Project Owner: _________________________________________________ Agreement No. 7590 4. Project Owner: _________________________________________________ 5. Project Owner: _________________________________________________ PRIOR SPECIALTY SKATEPARK CONSTRUCTION EXPERIENCE 1.Contractor Name: Agreement No. 7590 2.Contractor Name: Bidder may attach additional reference pages if necessary. BIDDER Agreement No. 7590 BIDDER’S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT Agreement No. 7590 INSURANCE REQUIREMENTS RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT *The city has the option to increase the limits as required for more complex and major waterworks, sanitation, and road pavement projects. END PROPOSAL SECTION Agreement No. 7590 PUBLIC WORKSAGREEMENT BETWEEN THE CITY OF EL SEGUNDO AND ___ _ RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT 1. WORK Agreement No. 7590 2. CONTRACT SUM. 3. SECURITIES AND BONDS. 4.INSURANCE. Agreement No. 7590 *The city has the option to increase the limits as required for more complex and major waterworks, sanitation, and road pavement projects. Agreement No. 7590 i. ii. iii. 5. TIME FOR PERFORMANCE. Agreement No. 7590 6. DELAYS AND EXTENSIONS OF TIME. 7. TERM AND TERMINATION. Agreement No. 7590 8.PERMITSAND LICENSES. 9. COOPERATION AND COLLATERAL WORK 10. EXTRA WORK. 11. ASSIGNMENT. Agreement No. 7590 12.INSPECTION. 13. WORKSITE MAINTENANCE 14. WARRANTY. Agreement No. 7590 15. CONTRACTOR’S RESPONSIBILITY FOR WORK. 16. DISPUTES 17.THIRD PARTY CLAIMS 18. TAXPAYER IDENTIFICATION NUMBER 19. OWNERSHIP OF DOCUMENTS. 20. INDEMNIFICATION. Agreement No. 7590 21.NONDISCRIMINATORY EMPLOYMENT. Agreement No. 7590 22.PREVAILING WAGES 23. INDEPENDENT CONTRACTOR. 24. CONFLICTS OF INTEREST. 25. AUDIT OF RECORDS. 26. NON-WAIVER OF TERMS, RIGHTS AND REMEDIES. 27. NOTICES Agreement No. 7590 28. NO THIRD PARTY BENEFICIARY 29. INTERPRETATION 30. EFFECT OF CONFLICT 31. SEVERABILITY. 32. AUTHORITY/MODIFICATION. 33. ENTIRE AGREEMENT. Agreement No. 7590 34.ELECTRONIC SIGNATURES; SIGNATURE AUTHORITY 35. COVENANTS AND CONDITIONS. 36. CAPTIONS. 37. TIME IS OF ESSENCE. Signatures on following page Agreement No. 7590 Agreement No. 7590 FAITHFUL PERFORMANCE BOND RECREATION PARK TEEN CENTER, PLAZA, AND SKATEPARK RENOVATION PROJECT DOLLARS SPECIFICATIONS NO. PW 25-13 SPECIFICATIONS NO. PW 25-13 CITYDRAWING FILE NO. PW 25-13 Agreement No. 7590 SPECIFICATIONS NO. PW 25-13 \[SIGNATURES ON FOLLOWING PAGE\] Agreement No. 7590 PRINCIPAL’s MAILING SURETY’s MAILING ADDRESS: ADDRESS: Agreement No. 7590 LABOR AND MATERIALS BOND RECREATION PARK TEEN CENTER, PLAZA AND SKATEPARK RENOVATION PROJECT DOLLARS SPECIFICATIONS NO. PW 25-13 SPECIFICATIONS NO. PW 25-13, CITY DRAWING FILE NO. PW 25-13 Agreement No. 7590 SPECIFICATIONS NO. PW 25-13, \[SIGNATURES ON FOLLOWING PAGE\] Agreement No. 7590 PRINCIPAL’s MAILING ADDRESS: SURETY’s MAILING ADDRESS: Agreement No. 7590 SECTION II - GENERAL REQUIREMENTS CITY OF EL SEGUNDO PUBLIC WORKSDEPARTMENT GENERAL SPECIFICATIONS Contractor Contractor Subcontractors Contractor Subcontractors BEFORE PERFORMING WORK. Contractor One Thousand Four Hundred Forty-Four Dollars ($1,444.00) Contractor Contractor One Hundred and Fifty-Six Dollars ($156.00) Contractor Contractor Contractor Contractor Agreement No. 7590 Contractor ContractorSubcontractor Agreement No. 7590 CITYOF EL SEGUNDO PUBLIC WORKS DEPARTMENT SUPPLEMENTAL PROVISIONS PART 1 GENERAL PROVISIONS SECTION 1 - GENERAL 0-0STANDARD SPECIFICATIONS 0-1 GENERAL 0-2 NUMBERING OF SECTIONS 1-2 TERMS AND DEFINITIONS Acceptance City Council City City Council Compensable Delay Due Notice Agreement No. 7590 Engineer Prompt Public Works Director State Standard Specifications Working Days 6-3TIME OF COMPLETION. 1-3 ABBREVIATIONS 1-3.1Common Usage 1-3.2 Institutions Agreement No. 7590 1-6.1 General Agreement No. 7590 1-6.3 Additional Responsibility 1-7 AWARD AND EXECUTION OF THE CONTRACT 1-7.2 Contract Bonds SECTION 2 – SCOPE OF THE WORK 2.1 WORK TO BE DONE 2-1.1 Access to Project Site 2-1.2 Ownership and Use of Contract Documents Agreement No. 7590 2-2 PERMITS 2-3 RIGHT-OF-WAY 2-3.1 Additional Work Areas and Facilities 2-9 CHANGED CONDITIONS. immediately Agreement No. 7590 is not a part 2-10 DISPUTED WORK SECTION 3 – CONTROL OF THE WORK Agreement No. 7590 3-7 CONTRACT DOCUMENTS 3-7.1 General 3-7.2 Precedence of Contract Documents Agreement No. 7590 3-7.3 Accuracy of Plans and Specifications 3-10 SURVEYING 3-10.3 Survey Service 3-10.3.1 Construction Surveying Agreement No. 7590 3-10.3.2 Measurement and Payment 3-12 WORK SITE MAINTENANCE 3-12.1 Cleanup and Dust Control 3-12.1.1General 3-12.1.2 Watering Agreement No. 7590 3-12.6 Water Pollution Control 3-12.7 Protection and Restoration of Existing Improvements Agreement No. 7590 3-12.7 Public Convenience and Safety 3-12.8.1 Traffic and Access Agreement No. 7590 3-12.8.2 Street Closures, Detours, Barricades 3-12.8.3 Protection of the Public Agreement No. 7590 3-13 COMPLETION AND ACCEPTANCE 3-13.1 General Guaranty SECTION 4 – CONTROL OFMATERIALS 4-3 INSPECTION 4-3.1 General Agreement No. 7590 4-6 TRADE NAMES 4-6.1 Trade Names or Equals Agreement No. 7590 Agreement No. 7590 SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES 5-3 LABOR 5-3.2 Prevailing Wages 5-3.5 Apprentices Agreement No. 7590 5-3.3 Record of Wages Paid: Audit 5-4 INSURANCE 5-4.1 General COVERAGE PER ISO FORM COMBINED OCCURRENCE SINGLE LIMIT Agreement No. 7590 Agreement No. 7590 will not 5-4.2 General Liability Agreement No. 7590 5-4.3 Worker’s Compensation 5-4.4 Auto Liability Insurance 5-4.5 Indemnification and Defense Agreement No. 7590 5.7 SAFETY 5-7.4 Hazardous Material Agreement No. 7590 SECTION 6 -PROSECUTION AND PROGRESS OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 Contract Schedule 6-1.2 Content of the Contract Schedule Agreement No. 7590 6-1.3 Effect of Contract Schedule Agreement No. 7590 6-1.4 Commencement of Contract Time 6-3.3 Working Days and Working Hours Agreement No. 7590 6-3.4 Night Work 6-3.5 Weekend and Holiday Work 6-4 DELAYS AND EXTENSIONS OF TIME 6-4.1 General Agreement No. 7590 6-4.2 Extensions of Time 6-4.3 Payment for Delays to Contractor 6-4.4 Written Notice and Report 6-7 DEFAULT BY CONTRACTOR 6-7.1 General Agreement No. 7590 6-7.2 Termination of Contractor’s Control Over the Work 6-7.3 Surety’s Assumption of Control Agreement No. 7590 6-9 LIQUIDATED DAMAGES 6-9.1 Failure to Complete Work on Time SECTION 7 – MEASUREMENT AND PAYMENT 7-2 LUMP SUM WORK 7.3 PAYMENT Agreement No. 7590 7-3.2 Partial and Final Payments last working day of each month Agreement No. 7590 7-3.2.1 Final Payment and Termination of Agency Liability 7-3.3 Delivered Materials 7.4 PAYMENT FOR EXTRA WORK 7-4.2Basis for Establishing Costs 7-4.2.3 Tools and Equipment Rental Agreement No. 7590 7-4.3 Markup 7-4.3.1Work by Contractor 7-4.3.2 Work by Subcontractors 7-4.3.3 Compensable Delays 7-4.4 Daily Reports by Contractor 7-4.5 Disputes and Claims Procedure Agreement No. 7590 7-4.5.1 General 7-4.5.2 Form and Content Agreement No. 7590 Agreement No. 7590 7-4.5.3 Claims Submitted to the Engineer 7-4.5.4 Claim is Prerequisite to Other Remedy 7-4.5.5 Decision on Claims Agreement No. 7590 7-4.5.6 Appeal of Engineer’s Decision 7-4.5.7 Mediation 7-4.5.8 Arbitration 7-4.5.9When Arbitration Decision Becomes Binding Agreement No. 7590 7-4.5.10Appeal to Superior Court – Waiver of Jury Trial 7-4.5.11AB 626 Claims Process Agreement No. 7590 PART 4 – EXISTING IMPROVEMENTS SECTION 402 UTILITIES 402-2 PROTECTION 402-2.1 Incorrect Location of Utilities 402-4 RELOCATION 402-4.1 Responsibility of Utility Removal or Relocation 402-5 DELAYS 402-5.1 Calculating Idle Time Agreement No. 7590 Agreement No. 7590 SECTION III – SPECIAL PROVISIONS Two-HundredForty-Five (245) OPERATIONOFFICE TELEPHONE CONTRACTOR CONTRACTOR'S Agreement No. 7590 CONTRACTOR'S Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 EXHIBIT A Technical Specifications Agreement No. 7590 Agreement No. 7590 TABLE OF CONTENTS DIVISION 01 – GENERAL DIVISION 03 – CONCRETE DIVISION 04 – MASONRY DIVISION 05 – METALS DIVISION 07 – THERMAL AND MOISTURE PROTECTION Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 SECTION 03 50 00 - CAST-IN-PLACE CONCRETE 1.0 GENERAL 1.1 SCOPE a. b. 1.2 REFERENCE STANDARD 1.3 SUBMITTALS a. b. (1) (2) c. d. 1.4 STORAGE OF MATERIALS a. b. Agreement No. 7590 c. d. 1.5 TESTING LABORATORY SERVICES 2.0 PRODUCTS 2.1 MATERIALS a. b. (1) (2) (3) c. d. (1) (1) (2) Agreement No. 7590 e. f. g. h. i. 2.2 PROPORTIONING a. b. c. d. e. Agreement No. 7590 f. (1) (2) g. (1) (2) (3) (4) Agreement No. 7590 h. (1) (2) (3) 2.3 MIXING NORMAL WEIGHT CONCRETE a. (1) (2) (3) (4) (5) Agreement No. 7590 (6) (7) b. (1) (2) (3) c. (1) (2) (3) (4) d. Agreement No. 7590 (1) (2) (3) e. (1) (2) (3) 3.0 EXECUTION 3.1 PREPARATION a. b. c. (1) (2) Agreement No. 7590 d. 3.2 CONVEYING a. b. (1) (2) (3) (4) c. Agreement No. 7590 3.3 PLACING a. b. (1) (2) (3) (4) (5) (6) Agreement No. 7590 (7) c. 3.4 REPAIRING SURFACE DEFECTS a. (1) (2) (3) (4) b. c. Agreement No. 7590 3.5 FINISHING OF FORMED SURFACES a. b. (1) (2) (3) 3.6 FINISHING SLABS AND SIMILAR FLAT SURFACES a. b. c. d. (1) Agreement No. 7590 (2) e. (1) (2) 3.7 CURING PROCEDURES a. b. (1) (2) (3) (4) (5) (6) c. (1) (2) Agreement No. 7590 (3) d. e. f. g. (1) (2) (3) h. END OF SECTION 033000 Agreement No. 7590 SECTION 042200 Î CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SECTION INCLUDES 1.02 MEASUREMENT AND PAYMENT Agreement No. 7590 1.03 REFERENCES 1.04 REGULATORY REQUIREMENTS Agreement No. 7590 1.05 SUBMITTALS 1.07 QUALITY ASSURANCE PART 2 - PRODUCTS2.01 MATERIALS Agreement No. 7590 2.02 MORTAR Agreement No. 7590 2.03 GROUT 2.04 SURFACE SEALER PART 3 - EXECUTION3.01 LAYING CONCRETE MASONRY UNITS Agreement No. 7590 Agreement No. 7590 3.02 REINFORCING STEEL Agreement No. 7590 3.03 GROUTING 3.04 REPAIRING AND POINTING Agreement No. 7590 3.05 CLEANING 3.06 CURING 3.07 SEALER APPLICATION 3.08 FIELD QUALITY CONTROL Agreement No. 7590 3.09 ACCEPTANCE OF STRUCTURE END OF SECTION Agreement No. 7590 SECTION 051200 Î STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 DEFINITIONS 1.4 COORDINATION 1.5 PREINSTALLATION MEETINGS 1.6 ACTION SUBMITTALS 1.7 INFORMATIONAL SUBMITTALS Agreement No. 7590 1.8 QUALITY ASSURANCE 1.9 DELIVERY, STORAGE, AND HANDLING Agreement No. 7590 PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS 2.2 STRUCTURAL-STEEL MATERIALS 2.3 BOLTS, CONNECTORS, AND ANCHORS Agreement No. 7590 2.4 PRIMER 2.5 FABRICATION Agreement No. 7590 2.6 SHOP CONNECTIONS 2.7 SHOP PRIMING 2.8 GALVANIZING 2.9 SOURCE QUALITY CONTROL Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION 3.2 PREPARATION 3.3 ERECTION Agreement No. 7590 3.4 FIELD CONNECTIONS 3.5 INSTALLING LEVELING AND BEARING PLATES 3.6 FIELD QUALITY CONTROL Agreement No. 7590 3.7 REPAIRS AND PROTECTION END OF SECTION 051200 Agreement No. 7590 SECTION 05 50 00 Î METAL FABRICATION FOR SKATEPARKS PART 1 - GENERAL 1.1 GENERAL INFORMATION 1.2 REFERENCE STANDARDS 1.3 RELATED SECTIONS: PART 2 Î PRODUCTS PART 3 - EXECUTION Agreement No. 7590 END OF SECTION 05 50 00 Agreement No. 7590 SECTION 07 21 50 Î BUILDING ENCLOSURE INSULATION PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS 1.5 QUALITY ASSURANCE 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 FIBERGLASS BLANKET INSULATION 2.3 SPRAYED POLYURETHANE FOAM INSULATION Agreement No. 7590 2.4 INSTALLATION MATERIALS: PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION: 3.3 CORRECTION AND REPAIR Agreement No. 7590 3.4 CLEANUP 3.5 PROTECTION END OF SECTION 07 21 50 Agreement No. 7590 SECTION 07 55 23 Î EPDM ROOFING PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1. 2. 3. 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS 1.8 WARRANTY PART 2 - PRODUCTS 2.1 ROOFING MEMBRANE 2.2 ROOFING INSULATION AND COVER BOARD Agreement No. 7590 2.3 INSTALLATION MATERIALS 2.4 ACCESSORIES: Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 PREPARATION: 1. 2. Agreement No. 7590 3.3 INSTALLATION Agreement No. 7590 Agreement No. 7590 3.4 FIELD QAULITY CONTROL Agreement No. 7590 3.5 CORRECTION AND REPAIR Agreement No. 7590 3.6 CLEANING 3.7 CLOSEOUT ACTIVITIES 3.8 PROTECTION END OF SECTION 07 55 23 Agreement No. 7590 SECTION 07 57 13 Î BASF SEAMLESS SILICONE/POLYURETHANE INSULATED ROOF SYSTEM FOR NEW CONSTRUCTION OR RETROFIT APPLICATIONS PART 1 - GENERAL 1.1 SUMMARY 1.2 RELATED WORK: 1.3 RELATED DOCUMENTS Agreement No. 7590 1.4 QUALITY ASSURANCE Agreement No. 7590 1.5 SUBMITTALS 1.6 MATERIALS, DELIVERY AND STORAGE 1.7 ENVIRONMENTAL CONDITIONS Agreement No. 7590 1.8 SEQUENCING AND SCHEDULING 1.9 WARRANTY PART 2 - PRODUCTS 2.1 POLYURETHANE FOAM NSULATION Agreement No. 7590 2.2 SILICONE COATING 2.3 SEALANT Agreement No. 7590 2.4 SUBSTRATE PRIMER 2.5 GRANULES 2.6 PROTECTIVE COVERING / WALKWAYS 2.7 GYPSUM BOARD Agreement No. 7590 2.8 POLYISO INSULATION BOARD PART 3 - EXECUTION 3.1 INSPECTION: 3.2 SURFACE PREPARATION: Agreement No. 7590 3.3 POLYURETHANE FOAM APPLICATION Agreement No. 7590 3.4 SILICONE ROOF COATING APPLICATION 3.5 GRANULE APPLICATION Agreement No. 7590 3.6 FIELD QUALITY CONTROL 3.7 SAFETY REQUIREMENTS 3.8 FOLLOW-UP INSPECTIONS END OF SECTION 07 55 23 Agreement No. 7590 SECTION 07 65 26 Î SASM FLASHING PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 PROJECT CONDITIONS Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 THROUGH-WALL SASM FLASHING Agreement No. 7590 2.3 OPENING AND PENETRATION SASM FLASHING Agreement No. 7590 2.4 INSTALLATION MATERIALS Agreement No. 7590 2.5 ACCESSORIES: PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 PREPARATION: Agreement No. 7590 3.3 INSTALLATION 3.4 FIELD QUALITY CONTROL Agreement No. 7590 3.5 CORRECTION AND REPAIR Agreement No. 7590 3.6 CLEANING 3.7 PROTECTION END OF SECTION 07 65 26 Agreement No. 7590 SECTION 07 62 00 Î SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 Minimum Design Loads and Associated Criteria for Buildings and other Structures 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Architectural Sheet Metal Manua ÐRoofing and Waterproofing ManualArchitectural Sheet Metal and Metal Roofing Agreement No. 7590 1.6 HANDLING PART 2 - PRODUCTS 2.1 MATERIALS Agreement No. 7590 2.2 ROOFING INSULATION AND COVER BOARD Agreement No. 7590 2.3 OTHER SHEET METAL FLASHINGS AND TRIM 2.4 ACCESSORIES: Agreement No. 7590 Agreement No. 7590 2.5 FABRICATION PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION: Agreement No. 7590 Agreement No. 7590 3.3 CORRECTION AND REPAIR 3.4 CLEANING Agreement No. 7590 3.5 PROTECTION END OF SECTION 07 62 00 Agreement No. 7590 SECTION 07 84 00 Î FIRESTOPPING PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 Directory of Listed Building Products, Materials, & Assemblies 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 PROJECT CONDITIONS Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 FIRESTOPPING ASSEMBLIES Agreement No. 7590 2.3 MATERIALS Agreement No. 7590 2.4 ACCESSORIES 2.5 MIXING PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 PREPARATION: 3.3 INSTALLATION Agreement No. 7590 3.4 FIELD QUALITY CONTROL 3.5 CORRECTION AND REPAIR Agreement No. 7590 3.6 CLEANING 3.7 PROTECTION END OF SECTION 07 84 00 Agreement No. 7590 SECTION 07 92 00 Î JOINT SEALANTS PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 Agreement No. 7590 1.4 SUBMITTALS 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS 1.8 WARRANTY PART 2 - PRODUCTS 2.1 MANUFACTURERS Agreement No. 7590 2.2 TRAFFIC JOINT SEALANTS 2.3 EXTERIOR FACADE SEALANTS Agreement No. 7590 2.4 SPECIALTY JOINT SEALANTS 2.5 INTERIOR JOINT SEALANTS Agreement No. 7590 2.6 JOINT SEALANT BACKINGS Agreement No. 7590 2.7 TAPE SEALANTS 2.8 ACCESSORIES Agreement No. 7590 2.9 MIXING PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 PREPARATION: Agreement No. 7590 3.3 INSTALLATION Agreement No. 7590 3.4 FIELD QUALITY CONTROL Agreement No. 7590 3.5 CORRECTION AND REPAIR 3.6 CLEANING Agreement No. 7590 END OF SECTION 07 92 00 Agreement No. 7590 SECTION 07 92 01 Î JOINT SEALANTS FOR SKATEPARKS PART 1 - GENERAL 1.1 DESCRIPTION: 1.2 RELATED SECTIONS: PART 2 Î PRODUCTS PART 3 - EXECUTION 3.1 CONCRETE: Agreement No. 7590 END OF SECTION 07 92 01 Agreement No. 7590 SECTION 08 12 13 Î STANDARD HOLLOW METAL FRAMES PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING PART 2 - PRODUCTS 2.1 MANUFACTURERS Agreement No. 7590 2.2 STANDARD HOLLOW METAL FRAMES 2.3 COMPONENTS Agreement No. 7590 2.4 ACCESSORIES Agreement No. 7590 2.5 MATERIALS Agreement No. 7590 2.6 FINISHES PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 Agreement No. 7590 3.3 CORRECTION AND REPAIR 3.4 CLEANING 3.5 PROTECTION END OF SECTION 08 12 13 Agreement No. 7590 SECTION 08 13 13 Î STANDARD HOLLOW METAL DOORS PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING PART 2 - PRODUCTS 2.1 MANUFACTURERS Agreement No. 7590 2.2 STANDARD HOLLOW METAL FRAMES Agreement No. 7590 2.3 ACCESSORIES Agreement No. 7590 2.4 MATERIALS Agreement No. 7590 2.5 FINISHES PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 CORRECTION AND REPAIR 3.4 ADJUSTING 3.5 CLEANING Agreement No. 7590 3.6 PROTECTION END OF SECTION 08 13 13 Agreement No. 7590 SECTION 08 14 16 Î FLUSH WOOD DOORS PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING Agreement No. 7590 1.7 WARRANTY PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 WOOD VENEER-FACED DOORS Agreement No. 7590 2.3 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 ADJUSTING 3.4 CORRECTION AND REPAIR 3.5 CLEANING Agreement No. 7590 3.6 PROTECTION END OF SECTION 08 14 16 Agreement No. 7590 SECTION 08 31 16 Î ACCESS PANELS PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE 1.6 HANDLING Agreement No. 7590 PART 2 - PRODUCTS 2.1 METAL ACCESS PANEL AND FRAMES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION 3.3 ADJUSTING 3.4 CORRECTION AND REPAIR 3.5 CLEANING Agreement No. 7590 3.6 PROTECTION END OF SECTION 08 31 16 Agreement No. 7590 SECTION 08 36 13 Î OVERHEAD SECTIONAL DOORS 1.1 SUMMARY 1.2 REFERENCES 1.3 SUBMITTALS Agreement No. 7590 1.4 QUALITY ASSURANCE 1.5 HANDLING Agreement No. 7590 1.6 WARRANTY PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 GLAZED OVERHEAD SECTIONAL DOORS Agreement No. 7590 2.3 INSULATED OVERHEAD SECTIONAL DOORS 2.4 OPERATIONS AND CONTROLS 2.5 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 ADJUSTING 3.4 CORRECTION AND REPAIR 3.5 CLEANING 3.6 PROTECTION 3.7 CLOSEOUT ACTIVITIES Agreement No. 7590 END OF SECTION 08 36 13 Agreement No. 7590 SECTION 08 53 13 Î VINYL WINDOWS 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 WARRANTY Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 VINYL WINDOWS 2.3 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION 3.3 ADJUSTING 3.4 FIELD QUALITY CONTROL Agreement No. 7590 3.5 CORRECTION AND REPAIR 3.6 CLEANING Agreement No. 7590 3.7 PROTECTION END OF SECTION 08 53 13 Agreement No. 7590 SECTION 08 81 00 Î GLASS GLAZING 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING Agreement No. 7590 1.7 WARRANTY PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 MANUFACTURED GLASS 2.3 SECONDARY GLASS FABRICATORS Agreement No. 7590 2.4 ACCESSORIES Agreement No. 7590 Standard Specification for Laminated Architectural Flat Glass North American Glazing Guidelines for Sealed Insulating Glass Units for Commercial and Residential UseÑ 2.5 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 CORRECTION AND REPAIR 3.4 CLEANING Agreement No. 7590 3.5 PROTECTION END OF SECTION 08 81 00 Agreement No. 7590 SECTION 09 05 16 Î PREPARATION OF CONCRETE SUBSTRATES FOR FINISH FLOORING 1.1 SUMMARY 1.2 RELATED DOCUMENTS 1.3 PRICE AND PAYMENT PROCEDURES Agreement No. 7590 1.4 REFERENCES Agreement No. 7590 1.5 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 Agreement No. 7590 1.6 SUBMITTALS PART 2 - PRODUCTS 2.1 MANUFACTURERS Agreement No. 7590 2.2 CONCRETE SUBSTRATE TESTING EQUIPMENT 2.3 CORRECTIVE (REMEDIAL) MVECS Agreement No. 7590 2.4 ACCESSORIES 2.5 SURFACE PREPARATION Agreement No. 7590 Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 FIELD QUALITY CONTROL Agreement No. 7590 Agreement No. 7590 3.3 CORRECTION AND REPAIR END OF SECTION 09 05 16 Agreement No. 7590 SECTION 09 22 26 Î METAL SUSPENSION SYSTEMS 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING PART 2 - PRODUCTS 2.1 MANUFACTURERS Agreement No. 7590 2.2 MATERIALS 2.3 COMPONENTS Agreement No. 7590 2.4 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION 3.3 CORRECTION AND REPAIR Agreement No. 7590 3.4 CLEANING END OF SECTION 09 22 26 Agreement No. 7590 SECTION 09 22 38 Î CEMENT PLASTER BASE 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 PROJECT CONDITIONS Agreement No. 7590 1.8 WARRANTY PART 2 - PRODUCTS 2.1 SUPPORTING FRAMEWORK Agreement No. 7590 2.2 CEMENTIOUS SCRATCH AND BROWN Agreement No. 7590 2.3 ACCESSORIES Agreement No. 7590 2.4 MIXING PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 PREPARATION Agreement No. 7590 3.3 INSTALLATION Agreement No. 7590 Agreement No. 7590 3.4 CORRECTION AND REPAIR Agreement No. 7590 3.5 CLEANING 3.6 PROTECTION END OF SECTION 09 22 38 Agreement No. 7590 SECTION 09 28 15 Î GMF GYPSUM TILE BACKING BOARD 1.1 SUMMARY 1.2 REFERENCES 1.3 SUBMITTALS Agreement No. 7590 1.4 QUALITY ASSURANCE 1.5 HANDLING Handling Gypsum Board Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 GMF GYPSUM BACKING BOARD Agreement No. 7590 2.3 INSTALLATION MATERIALS 2.4 JOINT TREATMENT MATERIALS 2.5 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION 3.3 CORRECTION AND REPAIR Agreement No. 7590 3.4 CLEANING END OF SECTION 09 28 15 Agreement No. 7590 SECTION 09 29 00 Î GYPSUM BOARD 1.1 SUMMARY 1.2 REFERENCES Agreement No. 7590 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING Handling Gypsum Board PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 PRE-ROCK GYPSUM BOARD Agreement No. 7590 2.3 FIRE-RESISTANCE RATED GYPSUM BOARD Agreement No. 7590 2.4 METAL TRIM 2.5 INSTALLATION MATERIALS Agreement No. 7590 2.6 JOINT TREATMENT MATERIALS 2.7 ACCESSORIES Agreement No. 7590 2.8 MARKING AND IDENTIFICATION PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 3.3 CORRECTION AND REPAIR 3.4 CLEANING 3.5 PROTECTION Agreement No. 7590 3.6 GYPSUM BOARD FINISH SCHEDULE Recommended Levels of Gypsum Board Finish END OF SECTION 09 29 00 Agreement No. 7590 SECTION 09 30 00 Î TILING 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 Handbook for Ceramic, Glass, and Stone Installation 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS 1.8 WARRANTY PART 2 - PRODUCTS 2.1 TILE SURFACING UNITS 2.2 THRESHOLDS Agreement No. 7590 2.3 INSTALLATION MATERIALS Agreement No. 7590 2.4 ACCESSORIES Agreement No. 7590 2.5 MIXING PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 PREPARATION 3.3 INSTALLATION Agreement No. 7590 3.4 CORRECTION AND REPAIR Agreement No. 7590 3.5 CLEANING 3.6 PROTECTION END OF SECTION 09 30 00 Agreement No. 7590 SECTION 09 51 00 Î ACOUSTICAL TECTUM§ SHAPES AND CLOUDS CEILINGS 1.1 SUMMARY 1.2 REFERENCES Agreement No. 7590 1.3 SYSTEM DESCRIPTION 1.4 SUBMITTALS Agreement No. 7590 1.5 SUSTAINABLE MATERIALS 1.6 QUALITY ASSURANCE Agreement No. 7590 1.7 DELIVERY, STORAGE & HANDLING 1.8 PROJECT/SITE CONDITIONS 1.9 WARRANTY Agreement No. 7590 1.10 MAINTENANCE 1.11 MANUFACTURER PART 2 - PRODUCTS 2.1 ACOUSTICAL CEILING UNITS 2.2 METAL SUSPENSION SYSTEMS Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION 3.2 PREPARATION 3.3 INSTALLATION 3.4 ADJUSTING AND CLEANING END OF SECTION 09 51 00 Agreement No. 7590 SECTION 09 51 13 Î ACOUSTICAL PANEL CEILINGS 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE , ÐMinimum Design Loads For Buildings and Other StructuresSeismic Construction HandbookÑ 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS 1.8 WARRANTY PART 2 - PRODUCTS 2.1 ACOUSTICAL CEILING PANELS Agreement No. 7590 2.2 SUSPENSION SYSTEMS 2.3 INSTALLATION MATERIALS 2.4 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION Agreement No. 7590 3.3 CORRECTION AND REPAIR Agreement No. 7590 3.4 CLEANING 3.5 PROTECTION END OF SECTION 09 51 13 Agreement No. 7590 SECTION 09 65 14 Î RESILIENT BASE 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 PROJECT CONDITIONS Agreement No. 7590 PART 2 - PRODUCTS 2.1 RESILIENT WALL BASE 2.2 INSTALLATION MATERIALS 2.3 ACCESSORIES PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 PREPARATION 3.3 INSTALLATION Agreement No. 7590 3.4 CORRECTION AND REPAIR 3.5 CLEANING 3.6 PROTECTION END OF SECTION 09 65 14 Agreement No. 7590 SECTION 09 65 23 Î RESILIENT PLANK FLOORING 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS PART 2 - PRODUCTS 2.1 RESILIENT PLANK FLOORING 2.2 SURFACE PREPARATION 2.3 INSTALLATION MATERIALS Agreement No. 7590 2.4 ACCESSORIES PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 PREPARATION 3.3 INSTALLATION Agreement No. 7590 3.4 CORRECTION AND REPAIR 3.5 CLEANING Agreement No. 7590 3.6 PROTECTION END OF SECTION 09 65 23 Agreement No. 7590 SECTION 09 81 33 Î ACOUSTICAL INSULATION, SEALANTS, AND ACCESSORIES 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS 1.5 HANDLING 1.6 PROJECT CONDITIONS PART 2 - PRODUCTS Agreement No. 7590 2.1 CONCEALED ACOUSTICAL INSULATION 2.2 ACOUSTICAL SEALANTS Agreement No. 7590 Agreement No. 7590 2.3 ACOUSTICAL 2.4 FIRESTOP AND ACOUSTICAL PUTTY PADS 2.5 INSTALLATION MATERIALS Agreement No. 7590 2.6 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 CORRECTION AND REPAIR Agreement No. 7590 3.4 CLEANING 3.5 PROTECTION END OF SECTION 09 81 33 Agreement No. 7590 SECTION 09 91 00 Î PAINTING 1.1 SUMMARY 1.2 REFERENCES Agreement No. 7590 2 5 7 Reference Sheen Gloss Range Test Method Description Gloss Level 1 Matte/Flat 1 to 5 GUs 60-degree meter (Low Sheen) 1 to 10 GUs 85-degree meter Gloss Level 2 Velvet 6 to 10 GUs 60-degree meter (Low Sheen) 11 to 24 GUs 85-degree meter Gloss Level 3 Eggshell 11 to 20 GUs 60-degree meter (Medium Sheen) 25 to 35 GUs 85-degree meter Gloss Level 4 Satin 21 to 35 GUs 60-degree meter (Medium Sheen) >35 GUs 85-degree meter Gloss Level 5 Low sheen 36 to 49 GUs 60-degree meter (Medium Sheen) Gloss Level 6 Semi-gloss 50 to 70 GUs 60-degree meter (Medium Sheen) Gloss Level 7 Gloss 71 to 85 GUs 60-degree meter (High Sheen) Up to 60 GUs 20-degree meter Gloss Level 8 High-Gloss >85 GUs 60-degree meter (High Sheen) >60 GUs 20-degree meter 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 Agreement No. 7590 1.4 SUBMITTALS 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 PROJECT CONDITIONS Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 PAINT 2.3 ACCESSORIES 2.4 MIXING Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 PREPARATION 3.3 INSTALLATION Agreement No. 7590 3.4 CORRECTION AND REPAIR 3.5 CLEANING Agreement No. 7590 3.6 SCHEDULE END OF SECTION 09 91 00 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE EXTERIORSURFACESLOWVOC Concrete&CMUSubstrates: As specified in