Loading...
CONTRACT 7009 Professional Services AgreementAgreement No. 7009 PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF EL SEGUNDO AND MNS ENGINEERS, INC. ENG 24-38: ON -CALL CONSTRUCTION INSPECTION SERVICES This AGREEMENT is entered into this 27'h day of June, 2024, by and between the CITY OF EL SEGUNDO, a municipal corporation and general law city ("CITY") and MNS ENGINEERS, INC., a California Corporation ("CONSULTANT"). 1. CONSIDERATION. A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below; B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement; C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed $50,000 annually in each fiscal year for CONSULTANT's services. CITY may modify this amount as set forth below. Unless otherwise specified by written amendment to this Agreement, CITY will pay this sum as specified in the attached Exhibit "A," which is incorporated by reference. 2. SCOPE OF SERVICES. A. CONSULTANT will perform services listed in the attached Exhibit "A," which is incorporated by reference. B. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement. 3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT will use the appropriate generally accepted professional standards of practice existing at the time of performance utilized by persons engaged in providing similar services. CITY will continuously monitor CONSULTANT's services. CITY will notify CONSULTANT of any deficiencies and CONSULTANT will have fifteen (15) days after such notification to -1- Rev 4/18/24 Agreement No. 7009 cure any shortcomings to CITY's satisfaction. Costs associated with curing the deficiencies will be borne by CONSULTANT. 4. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit "A") the tasks performed, the percentage of the task completed during the billing period, the cumulative percentage completed for each task, the total cost of that work during the preceding billing month and a cumulative cash flow curve showing projected and actual expenditures versus time to date. 5. NON -APPROPRIATION OF FUNDS. Payments due and payable to CONSULTANT for current services are within the current budget and within an available, unexhausted and unencumbered appropriation of the CITY. In the event the CITY has not appropriated sufficient funds for payment of CONSULTANT services beyond the current fiscal year, this Agreement will cover only those costs incurred up to the conclusion of the current fiscal year. 6. FAMILIARITY WITH WORK. A. By executing this Agreement, CONSULTANT agrees that it has: Carefully investigated and considered the scope of services to be performed; Carefully considered how the services should be performed; and iii, Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONSULTANT agrees that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONSULTANT discover any latent or unknown conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT's own risk until written instructions are received from CITY. 7. TERM. The term of this Agreement will be from July 1, 2024 to June 30, 2027. Unless otherwise determined by written amendment between the parties, this Agreement will terminate in the following instances: A. Completion of the work specified in Exhibit "A"; B. Termination as stated in Section 15. -2- Rev 4/18/24 Agreement No. 7009 8. TIME FOR PERFORMANCE. A. CONSULTANT will not perform any work under this Agreement until: CONSULTANT furnishes proof of insurance as required under Section 22 of this Agreement; and CITY gives CONSULTANT a written notice to proceed, B. Should CONSULTANT begin wor k 9. TIME EXTENSIONS. Should CONSULTANT be delayed by causes beyond CONSULTANT's control, CITY may grant a time extension for the completion of the contracted services. If delay occurs, CONSULTANT must notify the Manager within forty-eight hours (48 hours), in writing, of the cause and the extent of the delay and how such delay interferes with the Agreement's schedule. The Manager will extend the completion time, when appropriate, for the completion of the contracted services. 10. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below: A. Exhibit A: Proposal for Services and rates 11.CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties. 12.TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number. 13. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement. 14. WAIVER. CITY's review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT's performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any -3- Rev 4/18/24 Agreement No. 7009 subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character. 15.TERMINATION. A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. B. CONSULTANT may terminate this Agreement at any time with CITY's mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date. C. Upon receiving a termination notice, CONSULTANT will immediately cease performance under this Agreement unless otherwise provided in the termination notice. Except as otherwise provided in the termination notice, any additional work performed by CONSULTANT after receiving a termination notice will be performed at CONSULTANT" own cost; CITY will not be obligated to compensate CONSULTANT for such work. D. Should termination occur, all finished or unfinished documents, data, studies, surveys, drawings, maps, reports and other materials prepared by CONSULTANT will, at CITY's option, become CITY's property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination, not to exceed the total costs under Section 1(C). E. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated. F. By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 16.OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT under this Agreement are CITY's property. CONSULTANT may retain copies of said documents and materials as desired, but will deliver all original materials to CITY upon CITY's written notice. CITY agrees that use of CONSULTANT's completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY's own risk. 17. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or public CITY without CITY's prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will -4- Rev 4/18/24 Agreement No. 7009 be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties. 18.INDEMNIFICATION. A. CONSULTANT agrees to the following: Indemnification for Professional Services. CONSULTANT will save harmless and indemnify and at CITY's request reimburse defense costs for CITY and all its officers, volunteers, employees and representatives from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, any injuries or damages sustained by any person or property resulting or arising from any negligent or wrongful act, error or omission by CONSULTANT or any of CONSULTANT's officers, agents, employees, or representatives, in the performance of this Agreement. i'i. Indemnification for other Damages. CONSULTANT indemnifies and holds CITY harmless from and against any claim, action, damages, costs (including, without limitation, attorney's fees), injuries, or liability, arising out of this Agreement, or its performance. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONSULTANT will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise. B. For purposes of this section "CITY" includes CITY's officers, officials, employees, agents, representatives, and certified volunteers. C. It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement. D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 222, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification. 19.ASSIGNABILITY. This Agreement is for CONSULTANT's professional services. CONSULTANT's attempts to assign the benefits or burdens of this Agreement without CITY's written approval are prohibited and will be null and void. -5- Rev 4/18/24 Agreement No. 7009 20.INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only. 21.AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with respect to all services and matters covered under this Agreement. CITY will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. CONSULTANT will retain such financial and program service records for at least three (3) years after termination or final payment under this Agreement. 22.INSURANCE. A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: T e of Insurance Commercial general liability: Professional Liability Business automobile liability Workers compensation Limits $1,000,000 $1,000,000 $1,000,000 Statutory requirement B. Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or -6- Rev 4/18/24 Agreement No. 7009 equivalent. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. C. Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. D. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). E. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." F. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to Section 15. 23. USE OF SUBCONTRACTORS. CONSULTANT must obtain CITY's prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation. 24.INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the status on the project, which will include a schedule update and a short narrative description of progress during the past month for each major task, a description of the work remaining and a description of the work to be done before the next schedule update. -7- Rev 4/18/24 Agreement No. 7009 25. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: If to CONSULTANT: Aftenfuon" Greg Cheluni MNS Eng4)eeir , Inc. 100 E.housand Oalks BW, Ste. 10 [ housand Oaks, CA 91360 1:::Ihone 0-.896-9474 I irnasi gcheliirnn@irnnseirngirneeirs.coirnrn If to CITY: Attenfiom Ariisrnnne Boy City of EI Segundo 9 Main Si.. I Seguirndo, CA 99245 I1:::)1hone 10- 4-2 64 Il::::.u�na iilaWa@elsegundo.org Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 26. PROHIBITED USE OF ARTIFICIAL INTELLIGENCE. A. Restriction on Artificial Intelligence Usage. CONSULTANT must not utilize, employ, or incorporate any form artificial intelligence, machine learning, or other similar technologies (collectively, "Al") in the provision of professional services in this Agreement without CITY's express written consent. B. Exclusions. The Al prohibition set forth directly above will not apply to general business tools and software that may have Al components but are not directly involved in the execution or delivery of professional services that this Agreement covers, provided that such tools and software do not significantly impact the quality or nature of such services. C. Notification. CONSULTANT must promptly notify CITY, in writing, of any proposal to employ Al in connection its provision of services to the CITY under this Agreement. CITY will have the sole discretion to grant or deny such proposal. 27. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY's conflict of interest regulations. 28.SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT's bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT's bona -8- Rev 4/18/24 Agreement No. 7009 fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability. 29.THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT's or CITY's obligations under this Agreement. 30.INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County. 31. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state, and local laws applicable to this Agreement. 32. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns. 33. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party. 34. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 35.AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. CITY's executive manager, or designee, may execute any such amendment on behalf of CITY. 36. ELECTRONIC SIGNATURES; SIGNATURE AUTHORITY. This Agreement may be executed by the Parties on any number of separate counterparts, and all such counterparts so executed constitute one Agreement binding on all the Parties notwithstanding that all the Parties are not signatories to the same counterpart. In accordance with Government Code § 16.5, the Parties agree that this Agreement, Agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party -9- Rev 4/18/24 Agreement No. 7009 is delivered by electronic transmission. Such electronic signature will be treated in all respects as having the same effect as an original signature. CONSULTANT warrants that its signatory (or signatories, as applicable) to this Agreement has the legal authority to enter this Agreement and bind CONSULTANT accordingly. 37. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 38.TIME IS OF ESSENCE. Time is of the essence for each and every provision of this Agreement. 39. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, acts of terrorism, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' reasonable control, then the Agreement will immediately terminate without obligation of either party to the other. 40.STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY. [Signatures on next page] -1 0- Rev 4/18/24 Agreement No. 7009 IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUNDO Qao)�� Darrell George City Manager ATTEST Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney al MNS ENGINEERS, INC. ✓/, IL Greg GC Name: helini, PE Title: Vice President �u Name: Miranda Patton Title: Corporate Secretary Taxpayer ID No. 95-2080889 Joaquitn"Vazquez, Assistant City Attorney Insurance Reviewed by: t�M((1i1 -1 1 - Rev 4/18/24 ®r MR We's Repo � mwm � wa, AQrLefoaatO"uteh Wsuite 1 o 5 Thousand Oaks, CA 91360 June 27, 2024 City of El Segundo Attention: Ms. Arianne Bola, Senior Associate Engineer 350 Main Street El Segundo, CA 90245 RE: Proposal for On -Call Construction Inspection Services Dear Ms. Bola: Thank you forthe opportunity to submitthis proposal for On -Call Construction Inspection Services for the City of El Segundo (City). Since 1962, MNS Engineers, Inc. (MNS) has provided quality infrastructure consulting services to the transportation, water resources, government, and federal markets in California. We specialize in the core services of construction management, civil engineering, and land surveying. MNS understands the City is seeking qualified professional consulting firms to provide construction inspection services on an as -needed basis. Although the projects will vary in size and scope, project types include water infrastructure improvements, sewer structure improvements, and local street rehabilitation. We have selected qualified staff and project experience references to demonstrate our intent to successfully meet the City's needs. MNS offers a uniquely qualified team to provide these key advantages: Professional and Qualified Team Leading the team is Greg Chelini, PE, Principal -in -Charge, who specializes in construction management, contract administration, field construction, and design and land surveying experience in the civil engineering and construction field. Greg has been responsible for managing projects ranging from asphalt pavement rehabilitation to constructing bridges over water bodies (environmentally sensitive areas) and railroad lines. Responsibilities include scheduling, estimating, construction inspection, contract administration, claim resolution, and utility relocations. He also handled project team coordination meetings with design engineers, contractors, and government agencies, as well as field management of employees, and subcontractors. On -Call and Public Agency Experience A depth of staff resources and a reputation for successful project delivery and agency coordination are just some of the reasons clients count on MNS for pre -qualified consulting services year after year. Our firm understands agencies expect quality services that remain on schedule and budget. As atestament to our quality of work, we have provided pre -qualified construction management, civil engineering, and land surveying services to many Central/Southern California public agencies including: J Cities of El Segundo, Arroyo Grande, Buellton, Carpinteria, Commerce, Goleta, Long Beach, Malibu, Oxnard, Palmdale, Paso Robles, Pasadena, Pomona, San Luis Obispo, Santa Barbara, Santa Clarita, Santa Monica, Simi Valley, Solvang, Thousand Oaks, and Ventura d Counties of Los Angeles, San Luis Obispo, Santa Barbara, and Ventura Ph 805.648.4840 F 805,692.6931 Legal Name MNS Engineers, Inc„ Firm Ownership Type C-Corporation Year Firm Established 1962 DIR Number 1000003564 Corporate Office 201 N. Calle Cesar Chavez, Suite 300 Santa Barbara, CA 93103 805.692.6921 Office www.mnsengineers.com Branch Office 100 E. Thousand Oaks Boulevard, Suite 105 Thousand Oaks, CA 91360 805.648.4840 Office Principal -in -Charge Authorized Signature Greg Chelini, PE 805.456.3519 Office 805.896.9474 Mobile gchelini@mnsengineers.com Agreement No. (19P (Segundo ATIFN: Arianne Bola r June 21,2024 d Districts such as Calleguas Municipal Water District, Las Virgenes Municipal Water District, Santa Ana Watershed Protection Agency, Santa Maria Valley Water Conservation District, Suburban Water Systems, United Water Conservation District, Water Replenishment District of Southern California, and West Basin Municipal Water District d Caltrans Districts 5, 6, 7, and 5/59 (Structures) Diversified Team Experience Our firm's experience, coupled with our knowledge of municipalities, makes MNS an easy addition to provide professional services. We draw from our highly qualified staff with expertise and resources to always and precisely find the right skill set and personality fit forthe job. Proactive Project Management Approach We are committed to the success of projects completed through this contract. We understand the responsiveness, thoroughness, and quality expected, while maintaining the project budget and schedule milestones. MNS places high value on communicating regularly with the projectteam to ensure resources are available to accomplish the work and appropriate quality assurance/quality control (QA/QC) reviews are performed on every deliverable, as well as communicating with the City on project progress, concerns, and coordination issues. Team Availability Our team is available to respond immediately to meet the City's various project needs. MNS understands we will work as an extension to the City staff, providing professional quality engineering services that align with the City's expectations. Additional Statements • City Consultant Agreement. MNS currently provides on -call services and has an existing consultant agreement with the City. We would like to use the same contract language. • Proof of Insurance. MNS currently has proof of insurance on file with the City through the on -call services contract. • Business License. MNS currently has a City Business license. We appreciate the opportunity to submit this proposal for the City of El Segundo. We are excited about the opportunity to continue working with the City. Please contact me at 805.896.9474 or gchelini@ mnsengineers.com with any questions regarding this proposal. Thank you for your consideration. Sincerely, MNS Engineers, Inc. ,V, ILL Greg Chelini, PE Vice President 1111, � 1� 611 QMNS Section 5. Fee Schedule Appendix,A. Resumes Agreement;; NO,) [71,'QWGi ON -CALL CONSTRUCTION INSPECTION SERVICES W", Established in 1962, MNS provides quality infrastructure consulting services to the transportation, water resources, and government service markets throughout California. Specializing in the core services of civil engineering, construction management, and land surveying, MNS' reputation has been built on clear and direct communication and quality services. We understand the technical, environmental, and regulatory aspects that may be required for any project. We are experienced and knowledgeable with utility and multi -agency coordination. Construction Management and Inspection A leader in construction management and inspection services, we offer the City a depth of staff resources and a reputation for success in meeting project quality, budget, and schedule goals. We will provide a qualified construction management team consisting of our most experienced team members who are available forthe contract duration so project -to -project staff continuity can be maintained where possible. MNS focuses on providing quality construction management and inspection services for transportation and utility infrastructure projects. Many of our projects are either within Caltrans right- of-way or involved federal funds which required the project to be administered perthe Caltrans Local Assistance Procedures SECTION 1. FIRM QUALIFICATIONS Agreement iN,oj,,7[QQ9� ON -CALL CONSTRUCTION INSPECTION SERVICES Manual (LAPM); therefore, we have modeled our construction administration procedures after the Caltrans LAPM. The MNS team is very knowledgeable and well versed in administering projects per Caltrans LAPM and Greenbook guidelines. Our expertise includes: • Complete construction management • Construction inspection • Scheduling and critical path method (CPM) review • Contract administration and labor compliance • Constructability review • SWPPP compliance and environmental compliance • Multi -party and contractor coordination • Utility and regulatory agency coordination • Funding administration: local, state, and federal Additional Firm Services As a full -service engineering firm, we also provide various land surveying services: municipal surveying, right-of-way engineering, design surveying, and construction surveying„ Contract and Federal Administration MNS has successfully delivered numerous public works projects that involve local, state, and federal funding. We understand the importance of having detailed and accurate contract administration in order forthe agency to receive 100 percent reimbursement of the federal funding allocated to the project. MNS understands utilizing Disadvantaged Business Enterprise (DBE) firms is important. We maintain a pre -qualified list of DBE firms for various services; we include DBE firms as necessary. Approximately 75% of our projects are funded on the federal level. To date, all of these projects have successfully passed their State and federal audits for construction. _1 Agreement;IM4�,i7Q�� ON -CALL CONSTRUCTION INSPECTION SERVICES Prof essIIof iTfaQ rf1""ril ffluaII,((I„ed I f'r°'fff The key to a successful project is a highly qualified and well -managed team. We offer the City a cohesive, talented team of licensed professionals and experienced staff. Our team was assembled to meet all the specific elements and needs for the City's anticipated projects. We work with the following key objectives in mind —quality service and project deliverables, time and budget efficiency, adherence to quality assurance standards, constant communication, and application of technical and practical expertise. Furthermore, MNS understands we will work as an extension of the City. Following the organizational chart, we present a brief staff overview of our on -call team. Detailed resumes are provided in Appendix A. 1 i= Principal -in -Charge Greg Chelini, PE Project Manager Robert Newman, PE, PLS Resident Engineers/ Construction Managers Michael McDonald, PE Taylor Merlo, PE Additional Resident Engineers/ Construction Managers Chris Cox Jason Mate, CPII Quality Control/Quality Assurance Jeff Edwards Construction Inspectors Chris Cooper Phil Lemmon. CPII Ryan Newman, EIT George Haines Donny Spates Additional Construction Inspectors Dan Becker Michael McFadden John Stage SECTION 2. STAFF QUALIFICATIONS 2 Staff Overview Role Principal -in -Charge License Professional Civil Engineer, CA No. 48181 Education BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA Mr. Chelini specializes in construction management and