2025-02-04 CC Agenda Packet - ITEM D11 - Smoky Hollow Parking Project Phase IICITY OF
ELSEGUNDO
Smoky Hollow Parking Project
Phase I I
Project Goals & Objectives
• Implementation of Smoky Hollow Specific Plan parking project.
• Conversion from 2-way street to 1-way street and provide
angled parking.
• Increase parking capacity.
ELSEGUYDO
City of El Segundo 1 350 Main St. El Segundo, CA90245 2
Smoky Hollow Specific Plan
• Identification of one-way streets
A
11
- 91. Is \
"Center Street one-way conversion was removed at the direction of the Planning Commission at 11/14/2024 meeting.
City of El Segundo 1 350 Main St. El Segundo, CA90245 3 ELSEGUNDO
lifornia Street
I , � 'I - "--I
— . — _ _:-a*r'�.� -- ��L�C�r�3��.`�►�:+'may tom. s � - "...__. _ _ +�_ ,_ ' �
California Street
City of El Segundo 1 350 Main St. El Segundo, CA90245
EI.SEGUYDO
6
Speed Study
City of El Segundo 1 350 Main St. El Segundo, CA90245
ELSEGUNDO
0
How satisfied are you with the implementation of this
pilot project?
■ Extremely satisfied
Moderately satisfied
Neither satisfied nor
dissatisfied
Moderately dissatisfied
Extremely dissatisfied
WO
Do you think the additional parking spaces that this
pilot project provided are adequate for the pilot
project area?
■ Yes
No
:)mmunity Outreach Feedback (Exnansic.
Permanent Curb (opposed
to bollards)
Landscaping
Street Furniture (benches,
chairs, bike racks, etc.)
New Pavement/Striping
■ Very satisfied
Somewhat satisfied
Neither satisfied nor
dissatisfied
Somewhat dissatisfied
n Very dissatisfied
Segment Location
Existing Parallel
parking Capacity
Potential
Remaining Total Potential
Diagonal Parking parallel Parking Parking
Capacity (1 side)
Increase In
Parking Spaces
Percentage
Increase In
Parking
Standard Street
17
11
10
21
4
24%
Eucalyptus Street
21
10
15
25
4
19%
Sheldon Street
10
5
6
11
1
10%
Penn Street
Sierra Street
17
6
10
16
-1
-6%
9
4
6
10
1
11
Lomita Street
19
11
10
21
2
11%
Maryland Street
20
15
11
26
6
30%
Nevada Street (North)
21
12
11
23
2
10%
Nevada Street (South)
19
21
10
31
12
63%
Oregon Street (North)
23
23
10
33
10
43%
Oregon Street (South)
20
10
12
22
2
10%
California Street
24
28
10
38
14
58%
Totals
220
City of
156
El Segundo 350
121
Main St. El Segundo,
277
CA 90245
57
26%
10
3 •
4 •
Nroiect Cc
Quick build
Signing and striping
Curb extensions w/ paint and bollards
Signing and striping
Permanent curb extensions and sidewalk (concrete)
Signing and striping
Permanent curb extensions and sidewalk (concrete)
Roadway rehabilitation
Signing and striping
Permanent curb extensions and sidewalk (concrete)
Roadway rehabilitation
Landscape and irrigation improvements at curb
extensions
Estimated O&M for Landscaping: $29,000/year
$5 million
$6.3 million
$6.6 million
1 year
1.5 years
2 years
2 years
Potential Funding
• Measure MMulti-year Subregional Program (MSP) Grant
➢Have already applied for this Grant through South Bay Cities Council of
Governments (SBCCOG)
Earmark future local return transportation funds (Measure M,
Measure R, Gas Tax) towards this project. Depending on
chosen alternative, this could take several years for the funds to
accrue.
• General Fund
ELSEGUNDO
City of El Segundo 1 350 Main St. El Segundo, CA90245 12
Recommendations
1. Authorize staff to proceed with Alternative 1, which is signing
and striping the parking spaces, striping the corner curb
extensions, and installing plastic bollards.
2. Direct staff to return to City Council to consider other
alternatives if the SBCCOG/Metro grant is not awarded.
3. Alternatively, discuss and take other action related to this
item.
ELSF.GUNUO
City of El Segundo 1 350 Main St. El Segundo, CA 90245 13
CITY OF
ELSEGUNDO
Questions?
1.01
REMOVE SIGNING & STRIPING
1
LS
$1,350
$1,350
1.02
INSTALL SIGNING, STRIPING, AND CURB MARKINGS
1
LS
$30,000
$30,000
1.03
INSTALL K-71 FLEXIBLE BOLLARD
26
EA
$150
$3,900
1.04
FURNISH & INSTALL 6"X6"X6' CONCRETE WHEEL STOP
35
EA
$150
$5,250
SUBTOTAL
$40,500
TOTAL FOR 12 BLOCKS
$486,000,
MOBILIZATION (10%)
$48,600
TRAFFIC CONTROL (8%)
$38,880
30% CONTINGENCY
$172,100
DESIGN (15%)
$111,837
2.04
DEMO/UNCLASSIFIED EXCAVATION
204
CY
$400
$81,600
2.05
CONSTRUCT 6" AC PAVEMENT OVER 8" CMB
4,800
SF
$15
$72,000
2.06
CONSTRUCT 4" PCC OVER 3" CMB CURB RAMP WITH DWS. (CURB EXT.)