Section 09 96 53 - Elastomeric Coatings Concrete&BrickSubstrates: 100% Acrylic FLAT st 4600 Uniprime II ESPR00 Eff-Stop 023 Fresh Start Primer 1Coat nd 2000 Duratone EVSH10 Evershield Flat 400 Regal Select Flat 2Coat rd 2000 Duratone EVSH10 Evershield Flat 400 Regal Select Flat 3Coat CMUSubstrates: 100% Acrylic FLAT st 018 Acrylic Block Filler SBPR00 Blockfill M88 Latex Block Filler 1Coat nd 2000 Duratone EVSH10 Evershield Flat 400 Regal Select Flat 2Coat rd 2000 Duratone EVSH10 Evershield Flat 400 Regal Select Flat 3Coat CMUSubstrates: 100% Acrylic ELASTOMERIC st 4600 Uniprime II ESPR00 Eff-Stop 023 Fresh Start Primer 1Coat nd 500 Solotex W370 Endurawall 056 Moorlastic 2Coat rd 500 Solotex W370 Endurawall 056 Moorlastic 3Coat FinishedWoodSurfaces: 100% Acrylic FLAT st 4200 Terminator II EZPR00 EZ Prime Premium 0046 Hi-Hide All Purpose Primer 1Coat nd 2000 Duratone EVSH10 Evershield Flat W105 Regal Select Flat 2Coat rd 2000 Duratone EVSH10 Evershield Flat W105 Regal Select Flat 3Coat FinishedWoodSurfaces:100% Acrylic SEMI-GLOSS st 4200 Terminator II EZPR00 EZ Prime Premium 0046 Hi-Hide All Purpose Primer 1Coat EVSH50 Evershield Semi nd 7000 Acriglo Semi-Gloss W096Regal Soft Gloss 2 Coat Gloss EVSH50 Evershield Semi rd 7000 Acriglo Semi-Gloss W096Regal Soft Gloss 3 Coat Gloss FinishedWoodSurfaces:100% Acrylic GLOSS st 4200 Terminator II EZPR00EZ Prime Premium 0046 Hi-Hide All Purpose Primer 1Coat nd 8500 Carefree Gloss EVSH60Evershield Gloss NA 2Coat rd 8500 Carefree Gloss EVSH60Evershield Gloss NA 3Coat PAINT PRODUCTS SCHEDULE - 1 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE FinishedWoodSurfaces:Semi-Transparent Stain st Olympic Maximum ST Stain Okon WPT-3 0638 Arborcoat S/T Stain 1Coat nd Olympic Maximum ST Stain Okon WPT-3 0638 Arborcoat S/T Stain 2Coat Iron,Steel,andGalvanizedSteelSurfaces:Specified in Section 09 97 13 - High Performance Steel Coatings Iron&SteelSubstrates: 100% Acrylic GLOSS st 9600 Protec BRPR00-1 Block Rust M04 Acrylic Metal Primer 1Coat nd 8500 Carefree Gloss EVSH60 Evershield Gloss N/A 2Coat rd 8500 Carefree Gloss EVSH60 Evershield Gloss N/A 3Coat Iron&SteelSubstrates: 100% Acrylic SEMI-GLOSS st 9600 Protec BRPR00-1 Block Rust M04 Acrylic Metal Primer 1Coat EVSH50 Evershield Semi nd 7000 Acriglo Semi-Gloss 402 Regal Soft Gloss 2 Coat Gloss EVSH50 Evershield Semi rd 7000 Acriglo Semi-Gloss 402 Regal Soft Gloss 3 Coat Gloss GalvanizedSteel&AluminumSubstrates: 100% Acrylic GLOSS Pretreatment Krud Kutter Metal Etch ME01 Etch Jasco Prep N Prime GAPR00 Galv-Alum st 4800 Metal Pro Primer P04 Acrylic Metal Primer 1 Coat Premium nd 8500 Carefree Gloss EVSH60 Evershield Gloss N/A 2Coat rd 8500 Carefree Gloss EVSH60 Evershield Gloss N/A 3Coat GalvanizedSteel&AluminumSubstrates: 100% Acrylic SEMI-GLOSS Pretreatment Krud Kutter Metal Etch ME01 Etch Jasco Prep N Prime GAPR00 Galv-Alum 4800 Metal Pro Primer st P04 Acrylic Metal Primer 1 Coat Premium EVSH50 Evershield Semi nd 7000 Acriglo Semi-Gloss W096 Regal Soft Gloss 2 Coat Gloss EVSH50 Evershield Semi rd 7000 Acriglo Semi-Gloss W096 Regal Soft Gloss 3 Coat Gloss PAINT PRODUCTS SCHEDULE - 2 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE ZincAlloySurfaces:100% Acrylic SEMI-GLOSS Pretreatment Krud Kutter Metal Etch ME01 Etch Jasco Prep N Prime GAPR00 Galv-Alum 4800 Metal Pro Primer st P04 Acrylic Metal Primer 1 Coat Premium EVSH50 Evershield Semi nd 7000 Acriglo Semi-Gloss W096 Regal Soft Gloss 2 Coat Gloss EVSH50 Evershield Semi rd 7000 Acriglo Semi-Gloss W096 Regal Soft Gloss 3 Coat Gloss FiberCementBoardSurfaces:100% Acrylic FLAT st 4600 Uniprime II ESPR0 0 Eff-Stop N023 Fresh Start Primer 1Coat nd 2000 Duratone EVSH10 Evershield Flat W105 Regal Select Flat 2Coat rd 0 Evershield Flat W105 Regal Select Flat 2000 Duratone EVSH1 3Coat PortlandCementPlaster(Stucco)Surfaces(DoesnotapplytoPolymerMdifiedPlasterSurfaces):Specified in Section 09 96 53 - Elastomeric Coatings GypsumSoffitBoardSurfaces:100% Acrylic FLAT st 4600 Uniprime II Inter-Kote Premium IKPR00 N023 Fresh Start Primer 1Coat nd 2000 Duratone EVSH10 Evershield Flat W105 Regal Select Flat 2Coat rd EVSH10 Evershield Flat W105 Regal Select Flat 2000 Duratone 3Coat INTERIORSURFACESLOWVOC ConcreteSurfaces:100% Acrylic FLAT st 4600 Uniprime II ESPR00 Eff-Stop N023 Fresh Start Primer 1Coat nd 2Coat 7100 Acriglo Flat SSHL10 Spartashield Flat 547 Regal Select Flat rd 3Coat 7100 Acriglo Flat SSHL10 Spartashield Flat 547 Regal Select Flat ConcreteSurfaces:100% Acrylic EGGSHELL st 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer 1Coat SSHL30 Spartashield nd 550 Regal Select Pearl 7500 Acriglo Eggshell 2 Coat Eggshell SSHL30 Spartashield rd 7500 Acriglo Eggshell 550 Regal Select Pearl 3 Coat Eggshell PAINT PRODUCTS SCHEDULE - 3 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE ConcreteSurfaces:100% Acrylic SEMI-GLOSS st 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer 1Coat SSHL50 Spartashield Semi- nd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 2 Coat Gloss SSHL50 Spartashield Semi- rd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 3 Coat Gloss ConcreteSurfaces:100% Acrylic GLOSS st 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer 1Coat nd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 2Coat rd Evershield Gloss 794 Advance High Gloss 8500 Carefree Gloss EVSH 60 3Coat ConcreteSurfaces:100% Epoxy GLOSS Rust Oleum Sierra S70/S71 st 4600 Uniprime II 1Coat N023 Fresh Start Primer W Rust-Oleum Sierra S60 Gloss WB Rust-Oleum Sierra S60 nd P43 Super Spec HP Gloss Epoxy 2Coat Epoxy Gloss WB Epoxy CMUSurfaces:100% Acrylic Flat st 1Coat 018 Acrylic Block Filler SBPR00 Blockfill 160 Latex Block Filler nd 2Coat 7100 Acriglo Flat SSHL10 Spartashield Flat 547 Regal Select Flat rd 3Coat 7100 Acriglo Flat SSHL10 Spartashield Flat 547 Regal Select Flat CMUSurfaces:100% Acrylic EGGSHELL st 018 Acrylic Block Filler SBPR00 Blockfill 160 Latex Block Filler 1Coat SSHL30 Spartashield nd 7500 Acriglo Eggshell 550 Regal Select Pearl 2 Coat Eggshell SSHL30 Spartashield rd 7500 Acriglo Eggshell 550 Regal Select Pearl 3 Coat Eggshell CMUSurfaces:100% Acrylic SEMI-GLOSS st 018 Acrylic Block Filler SBPR00 Blockfill 160 Latex Block Filler 1Coat SSHL50 Spartashield Semi- nd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 2 Coat Gloss SSHL50 Spartashield Semi- rd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 3Coat Gloss CMUSurfaces:100% Acrylic GLOSS st 040 Block Kote SBPR00 Blockfill 160 Latex Block Filler 1Coat nd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 2Coat rd Evershield Gloss 794 Advance High Gloss 3Coat 8500 Carefree Gloss EVSH 60 PAINT PRODUCTS SCHEDULE - 4 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE CMUSurfaces:100% Epoxy GLOSS st 040 Block Kote SBPR00 Blockfill 160 Latex Block Filler 1Coat Rust-Oleum Sierra S60 Gloss WB Rust-Oleum Sierra S60 nd P43 Super Spec HP Gloss Epoxy 2Coat Epoxy Gloss WB Epoxy FerrousMetalSurfaces:100% Acrylic SEMI-GLOSS st 9600 Protec BRPR00 Bloc-Rust P04 Acrylic Metal Primer 1Coat SSHL50 Spartashield Semi- nd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 2 Coat Gloss SSHL50 Spartashield Semi- rd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 3 Coat Gloss FerrousMetalSurfaces:100% Acrylic GLOSS st 9600 Protec UGPR00 1Coat Ultra-Grip P04 Acrylic Metal Primer nd 8500 Carefree Gloss EVSH 60 2Coat Evershield Gloss 794 Advance High Gloss rd 3Coat 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss AluminumSurfaces:100% Acrylic SEMI-GLOSS st 9600 Protec BRPR00 Bloc-Rust P04 Acrylic Metal Primer 1Coat SSHL50 Spartashield Semi- nd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 2 Coat Gloss SSHL50 Spartashield Semi- rd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 3 Coat Gloss AluminumSurfaces:100% Acrylic GLOSS st 9600 Protec UGPR00 Ultra-Grip P04 Acrylic Metal Primer 1Coat nd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 2Coat rd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 3Coat StainlessSteel,Copper,andBrassSurfaces:100% Acrylic SEMI-GLOSS st 9600 Protec BRPR00 Bloc-Rust P04 Acrylic Metal Primer 1Coat SSHL50 Spartashield Semi- nd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 2 Coat Gloss SSHL50 Spartashield Semi- rd 7000 Acriglo Semi-Gloss 551 Regal Select Semi Gloss 3 Coat Gloss StainlessSteel,Copper,andBrassSurfaces:100% Acrylic GLOSS st 9600 Protec UGPR00 Ultra-Grip P04 Acrylic Metal Primer 1Coat nd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 2 Coat rd 3Coat 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss PAINT PRODUCTS SCHEDULE - 5 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE RoughSawnWoodSurfaces:Semi-Transparent Stain st 1Coat Olympic S/T Stain Okon WPT-3 0638 Arborcoat S/T Stain nd 2Coat Olympic S/T Stain Okon WPT-3 0638 Arborcoat S/T Stain FinishedWoodSurfaces:Semi-Transparent Stain st VWS0250 Series ST Stain Old Masters Wood Stain Moore's S/T WB Stain 1Coat FinishedWoodSurfaces:Clear Lacquer Finish st 1Coat NRS 1620 Sanding Sealer LQX 101-0 Sanding Sealer NRS 1620 Sanding Sealer nd 2Coat NRF 1626 Satin Lacquer LQX 104-0 Satin Lacquer NRF 1626 Satin Lacquer rd 3Coat NRF 1626 Satin Lacquer LQX 103-0 Satin Lacquer NRF 1626 Satin Lacquer FinishedWoodSurfaces:Water White Finish (for light-colored stains) st NAF 1420 Satin Sealer LQX 131-0 Sanding Sealer NAF 1420 Satin Sealer 1Coat nd NAF 1422 Satin Lacquer LQX 132-0 Satin Lacquer NAF 1426 Satin Lacquer 2Coat rd NAF 1422 Satin Lacquer LQX 132-0 Satin Lacquer NAF 1426 Satin Lacquer 3Coat FinishedWoodSurfaces:Clear Varnish Finish FLAT st Zenith PKF7501 Flat Zenith PKF7501 Flat Zenith PKF7501 Flat 1Coat nd Zenith PKF7501 Flat Zenith PKF7501 Flat Zenith PKF7501 Flat 2Coat rd Zenith PKF7501 Flat Zenith PKF7501 Flat Zenith PKF7501 Flat 3Coat FinishedWoodSurfaces:Clear Varnish Finish SEMI-GLOSS st Zenith PKF7501 Flat Zenith PKF7502 Satin Zenith PKF7502 Satin 1Coat nd Zenith PKF7501 Flat Zenith PKF7502 Satin Zenith PKF7502 Satin 2Coat rd Zenith PKF7501 Flat Zenith PKF7502 Satin Zenith PKF7502 Satin 3Coat FinishedWoodSurfaces:Clear Varnish Finish GLOSS st Zenith PKC7509 Gloss Zenith PKC7509 Gloss Zenith PKC7509 Gloss 1Coat nd Zenith PKC7509 Gloss Zenith PKC7509 Gloss Zenith PKC7509 Gloss 2Coat rd Zenith PKC7509 Gloss Zenith PKC7509 Gloss Zenith PKC7509 Gloss 3Coat FinishedWoodSurfaces:100% Acrylic LOW SHEEN st 4200 Terminator II UGPR00 Ultra-Grip 0046 Hi-Hide All Purpose Primer 1Coat nd 1750 Acriglo Low Sheen SPMA20 Suprema VS 549 Regal Select Eggshell 2Coat rd 3Coat 1750 Acriglo Low Sheen SPMA20 Suprema VS 549 Regal Select Eggshell PAINT PRODUCTS SCHEDULE - 6 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE FinishedWoodSurfaces:100% Acrylic SEMI-GLOSS st 4200 Terminator II UGPR00 Ultra-Grip 0046 Hi-Hide All Purpose Primer 1Coat SPMA50 Suprema Semi 7000 Acriglo Semi-Gloss nd 551 Regal Select Semi Gloss 2 Coat Gloss SPMA50 Suprema Semi 7000 Acriglo Semi-Gloss rd 551 Regal Select Semi Gloss 3 Coat Gloss FinishedWoodSurfaces:100% Acrylic Dryfall FLAT st DF 12 Dryfall Flat W 6079 Aquafall Flat M53 Dryfall Flat 1Coat nd DF 12 Dryfall Flat W 6079 Aquafall Flat M53 Dryfall Flat 2Coat ParticleBoard,MDF,andHardboardSurfaces:100% Acrylic FLAT st 4000 Uniprime II UGPR00 Ultra-Grip N023 Fresh Start Primer 1Coat nd 2Coat 7100 Acriglo Flat SPMA10 Suprema Flat 547 Regal Select Flat rd 3Coat 7100 Acriglo Flat SPMA10 Suprema Flat 547 Regal Select Flat ParticleBoard,MDF,andHardboardSurfaces:100% Acrylic SEMI-GLOSS st 4000 Uniprime II UGPR00 Ultra-Grip N023 Fresh Start Primer 1Coat SPMA50 Suprema Semi 7000 Acriglo Semi-Gloss nd 551 Regal Select Semi Gloss 2 Coat Gloss SPMA50 Suprema Semi 7000 Acriglo Semi-Gloss rd 551 Regal Select Semi Gloss 3 Coat Gloss ParticleBoard,MDF,andHardboardSurfaces:100% Acrylic GLOSS st 4000 Uniprime II UGPR00 Ultra-Grip N023 Fresh Start Primer 1Coat nd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 2Coat rd 8500 Carefree Gloss EVSH 60 Evershield Gloss 794 Advance High Gloss 3Coat PortlandCementPlasterSurfaces:100% Acrylic FLAT st 1Coat 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer nd 2Coat 7100 Acriglo Flat SPMA10 Suprema Flat 547 Regal Select Flat rd Suprema Flat 547 Regal Select Flat 3Coat 7100 Acriglo Flat SPMA10 PortlandCementPlasterSurfaces:100% Acrylic EGGSHELL st 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer 1Coat nd 7500 Acriglo Eggshell SPMA30 Suprema LS 550 Regal Select Pearl 2Coat rd Suprema LS 550 Regal Select Pearl 3Coat 7500 Acriglo Eggshell SPMA30 PAINT PRODUCTS SCHEDULE - 7 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE PortlandCementPlasterSurfaces:100% Acrylic SEMI-GLOSS st 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer 1Coat SPMA50 Suprema Semi 7000 Acriglo Semi-Gloss nd 551 Regal Select Semi Gloss 2 Coat Gloss SPMA50 Suprema Semi 7000 Acriglo Semi-Gloss rd 551 Regal Select Semi Gloss 3 Coat Gloss PortlandCementPlasterSurfaces:100% Acrylic GLOSS st 4600 Uniprime II ESPR00 Eff-Stop Premium N023 Fresh Start Primer 1Coat nd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 2Coat rd 8500 Carefree Gloss EVSH 60Evershield Gloss 794 Advance High Gloss 3Coat PortlandCementPlasterSurfaces:100% Epoxy GLOSS st 4600 Uniprime II Rust-Oleum S70/S71 WB N023 Fresh Start Primer 1Coat Rust-Oleum Sierra S60 Gloss WB Rust-Oleum Sierra S60 nd P43 Super Spec HP Gloss Epoxy 2Coat Epoxy Gloss WB Epoxy GypsumBoardSurfaces:100% Acrylic FLAT st VNPR00 Vinylastic N/A N 1 Coat Premium nd 7100 Acriglo Flat SPMA10 Suprema Flat 547 Regal Select Flat 2Coat rd 7100 Acriglo Flat SPMA10 Suprema Flat 547 Regal Select Flat 3Coat GypsumBoardSurfaces:100% Acrylic LOW SHEEN VNPR00 Vinylastic st N023 Fresh Start Primer 5001 Vpro Primer 1 Coat Premium nd 5200 Vpro Low Sheen SPMA20 Suprema VS 549 Regal Select Eggshell 2Coat rd 5200 Vpro Low Sheen SPMA20 Suprema VS 549 Regal Select Eggshell 3Coat GypsumBoardSurfaces:100% Acrylic EGGSHELL VNPR00 Vinylastic st 5001 Vpro Primer N023 Fresh Start Primer 1 Coat Premium nd 5300 Vpro Eggshell SPMA30 Suprema LS 550 Regal Select Pearl 2Coat rd 5300 Vpro Eggshell SPMA30 Suprema LS 550 Regal Select Pearl 3Coat PAINT PRODUCTS SCHEDULE - 8 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE GypsumBoardSurfaces:100% Acrylic SEMI-GLOSS VNPR00 Vinylastic st 5001 Vpro Primer N023 Fresh Start Primer 1Coat Premium SPMA50 Suprema Semi nd 5400 Vpro Semi-Gloss 551 Regal Select Semi Gloss 2 Coat Gloss SPMA50 Suprema Semi rd 5400 Vpro Semi-Gloss 551 Regal Select Semi Gloss 3 Coat Gloss GypsumBoardSurfaces:100% Acrylic GLOSS VNPR00 Vinylastic st 5001 Vpro Primer N023 Fresh Start Primer 1 Coat Premium nd 8500 Carefree Gloss EVSH 60 Evershield Gloss 794 Advance High Gloss 2Coat rd 8501 Carefree Gloss EVSH 60 Evershield Gloss 794 Advance High Gloss 3Coat GypsumBoardSurfaces:100% Epoxy GLOSS Rust-Oleum Sierra S70/S71 st 5001 Vpro Primer N/A 1 Coat WB Epoxy Acrylic Primer Rust-Oleum Sierra S60 Gloss WB Rust-Oleum Sierra S60 nd 2Coat N/A Epoxy Gloss WB Epoxy AcousticalTileSurfaces:100% Acrylic FLAT st 013 Acoustic Kote W 615 Acoustikote 258 Moore's Ceiling White 1Coat nd 013 Acoustic Kote W 615 Acoustikote 258 Moore's Ceiling White 2Coat INTERIORSURFACESZEROVOC ConcreteSurfaces:Acrylic FLAT VNSL00 Vinylastic Select st 511 Natura Primer 5001 Vpro Primer 1 Coat Primer nd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 2Coat rd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 3Coat ConcreteSurfaces:100% Acrylic EGGSHELL VNSL00 Vinylastic Select st 5001 Vpro Primer 511 Natura Primer 1 Coat Primer nd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 2Coat rd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 3Coat PAINT PRODUCTS SCHEDULE - 9 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE ConcreteSurfaces:100% Acrylic SEMI-GLOSS VNSL00 Vinylastic Select st 511 Natura Primer 5001 Vpro Primer 1 Coat Primer nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat CMUSurfaces:Acrylic FLAT st 1Coat 040 Block Kote SBPR00 Blockfill 160 Latex Block Filler nd 2Coat 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat rd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 3Coat CMUSurfaces:100% Acrylic EGGSHELL st 040 Block Kote SBPR00 Blockfill 160 Latex Block Filler 1Coat nd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 2Coat rd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 3Coat CMUSurfaces:100% Acrylic SEMI-GLOSS st 040 Block Kote SBPR00 Blockfill 160 Latex Block Filler 1Coat nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat Iron&SteelSurfaces:100% Acrylic SEMI-GLOSS st 9600 Protec UGPR00 Ultra-Grip P04 Acrylic Metal Primer 1Coat nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat AluminumSurfaces:100% Acrylic SEMI-GLOSS st 4800 Metal Pro Primer UGPR00 Ultra-Grip P04 Acrylic Metal Primer 1Coat nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 3Coat 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss PAINT PRODUCTS SCHEDULE - 10 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE StainlessSteel,Copper,andBrassSurfaces:100% Acrylic SEMI-GLOSS st 4800 Metal Pro Primer UGPR00 Ultra-Grip P04 Acrylic Metal Primer 1Coat nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat FinishedWoodSurfaces:100% Acrylic EGGSHELL st 5001 Vpro Primer UGPR00 Ultra-Grip 511 Natura Primer 1Coat nd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 2Coat rd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 3Coat FinishedWoodSurfaces:100% Acrylic SEMI-GLOSS st 5001 Vpro Primer UGPR00 Ultra-Grip 511 Natura Primer 1Coat nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat ParticleBoard,MDF,andHardboardSurfaces:Acrylic FLAT st 5001 Vpro Primer UGPR00 Ultra-Grip 511 Natura Primer 1Coat nd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 2Coat rd 3Coat 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat ParticleBoard,MDF,andHardboardSurfaces:100% Acrylic SEMI-GLOSS st 5001 Vpro Primer UGPR00 Ultra-Grip 511 Natura Primer 1Coat nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 3Coat 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss PAINT PRODUCTS SCHEDULE - 11 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE PortlandCementPlasterSurfaces:Acrylic FLAT st VNSL00 Vinylastic Select 5001 Vpro Primer 511 Natura Primer 1Coat Primer nd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 2Coat rd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 3Coat PortlandCementPlasterSurfaces:100% Acrylic EGGSHELL VNSL00 Vinylastic Select st 5001 Vpro Primer 511 Natura Primer 1 Coat Primer nd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell Coat 2 rd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 3Coat PortlandCementPlasterSurfaces:100% Acrylic SEMI-GLOSS VNSL00 Vinylastic Select st 5001 Vpro Primer 511 Natura Primer 1 Coat Primer nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat GypsumBoardSurfaces:Acrylic FLAT VNSL00 Vinylastic Select st 511 Natura Primer Not Required 1 Coat Primer nd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 2Coat rd 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat 3Coat GypsumBoardSurfaces:100% Acrylic EGGSHELL VNSL00 Vinylastic Select st 5001 Vpro Primer 511 Natura Primer 1 Coat Primer nd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 2Coat rd 5300 Vpro Eggshell EVER 30 Everest Eggshell 513 Natura Eggshell 3Coat PAINT PRODUCTS SCHEDULE - 12 Agreement No. 7590 SUBSTRATENO.OFCOATSVISTAPAINTDUNNEDWARDSBENJAMINMOORE GypsumBoardSurfaces:100% Acrylic SEMI-GLOSS VNSL00 Vinylastic Select st 5001 Vpro Primer 511 Natura Primer 1Coat Primer nd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 2Coat rd 5400 Vpro Semi-Gloss EVER 50 Everest Semi Gloss 514 Natura Semi Gloss 3Coat AcousticalTileSurfaces:Acrylic FLAT st 1Coat 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat nd 2Coat 5100 Vpro Flat EVER 10 Everest Flat 512 Natura Flat PAINT PRODUCTS SCHEDULE - 13 Agreement No. 7590 SECTION 09 97 13 Î HIGH-PERFORMANCE STEEL COATINGS 1.1 SUMMARY 1.2 RELATED DOCUMENTS 1.3 REFERENCES 1.4 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.5 SUBMITTALS 1.6 QUALITY ASSURANCE Agreement No. 7590 1.7 HANDLING 1.8 PROJECT CONDITIONS Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURERS 2.2 HIGH PERFORMANCE COATING Agreement No. 7590 Agreement No. 7590 2.3 SURFACE PREPARATION 2.4 ACCESSORIES 2.5 MIXING Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 PREPARATION 3.3 INSTALLATION Agreement No. 7590 3.4 CORRECTION AND REPAIR 3.5 CLEANING 3.6 PROTECTION Agreement No. 7590 END OF SECTION 09 97 13 Agreement No. 7590 SECTION 09 97 13 Î PENETRATING CONCRETE FLOOR SEALER 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS Agreement No. 7590 1.4 SUBMITTALS 1.5 QUALITY ASSURANCE 1.6 HANDLING Agreement No. 7590 1.7 PROJECT CONDITIONS Agreement No. 7590 PART 2 - PRODUCTS 2.1 PENETRATING CONCRETE FLOOR SEALER 2.2 ACCESSORIES 2.3 MIXING Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 PREPARATION 3.3 INSTALLATION Agreement No. 7590 3.4 CORRECTION AND REPAIR 3.5 CLEANING 3.6 PROTECTION Agreement No. 7590 END OF SECTION 09 97 23 Agreement No. 7590 SECTION 10 14 13 Î REGULATORY SIGNAGE 1.1 SUMMARY 1.2 REFERENCES 1.3 SUBMITTALS 1.4 QUALITY ASSURANCE Agreement No. 7590 Agreement No. 7590 1.5 HANDLING PART 2 - PRODUCTS 2.1 PHOTOPOLYMER PANEL SIGNS Agreement No. 7590 2.2 INSTALLATION MATERIALS 2.3 ACCESSORIES PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION 3.3 CORRECTION AND REPAIR 3.4 CLEANING Agreement No. 7590 3.5 PROTECTION END OF SECTION 10 14 13 Agreement No. 7590 SECTION 10 14 19 Î DIMENSIONAL LETTER SIGNAGE 1.1 SUMMARY 1.2 REFERENCES 1.3 SUBMITTALS 1.4 HANDLING Agreement No. 7590 PART 2 - PRODUCTS 2.1 DIMENSIONAL CHARACTERS 2.2 MATERIALS 2.3 FINISHES PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION 3.3 CORRECTION AND REPAIR 3.4 CLEANING Agreement No. 7590 3.5 PROTECTION END OF SECTION 10 14 19 Agreement No. 7590 SECTION 10 21 13 Î TOILET COMPARTMENTS 1.1 SUMMARY 1.2 REFERENCES 1.3 SUBMITTALS Agreement No. 7590 1.4 QUALITY ASSURANCE 1.5 HANDLING Agreement No. 7590 PART 2 - PRODUCTS 2.1 PLASTIC LAMINATE FACED TOILET COMPARTMENTS 2.2 HARDWARE 2.3 ACCESSORIES Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 ADJUSTING 3.4 CORRECTION AND REPAIR 3.5 CLEANING Agreement No. 7590 3.6 PROTECTION END OF SECTION 10 21 13 Agreement No. 7590 SECTION 10 28 13 Î COMMERCIAL TOILET ACCESSORIES 1.1 SUMMARY 1.2 SECTION REQUIREMENTS PART 2 - PRODUCTS 2.1 COMMERCIAL TOILET ACCESSORIES Agreement No. 7590 2.2 ACCESSORIES PART 3 - EXECUTION 3.1 INSTALLATION REQUIREMENTS Agreement No. 7590 END OF SECTION 10 28 13 Agreement No. 7590 SECTION 10 44 00 Î FIRE PROTECTION SPECIALTIES 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE 1.6 HANDLING Agreement No. 7590 PART 2 - PRODUCTS 2.1 MANUFACTURES 2.2 FIRE ACCESSORIES 2.3 FIRE EXTINGUISHER CABINETS Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: Agreement No. 7590 3.2 INSTALLATION 3.3 ADJUSTING 3.4 CORRECTION AND REPAIR Agreement No. 7590 3.5 CLEANING 3.6 PROTECTION END OF SECTION 10 44 00 Agreement No. 7590 SECTION 12 36 64 Î QUARTZ AGGLOMERATE COUNTERTOPS 1.1 SUMMARY 1.2 REFERENCES 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS Agreement No. 7590 1.5 QUALITY ASSURANCE Agreement No. 7590 1.6 HANDLING 1.7 WARRANTY PART 2 - PRODUCTS 2.1 MANUFACTURES Agreement No. 7590 2.2 QUARTZ AGGLOMERATE COUNTERTOPS 2.3 ACCESSORIES 2.4 FABRICATION Agreement No. 7590 PART 3 - EXECUTION 3.1 EXAMINATION: 3.2 INSTALLATION Agreement No. 7590 3.3 CORRECTION AND REPAIR 3.4 CLEANING 3.5 PROTECTION Agreement No. 7590 END OF SECTION 12 36 64 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 ± Agreement No. 7590 Agreement No. 7590 ± ± ± ± ± ± ± Agreement No. 7590 Agreement No. 7590 ± ± ± Agreement No. 7590 ± ± ± ± ± ± ± ± ± ± Agreement No. 7590 ± Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Ó Ó Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 EXHIBIT B Teen Center, Plaza, and Skatepark Plans Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 OPUF;!NVSBM!UP!JODMVEF!QSFQ!BOE!QSJNFS/ Agreement No. 7590 OPUF;!NVSBM!UP!JODMVEF!QSFQ!BOE!QSJNFS/ Agreement No. 7590 OPUF;!NVSBM!UP!JODMVEF!QSFQ!BOE!QSJNFS/ Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 ROLL-IN (NOPING) LA HIGH WALL (BRICK STAMPED) FYJTUJOH EURO GAP XBMM RAKED PANNED GRIND LEDGE QUARTERPIPE SINGLE KINKED SQUARE GRIND RAIL BANKED EXTENSION RADIUS WEDGE CITY OF RADIUS WEDGE RAKED GRIND LEDGE EL SEGUNDO ROLL-IN 350 Main St, El Segundo, CA 90245 QUARTERPIPE WITH POOL COPING SPHERE BOLLARD EL SEGUNDO EURO GAP RECREATION PARK PHASE 1 IMPROVEMENT GRIND LEDGE PROJECT MANHOLE COVER FEATURE TEEN CENTER AND TEEN SLAPPY MANUAL PAD PLAZA RADIUS WEDGE 405 E Grand Ave, El Segundo, CA 90245 Issue dates BANKED TURN PRECAST SMOKE STACK QUARETERPIPE GRIND LEDGE QUARTERPIPE PANNED LAUNCH RAMP ROLL-IN Sheet title: 3D PERSPECTIVE SLAPPY GRIND LEDGE QUARTERPIPE EXTENSION QUARTERPIPE XBMM!CZ WITH QUARTERPIPE PUIFST POOL COPING XBMM!CZ PUIFST SK1.0 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 CITY OF EL SEGUNDO 350 Main St, El Segundo, CA 90245 EL SEGUNDO RECREATION PARK PHASE 1 IMPROVEMENT PROJECT TEEN CENTER AND TEEN PLAZA 405 E Grand Ave, El Segundo, CA 90245 Issue dates Sheet title: 3D PERSPECTIVE SK1.1 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 AREA LIMIT OF WORK 7,125 SF K R O W F O T I M I L CITY OF EL SEGUNDO K 350 Main St, El R Segundo, CA 90245 O W F O T I EL SEGUNDO M RECREATION PARK I L PHASE 1 IMPROVEMENT PROJECT TEEN CENTER AND TEEN PLAZA 405 E Grand Ave, El Segundo, CA 90245 LIMIT O F WORK K R Issue dates O W F O T I M I L K R O W F O T I M Sheet title: I L SITE PLAN LIMIT OF WORK 1 1 5 0'4'8' SK2.0 Scale: 1" = 4'-0" NORTH 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 INFORMATION SCHEDULE JOINTING SCHEDULE CODEDESCRIPTIONDETAILCODEDESCRIPTIONDETAIL EXPANSION JOINT 5" THICK CONCRETE FLATWORK SP-01 1/SK9.0 H-01 5/SK9.0 EJEJEJ QUARTERPIPE11/SK9.0 SP-02 COLD JOINT OR KEY JOINT H-02 7/SK9.0 CJ-KJCJ-KJ 14/SK9.0 ROLL-IN (NOPING) SP-03 SAWCUT JOINT H-03 6/SK9.0 QUARTERPIPE WITH POOL COPING12/SK9.0 SP-04 TURNDOWN EDGE AT FINISH SURFACE 3/SK9.0 H-04 RADIUS WEDGE13/SK9.0 SP-05 J E SC OR CJ - FIELD DETERMINED J J H-05 E RADIUS WEDGE EXTENSION6,7/SK9.0 SP-06 E 3/SK9.2 SC-CJSC-CJ J E J E BANKED EXTENSION - WATER TOWER 4/SK9.2 SP-07 J E J J E E BANKED TURN7/SK9.1 J SP-08 E J E PRECAST SMOKE STACK QUARTERPIPE J E 2/SK9.2 J SP-09 BY APPROVED SKATEPARK MFG OR APPROVED EQUAL JOINTING NOTES: E J E J E RAKED PANNED GRIND LEDGE SP-10 10/SK9.1 J E J J K - J E C J E EURO GAP2/SK9.1 SP-11 CITY OF J E SP-09 1/SK9.1 SINGLE KINKED SQUARE GRIND RAIL SP-12 J J EJ E EL SEGUNDO E J J E K RAKED GRIND LEDGE6/SK9.1 SP-13 - 350 Main St, El J J EJ C C E J Segundo, CA 90245 J - K E 5/SK9.1 SPHERE BOLLARD SP-14 J J C E J - K J J GRIND LEDGE3/SK9.1 SP-15 J K - E JC J J C E J- SP-02 K SP-09 K J - STEEL SLAPPY GRIND LEDGE11/SK9.1 J SP-16 J J E C E J E J SLAPPY MANUAL PAD4/SK9.1 SP-17 E SP-08 J K - J EL SEGUNDO C 12/SK9.1 PANNED LAUNCH RAMP SP-18 J CK RECREATION PARK - J J J J- K E C E J PHASE 1 IMPROVEMENT GENERAL NOTES: SP-19 STEEL MANHOLE COVER1/SK9.2 PROJECT SP-02 2/TFF!TIFFU!TL5/1!GPS!DPMPS!QMBO/ J J 14/SK9.0 E SP-20 ROLL-IN J E K SP-20 - J CJ-KJC 3/UIF!TMBC!DPOGJHVSBUJPO-!OPUFT-!MPDBUJPO!PG!FYQBOTJPO!KPJOUT-!DPME!KPJOUT-!TEEN CENTER TBX!DVUT-!EFUBJM!SFGFSFODFT-!BOE!BQQMJDBCMF!EFUBJMT!IBWF!CFFO!JODMVEFE! J K - J C SP-21 LA HIGH WALL GPS!DMBSJUZ/!KPJOUT!BOE!EFUBJMT!TIPXO!BSF!GPS!UIF!TLBUFQBSL!POMZ/!SFGFS! 