CONTRACT 7451 Reimbursement AgreementAgreement No. 7451 REIMBURSEMENT AGREEMENT BETWEEN THE CITY OF EL SEGUNDO AND 8 Form, LLC a Delaware Limited Liability Company This Reimbursement Agreement ("Agreement") is entered into as of October 7Z-, 2025, by and between the City of El Segundo, a general law city and municipal corporation ("City"), and 8 Form, LLC a Delaware Limited Liability Company ("Applicant"). The parties agree as follows: Recitals. This Agreement is made with reference to the following facts and circumstances: a. The Applicant filed applications for Environmental Assessment No. EA- 1400 (the "Project") to construct a new Data Center at 750 N. Nash Street. b. The Project requires the retention of professional consultants; the costs of attorneys' fees; the costs of work performed by City staff to complete the number of tasks including drafting documents and environmental review; zoning review, plans review for compliance with City standards, building code compliance, preparation of reports, and project management duties; the reasonable processing costs related to review and inspection of the Project; and the costs of implementing the conditions of approval (collectively, "Project Costs") as indicated in ExhibitA— Proposal to Provide Consulting Services for the Data Center'at 750 N. Nash Street prepared by Kimley-Horn (attached). C. City believes it is in the public interest for Applicant to pay for such Project Costs. Applicant understands that all work performed by the City related to the Project will be under the direction of City, but at Applicant's expense. 2. City Reimbursement. Applicant agrees to fully reimburse the City for the Project Costs. The City has estimated the Project Costs for processing as being approximately $230,000.00. However, the Applicant acknowledges that the actual amount of such costs and expenses may be different. Nonetheless, even though the actual amount of such Project Costs may be different, the Applicant agrees to reimburse the City for the full amount of such actual costs in the manner provided in this Agreement. City will provide Applicant with an accounting of the Project Costs on a monthly basis, which accounting shall include any City Administrative Costs (as discussed in Section 5 below), which accounting the Applicant agrees will be conclusive, in the absence of manifest error. The total of the costs of the Project, as disclosed by the accounting, is called the "Reimbursement Amount." 3. City has No Obligation to Approve Project. By signing this agreement, Applicant acknowledges and understands that this Agreement in no way obligates the City to approve any of the entitlements or environmental documents for the Project. The City and its elected and appointed officials retain sole discretion to either approve or deny any of the environmental documents or entitlements that are subject of this Agreement and need to effectuate the Project. 4. Method of Reimbursement. Agreement No. 7451 Except as provided below, upon execution of this Agreement, Applicant agrees to deposit with City $90,000.00 ("Deposit Amount") which represents 39 percent of the estimated Reimbursement Amount for processing. Once the Deposit Amount balance falls below $5,000.00, a minimum Replenishment deposit of $140,000.00 must be submitted to the City in accordance with Section 4(c) below. b. The Deposit Amount will be placed in a non -interest bearing trust account established by the City Manager. Applicant understands and agrees that City will not pay interest to Applicant on the Deposit Amount and Applicant will not seek such interest payments from City. C. Reglenishment Deposit. Whenever the Deposit Amount balance falls below $5,000.00, the City may request in writing to the Applicant that it replenish the Deposit Amount ("Replenishment Deposit"). Applicant agrees to deliver a Replenishment Deposit to the City within 10 business days following the City's request. If a Replenishment Deposit is not received within 10 business days following the City's request, then all work on the project shall cease immediately. d. Should the actual Reimbursement Amount exceed the Deposit Amount, Applicant agrees to promptly pay City any difference. Should the Reimbursement Amount be less than the Deposit Amount, City will refund the Applicant any remaining Deposit Amount to applicant within 30 days after determining the Reimbursement Amount. 5. Cily Administrative Costs. Administrative costs incurred by City, including, without limitation, staff time, legal costs, fees and services, must be reimbursed on a time and materials basis based on current City reimbursement rates. Such costs will be deducted by City from the Deposit Amount on a monthly basis. 6. A licant Default. Should Applicant fail to perform any of its obligations under this Agreement, then City may, at its option, pursue any one or more or all of the remedies available to it under this Agreement, at law or in equity. Without limiting any other remedy which may be available to it, if Applicant fails to perform any of its obligations under this Agreement, City may cease performing its obligations under this Agreement and may bring an action to recover all costs and expenses incurred by the City in completing the studies, together with interest thereon from the date incurred at the rate of 10% per annum. However, notwithstanding anything contained to the contrary herein, Applicant shall not be liable for any indirect, incidental, consequential, special or punitive damages of any nature or kind resulting from or in connection with this Agreement. 7, Term. This Agreement will terminate either: (i) 12 months from the date the Applicant's application is approved by the City; or (ii) when the Project is disapproved or the application is formally withdrawn. Disapproval of the Project or the Applicant's withdrawal of the application does not excuse Applicant from reimbursing the City for the Project Costs incurred up to such date of disapproval or withdrawal pursuant to this Agreement. Agreement No. 7451 8. Compliance with Law. Applicant will, at its sole cost and expense, comply with all of the requirements of all federal, state, and local authorities now in force, or which may hereafter be in force, pertaining to this Agreement. 9, Waiver of Breach. Any express or implied waiver of a breach of any term of this Agreement will not constitute a waiver of any further breach of the same or other term of this Agreement. 10. Insolvency; Receiver. Either the appointment of a receiver to take possession of all or substantially all of the assets of Applicant, or a general assignment by Applicant for the benefit of creditors, or any action taken or offered by Applicant under any insolvency or bankruptcy action, will constitute a breach of this Agreement by Applicant, and in such event this Agreement will automatically cease and terminate if Applicant or its successor or assign cease or fails to timely pay any amount due and payable by Applicant (or its successor or assign) under this Agreement. 11. Notices. Except as otherwise expressly provided by law, all notices or other communications required or permitted by this Agreement or by law to be served on or given to either party to this Agreement by the other party will be in writing and will be deemed served when personally delivered to the party to whom they are directed, or in lieu of the personal service, upon deposit in the United States Mail, certified or registered mail, return receipt requested, postage prepaid, addressed to: Applicant/ 8 Form, LLC Developer at: 1299 Ocean Ave, Suite 470 Santa Monica, CA 90401 Attn: Arjun Shokeen Email: arjun@eightform.com Phone: (310) 947-0259 With Copy To: Jared Pino jared@eightform.com (407) 670-4585 City at: City of El Segundo Attn: Eduardo Schonborn, Planning Manager 350 Main Street EI Segundo, CA 90245 (310) 524-2312 Either party may change its address for the purpose of this Section by giving written notice of the change to the other party. 12. Acceptance of Electronic Signatures, The Parties agree that agreements ancillary to this Agreement and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by electronic mail in "portable document format" (i.e., .pdf) form, or by facsimile Agreement No. 7451 transmission. Such signature will be deemed to be and treated in all respects as an original signature. 13. Governing Law. This Agreement is made in and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Agreement will be in Los Angeles County. 14. Partial Invalidity. Should any provision of this Agreement be held by a court of competent jurisdiction to be either invalid or unenforceable, the remaining provisions of this Agreement will remain in effect, unimpaired by the holding. 