2025-02-04 CC Agenda Packet - ITEM D11 - Smoky Hollow Parking Project Phase IICITY OF ELSEGUNDO Smoky Hollow Parking Project Phase I I Project Goals & Objectives • Implementation of Smoky Hollow Specific Plan parking project. • Conversion from 2-way street to 1-way street and provide angled parking. • Increase parking capacity. ELSEGUYDO City of El Segundo 1 350 Main St. El Segundo, CA90245 2 Smoky Hollow Specific Plan • Identification of one-way streets A 11 - 91. Is \ "Center Street one-way conversion was removed at the direction of the Planning Commission at 11/14/2024 meeting. City of El Segundo 1 350 Main St. El Segundo, CA90245 3 ELSEGUNDO lifornia Street I , � 'I - "--I — . — _ _:-a*r'�.� -- ��L�C�r�3��.`�►�:+'may tom. s � - "...__. _ _ +�_ ,_ ' � California Street City of El Segundo 1 350 Main St. El Segundo, CA90245 EI.SEGUYDO 6 Speed Study City of El Segundo 1 350 Main St. El Segundo, CA90245 ELSEGUNDO 0 How satisfied are you with the implementation of this pilot project? ■ Extremely satisfied Moderately satisfied Neither satisfied nor dissatisfied Moderately dissatisfied Extremely dissatisfied WO Do you think the additional parking spaces that this pilot project provided are adequate for the pilot project area? ■ Yes No :)mmunity Outreach Feedback (Exnansic. Permanent Curb (opposed to bollards) Landscaping Street Furniture (benches, chairs, bike racks, etc.) New Pavement/Striping ■ Very satisfied Somewhat satisfied Neither satisfied nor dissatisfied Somewhat dissatisfied n Very dissatisfied Segment Location Existing Parallel parking Capacity Potential Remaining Total Potential Diagonal Parking parallel Parking Parking Capacity (1 side) Increase In Parking Spaces Percentage Increase In Parking Standard Street 17 11 10 21 4 24% Eucalyptus Street 21 10 15 25 4 19% Sheldon Street 10 5 6 11 1 10% Penn Street Sierra Street 17 6 10 16 -1 -6% 9 4 6 10 1 11 Lomita Street 19 11 10 21 2 11% Maryland Street 20 15 11 26 6 30% Nevada Street (North) 21 12 11 23 2 10% Nevada Street (South) 19 21 10 31 12 63% Oregon Street (North) 23 23 10 33 10 43% Oregon Street (South) 20 10 12 22 2 10% California Street 24 28 10 38 14 58% Totals 220 City of 156 El Segundo 350 121 Main St. El Segundo, 277 CA 90245 57 26% 10 3 • 4 • Nroiect Cc Quick build Signing and striping Curb extensions w/ paint and bollards Signing and striping Permanent curb extensions and sidewalk (concrete) Signing and striping Permanent curb extensions and sidewalk (concrete) Roadway rehabilitation Signing and striping Permanent curb extensions and sidewalk (concrete) Roadway rehabilitation Landscape and irrigation improvements at curb extensions Estimated O&M for Landscaping: $29,000/year $5 million $6.3 million $6.6 million 1 year 1.5 years 2 years 2 years Potential Funding • Measure MMulti-year Subregional Program (MSP) Grant ➢Have already applied for this Grant through South Bay Cities Council of Governments (SBCCOG) Earmark future local return transportation funds (Measure M, Measure R, Gas Tax) towards this project. Depending on chosen alternative, this could take several years for the funds to accrue. • General Fund ELSEGUNDO City of El Segundo 1 350 Main St. El Segundo, CA90245 12 Recommendations 1. Authorize staff to proceed with Alternative 1, which is signing and striping the parking spaces, striping the corner curb extensions, and installing plastic bollards. 2. Direct staff to return to City Council to consider other alternatives if the SBCCOG/Metro grant is not awarded. 3. Alternatively, discuss and take other action related to this item. ELSF.GUNUO City of El Segundo 1 350 Main St. El Segundo, CA 90245 13 CITY OF ELSEGUNDO Questions? 