8/SK9.1 AND TEEN JJ UP!UIF!MBOETDBQF!QMBOT!GPS!TDPQFT!CFZPOE!UIF!TLBUFQBSL/ EE J K - J C 4/TVHHFTUFE!PSEFS!PG!DPOTUSVDUJPO!GPS!DPODSFUF!FMFNFOUT!XJUIJO!UIF!PLAZA TLBUFQBSL!GPPUQSJOU; SP-01 JJ 405 E Grand Ave, J K!!!!!B/!TVCTVSGBDF!ESBJOBHF E-E J C !!!!!C/!TVCHSBEF!QSFQ!.!HSBEF-!NPJTUVSF!DPOEJUJPO-!BOE!DPNQBDU!TLBUFQBSL! El Segundo, CA 90245 C JJ K!!!!!!!!!GPPUQSJOU!UP!,0.!/2(!PG!TQFDJGJFE!TVCHSBEF!FMFWBUJPOT/ - J - C SP-02 K !!!!!D/!GJOF!HSBEJOH J JJ E J E K -!!!!!E/!MFEHFT!BOE!NBOVBM!QBET J C !!!!!F/!CBOLT!BOE!USBOTJUJPOT EJ !!!!!G/!HSJOE!SBJM!GPPUJOH!JOTUBMMBUJPO SP-01 SP-15 !!!!!H/!GMPPS!TMBC0GMBUXPSL JJ EE SP-02 EJ 5/BMM!FYQPTFE!DPODSFUF!BOE!TIPUDSFUF!TVSGBDFT!UP!CF!OBUVSBM!HSBZ!JO! DPMPS!XJUI!IBSE!TUFFM!USPXFM!GJOJTI!VOMFTT!PUIFSXJTF!TQFDJGJFE/ JJ EE SP-01 EJ JJ EE EJ SP-14 JJ J K SP-04 - J E E CC J SP-04 -K J CJ-KJ J K -J EJEJEJEJEJEJEJEJEJEJ -K JJ E C C J Issue dates SP-15 J J E K - J C EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ J K - JCJ-KJCJ-KJ C SP-20 J J EJ E J -K KJ C - J C SP-05 J EJ E EJEJ EJ J EJ CJ-KJ K - CJ-KJ JCJ-KJ JJJJJJ EJ CJ-KJC EEEEEE SP-18 SP-10 SP-18 J CJ-KJCJ-KJ E EJ EJ JEJEJ E J SP-11 SP-06 SP-02 E CJ-KJ J E CJ-KJ CJ-KJ CJ-KJ J SP-16 EJEJEJ E EJEJEJEJ SP-01 SP-01 JEJEJEJEJ EJEJ E J EJ SP-07 E CJ-KJ JJ SP-12 EE SP-02 CJ-KJ CJ-KJ CJ-KJ J EJ E J EE JJ E Sheet title: SP-02 J EJ E CJ-KJ INFORMATION J E CJ-KJ CJ-KJ PLAN J E SP-06 CJ-KJ EJ SP-05 J SP-19 E SP-05 CJ-KJ EJ SP-17 J E J EJ K EJ- CJ-KJ J C C J -K J SP-02 CJ-KJ SP-17 CJ-KJ EJEJEJ C J J J- K J E E SP-05 SP-03 CJ-KJCJ-KJ EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ CJ-KJ C J J E - SP-21SP-02 K J J SP-15 E CJ-KJ SP-13 J EJEJEJEJEJEJEJEJEJEJEJEJEJEJ EJEJEJE CJ-KJCJ-KJCJ-KJCJ-KJCJ-KJ EJEJEJEJ EJEJEJEJ EJEJEJE JEJEJEJ EJEJEJEJ 0'4'8' SK3.0 1 1 Scale: 1" = 4'-0" 5 NORTH 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 COLOR SCHEDULE HATCHCODE QTYDETAIL CAST-IN-PLACE CONCRETE TO BE NATURAL GRAY C-01 4,730 SF COLORED CAST-IN-PLACE CONCRETE TO BE "SOMBRA" 2,807 SF C-02 BY INCRETE COLOR SYSTEMS OR APPROVED EQUAL BRICK-STAMPED COLORED CAST-IN-PLACE CONCRETE TO BE C-03 87 SF "SOMBRA" BY INCRETE COLOR SYSTEMS OR APPROVED EQUAL STANDARD PAINT TO BE "WATER TOWER BLUE" C-04 3/SK9.3 127 SF ADD ALTERNATE COLORED CAST-IN-PLACE CONCRETE TO BE "PHILLY BLUE" BY 127 SF4/SK9.3 C-04C INCRETE COLOR SYSTEMS OR APPROVED EQUAL STANDARD PAINT TO BE "SMOKESTACK RED" C-05 34 SF1/SK9.3 STANDARD PAINT TO BE "WHITE" C-06 17 SF 1/SK9.3 C-07 STANDARD PAINT TO BE "BLACK"13 SF 2/SK9.3 COLORNOTES: C-01 1 CITY OF C-05 C-06 EL SEGUNDO 350 Main St, El C-02 Segundo, CA 90245 C-07 C-02 C-05 C-01 EL SEGUNDO C-06 C-01 RECREATION PARK PHASE 1 IMPROVEMENT C-02 PROJECT TEEN CENTER AND TEEN C-02 PLAZA C-01 405 E Grand Ave, El Segundo, CA 90245 C-01 C-01 C-02 SMOKE STACKSWATER TOWER LETTERING C-01 12 PAINT APPLICATIONPAINT APPLICATION C-02 C-01 Issue dates C-01 C-02 C-02 C-02C-02 2 C-01 C-01C-01 C-04 C-02 C-04C Sheet title: C-02 COLOR PLAN C-02 C-01 C-02 C-01 C-01 C-03 C-01 0'4'8' SK4.0 Scale: 1" = 4'-0" NORTH 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 0 1 1 CONSTRUCTION NOTES: 1 " 9 '-2 8 3 7 6 ° 7 ° 1 " 3 4 - ' 4 1 " 1 - 'CITY OF 3 1 " 0 1 - ' 7 EL SEGUNDO 1" " 0 " 0 2 -- ''350 Main St, El 44 1 - 5 3'7 " 8 ' - 8 4 -7 ' 3 Segundo, CA 90245 2 4 5" 1 '" - R11'-8" 4 0 34 " 0" - ' 4R5'-11" R4'-2" 1 1 7 '5 - '1 1 36'-1 -0' - 6 "8 2 1 3 4 4 " " " 1" R2'-6" 9 - '41 4 61- R3'-10" ' 2 1 '5 - " 0 1- ' 5 R7'-7"1" 4 '- 3 8 4 " " 8 " -2 ''- 3 3 1 1 7'-8" 1 4 EL SEGUNDO R4'-0" RECREATION PARK " 14 2 -PHASE 1 IMPROVEMENT ' 6 PROJECT " 7 9 ' -- ' 2 8 1 2 " TEEN CENTER R5'-5" 1 " 4'-8" 2 -4 ' 1 3 ' - AND TEEN 8 1 "R2'-4"4 " 8 - ' 0R1'-6" PLAZA 3 R4" " 3 4 '- 2 3 " " 405 E Grand Ave, 16 1 4 -- ' 1' 4 2'-0" El Segundo, CA 90245 R4'-0" 6 ' - R4" 0 " R4'-0" " 1 4 5 - ' 4 R1'-6" 1 L=4'-1" 2 " 9 '- 3 6 " 1" 4 -1 ' 1 1 2 R1'-0" 3 3 L=2'-10" R5'-5"'4 13'-7" " - 1 1 12 14'-2 1 " 15'-0" " 73 0'-2 4 1 ' - 1 1 -1 ' 1 4 " 1 R6'-2" 2 3 8 ' 2'-0"- 9 " 3 R " 1 1 41 3"- ' 1 L=4'-1" 4 6 2 - 6'-8"' 1 6'-1" 1 24'-9" 4 4 "3' 3- 9Issue dates 14 7'-0"1 R6'-0"' 4 - 1 2 R1'-4"" 0 3 3'-9" 2'-0" 1 1 4 R4'-0" "3'-2" L=2'-5" 1 '-4 41 1 2 32'-11" 4 R6'-6" 3 1 33'-6" 9'-2" 44 " 3 12" 34'-3" 4 34 7 5 ° 5'-9 1 " 6'-9 1 4 36'-0"6'-0" 18'-3" - 4 ' 1 0 17'-0"18'-4"19'-11" 1 2 1'-2" 1 R5'-5"7'-8" 12'-5"2'-0"1 2 2'-5" 2 4'-0"4'-0" 2'-0"2'-0" 111 " 7'-7"3'-1"7'-7" 5'-3"12 424 8'-0"8'-0" " 5'-0"34 7'-2 " 5'-1 34 6'-0"4'-0"6'-0" 1 3 9'-11 0'-7" 3'-2"2'-0"2'-0"2'-0" 4 4 1 21'-10" 2'-1" 1'-0" 3 18'-8" 34 3'-0" 0'-6"4 4 16'-0" 1 19'-10" 41 "6'-7" "4 14 14 6'-0"6'-0" " 22'-5 " 11'-11 34 14 10'-6 " 12'-8 34 Sheet title: 1'-0" " 14 3 16'-3 32'-6" LAYOUT PLAN 4 12'-0" 20'-6 " 3 34 11'-6"3'-0"6'-0"3'-0"9'-0" "4 34 1'-0" R1'-4" 14'-90'-6"1'-0" 7'-2 3 1 R3" 5'-3" 4 2'-0" 2 1 1 "3'-0"R5'-2" 6'-6" 1' 42- 60 ' -1 " "1 R5'-11" 2 8'-3 7 3 '2'-11" -1" 9 " 4 4 1" 7 "- 2' 15'-4"0 29 4'-0"3 -1 '1 6'-0" R6'-10"4 1 41 1 5'-2" 2 R4" 2 " 8'-1" 3 6 3 - 12'-0" '3'-0" 4 4 " 2 2'-0" 14 1 1 - 10'-9"' 4 4 31 13 7'-4"6'-0" 1 42 6'-0"7'-6"15'-4"4'-9" 1'-4" 24 4 0'4'8' SK5.0 1 1 Scale: 1" = 4'-0" 5 NORTH 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 DRAINAGE SCHEDULE CITY OF CODEDESCRIPTIONQTY EL SEGUNDO AREA DRAIN7 350 Main St, El 4" SDR 35 DRAIN LINE235 LF Segundo, CA 90245 GRADING NOTES 1.ALL GRADING SHALL BE IN ACCORDANCE WITH THE EL SEGUNDO LOCAL GRADING CODE AND ANY SPECIAL RECREATION PARK REQUIREMENTS OF THE GRADING PERMIT. PHASE 1 IMPROVEMENT 2.CONTRACTOR TO VERIFY GRADES AND NOTIFY OWNER'S CONSTRUCTION ADMINISTRATOR PRIOR PROJECT TO START OF GRADING WORK. 3.SLOPES SHALL BE NO STEEPER THAN 3' TEEN CENTER HORIZONTAL TO 1' VERTICAL (3:1) AND SHALL HAVE NOT LESS THAN 90% COMPACTION OUT TO THEIR AND TEEN FINISH SURFACES. 4.ALL PAVED AREAS SHALL SLOPE AS SHOWN ON PLANS WITH A 2% MAXIMUM FALL. PLANTED AREAS PLAZA SHALL HAVE A MINIMUM 2% FALL. 405 E Grand Ave, 5.FINISH GRADE SHALL HAVE A UNIFORM SURFACE, FREE OF LUMPS, BUMPS AND DEPRESSIONS AND El Segundo, CA 90245 ANY OBJECTS THAT MAY PREVENT A POSITIVE FLOW TO DRAIN. 6.ALL PROPOSED PAVING SURFACES SHALL MEET EXISTING PAVING SURFACES WITH SMOOTH AND CONTINUOUS TRANSITIONS AND FLUSH ALONG ENTIRE EDGE. 7.CONCRETE WALKS TO HAVE A MAXIMUM CROSS SLOPE OF 2% AND SHALL MEET ALL CITY AND COUNTY REQUIREMENTS. 8.PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS, EXISTING DRAINAGE STRUCTURES, PARKING LOT IMPROVEMENTS, AND FINISH FLOOR ELEVATIONS. NOTIFY THE OWNER'S CONSTRUCTION ADMINISTRATOR IMMEDIATELY UPON NOTING ANY DISCREPANCIES. 9.FINISH GRADE AT TURF AREAS SHALL BE ONE INCH BELOW FINISH SURFACE OF SIDEWALKS, CURBS OR PAVED AREAS. PLANTING AREA FINISH GRADE Issue dates SHALL BE 2" BELOW SAME UNLESS OTHERWISE SPECIFIED. 10.ALL CONSTRUCTION AREAS SHALL BE FREE OF ROCK, DEBRIS, ETC. ALL EXISTING WEEDS SHALL BE REMOVED. 11.CONTRACTOR SHALL MEET EXISTING GRADE AT GRADING LIMITS WITH A SMOOTH AND CONTINUOUS TRANSITION. GRADING LEGEND: EXISTING CONTOURS PROPOSED CONTOURS PROPOSED GRADE BREAK PROPOSED ELEVATIONS PROPOSED FLOW DIRECTION BSBOTTOM OF STEP FGFINISH GRADE FSFINISH SURFACE HPHIGH POINT INVINVERT ELEVATION (MAY CHANGE IN FIELD) Sheet title: PAPLANTING AREA TDTOP OF DRAIN GRADING & TLTOP OF LEDGE TPTOP OF PAD DRAINAGE PLAN TRTOP OF RAIL TSTOP OF STEP EXISTING ELEVATION (VERIFY IN FIELD) COPING NOTCH N O R T H 01'5'10' Scale: 3/16" = 1'-0" SK6.0 PLAN CHECK RESUBMITTAL #1 (10/17/25) Agreement No. 7590 DRAINAGE SCHEDULE CITY OF CODEDESCRIPTIONQTY EL SEGUNDO AREA DRAIN7 350 Main St, El 4" SDR 35 DRAIN LINE235 LF Segundo, CA 90245 5 3 GRADING NOTES ° 1.ALL GRADING SHALL BE IN ACCORDANCE WITH THE EL SEGUNDO LOCAL GRADING CODE AND ANY SPECIAL RECREATION PARK REQUIREMENTS OF THE GRADING PERMIT. PHASE 1 IMPROVEMENT 2.CONTRACTOR TO VERIFY GRADES AND NOTIFY OWNER'S CONSTRUCTION ADMINISTRATOR PRIOR PROJECT TO START OF GRADING WORK. 3.SLOPES SHALL BE NO STEEPER THAN 3' TEEN CENTER HORIZONTAL TO 1' VERTICAL (3:1) AND SHALL HAVE NOT LESS THAN 90% COMPACTION OUT TO THEIR 7 AND TEEN 4'-2" 8 FINISH SURFACES. @ 2.0% 4.ALL PAVED AREAS SHALL SLOPE AS SHOWN ON PLANS WITH A 2% MAXIMUM FALL. PLANTED AREAS PLAZA SHALL HAVE A MINIMUM 2% FALL. 405 E Grand Ave, 5.FINISH GRADE SHALL HAVE A UNIFORM SURFACE, FREE OF LUMPS, BUMPS AND DEPRESSIONS AND El Segundo, CA 90245 ANY OBJECTS THAT MAY PREVENT A POSITIVE FLOW TO DRAIN. 6.ALL PROPOSED PAVING SURFACES SHALL MEET EXISTING PAVING SURFACES WITH SMOOTH AND CONTINUOUS TRANSITIONS AND FLUSH ALONG ENTIRE EDGE. 7.CONCRETE WALKS TO HAVE A MAXIMUM CROSS SLOPE OF 2% AND SHALL MEET ALL CITY AND 7 COUNTY REQUIREMENTS. 18'-8" @ 2.0% 8 8.PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS, EXISTING DRAINAGE STRUCTURES, PARKING LOT 3 22'-6" @ 2.0% 4 IMPROVEMENTS, AND FINISH FLOOR ELEVATIONS. NOTIFY THE OWNER'S CONSTRUCTION ADMINISTRATOR IMMEDIATELY UPON NOTING ANY DISCREPANCIES. 9.FINISH GRADE AT TURF AREAS SHALL BE ONE INCH BELOW FINISH SURFACE OF SIDEWALKS, CURBS OR PAVED AREAS. PLANTING AREA FINISH GRADE Issue dates SHALL BE 2" BELOW SAME UNLESS OTHERWISE SPECIFIED. 10.ALL CONSTRUCTION AREAS SHALL BE FREE OF ROCK, DEBRIS, ETC. ALL EXISTING WEEDS SHALL BE REMOVED. 11.CONTRACTOR SHALL MEET EXISTING GRADE AT GRADING LIMITS WITH A SMOOTH AND CONTINUOUS TRANSITION. GRADING LEGEND: EXISTING CONTOURS PROPOSED CONTOURS PROPOSED GRADE BREAK PROPOSED ELEVATIONS PROPOSED FLOW DIRECTION 1 49'-3" @ 2.0% 8 BSBOTTOM OF STEP FGFINISH GRADE FSFINISH SURFACE HPHIGH POINT INVINVERT ELEVATION (MAY CHANGE IN FIELD) Sheet title: PAPLANTING AREA TDTOP OF DRAIN GRADING & TLTOP OF LEDGE TPTOP OF PAD DRAINAGE PLAN TRTOP OF RAIL TSTOP OF STEP TCTOP OF CURB TWTOP OF WALL EWEXISTING WALL COPING NOTCH EXISTING ELEVATION (VERIFY IN FIELD) N O R T H 01'5'10' Scale: 3/16" = 1'-0" SK6.1 PLAN CHECK RESUBMITTAL #1 (10/17/25) Agreement No. 7590 STEEL SCHEDULE CODEDESCRIPTIONDETAILFINISH 2-3/8" O.D. SCH. 40 STEEL COPINGHOT DIPPED 10/SK9.0 S-01 GALVANIZED 1.5 X 2 X 3/16" THICK STEEL EDGING HOT DIPPED S-02 8/SK9.0 GALVANIZED POWDER COAT FOLDED STEEL EDGING S-03 9/SK9.1 SKY BLUE RAL #5015 STEEL SLAPPY POWDER COAT S-04 4,11/SK9.1 SKY BLUE RAL #5015 SLAPSLAP GRIND RAIL POWDER COAT S-05 20TL:/2 1/SK9.0 SKY BLUE RAL #5015 STEEL PANNED ELEMENT POWDER COAT S-06 10,12/SK9.1 SKY BLUE RAL #5015 POOL COPING TEDDERSTONE S-07 12/SK9.0 PCPCPCPC STD BULLNOSE 2" STEEL STRAP POWDER COAT S-08 9/SK9.0 SKY BLUE RAL #5015 CITY OF EL SEGUNDO STEEL NOTES: 350 Main St, El 4 7 ' - 7 3 Segundo, CA 90245 R11'-8" 4 " 1 R5'-10" 2 1" 4 4 - ' 5 3 " 6 -4 ' "1 2 '- 3 1 EL SEGUNDO 3 " RECREATION PARK 1 1 4 - ' 1 PHASE 1 IMPROVEMENT PROJECT " 9 - ' 8 TEEN CENTER R5'-5" AND TEEN 1 ' -PLAZA 1 1 3 4 "" " 405 E Grand Ave, 66 -- '' 44 El Segundo, CA 90245 R4'-0" 6 ' - 0 R4'-0" " " 1 4 5 - ' 4 1 ' - 1 1 " 3 9 '- 4 6 " C P P 13'-6" C 1 1 1 "C P' 7- '-2 R5'-5"7 4 1 " P 1C P "C 1 -4 ' 1 2 C P 8 3 ' -" 9 1 4 1 C "-3 'P 1 R6'-2" 4 P C P C 1 C 3 P 5 ° 1 3 45 ° ' - Issue dates 1 0 3 4 " 1 32'-10" 4 11 6'-11" (T/SK8.1)6'-11" (T/SK8.1) 44 1 12'-8" (O/SK8.0) 2 4'-0" 2'-0" 5'-3" 8'-0" " 2 - ' R2'-0" 2 6'-0"4'-0"6'-0" " 1 4 SLAPSLAP 7 "31 13'-2" (Q/SK8.0)6'-7" 4 42 - ' 0 1 1 R47'-4" 2 6'-0" " 14 12'-8 Sheet title: STEEL PLAN 2 'R2'-0" - 2 3 11'-6"9'-0" " 4 " SLAPSLAPSLAP 12 1'-3 5'-3" " 1 2 3 1 - ' R5'-11" SLAP 2 8 " 1 5 1"- 2'-0" ' 2 4 9 9 1 11'-6" (R/SK8.1) 40'-1" 2 " 3 " 6 R4" 0-4 ' - ' 2 2 0'4'8' SK7.0 Scale: 1" = 4'-0" NORTH 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 1 3'-0"12'-0" 4 11 6"3'-0"8'-5" 22 1 3'-0"10'-0" 4 3 ' -° 1 7 D1 " 7 1'-2"8'-10" 3'-0" 11 2'-9"6'-0" 24 FYJTUJOH E EXISTING SFUBJOJOH!XBMM RETAINING 5'-10" 6'-4" WALL 3 ° ' 4-° V D2 8 '0W 1 0 - 4 5 12 5 " 2'-10" 4 " 8'-10" U 3'-4"3'-4"9'-4" 1 SECTION A1F 2'-0"6'-5" 2M2 C TRANSITION BEHIND M1 5'-10" R7'-0" 1 3'-6" 6"6"R7'-0" 2 G 6"3'-0" VARIES SEEVARIES SEE 2'-6" GRADING PLANGRADING PLAN4 N ' - 1 1 8" 2 8" " B O T 5"5" 6"6" "H P 6 2'-8"2'-0" S1 4'-8" S2 Q A2 CITY OF I SECTION A1SECTION A2 J4 A1 EL SEGUNDO 350 Main St, El A3 R 1 Segundo, CA 90245 22'-5" 4 1 5'-3"11'-11"5'-3"J3J2J1 4 LK 1 10'-2" 2 EXISTING RETAINING WALL R10'-6" 2 "2'-0" ' EL SEGUNDO - 2 3'-0"2 - ' 1'-6"8'-8" " 2 RECREATION PARK 3 R2'-0" R2'-0" 6'-2"6'-9" 4 PHASE 1 IMPROVEMENT 6" 2'-0" 6" 6'-4"PROJECT 5" 6" TEEN CENTER R7'-0" R11'-6" R6"R6" 3'-4"6" VARIES SEE 2'-6"2'-6"AND TEEN GRADING PLAN 8"8" PLAZA " " 5"5"5"6 5" 6"6"6"6" 6 405 E Grand Ave, El Segundo, CA 90245 SECTION BSECTION C SECTION A3 1 4'-10" 4 2'-6"2'-4" EXISTING RETAINING WALL 1 Issue dates 17'-1" 4 3 3 5'-6"R16'-0" 4" 8'-6" 3 R 4 0 1'-6"4'-0"- 4'5'-0" 96" 9 ' EXISTING - 0 R " RETAINING R4'-0" "" R4'-0" WALL 1212 R8'-0" R1'-0" R8'-0"1'-91'-9 8" 5"5"5"5" 6"6"6"6" VARIES SEE GRADING PLAN 6" 4'-10" SECTION D1SECTION D2 SECTION E VARIES SEE GRADING PLAN NEW WALLNEW WALL BY OTHERSBY OTHERS 7'-8" 11 5'-2"2'-5" 22 NEW WALLNEW WALL 7'-8" 11 BY OTHERSBY OTHERS Sheet title: 4'-7"3'-0" 22 SECTIONS 1 R5'-0" 2'-0" 6" 2 3'-0"R5'-0" 2'-0" 7 8" 2 8" VARIES SEEVARIES SEE 1'-0"°1'-0" 66 "" GRADING PLANGRADING PLAN 5"5"5" 6"6"6"6" 5" SECTION FSECTION GSECTION HSECTION I 0'2'4' SK8.0 Scale: 1" = 2'-0" 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 D1 E EXISTING EXISTING RETAINING RETAINING WALL WALL V D2 W U F M2 C M1 11 10'-3"10'-3" 22 11 2'-0"4'-0"4'-3"2'-0"3'-8"4'-7" 22 11 2'-10"1'-3" 2"2" 1212 G "" 1111 1212 10" R9'-3" N 6" 11 VARIES SEE 1'-31'-3 5"5" 22 GRADING PLAN B O T 5"5" 6"6" H ° P 6 7 S1 S2 Q A2 SECTION J1SECTION J2 CITY OF I J4 A1 EL SEGUNDO 350 Main St, El A3 R Segundo, CA 90245 J3J2J1 LK EXISTING RETAINING WALL 3163C CAST IRON MANHOLE COVER EL SEGUNDO SOURCED FROM LONG BEACH IRON WORKS (www.lbiw.com) RECREATION PARK OR SIMILAR VENDOR PHASE 1 IMPROVEMENT 1 10'-3" 2 PROJECT 1 3 2'-0"8'-3" 2 32'-6" 4 TEEN CENTER 3 3 11'-6"12'-0"9'-0" 4 3'-8"2'-11"1'-0"6" 4 R10'-0"R10'-0" 10" 3'-0"6'-0"3'-0"AND TEEN 111 VARIES SEE 5"5"5" 222 GRADING PLAN PLAZA 5"5"5" 6"6"6" 7 °° 6 66 ° 405 E Grand Ave, 77 El Segundo, CA 90245 SECTION J3SECTION J4 EXISTING EXISTING RETAININGRETAINING BRICK STAMP WALLWALL PATTERN ON FLAT BANK SECTION 3 4'-8" 4 1 1 6'-6" 4'-10" 4 2 1 3 1 4" 1'-9"2'-11"6"11 4 1 4 4 6'-0"4'-10"11"11"2'-8" 424 2 5"5" 6"6" ° ' - R3'-0" 2 °5 " 7 810" 5 1 Issue dates R7'-0"R3'-8" 4 8" 1 2'-6"2'-6"2'-6" 2'-6"1 R17'-1" 2 R1'-4" "2 6 8" 8"8" VARIES SEEVARIES SEE 8" " GRADING PLANGRADING PLAN 6 5"5"5"5" 6"6"6"6" " " 6 6 SECTION KSECTION LSECTION M1SECTION M2 1 12'-8" 2 2 ' "- -01 '1 1 1 2 " BANK BEYOND 1 3 3 3 12'-0" °4 12'-0" 4 ° 3 6" 6"5 3 4 R6" 1'-6" 4 5'-5"2'-0"2'-0"2'-0" 4 Sheet title: 1 1 5"5"5" 6"5 6"6"6" ' 4 - " 6 ° 3 SECTIONS 4 4'-0"6" 1'-2" " 6" R6'-6" " 2'-6"12 2'-6" R6'-6" 6 8" " 1'-5 8"6 1'-0" " 5"5"5" 6"6"6" 1'-2" SECTION NSECTION OSECTION P 0'2'4' SK8.1 Scale: 1" = 2'-0" 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 D1 E V D2 W U F M2 C M1 1 GRIND LEDGE 19'-10" 43 12'-0" SECTION J1/SK8.0 4 31 13'-2"6'-7" 421 10'-8" 4 G 7" N 1 1 0 " '-5 3 4°B 1"O T °9 ' - 69 " -4 ' 1 H 1 R6'-6"P S1 5" 6" 1 9" 2 S2 3 Q A2 " 1'-4" 1'-4" CITY OF I 1'-8" J4 A1 EL SEGUNDO 1'-8" 5"2'-2" 6" 350 Main St, El 5" 6" A3 1'-4"R Segundo, CA 90245 11 1 10'-0"1'-6" 6'-3"6'-10"5'-9" 244 6" J3J2J1 3"3"3"3" LK SECTION R SECTION Q EL SEGUNDO RECREATION PARK PHASE 1 IMPROVEMENT PROJECT TEEN CENTER AND TEEN PLAZA 405 E Grand Ave, El Segundo, CA 90245 16'-0" 1 7" 4 6'-0"4'-0"6'-0" 313 7'-5"3'-4"7'-5" 424 5"4" ° 1'-6"1'-6" 5"6" 7 8"8" 1'-2" 1'-2"9"7 1'-8" 5"5" 5"5"5"5" 6"6"6"6"6"6" 11 5'-6"7'-3"5'-6" 22 6" SECTION S1SECTION S2 SECTION T Issue dates 11'-9" 6" 1 11 7'-2" 2 3'-4"7'-10" 42 5"5" 6"6" R7'-0" 4'-6"1 12'-6" 2 1 8"11'-4"6" 2 7'-0" " R8'-0" 6 8"3 R6'-7" 4 6 " 5"5" 6"6" Sheet title: BOWL DRAIN BOWL DRAIN CENTERLINECENTERLINE R52'-0"SECTIONS 2'-6" SECTION U " 6 R7'-10" SECTION V SECTION W 0'2'4' SK8.2 Scale: 1" = 2'-0" 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 TYPICAL CONCRETE ZURN FD2210-PV4-NTCOMPACTED EXPANSION TYPICALPVC DRAINLINE, FLATWORK *4000 PSI SUBGRADE JOINTADJUSTABLE FLOOR CONCRETE90 DEG ELBOW. CONCRETE DRAIN WITH 5" "TYPE FLATWORKINVERT ELEVATION *SKATEPARK SURFACE TO HAVE STEEL PRE-COMPRESSED FLATWORK4000 PSI CONCRETEBASE COURSE B" NICKEL BRONZE PER GRADING PLAN. HARD-TROWEL FINISH. CEASE TROWELING EXPANSION MATERIAL WITH #3 FLATWORK WITH #3 COLD ORSTRAINER, OR BEFORE SURFACE BECOMES GLOSSY. DO 1/2" DECK-O-FOAM OR REBAR @ 16"REBAR 16" O.C. BW APPROVED EQUAL. EXPANSION NOT TROWEL BURN SURFACE. SIMILAR O.C. BW JOINTINSTALL PER SLIP DOWEL MANUFACTURER'S EXPANSION JOINT. 1/8" BASE COURSE, 4" SLEEVE FOR RECOMMENDATIONS. **DIMENSION SHALL BE 1" BELOW FINISH TOOLED EDGE. APPLY DEEP MIN.BASE COURSE SLIP DOWEL ORSLOPE TO SURFACE IF SLAB EDGE IS ADJACENT TO POLYURETHANE BASED 2" CLR. MIN. TOP OF DRAIN. DRAIN, TYP. WRAP/GREASE COMPACTED TURF OR 2" BELOW FINISH SURFACE IF SLAB 1/2" TOOLEDNON-SAGGING TYP.SEE GRADING PLAN ONE END SUBGRADE EDGE IS ADJACENT TO PLANTING AREA EDGE OR STEELELASTOMERIC SEALANT EDGING. SEETYPICALAND TOOL FLAT 1/2" SMOOTH 1/2" TOOLED STEEL PLANCONCRETE DOWEL OR EDGE AT FG CONCRETE SKATE FOR LOCATION.FLATWORK REBAR DROP. ONLY ELEMENT SPACE 2'-6" O.C. ADJUSTABLE COMPACTED ALONG JOINT SLIP DOWEL PVC OUTLET SUBGRADE CONNECTION 9"9" 1% MIN SLOPEBASE COURSE TO OUTFALL SDR-35 DRAIN 1'-6" COMPACTED 6" LINE, TYP. SEE 3"9" SUBGRADE GRADING + DRAINAGE PLAN FOR MORE INFO. CITY OF SLAB EDGESLIP DOWELTURNDOWN EDGE AT FSAREA DRAINEXPANSION JOINT EL SEGUNDO 12345 1 1/2" = 1'-0"P-PIP-ELS-011 1/2" = 1'-0"P-PIP-ELS-071" = 1'-0"P-PIP-ELS-021 1/2" = 1'-0"P-PIP-ELS-101" = 1'-0"P-PIP-ELS-05 350 Main St, El TYPICAL CONCRETE SEE STEEL PLAN FOR Segundo, CA 90245 NOTE: CONSTRUCTION JOINT MAY BE BUILT AS1/8" MIN. ROUTED1/8" MIN. ROUTEDSEE STEEL PLAN FOR FLATWORK FABRICATION + FINISH NOTESEDGE GROUNDFABRICATION + FINISH NOTES EITHER COLD JOINT OR KEY JOINT OPTION. IT ISEDGE GROUND *4000 PSI CONCRETE FLAT WORK SMOOTH UP TO THE CONTRACTOR'S DISCRECTION.SMOOTH WITH #3 REBAR @ 16" O.C. BW 1/8" SAW CUT - FILL JOINT WITH SELF LEVELING 1/8" TOOLED EDGE BOTH SIDES. FILL 1.5" x 2" x 3/16" THICK2" x 2" x .120" THICK SEALANT AND TOOL JOINT WITH SELF LEVELING SEALANT AND STEEL STRAP EDGING STEEL EDGING FLAT. PROTECT TOOL FLAT. PROTECT SURROUNDING -SEE STEEL PLAN FOR -SEE STEEL PLAN FOR SURROUNDING SURFACE SURFACE FROM EXCESS SEALANT. PRIOR LOCATION LOCATION FROM EXCESS SEALANT. TO SEALING JOINT, PREP CONCRETE BY CUTTING JOINT 1/8" WIDE x 1/4 DEPTH OFCOPING ANCHOR, 3/8" X 2"COPING ANCHOR, 3/8" X 4" MIN. NELSON STUD4" MIN. NELSON STUD 2" CONCRETE OR SIMILAR @ 18" O.C. OR SIMILAR @ 18" O.C. EL SEGUNDO COMPACTED SUBGRADE 1/8" TOOLED EDGE RECREATION PARK 1/8" TOOLED EDGE SLIP DOWEL BOTH SIDES BOTH SIDES PHASE 1 IMPROVEMENT KEY JOINT 1-5/8" O.D. 9" TYPICAL STEELTYPICAL STEEL PROJECT REINFORCEMENT REINFORCEMENT 1'-6" BASE COURSE SKATE ELEMENT SKATE ELEMENT TEEN CENTER KEY JOINT COLD JOINT AND TEEN VARIES,SEE SECTIONS PLAZA 405 E Grand Ave, SAWCUT JOINTCOLD JOINT / KEY JOINTSTEEL EDGINGSTEEL STRAP El Segundo, CA 90245 6789 3" = 1'-0"P-PIP-ELS-061" = 1'-0"P-PIP-ELS-333" = 1'-0"P-PIP-ELS-193" = 1'-0"P-PIP-ELS-27 POOL COPING BLOCK 1/8" TOOLED EDGE BOTHCONCRETE CYLINDER FOOTING. 8' O.C. ALONG POOL COPING SEE STEEL PLAN FOR FABRICATION + FINISH NOTES VARIES, SEE LAYOUT PLAN & SECTIONS MFR: TEDDER STONE OR APPROVED EQUAL SIDES OF COPINGBACK OF COPING & WHERE NEEDED ALONG SMALLER RADII BLOCK. INSTALL PER TYPICAL CONCRETE COLOR: NATURAL GRAY MANUFACTURERS FLATWORK FS STEEL COPING - SEE STEELSPOT WELD TO COPING RECOMMENDATIONS. CONSTRUCTION NOTE: WHEN BUILDING SLAB/DECK BEHIND TILE BAND PLAN FOR LOCATION BASE COURSE COPING CONSTRUCTION JOINT, FIRST SATURATE SURFACE DRY MFR: NATIONAL POOL TILE OR APPROVED EQUAL TURN REBAR OUT 45 DEG APPLY 1/4" BED OF (SSD) PREVIOUSLY PLACED CONCRETE MATERIAL AND THEN CONSTRUCTION JOINTSIZE: 1"X1" SQUARE TILE COMPACTEDSPEC MIX BELOW UTILIZE SHOTCRETE PLACEMENT METHOD FOR THE INITIAL HAND SHAPED PRIOR TOCOLOR: DISKO BAY - ICEBERG WHITE COPING BLOCK SUBGRADE FRESH MATERIAL TO THE EXISTING MATERIAL OF DECK/SLAB CONCRETE CURING BEHIND COPING FOR PROPER PLACEMENT AND CONSOLIDATION EXPANSION JOINT STEEL COPING AT THE CONSTRUCTION JOINT. TYPICAL STEEL REINFORCEMENT 4000 PSI SHOTCRETETYPICAL 1'-0" REINFORCEMENT WITH #3 REBAR @ 12" BOWL TRANSITION 1/4" TYP. REVEAL O.C. BW COMPACTED COPING ANCHOR, 3/8" X 4" SLIP DOWELSUBGRADE MIN. NELSON STUD OR SIMILAR@ 18" O.C.COPING TO COLD JOINT OVERHANG 8" CONCRETE CYLINDER (2) #3 REBAR TIES TO FINISHED WALL 3/8" FOOTING SUPPORT COPING PRIOR MAX 6" TILE BAND. TO CONCRETE PLACEMENT FS TILE SET IN MORTAR CONSTRUCTION JOINT Issue dates BED AND FLUSH TYPICAL CONCRETE WITH SHOTCRETE FLATWORK WALL. BASE COURSE BASE COURSE 6" 6" COMPACTED SUB-GRADE STEEL COPINGTYPICAL QUARTERPIPEPOOL COPING 101112 1" = 1'-0"3/4" = 1'-0"1 1/2" = 1'-0" P-PIP-ELS-21P-PIP-ELS-08P-PIP-ELS-60 VARIES, SEE SECTIONS + LAYOUT TYPICAL CONCRETE TYPICAL CONCRETE FLATWORK4000 PSI SHOTCRETE WITH #3 REBAR @ 12" O.C. B.W.COLD JOINT / KEY JOINTTYPICAL CONCRETE4000 PSI SHOTCRETE FLATWORK FLATWORKWITH #3 REBAR @ 12" 6" BASE COURSECOMPACTED SUB-GRADESLIP DOWEL FSO.C. BW BASE COURSE STEEL EDGING COMPACTED SUBGRADE COMPACTED STEEL COPING SUBGRADE SEE LAYOUT & SECTIONS VARIES, SEE SECTION + LAYOUT EXPANSION JOINT 6" 4000 PSI SHOTCRETE WITH #3 REBAR @ 12"FS BASE COURSE O.C. BW SLIP DOWEL COLD JOINT / KEY JOINT 8" MAX 8" FS MAX FS Sheet title: CONSTRUCTION TYPICAL RADIUS WEDGETYPICAL ROLL-INTYPICAL QUARTERPIPE EXTENSION DETAILS 131415 3/4" = 1'-0"3/4" = 1'-0"1" = 1'-0" P-PIP-ELS-31P-PIP-ELS-32P-PIP-ELS-30 SK9.0 90% CD SUBMITTAL (08/20/25) Agreement No. 7590 4000 PSI CONCRETE4000 PSI CONCRETE 4000 PSI CONCRETE WITH SEE STEEL PLAN FOR WITH #3 REBAR @WITH #3 REBAR @ 12" #3 REBAR @ 16" O.C. B.W. FABRICATION + FINISH 16" O.C. B.W.O.C. B.W. NOTES BASE COURSE SIZE VARIES, SEE (2) #3 REBAR 6" COMPACTED SECTIONS + LONG. DRILLEDSUBGRADE COMPACTED STEEL PLAN THROUGH + VARIES, SEE SECTIONS SUBGRADE SLIP DOWEL CROSSED ABOVE TO 4000 PSI SHOTCRETE SEE SECTIONS FS EXPANSION JOINT STABILIZEWITH #3 REBAR @ 12" O.C. BWSLOPE STEEL EDGING CONCRETE FOOTING SLIP DOWEL BASE COURSE BASE COURSECOLD JOINT / KEY 8" JOINT COMPACTED MAX SUBGRADE EXPANSION JOINT FS GRIND RAILFOLDED STEEL EDGING 6" 1'-0" CITY OF TYPICAL GRIND RAIL FOOTINGTYPICAL EURO GAPGRIND LEDGE EL SEGUNDO 123 1" = 1'-0"P-PIP-ELS-153/4" = 1'-0"P-PIP-ELS-223/4" = 1'-0"P-PIP-ELS-63 350 Main St, El DISTANCE OF ANCHOR PRECAST BOLLARD BY4000 PSI CONCRETE 4000 PSI CONCRETE Segundo, CA 90245 POST ABOVE + BELOW BELSON OUTDOORS ORWITH #3 REBAR @ 12" SEE STEEL PLAN FOR FLATWORK WITH #3 REBAR 4000 PSI CONCRETE WITH GRADE DETERMINED BY SIMILARO.C. FABRICATION + FINISH NOTES @ 16" O.C. BW #3 REBAR @ 12" O.C. B.W. SKATEPARK BUILDER. ANCHOR POST 1'-6"L x 2-7/8 DIA. SUPPLIED BY STEEL EDGING EXPANSION JOINT OTHERS SEE SLIP DOWEL4000 PSI CONCRETE WITH #3 QUICK SET CONCRETE E E S S,SECTIONSSEE SECTIONS IE RREBAR @ 12" O.C. BW A OR GROUTV S N O TI BASE COURSEC E S BASE COURSE EXPANSION JOINT COMPACTED SUB-GRADE COMPACTED BASE COURSESEE SEE SUBGRADE EL SEGUNDO FOLDED STEEL EDGING SECTIONS SECTIONS 4000 PSI CONCRETE COMPACTED SUBGRADE RECREATION PARK VARIES - SEE SECTIONS FLATWORK WITH #3 REBAR @ 16" O.C. B.W. 3" PHASE 1 IMPROVEMENT PROJECT TEEN CENTER AND TEEN 2'-0" THICKENED SLAB PLAZA 405 E Grand Ave, SLAPPY MANUAL PADSPHERE BOLLARD RAKED GRIND LEDGE El Segundo, CA 90245 456 3/8" = 1'-0"P-PIP-ELS-541" = 1'-0"P-PIP-ELS-671/2" = 1'-0"P-PIP-ELS-09 1/8" MIN. ROUTED SEE STEEL PLAN FOR 4000 PSI CONCRETE WITH #3 REBAR4000 PSI CONCRETE FLATWORK SEE SECTIONS EDGE GROUNDFABRICATION + FINISH NOTES WITH #3 REBAR @ 16" O.C. BW CONTINUOUS BW @ 12" O.C. SMOOTH VARIES -SEE SECTIONS & LAYOUT PLAN BASE COURSE COMPACTED SUB-GRADE 3/16" THICK FOLDED NS IO CT SE E SE STEEL EDGING - SEE STEEL STRAP BASE COURSE STEEL PLAN FOR SEE VARIES - SEE LOCATION SLIP DOWEL4000 PSI SHOTCRETE WITH #3SECTIONS SECTIONS REBAR @ 12" O.C. BW COPING ANCHOR, 3/8" X COLD JOINT 4" MIN. NELSON STUD SLIP DOWEL OR SIMILAR @ 18" O.C. COMPACTED SUB-GRADE 1/8" TOOLED EDGE COLD JOINT BOTH SIDES VARIES, SEE TYPICAL STEEL SECTIONS REINFORCEMENT SKATE ELEMENT Issue dates BANKED TURNLA HIGH WALLFOLDED STEEL EDGING 789 3/4" = 1'-0"3/4" = 1'-0"3" = 1'-0" P-PIP-ELS-97P-PIP-ELS-52P-PIP-ELS-18 TYPICAL PANNED LEDGESEE STEEL PLAN FOR 4000 PSI CONCRETE WITH #3 4000 PSI CONCRETE#3 REBAR @ 8" O.C. SHORTSEE STEEL PLAN FOR FABRICATION AND FINISH NOTES 4000 PSI CONCRETE WITH #4 REBAR CONTINUOUS BOTH WAYS @ 12" O.C. BW SEE STEEL PLAN FOR FABRICATION + SECTION A-A VIEWFABRICATION + FINISH REBAR @ 16" O.C. B.W. FLATWORK WITH #3WAY IN LEGS FINISH NOTES NOTES 2" REBAR @ 16" O.C. BWEXPANSION JOINT SLIP DOWEL SLAPPY LEDGE TO BE FILLED WITH SLIP DOWEL #3 REBAR LONG BAR @ 6".125" STEEL WALL WITH 1/8" MIN. ROUTED EDGE GROUND SMOOTH CONCRETE OR EXPANSION FOAM O.C. PRIOR TO SETTING STEEL SLAPPY CURB. 1/8" / 11 GA 4000 PSI CONCRETE FLATWORK 2'-0" STEEL WALL WITH 1/8" MIN. #3 REBAR SHORT BAR @ SEE SECTIONS VARIES, SEE SECTIONS ROUTED EDGE GROUNDBASE COURSE 12" O.C. SMOOTH COMPACTED SUB-GRADE 11GA .120" THICK STEEL WALL WITH 1/8" MIN. ROUTED EDGE GROUNDA SMOOTH PROVIDE VERT. BAR A SUPPORTS WELDED TO 8" STEEL PAN @ 18" O.C. ALONG LONG BARS SLIP DOWEL @ 16" O.C. 5" BASE COURSE COMPACTED SUBGRADE SEE SECTIONS Sheet title: 5" EXPANSION JOINT SEE SECTIONS CONSTRUCTION RAKED PANNED GRIND LEDGESTEEL SLAPPY GRIND LEDGEPANNED LAUNCH RAMP DETAILS 101112 3/4" = 1'-0"1 1/2" = 1'-0"3/4" = 1'-0" P-PIP-ELS-12P-PIP-ELS-13P-PIP-ELS-46 SK9.1 90% CD SUBMITTAL (08/20/25) Agreement No. 7590 BASE COURSE 4000 PSI CONCRETECOMPACTED 3163C CAST IRON MANHOLE FLATWORK WITH #3SUBGRADE COMPACTED COVER SOURCED FROM LONG REBAR @ 16" O.C. B.W. SUBGRADE BEACH IRON WORKS (www.lbiw.com) 4000 PSI SHOTCRETE WITH SEE SECTIONS OR SIMILAR VENDORSTEEL#3 REBAR @ 12" O.C. BW STRUCTURAL EDGING FOAM FILL - TO FOLDED STEEL EDGING BE EPS15 OR STEEL BASE COURSESIMILAR STRAP VARIES, SEE VARIES, SEE SECTIONS SECTIONS COMPACTED SUBGRADECOLD JOINT EXPANSION JOINT EXPANSION JOINTEXPANSION JOINT VARIES SEE SECTIONS BASE SLIP DOWEL COURSE SLIP DOWEL 4000 PSI CONCRETE WITH #3 REBAR CONTINUOUS BW @ 12"4000 PSI O.C.CONCRETE FLATWORK EXISTING RETAINING WALL WITH #3 FS REBAR @16" O.C. BW 4000 PSI CONCRETE WITH #3 REBAR @12" CITY OF O.C. BW STEEL MANHOLE COVERSMOKE STACKSTYPICAL RADIUS WEDGE EXTENSION EL SEGUNDO 123 1/2" = 1'-0"P-PIP-ELS-981/2" = 1'-0"P-PIP-ELS-991" = 1'-0"P-PIP-ELS-16 350 Main St, El BASE COURSE Segundo, CA 90245 COMPACTED SUBGRADE SEE SECTIONS FOLDED STEEL EDGING STEEL COPING COLD JOINT SLIP DOWEL