Loading...
2025-10-07 CC Agenda Packet - ITEM D9 - PW 25-05 Repair at Recreation ParkCITY OF ELSEGUNDO REPAIR OF DISTRESSED WALLS, FENCE POSTS AND SURFACE CRACKS AT RECREATION PARK PW 25-05 General Overview • This project will repair distressed walls, fence posts and court surface cracking cosmetically throughout Recreation Park. • Total of 97 locations across courts, bleacher areas, clubhouse area, Stevenson Field and other walkways & stairways will be repaired. • Method of repairs: By utilizing an epoxy for these types of applications • Scope of work • Removal of damaged concrete • Removal of corroded fence posts • Concrete replacement • Repair/replacement of damaged fence posts • Repair of developed surface cracks in the courts ELSEGUNDO City of El Segundo 1 350 Main St. El Segundo, CA 90245 2 IMMAZW. PA, IV Goals: • Improve safety • Extend facility lifetime by stopping water intrusion and avoiding further damage • Strengthening the walls • Eliminating eye sores and providing a much more pleasing aesthetic environment throughout Recreation Park E SEGUNDO Project Cost and Schedule • Cost Estimate: $950,000 • Construction: 50 Working days * As part of project scheduling, ongoing coordination with Rec & Park staff for court usage will take place during the construction CLSEGUYDO