project management working for public agencies. Greg's extensive work experience makes him highly qualified for supervising staff on concurrent projects; administrating multiple projects; supporting field staff; providing project team quality control; applying value engineering concepts to projects; consulting with various project players to facilitate efficient job progress and maintaining project integrity; coordinating with public agencies; and maintaining project schedule and budget. if lii%/ 9/%ioi YOU, Yrs Exp 44 Role Project Manager License Professional Civil Engineer, CA No. 51733 Professional Land Surveyor, CA No. 6696 Education Graduate Studies in Public Administration, California State Northridge University, Northridge, CA BS, Civil Engineering, California State Polytechnic University, Pomona, CA Mr. Newman has over 40 years of experience in transportation and water/wastewater improvement and development projects. Prior to joining MNS, Robert served as the Public Works Director for the City of Santa Clarita. He managed six divisions in the department (Building and Safety, Capital Improvement Projects, Engineering Services, Environmental Services, General Services, and Traffic and Transportation Planning) with a full-time staff of 145, an operating budget of $26M, and a capital budget of $50M. 0/, NMI f/f�����IU11 Yrs Exp 36,, Role Construction Manager/Inspector License Professional Civil Engineer, CA No. 45963 Mr. McDonald has over 22 years of engineering experience in the industries of civil, environmental, geotechnical, and geological engineering industries. Michael's extensive multi -disciplinary experience has benefited the various transportation and water resource projects he has worked on throughout his career. His experience includes design and construction of roadway and pavement, bridges, drainage systems, slope stability, grading, and erosion control and sediment management. Michael is a hand -on engineer and excels in project management where he has managed up to 40 team members. He has managed a wide range of projects from small to large multimillion -dollar, Agreement,, No.,i790,p(,, ,i �; ON -CALL CONSTRUCTION INSPECTION SERVICES multiyear projects. Michael prides himself with the ability to find cost effective and environmentally sound solutions while conducted at the highest level of safety. r/ Yrs Exp 1;1 Role Construction Manager Licensing/ Professional Civil Engineer, CA No. 87349 Certifications 10-hour Construction Safety, Cal/OSHA; ACI Concrete Field -Testing Technician, Grade 1, No. 01380996, Confined Space Awareness, Pro CPR Adult CPR/AED and First Aid Certificate, No. 162801729592967 Education BS, Civil Engineering, University of Southern California, Los Angeles, CA Mr. Merlo is a Regional Construction Manager with over ten years of experience specializing in roadway and utiltiy improvements project. Taylor also has experience with onsite construction inspection and coordination for bridges, roadway, and waterline projects. He is familiar with Caltrans and Greenbook specifications as well as coordinating with multiple agencies and utilities. f 1 (fly%�� "aril /0 `J� f�lfl��f f%YrsEx %35 ��%1JJ111 ;11///////,Gfal/// p Role Senior Construction Inspector Certification ICC Structural Concrete, ICC Structural Masonry, ICC Structural Steel and Welding, ICC Structural Steel and Welding,10- and 30-hour Outreach Trainer Certified, al/ OSHA, First Aid and CPR Education Coursework, OSHA Outreach Training, California State University, Dominguez Hills, CA Mr. Cox has over 35 years of construction inspection and management experience with the City of Los Angeles on a variety of public works projects including Metropolitan Transportation Authority (MTA) transit, wastewater interceptor sewer, Capital Improvement, and Active Transportation (ATP) projects. Chris is a detail -oriented construction inspector with proven expertise in managing a construction inspection crew and providing structural reviews to successfully deliver projects in accordance to plan requirements. He is known for being decisive in identifying and mitigating construction challenges. Chris has expertise in plan review and correction, technical reviews, report generation, safety awareness, permitting, repair procedures, and building codes. SECTION 2. STAFF QUALIFICATIONS 3 Agreement;Nppr7aQQ;9t,lii ON -CALL CONSTRUCTION INSPECTION SERVICES i iilo � ��/// ,//� Yrs Ex Yrs Ex _ P ����I�������i,, P Role Construction Manager Certification Certified Public Infrastructure Inspector Education BEng, Environmental Engineering, minor in Civil Engineering (Honors), Griffith University, Queensland, Australia Mr. Mate's expertise is in environmental and civil engineering construction projects. Jason's roles have ranged from project engineer, resident engineer, to project manager for several large- scale $500M+ projects involving water/wastewater resources, transportation, and solar energy. /�laa/y/111111� .Yrs Exp ;�; Role Construction Inspector Certifications Concrete Field Testing Technician, ACI Grade 1; Caltrans CTM 125,125AC, 125AGG, 125PCC, 216, 231, 504, 518, 523, 533, 539, 540, 556, 577 Mr. Cooper is experienced as a construction inspector and soils and materials technician working on highway/roadway improvements. Chris' expertise includes concrete and hot mix asphalt (HMA) placement inspection, slurry seal, masonry, bolting, pre -stressed concrete, soils and geotechnical testing, and framing and nailing inspection, soils and geotechnical testing. He has provided field quality control and quality assurance in both structure and infrastructure projects. He is knowledgeable with Caltrans and Greenbook methods and procedures. ��YrsEx ��J'1; 51' /,l� p,� P Role Senior Construction Inspector Certifications Certified Public Infrastructure Inspector; Nuclear testing gauge operator No. 059034; Construction Safety Certification, CFR Title 29, Cal/OSHA; HAZWOPER, Cal/ OSHA; Confined Space Awareness Mr. Lemmon brings an impressive career of experience in construction project management, pavement construction inspection, and detailed knowledge of all aspects of public works construction. Phil has extensive experience in providing field support for engineering in addition to construction inspection. He has worked on numerous projects, including pavement, grading, curb and gutter, traffic control, trenching, boring, micro - tunneling, and blasting. A majority of this project experience has included Caltrans specifications, methods, and procedures. Role Construction Inspector Education BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA 2022 Mr. Newman brings two years of experience in construction inspection for roadway and utiltiy improvement projects. Ryan has worked on multiple projects for the City of El Segundo. /1�%% Yrs Exp 1,32 Role Construction Inspector Certifications Highway Construction, Level III, NICET No. 80134; ACI Concrete Field Testing Technician; Nuclear Gauge Safety; 1 0-hour Construction Safety, Cal/OSHA Education AS, Civil Engineering, Hartford State Technical College, CT Mr. Haines is experienced as a site construction manager; utility, water and sewer, roadway, and bridge construction inspector for private and public agency projects. George's responsibilities involve inspecting and managing all phases of construction for various types of underground utilities, reinforced concrete, tieback walls, retaining walls, and roadways. These projects involved work over State highways, and waterways requiring coordination with Caltrans and City/County staff. He is familiar with various local agency, Special Districts, Caltrans, and Greenbook standards. o iooia/i /�IJ�llll��� Yrs Exp '32 Role Construction Inspector Certifications Coating Inspector, Level 1, NACE; Concrete Field Testing Technician, Grade I, ACI; Reinforced Concrete Special Inspector, ICC;10-hour Construction Safety, Cal/OSHA Education AS, Construction Management, San Joaquin Valley College, CA Mr. Spates is experienced in project supervision and inspection in water and wastewater facilities, reinforced concrete, structural steel, roadways, and underground piping. Donny is skilled at interpreting plans and specifications to mitigate cost and schedule risks. He is an excellent project team supervisor and strives to implement resource saving solutions. SECTION 2. STAFF QUALIFICATIONS 4 Our measure of success is the long-standing relationships we maintain with our clients. This section showcases a sample of our firm's relevant project experience in the last five years: Reference Cheryl Ebert, Senior Engineer 350 Main Street, El Segundo, CA 90245 Ph 310.524.2321 Date 2020-current El Segundo Boulevard is a major six -lane east -west arterial with a median from Isis Avenue to Pacific Coast Highway (PCH). The roadway corridor is mixed with commercial properties and aerospace campuses. This $8M project will rehabilitate the existing pavement throughout the 1.5-mile corridor. The project will also remove existing mature ficus trees in the median and develop a landscaped median. El Segundo Boulevard requires Americans with Disabilities Act (ADA) compliant driveways, curb ramps, and pedestrian crossings at the intersections; traffic signal modifications; and three miles of dedicated bicycle facilities including bicycle detection and a Class IV one-way cycle track. The project will also enhance bicycle safety on Nash Street from Imperial Highway to El Segundo Boulevard and Douglas Streetfrom Imperial Highway to Rosecrans Avenue. The project will incorporate stormwater structural Best Management Practices (BMPs) for the project corridor. Agreement,iN,a,i7QQ,9,,,�)i.�)u ON -CALL CONSTRUCTION INSPECTION SERVICES +o ,r i,� MNS is providing preliminary and final design services and right-of-way and construction surveying. Reference Lifan Xu, PE, City Engineer 350 Main Street, El Segundo, CA 90245 Ph 310..524.2300 Date 2023-2024 MNS provided the City with public works inspection services for the Nash Street Project. The public street was constructed as part of a corporate office headquarters and training facility for a professional football organization as part of the El Segundo South Campus Specific Plan (ESSCSP) area. Parttime public works inspection was provided to ensure the City would not assume long-term maintenance liability. The work was completed in June 2024. Construction inspection. Reference Lifan Xu, PE, City Engineer 350 Main Street, El Segundo, CA 90245 Ph 310..524.2300 Dates 2023 SECTION 3. PROJECT EXPERIENCE AND REFERENCES 5 MNS provided the City with public works inspection for the Dougals Street Emergency Storm Drain Repairs, overseeing the work of the Union Pacific Railroads contractor in the replacement of a failed storm drain culvert within the City street right of way. Due to a storm drain failure. the roadway was closed during the duration of the repairs. 11'1,k,r 6cfr s Construction inspection. Reference Hamed Hashemian, Deputy Director of Public Works 38250 Sierra Highway, Palmdale, CA 93550 Ph 661.267.5300 Date 2023-current MNS provided public works inspection and overall QA/QC forthe City of Palmdale Avenue R multi -faceted project. The project scope included improvements for pedestrian and cyclist safety, storm drain system, sewer, upgrade traffic signals, and enhance overall street functionality from Sierra Highway to 25th Street East. The project had significant utility relocation and coordination. MNS Engineers' role included pre -construction planning, daily on -site inspections to ensure compliance with safety and contract requirements, and meticulous project documentation. The project was funded from ATP grants, Measure M, Gas Tax, Proposition C, and Article 8 funds. Pre -construction planning and construction inspection Reference Harriet Howell, Public Works Project Manager 38250 Sierra Highway, Palmdale, CA 93550 Ph 661.267.5300 Date 2023-current MNS Engineers provided construction support services for Phase II of the Sam Yellen Park project in Palmdale, CA. This phase included developing 12 acres of the park with amenities such as a Agreement;Nq,.);7,,QQ,9�, ili) ON -CALL CONSTRUCTION INSPECTION SERVICES community center, picnic areas, sports courts, playgrounds, and improved infrastructure like parking lots and utility systems. MNS Engineers' services encompassed full-time public works inspection to ensure construction adhered to city -approved plans, project management to oversee the project's progress, and quality assurance/quality control to maintain high standards. Additionally, they handled project documentation to comply with Prop A Grant requirements, ensuring thorough records for future audits. Their efforts facilitated a smooth construction process, addressing site challenges and coordinating closely with city staff to achieve the project's goals. Construction inspection. Reference Teresa Lopes, PE, Project Manager 130 Cremona Drive, Suite B, Goleta, CA 93117 Ph 805.961,7563 Date 2008-present As part of an on -call construction inspection contract, MNS has provided construction inspection to various local roadway and drainage projects. Projects included: • Patterson Avenue Widening. This roadway project improved and widened Patterson Avenue from Debbie Lane to Hollister Avenue and included improved driveway access to commercial, and professional businesses. Construction elements included widening the existing roadways; grading; new curbs, gutters, and sidewalks; subgrade remediation; hot mix asphalt (HMA) paving; and traffic control. Los Carneros Road/Hollister Avenue Street Improvements. This roadway project improved and widened two main arterials that accesses UC Santa Barbara, City Hall, and commercial, industrial, and professional businesses. Construction elements included widening the existing roadways; grading; curbs, gutters, and sidewalks; drainage improvements; subgrade remediation; HMA paving; and daily traffic control Construction was within the City's right-of-way. Fairview Avenue Widening. Construction elements included drainage improvements, reinforced concrete pipes, and new sidewalks, and curbs and gutters. This project required coordination with the City of Goleta, City of Santa Barbara, and the Santa Barbara Metropolitan Transportation District. SECTION 3. PROJECT EXPERIENCE AND REFERENCES 6 f ir'41 • Sumida Gardens Roadway Construction. Construction elements included subgrading; grading; sewer, water, electric, and gas utility lines; storm drainage; sidewalks; and asphalt paving. • Calle Real Grinding and Overlay. Construction elements included removing excess asphalt and repaving to facilitate overflow water conditions at San Pedro Creek. • Las Vegas and San Pedro Creeks Box Culvert Repairs. Construction for this emergency repair project included removing and reconstructing the middle stem wall of existing box culverts; concrete saw cutting; concrete removal; doweling; bar reinforcement; and placement of structural concrete. Serv,ir,es Construction management and inspection. Reference Jill McPeek, Project Manager 214 East Branch Street, Arroyo Grande, CA 93420 Ph 805.473.5444 Date 2016-2021 As part of the on -call contract with the City, MNS has provided construction management and inspection for several projects: • Platino Oro Drainage • Phillips 66 Paving • Oak Park Boulevard/US 101 Traffic Signal Upgrade • Oak Park Boulevard ADA Ramp Rehabilitation • Le Point Area Water Main Upgrade • S. Alpine Water Line Improvements • Mid -Block Crossing Improvements • 2016 Street Repairs and Resurfacing, and Concrete Repairs Acet> Construction management and inspection. Reference Erin Wiggin, CIP Project Manager 154 S. Eighth Street, Grover Beach, CA 93433 Ph 805.473.4537 Date 2016 As part of an on -call construction management and inspection contract, MNS has provided services to various local roadway projects which include: Agreement,NP, 7�QQ9(,w i,,�) ON -CALL CONSTRUCTION INSPECTION SERVICES Longbranch Avenue Rehabilitation and Repair. Funded by Measure K-14, this $1.3M project completely rebuilt Longbranch Avenue from 3rd Street to 10th Street. The project constructed new sidewalks and curb ramps forthe entire length of the project. Each of the existing driveways was tied into the new roadway; all the existing mailboxes were moved to the edge of the new pavement. Parkways were added between the sidewalks and the new roadway. MNS provided construction management, inspection, and materials testing. Ocean View Avenue Rehabilitation and Repair. Funded by Measure K-14, this $870K project was a complete rehabilitation of Ocean View Avenue and the surrounding cross streets of Front Street,1 st Street, 2nd Street, and Carmelda Lane. The project consisted of removing the existing asphalt and placing a new section of aggregate base and asphalt. New cross gutters, sidewalks, and curb ramps were installed at various locations within the project. Newport Avenue was added as an extension of this project for an additional construction cost of $204K. MNS provided construction management, inspection, and materials testing. Grover Bach Street Rehabilitation and Safety Improvements. Funded by Measure K-14, this $500K project provided pavement rehabilitation of various streets. Construction elements involved removing and replacing (dig outs) failing sections of pavement with a 4-inch hot mix asphalt (HMA) plug, followed by a crack seal and a slurry seal of the entire street. A number of dig out locations required root removal and curb and gutter replacement to repair damage caused by tree root intrusion. The project also reinstalled the pavement stripe and markings. MNS provided construction management and inspection. Construction management and inspection. Reference Brian Ochoa, CIP Project Manager 1437 4th Street, Suite 300, Santa Monica, CA 90401 Ph 310.458.8721 Date 2019-current The North Beach Trail was constructed to improve safety and mobility for beachgoers and to renovate Ocean Front Walk north SECTION 3. PROJECT EXPERIENCE AND REFERENCES of the Pier with new paving, lighting, and seating. Construction took place along the highly public beach of Santa Monica. During each phase, construction was performed in incremental sections. Signage provided direction for pedestrian detours and any closures, while a temporary path provided access for cyclists and pedestrians in the construction zone. This project widened approximately 2.2 miles of the Marvin Braude Bike and Pedestrian Trail from 14 feetto 30 feet at Santa Monica State Beach. The project provided a separate pedestrian and bicycle path separated by a concrete buffer. Additional trail improvements included the development of a "Pier Plaza" adjacentto the Santa Monica Pier; installation of new seat walls, lighting, and paving along the oceanfront walk portion of the trail; construction of a new vertical wayfinding path through the center of the 1,550 parking lot; and replacement of the existing 2-foot- high wall under the Santa Monica Pier Bridge. Daily coordination with the adjacent residents, businesses, and the public was critical throughout the project. S,mrvk,� . Construction management and program management. Reference John Waddell, Project Engineer 1055 Monterey Street, San Luis Obispo, CA 93408 Ph 805.788.7213 Date 2019-2020 This project rehabilitated the steel truss bridge over the Estrella River. Construction elements included removing the existing steel truss bridge from the current foundations while the existing abutments were demolished and replaced with new abutments and wing walls founded on 48-inch CIDH piles. The concrete bridge deck, barriers, and pedestrian walkway were removed from the existing bridge during this process, and the steel structure was rehabilitated with the replacement of the top chord truss pins, end portal bracing elements, and new high strength connections. The bridge was re -installed on the new abutments, and a new concrete deck was placed on the retrofitted structure along with new guardrails and a new barrier matching the original historical bridge barrier. The bridge was also subject to SECTION 3. PROJECT EXPERIENCE AND REFERENCES Agreement,,Nq,)i7QQ,9t,1)ifi,�) ON -CALL CONSTRUCTION INSPECTION SERVICES environmental restrictions and was constructed within a limited working window. The project included replacing the supporting foundation, replacing the concrete deck, and upgrading the structural members to remove the current weight and height restrictions. Uni �e Construction management and program management. Reference Teresa Lopes, PE, Project Manager 130 Cremona Drive, Suite 6, Goleta, CA 93117 Ph 805.961.7563 Date 2017-2018 This $5M project constructed a Class I bike/multi-purpose path along the south side of Hollister Avenue from Pacific Oaks Road to Ellwood Elementary School to provide a higher level of comfort and safety to the bicyclists and pedestrians, especially school children, living in the area. This project consisted of over a mile of complete street improvements such as pavement rehabilitation, multimodal path construction, replacement of over a dozen curb ramps, drainage improvements, signaled intersection upgrades, parkway and median planter construction, and curb and gutter replacement. The pavement rehabilitation entailed removal and replacement of failing pavement sections, pavement leveling courses, pavement overlays, and micro surfacing placement. The project also incorporated a detailed landscape and recycled water irrigation plan, which enhanced the bikeway and pedestrian path. The construction team maintained access to adjacent businesses and provided safe pedestrian and bicycle passage through the project site. Proactive daily traffic control monitoring and coordination with the public also contributed to the success of the project. The multiple funding sources for this project included a $1.6M Active Transportation Program (ATP) grant for project construction, Measure A, and Goleta Transportation Impact Program funds. MNS utilized an in-house document control system to manage the project in accordance with City and Caltrans Local Assistance Procedure Manual (LAPM) guidelines. i if� ; Construction management and inspection, and construction surveying. S This $41M project placed 22,000 tons of hot mix asphalt (HMA), removed and replaced existing failed pavement, constructed shoulder backing, raised existing utilities, and constructed a HMA dike. The project also involved daily traffic control, and public relations. MNS provided construction management and inspection and construction layout. The project was finished ahead of schedule and well within budget. Construction management and inspection. Reference Harriet Howell, Public Works Project Manager 38250 Sierra Highway, Palmdale, CA 93550 Ph 661.267.5300 Date 2023-current MNS Engineers provided construction support services for Phase II of the Sam Yellen Park project in Palmdale, CA. This phase included developing 12 acres of the park with amenities such as a community center, picnic areas, sports courts, playgrounds, and improved infrastructure like parking lots and utility systems. MNS Engineers' services encompassed full-time public works inspection to ensure construction adhered to city -approved plans, project management to oversee the project's progress, and quality assurance/quality control to maintain high standards. Additionally, they handled project documentation to comply with Prop A Grant requirements, ensuring thorough records for future audits. Their efforts facilitated a smooth construction process, addressing site challenges and coordinating closely with city staff to achieve the project's goals. ervkr u­, Construction inspection. Agreement: ��,i740��,i l,li,ri ON -CALL CONSTRUCTION INSPECTION SERVICES Reference Kelly Fisher, Project Manager 30001 Ladyface Court, Agoura Hills, CA 91301 Ph 818.597.7338 Date 2018-2022 This $12M interchange improvement project widened Palo Comado Canyon Road and both sides of the Palo Comado Canyon Road Overcrossing over US 101. The new bridge is a four -span, combination T-beam and pre-cast/pre-stressed (PC/PS) [-girder bridge, which also required modifications to the northbound on/off- ramps and a new highway auxiliary lane. Construction also involved cast -in -drilled -hole (CIDH) piles, three retaining walls, and City roadway improvements. Roadway improvements included new street and bridge lighting, traffic signal improvements, architectural features on the bridge, drainage, ramp metering, utility relocation, earthwork, prepaving inertial profile, hot mix asphalt (HMA) paving, jointed plain concrete pavement (JPCP), Midwest guardrail system (MGS), fencing, and new irrigation and landscaping. The project also provided beautification with the construction of architectural treatment of the concrete barriers, retaining walls, slope paving, and bridge portal pilasters. Drainage modifications involved placing 18-and 24-inch reinforced concrete pipe (RCP) in 20- to 25-foot-deep trenches to tie into the existing systems. MNS is provided construction management and inspection and material testing services forthe roadway work. Construction management and inspection. SECTION 3. PROJECT EXPERIENCE AND REFERENCES 9 The City of El Segundo (City) is requesting a proposal to provide consulting services on an as -needed, on -call basis for the City's Public Works Department. The projects will vary in size and scope; the type of services will be determined as the need arises on a task order basis. The consultant will provide the required construction inspection services as outlined in the task order. MNS has the ability to respond in atimely mannerto meetthe staffing needs for the various types of projects. We also have a depth of resources and be experienced in providing construction management and inspection services for water, sewer, drainage, and roadway related projects. Our staff will act as an extension of the City and will coordinate directly with City staff. MNS specializes in providing construction management and inspection services for local agency public works projects. As shown in our project experience (Section 3), we have successfully managed water and sewer pipeline and facility projects; parks and downtown beautification; sidewalk and curb ramp (ADA) upgrades; drainage; and roadway rehabilitation projects. We are able to meetthe anticipated project and staffing needs as shown in the City's CIP. ManagementContract Approach Our overall management approach is to provide the most qualified and experienced resources to the City of El Segundo in a timely manner with personnel that best meets the needs of the anticipated project. MNS staff will work as an extension of the City of El Segundo's staff or as an independent team when required by the City; we will have the necessary experience and training to hit the ground running for any project. Agreement, i19,p`.1r?