EXPANSION JOINT EL SEGUNDO 4000 PSI CONCRETE FLATWORK WITH #3 RECREATION PARK REBAR @ 16" O.C. B.W. PHASE 1 IMPROVEMENT 4000 PSI CONCRETE WITH #3 REBAR @$5 12" O.C. B.W.PROJECT TEEN CENTER AND TEEN PLAZA 405 E Grand Ave, BANKED EXTENSION - WATER TOWER El Segundo, CA 90245 4 3/8" = 1'-0"P-PIP-ELS-100 Issue dates Sheet title: CONSTRUCTION DETAILS SK9.2 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 1 22'-5" 4 1 5'-3"11'-11"5'-3" 4 " 1'-9" 12 9" 11 3'-0" 1 1'-6"1'-4" 2 1'-0" 1'-8" 3 2" 4 11 1'-6"8'-11"1'-6" 44 5'-0"1'-8" CITY OF 3'-4" EL SEGUNDO 350 Main St, El 1'-8" Segundo, CA 90245 1'-8"5'-0"1'-8" EL SEGUNDO SMOKE STACKS PAINT APPLICATION 1 RECREATION PARK 1" = 1'-6" 1'-0"1'-0" PHASE 1 IMPROVEMENT 6'-0"PROJECT TEEN CENTER "EL SEGUNDO" TEXT PAINT APPLICATION STANDARD PAINT TO BE "SMOKESTACK RED" 2 1" = 1'-6" AND TEEN STANDARD PAINT TO BE "WHITE" STANDARD PAINT TO BE "BLACK" PLAZA "EL SEGUNDO" TYPEFACE IS BODONI BOLD. LETTERS @ 12" TALL 405 E Grand Ave, El Segundo, CA 90245 11 22'-5"22'-5" 44 11 5'-3"11'-11"5'-3"5'-3"11'-11"5'-3" 44 11 10'-2"10'-2" 22 Issue dates R10'-6"R10'-6" 22 "" 3'-0"3'-0" '' -- 22 22 -- '' "" 22 R2'-0"R2'-0" R2'-0"R2'-0" 6'-4"6'-4" 1'-9"1'-9"1'-9"1'-9" 3'-4"3'-4" R2'-0"R2'-0"R2'-0"R2'-0" 22 "" '' -- 22 22 -- '' "" 22 11 '"'" -- 00 00 -- "'"' 11 """" 34343434 2'-42'-42'-42'-4 Sheet title: 1'-0"6'-0"1'-0"1'-0"6'-0"1'-0" CONSTRUCTION DETAILS WATER TOWER BLUE PAINT ADD ALTERNATEE BC WATER TOWER BLUE CONCRETE 34 1" = 1'-6"1" = 1'-6" ALT OPTION: COLORED CAST-IN-PLACE CONCRETE STANDARD PAINT TO BE "WATER TOWER BLUE" (68.5 SF) TO BE "PHILLY BLUE" BY INCRETE COLOR SYSTEMS OR APPROVED EQUAL EL SEGUNDO_SKATEPARK_102025-17.3dm CAST-IN-PLACE CONCRETE TO BE NATURAL GRAYCAST-IN-PLACE CONCRETE TO BE NATURAL GRAY 0'3'6' SK9.3 Scale: 1" = 1'-6" 10/21/2025 4:17 PM 100% CD SUBMITTAL (10/21/2025) Agreement No. 7590 BEE!BMUFSOBUF!B!)SFUSPGJU* Agreement No. 7590 BEE!BMUFSOBUF!B!)SFUSPGJU* Agreement No. 7590 BEE!BMUFSOBUF!B!)SFUSPGJU* Agreement No. 7590 BEE!BMUFSOBUF!B!)SFUSPGJU* Agreement No. 7590 BMUFSOBUF!B BEE!BMUFSOBUF!C!)OFX* Agreement No. 7590 BMUFSOBUF!B BEE!BMUFSOBUF!C!)OFX* Agreement No. 7590 BMUFSOBUF!B BEE!BMUFSOBUF!C!)OFX* Agreement No. 7590 BMUFSOBUF!B BEE!BMUFSOBUF!C!)OFX* Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 CITY OF EL SEGUNDO 350 Main St, El Segundo, CA 90245 11 22'-5"22'-5" 44 11 5'-3"11'-11"5'-3"5'-3"11'-11"5'-3" 44 1 10'-2" 2 EL SEGUNDO RECREATION PARK PHASE 1 IMPROVEMENT " 1'-9" 1 2 R10'-6" PROJECT 9" 11 2 " 3'-0"3'-0"' - 2 2 - ' " 2 TEEN CENTER 1 1'-6" 1'-4" 2 1'-0" R2'-0" R2'-0" AND TEEN 3 2" 6'-4" 4 PLAZA 11 1'-6"8'-11"1'-6" 44 405 E Grand Ave, 1'-9"1'-9" El Segundo, CA 90245 3'-4"3'-4" R2'-0"R2'-0" 2 " ' - 2 2 - ' " 2 1 " '- 0 0 - "' 1 "" 44 33 2'-42'-4 1'-0"1'-0" 6'-0"1'-0"6'-0"1'-0" Issue dates C ADD ALTERNATE C: WATER TOWER BLUE CONCRETE B "EL SEGUNDO" TEXT PAINT APPLICATION 24 1" = 1'-6"1" = 1'-6" STANDARD PAINT TO BE "BLACK" ALT OPTION: COLORED CAST-IN-PLACE CONCRETE TO BE "PHILLY BLUE" BY INCRETE COLOR SYSTEMS OR APPROVED EQUAL "EL SEGUNDO" TYPEFACE IS BODONI BOLD. LETTERS @ 12" TALL CAST-IN-PLACE CONCRETE TO BE NATURAL GRAY Sheet title: CONSTRUCTION DETAILS BEE BMUFSOBUF!DC )XBUFS!UPXFS JOUFHSBM!DPMPS* 0'3'6' 0'3'6' Scale: 1" = 1'-6" SK9.3C C Scale: 1" = 1'-6" BEE!BMUFSOBUF!D!)XBUFS!UPXFS!JOFHSBM!DPMPS* PLAN CHECK RESUBMITTAL #3 (12/19/2025) Agreement No. 7590 EXHIBIT C Structural Calculations Agreement No. 7590 9 Agreement No. 7590 El Segundo Skateprk 26-02 116 B2 Agreement No. 7590 B3 Agreement No. 7590 SFDSFBUJPOBM!VTFT IJHIMJHIUFE!BSF NPTU!TJNJMBS!UP TLBUFQBSL!VTF B4 Agreement No. 7590 B5 Agreement No. 7590 B6 Agreement No. 7590 EVF!UP!FOHJOFFSJOH!KVEHFNFOU!BOE!VTBHF!PG!SBJMT!XJUIJO!TLBUFQBSL- CTF!IBT!JODSFBTFE!UIF!NJO/!DPODFOUSBUFE!MPBE!VTFE!UP!361!MCT/ 361!MC!DPODFOUSBUFE!MPBE!IBT!CFFO JODSFBTFE!CZ!TBGFUZ!GBDUPS!PG!2/6!GPS TLBUF!FMFNFOU!EFTJHO!UP!BDDPVOU VOVTVBM!WJCSBUJPO!BOE!JNQBDU!GPSDFT/ B7 Agreement No. 7590 BTDF!Ib{bset!Sfqpsu BTDF0TFJ!8.2744/:2:646 Address:Standard:Latitude: Fm!Tfhvoep!Tlbuf!Qbsl!.!516! JJ.229/52339 Risk Category:Longitude: Fbtu!Hsboe!Bwfovf E!.!Efgbvmu!)tff!227/9:8545169:6:36!gu! Soil Class:Elevation: Fm!Tfhvoep-! Tfdujpo!22/5/4*)OBWE!99* Wind Results: Xjoe!Tqffe:5!Wnqi 21.zfbs!NSJ76!Wnqi 36.zfbs!NSJ82!Wnqi 61.zfbs!NSJ87!Wnqi 211.zfbs!NSJ92!Wnqi Ebub!Tpvsdf;!BTDF0TFJ!8.27-!Gjh/!37/6.2C!boe!Gjht/!DD/3.2—DD/3.5-!boe!Tfdujpo!37/6/3 Ebuf!Bddfttfe;!Xfe!Kbo!25!3137 Wbmvf!qspwjefe!jt!4.tfdpoe!hvtu!xjoe!tqffet!bu!44!gu!bcpwf!hspvoe!gps!Fyqptvsf!D!Dbufhpsz-!cbtfe!po!mjofbs! joufsqpmbujpo!cfuxffo!dpoupvst/!Xjoe!tqffet!bsf!joufsqpmbufe!jo!bddpsebodf!xjui!uif!8.27!Tuboebse/!Xjoe!tqffet! dpssftqpoe!up!bqqspyjnbufmz!b!8&!qspcbcjmjuz!pg!fydffebodf!jo!61!zfbst!)boovbm!fydffebodf!qspcbcjmjuz!>! 1/11254-!NSJ!>!811!zfbst*/ Tjuf!jt!opu!jo!b!ivssjdbof.qspof!sfhjpo!bt!efgjofe!jo!BTDF0TFJ!8.27!Tfdujpo!37/3/ iuuqt;00btdfib{bseuppm/psh0Qbhf!2!pg!4Xfe!Kbo!25!3137 B8 Agreement No. 7590 Seismic Site Soil Class: E!.!Efgbvmu!)tff!Tfdujpo!22/5/4* Results: T;2/97:T;O0B TE2 T;1/77U;9 2M G;2/3QHB;!1/918 b G;O0BQHB;1/:79 wN T;3/354G;2/3 NTQHB T;O0BJ;2 N2f T;2/5:6D;2/585 ETw Hspvoe!npujpo!ib{bse!bobmztjt!nbz!cf!sfrvjsfe/!Tff!BTDF0TFJ!8.27!Tfdujpo!22/5/9/ Data Accessed: Xfe!Kbo!25!3137 Date Source: VTHT!Tfjtnjd!Eftjho!Nbqt iuuqt;00btdfib{bseuppm/psh0Qbhf!3!pg!4Xfe!Kbo!25!3137 B9 Agreement No. 7590 Uif!BTDF!Ib{bse!Uppm!jt!qspwjefe!gps!zpvs!dpowfojfodf-!gps!jogpsnbujpobm!qvsqptft!pomz-!boe!jt!qspwjefe!”bt!jt•!boe!xjuipvu!xbssboujft!pg!boz! ljoe/!Uif!mpdbujpo!ebub!jodmvefe!ifsfjo!ibt!cffo!pcubjofe!gspn!jogpsnbujpo!efwfmpqfe-!qspevdfe-!boe!nbjoubjofe!cz!uijse!qbsuz!qspwjefst<!ps! ibt!cffo!fyusbqpmbufe!gspn!nbqt!jodpsqpsbufe!jo!uif!BTDF!tuboebse/!Xijmf!BTDF!ibt!nbef!fwfsz!fggpsu!up!vtf!ebub!pcubjofe!gspn!sfmjbcmf! tpvsdft!ps!nfuipepmphjft-!BTDF!epft!opu!nblf!boz!sfqsftfoubujpot!ps!xbssboujft!bt!up!uif!bddvsbdz-!dpnqmfufoftt-!sfmjbcjmjuz-!dvssfodz-!ps! rvbmjuz!pg!boz!ebub!qspwjefe!ifsfjo/!Boz!uijse.qbsuz!mjolt!qspwjefe!cz!uijt!Uppm!tipvme!opu!cf!dpotusvfe!bt!bo!foepstfnfou-!bggjmjbujpo-! sfmbujpotijq-!ps!tqpotpstijq!pg!tvdi!uijse.qbsuz!dpoufou!cz!ps!gspn!BTDF/ BTDF!epft!opu!joufoe-!ops!tipvme!bozpof!joufsqsfu-!uif!sftvmut!qspwjefe!cz!uijt!Uppm!up!sfqmbdf!uif!tpvoe!kvehnfou!pg!b!dpnqfufou! qspgfttjpobm-!ibwjoh!lopxmfehf!boe!fyqfsjfodf!jo!uif!bqqspqsjbuf!gjfme)t*!pg!qsbdujdf-!ops!up!tvctujuvuf!gps!uif!tuboebse!pg!dbsf!sfrvjsfe!pg!tvdi! qspgfttjpobmt!jo!joufsqsfujoh!boe!bqqmzjoh!uif!dpoufout!pg!uijt!Uppm!ps!uif!BTDF!tuboebse/ Jo!vtjoh!uijt!Uppm-!zpv!fyqsfttmz!bttvnf!bmm!sjtlt!bttpdjbufe!xjui!zpvs!vtf/!Voefs!op!djsdvntubodft!tibmm!BTDF!ps!jut!pggjdfst-!ejsfdupst-! fnqmpzfft-!nfncfst-!bggjmjbuft-!ps!bhfout!cf!mjbcmf!up!zpv!ps!boz!puifs!qfstpo!gps!boz!ejsfdu-!joejsfdu-!tqfdjbm-!jodjefoubm-!ps!dpotfrvfoujbm! ebnbhft!bsjtjoh!gspn!ps!sfmbufe!up!zpvs!vtf!pg-!ps!sfmjbodf!po-!uif!Uppm!ps!boz!jogpsnbujpo!pcubjofe!uifsfjo/!Up!uif!gvmmftu!fyufou!qfsnjuufe!cz! mbx-!zpv!bhsff!up!sfmfbtf!boe!ipme!ibsnmftt!BTDF!gspn!boz!boe!bmm!mjbcjmjuz!pg!boz!obuvsf!bsjtjoh!pvu!pg!ps!sftvmujoh!gspn!boz!vtf!pg!ebub! qspwjefe!cz!uif!BTDF!Ib{bse!Uppm/ iuuqt;00btdfib{bseuppm/psh0Qbhf!4!pg!4Xfe!Kbo!25!3137 B: Agreement No. 7590 TJOHMF!LJOLFE!TRVBSF!HSJOE!SBJM OPEFT!BOE!NFNCFS!OVNCFST C2 Agreement No. 7590 TJOHMF!LJOLFE!TRVBSF!HSJOE!SBJM C3 Agreement No. 7590 C4 Agreement No. 7590 TJOHMF!LJOLFE!TRVBSF!HSJOE!SBJM MJWF!MPBE C5 Agreement No. 7590 TJOHMF!LJOLFE!TRVBSF!HSJOE!SBJM MJWF!MPBE!PVU!PG!QMBOF C6 Agreement No. 7590 TJOHMF!LJOLFE!TRVBSF!HSJOE!SBJM C7 Agreement No. 7590 TJOHMF!LJOLFE!TRVBSF!HSJOE!SBJM C8 Agreement No. 7590 C9 Agreement No. 7590 C: Agreement No. 7590 C21 Agreement No. 7590 QBOOFE!MBVODI!SBNQ OPEFT!BOE!NFNCFS!OVNCFST C22 Agreement No. 7590 SBLFE!QBOOFE!HSJOE!MFEHF OPEFT!BOE!NFNCFS!OVNCFST C23 Agreement No. 7590 QBOOFE!MBVODI!SBNQ!' SBLFE!QBOOFE!HSJOE!MFEHF C24 Agreement No. 7590 C25 Agreement No. 7590 QBOOFE!MBVODI!SBNQ!' SBLFE!QBOOFE!HSJOE!MFEHF MJWF!MPBE SBLFE!QBOOFE!HSJOE!MFEHF QBOOFE!MBVODI!SBNQ C26 Agreement No. 7590 QBOOFE!MBVODI!SBNQ!' SBLFE!QBOOFE!HSJOE!MFEHF MJWF!MPBE!PVU!PG!QMBOF SBLFE!QBOOFE!HSJOE!MFEHF QBOOFE!MBVODI!SBNQ C27 Agreement No. 7590 QBOOFE!MBVODI!SBNQ!' SBLFE!QBOOFE!HSJOE!MFEHF TIFBS SBLFE!QBOOFE!HSJOE!MFEHF QBOOFE!MBVODI!SBNQ C28 Agreement No. 7590 QBOOFE!MBVODI!SBNQ!' SBLFE!QBOOFE!HSJOE!MFEHF NPNFOU SBLFE!QBOOFE!HSJOE!MFEHF QBOOFE!MBVODI!SBNQ C29 Agreement No. 7590 27 C2: Agreement No. 7590 C31 Agreement No. 7590 CBOLFE!FYUFOTJPO OPEFT!BOE!NFNCFS!OVNCFST C32 Agreement No. 7590 CBOLFE!FYUFOTJPO C33 Agreement No. 7590 C34 Agreement No. 7590 CBOLFE!FYUFOTJPO MJWF!MPBE C35 Agreement No. 7590 CBOLFE!FYUFOTJPO MJWF!MPBE!PVU!PG!QMBOF C36 Agreement No. 7590 CBOLFE!FYUFOTJPO TIFBS C37 Agreement No. 7590 CBOLFE!FYUFOTJPO NPNFOU C38 Agreement No. 7590 C39 Agreement No. 7590 El Segundo Skateprk 26-02 116 C3: C57 Agreement No. 7590 El Segundo Skateprk 26-02 116 C41 Agreement No. 7590 El Segundo Skateprk 26-02 116 C42 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 4 Agreement No. 7590 5 Agreement No. 7590 6 Agreement No. 7590 7 Agreement No. 7590 8 Agreement No. 7590 9 Agreement No. 7590 : Agreement No. 7590 Mbufsbm!mpbe;! Tfjtnjd; Tet!>!2/5:2 Xq!>!7023+261!>!86 Gq!>!/5+bq+Tet0)Sq0Jq*+)2!!, 3+{0I*+Xq >!/5+3/6+2/5:20)3/602!*!+!!86!>!/71Xq!> 56!qtg BTE;!1/8F!>!42/4!qtg Xjoe; r!>!/11367+L{L{uLe+W_3!. /11367+/96+2/1+/96+:6_3!>!27/8qtg t0i!>!2/1 C0t!>!6 Dg!>!2/46 H!>!/96 Q!>!27/8+2/46+/96!>!2:/3!qtg BTE;!1/7+2:/3!>!22/63!==!1/8F!>!42/4 qtg 21 Agreement No. 7590 7023+261+5!>!411$ 5gu+42/4qtg!>!236$!A!3gu bcpwf!upq!pg!xbmm N!>!236+3!>!361$.gu 2+3+261!!, 211+2/6+/6!>!486 Gppujoh!Cfbsjoh!Qsfttvsf; Tmjejoh Q!>!Xuh!>!411,411!>!786$ Pwfsuvsojoh 1/7Q!>!516 Mbufsbm!Gpsdf!>!236$ Mbufsbm!Gpsdf!>!236$!A!3gu f!>!N0/7Q!>!3610516!>!1/73gu 1/7Xfjhiu!>!/7+786!>!516$ N!>!236+3!>!361$.gu b!>!302!.!/73!>!1/49 Gsjdujpo!sftjtubodf!> N!sftjtubodf!>!1/7Xug+f Qsfttvsf!>!304+516!0/49!02!> 1/4+516!>!233$ >!/7+!786+303!>!516$.gu!?!N!> 821!qtg!==!2611!QTG Qbttjwf!Qsfttvsf;!Bwfsbhf 361 qbttjwf!qsfttvsf!>!1)!, 2/6+311*03!>!261$0gu Gsjdujpo!qmvt!qbttjwf!>!233 ,!261!>!383$0gu!? 22 Agreement No. 7590 23 Agreement No. 7590 24 Agreement No. 7590 Xuh!>!3/6+7023+261 ,2+2/6+261!>!524$ Xuh!>!7023+211+3/6!>!236$ 46qdg 99+3/603!>!21:$ 46+3/6!>!99qtg Xuh!>!3/6+7023+261 ,2+2/6+261!>!524$ Difdl!pwfsuvsojoh; Difdl!tpjm!cfbsjoh Npwfsuvsojoh!>!21:+3/604 Difdl!tmjejoh; qsfttvsf; >!:2$0gu Npwfsuvsojoh!>!21:+3/604 Nsftjtu!>!1/7!+!524+/86!> Mbufsbm!Gpsdf!>!21:$ >!:2$0gu 297$0gu!?!!Npu Gsjdujpo!>!1/4!+!/7!+!524!> 85$ 1/7Q!>!/7+524!>!359$0gu Bwfsbhf!Qbttjwf f!>!:20359!>!1/48 qsfttvsf!> b!>!/86!.!/48!>!/49 )/6+311,2/6+311*03!>!311 Qsfttvsf!>!304+3590/49!> 546!qtg Upubm!sftjtubodf!>!385$!? 21:$ 25 Agreement No. 7590 26 Agreement No. 7590 5(.4# 27 Agreement No. 7590 28 Agreement No. 7590 difdl!21/36gu!qpmf!xjui! 5/3603!,!28/603!>!21/:#gu!pg!usjc r!>!/11367+L{L{uLe+w_3! >!/96+2/1+/96+:6_3!>!27/8 Q!>!2/5+27/8!>!34/5!qtg GPSDF!>!34/5+21/36+21/:!> 3/725!LJQT!A!6/236GU N!>!3/725+72/6!>!271/2!ljq.jo \[!>!271/2+2/78057!>5/95 ITT5y5y409!ps!ITT6y6y407 29 Agreement No. 7590 2: Agreement No. 7590 31 Agreement No. 7590 32 Agreement No. 7590 Mbufsbm!mpbe;! Xjoe; r!>!/11367+L{L{uLe+W_3!.!/11367+/96+2/1+/96+:6_3!>!27/8qtg t0i!>!2/1 C0t!>!6 Dg!>!2/46 H!>!/96 Q!>!27/8+2/46+/96!>!2:/3!qtg BTE;!1/7+2:/3!>!22/63! Tfjtnjd; Tet!>!2/5:2 Xq!>!7023+261!>!86 Gq!>!/5+bq+Tet0)Sq0Jq*+)2!!,!3+{0I*+Xq >!/5+3/6+2/5:20)3/602!*!+!!86!>!/71Xq!>!22/63 Xq!>!22/630/7!>!2:/3!qtg/ Uif!gfodf!jt!opu!npsf!uibo!29qtg/ BTE!EFTJHO!QSFTTVSF!>!22/63QTG !GPSDF!>!22/63+21+21/36!>!2292!A!6/236 GPPUJOH!DBO!CF!6GU!EFFQ!Y!29#!JO!EJBNFUFS/ 33 Agreement No. 7590 34 Agreement No. 7590 GPPUJOH0 SFJOGPSDJOH 35 Agreement No. 7590 36 Agreement No. 7590 Pwfsuvsojoh; Mbufsbm!mpbe;! Cfbsjoh; Xjoe; r!>!/11367+L{L{uLe+W_3!. /11367+/96+2/1+/96+:6_3!>!27/8qtg t0i!>!2/1 C0t!>!6 Dg!>!2/46 H!>!/96 N!sftjtu!?!N pwfsuvujoh/!!Nblf Q!>!27/8+2/46+/96!>!2:/3!qtg gppujoh!4/6gu!xjef/ BTE;!1/7+2:/3!>!22/63! Gpsdf!>!22/63+23!>!249$0gu N!pwfsuvsojoh!>!249+7!>!93: Xfjhiu!>!2/6+3/6+261!,!2+261+M Tjejoh; Mbufsbm!gpsdf!> 249$0gu Qbttjwf!qsfttvsf!> )1,3+311*03!> 311qtg!>!511$0gu!?! 249$0gu 37 Agreement No. 7590 38 Agreement No. 7590 39 Agreement No. 7590 Mbufsbm!mpbe!bu!upq!pg!gppujoh Tfjtnjd; Tet!>!2/5:2 Xq!>!7023+261!>!86 Gq!>!/5+bq+Tet0)Sq0Jq*+)2!!, 3+{0I*+Xq >!/5+3/6+2/5:20)3/602!*!+!!95!>!/71Xq!> 61/5!qtg BTE;!1/8F!>!46/4qtg!gps!Nbtposz Gps!gfodf!xjui!Xq!>!21qtg 1/8F!>!4/7!qtg!gps!Gfodf Gpsdf!>!4/7+5/5!,!46/4+5/77!>!275/6$0gu N!>!>!46/4+5/77_303!, 4/7+5/5+)5/77,5/503*!>!5:3!!=>!dpouspmt Xjoe; r!>!/11367+L{L{uLe+W_3!. /11367+/96+2/1+/96+:6_3!>!27/8qtg t0i!>!2/1 C0t!>!6 Dg!>!2/46 H!>!/96 Q!>!27/8+2/46+/96!>!2:/3!qtg BTE;!1/7+2:/3!>!22/63! Gpsdf!>!9/5+22/63!>!:8 N!>!:8+9/503!>!517 3: Agreement No. 7590 Mbufsbm!mpbe!bu!upq!pg!xbmm Tfjtnjd!xjmm!opu!hpwfso!cfdbvtf!gfodf!jt!mjhiu/ Xjoe; r!>!/11367+L{L{uLe+W_3!.!/11367+/96+2/1+/96+:6_3!> 27/8qtg t0i!>!2/1 C0t!>!6 Dg!>!2/46 H!>!/96 Q!>!27/8+2/46+/96!>!2:/3!qtg BTE;!1/7+2:/3!>!22/63! Gpsdf!>!5/5+22/63!>!62 N!>!62+5/503!>!223$0gu!>!9:3$.gu0qtpu N!>!9:3$.gu!>!/9:3ljq.gu!>!21/8!ljq.jo0qptu 4# DIFDL DIFDL!QMBUF BODIPSBHF S!>!21/804030/7!> N!>!21/8 4/68!ljq03!cpmut!> {!>!21/8+2/78047!>!/5: 2/89!ljqt0!cpmu!? c!>!9-!e!>!/52 3/33ljqt!qfs gpmmpxjoh!qbhf DIBOHF!QMBUF!UP!203#!PO ESBXJOHT/ DIFDL!ITT TFDUJPO \[!>!21/8+2/78!0!57!> DIFDL!XFME!GSPN!ITT /499 UP!QMBUF;!T!>!3_3+504!> 6/44 ITT3y3y4027!IBT sx!>!21/806/44>!3/17 UIJT/ Sx0pNFHB!> /4'81+/360)3_/6*!>!4/82 41 Agreement No. 7590 N!>!5:3$.gu0gu Xuh!>!95+5/77,2+M+261!, 2/44+/77+211!>!M+261!,!58: Qfs!2716/3/2!pg!DCD Dsjujdbm!Mpbe!Dpncjobujpo!dbo!cf! 1/:E!,!F02/5!>! 1/:E!,!/825F Pwfsuvsojoh Gppujoh!Cfbsjoh!Qsfttvsf; Tmjejoh N!pu!>!612$.gu Q!>!/:E!>!/:+88:!>!812 N!>!5:3+/8250/8!>!612$.gu Mbufsbm!Gpsdf!>!276$+/8250/8 N!sftjtubodf!>!812$+302!>! >!279$ 812$.gu 1/:Xfjhiu!>!812 Nsftjtubodf!?!!N!pu/ Gsjdujpo!sftjtubodf!> 1/4+812!>!321$ M!>!3gu Gsjdujpo!jt!hsfbufs!uibo gpsdf Bmmpxbcmf!qsfttvsf!> 3111qtg!qfs!tpjmt!sfqpsu 42 Agreement No. 7590 Z g g Z Z ZZ ZZ m m g2 g3 3331$0!cpmu g g g g g Z g!>gZ g!>gZ g!>gZ 43 Agreement No. 7590 uuuuu u m m Z Z ZZ g!> g 44 Agreement No. 7590 45 Agreement No. 7590 46 Agreement No. 7590 Mbufsbm!mpbe;! Tfjtnjd; Xfjhiu!pg!gfodf!jt!wfsz!mjhiu/!!Xjoe!hpwfsot/ Xjoe; r!>!/11367+L{L{uLe+W_3!.!/11367+/96+2/1+/96+:6_3!>!27/8qtg t0i!>!2/1 C0t!>!6 Dg!>!2/46 H!>!/96 Q!>!27/8+2/46+/96!>!2:/3!qtg BTE;!1/7+2:/3!>!22/63 Xjsf!tibmm!sftjtu!61&!pg!uifjs!usjc!xfjhiu-!cbtfe!po!esbh/!!Gfodf-!jo gbdu-!rvjuf!pqfo/ BTE;!22/63+61&!>!6/87qtg Gfodf!tqboojoh!gspn!mfgu!up!sjhiu!qfs!efubjm!40T3/13/ Ipsj{poubm!xjsft!bsf!bu!9#!p/d/ x!>!9023+6/87!>!4/95$0gu Agreement No. 7590 Ipsj{poubm!xjsft!bsf!bu!9#!p/d/ x!>!9023+6/87!>!4/95$0gu Tqbo!>!9/36gu N!>!9/36_309+2302111!>!/4:!ljq.jo Gz!Xjsf!>! B!>!/14:9 e(!>!/2:3!,!/336>!/528 J!>!/14:9+/528_3!>!/117: T!>!/117:0)/2:303,/336* >!/132 gz!>!/4:0/132!>!29/25!ltj= Gz!>!4702/78!>!32/7 uifsfgpsf-!plbz/ e!>!/2:3# e!>!/336# B!>!/14:9 Nby!usjc!bsfb!po!pof Agreement No. 7590 dpoofdujpo!up!uif!qptu!!> 9/603+2303!>!36/6!gu_3 Nby!usjc!bsfb!po!dpoofdujpo!>!36/6qtg Agreement No. 7590 Xjoe!gpsdf!>!22/63qtg Gpsdf!>!36/6+22/63!>!3:5$ 3:5$ Dbssjbhf!cpmu!ibt!6027# ejbnfufs-!ps!B!>!/187 gz!>!/3:50/187!>!4/94!ljt Gz!>!6ltj!njo/ Uifsfgpsf-!cpmu!jt!tuspoh fopvhi Agreement No. 7590 2/6# 2# 25hbhf!nfubm u!>!1/1858 4 W!>!3:5$! B!>!3!+!/1858!+!2!>!1/25:5jo_3 3:5$ gw!>!2/:8!ltj Gw!>!4703!>!29!ltj Xijmf!uif!tuffm!xjmm!mjlfmz!cfoe!b!cju-!ju xjmm!opu!tifbs-!boe!uif!gfodf!nbu!xjmm dpoujovf!up!cf!tvqqpsufe/ Agreement No. 7590 EXHIBIT D LID Report Agreement No. 7590 PRELIMINARY LOW IMPACT DEVELOPMENT REPORT(PLID) FOR EL SEGUNDO RECREATION TEEN CENTER AND PLAZA 405E. GRAND AVENUE, EL SEGUNDO, CA90245 PREPARED FOR: City of El Segundo 350 Main Street El Segundo, CA 90245 PREPARED BY: BKF ENGINEERS 4675 MacArthur Court, Suite 400 Newport Beach, CA 92660 (949)526-8460 PREPARED: June2025 REVISED: November2025 Bruce Kirby, PE R.C.E. No. 42393 Agreement No. 7590 .YC 9bDLb99w{ TABLE OF CONTENTS 1.0INTRODUCTION.........................................................................................................................................................................4 1.1 SITE AND PROJECT DESCRIPTION͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵Ѝ 1.2 LOW IMPACT DEVELOPMENT STRATEGIES AND GOALS͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵Ѝ 2.0DESIGNATED PROJECT REQUIREMENT...........................................................................................................................5 2.1 DETERMINATION FOR PERMANENT BMP REQUIREMENT͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵Ў 2.2 DESIGN PROCESS CHART BREAKDOWN͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵Џ 3.0SITE ASSESSMENT AND DESIGN CONSIDERATIONS................................................................................................7 3.1 VICINITY MAP͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵А 3.2 PROJECT SUMMARY INFORMATION͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵Б 3.3 WATERSHED͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵Б 3.4 GEOTECHNICAL CONDITIONS͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵В 3.5 GEOTECHNICAL HAZARDS͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵В 3.6 SITE DESIGN PRINCIPLES͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЊЉ 4.0SOURCE CONTROL MEASURES.......................................................................................................................................12 5.0STORMWATER QUALITY DESIGN VOLUME CALCULATIONS.............................................................................17 5.1 DESIGN STORM EVENT͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЊА 5.2 STORMWATER QUALITY DESIGN VOLUME (SWQDv)͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЊА 6.0STORMWATER QUALITY CONTROL MEASURES.......................................................................................................18 6.1UNDERGROUND INFILTRATION CHAMBER SIZING...............................................................................................18 7.0HYDROMODIFICATION......................................................................................................................................................19 8.0STORMWATER QUALITY CONTROL MEASURE MAINTENANCE........................................................................20 8.1 MAINTENANCE RESPONSIBILITY͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЋЉ 8.2 INSPECTION AND MAINTENANCE FOR SOURCE CONTROL MEASURES͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЋЉ 8.3 INSPECTION AND MAINTENANCE FOR STORM QUALITY MEASURES͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЋЉ 8.4 INSPECTION AND MAINTENANCE FREQUENCY͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЋЉ 8.5 RECORD KEEPING REQUIREMENTS͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ЋЋ 9.0SUMMARY.................................................................................................................................................................................23 CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Њ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ APPENDICES APPENDIX A VICINITY MAP APPENDIX B LID EXHIBIT APPENDIX C COUNTY OF LOS ANGELES HYDROLOGY MAPS TH APPENDIX DHYDROCALC OUTPUT -85PERCENTILESTORM APPENDIX ESTORMWATER QUALITY DESIGN MEASURE CALCULATIONS APPENDIX FBMP MANUFACTURER BROCHURES APPENDIX GBMP OPERATIONS & MAINTENANCE MANUAL APPENDIX HCOVENANT AND AGREEMENT APPENDIX IGEOTECHNICAL REPORT (FOR REFERENCE ONLY) CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Ћ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ This Low Impact Development Report(LID) for El Segundo Teen Center and Teen PlazaProjectwas prepared for the City of El Segundo by BKF Engineers. This LID Reportis intended to comply with the requirements of the City of El Segundo, County of Los Angeles, requiring the preparationof a project specific LID Report. I certify under penalty of law that this document and all attachments were prepared under my jurisdiction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons whomanage the system or those persons directly responsible for the gathered information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan and will ensure that this plan is amended as appropriate to reflect up-to-date conditions on the site consistent with the current Los Angeles County Stormwater Quality Management Plan (SWQMP), and the intent of the stormwater and urban runoff NPDES Permit and Waste Discharge Requirements for the Countyof Los Angeles, Los Angeles County Flood Control District and the incorporated Cities of Los Angeles County under the jurisdiction of the Los Angeles Regional Water Quality Control Board. A copy of this LID Reportwill be maintained at the project site/office. This LID Reportwill be reviewed with the facility operator, facility supervisors, employees, tenants, maintenance and service contractors, or any other party having responsibility for implementing portions of this LID Report. At least one copy of the approved and certified copy of this LID Reportshall be available on the subject property in perpetuity. Once the undersigned transfers its interest in the property, its successors-in-interest shall bear the aforementioned responsibility to implement andamend the LID Report. BKF Engineers Company 4675 MacArthur Court, Suite 400 Bruce Kirby, P.E., Associate PrincipalNewport Beach, CA 92660 Printed Name/TitleCompany Address (949) 526-846011/14/2025 Telephone No.Date CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Ќ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 1.0INTRODUCTION This Low Impact Development Report (LID) summarizes storm water protection requirements for the El Segundo Recreation Teen Center and Teen Plaza Project This LID Reportdescribes the permanent storm water Best Management Practices (BMPs) that will be incorporated into the project in order to mitigate the impacts of pollutants in storm water runoff from the proposed project. For the purposes of post-constructionstorm water quality management, the project will follow the guidelines and requirements set forth in the County of Los Angeles Project Applicant:MIG 360 East Second Street, Suite 675 Los Angeles, CA 90012 1.1 SITE AND PROJECT DESCRIPTION The subject site is located in El Segundo, California. The proposed siteis located on El Segundo Teen Center on Grand Avenue between Arena Street and Sheldon Street.The project is bounded by a slope and parking lotto the north, Grand Avenueto the south, a driveway and restaurantto the east, and the El Segundo Scout Houseto the west. The 0.39-acre site is currently occupied by anexisting skate park and recreation building with a basementthat will be renovated.The proposed project will consist of: Removal ofasphalt and concretepavement, fencing, skate park, and landscaping Construction of a new skate park, basketball court, accessible parking and walkways, and bike racks Installation of a storm drain system with infiltration vault located off-site The existing development is generally flat, but slopes to the northand westand has an average slope of 5% slope.Infiltration is feasible for this project as it has an infiltration rate of 2.49in/hr. 1.2 LOW IMPACT DEVELOPMENT STRATEGIES AND GOALS The LA County LID guidelines aim to reduce and/or eliminate the altered project area of the post- development hydrographby reducing the peak discharge rate and volume using site design and stormwater quality control measuresand conducting trash capture. The benefits of reduced stormwater runoff volume include reduced pollutantloadings and increased groundwater recharge and evapotranspiration rates. The LID strategy used to address the stormwater management goals of the county include the installation of an ADS StormTech SC-310 infiltration chambersthat will serve to mitigate peak flows and infiltrate design storm water volume for the developed siteand ADS Connector Pipe Screens for trash capture. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Ѝ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 2.0DESIGNATED PROJECT REQUIREMENT Requirements for permanentBMPs are determine based onthecriteria set forth in the LID Manual. Projects are identified by four categories: Designated Project Non-Designated Project Small-Scale Non-Designated Project Large-Scale Non-Designated Project 2.1 DETERMINATION FOR PERMANENT BMP REQUIREMENT The projectis considered a Designated Projectbased on the LID Manual. The project meets the following requirements to be a Designated Project: Redevelopment projects, which are developments that result in creation or addition or replacement of either: (1) 5,000 square feet or more of impervious surface on a site that was previously developed; or (2) 10,000 square feet or more of impervious surface area on a site that was previous developed as a single-family home. All Designated Projectsmust retain 100 percent of the Storm Water Quality Design Volume (SWQDv) on- site through infiltration, evapotranspiration, stormwater runoff harvest and use, or a combination thereof unless it is demonstrated that it is technicallyinfeasible to do so. Based on the geotechnical investigation, infiltration is feasibleas the site has an infiltration rate of 2.49in/hr. The proposed project willuseADS StormTech SC-310 chamber infiltrationsystemfor infiltrationand ADS Connector Pipe Screens for trash capture. See Section 5.0, Section 6.0and Appendix Efor more informationand calculations. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Ў ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 2.2DESIGN PROCESS CHART BREAKDOWN CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Џ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 3.0SITE ASSESSMENT AND DESIGN CONSIDERATIONS This section discusses the steps taken for assessing the project site conditions and identifying design considerations to determine appropriate stormwater quality control measures for the project. 