2025-10-21 CC Agenda Packet - ITEM D7 - PW 25-13 Teen Center, Plaza, Skatepark RenovationCITY OF
ELSEGUNDO
PW 25-1 3 Teen Center, Plaza, &
Skatepark Renovation Project
0
Option B: Rotated Court
KEYNOTES
Conn etc Pavement
CasUin-place Concrete SeHlwall
Cast•in-place Conacte Steps
Concrcle Rarnp
�_• _____-- Isl Hondril at Ramp
-' i � � Handrnil ut Steps
Nµ1, - � Planting Area
1 iE) Light to Remain
EF WARM."J
1 I EEai [ENtt ! •� j Security Lfyht
r
! mi (E) Concrcle Vlelk to Remain
E n Monument Sign
i
E nlI Trash Receptacic
I <_1
I
I �L 1
I
i
E GPAND AVFNIIE
MulLipurpose mart
Skalc Park
_. ______________ Bike Rock
az•' Hiyh Panrr,atar r-anm
r ii I 8' High CourL Fencc
--- -- - --_ i 1 20' VJ,dc Sliding Gml
J� �1 ADA Parking
I�a BoctleFlll-
Option A: As -is
Option D: Court Aligned with Fence
• Existing sUa pa,k area
•. Existing basketball court
--------------,
E
r1 E E
I � 1
E E �
1 E1 E
--lid
-a -------
i�
PE CONSTRUCTION SCHEDULE:
liEu: n vcHvilrn/
I9a-nw rouw:� M'
® IU�u n iiQ1YM�w You w[c
BASKETBALL & Volleyball
a■
BASKETBALL & PICKEKBALL
■■
Calculation Summary
Label
CalcType
Units
Avg
Max
Min
Avg/Min
Ma Min
BASKETBALL COURT
Illuminance
Fc
19.35
34.6
6.4
3.02
5.41
SKATEPARK
Illuminance
Fc
25.74
48.7
10.8
2.38
4.51
Skatepark
Base Scope:
1. Water Tower
• Grey Concrete
• Blue Paint Coating
• City Name Lettering
2. Cooling Towers
• Grey Concrete
• Red Paint Coating
Stripes
Alternate Bid:
1. Water Tower
• Integral Blue Colored
Concrete
• City Name Lettering
10/21 /2025
City of El Segundo 1 350 Main St. El Segundo, CA 90245
7
ELSEGUNDO
T - _ - eN - d 1 a
E6;iEGUVUu
10/21/2025 City of El Segundo 1 350 Main St. El Segundo, CA90245 8
LAW
j
lvow— lw
ALt If
il
- 44w .4p",
Cost Estimate
&
Teen Center, Plaza
and Skatepark Renovatloq&
Base Scope
Lump
Sump
$674,627
ProSkatepark
ject
SchedulePainting
of Skate Park Features
Water Tower Lettering on
Gray Concrete (Blue Paint
Project
- �
, (215 ' • '
Coat)
Lump Sump
$20,625
Cooling Tower on Grey
November 2025
Advertising and Bid Process
( Red Striped Paint
Concretecoat)
February 2026
Contract Award
Site work
Lump Sump
$1,295,228
Teen Center
Lump Sump
$1,685,204
May 2026
Begin Construction
Environmental Abatement
Allowance
$50,000
June 2027
Project Completion
Stormwater Treatment
Lump Sump
$175,500
(Measure VIA
Total (Plus Contingency)
--$4,950,000
Iternatives
Water Tower: Blue Dyed
Colored Concrete
Lump Sump
Add $19,600
Outdoor Lighting - Reuse
Lump Sump
$32,726
Outdoor Lighting - New
Lump Sump
$96,426