�Q4�,rai ON -CALL CONSTRUCTION INSPECTION SERVICES Based on on -call contracts completed with other agencies, we have divided our approach to managing this contract and associated task orders into four phases: • Contract Setup and Project Scoping • Staffing Implementation • Quality Control • Reporting/Invoicing Contract Setup and Project Scoping As part of Contract Setup, one of the first actions upon selection is to meet with the City of El Segundo's Project Manager to establish a clear protocol and understand specific forms, reports, invoicing processes, schedule, and expectations for the contract. Communication is fundamental to establishing a firm foundation. The MNS Project Manager will prepare detailed scope of services for each project or task order based upon the following: • Our understanding of the project • Information supplied by the City at the preliminary scoping meeting • Our own evaluation of the project site and services required Necessary subconsultants will also be retained atthis time for any portion of the work in which MNS requires additional or specialized technical expertise, and/orto meet Disadvantaged Business Enterprise (DBE) requirements. Staffing Implementation Staffing Implementation starts with understanding the staffing needs of the current project as well as future projects. This is accomplished by communicating with the City of El Segundo's Project Manager on a consistent basis in order to anticipate the specific project need and identify/approve the scope of work in advance to proactively meet the project needs. We are able to immediately respond to City staffing/project needs. Our staff is SECTION 4. PROJECT UNDERSTANDING AND APPROACH 10 crossed trained in multiple disciplines providing the City with a high level of efficiency and experience for its projects. Quality Control MNS considers quality control the backbone of the value-added services we provide. Based on working with various local agencies for over 55 years, MNS has developed an internal Quality Assurance/Quality Control (QA/QC) program that is implemented on all projects. The program, which is tailored to meetthe specific work requirements and expectations for the City of El Segundo's on -call contract, focuses on performance and responsibilities. As the first order of work, the MNS Project Manager will implement its Quality Control Plan for the contract. The program will include procedures to ensure quality and timely services; provide accurate and timely services, documentation, calculations, and reports; and perform in a professional manner. The Project Manager will monitor and oversee each individual project staffing need throughout the contract to ensure that the overall quality of service for the project and the City are being m et. Reporting/Invoicing The MNS Project Manager will work directly with the City of El Segundo's Project Managerto effectively communicates task order status, progress, and MNS team performance to the City. As MNS has repeatedly demonstrated on previous and current on -call contracts, a few of the key elements in managing these contracts includes responsiveness, organization, quality control, and correct attitude. Construction Inspection MNS will provide the level of inspection required for the specific type of project. The MNS inspector will ensure the work is performed in accordance with the contract documents. Inspection tasks include monitoring the contractor's activities for conformance with the plans and specifications; permits; contract change orders; and working drawings. Inspectors will track and review the following: • Item quantities • Extra work time and materials • Monitor safety/traffic control • Utility coordination • Significant conversations and events • Verify materials incorporated in the work meet contract requirements • Monitor contractor's SWPPP and best management practice (BMP) compliance • Record activities in daily reports and with photographs SECTION 4. PROJECT UNDERSTANDING AND APPROACH Agreement;iNQo 7,Q ,iirjw ON -CALL CONSTRUCTION INSPECTION SERVICES Inspectors will also assist in the coordination of surveying and materials testing. Inspectors will ensure as -built drawings will be maintained and reviewed for accuracy. Construction i ili list In addition to the scope of work outlined in the City's Scope of Work, Inspector responsibilities will include: • Conducting on -site inspection of the work in progress to ensure the work is performed in accordance with the contract documents. • Keeping a daily report for recording hours and equipment on the job site, extra work, and daily activities. • Providing assistance with coordination of any utility work required. • Ensuring the contractor's traffic control is performed in accordance to the contract's approved traffic control plan or to the Caltrans Manual on Uniform Traffic Control Devices (MUTCD). • Collecting material certifications and load tickets to maintain a record of the quantity of material used. • Documenting the material to incorporate into the work meets the required project specifications. • Maintaining orderly files for reports and copies of the contract documents. • Coordinating and witnessing acceptance testing such as air testing, mandrel, closed-circuit television (CCTV) inspection for pipelines and other similar items. • Providing inspection to ensure SWPPP and BMPs are implemented correctly. • Serving as a liaison between the contractor and the City to assist the contractor in understanding the intent of the contract documents. • Coordinating materials tests and soils tests during construction to confirm materials used and workmanship meet or exceed expectations of the plans and specifications. • Maintaining a marked -up set (by contractor) of contract record drawings. • Assisting with RFIs in obtaining relevant details and information to aid in the resolution of any plan or specification discrepancies. • Delivering Notices of Non -Compliance whenever work is deemed unsatisfactory, faulty or defective, or does not conform to the contract documents. • Verifying tests, equipment, and systems startups and operating and maintenance instructions are conducted as required by the contract documents and in presence of the required personnel. 11 • Reviewing contractor's monthly partial payments for accuracy Identifying any discrepancies to the contractor, resolving differences and making final recommendations to the City for approval of payment. • Tracking extra work an change order work. • Inspecting the project site daily for potential safety issues. • Maintaining job site photos to record construction progress. • Assisting in project closeout and developing a deficiency list (punch list) for various areas of work, notifying the contractor, and re -inspection. • Conducting a final inspection in presence of the City and contractor. • Preparing a final list of items found to be incomplete. Upon final inspection and satisfactory completion of all contract work, recommending final acceptance of the projectto the City. 1�0IIr�eii�ru��H�ollr �,DFb�II�a��I�f�r,f;,a.�Ilt.,ll, (�/II fill golf�.ii MNS can provide additional construction management support services as needed. Our straightforward approach to construction management and inspection focuses on project efficiency and fulfilling all agency budget, schedule, and documentation requirements. Greg Chelini, PE, will manage the Construction Management (CM) team to achieve those goals. Our construction management scope of work can be categorized into three separate tasks: • Pre -Construction Phase • Construction Phase • Post -Construction Phase Our typical approach to providing this scope of services is outlined as follows: ; lff fir»ff%��1ii1�'111 Constructability Review Prior to project bidding, MNS will be available to review the project documents for constructability issues and submit a constructability report with our findings and recommendations Project Review Priorto construction, it is important the construction managementteam obtains comprehensive knowledge and understands the information surrounding the project. The construction management team will familiarize themselves Agreement ,N:a;, 7QQ9, r ,, ON -CALL CONSTRUCTION INSPECTION SERVICES with the project and site prior to construction and thoroughly review the project documents (e.g. plans, specifications, utility agreements, permits, soils reports, etc.) to understand the project and the various limitations that may apply. Project Setup/Kick-off Meeting The MNS Project Manager will meet with the City of El Segundo Project Manager to review the following: • Establish parameters including design features, levels of authorization, inspection needs, and procedures for contract change orders and requests for information (RFIs). • Review project administration requirements to ensure consistency with the special funding administration procedures, such as the Caltrans Local Assistance Procedures Manual (LAPM) for state orfederally funded projects. • Establish an outline of dispute resolution regarding any disputes with the contractor's methodologies, policies, and procedures. Pre -Construction Conference MNS will coordinate a pre -construction meeting to discuss the hierarchy of both the construction management team and the contractor and to establish the protocol used throughout the project. The following parties are typically invited: selected contractor, City staff, utility companies, and others involved with the project. The meeting will highlight the contractor's responsibility towards such items as safety, emergency response, traffic control, site access, labor compliance, certifications of materials, submittals, schedule updates, permit and utility agreements, order of work, weekly meetings, pay requests, public notices, and quality control. MNS will prepare and distribute an agenda and meeting minutes. Construction Coordination MNS will work closely with the City of El Segundo and the contractor to promote effective coordination and communication at the job level with all agencies, surveyors, technicians, and the affected community and businesses. Timely coordination and review of contractor's submittals such as the Stormwater Pollution Prevention Plan (SWPPP), working drawings, material testing, and traffic control updates will be performed to minimize potential delays. Contract Administration MNS has developed a system of computer -generated files and forms which can be modified to meetthe City of El Segundo's requirements. SECTION 4. PROJECT UNDERSTANDING AND APPROACH 12 MNS has successfully used these forms to assist in tracking correspondence, submittals, RFIs, contract change orders, weekly statement of working days, and progress pay estimates. We also use summary sheets for tracking and documenting materials testing results and certification. We monitor labor compliance through review of certified payroll and employee interviews. We monitor cost control by tracking contract item payments and quantities, contract change order payments, extra work, and supplemental work. Weekly Meetings To facilitate and maintain communication, we will hold weekly construction meetings with the contractor to discuss the progress of the work, and address any outstanding or anticipated issues. Specialty meetings such as utility, traffic control, and pre - paving will be held to address project -specific work elements as required. The contractor's three -week -look -ahead schedule will be reviewed and discussed during each meeting. Public Relations MNS understands the importance of public relations and public awareness for construction projects and realizes most public works projects directly impact neighboring properties and the traveling public. MNS will act as a liaison between the City and the public, respond to questions and complaints from the public and other agencies regarding construction activities, and be available for public meetings. Submittals/RFIs The timely review of submittals and RFIs is critical to project construction. All submittals and RFIs will be logged and distributed as necessary. MNS will monitor the log to verify responses are submitted in a timely manner and will also coordinate with the Design Engineer to ensure the RFIs and submittals are answered and returned within the required time frame. Schedule Review MNS will perform a preliminary review of the contractor's baseline schedule to verify all project milestones are accounted for and the schedule includes adequate data to present a clear picture of sequencing the various work items to support a logical project completion date. Requiring a clear and detailed schedule, along with subsequent monthly updates, will be a valuable tool during the life of the projectto monitor contract progress and potential delays. Agreement N .17Qg,9j1 i ON -CALL CONSTRUCTION INSPECTION SERVICES MNS will take the lead in negotiating time extensions due to contract change orders (CCOs) and other delays. The contractor's three -week -look -ahead schedule is also a valuable tool that will be reviewed at each weekly meeting. Permit Management MNS will monitor the work to ensure the contractor is complying with the various permit requirements. Ourteam includes certified Qualified SWPPP Practitioner (QSP) and Qualified SWPPP Developer (QSD) staff to ensure the project's compliance with the approved SWPPP and Water Pollution Control Board permit. MNS inspectors will provide focused attention to dust control, prevention of sediment tracking onto the roadway, and site maintenance. Safety Performing all work and operations in a safe manner is imperative and must remain consistent with the following guidelines and regulations: Cal/OSHA, Department of Industrial Relations Construction Safety Orders and the contractor's Code of Safe Practices, governing codes and regulations, and contract documents. MNS will review the site for safe working practices and notify the contractor of any unsafe conditions and verify the safety concerns have been properly addressed. Change Orders and Potential Claims The main objective for claims on any project is to avoid them when possible. Methods include anticipating and addressing any potential problems before they occur, providing timely responses to RFIs, expediting prompt processing of change orders, reviewing the contractor's schedule, and reviewing the project work. MNS will review, negotiate, and prepare all CCOs, and coordinate with the City of El Segundo to process CCOs. Construction Surveying MNS has in-house surveyors available should the City of El Segundo require the construction management team to provide surveying services. Otherwise, MNS will coordinate with the contractor's project surveyorto ensure all required surveying is provided in accordance with the contract documents. Materials Testing MNS will either provide a subconsultant or work with the City of El Segundo's preferred firm to provide materials testing. MNS will coordinate with the materials testing firm to provide any needed testing throughoutthe project. Testing will be performed in accordance with the City's Quality Assurance Procedures SECTION 4. PROJECT UNDERSTANDING AND APPROACH 13 (OAP) at the required/needed frequency to verify the adequacy of the material being placed. Punch List and Final Report To expedite and ensure the accuracy of final documents and reports, MNS will maintain an updated set of record drawings, quantities, CCO costs, and general record keeping throughoutthe life of the project. The Resident Engineer will coordinate a project review and miscellaneous punch list items priorto acceptance of the contract work. This task also includes a final walkthrough of the project with the City and any governing agencies involved with the project. Final reports and job records will be submitted to the City of El Segundo atthe completion of the contract. We will coordinate a post -construction meeting with the City, Design Engineer, and involved staff to discuss project issues and any "Lessons Learned" on the project. j,a11 f)II1Ucl,iillll't 11'111> II/01I'ii0) 'r111111 „Il a r 101,1 c o"1 MNS considers quality control the backbone of the services it provides. MNS has developed an internal Quality Assurance/ Quality Control (QA/QC) system that is implemented on all projects. Implementation of this system has resulted in all MNS- managed construction projects successfully passing federal and state audits for funding reimbursement and timely closeout with project agencies. Each project team member is responsible for quality assurance and quality control; it does not lie on just one individual. Each member of the construction management team is responsible for reviewing their documentation on a consistent basis and adhering to the procedures and requirements set forth in the contract documents. For each project, MNS designates a QA/QC Manager responsible for performing reviews of the project records and project site to ensure compliance with the contract documents. A few of the areas checked for completeness and accuracy as part of the reviews include: • Project daily reports • CCO, RFI, submittal, and material logs • Certificates of compliance • Pay quantities • Project schedule and costs Agreement;iNq.,i7QQ9� lr.i�ra ON -CALL CONSTRUCTION INSPECTION SERVICES • Labor compliance • Correspondence Any outstanding items are noted such as a list of any areas missing information, need updating, or require special attention. Any new procedures, requirements, or standards that may need to be incorporated into the project are also discussed at this time. We have found performing these independent reviews and implementing these quality assurance and quality control procedures results in a quality project that meets all the requirements of the contract documents and efficient closeout of the project. The Resident Engineer will oversee the inspection of the project and ensure all work is being performed in accordance with the contract documents. ,�'�l�J%�//�1��%%/����/1rii� Cost and schedule control is an ongoing task throughout the life of the project. Schedule and costs will be carefully managed to contain expenditures within the project budget. MNS aggressively pursues cost savings measures and seeks to identify and implement cost reducing opportunities throughout the project. Cost and schedule often go hand -in -hand with one another. By keeping the schedule on track and minimizing delays will most certainly minimize extra costs to the project as well. Our overall approach to schedule and cost control is being proactive and looking ahead in lieu of reacting. Cost savings start with an experienced and knowledgeable construction managementteam that understands what is required to successfully construct a project. At MNS, we have seasoned construction engineers, managers, and inspectors with the ability to identify potential impacts to a project and identify cost savings ahead of time to minimize impacts and reduce overall project costs. A few methods to assist with increasing construction efficiency, adhering to the schedule, and minimizing costs include understanding and being familiar with the project, permits, and challenges prior to commencing the project: • Schedule review and maintenance • Anticipate potential areas/items that may cause time and cost impacts and address them early • Provide clear and simple procedures for addressing problems/ change • Track quantities and change order work • Clear communication with project stakeholders The project's document control system will track and monitor the actual construction costs on a project. The tracking of contract item payments and quantities is incorporated into the progress payment spreadsheet. Tracking of contract change order SECTION 4. PROJECT UNDERSTANDING AND APPROACH 14 payments, extra work, supplemental work, item overruns and underruns, and the impact of price index fluctuations will also be tracked. MNS will work closely with the City Project Manager, the design engineer, and the contractor to resolve all change orders and or disputes at the lowest level in an effort to minimize escalation of cost and schedule impacts to the project. It is our utmost priority to keep the City's projects moving forward and managed in every aspect at all times. All work will be scheduled with an adequate amount of time and MNS will have qualified staff readily available to work on projects in a timely manner as they are presented by the City. MNS will provide the schedule and budget in Microsoft Project and Excel formats compatible with the City's approved format. Agreemenj:,NQ,-,79W(ri.,I,�i r ON -CALL CONSTRUCTION INSPECTION SERVICES SECTION 4. PROJECT UNDERSTANDING AND APPROACH 15 Agreemen�,,No, �.,�799P, i I ON -CALL CONSTRUCTION INSPECTION SERVICES 2024 STANDARD SCHEDULE OF FEES Principal Engineer..................................