3.1 VICINITY MAP CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ А ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 3.2PROJECT SUMMARY INFORMATION PRE-PROJECT The existing land use for the project is an existing recreation center building with a parking lot, skate park, basketball court, and landscaping. The northern side of the project site is a slope with stairs to an adjacent parking lot that serves both this project and parks nearby. There are no offsite drainage areas that discharge storm water onto the project site in the pre-project condition. The existing site is generally flat, but slopes to the north and west with an average slope of 5%. Stormwater south of the existing recreation centerat the parking lotsurface flows offsite into the gutter along Grand Avenue. Stormwater to the west and north of the building surface flows to an area drain that flows down to a curb outlet at an adjacent parking lot to the north. This offsite curb outlet then flowsover the surfaceto an offsite valley gutter which intersects Eucalyptus Drive. POST-PROJECT In the post-project conditions, the project site consists of a renovatedbuilding along with associated improvements include accessible walkways, landscaping, underground utilities, and an ADS StormTech SC- 310 stormwater infiltration chamberssystemwith ADS Connector Pipe Screens for trash capture. SUMMARY OF IMPERVIOUS AREAs Impervious Area Pervious AreaPercent Condition Acres(SF)Acres(SF)Impervious(%) Pre-Project0.39(17,041)0(0)100% Post-Project0.39(16698)0.006(290)98% 3.3WATERSHED The proposed development is located within the San GabrielWatershed, located within Region 4 Los Angeles Regional Water Quality Control Board (LARWQCB). Surface flow from the project enters the municipal storm drain system and ultimately discharges into the Pacific Ocean. Region:Los Angeles Regional Water Quality Control Board (LARWQCB) Receiving Water:Ballona Creek Watershed:Ballona Creek and other Urban Watersheds 303(d) Listing:DDT, Toxicity, Cadmium, Chlordane, Copper, Lead, PCBs, Silver, Zinc, DDE, PAHs, Indicator Bacteria CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ Б ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 3.4 GEOTECHNICAL CONDITIONS Geotechnical information outlined below was taken from the Geotechnical Evaluation by Converse Consultantsdated November12th, 2024. Topography:The project siteranges from 114 feetto 121 feetabove mean sea level andsurface drainage sheet flows acrossthe existing site to the north and to the westwith a 5% slope. Geologic Setting:Fill soils were encountered in all borings and ranged from approximately 3to 5ft. in thicknessunder concrete and base layer. The fill generally consisted of brownmoist silty sand. Groundwater:Groundwater wasnotencountered in all boringsto 5ft. Fluctuations in groundwater levels may occur due to variations in precipitation, ground surface topography, subsurface stratification, irrigation, groundwater pumping, and other factors that may not have been evident at the time of the field evaluation. According to the groundwater contours compiled by the CDMG (1988), the historical high depth to groundwater is mapped at the site as approximately 2 to 24ft. below the ground surface. See Appendix Ifor additional information. 3.5 GEOTECHNICAL HAZARDS Geotechnical information outlined below was taken from the Geotechnical Evaluation by Converse Consultantsdated November 12th, 2024. The project site is situated in a seismicallyactive region although not currently designated as a State of California Earthquake Fault Zone.The project site is not located within a potential liquefaction zone per the State of California Seismic Hazard Zones Map. Due to the relatively flat nature ofthe project site, the risk of lateral spreading is negligible. See Appendix Ifor additional information. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ В ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 3.6 SITE DESIGN PRINCIPLES Site design can protect sensitive environmental features. The intention of site design principles is to reduce stormwater peak flows and volumes and other impacts associated with land development. The following text discusses the low impact development BMPs outlined in the LID Manual with respect to the project. Italicized text is takendirectly from the LID Manualand reproduced for this report. Portions of the italicized text are condensed from the LID Manual. Immediately following and written in regular text, will be the response as it applies to the project. Site Planning Project applicants must implement a holistic approach to site design in order to develop a more hydraulically-functional site, help to maximize the effectiveness of on-site retention, and integrate stormwater management throughout the project site. Early project site planning can identify physical site constraints, reduce costs of downstream stormwater quality control measures, and prevent potential project site re-design. Response: The project site layout conforms to natural landforms. PROTECT AND RESTORE NATURAL AREAS Conservation of natural areas, soils, and vegetation helps to retain numerous functions of pre-developmenthydrology, including rainfall interception, infiltration, and evapotranspiration. Each project site possesses unique topographic, hydrologic, and vegetative features, some of which are more suitable for development than others. Sensitive areas, such as streams and their buffers, floodplains, wetlands, steep slopes, and highly- permeable soils, should be protected and/or restored. Slopes can be a major source of sediment and should be properly protected and stabilized. Locating development in less sensitive areas of a project site and conserving naturally vegetated areas can minimize environmental impacts from stormwater runoff. Response: The project is to protect as much of the existing landscapingas feasible. MINIMIZE IMPERVIOUS AREA The potential for discharge of pollutants in stormwater runoff from a project site increases as the percentage of impervious area within the project site increases because impervious areas increase the volume and rate of stormwater runoff. Pollutants deposited on impervious areas are easily mobilized and transported by stormwater runoff. Minimizing impervious area through site design is an important method to reducing the pollutant load in stormwater runoff. In addition to the environmental and aesthetic benefits, a highly pervious site may allow reduction of potential downstream conveyance and stormwater quality control measures, yielding savings in development costs. Minimizing impervious area will also reduce the stormwater runoff coefficient, which is directly proportional to the volume of stormwater runoff that must be retained on-site. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЉ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ Response: The projectminimizes additional impervious area to the full extent possible. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЊ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 4.0SOURCE CONTROL MEASURES Source control measures are designed to prevent pollutants from contacting stormwater runoff or prevent discharge of contaminated stormwater runoff to the storm drain system and/or receiving water. This section describes structural type, source control measures that will be considered for implementation in conjunction with appropriate non-structural source control measures. The following text discusses the source control measures BMPs from the LID Manual with respect to the project. Italicized text is taken directly from the LID Manual, and reproduced for this report. Portions of the italicized text are condensed from the LID Manual. Immediately following and written in regular text, will be the response as it applies to the project. For more information regarding the Source Control Measures outlined below, see Appendix D from the LID Manual. S-1: STORM DRAIN MESSAGE AND SIGNAGE Signs with language and/or graphical icons that prohibit illegal dumping, must be posted at designated public access points along channels and streams within the project area. Consult with Los Angeles County Department of Public Works (LACDPW) staff to determine specific signage requirements for channels and streams. Storm drain message markers, placards, Dumping project area to discourage illegal or inadvertent dumping. Signs should be placed in clear sight facing anyone approaching the storm drain inlet or catch basin from either side (see Figure D-1 and Figure D-2). LACDPW staff should be contacted to determine specific requirements for types of signs and methods of application. A stencil can be purchased for anominal fee from LACDPW Building and Safety Office by calling (626) 458-3171. All storm drain inlet and catch basin locations must be identified on the project site map. Response: Drains to S-2: OUTDOOR MATERIAL STORAGE Design specifications for material storage areas are regulated by local building and fire codes, ordinances, and zoning requirements. Source control measures presented in the LID Manualare intended to enhance and be consistent with local code and ordinance requirements while addressing stormwater runoff concerns. The design specifications, presented in Table D-2in the LID Manual, must be incorporated into the design of outdoor material storage areas when stored materials could contribute pollutants to the storm drain system. The level of controls required varies relative to the risk category of the material stored. Response: The project does not propose any outdoor material storage areas. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЋ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ S-3: OUTDOOR TRASH STORAGE AND WASTE HANDLING AREA Wastes from commercial and industrial sites are typically hauled away for disposal by either public or commercial carriers that may have design or access requirements for waste storage areas. Design specifications for waste handling areas are regulated by local building and fire codes and by current County ordinances and zoning requirements. The design specifications, listed below in Table D-3, are recommendations and are not intended to conflict with requirements established by the waste hauler. The design specifications are intended to enhance local codes and ordinances while addressing stormwater runoff concerns. The waste hauler should be contacted prior to the design of trash storage and collection areas to determine established and accepted guidelines for designing trash collection areas. All hazardous waste must be handled in accordance with the legal requirements established in Title 22 of the California Code of Regulations. Conflicts or issues should be discussed with LACDPW staff. Response: The project site does not proposestorage areas for trash compactors. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor trash storage and waste handlingwill be designed pursuant to the guidelines outlined above and in the LID Manual. S-4: OUTDOOR LOADING/UNLOADING DOCK AREA Design specifications for outdoor loading/unloading dock areas are regulated by local building and fire codes and by current County ordinances and zoning requirements. Additionally, individual businesses may have their own design or access requirements forloading docks. Design specifications presented in this fact sheet are intended to enhance and be consistent with these code and ordinance requirements while addressing stormwater runoff concerns. The design specifications presented in Table D-4 are not intended to conflict with requirements established by individual businesses, but should be followed to the maximum extent practicable. Response: The project does not propose any outdoor loading and unloading dock areas. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЌ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ S-5: OUTDOOR VEHICLE/EQUIPMENT REPAIR/MAINTENANCE AREA Design specifications for vehicle and equipment repair/maintenance areas are regulated by local building and fire codes and by current County ordinances and zoning requirements. The design specifications presented in this fact sheet are intended to enhance and be consistent with these code and ordinance requirements while addressing stormwater runoff concerns. The design specifications required for vehicle and equipment repair/maintenance areas are presented in Table D-5. All wash water and hazardous and toxic wastes must be prevented from entering the storm drain system. Response: The project does not propose any outdoor vehicle equipment repair areas, or outdoor vehicle maintenanceareas. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. S-6: OUTDOOR VEHICLE/EQUIPMENT/ACCESSORY WASHING AREA Design specifications for vehicle/equipment/accessory washing areas are regulated by local building and fire codes and current County ordinances and zoning requirements. The design specifications presented in Table D-6 are intended to enhance and be consistent with these requirements while addressing stormwater runoff concerns. All wash water and hazardous and toxic wastes must be prevented from entering the storm drain system. Response: The project does not propose any outdoor vehicle equipment areas or outdoor vehicle accessory washing areas. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. S-7: FUEL AND MAINTENANCE AREA Design specifications for fuel and maintenance areas are regulated by local building and fire codes and current County ordinances and zoning requirements. The design specifications presented in Table D-7 are intended to enhance and be consistent with these code and ordinance requirements while addressing stormwater runoff concerns. Response: The project does not propose any fuel and maintenance areas. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЍ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ S-8: LANDSCAPE IRRIGATION PRACTICES Choose plants that minimize the need for fertilizer and pesticides. Group plants with similar water requirements and water accordingly. Use mulch to minimize evaporation and erosion. Include a vegetative boundary around project site to act as a filter. Design the irrigation system to only water areas that need it. Install an approved subsurface drip, pop-up, or other irrigation system. The irrigation system should employ effective energy dissipation and uniform flow spreading methods to prevent erosion and facilitate efficient dispersion. Install rain sensors to shut off the irrigation system during and after storm events. Include pressure sensors to shut off flow-through system in case of sudden pressure drop. A sudden pressure drop may indicate a broken irrigation head or water line. If the hydraulic conductivity in the soil is not sufficient for the necessary water application rate, implement soil amendments to avoidpotential geotechnical hazards (i.e., liquefaction, landslide, collapsible soils, and expansive soils). For sites located on or within 50 feet of a steep slope (15% or greater), do not irrigate landscape within three days of a storm event to avoid potential geotechnical instability. Implement Integrated Pest Management practices For additional guidelines and requirements, refer to the Los Angeles County Department of Health Services. Response: The project does not propose any irrigation due to the small footprint of each landscaping area. S-9: BUILDING MATERIAL SELECTION Lumber Decks and other house components constructed using pressure-treated wood that is typically treated using arsenate, copper, and chromium compounds are hazardous to the environment. Pressure- treated wood may be replaced with cement-fiber or vinyl. Roofs, Fencing, and Metals Minimizing the use of copper and galvanized (zinc-coated) metals on buildings and fencing can reduce leaching of these pollutants into stormwater runoff. The following building materials are conventionally made of galvanized metals: o Metal roofs o Chain-link fencing and siding o Metal downspouts, vents, flashing, and trim on roofs. Architectural use of copper for roofs and gutters should be avoided. As an alternative to copper and galvanized materials, coated metal products are available for both roofing and gutter application. Vinyl-coated fencing is an alternative to traditional galvanized chain-link fences. These products eliminate contact of bare metal with precipitation or stormwater runoff, and reduce the potential for stormwater runoff contamination. Roofing materials are also made of recycled rubber and plastic. Green roofs may be an option. Green roofs use vegetation such as grasses and other plants as an exterior surface. The plants reduce the velocity of stormwater runoff and absorb water to reduce the CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЎ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ volume of stormwater runoff. One potential problem with using green roofsin the Los Angeles County area is the long, hot and dry summers, which may kill the plants if they are not watered. See the Green Roof Fact Sheet (RET-7) in Appendix E of the LID Manual. Response: Building material selection will be designed pursuant tothe guidelines outlined above and in the LID Manual. S-10: ANIMAL CARE AND HANDLING FACILITIES Site barns, corrals, and pastures on property that drains away from the storm drain system and receiving waters. Locate animal washing areas, pastures, horse riding areas, stalls, or cages at least 50 feet away from storm drains, domestic wells, septic tank or leach field sites, and receiving waters. Design berms, gutters, or grassed ditches to divert stormwater runoff away from animal area, storm drain system, and receiving waters. Cover animal enclosures (i.e., stables) to protect them from precipitation. Prevent animals from entering sensitive environmental areas. Regularly sweep or shovel animal holding areas. Response: The project does not propose any animal care or handling facilities. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. S-11: OUTDOOR HORTICULTURE AREAS Do not allow wash water from the horticulture area to drain directly to the storm drain system or receiving waters Response: The project does not propose outdoor horticulture areas. If these conditions change, it is the responsibility of the project site owner/operator to ensure that outdoor materials storage will be designed pursuant to the guidelines outlined above and in the LID Manual. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊЏ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 5.0STORMWATER QUALITY DESIGN VOLUME CALCULATIONS Current water quality requirements are based on treating a specific volume of stormwater runoff from the project site (stormwater quality design volume \[SWQDv\]).By treating the SWQDv, it is expected that pollutant loads, which are typically higher during the beginning of storm events, will be reduced in the discharge to or prevented from reaching the receiving waters. 5.1 DESIGN STORM EVENT The design storm, for which the SWQDv is calculated, is defined as the greater of: The 0.75-inch, 24-hour rain-event; or The 85th percentile, 24-hour rain event as determined from the Los Angeles County 85th percentile precipitation isohyetmap. It was determined that the 85th percentile, 24-hour rain event will be the design storm for which the SWQDv will be calculated for this project site as shown below. th The 85thpercentile, 24-hour rain = 0.90in.>0.75-inches\[Use85percentile\] Note: The 85th percentile, 24-hour rain event precipitation was found using the Los Angeles County Hydrology Map GIS Viewer, see Appendix C. 5.2STORMWATER QUALITY DESIGN VOLUME (SWQDV) The project sitewas determined to be a Designated Project;therefore,the project siteis required to retain 100% of the SWQDv on-site. The SWQDv for the sitewascalculated using the HydroCalc software developed by Los Angeles County Department of Public Works (LACDPW). The software completes the full MODRAT calculation process and produces the peak stormwater runoff flow rates and volumes for single subareas. HydroCalc is limited to watersheds and project areas up to 40 acres. Using the following inputs in HydroCalc, aSWQDv of 1,200CFis determined: Area = 0.39Acres 85th percentile Rainfall Depth = 0.90in Percent Impervious = 98% Soil Type = 010 CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊА ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 6.0STORMWATER QUALITY CONTROL MEASURES Stormwater quality control measures are required to augment site design principles and source control measures to reduce the volume of stormwater runoff and potential pollution loads in stormwater runoff to the maximum extent practicable. Stormwater quality control measures are designed to handle the frequent, smaller storm events, or the initial volume of stormwater runoff from larger storm events (typically referred to as first flush events). The first flush of larger storm events is the initial period of the storm where stormwater runoff typically carries the highest concentration and loads of pollutants. Small, frequent storm events represent most of the total annual average precipitation in the County. The LID Ordinance requires that all Designated Projects retain the SWQDv on-site using retention-based stormwater quality control measures (infiltration and/or stormwater runoff harvest and use) or biofiltrate 1.5 times the SWQDv if infiltration is not feasible. Thestormwater quality control measures outlined in the LID Manual were evaluated. It was determined that the most practicable treatment BMP for the project will be the following: Infiltration Basin (RET-2) 6.1INFILTRATION VAULTSIZING Stormwater runoff drains away from the building on the north, east, and west then sheet flows to a network of inlets and into the proposed stormwater treatment and detention system. The ADS SC-310 infiltration chamber system is designed to treat the SWQDv of 1,200CF. Overflow of excess stormwater beyond the SWQDv willbubble up from a grated drop inlet adjacent to the ADS Nyloplast drain basinand will enter a valley gutter which flows downstream to a catch basin on Eucalyptus Drive. Calculations for the infiltration vaultis available in Appendix E. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊБ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 7.0HYDROMODIFICATION All Designated projects located within natural drainage systems thathavenot been improvedor drainage systems that are tributary to a natural drainage system are required to implement hydromodification controls. Projects may be exempt from implementation of hydromodification control measures where assessments of downstream channel conditions and proposed discharge hydrology indicate adverse hydromodification effects to beneficial uses of natural drainage systems are unlikely. The proposed project hasbeen determined to be EXEMPT from hydromodification requirements since it is not located within a natural drainage systemand is a redevelopment of a previously developed site in an urbanized area that does not decrease the infiltration capacitycompared to the pre-project conditions. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЊВ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 8.0STORMWATER QUALITY CONTROL MEASURE MAINTENANCE Continued effectiveness of stormwater quality control measures specified in the LID Standards Manual depends on on-going inspection and maintenance. All publicly maintained stormwater quality control measures must have easements for access and maintenance or be in lots dedicated to the County in fee title. To ensure that such maintenance is provided, LACDPW may require the submittal of a Maintenance Plan and execution of a Maintenance Agreement with the owner/operator of stormwater quality control measures. The property owner or his/her designee is responsible for complying with the Maintenance Agreement outlined in the LID Manual. A copy of the Maintenance Agreement is provided in Appendix H. 8.1 MAINTENANCE RESPONSIBILITY The Owner of the project site is the site operator and will be the party responsible to ensure implementation and funding of maintenance of permanent BMPs. It is anticipated that the owner of the project will manage multiple separate maintenance contracts for different types ofmaintenance (e.g., landscape maintenance vs. maintenance of the BMPs). Throughout this 8.2 INSPECTION AND MAINTENANCE FOR SOURCE CONTROL MEASURES The following source control measures for the project requires permanent maintenance: None 8.3 INSPECTION AND MAINTENANCE FOR STORM QUALITY MEASURES The following storm quality measurefor the project requires permanent maintenance: Underground infiltrationvaults The discussions below provide inspection criteria, maintenance indicators, and maintenance activities for the above listed storm quality measurethat require permanent maintenanceaccording to manufacturer recommendations.These proprietary systems shall be inspected and maintained permanufacturer specifications and recommendations.See Appendix Gfor the Operations and Maintenance of each BMP listed above. 8.4 INSPECTION AND MAINTENANCE FREQUENCY The Table below lists the BMPs to be inspected and maintained and the minimum frequency of inspection and maintenance activities. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЋЉ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ BMPInspection Maintenance Frequency Frequency Landscape Irrigation PracticesMonthlyRoutine trimming and trash removal; monthly non-routine maintenance as- needed based on maintenance indicators in Section 8.2. Underground InfiltrationVaultsSemiannuallyand Routine maintenance to clean the after major storm underground detention chamber of eventssediments, trash, and debris.Routine maintenance semiannually.Inspect sediment in Inspection Port and Isolator Row Plus and clean with JetVac. FlexStorm Connector Pipe Semiannuallyand Routine maintenance of removing trash and Screen Trash Capture after major storm sediment from initial trash capture. events Thefrequencies given in the Summary Table of Inspection and Maintenance Frequency are minimum recommended frequencies for inspection and maintenance activities for the project. Typically, the frequency of maintenance required for permanent BMPs is site and drainage area specific. If it is determined during the regularly scheduled inspection and/or routine maintenance that a BMP requires more frequent maintenance (e.g., to remove accumulated trash) it may be necessary to increase the frequency of inspection and/or routine maintenance. If it is determined during the regularly scheduled inspection that the maintenance thresholds are consistently met or exceeded, it may be necessary to increase the frequency of inspection and routine maintenance. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЋЊ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 8.5 RECORD KEEPING REQUIREMENTS The party responsible to ensure implementation and funding of maintenance of permanent BMPs shall maintain records documenting the inspection and maintenance activities. The records must be kept a minimum of 5 years and shall be made available to the City of El Segundofor inspection upon request at any time. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЋЋ ƚŅ ЋЌ Agreement No. 7590 .YC 9bDLb99w{ 9.0SUMMARY This Low Impact Development Report (LID) summarizes the permanent storm water management features proposed for the project site that will collectively meet the requirements set forth in the LIDManual. The project meets the hydromodification exemption criteria and is not required to implement hydromodification management facilities as discussed in Section 7.0 of this report. based on theLID Manual as discussed in Section 2.1. -site and identification of receiving waters that are listed as impaired on the 2010 CWA Section 303(d) List of Water Quality Limited Segments,the following are the projectpollutants of concern: Trash, DDT, Toxicity, Cadmium, Chlordane, Copper, Lead, Copper, Lead, PCBs, Silver, Zinc, DDE, PAHs, and Indicator Bacteria. In addition to treatment control BMPs, the project will incorporate source control BMPs which are described in Section 4.0 and Section 6.0. The project includes a proposed network of storm water management featuresthat will utilize source control measures to meet the requirements for stormwater quality design measure. The following list provides a summary of stormwater quality design measuresselected for the project site: Infiltration Basin (RET-2) The above stormwater quality design measurewas efficiency for thetargeted pollutants of concern as discussed in Section 3.3 and Section 6.1. The stormwater quality design measure maintenance inSection 8.0 of this report provides inspection criteria, maintenance indicators, and maintenance activities for the above-listed BMPs that require permanent maintenance. This report accompanies a set of construction drawings and specifications which detail the construction, operation, and maintenance of the proposed Low Impact Development (LID) design elements for this site. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 tğŭĻ ΋ ЋЌ ƚŅ ЋЌ Agreement No. 7590 APPENDIX A VICINITY MAP CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 APPENDIX B LID EXHIBIT CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 Agreement No. 7590 APPENDIX C COUNTY OF LOS ANGELES HYDROLOGY MAPS CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 2/1!JODI QSPKFDU!MPDBUJPO; 96UI!QFSDFOUJMF TUPSN!>!1/:1!JODIFT 1/:1 1/91 Agreement No. 7590 QSPKFDU!MPDBUJPO; TPJM!DMBTT!>!121 Agreement No. 7590 APPENDIX D TH HYDROCALC OUTPUT 85 PERCENTILE STORM CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 Peak Flow Hydrologic Analysis Gjmf!mpdbujpo;!00CLG.OC0wpm5031350351144`Fm`Tfhvoep`Sfdsfbujpobm`Qbsl0.21`UffoDus`UffoQmb{b0EPD016.Eftjho0Sfqpsut`Dbmdt0Tupsnxbufs0MJE036`1513!FTQ`Uffo!Dfoufs!.!ENB!2/qeg Wfstjpo;!IzespDbmd!2/1/4 Input Parameters Qspkfdu!ObnfFm!Tfhvoep!Uffo!Dfoufs!boe!Qmb{b Tvcbsfb!JEENB.2 Bsfb!)bd*1/4: Gmpx!Qbui!Mfohui!)gu*271/1 Gmpx!Qbui!Tmpqf!)wgu0igu*1/13 96ui!Qfsdfoujmf!Sbjogbmm!Efqui!)jo*1/: Qfsdfou!Jnqfswjpvt1/:: Tpjm!Uzqf21 Eftjho!Tupsn!Gsfrvfodz96ui!qfsdfoujmf!tupsn Gjsf!Gbdups1 MJEUsvf Output Results Npefmfe!)96ui!qfsdfoujmf!tupsn*!Sbjogbmm!Efqui!)jo*1/: Qfbl!Joufotjuz!)jo0is*1/4818 Voefwfmpqfe!Svopgg!Dpfggjdjfou!)Dv*1/2 Efwfmpqfe!Svopgg!Dpfggjdjfou!)De*1/9:3 Ujnf!pg!Dpodfousbujpo!)njo*22/1 Dmfbs!Qfbl!Gmpx!Sbuf!)dgt*1/23: Cvsofe!Qfbl!Gmpx!Sbuf!)dgt*1/23: 35.Is!Dmfbs!Svopgg!Wpmvnf!)bd.gu*1/136: 35.Is!Dmfbs!Svopgg!Wpmvnf!)dv.gu*2238/243: Agreement No. 7590 APPENDIX E STORMWATER QUALITY DESIGN MEASURE CALCULATIONS CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 Stormwater Quality Design Measure Calculations Date:6/4/2025 Job No.: Project: Description and Assumptions: * Based on County of Los Angeles Low Impact Development Standard Manual Design Frequency = 85th Percentile, 24-Hour Rain Event = 0.90 in STORMWATER QUALITY DESIGN CALCS FOR BMP #1 Area Summary Bsfb! Tvsgbdf!UzqfBsfb!)tg* )bdsft* Impervious 27-862 Љ͵ЌБ Pervious 3:1 Љ͵ЉЊ TOTAL17,041 0.39 Step 1: Determine the Stormwater Quality Design Volume (SWQDv) 3 85th Percentile SWQDv per HydroCalc Output in Appendix D=ft 1,130 HydroCalc Design Volume (SWQDv) output is an accepted value per section 6.3 in the LA County Low Impact Development Standards Manual (See Appendix D for Hydrocalc Analysis) Step 2: Determine the design infiltration rate f= f/FS designmeasured f = 2.49in/hr measured FS =2 f=1.25 in/hr design Step 3: Determine the BMP surface area d= f/12 x t max design Where: d= Maximum depth of water that can be infiltrated within the max detention time \[ft\] max f = Design infiltration rate \[in/hr\] design t = Maximum retention time (max 96 hrs) \[hr\] d=9.96 ft max BKF Engineers 4675 MacArthur Court, Suite 400 Newport Beach, California 92660 Agreement No. 7590 Select a ponding depth less than the maximum ponding depth d maxp Where: d = Maximum depth of water that can be infiltrated within the maximum detention max time \[ft\] d = Ponding depth \[ft\] p d=1.33ft p Calculate the infiltrating surface area (bottom of the bioretention area) required A = SWQDv / d p A=850sf Calculate infiltration surface area provided Treatment Volume Provided =1200cf d=1.33ft p Area Provided=900sf Advanced Drainage Systems (ADS) provided calculations for drawdown time with a factor of safety of 2 Surface Area (SF)fVolume (CF)ağǣ 5ƩğǞķƚǞƓ design (in/hr) 9001.24 ЊЋЉЉ 96hrs Drawdown (hr)=12.13hr ѡağǣ 5ƩğǞķƚǞƓ BKF Engineers 4675 MacArthur Court, Suite 400 Newport Beach, California 92660 Agreement No. 7590 APPENDIX F BMP MANUFACTURERS BROCHURES CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 APPENDIX G BMP OPERATION & MAINTENANCE CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 Agreement No. 7590 APPENDIX H COVENANT AND AGREEMENT City of El Segundo to provide covenant and agreement. CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 APPENDIX I GEOTECHNICAL REPORT (FOR REFERENCE ONLY) CLG!FohjoffstMpx!Jnqbdu!Efwfmpqnfou!Sfqpsu 5786!NbdBsuivs!Dpvsu-!Tvjuf!511CLG!Qspkfdu!Op/!31351144 Ofxqpsu!Cfbdi-!Dbmjgpsojb!:3771 Q!:5:/637/9571 Agreement No. 7590 HFPUFDIOJDBM!JOWFTUJHBUJPOBOE!QFSDPMBUJPOSFQPSU C ITY OF E L S EGUNDO R ECREATION P ARK R ENOVATION P ROJECT-P HASE 1 512T IFMEPO!T USFFU F M T FHVOEP-D BMJGPSOJB:1356 C ONVERSE P ROJECT N O.24-31-126-01 Prepared For: MIG Ns/!Tufwf!Mboh-!QMB Qsjodjqbm 21:!Xftu!Vojpo!Bwfovf Gvmmfsupo-!Dbmjgpsojb!:3943 Presented By: C ONVERSE C ONSULTANTS 828!Tpvui!Nzsumf!Bwfovf Npospwjb-!Dbmjgpsojb:2127 737.:41.2311 Opwfncfs!23-!3135 Agreement No. 7590 Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Opwfncfs!23-!3135 Ns/!Tufwf!Mboh-!QMB Qsjodjqbm NJH 21:!XftuVojpo!Bwfovf Gvmmfsupo-!Dbmjgpsojb!:3943! Tvckfdu;GEOTECHNICAL INVESTIGATIONAND PERCOLATIONREPORT City of El Segundo Recreation Park RenovationProject-Phase 1 512Tifmepo!Tusffu-!Djuz!pg!Fm!Tfhvoep Mpt!BohfmftDpvouz-!Dbmjgpsojb!:1356 !!Dpowfstf!Qspkfdu!Op/!35.42.237.12! Efbs!Ns/!Mboh;! Dpowfstf!Dpotvmubout!)Dpowfstf*!ibt!qsfqbsfe!uijt!hfpufdiojdbm!jowftujhbujposfqpsu!up! qsftfou!uif!gjoejoht-!dpodmvtjpot-!boe!sfdpnnfoebujpot!pg!pvs!hfpufdiojdbm!Jowftujhbujpo gps!uif!Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!SfopwbujpoQspkfdu.Qibtf!2-!mpdbufe!buDjuz! pg!Fm!Tfhvoep-Mpt!BohfmftDpvouz-!Dbmjgpsojb/ Dpowfstf!fwbmvbufe!uif!obuvsf!boe!fohjoffsjoh!qspqfsujft!pg!uif!tvctvsgbdf!tpjmt!up! qspwjef!hfpufdiojdbm!sfdpnnfoebujpot!gps!tjuf!fbsuixpsl-!gpvoebujpo!eftjho!boe! dpotusvdujpo!gps!uif!qspqptfe!qspkfdu!efwfmpqnfou/!Pvs!tfswjdft!xfsf!qfsgpsnfe!jo! bddpsebodf!xjui!pvs!qspqptbm!ebufe!Kbovbsz!3:-!3135/! Xf!bqqsfdjbuf!uif!pqqpsuvojuz!up!cf!pg!tfswjdf!up!zpv/!Jg!zpv!ibwf!boz!rvftujpot-!qmfbtf! ep!opu!iftjubufup!dpoubdu!vt!bu!)737*!:41.2386/! Tjodfsfmz- CONVERSE CONSULTANTS Tjwb!L/!Tjwbuibtbo-!QiE-!QF-!HF-!EHF-!RTE-!G/!BTDF Tfojps!Wjdf!Qsftjefou0Qsjodjqbm!Fohjoffs 828!Tpvui!Nzsumf!Bwfovf-!Npospwjb-!Dbmjgpsojb!:2127 Ufmfqipof;!)737*!:41.2311!Gbdtjnjmf;!)737*!:41.2323!xxx/dpowfstfdpotvmubout/dpn Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!jj PROFESSIONAL CERTIFICATION Uijt!sfqpsu!gps!uif!Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf2- mpdbufe!jouif!djuz!pgFm!Tfhvoep-!Mpt!Bohfmft-!Dbmjgpsojb-!ibt!cffo!qsfqbsfe!cz!uif!tubgg! pg!Dpowfstf!voefs!uif!qspgfttjpobm!tvqfswjtjpo!pg!uif!joejwjevbmt!xiptf!tfbmt!boe! tjhobuvsft!bqqfbs!ifsfpo/ Uif!gjoejoht-!sfdpnnfoebujpot-!tqfdjgjdbujpot-!ps!qspgfttjpobm!pqjojpot!dpoubjofe!jo!uijt! sfqpsu!xfsf!qsfqbsfe!jo!bddpsebodf!xjui!hfofsbmmz!bddfqufe!qspgfttjpobm!fohjoffsjoh!boe! fohjoffsjoh!hfpmphjd!qsjodjqmft!boe!qsbdujdf!jo!uijt!bsfb!pg!Tpvuifso!Dbmjgpsojb/!Uifsf!jt! op!xbssbouz-!fjuifs!fyqsfttfe!ps!jnqmjfe/ Jo!uif!fwfou!uibu!dibohft!up!uif!qspqfsuz!pddvs-!ps!beejujpobm-!sfmfwbou!jogpsnbujpo!bcpvu! uif!qspqfsuz!jt!cspvhiu!up!pvs!buufoujpo-!uif!dpodmvtjpot!dpoubjofe!jo!uijt!sfqpsu!nbz!opu! cf!wbmje!vomftt!uiftf!dibohft!boe!beejujpobm!sfmfwbou!jogpsnbujpo!bsf!sfwjfxfe-boe!uif! sfdpnnfoebujpot!pg!uijt!sfqpsu!bsf!npejgjfe!ps!wfsjgjfe!jo!xsjujoh/ Spcjo!D/!Ejb{-!QiE Qspkfdu!Fohjoffs0Hfpmphjtu Tjwb!L/!Tjwbuibtbo-!QiE-!QF-!HF-!EHF-!RTE-!G/!BTDF Qsftjefou0Qsjodjqbm!Fohjoffs Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!jjj EXECUTIVE SUMMARY Uif!gpmmpxjoh!jt!b!tvnnbsz!pg!pvs!hfpufdiojdbm!tuvez-!gjoejoht-!dpodmvtjpot-!boe! sfdpnnfoebujpot-!bt!qsftfoufe!jo!uif!cpez!pg!uijt!sfqpsu/!!Qmfbtf!sfgfs!up!uif!bqqspqsjbuf! tfdujpot!pg!uif!sfqpsu!gps!dpnqmfuf!dpodmvtjpot!boe!sfdpnnfoebujpot/!Jo!uif!fwfou!pg!b! dpogmjdu!cfuxffo!uijt!tvnnbsz!boe!uif!sfqpsu-!ps!bopnjttjpo!jo!uif!tvnnbsz-!uif!sfqpsu! tibmm!qsfwbjm/ Uif!qspkfdu!tjuf!jt!mpdbufe!bu!512!Tfmepo!Tu-!Djuz!pg!Fm!Tfhvoep-!Mpt!Bohfmft! Dbmjgpsojb/Uif!qspkfdu!xjmm!jodmvefofx!hsbtt!uvsg!boe!jssjhbujpo!xjui!uif!qpttjcjmjuz! pg!jnqspwfe!esbjobhfboe!b!qfsdpmbujpo!uftujoh/!Jefoujgjdbujpo!pg!pme!cvsjfe!ujmf-!boe! efnpmjujpo!boe!dpotusvdujpo!pg!b!ofx!tlbufcpbse!gjfme/! B!upubm!pg!fjhiuffo!)29*!fyqmpsbupsz!cpsjoht!xfsf!esjmmfebu!uisff!tfqbsbuf!mpdbujpot! xjuijo!uif!qbsl!bt!gpmmpxt;!Uisff!)4*!dpodsfuf!dpsf!fyusbdujpot!xjui!cpsfipmft!bu! gjwf!gffu!effq!bu!uif!fyjtujoh!tlbufcpbse!gjfme-!gpvs!)5*!gjwf!gffu!cpsjoht!jodmvejoh! pof!)2*!gps!qfsdpmbujpo!uftujoh!bu!uif!tpgucbmm!gjfme-!boe!fmfwfo!)22*!fyqmpsbujpo! cpsjoht!bu!uisff!gffu!up!mpdbuf!uif!qsftfodf!pg!pme!cvsjfe!ujmft/!Bmm!cpsfipmft!xfsf! bewbodfe!vtjoh!b!iboebvhfs-!xjuijo!uif!qspkfdu!tjuf!cfuxffo!Pdupcfs!27!boe!28-! 3135/! Uif!fbsui!nbufsjbmt!fodpvoufsfe!evsjoh!pvs!jowftujhbujpo!dpotjtu!pg!fyjtujoh!gjmm!tpjmt! qmbdfe!evsjoh!qsfwjpvt!tjuf!hsbejoh!pqfsbujpot-!pme!ujmf!gsbhnfout!bu!uif!Csfuu!Gjfme boe!obuvsbm!bmmvwjbm!tpjmt!up!b!nbyjnvn!efqui!pg!6!gffu!cht/Uif!gjmmtpjmt fodpvoufsfe!dpotjtufe!qsjnbsjmz!pg!tboet!boe!tjmuz!tboet/!!Uifobujwfbmmvwjbm!tpjm! efqptjut!cfmpx!uif!gjmmtqsjnbsjmz!dpotjtut!pg!tboet-!boe!tjmuz!tboet/! Hspvoexbufs!xbt!opu!fodpvoufsfe!evsjoh!pvs!tvctvsgbdf!fyqmpsbujpo/! Uif!qspkfdu!tjuf!jt!opu!mpdbufe!xjuijo!b!dvssfoumz!eftjhobufe!Tubuf!pg!Dbmjgpsojb! Fbsuirvblf!Gbvmu!\[pof!)gpsnfsmz!Bmrvjtu.Qsjpmp!Tqfdjbm!Tuvejft!\[poft*!gps!tvsgbdf! gbvmu!svquvsf/!Op!tvsgbdf!gbvmut!bsf!lopxo!up!qspkfdu!uispvhi!ps!upxbset!uif!tjuf/ Uif!tjuf!jtopumpdbufe!xjuijo!b!nbqqfe!Tfjtnjd!Ib{bse!\[pof!gps!mjrvfgbdujpo/! !Pwfs.fydbwbujpo!boe!sf.dpnqbdujpo!pg!uif!gjmm!tpjmt!boe!vqqfs!bmmvwjvn!tfejnfout jt!sfdpnnfoefe/!Uif!njojnvn!efqui!pg!pwfs.fydbwbujpo!tipvme!cf!4!gffu!cfmpx! uif!hspvoe!tvsgbdf!ps!bu!mfbtu!3!gffu!cfmpx!cpuupn!pg!qspqptfe!tibmmpx! gpvoebujpot-!xijdifwfs!jt!effqfs/Uif!pwfs.fydbwbujpo!boe!sf.dpnqbdujpo!bsf sfdpnnfoefe!up!fyufoe!4!gffu!cfzpoe!uif!fehftpg!uif!cvjmejoh!tusvduvsf! gpvoebujpot/! Jg!mpptf!ps!tpgu!tpjmt!bsf!fodpvoufsfe-!pwfs.fydbwbuf!bo!beejujpobm!29!jodift!effq-! boe!uifo!qmbdf!29.jodi.uijdl!dpnqbdufe!cbtf!nbufsjbm!)DBC!ps!frvjwbmfou*!up! csjehf!uif!tpgu!cpuupn/!Cbtf!tipvme!cf!dpnqbdufe!up!:6&!sfmbujwf!dpnqbdujpo/!Bo! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!jw beejujpobm!mbzfs!pg!hfpgbcsjd!nbz!cf!offefe!po!upq!pg!cbtf!efqfoejoh!po!uif!bduvbm! tjuf!dpoejujpot/ Tjuf!tpjmt!uftufe!ibwf!”ofhmjhjcmf•!dpodfousbujpot!pg!xbufs.tpmvcmftvmgbuft-!xijdi! jt!dpotjefsfe!”opo.dpssptjwf•!up!dpodsfuf/ Uif!qI!wbmvf!boe!dimpsjef!dpoufou!pg!uif!tbnqmf!uftufe!jt!jo!uif!”opo.dpssptjwf•! sbohf/!!Ipxfwfs-!uif!sftjtujwjuz!jt!jo!uif!”dpssptjwf•!sbohf!up!gfsspvt!nfubmt!bu!uif! qspkfdu!tjuf/ Uif!qspqptfe!jnqspwfnfoutnbz!cf!tvqqpsufe!cz!tibmmpx!gpvoebujpotgpvoefe! po!dpnqbdufe!gjmm/ Qfsdpmbujpo!uftu!xbt!qfsgpsnfe!gps!uif!tvckfdu!qspkfdu!tjuf!boe!uif!sftvmut!bsf! qsftfoufe!jo!Bqqfoejy!D/ Sftvmut!pg!pvs!tuvez!joejdbuf!uibu!uif!tjuf!jt!tvjubcmf!gspn!b!hfpufdiojdbm!tuboeqpjou!gps! uif!qspqptfe!efwfmpqnfou-!qspwjefe!uibu!uif!sfdpnnfoebujpot!dpoubjofe!jo!uijt!sfqpsu! bsf!jodpsqpsbufe!joup!uif!eftjho!boe!dpotusvdujpo!pg!uif!qspkfdu/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!w! TABLE OF CONTENTS Qbhf!Ovncfs 1.0INTRODUCTION.............................................................................................................................. 1 2.0SITE AND PROJECT DESCRIPTION............................................................................................. 1 3/2T JUF!E FTDSJQUJPO/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////!2 3/3Q SPKFDU!E FTDSJQUJPO//////////////////////////////////////////////////////////////////////////////////////////////////////////////////!2 3.0SCOPE OF WORK.......................................................................................................................... 1 4/2Q SPKFDU!T FU.VQ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////!2 4/3T VCTVSGBDF!F YQMPSBUJPO///////////////////////////////////////////////////////////////////////////////////////////////////////////!3 4/4M BCPSBUPSZ!U FTUJOH///////////////////////////////////////////////////////////////////////////////////////////////////////////////////!4 4/5B OBMZTFT!BOE!S FQPSU/////////////////////////////////////////////////////////////////////////////////////////////////////////////////!4 4.0GEOLOGIC CONDITIONS.............................................................................................................. 3 5/2S FHJPOBM!H FPMPHJD!T FUUJOH///////////////////////////////////////////////////////////////////////////////////////////////////////!4 5/3T VCTVSGBDF!Q SPGJMF!PG!Q SPKFDU!T JUF////////////////////////////////////////////////////////////////////////////////////////!5 5/4H SPVOEXBUFS/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////!5 5/5T VCTVSGBDF!W BSJBUJPOT//////////////////////////////////////////////////////////////////////////////////////////////////////////////!6 5.0FAULTING AND SEISMIC HAZARDS............................................................................................ 5 6/2G BVMUJOH//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////!6 6/3T FJTNJD!I JTUPSZ//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////!7 6/4T VSGBDF!G BVMU!S VQUVSF/////////////////////////////////////////////////////////////////////////////////////////////////////////////!8 6/5M JRVFGBDUJPO!BOE!T FJTNJDBMMZ.J OEVDFE!T FUUMFNFOU/////////////////////////////////////////////////////////////////!8 6/6M BUFSBM!T QSFBEJOH/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////!8 6/7T FJTNJDBMMZ.J OEVDFE!T MPQF!J OTUBCJMJUZ//////////////////////////////////////////////////////////////////////////////////////!8 6/8F BSUIRVBLF.J OEVDFE!G MPPEJOH//////////////////////////////////////////////////////////////////////////////////////////////////!9 6/9U TVOBNJ!BOE!T FJDIFT///////////////////////////////////////////////////////////////////////////////////////////////////////////////////!9 6/:W PMDBOJD!F SVQUJPO!I B\[BSE////////////////////////////////////////////////////////////////////////////////////////////////////////!9 6.0SEISMIC ANALYSIS....................................................................................................................... 8 7/2DCDT FJTNJD!E FTJHO!Q BSBNFUFST//////////////////////////////////////////////////////////////////////////////////////////////!9 7.0EARTHWORK AND SITE GRADING RECOMMENDATIONS....................................................... 9 8/2H FOFSBM!F WBMVBUJPO///////////////////////////////////////////////////////////////////////////////////////////////////////////////////!: 8/3P WFS.F YDBWBUJPO//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////21 8/4T USVDUVSBM!G JMM////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////22 8/5F YDBWBUBCJMJUZ//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////22 8/6F YQBOTJWF!T PJM!N JUJHBUJPO////////////////////////////////////////////////////////////////////////////////////////////////////////22 8/7T ISJOLBHF!BOE!T VCTJEFODF//////////////////////////////////////////////////////////////////////////////////////////////////////23 8/8T VCHSBEF!Q SFQBSBUJPO////////////////////////////////////////////////////////////////////////////////////////////////////////////23 8.0DESIGN RECOMMENDATIONS...................................................................................................13 9/2T IBMMPX!G PVOEBUJPOT!GPS!Q SPQPTFE!S FUBJOJOH!X BMMT/////////////////////////////////////////////////////////24 9/3M BUFSBM!F BSUI!Q SFTTVSFT!BOE!S FTJTUBODF!UP!M BUFSBM!M PBET///////////////////////////////////////////////25 9/4N PEVMVT!PG!T VCHSBEF!S FBDUJPO/////////////////////////////////////////////////////////////////////////////////////////////25 9/5T MBCT.PO.H SBEF////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////26 9/6T PJM!D PSSPTJWJUZ!F WBMVBUJPO///////////////////////////////////////////////////////////////////////////////////////////////////26 9/7T JUF!E SBJOBHF////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////27 9.0CONSTRUCTION CONSIDERATIONS........................................................................................16 :/2H FOFSBM/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////27 Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!wj :/3U FNQPSBSZ!F YDBWBUJPOT//////////////////////////////////////////////////////////////////////////////////////////////////////////27 :/4T MPU!D VU!S FDPNNFOEBUJPOT////////////////////////////////////////////////////////////////////////////////////////////////////28 :/5H FPUFDIOJDBM!T FSWJDFT!E VSJOH!D POTUSVDUJPO//////////////////////////////////////////////////////////////////////28 10.0CLOSURE......................................................................................................................................18 11.0REFERENCES...............................................................................................................................19 FIGURES Gpmmpxjoh!Qbhf!Ovncfs Gjhvsf!Op/!2-!Tjuf!Mpdbujpo!Nbq//////////////////////////////////////////////////////////////////////////////////////////////////2!! Gjhvsf!Op/!3-!Bqqspyjnbuf!Cpsjoh!Mpdbujpot!Nbq///////////////////////////////////////////////////////////////////////!3! Gjhvsf!Op/!4-!Sfhjpobm!Hfpmphjd!Nbq/////////////////////////////////////////////////////////////////////////////////////////4!! Gjhvsf!Op/!5-!Tpvuifso!Dbmjgpsojb!Sfhjpobm!Gbvmu!Nbq////////////////////////////////////////////////////////////////!6! Gjhvsf!Op/!6-!Fqjdfoufs!Nbq!pg!Tpvuifso!Dbmjgpsojb!Fbsuirvblft!)2911.2:::*///////////////////////////!6! Gjhvsf!Op/!7-!Tfjtnjd!Ib{bse!\[poft!Nbq///////////////////////////////////////////////////////////////////////////////////!8! TABLES Qbhf!Ovncfs Ubcmf!Op/!2-Xfmmt!Ofbs!uif!Tjuf!gps!Ijtupsjd!Ifjhiu////////////////////////////////////////////////////////////////////!5! Ubcmf!Op/!3-!Tvnnbsz!pg!Sfhjpobm!Gbvmut///////////////////////////////////////////////////////////////////////////////////!6! Ubcmf!Op/!4-!DCD!Tfjtnjd!Eftjho!Nbq!Qbsbnfufst///////////////////////////////////////////////////////////////////!9! Ubcmf!Op/!5-!Bdujwf!boe!Bu.Sftu!Fbsui!Qsfttvsft//////////////////////////////////////////////////////////////////////25 Ubcmf!Op/!6-!Tpjm!Dpssptjwjuz!Uftu!Sftvmut/////////////////////////////////////////////////////////////////////////////////!26! Ubcmf!Op/!7-!Tmpqf!Sbujpt!gps!Ufnqpsbsz!Fydbwbujpot//////////////////////////////////////////////////////////////28 APPENDICES Bqqfoejy!B////////////////////////////////////////////////////////////////////////////////////////////////////////Gjfme!Fyqmpsbujpo Bqqfoejy!C///////////////////////////////////////////////////////////////////////////////////////Mbcpsbupsz!Uftujoh!Qsphsbn Bqqfoejy!D////////////////////////////////////////////////////////////////////////////////////////////////////Qfsdpmbujpo!Uftujoh Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!2! 1.0INTRODUCTION Uijt!sfqpsu!dpoubjot!uif!gjoejoht!boe!sfdpnnfoebujpot!pg!pvs!hfpufdiojdbm!tuvez! qfsgpsnfebuuif!qspqptfe!tjuf!pg!uif!qmboofeqibtf!2!pg!Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo! Qbsl!Sfopwbujpo.Qspkfdu-!efnpmjujpo!boe!sfdpotusvdujpo!pg!uif!tlbuf!qbsl-!ofx!uvsg!boe! jssjhbujpo!xjui!uif!qpttjcjmjuz!pg!jnqspwfe!esbjobhf-!boe!uif!jefoujgjdbujpo!pg!pme!cvsjfe!ujmft! bu!Csfuu!Gjfme!bu!Fm!Tfhvoep!SfdsfbujpoQbsl!mpdbufe!joFm!Tfhvoep-Mpt!Bohfmft- Dbmjgpsojb-bt!tipxo!po!GjhvsfOp/2-!Site Location Map/ Uijt!sfqpsu!jt!xsjuufo!gps!uif!qspkfdu!eftdsjcfe!ifsfjo!boe!jt!joufoefe!gps!vtf!tpmfmz!cz NJH!Fohjoffst!boe!juteftjho!ufbn/!!Ju!tipvme!opu!cf!vtfe!bt!b!cjeejoh!epdvnfou!cvu! nbz!cf!nbef!bwbjmbcmf!up!uif!qpufoujbm!dpousbdupst!gps!jogpsnbujpo!po!gbduvbm!ebub!pomz/!! Gps!cjeejoh!qvsqptft-!uif!dpousbdupst!tipvme!cf!sftqpotjcmf!gps!nbljoh!uifjs!pxo! joufsqsfubujpo!pg!uif!ebub!dpoubjofe!jo!uijt!sfqpsu/ 2.0SITE AND PROJECT DESCRIPTION 2.1Site Description Uif!qspkfdu!tjufjt!joDjuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl-Mpt!Bohfmft-!Dbmjgpsojb/!Uif! qspqptfe!qspkfdu!bsfb!jt!mpdbufe!cfuxffo!F/!Qjof!Bwfovf-!boe!Tifmepo!Tusffu!bt!tipxo! joGjhvsfOp/2-!Site Location Map/! 2.2Project Description Uif!qspqptfe!qspkfdu!dpotjtut!pg!efnpmjujpo!boe!sfdpotusvdujpo!pg!uif!tlbuf!qbsl-!ofx!uvsg! boe!uif!qpttjcjmjuz!pg!b!ofx!jssjhbujpo!tztufn-!bmtp!uif!qspkfdu!jodmveft!uif!jefoujgjdbujpo! pg!fyjtujoh!pme!ujmft!cvsjfe!xjuijo!Csfuu!Gjfme-!boe!b!xbufs!jogjmusbujpo!tuvez/!Bo!fyjtujoh! tlbufcpbse!qbsljogsbtusvduvsf!uibu!ibtfydffefe!jutvtfgvm!mjgf!xjmm!cf!sfqmbdfe!xjui!b!ofx! Tlbufcpbse!Qbsl/ 3.0SCOPE OF WORK Uif!tdpqf!pg!pvs!xpsl!jodmvefe!qspkfdu!tfu.vq-!tvctvsgbdf!fyqmpsbujpo!xjui!tpjm!tbnqmjoh-! mbcpsbupsz!uftujoh-!fohjoffsjoh!bobmztjt-!boe!qsfqbsbujpo!pg!uijt!sfqpsu/ 3.1Project Set-up Uif!qspkfdu!tfu.vq!dpotjtufe!pg!uif!gpmmpxjoh!ubtlt/ Qmpu!uif!qspqptfe!cpsjoht!po!uif!fyijcju!tipxjoh!uif!mpdbujpot!pg!uif!qspqptfe! jnqspwfnfout/ Dppsejobufe!xjui!dmjfou!up!tdifevmf!uif!gjfme!jowftujhbujpo/! !Nbslfe!uif!cpsjoh!mpdbujpot!bt!tipxo!po!uif!fyijcju/! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!3! Opujgjfe!Voefshspvoe!Tfswjdf!Bmfsu!)VTB*!up!dmfbs!uif!cpsjoh!mpdbujpot!pg!dpogmjdu! xjui!voefshspvoe!vujmjujft/ Bssbohfe!gps!esjmmjoh!boe!tbnqmjoh!pg!uif!fyqmpsbupsz!cpsjoht/ 3.2 Subsurface Exploration Fjhiuffo!)29*fyqmpsbupsz!cpsjoht!xfsf!esjmmfe!bu!uisff!tfqbsbuf!mpdbujpot!xjuijo!uif!qbsl! bt!gpmmpxt;!Uisff!)4*!dpodsfuf!dpsf!fyusbdujpot!xjui!cpsfipmft!bu!gjwf!gffu!effq!bu!uif! fyjtujoh!tlbufcpbse!gjfme-!gpvs!)5*!gjwf!gffu!cpsjoht!jodmvejoh!pof!)2*!gps!qfsdpmbujpo!uftujoh! bu!uif!tpgucbmm!gjfme-!boe!fmfwfo!)22*!fyqmpsbujpo!cpsjoht!bu!uisff!gffu!up!mpdbuf!uif!qsftfodf! pg!pme!cvsjfe!ujmft/!Fbdi!cpsjoh!xbt!wjtvbmmz!mphhfe!cz!b!Dpowfstf!fohjoffs!boe!tbnqmfe! bu!sfhvmbs!joufswbmt!boe!bu!dibohft!jo!tvctvsgbdf!tpjmt/!Efubjmfe!eftdsjqujpot!pg!uif!gjfme! fyqmpsbujpo!boe!tbnqmjoh!qsphsbn!bsf!qsftfoufe!jo!Bqqfoejy!B-!Field Exploration/ Sfmbujwfmz!voejtuvscfe!sjoh!boe!cvml!tbnqmft!pg!uif!tvctvsgbdf!tpjmt!xfsf!pcubjofe!bu! gsfrvfou!joufswbmt!jo!qsf.tfmfdufe!cpsjohtjuft/!Uif!voejtuvscfe!tbnqmft!xfsf!pcubjofe! vtjoh!b!Npejgjfe!Dbmjgpsojb!Tuffm!Tbnqmfs!)3/5!jodift!jotjef!ejbnfufs!boe!4/1!jodift! pvutjef!ejbnfufs*!mjofe!xjui!uijo!tbnqmf!sjoht/!!Uif!tbnqmfs!xbt!esjwfo!joup!uif!cpuupn! pg!uif!cpsfipmft!xjui!tvddfttjwf!espqt!pg!b!51.qpvoe!ibnnfs!gbmmjoh!23!jodift!cz!iboe/ Uif!ovncfs!pg!tvddfttjwf!espqt!pg!uif!esjwjoh!xfjhiu!)”cmpxt•*!sfrvjsfe!gps!fwfsz!7.jodi! pg!qfofusbujpo!pg!uif!tbnqmfs!bsf!tipxo!po!uif!Mpht!pg!Cpsjoht!jo!uif!”cmpxt•!dpmvno/ Uif!cpsjoht!xfsfcbdlgjmmfe!xjuihsbwfm!boetpjm!dvuujoht-!hspvoexbufs!xbt!opu! fodpvoufsfe/ Uif!bqqspyjnbuf!mpdbujpot!pg!uif!fyqmpsbupsz!cpsjoht!bsf!tipxo!jo!GjhvsfOp/3-! ApproximateBoring LocationsMap.Gps!b!eftdsjqujpo!pg!uif!gjfme!fyqmpsbujpo!boe! tbnqmjoh!qsphsbn!tff!Bqqfoejy!B-!Field Exploration/! 3.3Tiles Buried at George Brett Field Xf!esjmmfe!tibmmpxuisff)4*gffueffqcpsfipmft!bu!Csfuu!Gjfme-!uif!qvsqptf!pg!uiftf! fyqmpsbujpo!cpsfipmft!xbt!up!efufsnjof!uif!fyjtufodf!pg!cvsjfe!ujmft!voefsofbui!uif!gjfme-! boe!up!pcubjo!vobmufsfe!sjoh!tbnqmft!gps!mbcpsbupsz!uftujoh/ Xf!gpvoe!qjfdft!pg!ujmf!bu!gpvs!ejggfsfou!mpdbujpot!)HC.5-!HC.9-!HC.21-!boe!HC.22*-!tff! Gjhvsf!Op/!3/!Ju!jt!qpttjcmfuibu!uifsf!bsf!ujmf!qjfdft!tdbuufsfe!bmm!pwfs!uif!gjfme-!eftqjuf! pvs!tbnqmjoh!ejeo“u!gjoe!tbnqmft!bu!bmm!mpdbujpot-!qpttjcmz-!b!npsf!uipspvhi!fyqmpsbujpo! xpvmegjoe!qjfdft!pg!ujmf!bmm!pwfs!uif!gjfme-!cvu!uibu!xpvme!dsfbuf!b!tjhojgjdbou!ejtuvscbodf! jo!uif!gjfme!uibu!tipvmeopu!cf!ofdfttbsz/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!4! 3.3Laboratory Testing Sfqsftfoubujwf!tbnqmft!pg!uif!tjuf!tpjmt!xfsf!uftufe!jo!uif!mbcpsbupsz!up!bje!jo!uifjs dmbttjgjdbujpo-!boe!up!fwbmvbuf!sfmfwbou!fohjoffsjoh!qspqfsujft/!Uif!uftut!qfsgpsnfe! jodmvefe; In situ npjtuvsf!dpoufout!boe!esz!efotjujft!)BTUN!Tuboebse!E3327* Tpjm!Dpssptjwjuz!Uftut!)Dbmusbot!754-!533-!528* Hsbjo!tj{f!bobmztjt!)BTUN!Tuboebse!E533*! Nbyjnvn!esz!efotjuz!boe!pqujnvn.npjtuvsf!dpoufou!sfmbujpotijq!)BTUN!Tuboebse! E2668*! Ejsfdu!tifbs!)BTUN!Tuboebse!E4191* 3.4Analyses and Report Ebub!pcubjofe!gspn!uif!fyqmpsbupsz!gjfmexpsl!boe!mbcpsbupsz.uftujoh!qsphsbn!xfsf! bobmz{fe!boe!fwbmvbufexjui!sftqfdu!up!uif!qmboofe!dpotusvdujpo/!Uijt!sfqpsu!xbt! qsfqbsfe!up!qspwjef!uif!gjoejoht-!dpodmvtjpot!boe!sfdpnnfoebujpot!efwfmpqfe!evsjoh! pvs!tuvezboe!fwbmvbujpo/ 4.0GEOLOGIC CONDITIONS 4.1Regional Geologic Setting Uif!qspkfdu!tjuf!mjftxjuijo!2/3!njmft!fbtu!gspn!uif!Qbdjgjd!Pdfbo-!mftt!uibo!pof!njmf!tpvui! pg!Mpt!Bohfmft!Joufsobujpobm!Bjsqpsu!)MBY*-!tpjmt!bmnptu!jo!jut!foujsfmz!bsf!dpnqsjtfe!pgPme! tboe!evof!efqptjut!)Rpt*-!pwfsmzjoh!pmefs!bmmvwjvnhsbz!up!mjhiu!cspxo-!qfccmf.hsbwfm-! tboe!boe!tjmu.dmbz-!fmfwbufe!boe!ejttfdufe<!Cbmexjo!Ijmmt!eftjhobufe!bt!Cbmexjo!Ijmmt! )Rpb*!mjft!jouif!tpvuifso!dpbtubm!sbohft/!Uif!tjuf!jt!mpdbufe!jo!uif!tpvuifso!ibmg!pg!uif! Dpbtu!Sbohft!hfpnpsqijd!qspwjodf!pg!Dbmjgpsojb/!Uif!Dpbtu!Sbohft!qspwjodf!fyufoet bqqspyjnbufmz!711!njmft!gspn!uif!Psfhpo!cpsefs!up!uif!Tboub!Zof{!Sjwfs!jo!uif!tpvui/! Uif!gbvmut!bsf!hfofsbmmz!opsuixftu!usfoejoh!boe!qbsbmmfm!uif!Tbo!Boesfbt!gbvmu!tztufn/! Mpdbm!boe!sfhjpobm!gbvmut!jodmvef!Qbmpt!Wfseft!boe!Qbmpt!Wfseft!Dpoofdufe!)7/65!nl*-! Ofxqpsu!Johmfxppe!bmu!2!boe!Ofxqpsu!Johmfxppe!bmu!2!Dpoofdufe!)8/13!ln*-!Tboub! Npojdb!Bmu!3!)24/4!ln*!Tboub!Npojdb!Bmu!2!)25/14!ln*-!bsf!uif!ofbsftu!gbvmut!xjuijo!26!ln! gspn!uif!qspkfdu!tjuf-!b!Tvnnbsz!pg!uif!gbvmut!xjuijo!61!ln!pg!uif!qspkfdu!tjuf!bsf! tvnnbsj{fe!joUbcmf!Op/2/ Gjhvsf!Op/!4-!Regional Geologic Map-!ibt!cffo!qsfqbsfe!up!tipx!uif!mpdbujpo!pg!Fm! Tfhvoep!Qbsl!boe!Sfdsfbujpo!xjui!sftqfduupuif!hfpmphjd!vojut!dpnqsjtjoh!uif!tjuf!boe! vojut!uibu!tvsspvoe!ju/!Uif!tjuf!jt!mpdbufe!pwfs!vqqfs!Qmfjtupdfof!up!pmeRvbufsobsz!tboe! evofefqptjut!)Rpt*!jo!dpoubdu!xjui!bmmvwjbm!hsbz!up!mjhiu!cspxo!qfccmf.hsbwfm-!tboe!boe! tjmu!efqptjut!)Rbf*-!cpui!vojut!pwfsmbz!pmefs!bmmvwjvn!pg!hsbz!up!mjhiu!cspxo!qfccmf.hsbwfm-! tboe!boe!tjmu.dmbz!tvsgjdjbm!tfejnfout)Rpb*/)nbq!EG.433!Wfojdf.Johmfxppe!OHNEC*/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!5! Hfpmphjd!bdujwf!gbvmut!ofbscz<!Qbmpt!Wfseft-!Ofxqpsu.Johmfxppe-!Tboub!Npojdb-!Qvfouf! Ijmmt-!Nbmjcv!gbvmut!boe!puifs!bdujwf!mpdbm!boe!sfhjpobm!gbvmut!xfsf!jodmvefe!bt!bdujwf!gbvmut! npefmfe!gps!uif!qspcbcjmjtujd!tfjtnjd!ib{bse!bobmztjt/ 4.2 Subsurface Profile of Project Site Uif!fbsui!nbufsjbmt!fodpvoufsfe!evsjoh!pvs!jowftujhbujpo!dpotjtu!pg!fyjtujoh!gjmm!tpjmt! qmbdfe!evsjoh!qsfwjpvt!tjuf!hsbejoh!pqfsbujpot!boe!obuvsbm!bmmvwjbm!tpjmt!up!b!nbyjnvn! fyqmpsfe!efqui!pg!6!gffu!cht/!Uif!gjmm!fodpvoufsfe!dpotjtut!qsjnbsjmz!pg!tboet!boe!tjmuz! tboet/!!Uif!bmmvwjbm!tpjm!efqptjut!cfmpx!uif!gjmm!qsjnbsjmz!dpotjtu!pg!tboet-!boe!tjmuztboet/! Uif!qbsl!mjft!bu!uif!cpsefs!xjui!Fm!Tfhvoep!Pjm!Hbt!Gjfme-!bmmvwjbm!efqptjut!bsf!bmm! dpotjtufou!xjui!uif!eftdsjcfe!Pme!Tboe!Evof!Efqptjut!)Rpt*-!uif!qspkfdu!tjuf!jt!sfmbujwfmz! gmbu-!xjui!pme!evof!efqptjut!uibu!gpsn!tnbmm!ijmmt!bmpoh!uif!dpbtubm!qmbjot!pg!Johmfxppe-! Mfoopy!boe!Ibxuipsof!boe!gvsuifs!Tpvui!Sfepoep!Cfbdi!boe!Upssbodf Gps!b!efubjmfe!eftdsjqujpo!pg!uif!nbufsjbmt!fodpvoufsfe!evsjoh!pvs!fyqmpsbujpo-!tff! Bqqfoejy!B, Field Exploration. 