15, Integration. This instrument and its attachments constitute the sole agreement between City and Applicant respecting the matters above and correctly sets forth the obligations of City and Applicant. M Construction. The language of each part of this Agreement will be construed simply and according to its fair meaning, and this Agreement will never be construed either for or against either party. 17. Authority/Mod ifi: cation. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. The City's manager, or designee, may execute any such amendment on behalf of City. 18. Counterparts. This Agreement may be executed in any number of counterparts, each of which will be an original, but all of which together will constitute one instrument executed on the same date. [Signatures on following page] Agreement No. 7451 IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUNDO, A municipal corporation. ATTEST: Susan Truax, City Clerk APPROVED AS TO FORM: 4,oil Mark D. Hensley, City Attorney 8 Form, LLC a Delaware Limited Liability Company Mun Shoke n, Au'torized Person {if Corporation or similar entity, needs two officer signatures or evidence that one signature binds the company} Agreement No. 7451 Kimley»>Horn Exhibit A October 22, 2025 Ms. Maria Baldenegro, Assistant Planner City of El Segundo Community Development Department 350 Main Street El Segundo, CA 90245 Re: Revised Proposal to Provide Consulting Services for the Data Center and Substation at 750 North Nash Street Project, City of El Segundo, California Dear Ms. Baldenegro„ Kimley-Horn ("Kimley-Horn" or "Consultant") is pleased to submit this Revised Proposal to the City of El Segundo ("City" or "Client") to provide Consulting Services for the Data Center and Substation at 750 North Nash Street Project (the "Project"). This Proposal was revised to reflect the proposed Project updates, as detailed in Ms. Baldenegro's 10/08/25 email and as resulted in a change in the CEQA strategy. This Project understanding is based on Kimley-Horn's review of City -provided documentation and our understanding of land use and environmental issues. The Project site involves three parcels totaling approximately 4.7 acres located in the City's northeast portion, at the southeast corner of the North Nash Street and East Maple Avenue intersection. The APNs, acreages, addresses, and existing land uses within each property are presented in the Existing Land Uses Table below. The Project site is generally bound by East Maple Avenue on the north, a parking structure and office uses on the south, Campus Square West on the east, and Nash Street on the west. ..... _..... _ _ _ ....... EXISTING LAND USES TABLE _ APN Acres Address Existing Land Use 4138-030-093 _ 2.150 750 North Nash Street Hyatt Place LA ("Hyatt Hotel )1 4138-030-111 1.276 2310 EastMaple- mm _. _ ._ Avenue AC Hotel by Marriot ("AC Hotel") 4138-030 113 1.303 737 7 _... and .......��.�--� mmITITITITITITITIT�� � 757 Campus Square West Parking Structure' and Moose Toys ("Two Office Buildings") Total 4.7 Notes: 1. The Project proposes to demolish this five -story hotel, which includes 143 guest rooms, an outdoor fireplace, pool, and surface parking lot. 2. This parking structure serves the AC Hotel and the two office buildings The Project proposes to demolish the Hyatt Hotel and associated improvements and in their place construct and operate a data center and electrical substation. The approximately 176,256-gross square foot (GSF) data center would be up to four stories high and would include 15, Tier 4 emergency Agreement No. 7451 illepMorn Ms. Mario Baldenegro, October 22, 2025, Page 2 backup generators, and 32 chillers. The substation would total approximately 10,300 SF and would be approximately 20 feet tall with screening at a height of 25 feet. The substation's equipment would be fully concealed from view from the nearest public street (Nash Street). The data center would include one subterranean parking level containing 115 subterranean parking spaces in one underground parking level. The subterranean parking level would require approximately 30,000 cubic yards (CY) of export. The Project also proposes to subdivide the property (APN 4138-030-093) containing the Hyatt Hotel to create two lots through a Parcel Map, with the substation and data center each on their own legal lot. The proposed Project would require Site Plan Review (SPR), Transfer of Development Rights (TDR), and a Tentative Parcel Map. The Project site is zoned Corporate Campus Specific Plan (CCSP). CCSP Table 1 established the development thresholds for the CCSP area that received CEQA clearance through a Certified EIR (2002) for 2,550,000 GSF of development, including 2.0 million SF (MSF) of office uses and 550,000 SF of all other uses allowed by the CCSP (specified in CCSP Section V). The originally -proposed CCSP development was subsequently reduced to 2,175,000 GSF of development, including 1,740,000 GSF of office uses and 435,000 GSF for all other uses allowed by the CCSP ("Original Project"). CCSP Section V identifies the uses allowed by the CCSP Permitted Accessory Uses, and uses subject to an Administrative Use Permit (AUP) and/or a Conditional Use Permit (CUP) and indicates data centers are Permitted Uses within the CCSP (i.e., permitted by right). The substation is not identified specifically as an allowed use, but it is assumed to be allowed as a Permitted Accessory Use given the CCSP states "any use customarily incidental to a permitted use" and "other similar uses approved by the Director of Planning and Building Safety." Additionally, the CCSP "allows for the development of technology -related telecommunications and web hosting uses. Because of the prospective levels of power consumption associated with such uses, the Specific Plan area could include an on -site electrical co -generation facility." The Certified EIR (page IV.C-12) assumed that "because the project site is flat, grading depth will be shallow with only limited dust generation." The Certified EIR (page IV.C-13) also noted that "on -road emissions will result from trucks bringing construction materials and from construction workers," but did not assume any soil export. In November, 2013, the City approved an Addendum to the Certified EIR that addressed construction of up to 625,205 square feet of the remaining project SF on an undeveloped part of the property ("2013 Revised Project"), and in March 2015, an Addendum was prepared that identified development of a five -story, 214,340 SF office building, among other improvements ("2014 Revised Project"). Collectively, the Certified EIR and two Addendums are referred to as "earlier analyses." The City provided Trip Generation Calcs (undated) as an attachment to the RFP and has confirmed these are an accurate tabulation of the cumulative development that has occurred within the CCSP to date. The Trip Generation Calcs indicate the CCSP's cumulative development totals 698,150 SF or approximately 27 percent of the 2,550,000 GSF of development that received CEQA clearance through the Certified EIR (approximately 40 percent of the 2,175,000 GSF of development that is allowed in the CCSP). The City is seeking to obtain a Proposal for the preparation of the CEQA documents for construction and operation of the proposed Project. As noted above, although CCSV Section V indicates data centers are permitted by right, and the Trip Generation Calcs indicate the CCSP's cumulative HIM j%/ Agreement No. 7451 Imley>Morn Ms. Mario Soldenegro, October 22, 202-; Page 3 development totals only approximately 27 percent of the development that received CEQA clearance through the Certified EIR. However, as previously noted, the subterranean parking level would require approximately 30,000 CY of export, but the Certified EIR assumed grading depth would be shallow and only included on -road emissions from trucks bringing construction materials and construction workers (no trucks from soil export). These project changes are preliminarily anticipated to result in one or more significant effects not discussed in the Certified EIR and/or that significant effects previously examined would be substantially more severe than identified in the Certified EIR, thus, disqualifying the Project from an Addendum. Therefore, we have preliminarily determined the Technical Studies and Initial Study will identify potentially significant effects, but revisions to the Project plans and/or mitigation measures would avoid the effects or mitigate the effects to a