$305 Lead Engineer............................................270 Supervising Engineer..............................255 Senior Project Engineer .........................235 Project Engineer,.._....,. ............ ...............210 Associate Engineer..................................190 Assistant Engineer....................................175 SURVEYING Principal Surveyor..................................$280 Lead Surveyor............................................270 Supervising Surveyor..............................230 Senior Project Surveyor .........................210 Project Surveyor........................................185 Associate Project Surveyor...................175 Assistant Project Surveyor....................160 Party Chief(PW)........................................190 Chainperson(PW)....................................160 One -Person Survey Crew (PW) ........... 225 TIECIIiII4IICAI.. Si.UIPIPOIR"II'" CADD Manager.......................................$210 Supervising Technician ..........................180 Senior Technician.....................................170 Engineering Technician .........................130 IPIRO IECT/IPROGRAM MA,INAGEIMEINT Principal -In -Charge ............................... $340 Senior Project/Program Manager......325 Project/Program Manager....................275 Assistant Project/Program Manager 255 Senior Project Coordinator ...................195 Project Coordinator.................................165 CONSTRUCTION MANAGEMENT Principal Construction Manager ...... $330 Senior Construction Manager.............290 Senior Resident Engineer ......................265 Resident Engineer....................................250 Structure Representative .......................245 Construction Manager ...........................230 Assistant Resident Engineer.................210 Sr. Construction Inspector (PW) ........185 Construction Inspector (PW) ..............177 Office Administrator................................135 Planning Director ...... .......................e.....$23.5 City Planner/Planning Manager.........220 Principal Planner.......................................205 Senior Planner...........................................190 Associate Planner.....................................160 Assistant Planner......................................135 Planning Technician................................115 ADIWUIIIIIII IS°IIR.AT'IIVIE SUPPORT Senior Management Analyst.............$195 Management Analyst..............................165 IT Technician...............................................150 Graphics/Visualization Specialist.......160 Administrative Assistant ........................105 GOVERNMENT SERVICES City Engineer ........................................... $265 Deputy City Engineer..............................235 Assistant City Engineer ...........................225 Plan Check Engineer................................185 Permit Engineer.........................................175 City Inspector.............................................168 Senior City Inspector (PW) ..................185 City Inspector(PW)..................................177 Principal Stormwater Specialist .......... 190 Senior Stormwater Specialist...............180 Stormwater Specialist.............................170 Stormwater Technician ..........................150 Building Official.........................................250 Senior Building Inspector ......................200 Building Inspector....................................175 Senior Grant Writer..................................190 Grant Writer................................................180 Associate Grant Writer ...........................160 Assistant Grant Writer ............................145 DIRECT EXPENSES Use of outside consultants as well as copies, blueprints, survey stakes, monuments, computer plots, telephone, travel (out of area) and all similar charges directly connected withthe work will be charged at cost plus fifteen percent (15%). Mileage will be charged at the current federal mileage reimbursement rate. PREVAILING WAGE RATES Rates shown with Prevailing Wage "(PW)" annotation are used for field work on projects subject to federal or state prevailing wage law and are subject to increases per DIR. ANNUAL ESCALATION Standard fee rates provided for each classification are subject to 5%annual escalation or the most recent US Bureau of Labor Statistics Consumer Price Index, whichever is higher. OVERTIME IME Overtime for non-exempt employees will be charged at 1.5 x hourly rate; overtime for exempt employees and other classifications will be charged at 1 x hourly rate. SECTION 6. FEE SCHEDULE AgreementiKo,o 17009', �_irji (') ON -CALL CONSTRUCTION INSPECTION SERVICES r Greg Chelini, PE Principal -in -Charge A-2 Robert Newman, PE, PLS Project Manager A-4 Michael McDonald, PE Resident Engineer/Construction Manager A-6 Taylor Merlo, PE Resident Engineer/Construction Manager A-8 Chris Cox Resident Engineer/Construction Manager A-10 Jason Mate, CPII Resident Engineer/Construction Manager A-12 Chris Cooper, CPII Construction Inspector A-14 Phil Lemmon, CPII Construction Inspector A-16 Ryan Newman, EIT Construction Inspector A-18 George Haines Construction Inspector A-19 Donny Spates Construction Inspector A-21 Dan Becker Construction Inspector A-23 Michael McFadden, EIT Construction Inspector A-25 John Stage Construction Inspector A-27 APPENDIX A. RESUMES _ A-1 �� 21_1'011t, Greg Chelini, PE Project Manager Firm • MNS Engineers, Inc. Areas of Expertise • Construction management and inspection • Transportation projects • Sewer and water projects • Constructability reviews • Contract administration • Public agency coordination • Caltrans procedures Years of Experience • 36 Licensing • Professional Civil Engineer, CA No. 48181 Certification • Confined Space Awareness Education • BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA Professional Development • Temporary Pedestrian Facilities, Caltrans Awards • 2016 APWA Ventura Transportation Project of the Year, US 101 HOV Lane Widening • 2016 APWA Central Coast Environmental Project of the Year, Nipomo Supplemental Water Projects • 2015 ACEC Engineering Excellence Award of Merit, Ranchero Road Interchange at Interstate 15 • 2014 APWA Project of the Year, Honorable Mention, Chapala Street Bridge replacement • 2014 APWA Project of the Year, San Jose Creek and Capacity Improvements and Fish Passage • 2013 ACEC Engineering Excellence Award of Merit, Pitkins Curve Bridge and Rock Shed at State Route 1 • 2013 TAMC Transportation Excellence Award, Rocky Creek Viaduct on State Route 1 • 2012 APWA Project of the Year, Honorable Mention, Ortega Street Bridge Replacement • 2010 APWA Project of the Year, Lewis Road (State Route 34) Grade Separation • 2010 APWA Project of the Year, 8th Street Pedestrian Bridge Replacement Agreement, p4a.7 gp(,UiI ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Chelini has over 33 years of construction management and project management experience working for public agencies. Prior to MNS, Greg worked 12 years for the California Department of Transportation (Caltrans). His extensive work experience makes him highly qualified for supervising staff on concurrent projects; administrating multiple projects; supporting field staff; providing project team quality control; applying value engineering concepts to projects; consulting with various project players to facilitate efficient job progress and maintaining project integrity; coordinating with public agencies; and maintaining project schedule and budget. His experience includes: Hollister Avenue Class I Bike Path and Pedestrian Improvements, City of Goleta, CA. Principal -in -Charge. This $5M project constructed a Class I bike/multi- purpose path along the south side of Hollister Avenue from Pacific Oaks Road to Ellwood Elementary School. This project consisted of over a mile of complete street improvements such as pavement rehabilitation, multimodal path construction, replacement of over a dozen curb ramps, drainage improvements, signaled intersection upgrades, parkway and median planter construction, and curb and gutter replacement. The pavement rehabilitation entailed removal and replacement of failing pavement sections, pavement leveling courses, pavement overlays, and micro surfacing placement. The project also incorporated a detailed landscape and recycled water irrigation plan, which enhanced the bikeway and pedestrian path. The construction team maintained access to adjacent businesses and provided safe pedestrian and bicycle passage through the project site. Proactive daily traffic control monitoring and coordination with the public also contributed to the success of the project. The multiple funding sources for this project included a $1.6M Active Transportation Program (ATP) grant for project construction, Measure A, and Goleta Transportation Impact Program funds. MNS utilized an in-house document control system to manage the project in accordance with City and Caltrans Local Assistance Procedure Manual (LAPM) guidelines. Lindero Canyon Road Bridge Improvements at US 101, City of Westlake Village, CA. Project Manager. The highly -traveled Lindero Canyon Road corridor is the gateway to the City; this $6.2M project modified the existing bridge over US 101. The project removed the existing center median; added a travel lane in each APPENDIX A. RESUMES A-2 barriers with aesthetic treatments; modified the northbound Lindero Canyon Road on -ramp median; and improved related grading, drainage, utility and traffic signals. Responsibilities included overseeing project management with a particular focus on budget, schedule, and technical oversight; supporting the Resident Engineer in implementing the management plan; serving as the City's point -of -contact for the consultant contract and overall construction management services provided per the contract; and providing technical items for bridge construction, such as falsework and shoring review. ARRA-Funded Pavement Rehabilitation, City of Carpinteria, CA. Principal -in -Charge. This $1.3M pavement rehabilitation project repaired the existing asphalt by removing failed pavement areas. This process involved grinding the asphalt to assorted depths and replacing with a deep -lift of asphalt. This project installed 1,600 linear feet of AC dike and raised over 60 manholes, valves, and sewer cleanouts to finished grade. Village at the Park Sports Complex, Pleasant Valley Recreation and Park District, CA. Principal -in -Charge. This $12M, 55-acre sports complex at the Village of the Park residential community featured three softball fields, over 25 acres of soccer fields, three recreational -use buildings plus office facilities, a perimeter parking lot, concrete and granite walkways and paths, landscaping and irrigation, and extensive lighting for the fields and pedestrian walkways. Particular challenges for this project were staying within budget when faced with in- field changes and inadequate existing site conditions. MNS worked closely with the District and contractor to implement solutions on a daily basis to adhere to the budget such as reducing landscape overplanting and providing efficiency modifications to the irrigation plan. This project received the 2009 APWA Project of the Year from the Ventura County Chapter. Supplemental Water Project, Nipomo Community Services District, CA. Project Manager. This $16M supplemental water project involved three separate construction contracts: • Horizontal Directional Drilling (HDD) of 2,600 feet of 30-inch HDPE pipe under the Santa Maria River; 24- inch DIP; and jack and bore. • Blosser Road Waterline includes 5,000 feet of 18- inch pipeline and 270 feet of 36-inch jack and bore under the Santa Maria levee. • New Pump Station construction includes a booster pump station; electrical system (including portable backup generator); water chloramination system and appurtenances; approximately 1,720 linear feet of all - Agreement,No. 7.909 ON -CALL CONSTRUCTION INSPECTION SERVICES Greg Chelini, PE I RESUME PG 2 linear feet of 24-inch ductile iron pipe; pressure reducing station; and chloramination systems at four separate existing water wells in Nipomo. An 18-inch pipeline extension will be constructed along Blosser Road to the Santa Maria Levee. At this juncture, the pipeline will transition to a 24-inch horizontal directional drilled pipeline across the river; the 24- inch line will be constructed from the river basin up the bluffs south of the river, connecting to a 0.5- million-gallon storage reservoir. The pumping plant consists of a reinforced concrete structure founded on driven pile foundation. The project is constructed within a highly sensitive environmental habitat and requires extensive coordination with permitting agencies. Phase 1 Wastewater Treatment Plant Upgrade, Laguna County Sanitation District, CA. Principal -In - Charge. This $53M wastewater treatment plant upgrade and expansion project will replace the existing headworks; replace the existing clarifiers and trickling filter with an aeration basin/mixed liquor splitter box; repurpose existing settling ponds; construct new stormwater capture facilities; repurpose and convert the existing south primary clarifier for the use of a break tank; modify the existing sludge collection and digester process; expand the in-house recycled water system; install a new 800 kw generator; and construct a new building to house a new laboratory, offices, locker room, control room, and mechanical/server rooms. MNS is providing Construction Management and Inspection. Cabrillo Boulevard Bridge Replacement, City of Santa Barbara, CA. Principal -in -Charge. As part of the Lower Mission Creek Flood Control project, this $14M bridge was constructed at Cabrillo Boulevard and State Street in one of the most tourist -frequented areas in downtown Santa Barbara. This project replaced the existing bridge with a widened and longer bridge spanning Mission Creek, a highly environmentally - sensitive lagoon and estuary. One of the goals of this project was to preserve the architectural integrity of this historic bridge. The existing four -lane bridge, sidewalks, and bike path were replaced with a four -lane pre- stressed/pre-cast (PS/PC) slab bridge with sidewalks, decorative rail and lighting. The bridge was founded on special Tubex Piles as well as cast -in -drill -hole (CIDH) pile extensions with drop caps at the pier bents. This project was constructed in several stages to accommodate the high level of traffic. APPENDIX A. RESUMES A-3 Robert Newman, PE, PLS Project Manager Firm • MNS Engineers, Inc. Areas of Expertise • Construction management and inspection • Transportation, sewer, and water projects • Constructability reviews • Contract administration • Public agency coordination • Caltrans procedures Years of Experience • 44 Licensing • Professional Civil Engineer, CA No. 51733 • Professional Land Surveyor, CA No. 6696 Education • Graduate Studies in Public Administration, California State Northridge University, Northridge, CA • BS, Civil Engineer, California State Polytechnic University, Pomona, CA Affiliation(s) • State Transportation Cooperative Committee and State Highway Bridge Program Committee (League Appointments), Various Committee Positions • American Public Works Association, Southern California Chapter, President Elect • Los Angeles Metro Technical Advisory Committee (COG appointment), former member • League of Cities Policy Committees —Revenue and Tax, Community Services, former member • League of Cities, Public Works Officers Department, President (2012) • American Public Works Association, High Desert Branch, Past President (2009 and 2010) • Los Angeles City County Engineers Association, Past President (2002) • Santa Clarita Valley School Business Alliance, Former Board Member Award(s) • APWA Top Ten Leader National Public Works • James L Martin Award —Cal Cities • APWA Southern California Leader of the Year Award Agreement N9(11N0909 dYi,.:r ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Newman has over 44 years of experience in transportation, water/wastewater improvement, and development projects. Prior to joining MNS, Robert served as the Public Works Director for the City of Santa Clarita. He managed six divisions in the department (Building and Safety, Capital Improvement Projects, Engineering Services, Environmental Services, General Services, and Traffic and Transportation Planning) with a full-time staff of 145, an operating budget of $26M, and a capital budget of $50M. Robert's total capital improvement program oversights totaled over $1 B in improvements. He served an integral role in resolving Santa Clarita Valley Chloride compliance issues, working with council members and board members, water agencies, sanitation districts, and other project stakeholders to provide guidance, and expertise in a complex total maximum daily load (TMDL) regulatory matter. The program included efforts to protect the Santa Clarita Valley's critical water supply issues including the potential for future reclaimed water in partnership with the city and the sanitation district. Robert offers a progressive leadership style; coaching and mentoring skills; effective communicator on all levels, team building, large budget development and management; and supervisory skills including effective hiring, discipline, training, and performing multiple complex administrative tasks. His experience includes: Canyon Country Community Center Stormwater Improvements and Roadway Widening and Pedestrian Access, CA. Public Works Director Overseeing the Capital Improvement Program. This $3M project widened the Sierra Highway in coordination with a $67M new community center. While with the City of Santa Clarita, Robert served as the Public Works Director and worked with City staff and provided project oversight during the implementation of the project, from initial concepts through design, bidding, and construction of the project. The project is located at the intersection of two major roadways in the City with traffic volumes over 40,000 average daily traffic (ADT). The scope included utility relocations, property acquisition, street light installation, roadway widening, and traffic signal modifications. The project also included roadway widening, Class 2 bike lane, pedestrian sidewalk, streetlights, paving, landscaping of new median and parkway, signal modification, and overlay. As part of the overall project development, Robert led the efforts in the construction of a major regional storm drain and stormwater infiltration system, in partnership with the Los Angeles County Flood Control District. APPENDIX A. RESUMES A-4 Citywide Stormwater Project Oversight, City of Santa Clarita, CA. Public Works Director Overseeing the Capital Improvement Program. Robert provided oversight of regional board permitting through project conditioning, design, construction, and system maintenance. As the Public Works Director, Robert was involved with over 100 municipal and private development projects. Enhanced Watershed Management Plan (EWMP), City of Santa Clarita, CA. Public Works Director Overseeing the Capital Improvement Program. The EWMP allows collaboration among agencies on multibenefit regional projects to retain both non-stormwater and stormwater runoff, as well as to facilitate flood control and increase water supply. Nearly 90% of the watershed is open space with approximately 88% being undeveloped land and contains one of the last remaining national rivers in Southern California. The Upper Santa Clara River watershed (USCRW) presented unique challenges for maintaining the balance of population growth, conversation of endangered species habitat, floodplain management, water supply, and wildlife corridors that depend on the Santa Clara River and its floodplain. The EWMP was developed to protect the beneficial uses of the USCRW receiving waters while recognizing these unique characteristics. In this multiagency collaboration, as the City of Santa Clarita's Public Works Director, Robert provided oversight in the cities involvement in the Integrated Regional Water Management (IRWM) process, consisting of members of the RWMG as well as an extensive mix of many other agencies and organizations with an interest in improving water supply, water quality, flood management, and ecosystems in the region. Stakeholder agencies included Castaic Lake Water Agency (CLWA), City of Santa Clarita, Los Angeles County Flood Control District, Newhall County Water District (NCWD), Rivers and Mountains Conservancy (RMC), Santa Clarita Water Division of CLWA (SCWD), and Santa Clarita Valley Sanitation District of Los Angeles County (SCVSD). Specific efforts included direct emails, mailings, face to face interaction, event participation, classroom instruction, flyers, notices, surveys, and presentations were performed to get environmental groups, conservancy groups, well owner groups, disadvantaged communities (DACs), water suppliers, municipalities, the local sanitation and flood control districts, American Indian Tribes, developers, landowners, adjacent IRWMP areas, state agencies, elected representatives, and others to take part in the IRWMP. Involved specific roles and responsibilities. Robert Newman represented the City of Santa Clarita, a municipal government providing open space and land use planning as well as stormwater management, water Agreement No.) 7009(,uiii ON -CALL CONSTRUCTION INSPECTION SERVICES Robert Newman, PE I RESUME PG 2 conservation efforts on City owned properties, and creek restoration within City borders. Cross Valley Connector Construction, City of Santa Clarita, CA. Multi -Project Program Manager. This $245M multi -phase general plan consists of a complex 8.5-mile construction effort for a major roadway linking State Route 14 and Interstate 5. Robert successfully managed the project and collaborated with over 100 project stakeholders and with multiple funding sources in 11 construction phases, each with unique challenges and constraints. Annual Overlay and Slurry Seal Program, City of Santa Clarita, CA. Public Works Director Overseeing the Capital Improvement Program. This $13M pavement preservation project involved roadway improvements ranging from major arterials with traffic volumes exceeding 40,000 average daily traffic (ADT) to residential streets. Robert worked with City staff and provided oversight during the implementation of the project, from street selection based upon five-year - master plan, through preliminary design, engineering, traffic striping plan development, bidding, and construction. Funding for the project included STPL, Los Angeles Metro Measure M, State SB-1, TDA Article 8. City Wide Guardrail Improvements—HSIP, CA. Public Works Director Overseeing the Capital Improvement Program. This $1.1 M citywide guard rail improvement project replaced end attenuation and filling gaps, where needed. Robert worked with city staff and provided project oversight during the implementation of the project, from initial concepts