4
EA
$7,000
$28,000
2.07
CONSTRUCT VARIABLE HEIGHT PCC CURB AND 24" GUTTER OVER 6" CMB (TYPE A2)
280
LF
$65
$18,200
2.08
CONSTRUCT 4" PCC SIDEWALK OVER 3" CMB
2,050
SF
$15
$30,750
SUBTOTAL
$230,550
TOTAL FOR 12 BLOCKS
$3,205,800
MOBILIZATION (10%)
$320,580
TRAFFIC CONTROL (8%)
$256,464
30% CONTINGENCY1
$1,134,900
DESIGN (15%)
$737,662
MOVE SIGNING & STRIPING
1
LS
$1,350
$1,350
AND INSTALL SIGNING, STRIPING, AND CURB MARKINGS
1
LS
$30,000
$30,000
ff3.01REMOVE
RNISH & INSTALL 6"X6"X6' CONCRETE WHEEL STOP
35
EA
$150
$5,250
SUBTOTAL
$36,600
-STREET IMPROVEMENTS
3.03
DEMO/UNCLASSIFIED EXCAVATION
204
CY
$400
$81,600
3.04
FULL WIDTH COLD MILL, 2" DEPTH
21,280
SF
$0.50
$10,640
3.05
CONSTRUCT 2" ARHM-GG-C OVERLAY
262
TON
$180
$47,242
3.06
CONSTRUCT 6" AC PAVEMENT OVER 8" CMB
4,800
SF
$15
$72,000
3.07
CONSTRUCT 4" PCC OVER 3" CMB CURB RAMP WITH DWS. (CURB EXT.)
4
EA
$7,000
$28,000
3.08
CONSTRUCT VARIABLE HEIGHT PCC CURB AND 24" GUTTER OVER 6" CMB (TYPE A2)
280
LF
$65
$18,200
3.09
CONSTRUCT 4" PCC SIDEWALK OVER 3" CMB
2,050
SF
$15
$30,750
3.10
REMOVE EXISTING AND CONSTRUCT 12" AC (TYPE B-PG 64-10) PAVEMENT REPAIR
80
TON
$180
$14,400
SUBTOTAL
$302,832
TOTAL FOR 12 BLOCKS
$4,073,179
MOBILIZATION (10%)
$407,318
TRAFFIC CONTROL (8%)
$325,854
30% CONTINGENCY
$1,442,000
DESIGN (15%)
$937,253
4.01
REMOVE SIGNING & STRIPING
1
LS
$1,350
$1,350
4.02
INSTALL SIGNING, STRIPING, AND CURB MARKINGS
1
LS
$30,000
$30,000
4.03
FURNISH & INSTALL 6"X6"X6' CONCRETE WHEEL STOP
35
EA
$150
$5,250
SUBTOTALI
$36,600
STREET IMPROVEMENTS
403
DEMO/UNCLASSIFIED EXCAVATION
204
CY
$400
$81,600
404
FULL WIDTH COLD MILL, 2" DEPTH
21,280
SF
$0.50
$10,640
4.05
CONSTRUCT 2" ARHM-GG-C OVERLAY
262
TON
$180
$47,242
406
CONSTRUCT 6" AC PAVEMENT OVER 8" CMB
4,800
SF
$15
$72,000
4.07
CONSTRUCT 4" PCC OVER 3" CMB CURB RAMP WITH DWS (CURB EXT)
4
EA
$7,000
$28,000
4.08
CONSTRUCT VARIABLE HEIGHT PCC CURB AND 24" GUTTER OVER 6" CMB (TYPE A2)
1 280
LF
1 $65
$18,200
4.09
CONSTRUCT 4" PCC SIDEWALK OVER 3" CMB
1,070
SF
$15
$16,050
4.10
REMOVE EXISTING AND CONSTRUCT 12" AC (TYPE B-PG 64-10) PAVEMENT REPAIR
80
TON
$180
$14,400
SUBTOTAL
$288,132
-LANDSCAPING
4.09 ILANDSCAPING & IRRIGATION (ASSUMING WATER LINE IS EXISTING) 1,000 SF $32
$32,000
SUBTOTAL
$32,000
TOTAL FOR 12 BLOCKS
$4,280,779
MOBILIZATION (10%)
$428,078
TRAFFIC CONTROL (8%)
$342,462
30% CONTINGENCY
$1,515,400
DESIGN (15%)
$985,008
OPTION 4 GRAND TOTAL
$6,566,719
50•
s•
W
R/W�
1$ R6-1(RT)
z
w
it
R3-2
�rP'TI`
2
//FERr,-Ill)VI
rRI-I
I RI-
R5-1,
R5-1a ❑
1
Z 8 1
O9 10 6
8
Z
IS R6-1(RT)
Q I I
I
IS R3-I
R6-1(LT)
a I
LL-
JI
5' r-L.1
50'
CALIFORNIA
R6-1(LT) IS
(TYP) — —
STREET R6-1(LT)
R6-1(LT) IS 12' 4 R6-1(LT)
(n�
11 V R6-1(LT) IS 8 C (�\'
0 010 TAY
O� 1 O N Oj 1 12 7
20 YIN. I
PKG. LOADING ZO
R6-1(RT) IS 6AIA-6PM
R6-1(RTOJ
w 60'
D 6' 2._ 24' 6,
wR/W 1 I ) ~�R/W
12' 1 2' I12' 12
Q 1
.• 'LJ I I IJ-W11-2.
W16-7P
?� s 12' T2. 1`2'�12' WI1-2,
i off`' Wt6-7P
Qair �
R/W
R/W I I
,0 6' ��24��24' 6'
60'