less than significant level. As such, this Scope assumes preparation of Technical Studies and an Initial Study leading to a Mitigated Negative Declaration (IS/MND). Should the Technical Studies and Initial Study find that the Project may have a significant effect on the environment, the Project would be disqualified from an MND and preparation of an EIR would be appropriate, which would require a separate Scope and Fee. Kimley-Horn will provide the Scope of Services specifically set forth below. This Scope of Services has been prepared based upon Kimley-Horn's review of City -provided documentation and understanding of Project issues. This Scope assumes the following: • Preparation of an Initial Study leading to an MND. Changes to the CEQA strategy would require a budget augment. • A eight (8)-month Schedule. If substantial delay occurs (90 calendar days or more), a budget augment may be required to accommodate additional Project management time and other costs. • Baseline conditions, Project Description, and approach will not change once City issues the Notice to Proceed (NTP). Project revisions/changes requiring re -analysis (e.g., change in methodology, assumptions, etc.) are excluded and would require a budget augment. • City will not request substantial new analysis that has not previously been prepared or considered in the "Administrative" deliverables cycle. Substantial changes to the Project Description or analysis required to address City comments will require a budget augment. • Per deliverable and unless otherwise noted below, Kimley-Horn will: o Respond to two City review cycles. Additional review cycles are excluded and would require a budget augment. City comments will be provided as one reconciled set in Word redline format. o Per review cycle, provide a "redline copy" that reflects the proposed edits and responds to comments and a "check copy" for approval prior to finalizing. o Provide to City in electronic format (Word/pdf). • City will provide the following: o Project details to support the analyses: Agreement No. 7451 Imley>Morn Ms. Maria 6oldenegro, October 22, 20251. Page 4 • Project narrative identifying stationary equipment (including equipment specification data sheets), off -site improvements, and any other relevant Project details. • Construction details including phasing, duration, demolition, grading, excavation, export, and paving quantities. • Energy/water conservation measures and sustainable Project features that would be incorporated into the design. o Preliminary Geotechnical Investigation (per Certified EIR MM E-1); o Preliminary Grading and Drainage Plan and Preliminary Water Quality Management Plan (WQMP) (per Certified EIR MM E-2 and MM G-1); and o Preliminary Utility Plan (Dry and Wet). Kimley-Horn will organize and facilitate a Project Kick -Off Meeting with the City and Applicant to discuss the "CEQA Project" in greater detail. This initial meeting with the City is a key milestone, which is vital to the Project's success and CEQA compliance. The primary objectives will be to confirm the City's expectations and Project goals, and develop/refine the Project Description and Environmental Schedule. Because the Project would replace the Hyatt Hotel with the proposed data center and substation, Kimley-Horn will collaborate with the City to verify the analysis parameters for the proposed redevelopment (i.e., approach, assumptions, change from existing conditions, etc.). Scheduling, and overall communications protocol will also be established. Kimley-Horn will collect and review readily available reference data, planning and policy documentation from the City, and State, federal, and other agencies that may be affected by the Project. Kimley-Horn will assess whether available information is adequate and complete, and notify the City of data gaps, if any. Data collected through this Task will be foundational to the environmental documentation and incorporated into the analysis, as appropriate. M Kimley-Horn will prepare a Project Description, which will detail the Project's location, environmental setting, background and history, characteristics, discretionary actions, goals and objectives, construction schedule and phasing, agreements, and required permits and approvals. Kimley-Horn will prepare exhibits to depict the regional and local site vicinities, and key Project components. Because the Project would replace the Hyatt Hotel with the proposed data center and substation, Kimley-Horn will collaborate with the City to verify the existing conditions and accurately credit the proposed Project. The Project Description will also include a detailed Background and History discussion to establish the conditions concerning existing development. The Project Description will serve as the foundation for the Technical Studies and IS/MND. Agreement No. 7451 I ✓ - s. A4ario Baldenegr'o, October- 22, 2025. Page 5 I Task 1.0 Deliverables: City Data Needs List; Meeting Agenda, Minutes, and Action Items; CEQA Schedule; Draft and Final Project Descriptions Kimley-Horn will prepare the Technical Studies listed below. These analyses will be included in the Initial Study and the modeling outputs will be included as Appendices to the Initial Study. Kimley-Horn will assess air quality emissions in accordance with the South Coast Air Quality Management District's (SCAQMD's) recommended methodologies set forth in the SCAQMD CEQA Air Quality Handbook. The analysis will be prepared in accordance with CEQA criteria, standards, and provisions and will respond to the applicable checklist items within State CEQA Guidelines Appendix G. The following outlines our approach: Construction Emissions. Kimley-Horn will calculate construction emissions using the latest version of the California Emissions Estimator Model (CalEEMod). Emissions will be calculated based on the Project's scope and assumptions regarding construction equipment, scheduling, and associated vehicle trips. As previously noted, the underground parking area would require approximately 30,000 CY of export, which would generate truck haul trips. Construction activities would also generate truck delivery trips and construction workertrips. The construction air pollutant emissions will be compared to the SCAQMD regional thresholds of significance. Construction -related mitigation will be identified, as necessary. Operational Emissions. Kimley-Horn will quantify the Project's operational emissions (i.e., area, energy, and mobile source) related to area sources and local/regional vehicle miles traveled (VMT). Because the data center would replace an existing hotel, the analysis will credit the proposed Project. Also, because the data center will include stationary source equipment requiring SCAQMD permits, the results of the analyses needed for permitting will be incorporated into the Air Quality Assessment. Operational building emissions will be based on full buildout of the Project, inclusive of the stationary source equipment for CEQA purposes (i.e., building, area, and mobile, along with routine testing emissions- this excludes permitting). The Project's emissions will be compared to the SCAQMD thresholds of significance. Operational mitigation measures will be identified, if necessary. Localized Impacts. Localized impacts will be analyzed based upon the SCAQMD's Localized Significance Thresholds (LST) methodology. For construction, the analysis will utilize the SCAQMD's published LST Look -Up Tables to assess potential localized impacts from on -site emissions. For operations, the analysis will follow the SCAQMD Air Quality Analysis Guidance Handbook (Revised October 2003) and SCAQMD Guidance Document for Addressing Air Quality Issues in Local Planning (May 2005), which outline the dispersion modeling protocols for evaluating compliance with the National Ambient Air Quality Standards (NAAQS). Odors will be evaluated qualitatively. Applicable mitigation will be identified, if necessary. %%% %/%/ / // ,//e ///%/ i // ////pllllr , /� /i. Agreement No. 7451 IIepMorn Ms. Maria 6oldenecro, October 22, 202s Page o Plan Consistency. Kimley-Horn will evaluate the Project's consistency with the SCAQMD's Air Quality Management Plan (AQMP). The determination of AQMP consistency is primarily concerned with the long-term influence of a project on air quality in the South Coast Air Basin. Air Quality Modeling Protocol. Given the level of public interest and limited public understanding regarding data center operations, Kimley-Horn proposes to prepare an Air Quality Modeling Protocol for submittal to the SCAQMD for review and concurrence prior to conducting