through design, and bidding. The initial bids for the project came in over the project budget so the project was rescoped to ensure the project could be delivered within budget. The guardrail and roadway safety improvement project were performed and consistent with the Caltrans awarded Highway Safety Improvement Program (HSIP) grant funds. APPENDIX A. RESUMES A-5 Michael McDonald, PE Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Municipal engineering • Transportation projects • Bridge design • Roadway/pavement design and construction • Drainage systems • Erosion control and sediment management • Slope stability design, mitigation, failure analysis • Grading design • Geological investigations • Project management Years of Experience • 36 Licensing • Professional Civil Engineer, CA No. 45963 APPENDIX A. RESUMES Agreement,i� .L)o ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. McDonald has over 36 years of engineering experience in the industries of civil, environmental, geotechnical, and geological engineering industries. Michael's extensive multi -disciplinary experience has benefited the various transportation projects he has worked on throughout his career. His experience includes design and construction of roadway and pavement, bridges, drainage systems, slope stability, grading, and erosion control and sediment management. Michael is a hand -on engineer and excels in project management where he has managed up to 40 team members. He has managed a wide range of projects from small to large multimillion -dollar, multiyear projects. Michael prides himself with the ability to find cost effective and environmentally sound solutions while conducted at the highest level of safety. His experience includes: Roadways/Bridges Michael has extensive experience in the design of roadways such as residential streets, state and federal highways, bridges, bike paths, and parking lots/areas for shopping centers. Responsibilities included: • Designing, implementing, and providing construction oversight of flexible pavement sections for all types of applications. • Designing pavement sections ranging from bike paths to heavy truck/bus loads. • Evaluating and mitigating miles of distressed pavements. Proficient at identifying causes of pavement failures. • Conducting numerous subsurface investigations to evaluate soil parameters for pavement, bridge, and overpass designs. Grading Design/Grading Projects He has prepared numerous grading plans as a staff engineer and project civil-geotechnical engineer. The largest project he worked on was directly involved with was the FoothiIWVhiking Ranch project in South Grange County. Responsibilities included conducting preliminary investigations; preparing cut -fill sheets; overseeing the selection of the laboratory analysis of the soil samples; and preparing designs, and compaction and final geotechnical reports. Geological Investigations Michel has drilled and logged many thousands of soil borings for geotechnical or environmental applications throughout southern California. A-6 Drainage Systems Michael has extensive experience with designing and inspecting drainage systems for various applications: • Serving as Design Engineer on several large residential tracts of land (400+ homes), which involved developing temporary and permanent drainage systems such as above drainage conveyances and below ground pipelines, culverts, and channels. • Conducting oversight and inspection of many miles of pipeline installation. • Designing a diversion pipeline and associated structures to divert water from the landfill at Vandenberg Air Force Base (VAFB). • Providing an engineering evaluation of the entire water/ fire suppression system at VAFB. Erosion Control and Sediment Management Notable experience included a major culvert redesign to divert water from the World War I I (WWII) landfill. The drainage channel eroded into a VAFB WWII landfill containing sensitive and potentially dangerous unexploded ordnance (UXO). Slope Stability Design/Mitigation/Failure Analysis He has extensive experience with slope stability design, mitigation, and failure analysis. Responsibilities included: • Designing and providing oversight inspection for new slope construction. • Conducting forensic investigation and analyzing slope failures. • Designing with geotextiles to augment reinforcement of slopes. • Selective grading of native materials for construction of berms, dams, and buttresses, each necessitated slope stability analysis. Agreement Np(.,i7,QQ,9�JP D,;) ON -CALL CONSTRUCTION INSPECTION SERVICES Michael McDonald, PE I RESUME PG 2 Project Management Michael has worked with numerous clients ranging from public agencies to military installations. Project management highlights include: • Serving as Principal Engineer for Montgomery Watson Harza (MWH), he managed multimillion - dollar projects for VAFB for over eight years. Projects involved remedial investigation and mitigation of impacted soil and groundwater; the bulk of the remedial efforts included either removal of thousands of cubic yards of impacted soil or in -situ soil and groundwater treatment. • Serving as Engineer of Record for all MWH activities at VAFB including developing cost estimates, preparing proposals, negotiating contracts with the client and contractors, and final reporting preparation. • Serving as Project Manager, he was responsible for budget tracking, cost controls, and approving contractor payments. Additional tasks included tracking all aspects of the project to completion which involved overseeing implementation, inspection, and final compliance reporting; and served as the final review and licensed signatory engineer for all reports. • Preparing cost-effective work plans and budgets. • Supervising technical and professional staff (up to 40 staff). • Utilizing Primavera software to develop costs, track budgets, schedules, and prepare invoicing. • Participating in quarterly presentations to the Air force and Community Advisory Board (CAB). Notable experience included serving as Project Manager/Lead Project Engineer for the VAFB Underground Storage Tank (UST) program which had over 200 sites. APPENDIX A. RESUMES A-7 ' Taylor Merlo, PE Resident Engineer/Construction Manager Firm • MNS Engineers, Inc. Areas of Expertise • Roadway improvements design • Water resources design • Pavement rehabilitation • Construction inspection (bridges, roadways, and water resources projects) Years of Experience • 11 Licensing • Professional Civil Engineer, CA No. 87349 Certifications • 10-hour Construction Safety, Cal/OSHA • Concrete Field -Testing Technician, Grade 1, ACI No. 01380996 • Confined Space Awareness • Defensive Driving • CPR and First Aid Education • BS, Civil Engineering, University of Southern California, CA Professional Development • Caltrans Resident Engineer Academy • Stormwater Pollution Prevention Plan (SWPPP) training Award • 2016 APWA Central Coast Environmental Project of the Year, Nipomo Supplemental Water Project Agreement, Np .J7r9p9(,, w 1 ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Merlo has worked on a variety of transportation and water -related providing onsite inspection and coordination for roadway, bridge, and utility projects. He is familiar with Caltrans methods and procedures as well as coordinating with multiple agencies and utilities. His experience includes: State Route 246 Passing Lane and Operational Improvements, Caltrans District 5, Lompoc, CA Assistant Resident Engineer. This $18M highway improvement project was constructed in multiple stages and involved widening over four miles of highway including construction of new passing lanes and raising the profile over eight feet in some areas to improve sight distance. The project included over 250,000 cubic yards of roadway excavation; over 63,000 tons of hot mix asphalt (HMA) paving; 15,000 feet of HMA dike, 18- to 60-inch drainage pipe; reinforced concrete box culverts; rock slope protection (RSP); Midwest guardrail system; and traffic control. Also included in the project was the installation of two 84-inch culverts under the highway to serve as wildlife crossings. The project required coordination with adjacent property owners to maintain access, close adherence to permit requirements, coordination with materials technicians and surveyors. Responsibilities included daily inspection and documentation, preparing monthly estimates, submittal review, and checking grades. State Route 154 Rehabilitation and Overlay, Caltrans District 5, Santa Ynez, CA. Assistant Resident Engineer. This $12M Caltrans pavement rehabilitation project involved inertial profile grinding and paving of over 12 miles of highway. Construction elements included placement of 59,000 tons of rubberized hot mix asphalt (RHMA); placement of 80,000 feet of hot mix asphalt (HMA) dike; over 14,000 feet of Midwest guardrail system; concrete barrier rail transitions; striping; and extensive Stormwater Pollution Prevention Plan (SWPPP) and final best management practice (BMP) considerations. Taylor worked for both Structures and District Construction as part of the Caltrans on -call contract. Responsibilities included daily inspection and documentation, monitoring traffic control, preparing monthly estimates, submittal review, tracking extra work, and checking grades. Decision Point Documents for South Coast US 101 High Occupancy Vehicle (HOV) and Rehabilitation Project, Santa Barbara County Association of Governments (SBCAG), CA. Assistant Engineer. This APPENDIX A. RESUMES A-8 l Agreement o;,7QQ9( ljl,u ON -CALL CONSTRUCTION INSPECTION SERVICES project provides highway, roadway, structural engineering and design services to develop 35% plans for the northern segment of the South Coast 101 HOV Lanes Project and South Coast 101 Rehabilitation Project in southern Santa Barbara County. This segment of the US 101 begins north of the Padaro Lane Interchange in Summerland and extends to south of Sycamore Creek in the City of Santa Barbara. Overall, the US 101 HOV Lane Widening project will widen the US 101 by adding two lanes. This project is crucial in the overall widening project, for SBCAG and Caltrans to develop a comprehensive strategy to efficiently rehabilitate the existing four lanes. MNS is providing engineering services for two miles of freeway geometric design; overall roadway drainage design; and overall utility coordination. Responsibilities include modeling US 101 mainline and ramp corridors; geometric design of US 101 mainline and ramps, including profile, super elevation, and alignments; utility coordination and verification; preparing pothole plans; preparing alternative analysis of US 101 mainline and ramp alignments as well as truck turning analysis for ramp intersections. Supplemental Water Projects, Nipomo Community Services District, CA. Construction Inspector. This $17M supplemental water project involved three separate construction contracts: horizontal directional drilling (HDD) under the Santa Maria River; Blosser Road waterline and road improvements; and new pump station construction. The project also involved converting five existing wells to the chloramine disinfection process to coincide with the City of Santa Maria's process. A one - mile, 24-inch pipeline extension was constructed along Blosser Road to the Santa Maria River Levee, where it was bored and jacked under the levee. The pipe then transitioned to a 30-inch high -density polyethylene (HDPE) pipe, which was installed 100 feet under the riverbed by horizontal directional drilling (HDD). The HDD daylights on the bluff 120 feet above the riverbed where it connected to the newly constructed pump station. The new pump station construction included a booster pump station; electrical system (including portable backup generator); water chloramination system and appurtenances; approximately 1,720 linear feet of all- weather access road to the pump station site; and 1,750 linear feet of 24-inch ductile iron pipe. The project was constructed within highly sensitive environmental habitat, which required extensive surveying and coordination with permitting agencies as well and the surrounding farmland owners. MNS provided construction management and inspection. Responsibilities included inspecting all aspects of the pipeline —shoring for open cut sections, jack -and -bore, and concrete inspection of thrust blocks. Taylor also provided daily inspection and Taylor Merlo, PE I RESUME PG 2 documentation; prepared monthly estimates, concrete sampling, submittal reviews; coordinated materials testing; and checked grades. Goleta Drainage Improvements at US 101, Caltrans District 5, CA. Assistant Resident Engineer. This $16.6M project replaced the existing box culvert structures along rivers at US 101. This project was multi - staged over two seasons to accommodate traffic on US 101. The new bridge structure involved driven pile, cast - in -place deck slab, shoring and falsework, and environmental considerations for working within the two rivers. Responsibilities included inspecting all aspects of the bridge construction from falsework and shoring erection; pile driving; and pouring of abutments and deck slab; monthly quantity estimates and calculations; daily diaries; checking grades; change order tracking; and material verification in accordance with the Caltrans Construction Manual. Los Carneros Road Overhead Bridge Replacement at US 101, City of Goleta, CA. Construction Inspector/Construction Office Engineer. This $6.3M project involved removing and replacing the existing bridge over the Union Pacific Railroad (UPRR) tracks and reconstructing the roadway approaches. This project was multi -staged to accommodate traffic across the bridge throughout construction. The work within the UPRR and Caltrans right-of-way required close coordination with the railroad and Caltrans throughout construction. This project included shoring and falsework, pre -cast girders, lightweight expanded polystyrene backfill, metal beam guard rail (MBGR), hot mix asphalt (HMA) paving, drainage, and traffic control. Responsibilities included daily inspection, daily reports, document control, tracking item quantities and extra work. Black Road Bridge Replacement, Santa Maria, CA. Construction Inspector. This $2M bridge replacement project is located on Black Road in Santa Maria, CA. Construction elements involved a post -tensioned box girder bridge including the erection of falsework and shoring; 42-inch cast -in -drilled -hole (CIDH) piles in wet holes; steel frame tubular railing; and retaining walls. The bridge spanned over an environmentally sensitive creek, which required constant coordination and communication with an onsite biologist. Also included in the project was the installation of two 48-inch culverts within the roadway to serve as Tiger Salamander crossings for the environmentally sensitive area adjacent to the road. Responsibilities included inspecting all aspects of construction such as excavation in creek; driving and pouring of CIDH piles and abutment seats to falsework erection; pouring of stem and soffit and bridge deck; and post -tensioning, drainage, metal beam guard rail (MBGR). APPENDIX A. RESUMES A-9 Chris Cox Senior Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Permitting • Active Transportation Program • Capital improvements • Wastewater sewer interceptors • Repair procedures • Building codes • Contract administration • Proposition funding Years of Experience • 34 Certifications • ICC Structural Concrete • ICC Structural Masonry • ICC Structural Steel and Welding • 10- and 30-hour Outreach Trainer Certified, Cal/OSHA • First Aid and CPR Education • Coursework, OSHA Outreach Training, California State University, Dominquez Hills, CA Affiliations • Mayor's Executive Steering Committee, Lucas Museum for Narrative Art Accomplishments and Awards • Letter of Commendation, Lead Inspector for Los Angeles City Hall Seismic Rehabilitation Project • Career Service Award, Lead Inspector for the Northeast Interceptor Sewer Project • Letter of Commendation, Inspection Supervisor of Hollenbeck, Rampart, Olympic, and Harbor Police Stations Agreement;iNq.), 7-91)9cu.ir,ji7 ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Cox has over 34 years of construction inspection and management experience with the City of Los Angeles on a variety of public works projects including Metropolitan Transportation Authority (MTA) transit, wastewater interceptor sewer, Capital Improvement, and Active Transportation (ATP) projects. Chris is a detail -oriented construction inspector with proven expertise in managing a construction inspection crew and providing structural reviews to successfully deliver projects in accordance to plan requirements. He is known for being decisive in identifying and mitigating construction challenges. Chris has expertise in plan review and correction, technical reviews, report generation, safety awareness, permitting, repair procedures, and building codes. His experience includes: Valley Center Well PFAS Groundwater Treatment Improvements, Santa Clarita Valley Water Agency, Santa Clarita, CA. Senior Construction Inspector. The Santa Clarita Valley Water Agency (SCVWA) is constructing per- and polyfluoroalkyl substances (PFAS) treatment improvements for the Valley Center Well that has a capacity of 1,200 gallons -per -minute (GPM). The well has been offline due to PFAS contaminants being detected above the recommended levels. The $3.1 M project will treat PFAS groundwater contaminants and restore well pumping capacity back to normal levels. (10/2021 to current) Various Projects, City of Los Angeles, CA. Principal Construction Inspector. Chris supervised approximately 25 Construction Inspectors and was responsible for the contract administration of numerous Public Works projects. He was responsible for all Los Angeles County Metropolitan Transportation Authority (MTA) projects in the public right-of-way, Capital Improvement Projects in downtown Los Angeles, and various permit inspections in the Los Angeles Civic Center area. Additionally, he was a member of the Mayor's Steering Committee for the expenditure of proposition funding for MTA projects and for the Lucas Museum for Narrative Art. (10/1989- 12/2020) Crenshaw/LAX Transit Corridor Project, Los Angeles County Metropolitan Transportation Authority (MTA), CA. Principal Construction Inspector. This project extends the light rail transit service from the existing Metro E Line (Expo) at Crenshaw and Exposition Boulevards in Los Angeles and merges with Metro C Line (Green) at the Aviation/LAX Station on Aviation Boulevard and Interstate 105 in the City of El Segundo. APPENDIX A. RESUMES A-10 The line will travel 8.5 miles and serve the Cities of Los Angeles, Inglewood, and El Segundo. Once in operation, this line will offer additional transportation options to congested roadways and provide significant environmental benefits, economic development, and employment opportunities throughout Los Angeles County. Riders will have easier connections within the Metro Rail system, municipal bus lines, and other regional transportation services. The project includes the Southwestern Yard Maintenance Facility, a facility with the capacity to service and store up to 70 light -rail vehicles (LRV). This facility will serve the new Crenshaw/LAX Project and the existing Metro C Line (Green), housing general administration, and operation and support services. The facility will be equipped to perform inspections, body and heavy repairs, and cleaning and washing of Metro's growing LRV fleet. Metro is also constructing a transit station that will connect LAX to the regional rail system. The Airport Metro Connector (AMC) transit station at Aviation BI and 96th Street will provide a direct connection to LAX's future Automated People Mover (APM). The Crenshaw/LAX Transit Project will serve the Crenshaw District, Inglewood, Westchester, and surrounding areas with eight new stations: Expo/Crenshaw, Martin Luther King Jr., Leimert Park, Hyde Park, Fairview Heights, Downtown Inglewood, Westchester/Veterans, and Aviation/Century. The project began construction in 2014 and anticipates completion in 2021. The Crenshaw/LAX Project is one of 12 transit projects funded by Measure R, the half -cent sales tax approved by Los Angeles County voters in 2008. Responsibilities included quality assurance for approximately $250M in advance utility relocation such as the Los Angeles Department of Water and Power (DWP) water and power utilities, storm drains, streetlights, street signal, sanitary sewer, and communication conduit and conductors. Surface responsibilities included quality assurance inspection, survey and grade control, and material verification for the replacement of two miles of new curb and gutter, sidewalk, concrete pavement, drainage, landscaping, and several new bus pads and catch basins. (10/2016- 12/2020) Regional Connector Transit Project, Metro, Los Angeles, CA. Principal Construction Inspector. The $225M Metro Regional Connector Project extends from the Metro Gold Line Little Tokyo/Arts District Station to the 7th Street/Metro Center Station in downtown Los Angeles, allowing passengers to transfer to Blue, Expo, Red and Purple Lines, bypassing Union Station. The 1.9- mile alignment will serve Little Tokyo, the Arts District, Civic Center, The Historic Core, Broadway, Grand Avenue, Bunker Hill, Flower Street, and the Financial District. This new Metro Rail extension will also provide a Agreement;il ,aiTQ au� �t ON -CALL CONSTRUCTION INSPECTION SERVICES Chris Cox I RESUME PG 2 one -seat ride for travel across Los Angeles County. From the Metro Gold Line, passengers will be able to travel from Azusa to Long Beach and from East Los Angeles to Santa Monica without transferring lines. The Regional Connector will improve access to both local and regional destinations by providing continuous through service between these lines and providing connectors to other rail lines via the 7th Street/Metro Center Station. The new Metro Rail extension will offer an alternative transportation option to congested roadways and provide significant environmental benefits, economic development, and employment opportunities throughout Los Angeles County. Responsibilities included quality assurance for approximately $400M advanced utility relocation in the Los Angeles area of Little Tokyo to Flower Street and Seventh Street. Additional duties included quality assurance of shoring and support of excavation systems (SOE), coordination with the Los Angeles Department of Water and Power (DWP), Bureau Sanitation, DOT, and other agencies to ensure utilities are either properly relocated or protected in place, daily reports, grade control and field survey, submittal review, tracking quantities. (12/2016-12/2020) Advance Utility Relocation Projects, Metro, Los Angeles, CA. Principal Construction Inspector. Chris oversaw advanced utility relocation of several multibillion projects including the Crenshaw/LAX Transit Corridor Project. Regional Connector, Purple Line Extension (Sections 1, 2„ and 3), and Orange Line Extension. Responsibilities included supervision and inspection of utility relocation of all utilities in the public right-of-way including installation of ground monitoring equipment, relocation of wastewater lines from 6 to 92 inches, relocation of water service utilities from 6 inches to 2 feet, relocation of all other utilities for 7 MTA underground station boxes (each approximately 1,000 feet long), and traffic control plans and surface restoration. Purple Line