4.3 Groundwater Evsjoh!pvs!gjfme!fyqmpsbujpo-!hspvoexbufs!xbt!opu!fodpvoufsfe/!Ijtupsjdbmmz!ijhiftu! hspvoexbufs!dpoupvst!dpnqjmfe!cz!uif!DENH!)2:99*!gps!uif!Wfojdf8/6.njovuf! rvbesbohmf-!dmptftu!xbufs!mfwfm!dpoupvs!jt!bcpvu!5/6!njmft!gspn!uif!qspkfdu!tjuf-!ju!tipxt! xbufs!mfwfmt!bu!6!gffu!cfmpx!hspvoe!mfwfm/!Ebub!gspn!uif!Dbmjgpsojb!Efqbsunfou!pg!Xbufs! Sftpvsdft-!tipxt!uif!uisff!dmptftu!xfmmt!up!uif!qspkfdu!tjuf-!joejdbuf!ijtupsjd!ijhi!mfwfmt! pg!3/33-!8/76!boe!35/42!gffu!cfmpx!hspvoe!mfwfm!)UbcmfOp/!2*/! Table No. 1, Wells Near the Site for Historic Height Measured LocationMeasurement Site CodeWell NameDepth Range CoordinatesDate Range (feet bgs) 44/:639 44:639O2294935X11213T25X42I112T8/762::8 .229/4935 44/:229! 44:229O2294782X11314T25X28H115T 35/42.35/5:2::: .229/4782 44/:777:74! 44:781O22946:8X113Johmfxppe2`5 3/33.5/922::9.3113 .229/46:77: Jo!hfofsbm-!hspvoexbufs!mfwfmt!gmvduvbuf!xjui!uif!tfbtpot-!boe!mpdbm!{poft!pg!qfsdife! hspvoexbufs!nbz!cf!qsftfou!xjuijo!uif!ofbs.tvsgbdf!efqptjut!evf!up!mpdbm!dpoejujpot!ps! evsjoh!sbjoz!tfbtpot/!Hspvoexbufs!dpoejujpot!cfmpx!boz!hjwfo!tjuf!wbsz!efqfoejoh!po! ovnfspvt!gbdupst!jodmvejoh!tfbtpobm!sbjogbmm-!mpdbm!jssjhbujpo-!tupsn!xbufs!sfdibshf!boe! hspvoexbufs!qvnqjoh-!bnpoh!puifs!gbdupst/!! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!6! 4.4 Subsurface Variations Cbtfe!po!sftvmut!pg!uif!tvctvsgbdf!fyqmpsbujpo!boe!pvs!fyqfsjfodf-!tpnf!wbsjbujpot!jo! uif!dpoujovjuz!boe!obuvsf!pg!tvctvsgbdf!dpoejujpot!xjuijo!uif!qspkfdu!tjuf!tipvme!cf! boujdjqbufe/!!Cfdbvtf!pg!uif!vodfsubjoujft!jowpmwfe!jo!uif!obuvsf!boe!efqptjujpobm! dibsbdufsjtujdt!pg!uif!fbsui!nbufsjbm!bu!uif!tjuf-!dbsf!tipvme!cf!fyfsdjtfe!jo!joufsqpmbujoh! ps!fyusbqpmbujoh!tvctvsgbdf!dpoejujpot!cfuxffo!ps!cfzpoe!uif!cpsjoh!mpdbujpot/!!Jg-!evsjoh! dpotusvdujpo-!tvctvsgbdf!dpoejujpot!ejggfs!tjhojgjdboumz!gspn!uiptf!qsftfoufe!jo!uijt!sfqpsu-! uijt!pggjdf!tipvme!cf!opujgjfe!jnnfejbufmz!tp!uibu!sfdpnnfoebujpot!dbo!cf!npejgjfe-!jg! ofdfttbsz/ 5.0FAULTING AND SEISMIC HAZARDS Ejtdvttjpo!pg!gbvmujoh!boe!tfjtnjdjuz!jt!qsftfoufe!jo!uif!gpmmpxjoh!tfdujpot/ 5.1Faulting Jo!Dbmjgpsojb-!uif!Bmrvjtu.Qsjpmp!Fbsuirvblf!Gbvmu!\[pojoh!Bdu!sfhvmbuft!efwfmpqnfou!jo!uif! wjdjojuz!pg!bdujwf!gbvmut/!!Gps!qvsqptft!pg!uif!Bdu-!Dbmjgpsojb!efgjoft!bo!bdujwf!gbvmu!bt!pof! xijdi!ibt!ibe!tvsgbdf!ejtqmbdfnfou!xjuijo!Ipmpdfof!ujnf-!ps!bcpvu!uif!mbtu!22-111!zfbst/! Uif!tjuf!jt!dvssfoumz!opu!mpdbufe!xjuijo!b!dvssfoumz!eftjhobufe!Tubuf!pg!Dbmjgpsojb! Fbsuirvblf!Gbvmu!\[pof/!Uif!Dbmjgpsojb!Hfpmphjd!Tvswfz!)DHT*!gps!uif!8/6!njovuf!Wfojdf! Rvbesbohmf!joejdbuft!uibu!uifsf!bsf!opgbvmut!nbqqfe!upxbse!ps!xjuijo!uif!qspkfdu!tjuf-! Uif!qspqptfe!tjuf!jt!tjuvbufe!jo!b!tfjtnjdbmmz!bdujwf!sfhjpo/!!Bt!jt!uif!dbtf!gps!nptu!bsfbt! pg!Dbmjgpsojb-!hspvoe.tibljoh!sftvmujoh!gspn!fbsuirvblft!bttpdjbufe!xjui!ofbscz!boe! npsf!ejtubou!gbvmut!nbz!pddvs!bu!uif!qspkfdu!tjuf/!!Evsjoh!uif!mjgf!pg!uif!qspkfdu-!tfjtnjd! bdujwjuz!bttpdjbufe!xjui!bdujwf!gbvmut!dbo!cf!fyqfdufe!up!hfofsbuf!npefsbuf!up!tuspoh! hspvoe!tibljoh!bu!uif!tjuf/!Qmfbtf!tff!Gjhvsf!Opt/!5!boe!6/ Uif!gpmmpxjoh!ubcmf!dpoubjot!b!mjtu!pg!bdujwf!boe!qpufoujbmmz!bdujwf!gbvmut!xjuijo!61! ljmpnfufst!pg!uif!tvckfdu!tjuf!cbtfe!po!tjuf!dppsejobuft!pg!44/:3347:±Opsui!)mbujuvef*!boe! 229/5225699±Xftu!)mpohjuvef*/ Table No. 2, Summary of Regional Faults Maximum Pref Slip DistanceMoment NameRate (km)Magnitude (mm/yr) (Mmax) 7/658/84 Qbmpt!Wfseft!Dpoofdufe 7/658/44 Qbmpt!Wfseft 8/138/62/4 Ofxqpsu!Johmfxppe!Dpoofdufe!bmu!2 8/138/32 Ofxqpsu.Johmfxppe-!bmu!2 9/448/62/4 Ofxqpsu!Johmfxppe!Dpoofdufe!bmu!3 24/48/53/5 Tboub!Npojdb!Dpoofdufe!bmu!3 Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!7! Maximum Pref Slip DistanceMoment NameRate (km)Magnitude (mm/yr) (Mmax) 25/147/72 Tboub!Npojdb-!bmu!2 25/3781/8 Qvfouf!Ijmmt!)MB* 27/187/81/4 Nbmjcv!Dpbtu-!bmu!2 27/1881/4 Nbmjcv!Dpbtu-!bmu!3 28/38/34 Bobdbqb.Evnf-!bmu!3 29/327/82 Ipmmzxppe 33/::7/82/4 Fmztjbo!Qbsl!)Vqqfs* 36/297/81/8 Qvfouf!Ijmmt!)Tboub!Gf!Tqsjoht* 38/378/34 Bobdbqb.Evnf-!bmu!2 39/387/92/6 Sbznpoe 427/:1/6 Wfsevhp 45/157/:1/8 Qvfouf!Ijmmt!)Dpzpuf!Ijmmt* 45/68/143/6 Fmtjopsf<X 45/68/38o0b Fmtjopsf<X,HJ 45/68/59o0b Fmtjopsf<X,HJ,U 45/68/83o0b Fmtjopsf<X,HJ,U,K 45/68/8:o0b Fmtjopsf<X,HJ,U,K,DN 49/298/43 Tjfssb!Nbesf!Dpoofdufe 49/298/33 Tjfssb!Nbesf 51/37/83 Tjfssb!Nbesf!)Tbo!Gfsoboep* 54/447/:2/6 Opsuisjehf 54/::7/:6 Tboub!Tvtbob-!bmu!2 56/858/42 Tbo!Hbcsjfm 58/627/81/6 Dmbntifmm.Tbxqju )Tpvsdf;!!iuuqt;00fbsuirvblf/vtht/hpw0dgvtjpo0ib{gbvmut`3119`tfbsdi0* 5.2Seismic History Bo!bobmztjt!pg!uif!tfjtnjd!ijtupsz!pg!uif!tjuf!xbt!dpoevdufe!vtjoh!uif!dpnqvufs!qsphsbn! FRTFBSDI-!)Cmblf-!3111*-!boe!buufovbujpo!sfmbujpotijqt!qspqptfe!cz!Cppsf!fu!bm/! )2::8*!gps!tujgg!tpjm!dpoejujpot/!Uif!Tpvuifso!Dbmjgpsojb!Fbsuirvblf!Dbubmph!xjui!uif! Tpvuifso!Dbmjgpsojb!Fbsuirvblf!Dfoufs!xbt!bmtp!vujmj{fe!)TDFD-!3122*/ Cbtfe!po!uif!bobmztjt!pg!tfjtnjd!ijtupsz-!uif!ovncfs!pg!fbsuirvblft!xjui!b!npnfou! nbhojuvef!pg!6/1!ps!hsfbufs!pddvssjoh!xjuijo!b!ejtubodf!pg!211!ljmpnfufst!xbt!282-!tjodf! uif!zfbs!2911/!!Cbtfe!po!uif!bobmztjt-!uif!mbshftu!fbsuirvblf.joevdfe!hspvoe! bddfmfsbujpo!bggfdujoh!uif!tjuft!tjodf!uif!zfbs!2911!jt!b!8/1!nbhojuvef!fbsuirvblf!jo!2969 xjui!b!dbmdvmbufe!hspvoe!bddfmfsbujpo!pg!1/265h!bu!uif!tjuft/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!8! 5.3Surface Fault Rupture Uif!qspkfdu!tjufjtopu!mpdbufe!xjuijo!b!dvssfoumz!eftjhobufe!Tubuf!pg!Dbmjgpsojb!Fbsuirvblf! Gbvmu!\[pof!)gpsnfsmz!Bmrvjtu.Qsjpmp!Tqfdjbm!Tuvejft!\[poft*!gps!tvsgbdf!gbvmu!svquvsf/!!Uif! Bmrvjtu.Qsjpmp!Fbsuirvblf!Gbvmu!\[pojoh!Bdu!sfrvjsft!uif!Dbmjgpsojb!Hfpmphjdbm!Tvswfz!up! {pof!”bdujwf!gbvmut•!xjuijo!uif!Tubuf!pg!Dbmjgpsojb/!!Bo!”bdujwf!gbvmu•!ibt!fyijcjufe!tvsgbdf! ejtqmbdfnfou!xjui!Ipmpdfof!ujnf!)xjuijo!uif!mbtu!22-111!zfbst*!ifodf!dpotujuvujoh!b! qpufoujbm!ib{bse!up!tusvduvsft!uibu!nbz!cf!mpdbufe!bdsptt!ju/!!Qvcmjd!tdippm!tusvduvsft!bsf! sfrvjsfe!up!cf!tfu.cbdl!bu!mfbtu!61!gffu!gspn!bo!bdujwf!gbvmu/!!Uif!bdujwf!gbvmu!tfu.cbdl! ejtubodf!jt!nfbtvsfe!qfsqfoejdvmbs!gspn!uif!ejq!pg!uif!gbvmu!qmbof/!Cbtfe!po!b!sfwjfx!pg! fyjtujoh!hfpmphjd!jogpsnbujpo-!op!lopxo!bdujwf!gbvmut!qspkfdu!uispvhi!ps!upxbse!uif!tjuf/!! Uif!qpufoujbm!gps!tvsgbdf!svquvsf!sftvmujoh!gspn!uif!npwfnfou!pg!uif!ofbscz!nbkps!gbvmut! jt!dpotjefsfe!sfnpuf/ 5.4Liquefaction and Seismically-Induced Settlement Mjrvfgbdujpo!jt!uif!tveefo!efdsfbtf!jo!uif!tusfohui!pg!dpiftjpomftt!tpjmt!evf!up!ezobnjd! ps!dzdmjd!tibljoh/!!Tbuvsbufe!tpjmt!cfibwf!ufnqpsbsjmz!bt!b!wjtdpvt!gmvje!)mjrvfgbdujpo*!boe-! dpotfrvfoumz-!mptf!uifjs!dbqbdjuz!up!tvqqpsu!uif!tusvduvsft!gpvoefe!po!uifn/!!Uif! qpufoujbm!gps!mjrvfgbdujpo!efdsfbtft!xjui!jodsfbtjoh!dmbz!boe!hsbwfm!dpoufou!cvu!jodsfbtft! bt!uif!hspvoe!bddfmfsbujpo!boe!evsbujpo!pg!tibljoh!jodsfbtf/!!Mjrvfgbdujpo!qpufoujbm!ibt! cffo!gpvoe!up!cf!uif!hsfbuftu!xifsf!uif!hspvoexbufs!mfwfm!boe!mpptftboet!pddvs!xjuijo! 61!gffu!pg!uif!hspvoe!tvsgbdf/!! Uif!tjuf!jt!opu!mpdbufe!xjuijo!qpufoujbm!mjrvfgbdujpo!{poft!qfs!uif!Tubuf!pg!Dbmjgpsojb Tfjtnjd!Ib{bse!\[poft!Nbq!gps!uif!Tpvui!Hbuf!Rvbesbohmf!bt!tipxo!jo!Gjhvsf!Op/7 Seismic Hazard Zones Map/!! 5.5Lateral Spreading Tfjtnjdbmmz!joevdfe!mbufsbm!tqsfbejoh!jowpmwft!qsjnbsjmz!mbufsbm!npwfnfou!pg!fbsui! nbufsjbmt!evf!up!hspvoe!tibljoh/!!Ju!ejggfst!gspn!uif!tmpqf!gbjmvsf!jo!uibu!dpnqmfuf!hspvoe! gbjmvsf!jowpmwjoh!mbshf!npwfnfou!epft!opu!pddvs!evf!up!uif!sfmbujwfmz!tnbmmfs!hsbejfou!pg! uif!jojujbm!hspvoe!tvsgbdf/!Mbufsbm!tqsfbejoh!jt!efnpotusbufe!cz!ofbs.wfsujdbm!dsbdlt!xjui! qsfepnjoboumz!ipsj{poubm!npwfnfou!pg!uif!tpjm!nbtt!jowpmwfe/!Uif!upqphsbqiz!bu!uif! qspkfdu!tjuft!boe!jo!uif!jnnfejbuf!wjdjojuz!pg!uif!tjuft!jt!sfmbujwfmz!gmbu-!xjui!op!tjhojgjdbou! ofbscz!tmpqft!ps!fncbolnfout/!!Voefs!uiftf!djsdvntubodft-!uif!qpufoujbm!gps!mbufsbm! tqsfbejoh!bu!uif!tvckfdu!tjuf!jt!dpotjefsfe!ofhmjhjcmf/ 5.6Seismically-Induced Slope Instability Tfjtnjdbmmz!joevdfe!mboetmjeft!boe!puifs!tmpqf!gbjmvsft!bsf!dpnnpo!pddvssfodft!evsjoh! ps!tppo!bgufs!fbsuirvblft/!Uif!qspkfdu!tjuft!bsf!bmtp!opu!tipxo!xjui!boz!fbsuirvblf. joevdfe!mboetmjef!bsfbt!evf!up!uif!sfmbujwfmz!gmbu!dpoejujpo!pg!uif!tjuf!upqphsbqiz/!!Jo!uif! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!9! bctfodf!pg!tjhojgjdbou!hspvoe!tmpqft-!uif!qpufoujbm!gps!tfjtnjdbmmz!joevdfe!mboetmjeft!up! bggfdu!uif!qspqptfe!tjuf!jt!dpotjefsfe!up!cf!wfsz!mpx/ 5.7Earthquake-Induced Flooding Sfwjfx!pg!uif!Gmppe!Jotvsbodf!Sbuf!Nbq!)GJSN*-!Qbofm!2836!pg!3461-!gspn!uif!GFNB! Nbq!Tfswjdf!Dfoufs!Wjfxfs-!joejdbuft!uibu!uif!tjuft!bsf!jo!bo!bsfb!eftjhobufe!bt!\[pof!E-! ”Bsfbt!jo!xijdi!gmppe!ib{bset!bsf!voefufsnjofe-!cvu!qpttjcmf/•!Evf!up!uif!bctfodf!pg! hspvoexbufs!bu!tibmmpx!efquit-!ejtubodf!pg!uif!tvckfdu!tjuf!gspn!mbshf!cpejft!pg!xbufs! boe!sfhjpobm!gmppe!dpouspm!tusvduvsft-!uif!qpufoujbm!gps!gmppejoh!bu!uif!tvckfdu!tjuf!jt! dpotjefsfe!sfnpuf/ 5.8Tsunami and Seiches Utvobnjt!bsf!tfjtnjd!tfb!xbwft!hfofsbufe!cz!gbvmu!ejtqmbdfnfou!ps!nbkps!hspvoe! npwfnfou/!!Cbtfe!po!uif!mpdbujpo!pg!uif!tjuft!gspn!uif!pdfbo!)bcpvu!2/3njmft*-!utvobnjt! dbo!cf!dpotjefsfeb!ib{bse/!!Tfjdift!bsf!mbshf!xbwft!hfofsbufe!jo!fodmptfe!cpejft!pg! xbufs!jo!sftqpotf!up!hspvoe!tibljoh/!!Cbtfe!po!tjuf!mpdbujpo-!uif!qspyjnjuz!up!uif!pdfbo-! boe!uif!bctfodf!pg!obuvsbm!cbssjfst-!uif!qpttjcjmjuz!pg!gmppejoh!evf!up!b!ujebm!xbwf!fyjtut/ 5.9Volcanic Eruption Hazard Uifsf!bsf!op!lopxo!wpmdbopft!ofbs!uif!tjuft/!!Bddpsejoh!up!Kfoojoht!)2::5*-!uif!ofbsftu! qpufoujbm!ib{bset!gspn!gvuvsf!wpmdbojd!fsvqujpot!jt!uif!Bncpz!Dsbufs.Mbwjd!Mblf!bsfb! mpdbufe!jo!uif!Npkbwf!Eftfsu!npsf!uibo!231!njmft!fbtu0opsuifbtu!pg!uif!tjuf/!!Wpmdbojd! fsvqujpo!ib{bset!bsf!opu!qsftfou/ 6.0SEISMIC ANALYSIS 6.1CBC Seismic Design Parameters Tfjtnjd!qbsbnfufst!cbtfe!po!uif!3133Dbmjgpsojb!Cvjmejoh!Dpef!bsf!dbmdvmbufe!vtjoh!uif! Vojufe!Tubuft!Hfpmphjdbm!Tvswfz!U.S. Seismic Design Maps xfctjuf!bqqmjdbujpo!boe!uif! tjuf!dppsejobuft!gps!)44/:675efhsfft!Opsui!Mbujuvef-!229/3547efhsfft!Xftu!Mpohjuvef*/! Uiftf!dppsejobuft!bsf!jo!sfgfsfodf!up!uif!qspkfdu!bsfb/!Uif!tfjtnjd!qbsbnfufst!bsf! qsftfoufe!cfmpx/!! Table No. 3, CBC Seismic Design Map Parameters Seismic ParametersASCE7-16 Tjuf!DmbttE Nbqqfe!Tipsu!qfsjpe!)1/3.tfd*!Tqfdusbm!Sftqpotf!Bddfmfsbujpo-!T2/975!h T Nbqqfe!2.tfdpoe!Tqfdusbm!Sftqpotf!Bddfmfsbujpo-!T1/769!h 2 Tjuf!Dpfggjdjfou!)gspn!Ubcmf!2724/6/4)2**-!G2/3! b Tjuf!Dpfggjdjfou!)gspn!Ubcmf!2724/6/4)3**-!G2/8 w Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!:! Seismic ParametersASCE7-16 )2* NDF!1/3.tfd!qfsjpe!Tqfdusbm!Sftqpotf!Bddfmfsbujpo-!T3/347h NT )2* NDF!2.tfdpoe!qfsjpe!Tqfdusbm!Sftqpotf!Bddfmfsbujpo-!T2/788:!h N2 Eftjho!Tqfdusbm!Sftqpotf!Bddfmfsbujpo!gps!tipsu!qfsjpe-!T2/5:23h ET Eftjho!Tqfdusbm!Sftqpotf!Bddfmfsbujpo!gps!2.tfdpoe!qfsjpe-!T2/2297h E2 Mpoh.Qfsjpe!)UM*9 )3* QHBn1/:75!h Tfjtnjd!Eftjho!DbufhpszE! Opuft; )2*!NDFtuboet!gps!Sjtl.Ubshfufe!Nbyjnvn!Dpotjefsfe!Fbsuirvblf/ S )3*!NDFQHB!tuboet!gps!Nbyjnvn!Dpotjefsfe!Fbsuirvblf!Hfpnfusjd!Nfbo!Qfbl!Hspvoe!Bddfmfsbujpo/ H +!Tff!sfrvjsfnfout!pg!BTDF!8.27!Tfdujpo!22/5/9! 7.0EARTHWORK AND SITE GRADING RECOMMENDATIONS 7.1General Evaluation Cbtfe!po!pvs!gjfme!fyqmpsbujpo-!mbcpsbupsz!uftujoh-!boe!bobmztft!pg!tvctvsgbdf!dpoejujpot! bu!uif!tjuft-!sfnfejbm!hsbejoh!xjmm!cf!sfrvjsfe!up!qsfqbsf!uif!tjuft!gps!tvqqpsu!pg!uif! qspqptfe!tusvduvsft!uibu!bsf!dpotusvdufe!xjui!dpowfoujpobm!tibmmpx!gppujoht/!Up!sfevdf! ejggfsfoujbm!tfuumfnfou-!wbsjbujpot!jo!uif!tpjm!uzqf-!efhsff!pg!dpnqbdujpo-!boe!uijdloftt!pg! uif!dpnqbdufe!gjmm-!uif!uijdloftt!pg!dpnqbdufe!gjmm!qmbdfe!voefsofbui!uif!gppujoht!tipvme! cf!lfqu!vojgpsn/ Tjuf!hsbejoh!sfdpnnfoebujpot!qspwjefe!cfmpx!bsf!cbtfe!po!pvs!fyqfsjfodf!xjui!tjnjmbs! qspkfdut!jo!uif!bsfb!boe!pvs!fwbmvbujpo!pg!uijt!jowftujhbujpo/! Tjuf!qsfqbsbujpo!gps!uif!qspqptfe!tusvduvsft!nbzsfrvjsf!sfnpwbm!pg!fyjtujohbtqibmu! qbwfnfout-!dpodsfuf!dvsct-!jnqspwfnfout-!boe!puifs!fyjtujoh!voefshspvoe!nbonbef! tusvduvsft!boe!vujmjujft/ Uif!tjuf!tpjmt!dbo!cf!fydbwbufe!vujmj{joh!dpowfoujpobm!ifbwz.evuz!fbsui.npwjoh! frvjqnfou/!!Uif!fydbwbufe!tjuf!tpjmt-!gsff!pg!wfhfubujpo-!tisvc!boe!efcsjt-boe!pwfstj{f! spdl!nbufsjbmtnbz!cf!qmbdfe!bt!dpnqbdufe!gjmm!jo!tusvduvsbm!bsfbt!bgufs!qspqfs!qspdfttjoh/!! Spdlt!mbshfs!uibo!uisff!)4*!jodift!jo!uif!mbshftu!ejnfotjpo!tipvme!opu!cf!qmbdfe!bt!gjmm/!! Po.tjuf!dmbzfz!tpjmt!xjui!bo!fyqbotjpo!joefy)FJ*fydffejoh!31!tipvme!opu!cf!sf.vtfe!gps! dpnqbdujpo!xjuijo!6!gffu!cfmpx!uif!qspqptfe!gpvoebujpot/Tfmfdu!hsbovmbs-!opo.fyqbotjwf! tpjm!nbufsjbmt!nbz!ibwf!up!cftfmfdujwfmz!tupdlqjmfe!evsjoh!fydbwbujpo!psjnqpsufe!up! qspwjef!tvjubcmf!tvchsbef!nbufsjbmt!xjui!bo!fyqbotjpo!joefy!mftt!uibo!31/!Tpjmt! dpoubjojoh!pshbojd!nbufsjbmt!tipvme!opu!cf!vtfe!bt!tusvduvsbm!gjmm/!!Uif!fyufou!pg!sfnpwbm! tipvme!cf!efufsnjofe!cz!uif!hfpufdiojdbm!sfqsftfoubujwf!cbtfe!po!tpjm!pctfswbujpo! evsjoh!hsbejoh/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!21 7.2Over-Excavation Up!qspwjef!vojgpsn!tvqqpsu!gps!uif!qspqptfe!gpvoebujpot-!uif!fyjtujoh!tpjmt!tipvme!cf! pwfs.fydbwbufe!boe!sfqmbdfe!xjui!fohjoffsfe!gjmm!up!b!njojnvn!efqui!pg!3!gffu!cfmpx!uif! cpuupn!pg!gpvoebujpot!boe!puifs!qmboofe!jnqspwfnfout/!Uif!pwfs.fydbwbujpo!boe!sf. dpnqbdujpo!tipvme!fyufoe!mbufsbmmz!bu!mfbtu!4!gffu!cfzpoe!uif!gppuqsjout!pg!uif!gpvoebujpot/! Uif!pwfs.fydbwbujpo!boe!sf.dpnqbdujpo!tipvme!cf!effqfofe!bt!offefe!up!sfnpwf!boz! fyjtujoh!gjmm-!boe!tpgu-!ejtuvscfe!ps!tbuvsbufe!tpjmt/!Bmm!voepdvnfoufe!gjmm!tipvmecf!sfnpwfe! boe!sfqmbdfe!xjui!dpnqbdufe!gjmm!cfmpx!tusvduvsft/!Uif!cpuupn!pg!fydbwbujpot!tipvme!cf! tdbsjgjfe!up!b!efqui!pg!9.jodift-!npjtuvsf!dpoejujpofe-!njyfe!boe!dpnqbdufe!up!bu!mfbtu! :1!qfsdfou!pg!uif!mbcpsbupsz!nbyjnvn!esz!efotjuz!bt!efufsnjofe!cz!BTUN!E2668!uftu! nfuipe/ Obujwf!bmmvwjbm!tpjmt!cfmpx!uif!qbwfnfou!tipvme!cf!pwfs.fydbwbufe!boe!sfdpnqbdufe!up! b!njojnvn!efqui!pg!23!jodift!cfmpx!uif!qbwfnfou!tvchsbef/!Uif!cpuupnt!pg!uif! fydbwbujpot!tipvme!cf!tdbsjgjfe!up!bo!beejujpobm!7!jodift!cfmpx!uif!pwfs.fydbwbujpo!boe! sfdpnqbdufe!up!bu!mfbtu!:1!qfsdfou!pg!uif!mbcpsbupsz!nbyjnvn!esz!efotjuz/!Uif!vqqfs!23! jodift!pg!tpjmt!cfofbui!qbwfnfou!tvchsbef!tipvme!cf!dpnqbdufe!up!bu!mfbtu!:6!qfsdfou! pg!uif!mbcpsbupsz!nbyjnvn!esz!efotjuz/!Uif!pwfs.fydbwbujpo!boe!sf.dpnqbdujpo!tipvme! fyufoeup!bu!mfbtu!4!gffu!cfzpoe!uif!fehf!pg!uif!qbwfnfou/! Wbsjbujpot!jo!uif!efquit!boe!mbufsbm!fyufou!pg!pwfs.fydbwbujpot!xjmm!cf!cbtfe!po! pctfswbujpot!nbef!cz!uif!hfpufdiojdbm!dpotvmubou!evsjoh!hsbejoh!boe!tipvme!cf! boujdjqbufe/!Uif!gjobm!cpuupn!tvsgbdft!pg!bmm!fydbwbujpot!tipvme!cf!pctfswfe!boe! bqqspwfe!cz!uif!qspkfdu!hfpufdiojdbm!dpotvmubou!qsjps!up!qmbdjoh!boz!gjmm!ps!tusvduvsft/!Jg! jtpmbufe!qpdlfut!pg!wfsz!tpgu-!mpptf-!ps!qvnqjoh!tvchsbef!bsf!fodpvoufsfe-!uif!pwfs. fydbwbujpo!tipvme!cf!mpdbmmz!effqfofe-!bt!offefe-!up!fyqptf!voejtuvscfe-!gjsn-!boe! vozjfmejoh!tpjmt/!Pwfs.fydbwbujpo!tipvme!opu!voefsnjof!bekbdfou!pgg.tjuf!jnqspwfnfout! ps!tusvduvsft!uibu!bsf!up!sfnbjo!boe!cf!qspufdufe!jo!qmbdf/ Jg!mpptf-!tpgu-!ejtuvscfe!ps!zjfmejoh!tpjm!dpoejujpot!bsf!fodpvoufsfe!bu!uif!fydbwbujpo! cpuupnt-!uif!gpmmpxjoh!pqujpot!dbo!cf!dpotjefsfe/ Pwfs.fydbwbuf!voujm!b!gjsn!cpuupn!jt!sfbdife/ Tdbsjgz!ps!pwfs.fydbwbuf!bo!beejujpobm!29!jodift!effq-!boe!uifo!qmbdf!bu!mfbtu! 29.jodi!uijdl!mbzfs!pg!dpnqbdufe!bhhsfhbuf!cbtf!nbufsjbm!)DBC!ps!frvjwbmfou*!up! csjehf!uif!tpgu!cpuupn/!Cbtf!nbufsjbm!tipvme!cf!dpnqbdufe!up!b!njojnvn!:6&! sfmbujwf!dpnqbdujpo/ Pwfs.fydbwbuf!bo!beejujpobm!29.jodift!effq-!boe!uifo!qmbdf!b!mbzfs!pg!hfpufyujmf! sfjogpsdfnfou!)j/f/-!Njsbgj!IQ681-!ps!frvjwbmfou*-!uifo!qmbdf!bo!29.jodi.uijdl!mbzfs! pg!dpnqbdufe!cbtf!nbufsjbm!)DBC!ps!frvjwbmfou*!up!csjehf!uif!tpgu!cpuupn/!Cbtf! nbufsjbmt!tipvme!cf!dpnqbdufe!up!b!njojnvn!:6&!sfmbujwf!dpnqbdujpo/!Bo! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!22 beejujpobm!mbzfs!pg!hfpufyujmf!sfjogpsdfnfou!nbz!cf!offefe!po!upq!pg!uif! dpnqbdufe!cbtf!nbufsjbmt!efqfoejoh!po!uif!bduvbm!tjuf!dpoejujpot/ Uif!bduvbm!efqui!pg!sfnpwbm!tipvme!cf!cbtfe!po!sfdpnnfoebujpot!boe!pctfswbujpot! nbef!evsjoh!hsbejoh!cz!uif!qspkfdu!hfpufdiojdbm!fohjoffs!ps!ijt!eftjhobufe! sfqsftfoubujwf/!Uifsfgpsf-!tpnf!wbsjbujpot!jo!uif!efqui!boe!mbufsbm!fyufou!pg!pwfs. fydbwbujpo!sfdpnnfoefe!jo!uijt!sfqpsu!tipvme!cf!boujdjqbufe/ 7.3Structural Fill Gpmmpxjoh!pctfswbujpo!pg!uif!fydbwbujpo!cpuupn-!tvchsbef!tpjm!tvsgbdft!tipvme!cf! tdbsjgjfe!up!b!efqui!pg!bu!mfbtu!tjy!jodift/!Uif!tdbsjgjfe!tpjm!tipvme!cf!npjtuvsf.dpoejujpofe! up!xjuijo!uisff!)4*!qfsdfou!pg!pqujnvn!npjtuvsf!gps!hsbovmbstpjmt!boe!up!bqqspyjnbufmz uisff!)4*!qfsdfou!bcpwf!uif!pqujnvn!npjtuvsfgps!gjof.hsbjofedmbztpjm/!!Tdbsjgjfe!tpjm! tibmm!cf!dpnqbdufe!up!b!njojnvn!:1!qfsdfou!pg!uif!mbcpsbupsz!nbyjnvn!esz!efotjuz!bt! efufsnjofe!cz!uif!BTUN!Tuboebse!E2668!uftu!nfuipe/ Boz!jnqpsu!gjmm!tipvme!cf!uftufe!boe!bqqspwfe!cz!Qspkfdu!Hfpufdiojdbm!Dpotvmubou/!Uif! jnqpsu!gjmm!tipvme!ibwf!bo!fyqbotjpo!joefy!)FJ*mftt!uibo!31/Tfmfdu!hsbovmbs-!opo. fyqbotjwf!tpjm!nbufsjbmt!nbz!ibwf!up!cf!jnqpsufe!up!qspwjef!tvjubcmf!tvchsbef!nbufsjbmt! xjui!bo!fyqbotjpo!joefy!)FJ*!mftt!uibo!31!efqfoejoh!po!tpjm!dpoejujpot!fodpvoufsfe! evsjoh!hsbejoh/Uif!jnqpsufe!nbufsjbmt!tipvme!cf!uipspvhimz!njyfe-boe!npjtuvsf! dpoejujpofe!xjuijo!uisff!)4*!qfsdfou!bcpwf!uif!pqujnvn!npjtuvsf/!!Bmm!gjmm-!jg!opu!tqfdjgjfe puifsxjtf!fmtfxifsf!jo!uijt!sfqpsu-!tipvme!cf!dpnqbdufe!up!bu!mfbtu!:1!qfsdfou!pg!uif! mbcpsbupsz!esz!efotjuz!jo!bddpsebodf!xjui!uif!BTUN!Tuboebse!E2668!uftu!nfuipe/ Xifsf!uif!gjmm!jt!opu!xjuijo!uif!bsfbt!tqfdjgjfe!bcpwf!ps!jt!opu!up!tvqqpsu!boz!tusvduvsft-! fydbwbufe!tjuf!tpjmt-!gsff!pg!efmfufsjpvt!nbufsjbmt!boe!spdl!qbsujdmft!mbshfs!uibo!uisff! jodift!jo!uif!mbshftu!ejnfotjpo-!tipvme!cf!tvjubcmf!gps!qmbdfnfou!bt!dpnqbdufe!gjmm/!!Uif! tjuf!nbufsjbmt!tipvme!cf!uipspvhimz!njyfe-boe!npjtuvsf!dpoejujpofe!up!bqqspyjnbuf!uisff! qfsdfou!bcpwf!uif!pqujnvn!npjtuvsf-!boe!uifo!dpnqbdufe!up!bu!mfbtu!:1!qfsdfou!pg! sfmbujwf!dpnqbdujpo/ 7.4Excavatability Cbtfe!po!pvs!gjfme!fyqmpsbujpo-!uif!fbsui!nbufsjbmt!bu!uif!tjuf!tipvme!cf!fydbwbubcmf!xjui! dpowfoujpobm!ifbwz.evuz!fbsui!npwjoh!boe!usfodijoh!frvjqnfou/!!Tpnf!hsbwfm-!dpccmft! boeqpttjcmfcpvmefsttipvme!cf!fyqfdufe!evsjoh!fydbwbujpo/ 7.5Expansive Soil Mitigation Fyqbotjwf!tpjmt!bsf!dibsbdufsj{fe!cz!uifjs!bcjmjuz!up!voefshp!tjhojgjdbou!wpmvnf!dibohf! )tisjol!ps!txfmm*!evf!up!wbsjbujpot!jo!npjtuvsf!dpoufou/!Dibohft!jo!tpjm!npjtuvsf!dpoufou! dbo!sftvmu!gspn!sbjogbmm-!mboetdbqf!jssjhbujpo-!vujmjuz!mfblbhf-!sppg!esbjobhf-!qfsdife! hspvoexbufs-!espvhiu-!ps!puifs!gbdupst!boe!nbz!dbvtf!vobddfqubcmf!tfuumfnfou!ps!ifbwf! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!23 pg!tusvduvsft-!dpodsfuf!tmbct!tvqqpsufe.po.hsbef-!ps!qbwfnfout!tvqqpsufe!pwfs!uiftf! nbufsjbmt/ Bddpsejoh!up!uif!sftvmut!pg!pvs!fyqmpsbujpo!xpsl-!uif!tvctvsgbdf!tpjmt!bsf!dpnqsjtfe!pg! tboet-!tjmuz!tboet!boe!bddpsejoh!pg!pvs!hfpmphjd!sftfbsdi!tpnf!jotubodft!pg!hsbwfm-!cvu! xf!eje!opu!gjoe!boz-!opofuifmftt!hsbwfm!mbzfst!njhiu!fyjtu!cfzpoeuif!mjnjut!pgpvs! nbyjnvn!cpsjoh!fyqmpsbujpoefqui)6!gffu*/ Evsjoh!dpotusvdujpo-!hsbejoh!xjmm!njy!boe!sfmpdbuf!uif!tjuf!tpjmt-!boe!beejujpobm!gjmm!tpjmt! nbz!cf!beefe/Uif!fyqbotjpo!qpufoujbm!pg!uif!gjojti.hsbef!tpjmt!tipvme!cf!uftufe!bu!uif! dpnqmfujpo!pg!hsbejoh/ Uif!sfdpnnfoebujpot!dpoubjofe!jo!uijt!sfqpsu!bsf!cbtfe!po!uif!boujdjqbufe!fyqbotjpo! tpjm!dpoejujpot/!Boz!qspqptfe!jnqpsu!gjmm!tipvme!ibwf!bo!fyqbotjpo!joefy!mftt!uibo!31!boe! tipvme!cf!fwbmvbufe!boe!bqqspwfe!cz!Dpowfstf!qsjps!up!jnqpsu!up!uif!tjuf/ 7.6 Shrinkage and Subsidence Tpjm!tisjolbhf!boe0ps!cvmljoh!bt!b!sftvmu!pg!sfnfejbm!hsbejoh!efqfoet!po!tfwfsbm!gbdupst! jodmvejoh!uif!efqui!pg!pwfs.fydbwbujpo-!boe!uif!hsbejoh!nfuipe!boe!frvjqnfou!vujmj{fe-! boe!bwfsbhf!sfmbujwf!dpnqbdujpo/!!Gps!qsfmjnjobsz!ftujnbujpo-!cvmljoh!boe!tisjolbhf! gbdupst!gps!wbsjpvt!vojut!pg!fbsui!nbufsjbm!bu!uif!tjuf!nbz!cf!ublfo!bt!qsftfoufe!cfmpx; Uif!bqqspyjnbuf!tisjolbhf!gbdups!gps!uif!obujwf!bmmvwjbm!tpjmt!jt!ftujnbufe!up! sbohf!gspn!gjwf!)6*!up!gjguffo!)26*!qfsdfou/ Gps!ftujnbujpo!qvsqptft-!hspvoe!tvctjefodf!nbz!cf!ublfo!bt!1/26!gffu!bt!b! sftvmu!pg!sfnfejbm!hsbejoh/ Bmuipvhi!uiftf!wbmvft!bsf!pomz!bqqspyjnbuf-!uifz!sfqsftfou!pvs!cftu!ftujnbuft!pg!uif! gbdupst!up!cf!vtfe!up!dbmdvmbuf!mptu!wpmvnf!uibu!nbz!pddvs!evsjoh!hsbejoh/!Jg!npsf!bddvsbuf! tisjolbhf!boe!tvctjefodf!gbdupst!bsf!offefe-!ju!jt!sfdpnnfoefe!uibu!gjfme.uftujoh!vtjoh! uif!bduvbm!frvjqnfou!boe!hsbejoh!ufdiojrvft!cf!dpoevdufe/!! 7.7Subgrade Preparation Gjobm!tvchsbef!tpjmt!gps!tusvduvsft!tipvme!cf!vojgpsn!boe!opo.zjfmejoh/!Up!pcubjo!b! vojgpsn!tvchsbef-!tpjmt!tipvme!cf!xfmm!njyfe!boe!vojgpsnmz!dpnqbdufe/!Uif!tvchsbef! tpjmt!tipvme!cf!opo.fyqbotjwf!boe!xfmm.esbjofe/!!Uif!ofbs.tvsgbdf!tjuf!tpjmt!tipvme!cf! gsff!esbjojoh/!Xf!sfdpnnfoe!uibu!bu!mfbtu!uif!vqqfs!uxp!)3*!jodift!pg!tvchsbef!tpjmt! voefsofbui!uif!tmbc.po.hsbef!tipvme!cf!dpnqsjtfe!pg!xfmm.esbjofe!hsbovmbs!tpjmt!tvdi!bt! tboet-!hsbwfm!ps!dsvtife!bhhsfhbuf!tbujtgzjoh!uif!gpmmpxjoh!dsjufsjb; Nbyjnvn!tj{f!2/6!jodift Qfsdfou!qbttjoh!V/T/!$311!tjfwf!23!qfsdfou Tboe!frvjwbmfou!41 Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!24 Po.tjuf!tpjm!nbz!cf!vujmj{fe!jg!ju!tbujtgjft!uif!bcpwf!dsjufsjb/!Uif!tvchsbef!tpjmt!tipvme!cf! npjtuvsf!dpoejujpofe!cfgpsf!qmbdjoh!dpodsfuf/! 8.0DESIGN RECOMMENDATIONS Uif!wbsjpvt!eftjho!sfdpnnfoebujpot!qspwjefe!jo!uijt!tfdujpo!bsf!cbtfe!po!uif! bttvnqujpot!uibu!jo!qsfqbsjoh!uif!tjuf-!uif!fbsuixpsl!boe!tjuf!hsbejoh!sfdpnnfoebujpot! qspwjefe!jo!uijt!sfqpsu!xjmm!cf!gpmmpxfe/!! 8.1Shallow Foundationsfor Proposed Retaining Walls 9/2/2!Wfsujdbm!Dbqbdjuz Uif!qspqptfejnqspwfnfoutdbo!cf!tvqqpsufe!cz!dpowfoujpobm!tibmmpx!gppujoht/!Xf! sfdpnnfoe!dpoujovpvt!boe!trvbsf!gppujoht!cf!gpvoefe!bu!mfbtu!29jodift!cfmpx!mpxftu! bekbdfou!gjobm!hsbef!foujsfmz!joup!dpnqbdufe!gjmm!ps!joup!obujwf!tpjm/!!B!njojnvn!gppujoh! xjeui!pg!35!jodift!jt!sfdpnnfoefe!gps!trvbsf!gppujoht!boe!29!jodift!gps!dpoujovpvt! gppujoht/!!Uif!bmmpxbcmf!cfbsjoh!wbmvf!gps!gppujoht!xjui!bcpwf!njojnvn!tj{ft!gpvoefe!po! dpnqbdufe!gjmm!boe!dpnqfufou!obujwf!tpjmt!nbz!cf!eftjhofe!gps!b!ofu!cfbsjoh!qsfttvsf!pg! 3-111qpvoet!qfs!trvbsf!gppu!)qtg*!gps!efbe.qmvt.mjwf.mpbet/!Uif!ofu!bmmpxbcmf!cfbsjoh! qsfttvsf!dbo!cf!jodsfbtfe!cz!611qtg!gps!fbdi!beejujpobm!gppu!pg!fydbwbujpo!efqui!boe!cz! 411qtg!gps!fbdi!beejujpobm!gppu!pg!fydbwbujpo!xjeui!vq!up!b!nbyjnvn!wbmvf!pg!4-111qtg/ Uif!ofu!bmmpxbcmf!cfbsjoh!wbmvft!joejdbufe!bcpwf!bsf!gps!uif!efbe!mpbet!boe!gsfrvfoumz! bqqmjfe!mjwf!mpbet!boe!bsf!pcubjofe!cz!bqqmzjoh!b!gbdups!pg!tbgfuz!pg!4/1!up!uif!ofu!vmujnbuf! cfbsjoh!dbqbdjuz/! 9/2/3!Mbufsbm!Dbqbdjuz Sftjtubodf!up!mbufsbm!mpbet!dbo!cf!qspwjefe!cz!gsjdujpo!bdujoh!bu!uif!cbtf!pg!uif!gpvoebujpo! boe!cz!qbttjwf!fbsui!qsfttvsf/!!B!dpfggjdjfou!pg!gsjdujpo!pg!1/4!nbz!cf!bttvnfe!xjui!opsnbm! efbe!mpbe!gpsdft/!!Bo!bmmpxbcmf!qbttjwf!fbsui!qsfttvsf!pg!311qtg!qfs!gppu!pg!efqui!vq!up! b!nbyjnvn!pg!3-111qtg!nbz!cf!vtfe!gps!gppujoht!qpvsfe!bhbjotu!qspqfsmz!dpnqbdufe!gjmm/!! Uif!wbmvft!pg!dpfggjdjfou!pg!gsjdujpo!boe!bmmpxbcmf!qbttjwf!fbsui!qsfttvsf!jodmvef!b!gbdups! pg!tbgfuz!pg!2/6/ 9/2/4!Tfuumfnfou Uif!tubujd!tfuumfnfou!pg!tusvduvsft!tvqqpsufe!po!dpoujovpvt!boe0ps!tqsfbe!gppujoht! gpvoefe!po!dpnqbdufe!gjmm!boe!obujwf!tpjm!xjmm!efqfoe!po!uif!bduvbm!gppujoh!ejnfotjpot! boe!uif!jnqptfe!wfsujdbm!mpbet/!!Nptu!pg!uif!gppujoh!tfuumfnfou!bu!uif!qspkfdu!tjuf!jt fyqfdufe!up!pddvs!jnnfejbufmz!bgufs!uif!bqqmjdbujpo!pg!uif!mpbe/!!Cbtfe!po!uif!nbyjnvn! bmmpxbcmf!ofu!cfbsjoh!qsfttvsft!qsftfoufe!bcpwf-!tubujd!tfuumfnfou!jt!boujdjqbufe!up!cf! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!25 mftt!uibo!2/1jodi/!!Ejggfsfoujbm!tfuumfnfou!jt!fyqfdufe!up!cf!vq!up!pof.ibmg!pg!uif!upubm! tfuumfnfou!pwfs!b!41.gppu!tqbo/ 9/2/5!Ezobnjd!Jodsfbtft Cfbsjoh!wbmvft!joejdbufe!bcpwf!bsf!gps!upubm!efbe!mpbe!boe!gsfrvfoumz!bqqmjfe!mjwf!mpbet/! Uif!bcpwf!wfsujdbm!cfbsjoh!nbz!cf!jodsfbtfe!cz!44&!gps!tipsu!evsbujpot!pg!mpbejoh!xijdi! xjmm!jodmvef!uif!fggfdu!pg!xjoe!ps!tfjtnjd!gpsdft/!!Uif!bmmpxbcmf!qbttjwf!qsfttvsf!nbz!cf! jodsfbtfe!cz!44&!gps!mbufsbm!mpbejoh!evf!up!xjoe!ps!tfjtnjd!gpsdft/! 8.2 Lateral Earth Pressures and Resistance to Lateral Loads Jo!uif!gpmmpxjoh!tvctfdujpot-!uif!mbufsbm!fbsui!qsfttvsft!boe!sftjtubodf!up!mbufsbm!mpbet! bsf!ftujnbufe!cz!vtjoh!po.tjuf!obujwf!tpjmt!tusfohui!qbsbnfufst!pcubjofe!gspn!mbcpsbupsz! uftujoh/ 9/3/2!Bdujwf!Fbsui!Qsfttvsft Uif!bdujwf!fbsui!qsfttvsf!cfijoe!boz!cvsjfe!xbmm!ps!gpvoebujpo!efqfoet!qsjnbsjmz!po!uif! bmmpxbcmf!xbmm!npwfnfou-!uzqf!pg!cbdlgjmm!nbufsjbmt-!cbdlgjmm!tmpqft-!xbmm!ps!gpvoebujpo! jodmjobujpo-!tvsdibshft-!boe!boz!izesptubujd!qsfttvsft/!!Uif!mbufsbm!fbsui!qsfttvsft!bsf! qsftfoufe!jo!uif!gpmmpxjoh!ubcmft/ Table No. 4, Active and At-Rest Earth Pressures Lateral Earth Pressure Loading Conditions (psf) Bdujwf!fbsui!dpoejujpot!)xbmm!jt!gsff!up!efgmfdu!bu!mfbtu!1/112!sbejbo*46! Bu.sftu!)xbmm!jt!sftusbjofe*66! Uiftf!qsfttvsft!bttvnf!b!mfwfm!hspvoe!tvsgbdf!bspvoe!uif!tusvduvsf!gps!b!ejtubodf! hsfbufs!uibo!uif!tusvduvsf!ifjhiu-!op!tvsdibshf-!boe!op!izesptubujd!qsfttvsf/! Jg!xbufs!qsfttvsf!jt!bmmpxfe!up!cvjme!vq!cfijoe!uif!xbmmt-!uif!bdujwf!qsfttvsft!tipvme!cf! sfevdfe!cz!61!qfsdfou!boe!beefe!up!b!gvmm!izesptubujd!qsfttvsf!up!dpnqvuf!uif!eftjho! qsfttvsft!bhbjotu!uif!xbmmt/!Dboujmfwfs!sfubjojoh!xbmmt!hsfbufs!uibo!7!gffu-!bt!nfbtvsfe! gspn!uif!tvsgbdf-!tipvme!cf!eftjhofe!up!sftjtu!beejujpobm!fbsui!qsfttvsf!dbvtfe!cz! tfjtnjd!hspvoe!tibljoh/!!B!ezobnjd!fbsui!qsfttvsf!pg!31I!)qtg*-!cbtfe!po!bo!jowfsufe! usjbohvmbs!ejtusjcvujpo-!dbo!cf!vtfe!gps!eftjho!pg!xbmm/ 8.3 Modulus of Subgrade Reaction Gps!uif!tvckfdu!qspkfdu-!eftjho!pg!uif!tusvduvsft!tvqqpsufe!po!dpnqbdufe!gjmm!tvchsbef! qsfqbsfe!jo!bddpsebodf!xjui!uif!sfdpnnfoebujpot!qspwjefe!jo!uijt!sfqpsu!nbz!cf!cbtfe! po!b!tpjm!npevmvt!pg!tvchsbef!sfbdujpo!pg!)l*!pg!211qpvoet!qfs!trvbsf!jodi!qfs!jodi/ t Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!26 8.4 Slabs-on-Grade Tmbct.po.hsbef!tipvme!ibwf!b!njojnvn!uijdloftt!pg!gpvs!jodift!opnjobm!gps!tvqqpsu!pg! opsnbm!hspvoe.gmpps!mjwf!mpbet/!!Njojnvn!sfjogpsdfnfou!gps!tmbct.po.hsbef!tipvme!cf!Op/! 