detailed dispersion modeling. The protocol will summarize the proposed modeling approach and inputs, including ambient air quality data for the Project area, representative meteorological data, and Project -specific information on emissions sources, stack parameters, and other operational assumptions. The protocol will be developed consistent with the SCAQMD Air Quality Analysis Guidance Handbook (Revised October 2003) and U.S. EPA's Guideline on Air Quality Models (40 CFR Part 51, Appendix W) and will outline the modeling methodology, receptor grid, and averaging periods to be used for evaluating compliance with applicable National and California Ambient Air Quality Standards (NAAQS/CAAQS). This Scope excludes preparation of SCAQMD Authority to Construct/Permit to Operate forms and application materials, which can be scoped under an Amendment. Task ®2: Health RiskAssessment Per SCAQMD guidance, a Health Risk Assessment (HRA) is warranted for projects that involve the siting of new sources of toxic air contaminants within 1,000 feet of sensitive receptors, such as residences, schools, parks, hospitals, or places of worship. The proposed Project includes approximately 30,000 CY of export and a data center with stationary combustion sources (e.g., backup diesel generators), and would be located within 1,000 feet of sensitive receptors. As such, Kimley- Horn will prepare a quantitative HRA to evaluate potential construction and operational impacts. Our assessment will include the following components: • Construction diesel particulate matter (DPM) emissions rates will be derived from on- and off - road emissions quantified in the Air Quality Assessment above. • Operational DPM emissions from backup generators will be quantified using California Air Resources Board (CARE) emissions factors and engine specifications. Emissions estimates are based on the number of generators, rated horsepower, Tier certification, and anticipated hours of operation, consistent with methodologies recommended by the SCAQMD. o Construction and operational pollutant concentrations will be projected at the nearest sensitive receptors using the U.S. EPA AERMOD dispersion modeling software. • The modeled concentrations will be used to determine the increase in cancer risk, as well as the chronic and acute health impacts due to DPM exposure. The increased cancer risk and health hazard will be calculated following the methodology in the California Environmental Protection Agency's Office of Environmental Health Hazard Assessment (OEHHA) Air Toxics Hot Spots Program Risk Assessment Guidelines - The Air Toxics Hot Spot Program Guidance Manual for Preparation of Health Risk Assessment. The assessment will present background information on DPM and its health risks, the assumptions used for the modeling and modeling methodology and the results of the analysis. Agreement No. 7451 I Ms. Maria oaldenegro, October 22, 2025. Page 7 KlmoMorn s a a Energy Analysis Kimley-Horn will conduct an Energy Analysis for the Project. Kimley-Horn will analyze the Project's energy implications pursuant to State CEQA Guidelines § 15126.2(b) and Appendix F. The analysis will describe, where relevant, the wasteful, inefficient, and unnecessary consumption of energy caused bythe Project. The analysis will evaluate energy consumption associated with short-term construction activities, long-term operations, buildings, and transportation -related energy during construction and operations. The data center's diesel consumption (i.e., gallons per year) of the generators and the electrical demand would be compared against the utility service area's annual energy consumption to establish a relative energy consumption to support a CEQA conclusion. s Greenhouse Gas Emissions Assessment The analysis will evaluate the Project's potential contribution to cumulative impacts environmental effects of climate change and whether the Project would affect the State's ability to achieve established greenhouse gas (GHG) reduction goals. Land use data will be reviewed and an inventory of GHG emissions (i.e., nitrous oxide, methane, and carbon dioxide) from both direct (i.e., area and mobile sources) and indirect sources (i.e., energy/water consumption and wastewater/solid waste generation) will be prepared. Total GHG emissions from construction activities will be amortized into the GHG emissions inventory. CalEEMod will be used to quantify GHG emissions. Project -related GHG emissions will be assessed based on Project consistency with applicable GHG reduction plans, applicable City policies as well as other applicable regional/statewide GHG emissions reduction strategies such as the CARB Scoping Plan and the Regional Transportation Plan/Sustainable Community Strategy for the Southern California Association of Governments (SCAG) region. Task 2.5. Noise Assessment The noise assessment will quantify both construction and operational noise levels. The analysis will examine whether the Project noise would generate a substantial temporary or permanent increase in ambient noise levels in the Project's vicinity in excess of applicable standards. Noise modeling will be based on reference noise levels provided in equipment specifications. The following outlines our approach: Existing Conditions and Regulatory Setting. Noise standards regulating noise levels will be discussed for land uses on and adjacent to the Project site. A site visit will be conducted, and short-term and long-term noise level measurements will be taken along the Project area. Up to three separate short- term (15-minute) noise measurements and one long-term (24-hour) noise measurement will be taken to establish baseline noise levels in the Project area. Construction Noise. Stationary source construction noise levels will be analyzed based on the anticipated equipment to be used, length of a specific construction task, equipment power type (gasoline or diesel engine), horsepower, load factor, and percentage of time in use. The construction noise impacts will be evaluated in terms of maximum levels (Lmax) and hourly equivalent continuous noise levels (Leq) and the frequency of occurrence at adjacent sensitive receptors. Because the Agreement No. 7451 I>Morn Ms. Maria Saldenecre, October22, 2025, Page 8 underground parking area would require approximately 30,000 CY of export, which would generate truck trips, off -site noise impacts from construction traffic will be assessed qualitatively. Vibration. An analysis of construction vibration impacts will be based on the Federal Transit Administration's (FTA's) vibration analysis guidance. Analysis requirements will be based on the area's sensitivity, specific construction activities, and Noise Ordinance specifications. The analysis will examine whether the Project would generate excessive groundborne vibration. Operational Noise. On -site noise generating activities will be addressed and analyzed for potential impacts to the adjacent uses and will be assessed against the applicable Land Use Noise and Compatibility Matrix and Interior/Exterior Noise Guidelines. Kimley-Horn will model the data center's on -site operational noise including rooftop mechanical equipment, such as chillers, and emergency generators with the SouncIPLAN software. Operational noise will be analyzed to identify the future noise levels that will be experienced at the nearby sensitive receptors. Maximum (Lrt,a) and average (Leq) noise levels will be calculated at receptors. Analysis will include recommendations for sound wall, enclosure, fence, or other abatement measures, if required. Since data centers typically generate a low volume of daily vehicle trips, potential on- and off -site noise impacts from operational vehicular traffic will be assessed qualitatively. Kimley-Horn will prepare this analysis in accordance with the City's SB 743 Implementation Guidelines ("SB 743 Guidelines") and will address Project -related transportation impacts, including construction traffic, operational traffic, and VMT. TASK 2.6.1: CONSTRUCTION TRAFFIC ANALYSIS The underground parking area would require approximately 30,000 CY of export, which would generate truck haul trips. Kimley-Horn will prepare a qualitative construction traffic analysis XXXXX The underground parking area would require approximately 30,000 CY of export, which would generate truck haul trips. Kimley-Horn will prepare a haul route map and qualitative construction traffic analysis to evaluate potential interference with pedestrian, bicycle, transit, or vehicle circulation. Kimley-Horn will review construction information to determine if any closures, access