2024-10-15 CC Agenda Packet - ITEM C07 - El Segundo South Campus Specific Plan - Additional Information972
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
CITY CLERK
CITY OF EL SEGUNDO
350 Main Street
El Segundo, California 90245
EXEMPT FROM RECORDER'S FEES
Pursuant to Government Code § 6103
DEVELOPMENT AGREEMENT
BY AND BETWEEN
THE CITY OF EL SEGUNDO
AND
RAYTHEON COMPANY
2000 El Segundo Boulevard
El Segundo, California 90245
THIS AGREEMENT MUST BE RECORDED WITHIN TEN DAYS OF EXECUTION BY
ALL PARTIES HERETO PURSUANT TO THE REQUIREMENTS OF GOVERNMENT
CODE § 65868.5
1
7.6.2 Developer must allow a pedestrian easement across one or a combination
of Parcels 13, 14 and/or 24 of Vesting Map No. 71551 to allow direct pedestrian access to the
Green Line station. The walkway must be completed before a certificate of occupancy is issued
for any building on Parcel 13 or 14. The walkway must be paved and compliant with ADA
requirements with a minimum width of five feet.
7.7 Coral Circle Connection. Developer agrees to provide City with a 20-year
irrevocable offer of dedication of Parcels 20 and 22 of Vesting Map No. 71551. This dedication
may be accepted by City at such time City enters agreements with adjacent landowners located at
363-365 Coral Circle and 401 Coral Circle to obtain public street access across their property for
a roadway to connect Nash Street to Coral Circle. The offer of dedication will allow for fee simple
ownership of Parcels 20 and 22 to be transferred to the owners of 363-365 Coral Circle and 401
Coral Circle, and a public street dedication for a portion of the two parcels to the City for a roadway
consistent with the "Local Commercial Street" General Plan Circulation Element Street
Classification.
7.8 Traffic Fee In Lieu Credits. Except as otherwise specified herein, Developer will
be entitled to in lieu credits against the City's traffic impact fees for all required traffic mitigation
measures within the City of El Segundo's jurisdiction that are constructed or paid by Developer.
Developer is not entitled to any in lieu credits for mitigation measures outside of the City's
jurisdiction.
8. Utilities
8.1 City must maintain all City -owned public utilities located in public or private streets
within the Campus. Any utilities located on private property must be the responsibility of
Developer, or its successor in interest.
8.2 City is contemplating a capacity upgrade in the El Segundo sewer line.
8.2.1 Up to 2,142,457 gross square feet of development, the total amount of new
development allowed by the Specific Plan, must be able to access sewer service in the El Segundo
Boulevard sewer trunk line after completion of the sewer line upgrade provided that Developer
contributes twenty-five percent (25%) up to a maximum amount of $375,000.00 toward
completion of the sewer upgrade.
8.2.2 Developer must make its contribution at the time the City awards the sewer
improvement project, but no later than December 31, 2018, for Developer to obtain access to the
El Segundo Boulevard sewer trunk line.
8.2.3 Upon payment, City must reserve a portion of the available capacity in the
existing fifteen inch (15") line up to a net increase of 30,212 gallons per day for Developer and
Developer is entitled to connect to the existing line through a temporary sewer connection.
Developer is entitled to make a permanent connection to the upgraded line once the sewer capacity
upgrade project is completed.
9. Recreational Access.
14
4972 .� _J
9.1 The Specific Plan provides for 7.54 acres of land to be used for Open Space and
Recreational purposes. This land must remain private and only available to Raytheon employees.
However, should Developer sell more than twenty percent (20%) of ESSCSP Campus Area (i.e.,
at least 28.44 acres), to a user other than Raytheon or a Raytheon affiliate, Developer must provide
non -Raytheon or Raytheon affiliated employees within the ESSCSP area with permanent access
to the 7.54-acre recreational area within the Campus. The access must be formalized through
agreements between Raytheon and the purchaser(s) of the property.
9.2 Within 30 days of approval of a land transfer of the recreational/open space area to
an alternative parcel and before a building permit may be issued on Parcel 11, the Developer must
record a 20-year irrevocable offer of dedication of a 7.54 acre recreational/open space area to the
City of El Segundo, in a form approved by the City Attorney, for future potential park purposes if
located on any of the lots (Parcels 1, 2, 3, 4, 7, 8, 13 or 14 of Vesting Map No. 71551) and outside
the Raytheon security fenced perimeter.
10. Payments after Approval.
10.1 Six Annual Payments. The Developer must make one annual payment of $500,000
and five subsequent annual payments of $700,000 each to the City. Payments will start on March
31, 2016 and occur annually on March 31St, with the final payment due on March 31, 2021. These
payments will be deposited to the City's General Fund and may be used for any general purpose
identified by the City Council in its sole discretion. The total amount of the six payments is
$4,000,000.
10.2 Payment in Year 10. If the Nash Street extension, identified in Section 7.1, is not
completed within 10 years of the Effective Date, then the Developer is required to make a
$5,000,000 payment not later than the anniversary date that the Ordinance became effective (e.g.,
if the Ordinance became effective December 1, 2015, then payment would be due not later than
December 2, 2025). This payment will be deposited to the City's General Fund and may be used
for any general purpose identified by the City Council in its sole discretion.