Extension, Sections 1,2. and 3, Metro, Los Angeles, CA. Principal Construction Inspector. One of Metro's priority projects, the Purple Line Extension is a critically important rail project that provided a high - capacity, high-speed, and dependable alternative for commuters to travel between downtown Los Angeles, the Miracle Mile, Beverly Hills, and Westwood. From the current terminus at Wilshire/Western, the Purple Line Extension extends westward for about nine miles and adds seven new stations providing easy access to the Westside, our region's second-largest job center. The project is being built in three sections. The first section between Wilshire/Western and Wilshire/La Cienega is now under construction and is scheduled for completion in 2023. APPENDIX A. RESUMES A-11 Jason Mate, CCM, CPII Resident Engineer/Construction Manager Firm • MNS Engineers, Inc. Areas of Expertise • Water/wastewater projects • Roadways • Project management Years of Experience • 17 Certifications • Certified Construction Manager, CMAA • Certified Public Infrastructure Inspector, APWA • Concrete Field Testing Technician, ACI Grade 1 • 10-hour Construction Safety, Cal/OSHA Education • BEng, Environmental Engineering, minor in Civil Engineering (Honors), Griffith University, Queensland, Australia Professional Development • Stormwater Pollution Prevention Plan (SWPPP) training Agreement,N,9/-J,7ggq ,Ii�,���, ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Mate has over 17 years of experience in environmental and civil engineering. Jason's roles have ranged from project engineer, resident engineer, to project manager for several large-scale projects involving water/wastewater resources, transportation, and solar energy. His experience includes: New Turn -Out Structures at the San Gabriel River Coastal Basin Spreading Ground, Water Replenishment District of Southern California, CA. Construction Manager. This project constructed two new turn -out structures and associated discharge structures at the San Gabriel River Coastal Basin Spreading Grounds, which will provide needed operational flexibility for the spreading of an additional 11,000 acre-feet per year (AFY) of tertiary recycled water and 10,000 AFY of advanced treated recycled water. Additional work included shotcrete lining of an existing approximately 6,400-linear-foot distribution channel and the installation of new 66-inch pipelines approximately 500 linear feet along with electrical and instrumentation and control systems. North Pleasant Valley Groundwater Desalter Project, City of Camarillo, CA. Resident Project Representative. This $35M facility will process approximately 4,500 acre- feet per year of groundwater, producing about 3,800 acre-feet of drinking water per year. The resulting brine waste of approximately 700 acre-feet per year will be discharged to the Calleguas Regional SMP, Phase 2C. The SMP conveys brine waste to the Pacific Ocean. The North Pleasant Valley Desalter project site is located within the 4.7-acre treatment plant and will treat brackish groundwater for use as potable water. This project includes construction of a new Administration building housing an emergency generator, green sand filtration system, a reverse osmosis treatment system, storage tanks, and other operating facilities; a new perimeter wall, gates, access driveway, and related site improvements: large diameter pipelines to connect Wells A and B to the treatment site; drilling of a new well; pipelines to connect the discharge from the facility to the City's existing water system; a discharge brine line from the facility to the Regional Salinity Management pipeline, - wash -water solids settling system and connection to the local sewer, El Estero Wastewater Treatment Plant Tertiary Filter Replacement, City of Santa Barbara, CA. Assistant Resident Engineer. This $8.4M project replaced the treatment plant's existing filtration system with a APPENDIX A. RESUMES A-12 microfiltration (MF)/ultrafiltration (UF) facility. Work included demolition of an existing gravity filter, installation of driven concrete piles, construction of a new MF/UF facility, new filter feed pumps, replacement of chemical feed pumps, modifications to the chlorine contact basin, modifications to the reclaimed water storage reservoir, new reclaimed water transfer pumps, yard piping modifications, associated electrical and instrumentation modifications, and other appurtenant work. Owner's Agent/Owner's Engineer (OA/OE) Services for the Groundwater Reliability Improvement Program (GRIP), Water Replenishment District of Southern California (WRD), CA. Construction Manager. WRD established the GRIP to find alternative sources of water to offset the imported water used for replenishment in the Montebello Forebay. As part of the GRIP, an advanced water treatment facility (AWTF) is being designed and constructed to treat 10,000-acre-feet per year of tertiary recycled water. The GRIP AWTF is located in a 5.2-acre lot, adjacent to the San Gabriel River in the City of Pico Rivera. Treatment processes include automatic strainer to protect downstream membrane treatments systems from large particles; microfiltration (MF) or ultrafiltration (UF) to reduce turbidity and silt density index (SDI) of reverse osmosis (RO) feed water; cartridge filtration to project downstream of the RO process; RO to remove salts, minerals, metal ions, organic compounds, and microorganisms; advanced oxidation with utraviolet light (UV) treatment using hydrogen peroxide in concert with UV to reduce N-Nitroso-Dimethylamine (NDMA) concentrations and provide additional disinfection, decarbonation to release excess carbon dioxide and stabilize the product water; and pH adjustment/corrosivity stabilization. The 11,700-square-foot treatment facility is LEED certified with approximately 40,000 square feet of additional surface landscape and bioretention, 4,000 square feet of vegetated roof garden, with 79,000 square feet of surface parking and pedestrian hardscape. Government Wastewater Treatment Plant (WWTP) Upgrade (ICI), Ontario, Canada. Project Superintendent/Engineer. This $15M project constructed a new state-of-the-art polymer distribution system for sludge discharge, a new oil handling facility, civil cut/fill operation for new roads and access paths, retrofit of entire WWTP facility including a four-story demolition and reinstallation of concrete slabs and office layout. Project management responsibilities included conformance to stringent government specifications, requests for information (RFIs), monthly draws, cost estimating, close-out reports, document control, weekly contract negotiations and bid approval, quality assurance/quality control (QA/QC) inspections, project scheduling and Agreemen�,No�)i79Q?,,,, ON -CALL CONSTRUCTION INSPECTION SERVICES Jason Mate, CCM, CPII I RESUME PG 2 update (250-line CPM schedule), four -week -look -ahead schedule, operations and maintenance (O&M) manuals, as -built markups, cost and budget management, and weekly client meetings. Project completed successfully on time and within budget; 10% extra work was granted with full use of contingency. The project resulted in a $500K/year savings for client and plant capacity increased from 17M to 22M liters per day. Utility Scale Solar Farm (30 megawatts) for FIT program with LEED Certification, Ontario, Canada. Assistant Project Manager/Project Engineer: This $135M project required CAD layout and pre -side inspection of three utility scale solar farms with road access, module layout, structural footings, cultural excursion zones, racking supports, inverter, structural pads, substation, and interconnection point. Responsibilities included managing the principal contractor (PCL Constructors and RES USA), contract compliance, scheduling milestone and phase construction, problem solving design discrepancies onsite, extra work approvals, and quality assurance/quality control (QA/QC) inspections with 200 manpower onsite daily. Project management tasks included weekly and monthly reporting; monthly draws and cost; requests for information (RFIs); NCR; letters and notices; engineer reporting; chairman meetings; operations and maintenance (O&M) manuals; four -look - ahead forecast schedule; submittal of future project plans, testing plans, permits; contract negotiation; native exclusion zoning; and complete site due diligence for three future solar farm locations. Two Main Roads Government Projects, Brisbane, Canada. Site Engineer. This $700M major roadway infrastructure improvements project involved multiple subprojects: construction of large cut/fill operations, landscaping, and embankments ($7M); installation of 110,000 tons of four -lane highway asphalt ($10M); inner city installation of stormwater drainage and manholes ($1.5M); construction of a new road including diversions and traffic switches, which required 10 to 15 closures per week $1.25M; and installation of heavy-duty structural walls for a new road subgrade and paving ($5M). Detailed and site specific paperwork were created for each project including safe work method statements, process control plans, specification conformance, scheduling, bid analysis, contractor meetings, engineer meetings, permitting (road closure), NCR, requests for information (RFIs), and budgeting. Responsibilities included managing a total of $20-25M as a client engineering representative of AECOM and SKM, contract management, and site engineering. APPENDIX A. RESUMES A-13 Chris Cooper, CPII Senior Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Construction inspection • Materials testing • Transportation projects —roadways, interchanges, bridges, highways • Pavement rehabilitation Years of Experience • 21 Certifications • Caltrans CTM 105, 125, 125AC, 125AGG, 125PCC, 201, 202, 216, 217, 226, 227, 231, 504, 518, 523, 533, 539, 540, 556, 577 • Certified Public Infrastructure Inspector, APWA • Concrete Field -Testing Technician, Grade 1, ACI • ICC Pre -Stressed Concrete Special Inspector, No. 5312076-92 • ICC Reinforced Concrete Special Inspector, No. 5312076-49 • ICC Soils Special Inspector, No. 5312076-EC • ICC Spray Applied Fire Proofing Special Inspector • ICC Structural Masonry Special Inspector, No. 5312076-84 • Radiation Safety Officer, APNGA • Defensive Driving • CPR and First Aid Professional Development • Temporary Pedestrian Facilities, Caltrans Agreement,,,f4 i79IQ9 Ii )i ; ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Cooper has over 17 years of experience as a construction inspector and materials technician working on highway/roadway improvements. Chris' expertise includes concrete and hot mix asphalt (HMA) placement inspection, masonry, bolting, pre -stressed concrete, soils and geotechnical testing, and framing and nailing inspection, soils and geotechnical testing. He has provided field quality control and quality assurance in both structure and infrastructure projects. He is knowledgeable with Caltrans methods and procedures. His experience includes: On -Call Construction Management/Construction Inspection-2020 Measure D Projects, Santa Cruz County, CA. Construction Inspector. This project consists of pavement grinding, pavement pulverization, digouts, asphalt concrete overlays, microsurfacing, rubberized cape seals, striping, pavement markings, subdrain, and adjusting street monuments to grade. 2018 Roadway Sealing and Laurel Lane Complete Streets, City of San Luis Obispo, CA. Construction Inspector. This $2.3M project'. consisted of Type II slurry seal and new striping at various locations throughout the City of San Luis Obispo, including a major restriping of Laurel Lane to include new bike lanes. The project also installed new ADA curb ramps and traffic calming speed bumps. Responsibilities included calibration of placement equipment, inspection of stripe removal, installation of slurry, inspection of ADA ramps, tracking quantities, monitoring traffic control, and coordinating with the City. Rancho Monte Allegra Roadway Lots 1-18, Carpenteria Valley Water District, Carpenteria, CA. Construction Inspector. This $15M project installed 200 linear feet (LF) of 4-inch lateral hydrant lines; 3,000 LF of 2-inch and 6-inch service lines; and approximately two miles of 12-inch transmission lines. Additional project elements included offsets of line installations, adequate bedding material, depth and widths of excavations, testing of compaction efforts utilizing a nuclear gauge, pressure testing of transmission lines after backfill completion, thrust block placement, hydrant installations, service tie ins, and valve installations. The scope included roadway grading, building pad grading, removals, bridge installations, bin wall installations, service installations, concrete roadway placement, slide mitigation involving soil nailing, and tie back wall systems. APPENDIX A. RESUMES A-14 Agreement No. ON -CALL CONSTRUCTION INSPECTION SERVICES i Westlake Reservoir Replacement and Hydrostatic Test Project, Callegues Water District, CA. Concrete Technician Field Testing Technician. This $7.3M removed a reservoir and installed a new underground concrete reservoir. Additional project features included offset line tie in installations, excavations, bedding materials and backfill installations, width and depths of excavations, nuclear density gauge testing, and observation of excavation spoils removals. Chris served as a Concrete Technician Field Testing Technician for reservoir structure placement. Water Line Replacement, City of Greenfield, CA. Construction Inspector. This $230K project involved offsets of line installation, 6-inch water main replacement with 8-inch mains along four City of Greenfield blocks, valve replacements, and alley way improvements. Measure K-14 Road Rehabilitation, Oceanview, City of Grover Beach, CA. Construction Inspector. This project repaired water lines that sustained multiple breaks from construction traffic over subgrades. The project consisted of broken transite 4-inch line repair with C900 PVC, Torque couplers and concrete kickers, new hydrant installation with 6-inch ductile iron pipe and thrust block placement, removal and installation of new blow off valve system with pressure testing, sampling station removal and installation. Longbranch Avenue Rehabilitation and Repair, City of Grover Beach, CA. Construction Inspector. Funded by Measure K-14, this $1.3M project completely rebuilt Longbranch Avenue from 3rd Street to 10th Street. The project constructed new sidewalks and curb ramps for the entire length of the project. Each of the existing driveways was tied into the new roadway; all the existing mailboxes were moved to the edge of the new pavement. Parkways were added between the sidewalks and the new roadway. Responsibilities included construction inspection, tracking quantities, monitoring traffic control, and coordination. Ocean View Avenue Rehabilitation and Repair, City of Grover Beach, CA. Construction Inspector. Funded by Measure K-14, this $870K project was a complete rehabilitation of Ocean View Avenue and the surrounding cross streets of Front Street, 1 st Street, Second Street, and Carmelda Lane. The project consisted of removing the existing asphalt and placing a new section of aggregate base and HMA. New cross gutters, sidewalks, and ADA compliant curb ramps were installed at various locations within the project. Newport Avenue was added as an extension of this project for an additional construction cost of $200K. Responsibilities included Chris Cooper, CPII I RESUME PG 2 construction inspection, tracking quantities, monitoring traffic control, and coordination. Annual Overlay and Slurry Seal, City of Santa Clarita, CA. Construction Inspector/Materials Testing Technician. This $4M project involved hot mix asphalt (HMA) overlay, microsurFacing, and slurry seal treatments in various areas of the City for the 2014-2015 annual overlay and slurry seal program. Construction elements included dig out and replacement; asphalt concrete (AC) grinding; placement of up to 1,500 tons of HMA per day; crack sealing; slurry placement; raising utility covers and risers; utility replacement; ongoing daily traffic control; and coordination/outreach with residents and businesses. Responsibilities included providing oversite on inspectors providing field testing and inspection. Various Pavement Rehabilitation Projects, Various Agencies, Los Angeles, Santa Barbara, and Los Angeles Counties, CA. Public Works Inspector. For over 10 years, Chris has provided construction inspection services during all project phases for numerous pavement rehabilitation projects. Sample projects included: • Pavement Rehabilitation, County of Ventura, CA. This County of Ventura project involved pavement rehabilitation of 24 roads in the areas of Ventura and Mira Monte, CA. Construction work included pre -cast drop inlets; single pipe headwall and drain pipe installation; concrete curb and gutter; curb ramp; sidewalk removal and replacement; sidewalk grinding; and concrete cross and longitudinal gutter. Pavement and roadway improvements involved cold milling and grinding; asphalt concrete (AC) taper with key; base repair; leveling course; hot mix asphalt (HMA) and rubberized hot mix asphalt (RHMA) paving; miscellaneous paving, asphalt concrete (AC) curb rehabilitation and curb seal; process miscellaneous base (PMB) shoulder backing; survey monument frame adjustment and replacement; storm drain manhole adjustment; and appurtenant work. • Thousand Oaks Pavement Rehabilitation, Agoura Hills, CA. This project was part of the City's Annual pavement rehabilitation project. Construction elements involved rubberized hot mix asphalt (RHMA) paving, grinding, and traffic control. • Mullholland Highway Scenic Corridor Improvements, Phase 3, City of Calabasas, CA. This City project widened the highway to make way for an enhanced bicycle lane and landscaped sidewalks. This project also involved construction of a double retaining wall next to adjacent properties located up on a slope above the road. APPENDIX A. RESUMES A-15 Phil Lemmon, CPII Senior Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Field support for design • Caltrans guidelines and procedures • Pavement rehabilitation • Construction management and inspection • Water and wastewater systems • Underground utility construction projects Years of Experience • 50 Certifications • Certified Public Infrastructure Inspector, APWA • Nuclear testing gauge operator No. 059034 • Construction Safety Certification, CFR Title 29, Cal/OSHA • HAZWOPER, Cal/OSHA • Confined Space Awareness Award(s) • 2014 APWA Project of the Year, San Jose Creek and Capacity Improvements and Fish Passage Agreement Np,;17QQQ�i.S� ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Lemmon brings an impressive career of experience in construction project management, pavement construction inspection, and detailed knowledge of all aspects of public works construction. Phil has extensive experience in providing field support for engineering in addition to construction inspection. He has worked on numerous projects, including pavement, grading, curb and gutter, traffic control, trenching, boring, micro - tunneling, and blasting. A majority of this project experience has included Caltrans specifications, methods, and procedures. His experience includes: US 101/State Route 41 Guard Rail Removal and Installation of Concrete Median Barrier (EA 05- 1F4903), Caltrans District 5, Atascadero, San Luis Obispo County, CA. Construction Inspector. MNS provided construction management for pavement rehabilitation on US 101. The project included the installation of a new metal guardrail system (MGS), localized post and rail element wall shoulder support, along the northbound lane, with concrete barriers slabs for each of the three bridge approaches for State Route 41 between post miles 12.5 and 13.3, west of Atascadero, in San Luis Obispo County. The new MGS was placed approximately a minimum of 4 feet outside of the edge of travel way (ETVV). To facilitate this, shallow sliver fills retained by a metal beam and post rail element wall were locally placed behind the MGS to widen the top of slope hinge line. US 101 High -Occupancy Vehicle (HOV) Carpinteria Segment 4A (EA 05-ON7AU4) Caltrans District 59 in District 5, CA. Construction Inspector. This $151 M Caltrans multistage construction project along a 3.3-mile stretch of US 101 reconstructed the freeway and added an HOV lane in each direction. The project was constructed in multiple stages and included staged shoring and falsework, CIDH and driven piles, two new creek bridges, and new reinforced box culverts. Additional construction activities included replacing three existing bridges, realigning retaining walls, and adding miles of new sound walls and barrier rail. The project won the Platinum Hard Hat Award in Safety Excellence. A full-time Safety Manager was retained for the duration of the project. The Safety Manager and team leaders fostered a culture in which each activity was planned and executed with safety at the forefront. Going above and beyond standard safety requirements, the team developed project -specific quarterly safety themes and conducted monthly operations meetings. The rigorous safety program and activity included the following: APPENDIX A. RESUMES A-16 MNS respond to third -party on -site emergencies; documented tailgate safety meetings; checklists and training; partnering charter with emphasis on safety; extensive personnel training; incentives for safety engagement; and high team participation in safety events. Las Cruces Pavement Rehabilitation at State Route 1, Caltrans District 5, Lompoc, CA. Construction Inspector. This $60M Caltrans project is being constructed along a 19.3-mile stretch of State Route 1. Construction involves profile grinding and overlaying State Route 1 with over 64,000 tons of rubberized hot mix asphalt (RHMA) (gap graded). This project also consists of removing over 13,000 linear feet of guard rail; and installing over 10,700 linear feet of Midwest Guardrail System and over 360 linear feet of concrete barrier transition at 53 locations throughout the project. Work also involves significant drainage improvements. Additionally, there was over 118,000 linear feet of asphalt concrete (AC) dike removed and replaced with approximately 117,770 linear feet of hot mix asphalt (HMA) dike (various types). Responsibilities include providing construction inspection of the various items of work, daily reports„ traffic control, tracking quantities, and Stormwater Pollution Prevention Plan (SVVPPP) inspection. 2016 Street Repairs, City of Arroyo Grande, CA. Construction Inspector. This street repair project prolonged the life of numerous streets and prepared them for a slurry seal application. Construction involved removing and replacing failing sections of pavement with a 4-inch hot mix asphalt plug on the streets to be slurry sealed and then grinding and placing a thin maintenance overlay on streets in need of more extensive repair. The project also involved significant replacement of sidewalk and curb ramp to bring the area in compliance with the Americans with Disabilities Act (ADA). This project required close attention to the contractor's traffic control and communication with the design team to incorporate several approved design exceptions into the sidewalks and curb ramps. 