restrictions, and access modifications are required. The qualitative analysis will be summarized in a technical memorandum and will include evaluation of the following, based on the LA County "Transportation Impact Analysis Guidelines" (July 2020). • Temporary Transportation Constraints • Temporary Loss of Access • Temporary Loss of Bus Stops or Rerouting of Bus Lines Kimley-Horn assumes that Client will provide construction procedures, including phasing and duration. This task excludes preparation of a Traffic Control Plan. If a Traffic Control Plan is required, Kimley-Horn can prepare for an additional fee. /ia//J/ �//// / Agreement No. 7451 IMs. Maria 6oldenegro, October 22, 2025; Page 9 TASK 2.6.2: OPERATIONAL TRIP GENERATION SCREENING MEMORANDUM Kimley-Horn will prepare a screening -level trip generation analysis to estimate the number of daily and peak -hour trips generated by the proposed Project. Kimley-Horn will calculate the trip generation for the proposed Project, including the existing displaced hotel and the proposed data center utilizing the latest version of the Institute of Transportation Engineers (ITE) Trip Generation Manual and Applicant -provided Project employee data. The Project's trip generation will be presented in tabular form, including the existing trip credit and the net change from existing conditions. Kimley-Horn will prepare a Technical Memorandum to present the methodology and findings. The analysis will determine whether the Project qualifies for screening from a VMT analysis under CEQA. Based on the City's SB 743 Guidelines and preliminary assumptions, the Project is expected to generate fewer than 110 daily trips and therefore is anticipated to qualify for VMT screening and not require a full Local Transportation Assessment (LTA). Therefore, these are excluded from this Task. Task 2.0 Deliverables: Draft and Final Modeling, and Draft and Final Transportation Memos Kimley-Horn will provide Assembly Bill (AB 52) Native American communications assistance, as directed by the City. Kimley-Horn will contact the Native American Heritage Commission (NAHC) to request a Sacred Lands File (SLF) search. Using the City's California Native American tribal contacts list, Kimley-Horn will draft AB 52 letters for City distribution. A request for consultation would require the City to enter a consultation process. Results of the tribal cultural communications will be incorporated into the Initial Study. Should the City desire that Kimley-Horn provide consultation assistance, a budget augment would be required. Task 3.0 Deliverables: Draft and Final AB 52 Letters Kimley-Horn will prepare an Initial Study in accordance with Public Resources Code §§21080(c)-(e) and State CEQA Guidelines §§15060-15065. The Initial Study will describe the Project's location, environmental setting/baseline conditions, and characteristics. The Initial Study's main body will consist of an environmental checklist and the supporting environmental analyses. Kimley-Horn will explain all responses and "No Impact" responses will be supported by cited information sources. The explanation of each issue will also identify the significance criteria or threshold used to evaluate each question. The Initial Study will include up to 10 exhibits to enhance the written text and clarify the Project's environmental impacts. Our in-house graphic design team will create exhibits, as well as covers and dividers for the Initial Study and Appendices. rioii rii it iiiiiira % ,pr r / ri r%r r /iiiai / ////// /i r /-/{,'�, r �.r , /�/.. rig %/�//%////////// //����� ��� ////�io/%%//,,/i/� Agreement No. 7451 I- Ms. Muria Boldenegre, October22, 2025. Page 10 Upon completion of the Technical Studies and Initial Study, Kimley-Horn will schedule a call with the City to communicate the preliminary environmental review findings and critical path items/issues, if any. Assuming the Technical Studies and Initial Study determine that Project impacts can be avoided/mitigated to a less than significant level, Kimley-Horn will prepare an MND in accordance with the State CEQA Guidelines §§15063, 15162, 15167, and 15168. If the Technical Studies and Initial Study determine the Project may have a significant effect on the environment, the Project would be disqualified from an MND and preparation of an EIR would be required. This change to the CEQA strategy would require a budget augment. Task 4.2: Draft Initial Study Completion Kimley-Horn will respond to two reconciled sets of City comments (i.e., two review cycles) on the Administrative Draft Initial Study. Kimley-Horn will provide the City with redlines that reflect the proposed edits and respond to comments, and a check copy for approval prior to finalizing/public release. Task 4.0 Deliverables: Administrative Draft Initial Study, Check Copy Draft Initial Study, Draft Initial Study Kimley-Horn will prepare the Responses to Public Comments, which will consist of the following sections: • Introduction • List of Commenting Persons, Organizations, and Public Agencies • Comment Letters • Responses to Comments • Errata to the IS/MND, if required. Kimley-Horn will respond to public comments received on the Draft IS/MND during the public review period and any additional comments raised during public hearings. Kimley-Horn will prepare written responses to relevant environmental issues and incorporate these into the Final Initial Study. It is noted that the extent of public/agency comments that will result from the public review process is presently unknown. Therefore, Kimley-Horn has budgeted conservatively, assuming up to 20 hours for completion of the Administrative Responses to Public Comments. Should the level of comments and responses exceed the assumed effort, Kimley-Horn will provide additional services on a T&M basis. /%%iii'g/ ////i/%%///%%%///%/ /p 11111 ` ////////////off �� i/ Agreement No. 7451 II Ms. Maria Boldenegro, October22, 2025, Page 11 T Responses to Public Comments Completion Kimley-Horn will respond to two reconciled sets of City comments on the Administrative Responses to Public Comments. Kimley-Horn will provide the City with a redline copy that reflects the proposed edits and responds to comments, and a check copy for approval prior to finalizing. Once the Responses to Public Comments is finalized, Kimley-Horn will revise the Draft Initial Study in accordance with City direction and will prepare the Final Initial Study. Kimley-Horn has budgeted conservatively, assuming up to 20 hours for completion of the Final Initial Study. Should the level of Initial Study errata edits exceed the assumed effort, Kimley-Horn will provide additional services on a T&M basis. Kimley-Horn will provide the City with a check copy for approval prior to finalizing. Task 5.0 Deliverables: Administrative Responses to Public Comments, Screencheck Responses to Public Comments, Responses to Public Comments, Final Initial Study Kimley-Horn will prepare a Mitigation Monitoring and Reporting Program ("MMRP") in collaboration with the City to identify appropriate monitoring steps/procedures, and provide a basis for monitoring such measures during and upon Project implementation. The MMRP Checklist will indicate the mitigation measure number and text, monitoring milestone, method of verification (e.g., documentation, field checks, etc.), and a verification space for initials of the verifying individual, date, and pertinent remarks. Kimley-Horn will respond to one reconciled set of City comments on the Administrative MMRP. Kimley-Horn will provide the City with a redline copy that reflects the proposed edits and responds to comments, and a check copy for approval prior to finalizing. Task 6.0 Deliverables: Draft and Final MMRP Pursuant to AB 819, public agencies must submit all CEQA environmental documents to the State Clearinghouse (SCH) for publication to CEQAnet. Kimley-Horn will work with the City to obtain Submitter access to the CEQA Submit online platform. Kimley-Horn will complete the following CEQA Notices and SCH Forms for the Project and file these along with the Project's IS/MND to CEQAnet and the County Clerk on behalf of the City: Notice of Intent (NOI); SCH Notice of Completion (NOC), Environmental Document Transmittal, and OPR Summary Form; and Notice of Determination (NOD). Kimley-Horn will distribute the Notices to responsible, trustee, and interested agencies, community groups, and individuals based on a City -provided distribution list. The NOD will be filed within five working days of action on the Project. This Scope assumes that the City will provide the receipt of prior payment of California Department of Fish and Wildlife (CDFW) fees as a part of the Certified EIR. ///% %,!