Loading...
2025-10-21 CC Agenda Packet - ITEM D7 - PW 25-13 Teen Center, Plaza, Skatepark RenovationCITY OF ELSEGUNDO PW 25-1 3 Teen Center, Plaza, & Skatepark Renovation Project 0 Option B: Rotated Court KEYNOTES Conn etc Pavement CasUin-place Concrete SeHlwall Cast•in-place Conacte Steps Concrcle Rarnp �_• _____-- Isl Hondril at Ramp -' i � � Handrnil ut Steps Nµ1, - � Planting Area 1 iE) Light to Remain EF WARM."J 1 I EEai [ENtt ! •� j Security Lfyht r ! mi (E) Concrcle Vlelk to Remain E n Monument Sign i E nlI Trash Receptacic I <_1 I I �L 1 I i E GPAND AVFNIIE MulLipurpose mart Skalc Park _. ______________ Bike Rock az•' Hiyh Panrr,atar r-anm r ii I 8' High CourL Fencc --- -- - --_ i 1 20' VJ,dc Sliding Gml J� �1 ADA Parking I�a BoctleFlll- Option A: As -is Option D: Court Aligned with Fence • Existing sUa pa,k area •. Existing basketball court --------------, E r1 E E I � 1 E E � 1 E1 E --lid -a ------- i� PE CONSTRUCTION SCHEDULE: liEu: n vcHvilrn/ I9a-nw rouw:� M' ® IU�u n iiQ1YM�w You w[c BASKETBALL & Volleyball a■ BASKETBALL & PICKEKBALL ■■ Calculation Summary Label CalcType Units Avg Max Min Avg/Min Ma Min BASKETBALL COURT Illuminance Fc 19.35 34.6 6.4 3.02 5.41 SKATEPARK Illuminance Fc 25.74 48.7 10.8 2.38 4.51 Skatepark Base Scope: 1. Water Tower • Grey Concrete • Blue Paint Coating • City Name Lettering 2. Cooling Towers • Grey Concrete • Red Paint Coating Stripes Alternate Bid: 1. Water Tower • Integral Blue Colored Concrete • City Name Lettering 10/21 /2025 City of El Segundo 1 350 Main St. El Segundo, CA 90245 7 ELSEGUNDO T - _ - eN - d 1 a E6;iEGUVUu 10/21/2025 City of El Segundo 1 350 Main St. El Segundo, CA90245 8 LAW j lvow— lw ALt If il - 44w .4p", Cost Estimate & Teen Center, Plaza and Skatepark Renovatloq& Base Scope Lump Sump $674,627 ProSkatepark ject SchedulePainting of Skate Park Features Water Tower Lettering on Gray Concrete (Blue Paint Project - � , (215 ' • ' Coat) Lump Sump $20,625 Cooling Tower on Grey November 2025 Advertising and Bid Process ( Red Striped Paint Concretecoat) February 2026 Contract Award Site work Lump Sump $1,295,228 Teen Center Lump Sump $1,685,204 May 2026 Begin Construction Environmental Abatement Allowance $50,000 June 2027 Project Completion Stormwater Treatment Lump Sump $175,500 (Measure VIA Total (Plus Contingency) --$4,950,000 Iternatives Water Tower: Blue Dyed Colored Concrete Lump Sump Add $19,600 Outdoor Lighting - Reuse Lump Sump $32,726 Outdoor Lighting - New Lump Sump $96,426