1.01 REMOVE SIGNING & STRIPING 1 LS $1,350 $1,350 1.02 INSTALL SIGNING, STRIPING, AND CURB MARKINGS 1 LS $30,000 $30,000 1.03 INSTALL K-71 FLEXIBLE BOLLARD 26 EA $150 $3,900 1.04 FURNISH & INSTALL 6"X6"X6' CONCRETE WHEEL STOP 35 EA $150 $5,250 SUBTOTAL $40,500 TOTAL FOR 12 BLOCKS $486,000, MOBILIZATION (10%) $48,600 TRAFFIC CONTROL (8%) $38,880 30% CONTINGENCY $172,100 DESIGN (15%) $111,837 2.04 DEMO/UNCLASSIFIED EXCAVATION 204 CY $400 $81,600 2.05 CONSTRUCT 6" AC PAVEMENT OVER 8" CMB 4,800 SF $15 $72,000 2.06 CONSTRUCT 4" PCC OVER 3" CMB CURB RAMP WITH DWS. (CURB EXT.) 4 EA $7,000 $28,000 2.07 CONSTRUCT VARIABLE HEIGHT PCC CURB AND 24" GUTTER OVER 6" CMB (TYPE A2) 280 LF $65 $18,200 2.08 CONSTRUCT 4" PCC SIDEWALK OVER 3" CMB 2,050 SF $15 $30,750 SUBTOTAL $230,550 TOTAL FOR 12 BLOCKS $3,205,800 MOBILIZATION (10%) $320,580 TRAFFIC CONTROL (8%) $256,464 30% CONTINGENCY1 $1,134,900 DESIGN (15%) $737,662 MOVE SIGNING & STRIPING 1 LS $1,350 $1,350 AND INSTALL SIGNING, STRIPING, AND CURB MARKINGS 1 LS $30,000 $30,000 ff3.01REMOVE RNISH & INSTALL 6"X6"X6' CONCRETE WHEEL STOP 35 EA $150 $5,250 SUBTOTAL $36,600 -STREET IMPROVEMENTS 3.03 DEMO/UNCLASSIFIED EXCAVATION 204 CY $400 $81,600 3.04 FULL WIDTH COLD MILL, 2" DEPTH 21,280 SF $0.50 $10,640 3.05 CONSTRUCT 2" ARHM-GG-C OVERLAY 262 TON $180 $47,242 3.06 CONSTRUCT 6" AC PAVEMENT OVER 8" CMB 4,800 SF $15 $72,000 3.07 CONSTRUCT 4" PCC OVER 3" CMB CURB RAMP WITH DWS. (CURB EXT.) 4 EA $7,000 $28,000 3.08 CONSTRUCT VARIABLE HEIGHT PCC CURB AND 24" GUTTER OVER 6" CMB (TYPE A2) 280 LF $65 $18,200 3.09 CONSTRUCT 4" PCC SIDEWALK OVER 3" CMB 2,050 SF $15 $30,750 3.10 REMOVE EXISTING AND CONSTRUCT 12" AC (TYPE B-PG 64-10) PAVEMENT REPAIR 80 TON $180 $14,400 SUBTOTAL $302,832 TOTAL FOR 12 BLOCKS $4,073,179 MOBILIZATION (10%) $407,318 TRAFFIC CONTROL (8%) $325,854 30% CONTINGENCY $1,442,000 DESIGN (15%) $937,253 4.01 REMOVE SIGNING & STRIPING 1 LS $1,350 $1,350 4.02 INSTALL SIGNING, STRIPING, AND CURB MARKINGS 1 LS $30,000 $30,000 4.03 FURNISH & INSTALL 6"X6"X6' CONCRETE WHEEL STOP 35 EA $150 $5,250 SUBTOTALI $36,600 STREET IMPROVEMENTS 403 DEMO/UNCLASSIFIED EXCAVATION 204 CY $400 $81,600 404 FULL WIDTH COLD MILL, 2" DEPTH 21,280 SF $0.50 $10,640 4.05 CONSTRUCT 2" ARHM-GG-C OVERLAY 262 TON $180 $47,242 406 CONSTRUCT 6" AC PAVEMENT OVER 8" CMB 4,800 SF $15 $72,000 4.07 CONSTRUCT 4" PCC OVER 3" CMB CURB RAMP WITH DWS (CURB EXT) 4 EA $7,000 $28,000 4.08 CONSTRUCT VARIABLE HEIGHT PCC CURB AND 24" GUTTER OVER 6" CMB (TYPE A2) 1 280 LF 1 $65 $18,200 4.09 CONSTRUCT 4" PCC SIDEWALK OVER 3" CMB 1,070 SF $15 $16,050 4.10 REMOVE EXISTING AND CONSTRUCT 12" AC (TYPE B-PG 64-10) PAVEMENT REPAIR 80 TON $180 $14,400 SUBTOTAL $288,132 -LANDSCAPING 4.09 ILANDSCAPING & IRRIGATION (ASSUMING WATER LINE IS EXISTING) 1,000 SF $32 $32,000 SUBTOTAL $32,000 TOTAL FOR 12 BLOCKS $4,280,779 MOBILIZATION (10%) $428,078 TRAFFIC CONTROL (8%) $342,462 30% CONTINGENCY $1,515,400 DESIGN (15%) $985,008 OPTION 4 GRAND TOTAL $6,566,719 50• s• W R/W� 1$ R6-1(RT) z w it R3-2 �rP'TI` 2 //FERr,-Ill)VI rRI-I I RI- R5-1, R5-1a ❑ 1 Z 8 1 O9 10 6 8 Z IS R6-1(RT) Q I I I IS R3-I R6-1(LT) a I LL- JI 5' r-L.1 50' CALIFORNIA R6-1(LT) IS (TYP) — — STREET R6-1(LT) R6-1(LT) IS 12' 4 R6-1(LT) (n� 11 V R6-1(LT) IS 8 C (�\' 0 010 TAY O� 1 O N Oj 1 12 7 20 YIN. I PKG. LOADING ZO R6-1(RT) IS 6AIA-6PM R6-1(RTOJ w 60' D 6' 2._ 24' 6, wR/W 1 I ) ~�R/W 12' 1 2' I12' 12 Q 1 .• 'LJ I I IJ-W11-2. W16-7P ?� s 12' T2. 1`2'�12' WI1-2, i off`' Wt6-7P Qair � R/W R/W I I ,0 6' ��24��24' 6' 60'