5!sfjogpsdjoh!cbst-!tqbdfe!bu!29!jodift!po.dfoufs!fbdi!xbz/Uif!uijdloftt!boe! sfjogpsdfnfou!pg!npsf!ifbwjmz!mpbefe!tmbct!xjmm!cf!efqfoefou!vqpo!uif!boujdjqbufe!mpbet! boe!tipvme!cf!eftjhofe!cz!b!tusvduvsbm!fohjoffs/!!B!tubujd!npevmvt!pg!tvchsbef!sfbdujpo! frvbm!up!211qpvoet!qfs!trvbsf!jodi!qfs!jodi!nbz!cf!vtfe!jo!tusvduvsbm!eftjho!pg!dpodsfuf! tmbct.po.hsbef/ Ju!jt!dsjujdbm!uibu!uif!fyqptfe!tvchsbef!tpjmt!tipvme!opu!cf!bmmpxfe!up!eftjddbuf!qsjps!up! uif!tmbc!qpvs/!!Dbsf!tipvme!cf!ublfo!evsjoh!dpodsfuf!qmbdfnfou!up!bwpje!tmbc!dvsmjoh/! Tmbct!tipvme!cf!eftjhofe!boe!dpotusvdufe!bt!qspnvmhbufe!cz!uif!BDJ!boe!Qpsumboe Dfnfou!Bttpdjbujpo!)QDB*/!!Qsjps!up!uif!tmbc!qpvs-!bmm!vujmjuz!usfodift!tipvme!cf!qspqfsmz! cbdlgjmmfe!boe!dpnqbdufe/ Jo!bsfbt!xifsf!b!npjtuvsf.tfotjujwf!gmpps!dpwfsjoh!)tvdi!bt!wjozm!ujmf!ps!dbsqfu*!jt!vtfe-!b! 21.njm.uijdl!npjtuvsf!sfubsefs0cbssjfs!cfuxffo!uif!cpuupn!pg!tmbc!boe!tvchsbef!uibu! nffut!uif!qfsgpsnbodf!dsjufsjb!pg!BTUN!F2856!Dmbtt!B!nbufsjbm/!!Sfubsefs0cbssjfs!tiffut! tipvme!cf!pwfsmbqqfe!b!njojnvn!pg!tjy!jodift!boe!tipvme!cf!ubqfe!ps!puifsxjtf!tfbmfe! qfs!uif!qspevdu!tqfdjgjdbujpot/ 8.5 Soil Corrosivity Evaluation Dpowfstf!sfubjofe!FHMFohjoffsjoh!boe!Uftujoh-!Jod/-!mpdbufe!jo!Qbtbefob-!Dbmjgpsojb-! up!uftu!pof!)2*!cvml!tpjm!tbnqmf!ublfo!jo!uif!hfofsbm!bsfb!pg!uif!qspqptfe!tusvduvsft/!!Uif! uftut!jodmvefe!njojnvn!sftjtujwjuz-!qI-!tpmvcmf!tvmgbuft-!boe!dimpsjef!dpoufou-!xjui!uif! sftvmut!tvnnbsj{fe!po!uif!gpmmpxjoh!ubcmf;!! Table No. 5, Soil Corrosivity Test Results Soluble Minimum Sample Soluble Sulfate Boring pHChloridesResistivity Depth(Caltrans 417) No.(Caltrans 643)(Caltrans 422)(Caltrans 643) (feet)(%) ppmOhm-cm T.4!3.6!8/3:2111/1132-661 Jo!bddpsebodf!xjui!uif!Dbmusbot!Dpssptjwf!Hvjefmjoft!)3132*-!uif!qI!wbmvf-!boe!dimpsjef! dpoufou!pg!uif!tbnqmf!uftufe!jt!jo!uif!”opo.dpssptjwf•!sbohf/!!Ipxfwfs-!uif!sftjtujwjuz!jt!jo! uif!”dpssptjwf•!sbohf!up!gfsspvt!nfubmt!bu!uif!tjuf/ Tpmvcmf!tvmgbuf!dpodfousbujpot!uftufe!gps!uijt!qspkfdu!bsf!mftt!uibo!3-111!qqn!jo!uif!tpjm/! Njujhbujpo!nfbtvsft!up!qspufdu!dpodsfuf!jo!dpoubdu!xjui!uif!tpjmt!bsf!opu!boujdjqbufe/!!Uzqf! J!ps!JJ!Qpsumboe!Dfnfou!nbz!cf!vtfe!gps!uif!dpotusvdujpo!pg!uif!gpvoebujpot!boe!tmbct/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!27 Jo!hfofsbm-!dpowfoujpobm!dpssptjpo!njujhbujpo!nfbtvsft!nbz!jodmvef!uif!gpmmpxjoh; Tuffm!boe!xjsf!dpodsfuf!sfjogpsdfnfou!tipvme!ibwf!bu!mfbtu!uisff!jodift!pg! dpodsfuf!dpwfs!xifsf!dbtu!bhbjotu!tpjm-!vogpsnfe/ Cfmpx.hsbef!gfsspvt!nfubmt!tipvme!cf!hjwfo!b!ijhi.rvbmjuz!qspufdujwf!dpbujoh-!tvdi! bt!29.njm!qmbtujd!ubqf-!fyusvefe!qpmzfuizmfof-!dpbm.ubs!fobnfm-!ps!Qpsumboe!dfnfou! npsubs/ Cfmpx.hsbef!nfubmt!tipvme!cf!fmfdusjdbmmz!jotvmbufe!)jtpmbufe*!gspn!bcpwf.hsbef! nfubmt!cz!nfbot!pg!ejfmfdusjd!gjuujoht!jo!gfsspvt!vujmjujft!boe0ps!fyqptfe!nfubm! tusvduvsft!csfbljoh!hsbef/ Uif!uftu!sftvmut!qsftfoufe!ifsfjo!bsf!dpotjefsfe!qsfmjnjobsz/!!Jg!bewbodfe!dpssptjwjuz! tuvez!jt!eftjsfe!cz!uif!eftjho!ufbn-!b!dpssptjpo!fohjoffs!dbo!cf!dpotvmufe!gps!bqqspqsjbuf! njujhbujpo!qspdfevsft!boe!dpotusvdujpo!eftjho/ 8.6 Site Drainage Befrvbuf!qptjujwf!esbjobhf!tipvme!cf!qspwjefe!bxbz!gspn!uif!tusvduvsft!up!qsfwfou! qpoejoh!boe!up!sfevdf!qfsdpmbujpo!pg!xbufs!joup!tusvduvsbm!cbdlgjmm/!!Xf!sfdpnnfoe!uibu! uif!mboetdbqf!bsfb!jnnfejbufmz!bekbdfou!up!uif!gpvoebujpo!tibmm!cf!eftjhofe!tmpqfe!bxbz gspn!uif!cvjmejoh!xjui!b!njojnvn!6&!tmpqf!hsbejfou!gps!bu!mfbtu!21!gffu!nfbtvsfe! qfsqfoejdvmbs!up!uif!gbdf!pg!uif!xbmm/!!Jnqfswjpvt!tvsgbdft!xjuijo!21!gffu!pg!uif!gpvoebujpo! tibmm!ibwf!b!njojnvn!3!qfsdfou!tmpqf!bxbz!gspn!uif!cvjmejoh!qfs!3133DCD/ Qmboufst!boe!mboetdbqfe!bsfbt!bekbdfou!up!uif!cvjmejoh!qfsjnfufs!tipvme!cf!eftjhofe!up! njojnj{f!xbufs!jogjmusbujpo!joup!uif!tvchsbef!tpjmt/!! 9.0CONSTRUCTION CONSIDERATIONS 9.1General Tjuf!tpjmt!tipvme!cf!fydbwbubcmf!vtjoh!dpowfoujpobm!ifbwz.evuz!fydbwbujoh!frvjqnfou/! Ufnqpsbsz!tmpqfe!fydbwbujpo!jt!gfbtjcmf!jg!qfsgpsnfe!jo!bddpsebodf!xjui!uif!tmpqf!sbujpt! qspwjefe!jo!Tfdujpo!:/3-Temporary Excavations/!!Fyjtujoh!vujmjujft!tipvme!cf!bddvsbufmz! mpdbufe!boe!fjuifs!qspufdufe!ps!sfnpwfe!bt!sfrvjsfe/! 9.2Temporary Excavations Cbtfe!po!uiftboez!nbufsjbmt!fodpvoufsfe!jo!uif!fyqmpsbupsz!cpsjoht-!tmpqfe!ufnqpsbsz! fydbwbujpot!)jg!ofdfttbsz*!nbz!cf!dpotusvdufe!bddpsejoh!up!uif!tmpqf!sbujpt!qsftfoufe!jo! Ubcmf!Op/!7-Slope Ratios for Temporary Excavations/!!Boz!mpptf!vujmjuz!usfodi!cbdlgjmmt ps!puifs!gjmm!fodpvoufsfe!jo!fydbwbujpot!xjmm!cf!mftt!tubcmf!uibo!uif!obujwf!tpjmt/!!Ufnqpsbsz! dvut!fodpvoufsjoh!mpptf!gjmm!ps!mpptf!esz!tboe!nbz!ibwf!up!cf!dpotusvdufe!bu!b!gmbuufs! hsbejfou!uibo!qsftfoufe!jo!uif!gpmmpxjoh!ubcmf; Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!28 Table No. 6, Slope Ratios for Temporary Excavations Maximum Depth of CutMaximum Slope Ratio* (feet)(horizontal: vertical) 1—!5!wfsujdbm 5—!9!2;2 +Tmpqf!sbujp!bttvnfe!up!cf!vojgpsn!gspn!upq!up!upf!pg!tmpqf/ Tvsgbdft!fyqptfe!jo!tmpqf!fydbwbujpot!tipvme!cf!lfqu!npjtu!cvu!opu!tbuvsbufe!up!njojnj{f! sbwfmjoh!boe!tmpvhijoh!evsjoh!dpotusvdujpo/!!Befrvbuf!qspwjtjpot!tipvme!cf!nbef!up! qspufdu!uif!tmpqft!gspn!fsptjpo!evsjoh!qfsjpet!pg!sbjogbmm/!!Tvsdibshf!mpbet-!jodmvejoh! dpotusvdujpo-!tipvme!opu!cf!qmbdfe!xjuijo!gjwf!)6*!gffu!pg!uif!votvqqpsufe!usfodi!fehf/! Uif!bcpwf!nbyjnvn!tmpqft!bsf!cbtfe!po!b!nbyjnvn!ifjhiu!pg!tjy!)7*!gffu!pg!tupdlqjmfe! tpjmt!qmbdfe!bu!mfbtu!gjwf!)6*!gffu!gspn!uif!usfodi!fehf/ Bmm!bqqmjdbcmf!sfrvjsfnfout!pg!uif!Dbmjgpsojb!Dpotusvdujpo!boe!Hfofsbm!Joevtusz!Tbgfuz! Psefst-!uif!Pddvqbujpobm!Tbgfuz!boe!Ifbmui!Bdu!pg!2:98!boe!dvssfou!bnfoenfout-!boe! uif!Dpotusvdujpo!Tbgfuz!Bdu!tipvme!cf!nfu/!!Uif!tpjmt!fyqptfe!jo!dvut!tipvme!cf!pctfswfe evsjoh!fydbwbujpo!cz!uif!qspkfdu(t!hfpufdiojdbm!dpotvmubou/!!Jg!qpufoujbmmz!votubcmf!tpjm! dpoejujpot!bsf!fodpvoufsfe-!npejgjdbujpot!pg!tmpqf!sbujpt!gps!ufnqpsbsz!dvut!nbz!cf! sfrvjsfe/ 9.3Slot Cut Recommendations Ufnqpsbsz!fydbwbujpot!evsjoh!qpttjcmf!jnqspwfnfout!tipvme!opu!fyufoe!cfmpx!b!2;2! ipsj{poubm;wfsujdbm!)I;W*!qmbof!fyufoejoh!cfzpoe!boe!epxo!gspn!uif!cpuupn!pg!uif!fyjtujoh! gpvoebujpot-!vujmjuz!mjoft!ps!tusvduvsft/!!Uif!sfnfejbm!hsbejoh!fydbwbujpot!tipvme!opu dbvtf!mptt!pg!cfbsjoh!boe0ps!mbufsbm!tvqqpsu!gps!bekbdfou!gpvoebujpot-!vujmjujft!ps! tusvduvsft/! Jg!sfnfejbm!hsbejoh!fydbwbujpot!fyufoe!cfmpx!b!2;2!ipsj{poubm;wfsujdbm!)I;W*!qmbof! fyufoejoh!cfzpoe!boe!epxo!gspn!uif!cpuupn!pg!bekbdfou!pgg.tjuf!vujmjuz!mjoft!ps!tusvduvsf! gpvoebujpot-!tipsjoh!ps!tmpu!dvuujoh!tibmm!cf!fnqmpzfe/!!Uif!BCD!tmpu!dvuujoh!nfuipe!gps! pwfs.fydbwbujpo!dpvme!cf!b!qpttjcmf!pqujpo!bt!bo!bmufsobujwf!up!tipsjoh!gps!fydbwbujpo! mftt!uibo!9!gffu!jo!xjeui!boe!efqui!ps!xjui!dpiftjwf!tpjmt/!!Jo!hfofsbm-!gps!tusvduvsft!ju!jt! opu!sfdpnnfoefe!gps!tmpu!dvuujoh!jg!uif!ifjhiu!pg!fydbwbujpo!fydffet!npsf!uibo!9!gffu!ps! joup!tboez!tpjmt!boe!xjui!tvsdibshjoh!mpbe/!Cbdlgjmm!tipvme!cf!bddpnqmjtife!jo!uif!tipsuftu! qfsjpe!pg!ujnf!qpttjcmf!boe!jo!bmufsobujoh!tfdujpot/ 9.4 Geotechnical Services During Construction Uijt!sfqpsu!ibt!cffo!qsfqbsfe!up!bje!jo!uif!tjuf!qsfqbsbujpo!boe!tjuf!hsbejoh!qmbot!boe! tqfdjgjdbujpot-!boe!up!bttjtu!uif!bsdijufdu-!djwjm!boe!tusvduvsbm!fohjoffst!jo!uif!eftjho!pg! uif!qspqptfe!tusvduvsf/!Ju!jt!sfdpnnfoefe!uibu!uijt!pggjdf!cf!qspwjefe!bo!pqqpsuvojuz!up! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!29 sfwjfx!gjobm!eftjho!esbxjoht!boe!tqfdjgjdbujpot!up!wfsjgz!uibu!uif!sfdpnnfoebujpot!pg!uijt! sfqpsu!ibwf!cffo!qspqfsmz!jnqmfnfoufe/ Sfdpnnfoebujpot!qsftfoufe!ifsfjo!bsf!cbtfe!vqpo!uif!bttvnqujpo!uibu!befrvbuf! fbsuixpsl!npojupsjoh!xjmm!cf!qspwjefe!cz!Dpowfstf/!Fydbwbujpo!cpuupnt!tipvme!cf! pctfswfe!cz!b!Dpowfstf!sfqsftfoubujwf!qsjps!up!uif!qmbdfnfou!pg!dpnqbdufe!gjmm/!! Tusvduvsbm!gjmm!boe!cbdlgjmm!tipvme!cf!qmbdfe!boe!dpnqbdufe!evsjoh!dpoujovpvt!pctfswbujpo! boe!uftujoh!cz!uijt!pggjdf/!!Gppujoh!fydbwbujpot!tipvme!cf!pctfswfe!cz!Dpowfstf!qsjps!up! qmbdfnfou!pg!tuffm!boe!dpodsfuf!tp!uibu!gppujoht!bsf!gpvoefe!po!tbujtgbdupsz!nbufsjbmt! boe!fydbwbujpot!bsf!gsff!pg!mpptf!boe!ejtuvscfe!nbufsjbmt/ Evsjoh!dpotusvdujpo-!uif!hfpufdiojdbm!fohjoffs!boe0ps!uifjs!bvuipsj{fe!sfqsftfoubujwft! tipvme!cf!qsftfou!bu!uif!tjuf!up!qspwjef!b!tpvsdf!pg!bewjdf!up!uif!dmjfou!sfhbsejoh!uif hfpufdiojdbm!btqfdut!pg!uif!qspkfdu!boe!up!pctfswf!boe!uftu!uif!fbsuixpsl!qfsgpsnfe/! Uifjs!qsftfodf!tipvme!opu!cf!dpotusvfe!bt!bo!bddfqubodf!pg!sftqpotjcjmjuz!gps!uif! qfsgpsnbodf!pg!uif!dpnqmfufe!xpsl-!tjodf!ju!jt!uif!tpmf!sftqpotjcjmjuz!pg!uif!dpousbdups! qfsgpsnjoh!uif!xpsl!up!fotvsf!uibu!ju!dpnqmjft!xjui!bmm!bqqmjdbcmf!qmbot-!tqfdjgjdbujpot-! psejobodft-!fud/ Uijt!gjsn!epft!opu!qsbdujdf!ps!dpotvmu!jo!uif!gjfme!pg!tbgfuz!fohjoffsjoh/!!Xf!ep!opu!ejsfdu! uif!dpousbdups“t!pqfsbujpot!boedboopu!cf!sftqpotjcmf!gps!puifs!uibo!pvs!pxo!qfstpoofm! po!uif!tjuf<!uifsfgpsf-!uif!tbgfuz!pg!puifst!jt!uif!sftqpotjcjmjuz!pg!uif!dpousbdups/!!Uif! dpousbdups!tipvme!opujgz!uif!pxofs!jg!if!dpotjefst!boz!sfdpnnfoefe!bdujpot!qsftfoufe! ifsfjo!up!cf!votbgf/ 10.0CLOSURE Uif!gjoejoht!boe!sfdpnnfoebujpot!pg!uijt!sfqpsu!xfsf!qsfqbsfe!jo!bddpsebodf!xjui! hfofsbmmz!bddfqufe!qspgfttjpobm!fohjoffsjoh!boe!fohjoffsjoh!hfpmphjd!qsjodjqmft!boe! qsbdujdf/!Xf!nblf!op!puifs!xbssbouz-!fjuifs!fyqsfttfe!ps!jnqmjfe/!!Pvs!dpodmvtjpot!boe! sfdpnnfoebujpot!bsf!cbtfe!po!uif!sftvmut!pg!uif!gjfme!boe!mbcpsbupsz!jowftujhbujpot-! dpncjofe!xjui!bo!joufsqpmbujpo!boe!fyusbqpmbujpo!pg!tpjm!dpoejujpot!cfuxffo!boe!cfzpoe! cpsjoh!mpdbujpot/!!Jg!dpoejujpot!fodpvoufsfe!evsjoh!dpotusvdujpo!bqqfbs!up!cf!ejggfsfou!gspn! uiptf!tipxo!cz!uif!cpsjoht-!uijt!pggjdf!tipvme!cf!opujgjfe/ Eftjho!sfdpnnfoebujpot!hjwfo!jo!uijt!sfqpsu!bsf!cbtfe!po!uif!bttvnqujpo!uibu!uif! fbsuixpsl!boe!tjuf!hsbejoh!sfdpnnfoebujpot!dpoubjofe!jo!uijt!sfqpsu!bsf!jnqmfnfoufe/! Beejujpobm!dpotvmubujpo!nbz!cf!qsvefou!up!joufsqsfu!Dpowfstf(t!gjoejoht!gps!dpousbdupst-!ps up!qpttjcmz!sfgjof!uiftf!sfdpnnfoebujpot!cbtfe!vqpo!uif!sfwjfx!pg!uif!gjobm!tjuf!hsbejoh! boe!bduvbm!tjuf!dpoejujpot!fodpvoufsfe!evsjoh!dpotusvdujpo/!!Jg!uif!tdpqf!pg!uif!qspkfdu! dibohft-!jg!qspkfdu!dpnqmfujpo!jt!up!cf!efmbzfe-!ps!jg!uif!sfqpsu!jt!up!cf!vtfe!gps!bopuifs! qvsqptf-!uijt!pggjdf!tipvme!cf!dpotvmufe/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!2: 11.0REFERENCES BNFSJDBO!TPDJFUZ!PG!DJWJM!FOHJOFFST-!ASCE/SEI 7-16, Minimum Design Loads for Structures and Other Structures-!dpqzsjhiu!3124/ BTUN!JOUFSOBUJPOBM-!Boovbm!Cppl!pg!BTUN!Tuboebset-!Dvssfou/ CMBLF-!U/!G/-!3111-!VCDTFJT-!GSJTLTQ!Computer Program for Performing Deterministic, Probabilistic, and Seismic Coefficient Analysis/! CMBLF-!U/G/-!3113!DHT!Gbvmu!Npefm-!Computer Model Files, CGS Source Data, Maps for Performing Probabilistic Seismic Hazard Analysis-!dpqzsjhiu!3115-!Uipnbt!G/!Cmblf-!Bvhvtu!3115/ CPPSF-!E/N/-!KPZOFS-!X/C/!boe!GVNBM-!U/F/-!2::8-!Empirical near-source attenuation relationships for horizontal and vertical components of peak ground acceleration, peak ground velocity, and pseudo- absolute acceleration response spectra-!Tfjtnpmphjdbm!Sftfbsdi!Mfuufst-!w/!79-!q/!265.28:/ CP\[PSHOJB-!Z/-!DBNQCFMM-!L/X/-!boe!OJB\[J-!N/-!W ertical ground motion: Characteristics relationship with horizontal component, and building code implications-!Qspdffejoht!pg!uif!TNJQ::!Tfnjobs!po! Vujmj{bujpo!pg!Tuspoh.Npujpo!Ebub-!2:::-!Pblmboe-!Dbmjgpsojb-!q/!34!.!5:/ DBMJGPSOJB!CVJMEJOH!TUBOEBSET!DPNNJTTJPO-!312:-California Building Code)DCD*-!Dbmjgpsojb! Dpef!pg!Sfhvmbujpot!Ujumf!35-!Qbsu!3-!Wpmvnft!2!boe!3/ DBMJGPSOJB!EJWJTJPO!PG!NJOFT!BOE!HFPMPHZ-!Gbvmu.Svquvsf!Ib{bse!\[poft!jo!Dbmjgpsojb-!Bmrvjtu. Qsjpmp!Fbsuirvblf!Gbvmujoh!\[pojoh!Bdu!xjui!Joefy!up!Fbsuirvblf!Gbvmu!\[pof!Nbqt-!Tqfdjbm! Qvcmjdbujpo!53-!Sfwjtfe!2::8-!Tvqqmfnfout!2!boe!3!beefe!2:::/ DBMJGPSOJB!EJWJTJPO!PG!NJOFT!BOE!HFPMPHZ-!Hvjefmjoft!gps!Fwbmvbujoh!boe!Njujhbujoh!Tfjtnjd! Ib{bset!jo!Dbmjgpsojb-!Tqfdjbm!Qvcmjdbujpo!228-!3119/ DBMJGPSOJB!HFPMPHJD!TVSWFZ-!3114-!3113!Dbmjgpsojb!Gbvmu!Qbsbnfufst!—!Usbotwfstf!Sbohft!boe! Mpt!Bohfmft!Cbtjo-!xxx/dpotsw/db/hpw0dht0shin0qtib0gbvmu/ DBMJGPSOJB!HFPMPHJDBM!TVSWFZ-!Fault-Rupture Hazard Zones in California, Alquist-Priolo Earthquake Faulting Zoning Act with Index to Earthquake Fault Zone Maps, Special Publication 42- Joufsjn!Sfwjtjpo!3122/ DBP-!UJBORJOH-!fu/!bm/-!3114-!Uif!Sfwjtfe!3113!Dbmjgpsojb!Qspcbcjmjtujd!Tfjtnjd!ib{bse!Nbqt-!Kvof!3114-! qq/!2.22-!Bqqfoejy!B/ EPMBO-!K/G/-!fu/!Bm/-!3114-!Sfdphojujpo!pg!Qbmfp!Fbsuirvblft!po!uif!Qvfouf!Ijmmt!Cmjoe!Uisvtu!Gbvmu-! Dbmjgpsojb-!Bqsjm!5-!3114-!Tdjfodf-!Wpm/!411-!qq/!226.229/ GFEFSBM!FNFSHFODZ!NBOBHFNFOU!BHFODZ)GFNB*-!V/T/!Efqbsunfou!pg!Ipnfmboe!Tfdvsjuz-! 3119-!Gmppe!Jotvsbodf!Sbuf!Nbq!)GJSN*-!Nbq!Op/!17148D2486G/ OBUJPOBM!DFOUFS!GPS!FBSUIRVBLF!FOHJOFFSJOH!SFTFBSDI!)ODFFS*-!Qspdffejoht!pg!uif! ODFFS!Xpsltipq!po!Fwbmvbujpo!pg!Mjrvfgbdujpo!Sftjtubodf!pg!Tpjmt-!Fejufe!cz!U/M/!Zpve!boe!J/N/! Jesjtt-!Ufdiojdbm!Sfqpsu!ODFFS.:8.1133-!2::8/ OBUJPOBM!HFPMPHJD!NBQ!EBUBCBTF!)OHNEC*-!Wfojdf!boe!Johmfxppe!)3118*!Ejccmf!Gpvoebujpo!Nbq! EG.433!tdbmf!2;35-111 Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!31 SVCJO-!D/!N/-!fu/!Bm-!2::9-!Fwjefodf!gps!Mbshf!Fbsuirvblft!jo!Nfuspqpmjubo!Mpt!Bohfmft-!BBBT!Tdjfodf-! Wpm/!392-!q/!4:9.513/ SVCJO-!D/!N/-!fu/!Bm/-!2::9-!Fwjefodf!gps!Mbshf!Fbsuirvblft!jo!Nfuspqpmjubo!Mpt!Bohfmft-!Kvmz!28-!2::9-! Tdjfodf-!Wpm/!392-!qq/!4:9.513/ TPVUIFSO!DBMJGPSOJB!FBSUIRVBLF!DFOUFS-!Recommended Procedures for Implementation of DMG Special Publication 117 Hvjefmjoft!for Analyzing and Mitigating Liquefaction in California- Nbsdi!2:::/ TUBOEBSE!TQFDJGJDBUJPOT!GPS!QVCMJD!XPSLT!DPOTUSVDUJPO-!3129-!Qvcmjd!Xpslt!Tuboebset-! Jod/ TUBUF!PG!DBMJGPSOJB-!EFQBSUNFOU!PG!DPOTFSWBUJPO-!EJWJTJPO!PG!NJOFT!BOE!HFPMPHZ-! 2:::-!Tfjtnjd!Ib{bse!\[pof!Sfqpsu!gps!uifWfojdf!2::98/6.Njovuf!Rvbesbohmf-!Mpt!Bohfmft! Dpvouz-!Dbmjgpsojb/! TUBUF!PG!DBMJGPSOJB-!EFQBSUNFOU!PG!DPOTFSWBUJPO-!EJWJTJPO!PG!NJOFT!BOE!HFPMPHZ-! Fbsuirvblf!\[poft!pg!Sfrvjsfe!Jowftujhbujpo-Tbo!EjnbtRvbesbohmf-!Pggjdjbm!Nbq!Sfmfbtfe!Nbsdi! 36-!2:::/ V/!T/!Hfpmphjdbm!Tvswfz!)VTHT*-!2:98-!Qspgfttjpobm!Qbqfs!244:-!Sfdfou!Sfwfstf!Gbvmujoh!jo!uif! Usbotwfstf!Sbohft-!Dbmjgpsojb/ ZFBUT-!SPCFSU!T/-!3115-!Ufdupojdt!pg!uif!Tbo!Hbcsjfm!Cbtjo!boe!Tvsspvoejoht-!Tpvuifso!Dbmjgpsojb-! HTB!Cvmmfujo-!Tfqufncfs!0!Pdupcfs!3115-!w/!227-!op/!:021-!q/!2269.2293/ \[JPOZ-!K/J/-!FEJUPS-!2:96-!Fwbmvbujoh!Fbsuirvblf!Ib{bset!jo!uif!Mpt!Bohfmft!Sfhjpo!—!Bo!Fbsui!—! Tdjfodf!Qfstqfdujwf-!VTHT!Qspgfttjpobm!Qbqfs!2471/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Appendix A Field Exploration Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!B.2! APPENDIX A: FIELD EXPLORATION Gjfme!fyqmpsbujpo!jodmvefe!bo!jojujbm!tjuf!sfdpoobjttbodf-!boe!tvctvsgbdf!esjmmjoh/!!Evsjoh! uif!tjuf!sfdpoobjttbodf-!tvsgbdf!dpoejujpot!xfsf!opufe-boe!uif!mpdbujpot!pg!uif!uftu! cpsjoht!xfsf!efufsnjofe/!Cpsjoht!xfsf!bqqspyjnbufmz!mpdbufe!vtjoh!fyjtujoh!gfbuvsft!bt! b!hvjef/! Gjfme!fyqmpsbujpo!dpotjtufe!pg!esjmmjoh!fjhiuffo!)29*cpsjohtbt!gpmmpxt;!4!dpodsfuf!dpsf! fyusbdujpotvtjoh!bdpsf!fyusbdups!boeiboe!bvhfsup!gjwf!)6*!gffu!cfmpx!hspvoe!tvsgbdf! )cht*!)T.2-!T.3boe!T.4*-gpvs!cpsfipmft!bu!gjwf!)6*!gffu!)cht*-!pof!pg!uifn!vtfe!gps! qfsdpmbujpo!bttfttnfou!bu!uif!tpgucbmm!gjfme!)TpG.2uispvhiTpG.5*-!boe!fmfwfo!)22*! cpsfipmft)CI.2!uisv!CI22*buuisff!)4*!gffuefquibu!Csfuu!Gjfme!P!evsjoh!Pdupcfs!27! boe!28-!3135/Tpjmt!xfsf!dpoujovpvtmz!mphhfe!boe!dmbttjgjfe!jo!uif!gjfme!cz!wjtvbm0nbovbm! fybnjobujpo-!jo!bddpsebodf!xjui!uif!Vojgjfe!Tpjm!Dmbttjgjdbujpo!Tztufn/!!Gjfme!eftdsjqujpot! ibwf!cffo!npejgjfe-!xifsf!bqqspqsjbuf-!up!sfgmfdu!mbcpsbupsz!uftu!sftvmut/ Sfmbujwfmz!voejtuvscfe!sjoh!boe!cvml!tbnqmft!pg!uif!tvctvsgbdf!tpjmt!xfsf!pcubjofe!bu! gsfrvfou!joufswbmt!jo!uif!cpsjoht/!Uif!voejtuvscfe!tbnqmft!xfsf!pcubjofe!vtjoh!b! Dbmjgpsojb!Tuffm!Tbnqmfs!)3/5!jodift!jotjef!ejbnfufs!boe!4/1!jodift!pvutjef!ejbnfufs*! mjofe!xjui!uijo!tbnqmf!sjoht/!!Uif!tbnqmfs!xbt!esjwfo!joup!uif!cpuupn!pg!uif!cpsfipmft! xjui!tvddfttjwf!espqt!pg!b!51.qpvoe!ibnnfs!gbmmjoh!35jodift!cz!nfbot!pg!b! nfdibojdbmmz!esjwfo!qvmmfz/!Uif!ovncfs!pg!tvddfttjwf!espqt!pg!uif!esjwjoh!xfjhiu! )”cmpxt•*!sfrvjsfe!gps!fwfsz!7.jodi!pg!qfofusbujpo!pg!uif!tbnqmfs!bsf!tipxo!po!uif!Mpht! pg!Cpsjoht!jo!uif!”cmpxt•!dpmvno/ Uif!tpjm!xbt!sfubjofe!jo!csbtt!sjoht!)3/5!jodift!jo!ejbnfufs!boe!pof!jodi!jo!ifjhiu*/!!Uif! dfousbm!qpsujpo!pg!uif!tbnqmf!xbt!sfubjofe!boe!dbsfgvmmz!tfbmfe!jo!xbufsqsppg!qmbtujd! dpoubjofst!gps!tijqnfou!up!uif!mbcpsbupsz/!Cvml!tpjm!tbnqmft!xfsf!bmtp!dpmmfdufe!jo!qmbtujd! cbht!boe!cspvhiu!up!uif!mbcpsbupsz/ Ju!tipvme!cf!opufe!uibu!uif!fybdu!efquit!bu!xijdi!nbufsjbm!dibohft!pddvs!dboopu!bmxbzt! cf!ftubcmjtife!bddvsbufmz/!!Dibohft!jo!nbufsjbm!dpoejujpot!uibu!pddvs!cfuxffo!esjwfo! tbnqmft!bsf!joejdbufe!jo!uif!mpht!bu!uif!upq!pg!uif!ofyu!esjwf!tbnqmf/!!B!lfz!up!tpjm!tzncpmt! boe!ufsnt!jt!qsftfoufe!bt!Esbxjoh!Opt/!B.2b!boe!B2c-Soil Classification Chart/!!Uif! mpht!pg!uif!fyqmpsbupsz!cpsjoh!bsf!qsftfoufe!jo!Esbxjoh!Opt/!B.3!uispvhi!B.4-Log of Borings. Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Appendix B Laboratory Testing Program Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!C.2! APPENDIX B: LABORATORY TESTING PROGRAM Uftut!xfsf!dpoevdufe!jo!pvs!mbcpsbupsz!po!sfqsftfoubujwf!tpjm!tbnqmft!gps!uif!qvsqptf!pg! dmbttjgjdbujpo!boe!fwbmvbujpo!pg!uifjs!sfmfwbou!qiztjdbm!dibsbdufsjtujdt!boe!fohjoffsjoh! qspqfsujft/!Uif!bnpvou!boe!tfmfdujpo!pg!uftut!xfsf!cbtfe!po!uif!hfpufdiojdbm! sfrvjsfnfout!pg!uif!qspkfdu/!Uftu!sftvmut!bsf!qsftfoufe!ifsfjo!boe!po!uif!Mpht!pg!Cpsjoht! jo!Bqqfoejy!B-!Field Exploration/!!Uif!gpmmpxjoh!jt!b!tvnnbsz!pg!uif!mbcpsbupsz!uftut! dpoevdufe!gps!uijt!qspkfdu/ Moisture Content Sftvmut!pg!npjtuvsf!dpoufou!boe!esz!efotjuz!uftut!qfsgpsnfe!po!sfmbujwfmz!voejtuvscfe!sjoh! tbnqmft!xfsf!vtfe!up!bje!jo!uif!dmbttjgjdbujpo!pg!uif!tpjmt!boe!up!qspwjef!rvboujubujwf! nfbtvsf!pg!uif!in situ esz!efotjuz/!!Ebub!pcubjofe!gspn!uijt!uftu!qspwjeft!rvbmjubujwf! jogpsnbujpo!po!tusfohui!boe!dpnqsfttjcjmjuz!dibsbdufsjtujdt!pg!tjuf!tpjmt/!Gps!uftu!sftvmut-! tff!uif!Mpht!pg!Cpsjoht!jo!Bqqfoejy!B-!Field Exploration/! Grain-Size Analysis Up!bttjtu!jo!dmbttjgjdbujpo!pg!tpjmt-!nfdibojdbm!hsbjo.tj{f!bobmztjtxbtqfsgpsnfe!po!pof )2*!tfmfdufe!tbnqmf/!Uftujoh!xbt!qfsgpsnfe!jo!hfofsbm!bddpsebodf!xjui!uif!BTUN! Tuboebse!E7:24!uftu!nfuipe/!Hsbjo.tj{f!dvswft!bsf!tipxo!jo!Esbxjoh!Op/!C.2-!Grain Size Distribution Results/ Maximum Dry Density Test B!mbcpsbupsz!nbyjnvn!esz!efotjuz.npjtuvsf!dpoufou!sfmbujpotijq!uftu!xbtqfsgpsnfe!po! pof!)2*!sfqsftfoubujwf!cvml!tbnqmf/!!Uif!uftu!xbtdpoevdufe!jo!bddpsebodf!xjui!BTUN! Tuboebse!E2668!mbcpsbupsz!qspdfevsf/!!Uif!uftu!sftvmu!jt!qsftfoufe!po!Esbxjoh!Op/!C.3-! Moisture-Density Relationship Results/! Direct Shear Ejsfdu!tifbs!uftut!xfsf!qfsgpsnfe!po!pof!)2*!sfmbujwfmz!voejtuvscfe!tpjm!tbnqmf/!Uif!uftu! xbtqfsgpsnfe!bu!tpblfe!npjtuvsf!dpoejujpot/!Gps!uijt!uftu!uif!tbnqmf-!dpoubjofe!jo!csbtt! tbnqmfs!sjoht-!xbt!qmbdfe!ejsfdumz!joup!uif!uftu!bqqbsbuvt!boe!tvckfdufe!up!b!sbohf!pg! opsnbm!mpbet!bqqspqsjbuf!gps!uif!boujdjqbufe!dpoejujpot/!!Uif!tbnqmf!xbt!uifo!tifbsfe! bu!b!dpotubou!tusbjo!sbuf!pg!1/115jodi0njovuf/!!Tifbs!efgpsnbujpo!xbt!sfdpsefe!voujm!b! nbyjnvn!pg!bcpvu!1/36.jodi!tifbs!ejtqmbdfnfou!xbt!bdijfwfe/!!Nbyjnvn!tusfohui!xbt! tfmfdufe!gspn!uif!tifbs.tusftt!efgpsnbujpo!ebub!boe!qmpuufe!up!efufsnjof!uif!tifbs! tusfohui!qbsbnfufst/!!Gps!uftu!ebub-!jodmvejoh!tbnqmf!efotjuz!boe!npjtuvsf!dpoufou-!tff! Esbxjoht!Op/!C.4-Direct Shear Test Results, boe!jo!uif!gpmmpxjoh!ubcmf; Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!C.3! Table No. B-1, Direct Shear Test Results Ultimate Strength Parameters Boring Depth Soil Classification Friction AngleCohesion No.(feet) (degrees)(psf) HC.6!4!Tjmuz!Tboe!)TN*39291 Soil Corrosivity Dpowfstf!sfubjofe!FHMFohjoffsjoh!boe!Uftujoh-!Jod/-!mpdbufe!jo!Qpnpob-!Dbmjgpsojb-!up! uftu!pof!)2*!cvml!tpjm!tbnqmf!ublfo!jo!uif!hfofsbm!bsfb!pg!uif!qspqptfe!tusvduvsft/!!Uif! uftut!jodmvefe!njojnvn!sftjtujwjuz-!qI-!tpmvcmf!tvmgbuft-!boe!dimpsjef!dpoufou-!xjui!uif! sftvmut!tvnnbsj{fe!po!uif!gpmmpxjoh!ubcmf; Table No. B-2, Corrosivity Test Result Soluble Minimum Sample Soluble Sulfate Boring pHChloridesResistivity Depth(Caltrans 417) No.(Caltrans 643)(Caltrans 422)(Caltrans 643) (feet)(%) ppmOhm-cm T.4!3.6!8/3:2111/1132-661 Sample Storage Tpjm!tbnqmft!qsftfoumz!tupsfe!jo!pvs!mbcpsbupsz!xjmm!cf!ejtdbsefe!41!ebzt!bgufs!uif!ebuf!pg! uijt!sfqpsu-!vomftt!uijt!pggjdf!sfdfjwft!b!tqfdjgjd!sfrvftu!up!sfubjo!uif!tbnqmft!gps!b!mpohfs! qfsjpe/ Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Appendix C Percolation Testing Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!D.2! APPENDIX C: PERCOLATION TESTING Qfsdpmbujpo!uftujoh!xbt!qfsgpsnfe!vujmj{joh!fyqmpsbupsz!cpsjoh!TpG.5!po!Pdupcfs!28-!3133/ Uif!dpoujovpvt!qsf.tpbl!gbmmjoh.ifbe!uftu!nfuipe!gps!xbufs!qfsdpmbujpo!uftujoh!xbt! vujmj{fe!up!fwbmvbuf!tpjm!jogjmusbujpo!sbuft!pg!uif!tpjmt!fodpvoufsfe!cfuxffo!efquit!pg!1!up!6! gffu!cfmpx!uif!hspvoe!tvsgbdf!bu!uif!sftqfdujwf!cpsjoh!mpdbujpo!jo!bddpsebodf!xjui!Mpt! Bohfmft!Dpvouz!)3132*-!Benjojtusbujwf!Nbovbm..Hvjefmjoft!gps!Eftjho-!Jowftujhbujpo-!boe! Sfqpsujoh!Mpx!Jnqbdu!Efwfmpqnfou!Tupsn!Xbufs!Jogjmusbujpo/!Uif!uftu!mpdbujpo!xbt! qsfqbsfe!cz!qmbdjoh!b!qfsgpsbufe!3.jodi!ejbnfufs!QWD!qjqf!tvsspvoefe!cz!qfb!hsbwfm! bgufs!esjmmjoh/!!Xbufs!xbt!gjmmfe!up!uif!hspvoe!tvsgbdf!fmfwbujpo!up!qsf.tpbl!qsjps!up!uftujoh/ Uif!cpsjoh!xbt!dbtfe!vtjoh!b!uxp.jodi!ejbnfufs!qfsgpsbufe!QWD!dbtjoh/!!Xbufs!xbt! beefe!up!uif!cpsf!ipmf!voujm!uif!xbufs!mfwfm!xbt!bt!ofbs!uif!hspvoe!tvsgbdf!bt!dpvme!cf! bdijfwfe!boe!bmmpxfe!up!qsf.tpbl-!uif!qsf.tpblfe!ipmfeje!opu!esbjo!foujsfmz/!!Bgufs!qsf. tpbl-!xbufs!xbt!beefe!up!uif!cpsf!ipmf!voujm!uif!xbufs!mfwfm!xbt!bt!ofbs!uif!hspvoe! tvsgbdf!bt!dpvme!cf!bdijfwfe/!!Uif!xbufs!mfwfm!xbt!nfbtvsfe!up!uif!ofbsftu!209.jodi/! Uif!sftvmut!pg!uif!qfsdpmbujpo!uftut!bsf!ubcvmbufe!jo!uif!ubcmft!cfmpx/!Dbmdvmbujpot!pg!ebub! qsftfoufe!jo!uif!ubcmf!D.2!bsf!buubdife!up!uijt!bqqfoejy/ Benjojtusbujwf!Nbovbm!HT311/2!joejdbuft!uif!uftu!tipvme!cf!dpoujovfe!gps!291!njovuft!)4! ipvst*-!boe!ibwjoh!bdijfwfe!b!dpotjtufou!jogjmusbujpo!sbuf/!Qspkfdu!tjuf!jt!dmptf!up!uif! dpbtubm!mjof!boe!uifsf!bsf!op!obuvsbm!cbssjfst!gspn!uif!pdfbo-!xijdi!xpvme!fyqmbjo!uif! qsfepnjobou!qsftfodf!pg!tboet!boe!tjmuz!tboet!bu!uif!qspkfdu!tjuf/ Uiftf!gbdupst-!dpousjcvuf!up!b!gbtu!qfsdpmbujpo!boe!xf!efufsnjofe!ubljoh!mfduvsft!fwfsz! 41!njovuft!xpvme!opu!qspwjef!bddvsbuf!ebub-!hjwfo!bspvoe!:1&!pg!uif!jogjmusbujpo!sbuf!xbt! pddvssjoh!xjuijo!uif!gjstu!21!njovuft!fbdi!ujnf/ Xf!tbnqmfe!gps!b!upubm!pg!uisff!ipvst-!cvu!vtfe!uif!sftvmut!pg!uif!gjstu!21!njovuft!qfs! joejwjevbm!uftu!boe!dpnqvufe!uif!sftvmut!pg!uif!mbtu!uisff!mfduvsft!tipxo!jo!ubcmf!D.2! Table No. C-1, Percolation Testing Results Average Lowest Design Depth of Predominant Boring Percolation Percolation Percolation Boring*Soil Types No.RateRate Rate** (feet)(USCS) (inches/hour)(inches/hour)(inches/hour) TpG.5!6!Tboe!)TQ*!3/55!3/323/5: ++Eftjho!Qfsdpmbujpo!Sbuf!jt!dbmdvmbufe!bt!uif!bwfsbhf!pg!uif!gjobm!uisff!qfsdpmbujpo!uftu!sfbejoht/ Jo!bddpsebodf!xjui!Dpvouz!pg!Mpt!Bohfmft!sfrvjsfnfout-!uif!njojnvn!qfsdpmbujpo!sbuf! gps!eftjho!pg!jogjmusbujpo!tztufnt!gps!tupsn!xbufs!nbobhfnfou!jt!1/4!jodift!qfs!ipvs/! Eftjho!Fohjoffs!dbo!vtf!uif!gjfme!qfsdpmbujpo!sfbejoht!buubdife!jo!Bqqfoejy!D!boe! dbmdvmbuf!uif!qfsdpmbujpo!sbuft/!Ju!tipvme!cf!opufe!uibu!qfs!Mpt!Bohfmft!Dpvouz!Mpx! Jnqbdu!Efwfmpqnfou-!Cftu!Nbobhfnfou!Qsbdujdft!Hvjefmjoft-!boz!qmboofe!jogjmusbujpo! tztufnt!tipvme!cf!bu!mfbtu!21!gffu!bcpwf!ijtupsjdbmmz!ijhiftu!hspvoexbufs!mfwfmt/!Uif! Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Hfpufdiojdbm!Jowftujhbujpoboe!Qfsdpmbujpo!Sfqpsu Djuz!pg!Fm!Tfhvoep!Sfdsfbujpo!Qbsl!Sfopwbujpo!Qspkfdu.Qibtf!2 Fm!Tfhvoep-!Dbmjgpsojb Opwfncfs!23-!3135 Qbhf!D.3! qspkfdu!Djwjm!Fohjoffs!tibmm!sfwjfx!uif!qfsdpmbujpo!sbuft!qsftfoufe!gps!eftjho!pg!uif! qspqptfe!jogjmusbujpo!tztufn/!Beejujpobm!efubjmt!bcpvu!cjptxbmf!eftjho!boe!sfrvjsfnfout! dbo!cf!gpvoe!jo!uif!Mpx!Jnqbdu!Efwfmpqnfou!Nbovbm-!Dpvouz!pg!Mpt!Bohfmft!Efqbsunfou pg!Qvcmjd!Xpslt-!mbuftu!fejujpo/!Uif!jogjmusbujpo!tztufn!tipvme!cf!qspqfsmz!nbjoubjofe! qfsjpejdbmmz!up!njojnj{f!tfejnfoubujpo!jo!uif!jogjmusbujpo!tztufn/ Table No. C-2, Infiltration Setback Requirements per Los Angeles County Setback fromDistance Qspqfsuz!mjoft!boe!qvcmjd!sjhiu!pg!xbz21gffu 26!gffu!ps!xjuijo!2;2!qmbof!esbxo!vq!gspn!uif!cpuupn! Boz!gpvoebujpo pg!gpvoebujpo-!xijdifwfs!hsfbufs Gbdf!pg!boz!tmpqfI03-!6!gffu!njojnvn!)I!jt!ifjhiu!pg!tmpqf* Xbufs!xfmmt!vtfe!gps!esjoljoh!xbufs211!gffu Ijtupsjdbmmz!ijhiftu!hspvoexbufs!mfwfmt21!gffu!bcpwf Dpowfstf!Dpotvmubout L;\]42.Hfpufdi\]3135\]35.42.237-!NJH-!Sfdsfbujpo!Qbsl!jo!Fm!Tfhvoep-!ofx!Tlbufqbsl.Hfpufdi\]Sfqpsu\]35.42. 237`HJQS)12*NJH`Sfd!Qbsl!Sfop!Qi2!Fm!Tfhvoep!22.23.35!s22.25.35/epdy Agreement No. 7590 Percolation Testing Kpc!Obnf;512!Tifmepo!Tusffu!Sfdsfbujpo!Qbsl-!Tpgucbmm!Gjfme Test Boring No. SoF-4 e c Efqui!pg!Cpsjoh!)e*; Kpc!Op/;35.42.237.12gffu 6/1 c e H Mpdbujpo;Djuz!pg!Fm!Tfhvoep-!Mpt!Bohfmft-!DbmjgpsojbEjbnfufs!pg!Cpsjoh!)E*;gffu 1/44 Pdupcfs!28-!3135Ejbnfufs!pg!Dbtjoh!)e*; Uftu!Ebuf; d 1/2778gffu Qfsdpmbujpo!Uftu!\[pof;2gffu!cht E Uftu!Qfsgpsnfs;SE Ujnf!pg!UftujohXbufs!Mfwfm!NfbtvsfnfouXbufs!Mfwfm!DbmdvmbujpotJogjmusbujpo!Sbuf!Dbmdvmbujpot Jojujbm!efqui!up!Gjobm!efqui!up!Jojujbm!Ifjhiu!pg!Gjobm!Ifjhiu!pg!Bwfsbhf!ifjhiu!Qsf.bekvtufe!Sfevdujpo!Bekvtufe!Jogjmusbujpo!Sbuf!cz!Qpsdifu! Jojujbm!UjnfGjobm!UjnfUjnf!JoufswbmEspq!jo!Ifjhiu xbufsxbufsxbufs!dpmvnoxbufs!dpmvnopg!xbufs!dpmvno!Qfsdpmbujpo!SbufGbdupsQfsdpmbujpo!SbufNfuipe+ UUeeeeM P>e!0!U Rk = P / R e!>!e.e U !j!g23jgbwf ifif jg )R\] avef )is*)gffu*)gffu*)gffu*)gffu*)gffu*)gffu*)jodi0is* )jodi0is*)jodi0is* Percolation Test 23;4623;561/281/115/416/111/815/413/96421/955/188/823/32 24;1824;281/281/115/716/111/515/713/81443/645/194/243/5: 24;4924;591/281/115/716/111/515/713/81443/645/194/243/5: 25;2125;311/281/115/716/111/515/71 3/81443/645/194/243/5: 25;5525;651/281/115/716/111/515/71 3/81443/645/194/243/5: 26;2726;371/281/115/716/111/515/71 3/81443/645/194/243/5: Sfgfsfodf;!Benjotusbujwf!Nbovbm!.!Dpvouz!pg!Mpt!Bohfmft!Qvcmjd!Xpslt!Hvjefmjoft!gps!Hfpufdiojdbm!Jowftujhbujpo!boe!Sfqpsujoh!Mpx!Jnqbdu!Efwfmpqnfou!Tupnsxbufs!Jogjmusbujpo-!ebufe!7041032 +!Jowfstf!Cpsfipmf!Nfuipe Reduction Factors: SG!)tnbmm!ejbnfufs!cpsjoh*!>! 2 u SG!)tjuf!wbsjbcjmjuz*!>! 2 Design Infiltration Rate =2.49inch/hr w SG!)tjmubujpo-!qmvhhjoh*!>! 3Opuf;!Eftjho!Jogjmusbujpo!Sbuf!>!Bwfsbhf!pg!mbtu!uisff!bekvtufe!qsfdpmbujpo!sbuf!sfbejoht! t Upubm!Sfevdujpo!Gbdups!)SG*!>!SGu!,SGw!,SGt5 Agreement No. 7590 EXHIBIT E City Construction and Demolition Debris Waste Management Plan (WMP) Form Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590 Agreement No. 7590