/,/,o„m. Agreement No. 7451 IdepMornMs. Mario Boldenegro, October 22, 2025. Page 12 This Scope excludes radius mailing, the newspaper notice, and payment of California Department of Fish and Wildlife (CDFW) fees. Task 7.0 Deliverables: Draft and Final Notices and Forms :F, Kimley-Horn will be responsible for Project Management, including overall Project Team coordination and supervision, and ongoing consultation with the City. Project management responsibilities include task scheduling and assignment, contract administration and accounting, and coordination and communications with the City. Kimley-Horn will maintain communication to ensure compliance with the Scope of Work, budget, and schedule, and to disseminate Project information in a timely manner. This Task assumes a eight (8)-month Project duration. � The Kimley-Horn Project Manager and one additional Kimley-Horn Staff will attend meetings/hearings and represent the Project Team, as appropriate. This Task assumes up to 60 hours of meeting attendance, including preparation, attendance, and follow-up, as appropriate. Should the City determine that additional meeting/hearing attendance beyond the assumed is required, services will be provided on a time and materials (T&M) basis. All meetings are virtual, unless otherwise noted. Assumed meeti ngs/hea rings: 1 Kick -Off; 5 Progress; 1 Planning Commission (in -person with PowerPoint Presentation (PPP)); and 1 City Council (in -person with PPP). Task 8.0 Deliverables: Draft and Final NODs and Forms Any services not specifically provided for in the above Scope will be billed as additional services and performed at Kimley-Horn's then -current hourly rates. a, RIMMULI iR,IGIM101UP Kimley-Horn (KH) will perform the services described above as expeditiously as practicable with the goal of meeting the preliminary Project Schedule presented below. The Schedule identifies significant milestones and each task's duration. The Schedule also assumes authorization to proceed (ATP) mid - November. Based on the proposed Scope and as shown on the date -specific Schedule below, we estimate an eight (8)-month Project duration for the IS/MND, with a target Planning Commission hearing in June 2026. However, there may be an opportunity to accelerate the Schedule, which would be verified with the City. This Schedule is highly dependent on a timely review and responses from City staff. If a separate review process by City, third party CECW reviewer, or legal counsel is desired, �/um' ' iiiii////% �rrr�t�lawdarsk,rd /*j Agreement No. 7451 IMs. Maria Baldenegro, October 22, 2025, Pare 13 the Schedule and fee estimate would increase to allow for additional coordination and review/revision time. 2 1—J Project Desaiption 28d 11/13/25 12J10/25 3 KH Prepares Admin Draft 2w 11/13/25 11/26/25 4 City Reviews Admin Draft 1w 11/27/25 12/03/25 5 KH Prepares Final Draft 1w 12104/25 12/10125 61-AB 52 Compliance 69d 11/13125 01/20/26 7 KH Prepares AB 52 Letters 1w 11/13/25 11/19/25 8 AB 52 Tribal Consultation Noticing 30d 11/20/25 12/19/25 9 AS 52 Tribal Consultation (assumed if initiated) 30d 12/22/25 01/20/26 10 KH Prepares Technical Studies (accounts for holidays) 7w 12/04125 01121/26 11—! Admin Draft ISMND 119d 12/ 5 04101/26 12 KH Prepares Admin Draft 9w 12/04/25 02/04/26 13 City Reviews Admin Draft 2w 02/05/26 02118/26 14 KH Prepares Admin Draft #2 2w 02/19/26 03/04/26 15 City Reviews Admin Draft#2 1w 03/05/26 03111/26 16 KH Prepares Screencheck Draft 1w 03/12/26 03/18/26 17 City Reviews/Approves Screencheck Draft 1w 03/19/26 03/25126 18 KH Prepares Final Draft and CEQA Notices/SCH Forms 1w 03/26/26 04/01126 19 Draft ISMND Published ay Public Review 30d 04/02126 05/01/26 20 !-1 Final ISMND 05/04126 06/05126 21 KH Prepares Admin Final (includes MMRP and Responses to Public Comments) 15d 05/04/26 05/18126 22 City Reviews Admin Final 1w 05119/26 05/25/26 23 KH Prepares Screencheck Final 1w 05/26/26 06/01/26 24 City Reviews/Approves Screencheck Final 4d 06/02/26 06/05/26 25 Planning Commission Hearing Noticed (accounts for weekend) 12d 06/05/26 06116/26 26 Planning Commission Hearing 4d 06116126 06IM26 27 File Notice of Determination 5d 06/17126 06/21/26 28 City Council Hearing Noticed (accounts for weekend) 12d 06/12/26 06/23/26 29 City Council hleanng 1d 06123M6 06123126 30 File Notice of Determination 5d 06124/26 06/28/26 FEE AND EXPENSES Kimley-Horn will perform the Scope of Services outlined above on a labor fee plus expense basis with the maximum labor fee shown below in the Fee and Expenses Table below. Kimley-Horn will not exceed the total maximum labor fee shown without authorization from Client. Individual Task amounts are provided for budgeting purposes only. Kimley-Horn reserves the right to reallocate amounts among Tasks, as necessary. Direct reimbursable expenses such as express delivery services, fees, air travel, and other direct expenses will be billed at 1.10 times cost. A percentage of labor fee will be added to each invoice to cover certain other expenses such as telecommunications, in-house reproduction, postage, supplies, Project -related computer time, and local mileage. Administrative time related to the Project will be Agreement No. 7451 ms. maria 6aldenegro, October 22, 1025; Page 14 billed hourly. All permitting, application, and similar Project fees will be paid directly by the Client. Should the Client request Kimley-Horn to advance any such Project fees on the Client's behalf, a separate invoice for such fees, with a ten percent (10%) markup, will be immediately issued to and paid by the Client. 3 TASK # TASK FEE ..... .� 1.0 _......... . .................. ..._ PROJECT INITIATION ._ 1.1 ........� ._........ Project Kick -Off ..... -...... ...... $2,400 1.2 . ......._.... ____ ....... ........... Data Collection and Review ....... ....... $4,400 ...... 1.3 .......... ......... _.. ...... ._ .._._. Project Description $7,400 ... .......... 2.0 _. _...... _.,........_. .......... TECHNICAL STUDIES 2.1 - ..........,,,_ .._....... Air Quality Assessment $25,100 2.2 ... . . Health Risk Assessment ._....... ...... .... $17,700 ........ .__ ... 2.3 ......... ............... Energy Analysis $8,100 2.4 GHG Emissions Assessment $11,600 .. ........ 2.5 ........ .-.... ...... ..._._._._. .._.._. Noise Assessment _ .......... _. $25,500 2.6 Transportation Studies 2.6.1 _ Construction Traffic Analysis Memo $5,200 2.6.2 ............ Operational Trip Generation_ _....._ ning Memo Screening $5,500 3.0 ... ............. TRIBAL CULTURAL COMMUNICATIONS ..... $1,600 ....._........ 4.0 ........ ....... ....-.... .............._­. DRAFT INITIAL STUDY 4.1 _ Administrative Draft IS _ _ $18,600 4.2 Draft IS Completion $9,800 5.0 F. _...._.� .._... ....m ..._.... � INAL INITIAL STUDY _. 5.1 _.. ...... Admin. Responses to Public Comments ......... - $4,700 _. _._. 5.2 _.. ..�... ......... Responses to Public Comments Completion . .......- $2,900 5.3 Final IS Completion _, mm $4,500 �.... ..._. 6.0 ....... ..... ____ .._.... MMRP ........ $1,700 . .... 7.0 __ ..._ __......w CEQA NOTICES & SCH FORMS ......._... $2,400 - mmmmmmm8.0 PROJECT MANAGEMENT & MEETINGS /HEARINGS 8.1 .- -.. ... _ ........_... Project Management ...................... . .... $11 000 8.2 . _....... ........ _ Meetings/Hearings ........ .........._ $20,400 . _------- . ---------- ___... ............. Total Fee $190,500 _... _. Expenses $9 000 .......... ..._ Total Fee and Expenses $199,500 Payment will be due within 30 days of your receipt of the invoice and should include the invoice number and Kimley-Horn Project Number. Agreement No. 7451 IMs. Maria 6oldenegro, October 22, 2025, Page 15 mley>Morn In addition to the matters set forth herein, our Agreement shall include and be subject to, and only to, the attached Standard Provisions, which are incorporated by reference. As used in the Standard Provisions, "Consultant" shall referto Kimley-Horn and Associates, Inc., and "Client" shall referto CITY OF EL SEGUNDO. To expedite invoices and reduce paper waste, Kimley-Horn submits invoices via email in an Adobe PDF format. We can also provide a paper copy via regular mail, if requested. Please provide the following information: Please email all invoices to Please copy If you concur in all the foregoing and wish to direct us to proceed with the services, please have authorized persons execute the Agreement and return to us. We will commence services only after we have received a fully -executed agreement. Fees and times stated in this Proposal are valid for sixty (60) days after the date of this letter. To ensure proper set up of your project so that we can get started, please complete and return with the signed copy of this Agreement the attached Request for Information. Failure to supply this information could result in delay in starting work on your project. We appreciate the opportunity to provide these services to you. Please contact Rita Garcia at 714.786.6116 or rita.garcia@kimley-horn.com, if you have any questions. Sincerely, By: Rita Garcia Project Manager G % O///// / % /%/%//O //////%////l/o/o///r' /%/ %/ �'i//r % 0%/m// /// %/%//////%ii I0//// U %r ii% OD Agreement No. 7451 Page 16 CITY OF EL SEGUNDO By: (signature) (print name) Title: Date: Client's Federal Tax ID: Client's Business License No.: Client's Street Address:: Attachments: • Request for Information • Standard Provisions Agreement No. 7451 Page 9? Request for Information Please return this information with your signed contract, failure to provide this information could result in delay in starting your project Client Identification Legal Name of Client Mailing Address for Invoices __._ .. ....... ...... .._ Contact for Billing Inquiries Contact's Phone and a -mail Client is (check one) Owner-­­'T—� �Agen—tfcW-b—wner Unrelated to............ ..................._ _... _ __...-.. _.. ..._ Owner " 2Rgr Identification Parcel 1 Parcel 2Parcel 3 Par cel 4 Street Address County in which Property is Located Tax Assessor's Number(s) roperty Owner Identification _.. Owner 1 Owner 2 _Owner 3 Owner 4 Owner(s) Name Owner(s) Mailing Address Owner's Phone No. Owner of Which Parcel #? Attach additional sheets if there are more than 4 parcels or more than 4 owners Agreement No. 7451 KIMLEY-HORN AND ASSOCIATES, INC. STANDARD PROVISIONS (1) Consultant's Scope of Services and Additional Services. The Consultant will perform only the services specifically described in this Agreement. If requested by the Client and agreed to by the Consultant, the Consultant will perform Additional Services, which shall be governed by these provisions. Unless otherwise agreed to in writing, the Client shall pay the Consultant for any Additional Services an amount based upon the Consultant's then -current hourly rates plus an amount to cover certain direct expenses including telecommunications, in-house reproduction, postage, supplies, project related computer time, and local mileage. Other direct expenses will be billed at 1.15 times cost. (2) Client's Responsibilities. In addition to other responsibilities herein or imposed by law, the Client shall: (a) Designate in writing a person to act as its representative, such person having complete authority to transmit instructions, receive information, and make or interpret the Client's decisions. (b) Provide all information and criteria as to the Client's requirements, objectives, and expectations for the project and all standards of development, design, or construction. (c) Provide the Consultant all available studies, plans, or other documents pertaining to the project, such as surveys, engineering data, environmental information, etc., all of which the Consultant may rely upon. (d) Arrange for access to the site and other property as required for the Consultant to provide its services. (e) Review all documents or reports presented by the Consultant and communicate decisions pertaining thereto within a reasonable time so as not to delay the Consultant. (f) Furnish approvals and permits from governmental authorities having jurisdiction over the project and approvals and consents from other parties as may be necessary. (g) Obtain any independent accounting, legal, insurance, cost estimating and feasibility services required by Client. (h) Give prompt written notice to the Consultant whenever the Client becomes aware of any development that affects the Consultant's services or any defect or noncompliance in any aspect of the project. (3) Period of Services. Unless otherwise stated herein, the Consultant will begin work after receipt of a properly executed copy of this Agreement. This Agreement assumes conditions permitting continuous and orderly progress through completion of the services. Times for performance shall be extended as necessary for delays or suspensions due to circumstances that the Consultant does not control. If such delay or suspension extends for more than six months, Consultant's compensation shall be renegotiated. (4) Method of Payment. Client shall pay Consultant as follows: (a) Invoices will be submitted periodically for services performed and expenses incurred. Invoices are due and payable upon presentation. Client shall pay Consultant a time price differential of one and one-half percent (1.5%) of the outstanding amount of each invoice that is overdue for more than 30 days. The Client shall also pay any applicable sales tax. All retainers will be held by the Consultant and applied against the final invoice. If the Client fails to make any payment due under this or any other agreement within 30 days after presentation, the Consultant may, after giving notice to the Client, suspend services and withhold deliverables until all amounts due are paid, and may commence legal proceedings including filing liens to secure payment. (b) If the Client relies on payment or proceeds from a third party to pay Consultant and Client does not pay Consultant's invoice within 60 days of receipt, Consultant may communicate directly with such third party to secure payment. (c) If the Client objects to an invoice, it must advise the Consultant in writing giving its reasons within 14 days of receipt of the invoice or the Client's objections will be waived, and the invoice shall conclusively be deemed due and owing. If the Client objects to only a portion of the invoice, payment for all other portions remains due. (d) If the Consultant initiates legal proceedings to collect payment, it may recover, in addition to all amounts due, its reasonable attorneys' fees, reasonable experts' fees, and other expenses related to the proceedings. Such expenses shall include the cost, at the Consultant's normal hourly billing rates, of the time devoted to such proceedings by its employees. (e) The Client agrees that the payment to the Consultant is not subject to any contingency or condition. The Consultant may negotiate payment of any check tendered by the Client, even if the words "in full satisfaction" or words intended to have similar effect appear on the check without such negotiation being an accord and satisfaction of any disputed debt and without prejudicing any right of the Consultant to collect additional amounts from the Client. (5) Use of Documents. All documents and data prepared by the Consultant are related exclusively to the services described in this Agreement, and may be used only if the Client has satisfied all of its obligations under this Rev 01/18 18 Agreement No. 7451 Agreement. They,are not intended or represented to be suitable for use or reuse by the Client or others on extensions of this project or on any other project. Any modifications by the Client to any of the Consultant's documents, or any reuse of the documents without written authorization by the Consultant will be at the Client's sole risk and without liability to the Consultant, and the Client shall indemnify, defend and hold the Consultant harmless from all claims, damages, losses and expenses, including but not limited to attorneys' fees, resulting therefrom. The Consultant's electronic files and source code remain the property of the Consultant and shall be provided to the Client only if expressly provided for in this Agreement. Any electronic files not containing an electronic seal are provided only for the convenience of the Client, and use of them is at the Client's sole risk. In the case of any defects in the electronic files or any discrepancies between them and the hardcopy of the documents prepared by the Consultant, the hardcopy shall govern. (6) Opinions of Cost. Because the Consultant does not control the cost of labor, materials, equipment or services furnished by others, methods of determining prices, or competitive bidding or market conditions, any opinions rendered as to costs, including but not limited to the costs of construction and materials, are made solely based on its judgment as a professional familiar with the industry. The Consultant cannot and does not guarantee that proposals, bids or actual costs will not vary from its opinions of cost. If the Client wishes greater assurance as to the amount of any cost, it shall employ an independent cost estimator. Consultant's services required to bring costs within any limitation