2016 Street Resurfacing, City of Arroyo Grande, CA. Construction Inspector. This project followed the City's 2016 Street Repair project and involved crack sealing and slurry sealing the repaired streets, restriping streets, and repainting red curbs. This project required close monitoring of traffic control to ensure the contractor properly notified affected residents. Le Point Area Water Main Upgrade, City of Arroyo Grande, CA, Construction Inspector. This $480K project installed 2,280 feet of new 8-inch water main, replacing Agreement, No,.,i 7QQ9,, )k , ON -CALL CONSTRUCTION INSPECTION SERVICES Phil Lemmon, CPII I RESUME PG 2 the aging existing main. The project included the installation of 42 new service lateral connections to existing meters and the installation five new fire hydrants. The new main required six intersection tie-ins and one 8- inch hot tap to the 12-inch main. The trenches were backfilled with one sack slurry and then repaved. The new system was then disinfected per the City specifications, which are based on AWWA Standards. Responsibilities included serving as the main point of contact to address concerns from the public and to ensure the contractor was properly notifying residents in the area; coordination with the City's Utility Department; daily inspection of the contractor's operations consisting of trenching and shoring, pipe installation, trench backfill, sidewalk replacement and paving; and ensuring the contractor was in compliance with their Water Pollution Control Plan and Cal/OSHA requirements. This project required Phil to pay special attention to the contractor's traffic control because of the sites proximity to the local Junior High school. South Alpine Water Main Upgrade, City Of Arroyo Grande, CA. Construction Inspector. This $260K project installed 956 feet of new 8-inch water main to replace the existing main. This project included the installation of 22 new service lateral connections to existing meters and the installation of three new fire hydrants, five intersection tie-ins, and one blow off assembly. This project included the connection of an Elder Care Facility's fire suppression system to the new main, requiring close coordination with a 3rd party alarm system and the local fire department. The new system was disinfected per the City's specifications which were based on AWWA Standards. Responsibilities included serving as the main point of contact to address concerns from the public and to ensure the contractor was properly notifying residents in the area,daily inspection of the contractor's operations, consisting of trenching and shoring, pipe installation, trench backfill, sidewalk replacement and paving; and ensuring the contractor was in compliance with their Water Pollution Control Plan and Cal/OSHA requirements. This project required Phil to pay special attention to the contractor's traffic control because of the numerous cul-de-sacs impacted by this work. San Jose Creek Improvements and Fish Passage, City of Goleta, CA. Construction Inspector. This $22M creek capacity improvement project widened approximately 4„000 linear feet of creek channel to support a 100-year storm event and installed a fish, passage to facilitate the movement of endangered steelhead trout. The new channel was constructed with vertical walls of cast -in -drilled -hole (CIDH) steel piling — ranging from 37 feet to 50 feet long —with pre -cast APPENDIX A. RESUMES A-17 Agreement;Np(.,,71QQ9(�.i"F),':� ON -CALL CONSTRUCTION INSPECTION SERVICES r Ryan Newman, EIT Construction Inspector Firm • MINIS Engineers, Inc Areas of Expertise • Project management support • Roadways Years of Experience -2 Education • BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA 2022 Professional Development • Granite Heavy Civil Minor, California Polytechnic State University, San Luis Obispo, CA 2022 Affiliation(s) • American Society of Civil Engineers (ASCE) • Institute of Transportation Engineers (ITE) Mr. Newman brings two years of experience in construction inspection for roadway and utility improvement projects, including pavement management plans. Ryan has also helped develop proposals, reviewed traffic circulation studies to recommend changes, and compared cost estimates to plans and specs to reduce change orders. His experience includes: Douglas Avenue Emergency Storm Drain Repairs, City of El Segunda, CA. Construction Inspector. Ryan was responsible for on -site inspection and overseeing the work of Union Pacific Railroads contractor in the replacement of a failed storm drain culvert within the City street right of way. Due to a storm drain failure, the roadway was closed during the duration of the repairs. Nash Street Extension- Sewer & Storm Drain Repair, City of El Segundo, CA. Construction Inspector. Ryan was responsible for on -site inspection services for the Nash Street Project. The public street was constructed as part of a corporate office headquarters and training facility for a professional football organization as part of the El Segundo South Campus Specific Plan (ESSCSP) area. Part time public works inspection was provided to ensure the City would not assume long-term maintenance liability. Private Development Inspections, City of El Segundo, CA. Construction Inspector. Ryan was the on -site inspector for the City on various private development encroachment permits focused on restoration work for sidewalk and roadways for the City. APPENDIX A. RESUMES A-18 George Haines Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Construction inspection • Caltrans • Roadways and bridges Years of Experience • 32 Certifications • Highway Construction, Level III, NICET CA No. 80134 • Concrete Field Testing Technician, ACI • 10-hour Construction Safety, Cal/OSHA • Nuclear Gauge Safety • CPR and First Aid Education • AS, Civil Engineering, Hartford State Technical College, CT Professional Development • Temporary Pedestrian Facilities, Caltrans Award • 2015 ACEC Engineering Excellence Award of Merit, Ranchero Road Interchange at Interstate 15 Agreement,iNo, 70W,, ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Haines has over 29 years of experience as a site construction manager; utility, water and sewer, roadway, and bridge construction inspector; and construction foreman for private and public agency projects. George's responsibilities involve inspecting and managing all phases of construction for various types of underground utilities, reinforced concrete, tieback walls, retaining walls, and roadways. These projects involved work over State highways, and waterways requiring coordination with Caltrans and City/County staff. He is familiar with various local agency, Special Districts, Caltrans, and Greenbook standards. His experience includes: State Route 170 (Hollywood Freeway) Soundwall Package No. 11, METRO, Los Angeles, CA. Construction Inspector. This $60M Los Angeles METRO project with Caltrans oversight involves shoulder and bridge widening to build soundwalls along a 6-mile stretch of State Route 170 through the dense North Hollywood neighborhood. The widening includes the improvements to six freeway interchanges and reconstruction of 60 drainage systems. The widened shoulder sections include lean concrete base and rubberized hot mix asphalt construction (RHMA). The drainage system construction includes building new Austin Vaults, Gross Solids Removal Devises, and Bioswales. The project's bridge construction involved the widening and seismic retrofit of eight sets of bridge under crossings. Bridge widenings include use of Cast -in - Drilled -Hole (CIDH) pile or spread footing foundations, bents constructed of either columns or pier walls, spans of cast -in -place or pre -cast girders, and cast -in -place decks. Seismic retrofit elements include casing of existing columns and use of large diameter piles at bent widenings in conjunction with permeation grouting for soil improvement to transfer lateral seismic loads to the new foundations. The bridge widenings include the complex 460-foot-long, nine -span structure crossing both Riverside Dr. and Tujunga Ave., which includes a mix of cast -in place girders, precast girders, and T-Beam spans, meeting at a center hinge joint. The project includes construction of over 1500 feet of cast -in -place concrete retaining walls built in three locations. The widenings allow for the construction of almost 25,000 feet of Soundwalls, consisting of CMU block placed on top of 736SV Concrete Barrier built on CIDH piles. Other important elements of the project included removal and replacement of 12 overhead sign structures, temporary and new fiber optic communication conduit placement, new overhead highway lighting, traffic control management, and SWPPP compliance. The project is APPENDIX A. RESUMES A-19 I � w�wrr► AgreementiNo'>>7-p0,0,, jl�i () ON -CALL CONSTRUCTION INSPECTION SERVICES being built in multiple stages to accommodate traffic through this heavily traveled corridor with over 200,000 ADT. Additional elements included coordination with Caltrans and various City of Los Angeles agencies including DWP for relocation of overhead power lines requiring full freeway closures, BOE for protection and relocation of underground utilities including sewer lines, LADOT for city street closures and detours, and City sanitation. This project is being constructed in accordance with applicable Los Angeles METRO, Caltrans standards, and City of Los Angeles methods, and procedures. Responsibilities include project inspection, daily reports, grade checking, tracking quantities, and coordination. Pavement Rehabilitation at State Route 156, Caltrans District 5, Hollister, CA. Construction Inspector. Located on State Route 156 in San Benito County, this $5M project provided pavement rehabilitation of the existing highway using rubberized hot mix asphalt (RHMA), upgraded the metal beam guard rail to the Midwest Guardrail System, placed shoulder backing, and required daily traffic control. Responsibilities included performing inspection, night work, coordinating with the contractors and Caltrans staff, daily reports, tracking quantities, and Stormwater Pollution Prevention Plan (SWPPP) inspections. Owner's Agent/Owner's Engineer (OA/OE) Services for the Groundwater Reliability Improvement Program (GRIP), Water Replenishment District of Southern California (WRD), CA. Construction Inspector. WRD established the GRIP to find alternative sources of water to offset the imported water used for replenishment in the Montebello Forebay. As part of the GRIP, an advanced water treatment facility (AWTF) is being designed and constructed to treat 10,000-acre-feet per year of tertiary recycled water. The GRIP AWTF is located in a 5.2-acre lot, adjacent to the San Gabriel River in the City of Pico Rivera. Treatment processes include automatic strainer to protect downstream membrane treatments systems from large particles; microfiltration (MF) or ultrafiltration (UF) to reduce turbidity and silt density index (SDI) of reverse osmosis (RO) feed water; cartridge filtration to project downstream of the RO process; RO to remove salts, minerals, metal ions, organic compounds, and microorganisms; advanced oxidation with ultraviolet light (UV) treatment using hydrogen peroxide in concert with UV to reduce N-Nitroso-Dimethylamine (NDMA) concentrations and provide additional disinfection, decarbonation to release excess carbon dioxide and stabilize the product water; and pH adjustment/corrosivity stabilization. George Haines I RESUME PG 2 Prunedale Improvements Project, Caltrans District 5/59, Monterey County, CA. Assistant Structures Representative, The $75M Prunedale Improvement Project spanned four areas along an eight mile stretch of US 101 in the County of Monterey, north of Salinas, CA. This project involved realigning over 10 miles of State highway in multiple stages as well as improving and reconstructing the adjacent frontage roads; eight new structures, one existing structure widening, six concrete and/or soldier pile retaining walls and sound walls, and five reinforced box culverts. Additional elements included over one million cubic yards of earthwork, miles of hot mix asphalt (HMA) and Portland cement concrete (PCC) paving, numerous drainage systems, traffic control, and traffic signals. George provided field construction inspection on a soil nail wall and two of the bridges, tracking item quantities, daily reports, and traffic control. Various Emergency Storm Damage Repair Projects, Caltrans District 5, CA. Construction Inspector. George provided inspection on several storm damage repair projects on State Routes 1, 9, 17, 35, and 236 in Santa Cruz County and. US 101 and State Route 192 in Santa Barbara County as part of the Caltrans On -Call contract. Projects varied in size and scope and involved earthwork and grading, slide removal and embankment construction; soldier pile walls, retaining walls, crib walls; drainage repair; barrier rail; paving; traffic control. Due to the emergency nature of the projects they were administered on a time and materials basis in accordance with Caltrans requirements. Ranchero Road Interchange, San Bernardino County Transportation Authority, CA. Construction Inspector. This $34M new interchange construction project involved constructing a new two -span, post -tensioned box girder overcrossing across Interstate 15; realigning four frontage roads; constructing five new on/off-ramps; utility relocations; installing new 8-inch sewer lines and 12-inch water lines; over 600,000 cubic yards of earthwork; 50,000 tons of hot mix asphalt (HMA) and rubberized hot mix asphalt (RHMA) pavement; 12,000 cubic yards of Portland cement concrete (PCC) pavement; rock slope protection (RSP); metal beam guard rail (MBGR); barrier rail; extensive traffic signals, ramp metering, and lighting; numerous drainage systems; and significant environmental/permit requirements. The project was constructed within Caltrans and City right-of-way and per Caltrans and Greenbook standards and specifications. Responsibilities included project inspection, material verification, tracking item quantities, tracking extra work, traffic control, and coordination with the contractor and various subcontractors. ACEC Engineering Excellence Merit Award, Winner. APPENDIX A. RESUMES A-20 Donny Spates, CPII Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Reinforced concrete and masonry • Structural steel • Project management • Construction inspection • Waterline and sewer line • Water/wastewater improvements Years of Experience • 32 Certifications • Certified Public Infrastructure Inspector, APWA • NACE Coating Inspector, Level 1 • ACI Concrete Field -Testing Technician, Grade I • ICC Reinforced Concrete Special Inspector • 10-hour Construction Safety, Cal/OSHA • Confined Space Awareness • Defensive Driving • CPR and First Aid Education • AS, Construction Management, San Joaquin Valley College, CA Awards • 2016 APWA Project of the Year, Supplemental Water Project • 2016 National ASCE Project of the Year, Supplemental Water Project Agreement iMp;jr71Q09,, l.i . ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Spates has over 32 years of experience in project supervision and inspection in water and wastewater facilities, reinforced concrete, structural steel, roadways, and underground piping. Donald is skilled at interpreting plans and specifications to mitigate cost and schedule risks. He is an excellent project team supervisor and strives to implement resource saving solutions. His experience includes: 2020 Pipeline Rehabilitation Project, Goleta Sanitary District, Goleta, CA. Construction Inspector. This $1.5M sewer main rehabilitation project replaced 8-inch vitrified clay pipe (VCP) and rehabilitated over 7,500 feet of existing 6-inch, 8-inch, and 12-inch pipe through cured - in -place pipe (CIPP) liner including rehabilitating 76 laterals using top hat lateral connection sealers. The project also included rehabilitating 34 manholes using sprayed polyurethane coating; point repairs; trenching and shoring; HMA paving; and daily traffic control. The rehabilitation work was performed at various locations throughout the City requiring close coordination and communication with residents, businesses, and the District as well as accommodating the flow of vehicle, bicycle, and pedestrian traffic. Additionally, a portion of the pipeline required realigning to keep within easement boundaries. Donny was the District's Lead Inspector on the project responsible for daily inspection, tracking quantities, coordination, and also assisted with submittal and RFI review and recommendations. FY 17/18 Annual Water and Wastewater Main Improvements, City of Santa Monica, CA. Construction Inspector. This project encompasses two phases: water main replacement and wastewater main improvements. The $4.5M water main replacement installs approximately 5,400 lineal feet of 8- and 12-inch polyvinyl chloride (PVC) water main, 700 lineal feet of 16- inch ductile iron water main, and miscellaneous appurtenances. The $3M wastewater main improvement consists of new sewer construction and sewer lining. The new sewer construction includes replacement of approximately 8,800 lineal feet of 6- and 8-inch sewer main with new 8- and 10-inch sewer main, connection of existing service laterals to new sewer main, installation of 21 new manholes, and spray -lining and rehabilitation of 57 existing manholes. The sewer lining portion installs approximately 2,100 lineal feet of cured -in -place pipe (CIPP) liner and 72 top hat lateral connection sealers. Donny was the City's Lead Inspector on the project responsible for daily inspection, tracking quantities, APPENDIX A. RESUMES A-21 coordination, and also assisted the City with submittal and RFI review and recommendations. River Street Water Main Replacement, City of Santa Cruz, CA. Construction Inspector. This $3.51M water main replacement project replaced over 3,000-linear-foot of existing water line with 8-inch, 12-inch and 18-inch polyvinyl chloride (PVC) and ductile iron pipe along one of the most highly traveled corridors in the City. The project also included the installation of fire hydrants; service re -connections; testing, flushing, chlorination, and disinfection of the new pipeline; trenching and shoring; HMA and PCC paving; and daily traffic control. The project involved significant coordination with the local businesses and residents, as well as accommodating the heavy flow of vehicle, bicycle, and pedestrian traffic. Additionally, due to the old age of the street, the contractor encountered many unknown piping, utilities, and structures throughout the construction requiring in- field adjustments, removals, and cost-effective work- arounds in order to complete the pipe placement. Significant coordination with the contractor and the City was instrumental in successfully completing the project. Donny was the City's Lead Inspector on the project responsible for daily inspection, tracking quantities, coordination, and also assisted the City with submittal and RFI review and recommendations. Loma Vista Sewer Line, City of Ventura, CA. Lead Construction Inspector. This $3.5M project replaced over 4,700 linear feet (LF) of existing sewer line with 12-inch and 15-inch polyvinyl chloride (PVC) pipe along one of the most highly traveled corridors in the City. Additionally, the project replaced six manholes; rehabilitated four manholes; connected sewer laterals; used trenching and shoring; installed hot mix asphalt (HMA) paving; and provided daily traffic control. The project involved. significant coordination with the local businesses and residents. Construction had to accommodate a heavy flow of vehicle, bicycle, and pedestrian traffic. Donny provided full-time construction inspection to support the City's Construction Manager and served as a field liaison for the duration of the project. Responsibilities included providing daily inspection; tracking quantities, coordinating with the City, local business, and residents; and assisting with submittals and Requests for Information (RFI) review and recommendations. Supplemental Water Projects, Nipomo Community Services District, Nipomo, CA. Construction Inspector. This $16M supplemental water project involved three separate construction contracts: A one -mile, 24-inch pipeline extension was constructed along Slosser Road to the Santa Maria River Levee, where it was bored and Agreement,No.j7QQQ;,i jrn �J ON -CALL CONSTRUCTION INSPECTION SERVICES Donny Spates, CPII I RESUME PG 2 jacked under the levee. The pipe then transitioned to a 30-inch high -density polyethylene (HDPE) pipe, which was installed 100 feet under the riverbed by horizontal directional drilling (HDD). The new pump station construction included a booster pump station; electrical system (including portable backup generator); water chloramination system and appurtenances; approximately 1,720 linear feet of access road to the pump station site; and 1,750 linear feet of 24-inch ductile iron pipe.. The project was constructed within highly sensitive environmental habitat, which required extensive surveying and coordination with permitting agencies as well and the surrounding farmland owners. MNS provided construction management and inspection. APWA Project of the Year, Winner. ASCE Project of the Year, Winner. Joshua Road Pump Station Reservoir, Nipomo Community Services District, Nipomo, CA. Construction Inspector. The $3M Joshua Road Pump Station Reservoir project was phase 2 of the larger Supplemental Water Project completed in 2016 for the Nipomo Community Services District (District). Water purchased by the District from the City of Santa Maria and'. imported through the Supplemental Water Project pipeline allowed the Distriict to reduce pumping from its existing wells. Taking action to slow the depletion of groundwater to reduce the potential for seawater intrusion on the Nipomo Mesa was a shared responsibility of all groundwater users on the basin, By providing an additional source of water other than groundwater, this project increased the reliability and security of the community's water supply. This project constructed a 500,000 gallon, partially -buried concrete reservoir at the Joshua Road Pump Station. Additional construction elements involved associated piping, electrical, instrumentation, grading, and landscape improvements. This project increased delivery capacity to at least 800-acre-feet-per-year and provided operational flexibility. MINIS provided construction management services. Los Osos Valley Road Interchange, City of San Luis Obispo, CA. Construction Inspector. This $17M project constructed a new four -span„ '370-foot long, post - tensioned, box girder bridge on Los Osos Valley Road (LOVR) over US 101; widened a three -span, 112-foot long multi -plate bridge over San Luis Obispo Creek; and upgraded all four on/off-ramps at the interchange. The new bridge provided! two additional eastbound lanes for traffic relief on this busy roadway, in addition to sidewalks and bike lanes. LOVR now has two, 12-foot lanes for westbound traffic; two, 12-foot lanes for eastbound traffic; pedestrian sidewalks; and bike lanes in both directions. The project was built in multiple stages to accommodate traffic through this heavily traveled corridor. A-22 APPENDIX A. RESUMES _ Paul Burns Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Construction inspection • Construction management • Earthwork • Mechanical and electrical systems • Reinforced concrete • Utilities • Water line and sewer line • Water/wastewater improvements • Procore and Raken software Years of Experience • 36 Certification(s) • NEC Certificate of Completion • 10-hour Construction Safety, Cal/OSHA • CalTrans Resident Engineer (RE) Grant Course Certificate, CalTrans