10.3 Buildinu Permit Fee. Before building permits are issued for any new development
(not existing at time of project approval) in the project area, the Developer must pay a $0.50 per
gross square -foot fee. All revenue from this fee will be deposited to the City's General Fund and
may be used for any general purpose identified by the City Council in its sole discretion.
11. Uniform Codes and Standard Specifications
11.1 Nothing in this Agreement prevents City from applying Uniform Codes to the
Project provided that the provisions of any such Uniform Code:
11.1.1 apply to the Project only to the extent that such code is in effect on a City
wide basis;
11.1.2 with respect to those portions of any such Uniform Code that have been
adopted by City without amendment, be interpreted and applied in a manner consistent with the
interpretation and application of such code pursuant to California Law.
15
Agreement No. 4972A
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
CITY CLERK
CITY OF EL SEGUNDO
350 Main Street
El Segundo, California 90245
EXEMPT FROM RECORDER'S FEES
Pursuant to Goverment Code § 6103
FIRST AMENDMENT TO DEVELOPMENT AGREEMENT
BY AND BETWEEN THE CITY OF EL SEGUNDO
AND
RAYTHEON COMPANY
THIS AGREEMENT MUST BE RECORDED WITHIN TEN DAYS OF EXECUTION BY
ALL PARTIES HERETO PURSUANT TO THE REQUIREMENTS OF GOVERNMENT
CODE § 65868.5
Agreement No. 4972A
5. Section 7.1.2 ("Nash Street") is hereby amended to read as follows:
"The Nash Sheet extension must be constructed, inspected, approved and/or accepted by
the Public Works Director and Building Official, and/or their designees prior to the issuance of
any certificate of occupancy for any new structure or improvement within Phase H, III or IV or for
any new structure or improvement which would cause the Phase I Development trip cap of 89 a.m.
peak hour, 225 p.m. peak hour trips, or 3,775 daily trips to be exceeded."
6. Section 7.1.4 ("Nash Street) is hereby amended to read as follows:
"When the Nash Street extension is complete Developer must offer for dedication the street
and public improvements associated with the street to City (collectively, "Nash Street
Improvements"). The City will accept the dedication of the Nash Street improvements if it is
constructed in accordance with City standards and as noted in 7.1.2."
7. Section 7.2.1 ("Continental Boulevard Public Access") is hereby amended to read
as follows:
"Prior to the issuance of any Certificate of Occupancy for new strictures within Phase III,
Developer must build that portion of the extension of Continental Boulevard roadway that is to be
located on Parcel 25 in a manner consistent with the Secondary Arterial and Collector roadway
classifications, as well as the transition between them, as shown on Vesting Map No. 71551. Prior
to the issuance of any Certificate of Occupancy for any new construction or improvements that
result in a net increase in square footage or a change in use within Phase IV, the Developer must
build the extension of Continental Boulevard roadway that is to be located on Parcel 21 in a manner
consistent with the Collector roadway classification as shown on Vesting Map No. 71551. Parcel
25 must be built prior to, or concurrent with Parcel 2U'
8. The following Section 7.9 is hereby added to the Agreement:
"7.9 Transportation and Traffic Mitigation Measures "Fair Share". When noted in the
Mitigation, Monitoring, and Reporting Program's Mitigation Measures TRA-1 through 9
inclusive, the term "fair share" shall be determined by dividing the number of PM peak hour trips
produced by the individual development seeking a Certificate of Occupancy by the total Project
PM peak hour trips Ceiling as noted in City Council Ordinance No. 1516, Exhibit D "Conditions
of Approval" (3,120); multiplied by the total construction value of the TRA-1 through 9
improvements that permit "fair share" contributions as opposed to actual construction, as
submitted by a State -licensed Civil Engineer- and accepted and approved by the City Engineer."
9. Section 9 ("Recreational Access") is hereby amended to read as follows:
"9.1 The Specific Plan provides for 7.54 acres of land to be used for Open Space and
Recreational purposes. This land must remain private and only available to Raytheon employees.
However, should Developer sell more than twenty percent (20%) of ESSCSP Campus Area (i.e.,
at least 28.44 acres and not including parcels for which an irrevocable offer of dedication has made
to the City which are located in Phases I through IV), to a user other than Raytheon or a Raytheon
affiliate, Developer must provide non -Raytheon or Raytheon affiliated employees within the
ESSCSP area with permanent access to the 7.54-acre recreational area within the Campus. The
Agreement No. 4972A
access must be formalized through agreements between Raytheon and the purchaser(s) of the
property.
9.2 Within 30 days of approval of a land transfer of the recreational/open space area to
an alternative parcel and before a building pen -nit may be issued on Parcel 11, the Developer must
record a 20-year irrevocable offer of dedication of a 7.54 acre recreational/open space area to the
City of El Segundo, in a form approved by the City Attorney, for future potential park purposes if
located on any of the lots (Parcels 1, 2, 3, 4, 7, S, 13 or 14 of Vesting Map No. 71551) and outside
the Raytheon security fenced perimeter.