established by the Client will be paid for as Additional Services. (7) Termination. The obligation to provide further services under this Agreement may be terminated by either party upon seven days' written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof, or upon thirty days' written notice for the convenience of the terminating party. The Consultant shall be paid for all services rendered and expenses incurred to the effective date of termination, and other reasonable expenses incurred by the Consultant as a result of such termination. (8) Standard of Care. The standard of care applicable to Consultant's services will be the degree of care and skill ordinarily exercised by consultants performing the same or similar services in the same locality at the time the services are provided. No warranty, express or implied, is made or intended by the Consultant's performance of services, and it is agreed that the Consultant is not a fiduciary with respect to the Client. (9) LIMITATION OF LIABILITY. In recognition of the relative risks and benefits of the Project to the Client and the Consultant, the risks are allocated such that, to the fullest extent allowed by law, and notwithstanding any other provisions of this Agreement or the existence of applicable insurance coverage, that the total liability, in the aggregate, of the Consultant and the Consultant's officers, directors, employees, agents, and subconsultants to the Client or to anyone claiming by, through or under the Client, for any and all claims, losses, costs or damages whatsoever arising out of or in any way related to the services under this Agreement from any causes, including but not limited to, the negligence, professional errors or omissions, strict liability or breach of contract or any warranty, express or implied, of the Consultant or the Consultant's officers, directors, employees, agents, and subconsultants, shall not exceed twice the total compensation received by the Consultant under this Agreement or $50,000, whichever is greater. Higher limits of liability may be negotiated for additional fee. This Section 9 is intended solely to limit the remedies available to the Client or those claiming by or through the Client, and nothing in this Section 9 shall require the Client to indemnify the Consultant. (10) Mutual Waiver of Consequential Damages. In no event shall either party be liable to the other for any consequential, incidental, punitive, or indirect damages including but not limited to loss of income or loss of profits. (11) Construction Costs. Under no circumstances shall the Consultant be liable for extra costs or other consequences due to unknown conditions, or related to the failure of contractors to perform work in accordance with the plans and specifications. Consultant shall have no liability whatsoever for any costs arising out of the Client's decision to obtain bids or proceed with construction before the Consultant has issued final, fully -approved plans and specifications. The Client acknowledges that all preliminary plans are subject to substantial revision until plans are fully approved and all permits obtained. (12) Certifications. All requests for the Consultant to execute certificates, lender consents, or other third -party reliance letters must be submitted to the Consultant at least 14 days prior to the requested date of execution. The Consultant shall not be required to execute certificates, consents, or third -party reliance letters that are inaccurate, that relate to facts of which the Consultant does not have actual knowledge, or that would cause the Consultant to violate applicable rules of professional responsibility. Rev 01118 19 Agreement No. 7451 (13) Dispute Resolution. All claims by the Client arising out of this Agreement or its breach shall be submitted first to mediation in accordance with the American Arbitration Association as a condition precedent to litigation. Any mediation or civil action by Client must be commenced within one year of the accrual of the cause of action asserted but in no event later than allowed by applicable statutes. (14) Hazardous Substances and Conditions. Consultant shall not be a custodian, transporter, handler, arranger, contractor, or remediator with respect to hazardous substances and conditions. Consultant's services will be limited to analysis, recommendations, and reporting, including, when agreed to, plans and specifications for isolation, removal, or remediation. The Consultant will notify the Client of unanticipated hazardous substances or conditions of which the Consultant actually becomes aware. The Consultant may stop affected portions of its services until the hazardous substance or condition is eliminated. (15) Construction Phase Services. (a) If the Consultant prepares construction documents and the Consultant is not retained to make periodic site visits, the Client assumes all responsibility for interpretation of the documents and for construction observation, and the Client waives any claims against the Consultant in any way connected thereto. (b) The Consultant shall have no responsibility for any contractor's means, methods, techniques, equipment choice and usage, sequence, schedule, safety programs, or safety practices, nor shall Consultant have any authority or responsibility to stop or direct the work of any contractor. The Consultant's visits will be for the purpose of endeavoring to provide the Client a greater degree of confidence that the completed work of its contractors will generally conform to the construction documents prepared by the Consultant. Consultant neither guarantees the performance of contractors, nor assumes responsibility for any contractor's failure to perform its work in accordance with the contract documents. (c) The Consultant is not responsible for any duties assigned to it in the construction contract that are not expressly provided for in this Agreement. The Client agrees that each contract with any contractor shall state that the contractor shall be solely responsible for job site safety and its means and methods; that the contractor shall indemnify the Client and the Consultant for all claims and liability arising out of job site accidents; and that the Client and the Consultant shall be made additional insureds under the contractor's general liability insurance policy. (16) No Third -Party Beneficiaries; Assignment and Subcontracting. This Agreement gives no rights or benefits to anyone other than the Client and the Consultant, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole benefit of the Client and the Consultant. The Client shall not assign or transfer any rights under or interest in this Agreement, or any claim arising out of the performance of services by Consultant, without the written consent of the Consultant. The Consultant reserves the right to augment its staff with subconsultants as it deems appropriate due to project logistics, schedules, or market conditions. If the Consultant exercises this right, the Consultant will maintain the agreed -upon billing rates for services identified in the contract, regardless of whether the services are provided by in-house employees, contract employees, or independent subconsultants. (17) Confidentiality. The Client consents to the use and dissemination by the Consultant of photographs of the project and to the use by the Consultant of facts, data and information obtained by the Consultant in the performance of its services. If, however, any facts, data or information are specifically identified in writing by the Client as confidential, the Consultant shall use reasonable care to maintain the confidentiality of that material. (18) Miscellaneous Provisions. This- Agreement is to be governed by the law of California. This Agreement contains the entire and fully integrated agreement between the parties and supersedes all prior and contemporaneous negotiations, representations, agreements or understandings, whether written or oral. Except as provided in Section 1, this Agreement can be supplemented or amended only by a written document executed by both parties. Any conflicting or additional terms on any purchase order issued by the Client shall be void and are hereby expressly rejected by the Consultant. Any provision in this Agreement that is unenforceable shall be ineffective to the extent of such unenforceability without invalidating the remaining provisions. The non- enforcement of any provision by either party shall not constitute a waiver of that provision nor shall it affect the enforceability of that provision or of the remainder of this Agreement. Rev 01/18 20