9.3 The Developer acknowledges that under Sections 9.1 and 9.2, the City's strong
preference is that the 7.54 acre recreational / open space be located outside Developer's security
fence perimeter, so that the recreational / open space area may be accessed by the public, and that
the land be developed by the Developer before the offer of dedication is recorded. However, as an
alternative to the requirements of Sections 9.1 and 9.2, prior to development of Phase III, the City
and Developer may agree to explore other means of addressing the requirement for the 7.54 acre
recreational / open space being located within the ESSCSP. Such alternatives may include funding
for offsite recreational / open space within the City as opposed to an on -site reservation of such
space. If terns and conditions of an alternative solution are mutually agreed upon by City and
Developer in their respective sole discretion, the parties shall amend the Agreement and supporting
documentation appropriately."
10. The following addresses shall be used for Section 23 ("Notices") and may be
changed from time to time as provided for in the Agreement:
If to City: City of El Segundo
350 Main Street
El Segundo, California 90245
Attention: City Manager
Phone: 310 524-2301
Fax: 310 322-7137
E-Mail: smitnick@elseaundo.org
With a Copy to: City of El Segundo
350 Main Street
El Segundo, California 90245
Attn: City CIerk
With a Copy to: City of El Segundo
350 Main Street
El Segundo, California 90245
Attention: Director of Planning and Building Safety
Phone: 310 524-2346
Fax: 310 322-4167
E-mail: slee@elsegundo.org
Agreement No. 4972C
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
CITY CLERK
CITY OF EL SEGUNDO
350 Main Street
El Segundo, California 90245
EXEMPT FROM RECORDER'S FEES
Pursuant to Government Code § 6103
SECOND AMENDMENT TO DEVELOPMENT AGREEMENT
BY AND BETWEEN THE CITY OF EL SEGUNDO,
CDC MAR EAST CAMPUS 1 LLC, AND
RAYTHEON COMPANY
THIS AGREEMENT MUST BE RECORDED WITHIN TEN DAYS OF EXECUTION
BY ALL PARTIES HERETO PURSUANT TO THE REQUIREMENTS OF GOVERNMENT
CODE § 65868.5
65331.00005\34591924.3
Agreement No. 4972C
4. The Agreement and First Amendment are amended such that all references to
Parcels 1 through 26 in the Agreement shall refer to those Parcels as they are depicted in
Exhibit 5 to the Modified Specific Plan rather than in Vesting Map No. 71551 or Vesting
Map No. 83507.
5. Section 9.4 is hereby added to read as follows:
"9.4 The Sports Complex Project and the Relocation Project shall not trigger the
requirements of Sections 9 of this Agreement, including sections 9.1, 9.2, or 9.3 of this
Agreement which are alternative options for Raytheon or CDC Mar to meet the
requirements of Section 9 of this Agreement. If the City receives the first $1 million
payment pursuant to Section, and it is not subsequently required to return it to CDC Mar,
then the 7.54 acre requirement set forth in Section 9, shall be reduced to 7.34 acres.
6. Section 10.4 is hereby added to read as follows:
10.4 CDGMAR Payment and Land Dedication to the City
a. Upon City's final approval of the items listed under "Project Approvals" above,
CDC MAR shall deposit with the City $1,000,000. The $1,000,000 once deposited with the City
shall be non-refundable to CDC MAR and shall only be used by the City for Approved
Expenditures for the Urho Saari Swim Stadium ("The Plunge") as defined below in subsection (b).
b. The use of the Deposit shall be limited to capital projects for The Plunge,
specifically hard and soft costs of the City Council -approved project (the "Approved
Expenditures").
C. In addition to subsection (a) above, CDC MAR shall deposit into an escrow account
$2,000,000 ("the "Deposit") upon CDC MAR purchase of the land required for the Sports
Complex Project which shall take place within 10 days of the date that all of the entitlements
required for the Sports Complex Project are approved and past all applicable challenge periods
(the "Close of Escrow") and in no event later than six months after the Effective Date unless a
legal challenge is filed challenging said entitlements. If a legal challenge is filed, the time period
for depositing the $2,000,000 into escrow shall be the later of the (i) Close of Escrow, or (ii) six
months after the date that the litigation is fully adjudicated by a court of competent jurisdiction or
is settled by the parties thereto.
d. The Deposit shall be released from the escrow account to the City in phases as
follows: (1) $1,000,000 upon the City's issuance of a building permit for construction of the Sports
Complex Project; and (2) $1,000,000 upon City's issuance of the permanent certificate of
occupancy for the entire Sports Complex Project (the "Permanent C of O").
e. Except as set forth in Section 10.4.g., once an amount has been released from
escrow to the City, the City shall be entitled to keep and use such amount; however the amounts
received by the City shall only be used for Approved Expenditures
f. If no building permit is issued for the Sports Complex Project within twelve (12)
months of the Effective Date, the Deposit shall be released to CDC MAR.
-3-
653 31.00005\34591924.3