Construction Management • Commercial Building Inspector, CA • Confined Space Awareness • CPR and First Aid • Defensive Driving Education • Advanced Builder, U.S. Navy Construction Training Center • Construction Planning and Estimator Specialist, US Navy Construction Training Center • Construction Safety Inspector, US Navy Construction Training Center • Construction Technology Certificate, Cuesta College • Construction Technology, Venture Community College • National Electric Code Certificate, Cuesta College • Quality Control Inspector, US Navy Construction Training Center Professional Development • Construction Technology, Venture Community College Agreement Ni p,790,P(, ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Burns has over 30 years of experience in project supervision and inspection of public works construction projects involving water and wastewater facilities, pipelines, reinforced concrete, drainage, roadways, and buildings. Paul is skilled at interpreting plans and specifications to mitigate cost and schedule risks and has worked with various web -based contract administration software programs. He is an excellent project team supervisor and strives to implement resource saving solutions. Paul has provided inspection services through all phases of construction and been instrumental in addressing and resolving project issues at the lowest possible level. His experience includes: Sewer Collection System Master Plan Improvements, City of Pacific Grove, CA. Lead Construction Inspector. This $3.2 M project consisted of four projects to improve the City's sewer system. The work involved replacing approximately 4,200 feet of 8 to 180-inch sewer line, connecting existing service laterals to the new sewer main, replacing 20 manholes, and improving various drainage systems. The pipeline work required several methods of construction including up to 12-foot-deep open trench, 1,800-feet of pipe bursting with 8 to and 18- inch High Density Polyethylene (HDPE) fused pipe and slip lining of existing pipe and 18-inch sewer bypasses continually in place during construction. The pipe bursting consisted of excavating 12-foot by 40-foot pull pits requiring significant shoring and dewatering. Other project elements included replacing curb, gutter, and sidewalk; 14 Americans with Disabilities Act (ADA) curb ramps; and Hot Mix Asphalt (HMA) paving of various streets. The project, located in an environmentally sensitive area with portions adjacent to Monterey Bay, required strict controls to prevent zero spills or discharges. Pacific Grove -Monterey ASBS Wet -Dry Stormwater Capture and Reuse Project, City of Pacific Grove, CA. Lead Construction Inspector. This $3.3M stormwater collection system improvement project in the City of Pacific Grove (City) was part of a state grant to improve water quality discharging into Monterey Bay. The project installed a 40-foot by 50-foot by 7-foot underground concrete vault to capture and treat the stormwater prior to entering Monterey One Water's two-story pump station and prior to discharge into the Bay. The vault is located beneath the City golf course, which is immediately adjacent to Monterey Bay. The project also constructed a new lift station with 16-foot-deep wet wells with two APPENDIX A. RESUMES A-23 associated piping; replaced 1,200 feet of sewer line; and installed a SCADA system integration with the existing pump station. The project was constructed within the Coastal Zone and in an environmentally sensitive area requiring archeological and Native American monitoring. California Men's Colony Wastewater Treatment Plant Upgrade, San Luis Obispo, CA. Project Engineer. This $30M improvement to the existing wastewater treatment plant upgraded the facility to meet effluent discharge requirements and provide adequate redundancy and reliability. Construction of the new facilities included oxidation ditches, headworks, influent pump station, secondary clarifiers, effluent filters, sewer line, and associated yard piping. The project also required significant excavation, modifications to the sludge drying beds, and electrical and SCADA upgrades and integration. As Project Engineer, Paul was also responsible for coordination; testing and commissioning; closeout documentation including contract change orders (CCOs), punch list items, collection of warranty, spare parts, Operations and Maintenance (O&M) Manuals, training logs, and CDs. Union Road Improvements, City of Paso Robles, CA. Construction Inspector. This $2.3M roadway and utility improvement project installed half a mile of 16-inch ductile iron retrained water line, blow off assemblies, valve assemblies, and thrust blocks; 1,800-feet of 8-inch sewer force main; 900-feet of waterline including connections and associated BAC-T testing; electrical conduit; and roadway improvements, traffic signals, and traffic control. The project required extensive coordination with PG&E, the City of Paso Robles, and adjacent property owners. Atascadero State Hospital Seismic Upgrade, Atascadero, CA. Construction Manager. The $4M design -bid -build seismic improvement project to the state hospital involved significant coordination with the existing hospital staff to complete the improvements while minimizing disruptions to the facility. Improvements included 17-foot deep over -excavation and shoring to strengthen the existing foundation; placement of reinforced concrete and structural shotcrete; epoxy anchors; structural welding; repairs to the facility's windows, roof, walls, razor wire fencing, and security hardware and fixtures. The project also included hazardous material abatement. To maintain uninterrupted facility operation, the work was performed within a very tight schedule under maximum supervision. This required constant coordination and communication with the contractor and hospital staff. Paul's thorough planning and sequencing of the work, access, and Agreement; Nq.,70Q9(,t;; fi,;� ON -CALL CONSTRUCTION INSPECTION SERVICES Paul Burns I RESUME PG 2 shutdowns was essential to the successful completion of the project. Atascadero State Hospital Enhanced Treatment Unit, Atascadero, CA. Construction Manager. This $8.8M design -bid -build seismic improvement project to the state hospital involved a multiphase interior remodel that included structural modifications, HVAC, roofing, mechanical improvements, and modifications to 45 patient rooms. Responsibilities included strict coordination with state hospital programs, facilities, security, and plant operations policies and procedures. Coordination was required with the DGS and Office of State Fire Marshall. Various Job Order Contracting (JOC), CA. ProjectlConstruction Manager. Paul was responsible for scoping, pricing, contract implementation, and management for numerous JOC programs for multiple agencies. These contracts ranged from improvements, renovation, repair, and replacement to water/wastewater facilities, buildings, utilities, roadways, and structures. Items of work included fire sprinkler systems, HVAC systems, elevators, electrical switchgear replacements, backup generator installations, health lab renovation (electrical/mechanical/structural), earthwork, drainage, and structural concrete. Representative projects include: o Fresno Regional Wastewater Treatment Plant Improvements. Structural concrete repairs of secondary retention tanks at effluent processing area caused by high sulfide chemical reaction and miscellaneous deferred facility maintenance. • Vallejo Water Department. Replacement of several pumps including associated valves and piping. • Placer County Water Agency. Electrical switchgear and emergency generator upgrades and replacement, SCADA upgrades. Paso Robles Court House, Paso Robles, CA. Construction Manager. This $121M project constructed a new two-story 22,500-square-foot facility with elevators, office space, rest rooms, and four courtrooms. Work items consisted of potable water main, sewer connection, fire main, fire sprinkler, electrical switch gear, backup generator, three elevators, rooftop HVAC units with dampers and controls, and interior fireproofing. The project also included site and civil work for parking, pathways, American with Disabilities Act (ADA) considerations, landscaping, and private/secure/gated parking. APPENDIX A. RESUMES A-24 Michael McFadden, EIT Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Water resources • Wastewater infrastructure Years of Experience • 15 Licensing • Engineer -in -Training, CA No. 158994 Education • BS, Civil Engineering, San Diego State University, CA Agreement;Np,,,) T'Qg;9(a«i,Dr ''I ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. McFadden has over 15 years of experience specializing in design and construction management and inspection of public works projects such as pipelines, water distribution systems, hydraulics, roadways, and interchanges. Michael began his civil engineering career as an Engineering Aide in the United States (US) Navy. His tasks involved design and construction of various improvements. He utilized AutoCAD to prepare drawings and sketches; and operating and maintaining various precision surveying and lab test instruments in the field. Michael also worked for geotechnical/materials testing firms and a contractor to further enhance his engineering knowledge base. His experience includes: Palo Comado Canyon Road Interchange Project, City of Agoura Hills, Agoura Hills, CA. Construction Inspector. This $12M Interchange Improvement project is being constructed in several stages and includes widening Palo Comado Canyon Road and the Overcrossing over US Route 101 with one lane in each direction and a left -turn lane for the northbound on -ramp. The project widens the shoulders to accommodate Class II bike lanes and sidewalks on both sides of Palo Comado Canyon Road. The northbound on and off ramps are being widened including construction of a new traffic signal at the intersection with Palo Comado Canyon Road, new street and bridge lighting, architectural features, signs and striping, and new irrigation and landscaping. The existing PC/PS I -Girder and T-Beam bridge is being widened on both sides. The project also includes three retaining walls; overhead signs; relocation of several utilities; drainage systems; ramp metering; earthwork; hot mix asphalt (HMA) paving; jointed plain concrete pavement (JPCP); Americans with Disabilities Act (ADA) compliant curb ramps, driveways, and sidewalks; and adherence to environmental permitting requirements. Responsibilities include daily inspection and documentation, monitoring traffic control, preparing monthly estimates, submittal review, tracking extra work, and checking grades. (2019-Ongoing) Miramonte Pavement Resurfacing, County of Ventura, CA. Construction Inspector. This pavement resurfacing project was located in the Miramonte and East Ojai areas of the County. The improvements were constructed in various locations encompassing approximately 3.30 miles of deteriorated roadway. Improvements and rehabilitation included surface preparation and crack sealing, asphalt curb/dike sealing, pavement resurfacing with type II slurry seal, and final pavement delineation and markings. Other work items APPENDIX A. RESUMES A-25 included traffic control, WPCP implementation, and field coordination. Responsibilities included daily inspection and documentation, monitoring traffic control, preparing pay quantities, and submittal review. Sespe Street Bike Lane Improvements, County of Ventura, CA. Construction Inspector. This bike lane project was constructed in two segments. Segment A consisted of widening the existing roadway in order to accommodate new Class III bike lanes along the west side of Sespe Street, slurry sealing the entire roadway, and final pavement delineation and striping. Segment B consisted of striping and signing approximately 1.5 miles of pavement for the delineation of Class III bike lanes on both sides of Pasadena Avenue between Sespe Street and Chambersburg Road (CA Route 23). Other items include traffic control, WPCP implementation, and field coordination with ranches and residents. Responsibilities include daily inspection and documentation, monitoring traffic control, pay quantities, and submittal review. Ecocampus National Pollutant Discharge Elimination System (NPDES) Compliance, City of Burbank Water and Power, CA. Associate Engineer This conceptual and detailed design project will install underground storage and infiltration system and install approximately 360 feet of new 36-inch storm drain. The preliminary design evaluated alternative assessments for the Ecocampus to comply with the new standards. When coordination with the Division of Drinking Water (DDW) is complete and a preferred alignment is recommended, MNS will develop detailed plans, specifications, and cost estimates. Responsibilities include utility research, drafting potential water main alignments, writing the preliminary design technical memorandum, and developing preliminary design cost estimates. Juncal Dam Emergency Action Plan, Montecito Water District, CA. Associate Engineer. This project developed two-dimensional (2D) hydraulic models used to evaluate potential breach hazards for Juncal Dam. Hydraulic modeling was performed using HEC-RAS. Responsibilities included developing the 2D hydraulic models, preparing dam breach inundation maps, and drafting documentation for the analysis. Sherwood Reservoir Emergency Action Plan, Sherwood Development, LLC. Associate Engineer. This project developed two-dimensional (2D) hydraulic models used to evaluate potential breach hazards for Sherwood Dam. Hydraulic modeling was performed using HEC-RAS. Responsibilities included developing the 2D hydraulic models, preparing dam breach Agreementi►10; 7QQRA'��ND ON -CALL CONSTRUCTION INSPECTION SERVICES Michael McFadden, EIT I RESUME PG 2 inundation maps, and drafting documentation for the analysis. Inundation Mapping and Technical Study for Reservoir 4 and Reservoir 5, City of Burbank Water and Power, CA. Associate Engineer. This project developed two-dimensional hydraulic models used to evaluate potential breach hazards for Reservoir 4 and Reservoir 5. Hydraulic modeling was performed using HEC-RAS. Responsibilities included developing the two- dimensional (2D) hydraulic models, preparing dam breach inundation maps, and drafting documentation for the analysis. Effluent Storage Basins Improvements, Camrosa Water District, CA. Associate Engineer. This project involved planning and design services to regrade two onsite effluent ponds to balance storage capacity for treated effluent while accommodating a reduced volume available for equalization storage. Pond re -lining accommodated the use of mechanized equipment/tractors for ease of basin maintenance and cleaning. Responsibilities included developing grading plans and calculating basin storage volumes. Lake Bard and Springville Reservoir Erosion Repair and Drainage Improvements, Calleguas Municipal Water District, CA. Associate Engineer. A wide range of erosion problems are present at multiple sites at the District's Lake Bard reservoir and Springville Reservoir. Planning reports and design plans and specifications for erosion repair and drainage improvements were prepared for both locations. Responsibilities include assisting in detail design and cost estimates. Water Quality Improvements Project, Maywood Mutual Water Company No. 3, CA. Associate Engineer. Funded by the Water Replenishment District of Southern California, this planning and design project located in Maywood, California included multiple improvements to enhance a potable water storage and distribution system. Improvements entailed the replacement and installation of approximately 4,600 linear feet of new potable water mains, including a new trenchless pipe installation below a Union Pacific Railroad track. Also included in the project was interior and exterior coating of a 500,000- gallon welded steel water storage tank and replacements and repairs to water system valves and fire hydrants. Responsibilities include conducting utility research and updating GIS accordingly. APPENDIX A. RESUMES A-26 John Stage Construction Inspector Firm • MNS Engineers, Inc. Areas of Expertise • Construction inspection • Roadwork and paving • Earthwork • Drainage systems • Utility agency coordination • Caltrans Years of Experience • 48 Certifications • 10-hour Construction Safety, Cal/OSHA • Confined Space Awareness • Defensive Driver • CPR and First Aid Professional Development • Stormwater Pollution Prevention Plan (SWPPP) training Awards • 2014 APWA Project of the Year, San Jose Creek Improvements and Fish Passage • 2013 TAMC Transportation Excellence Award, Rocky Creek Viaduct at State Route 1 • 2010 APWA Project of the Year, 8th Street Pedestrian Bridge Replacement Agreemend,Np�)7QQQ ON -CALL CONSTRUCTION INSPECTION SERVICES Mr. Stage has considerable career expertise in the construction field. John spent 25 years with the Navy Seabees and over 10 years working on Caltrans and local agency projects, where he has acted in various roles and responsibilities on a wide variety of construction projects. His project experience ranges from public works construction including wastewater facilities, pipelines, bridges, retaining walls, tieback walls, earthwork, roadwork, paving, structures, utilities, storm drains, and miscellaneous concrete to building projects including structural steel, framing, concrete, mechanical, electrical, and plumbing. John is very familiar with Caltrans methods and procedures. His experience includes: Cogeneration Motor Rehabilitation, City of Oxnard, CA. Construction Inspector. This project consisted of removing the existing natural/methane gas generator from the cogeneration building for the motor to be rebuilt and reinstallation of the newly rebuilt generator. The project required coordination with the plant staff to minimize impacts and maintain the ongoing operations. Responsibilities included construction inspection of all work, pay quantities, tracking extra work, and coordination with the plant staff. Wastewater Treatment Plant Emergency Repairs, City of Oxnard, CA. Construction Inspector. This overall contract consists of five different projects to perform emergency repairs throughout the existing plant. These projects included rehabilitation of four 105-foot-diameter clarifier tanks including replacement of two catwalk bridges and the existing clarifier launders; replacement of the existing filter presses; replacement of the fire system including piping, valves, and sprinkler heads on three different floors of the solids processing building; reinforcement of the existing bio towers; replacement of the air conditioning system in the administration building; and construction of the CEPT Polymer containment structure including placement of the polymer tank, installation of mixing motors, and high-pressure water injection system. Responsibilities included construction inspection of all work, pay quantities, tracking extra work, and coordination with the plant staff. California Street Bridge Pedestrian Enhancements, City of Ventura, CA. Construction Inspector. This $1.3M project created a safer environment for pedestrians, bicyclists, and motorists crossing the bridge while helping to visually distinguish the California Street off -ramp as the entry to historic Downtown Ventura. This project APPENDIX A. RESUMES A-27 replaced 250 feet of existing low -height pedestrian railing with six-foot high decorative pedestrian railing on the existing California Street Bridge over US 101; replaced an existing bridge mounted sign; resurfaced the sidewalk area; and added eight ornamental light fixtures. As part of a busy pedestrian route connecting Ventura State Beach to the heart of the historic downtown, a pedestrian detour was constructed to provide pedestrians and bicyclists safe and convenient access through the jobsite. Constructed within City and Caltrans right-of-way, this project was performed in accordance with applicable City and Caltrans standards, methods, and procedures. Rocky Creek Viaduct at State Route 1, Caltrans, CA. Construction Inspector. This $9.5M Caltrans emergency bridge replacement project constructed a 600-foot viaduct structure that spans a landslide area and is supported by seven 54-inch cast -in -drilled -hole piles (CIDH) concrete piles drilled into the steep rocky hillside 230 feet above the ocean. This superstructure included a 9.75-inch concrete deck constructed on six 75-foot-long, pre -stressed, pre -cast box girders in each span and a 600-foot-long parallel soldier pile retaining wall to shore the hillside adjacent to the bridge. Construction occurred in two stages. Stage one accommodated a single open lane of traffic. Stage two accommodated two-way traffic on a portion of structure while the remainder of the viaduct was under construction. Additional project elements included temporary signalized traffic control; drainage improvements; earthwork and grading; hot mix asphalt (HMA) paving; and Stormwater Pollution Prevention Plan (SWPPP) compliance. TAMC Transportation Excellence Award, Winner. New Turn -Out Structures at the San Gabriel River Coastal Basin Spreading Ground, Water Replenishment District of Southern California, CA. Construction Inspector. This project constructs two new turn -out structures and associated discharge structures at the San Gabriel River Coastal Basin Spreading Grounds, which will provide needed operational flexibility for the spreading of an additional 11,000 acre-feet per year (AFY) of tertiary recycled water and 10,000 AFY of advanced treated recycled water. Additional work includes shotcrete lining of an existing approximately 6,400-linear-foot distribution channel and the installation of new 66-inch pipelines approximately 500 linear feet along with electrical and instrumentation and control systems. State Route 154 Operational and Safety Improvements, Group II, Santa Barbara County Association of Governments, CA. Construction Inspector. This $5M project involved modifying and widening four different locations along State Route 154 Agreement iMot.,,79P9; ON -CALL CONSTRUCTION INSPECTION SERVICES John Stage I RESUME PG 2 Work included widening the intersection at State Routes 154 and 246 in Santa Ynez, constructing a 0.70 mile passing lane, widening of the Paradise Road intersection, and widening the Vista Point rest area located near the Cold Springs Bridge. Construction involved a soldier pile and lagging wall, multiple drainage systems with concrete headwalls and inlets, and over 40,000 cubic meters of earthwork, traffic control, and asphalt concrete (AC) paving. This project also included Caltrans construction oversight and coordination as the work was constructed entirely in the State right-of-way. Responsibilities included construction inspection. San Jose Creek Improvements and Fish Passage, City of Goleta, CA. Construction Inspector. This $22M creek capacity improvement project widened approximately 4,000 linear feet of creek channel to support a 100-year storm event and installed a fish passage to facilitate the movement of endangered steelhead trout. The new channel was constructed with vertical walls of cast -in -drilled -hole (CIDH) steel piling —ranging from 37 feet to 50 feet long —with pre -cast concrete wall sections. The bottom of the channel was constructed using articulated concrete revetment with over 500 tie -down anchors. The project also included constructing a flood wall on west side, fish passage channel with slotted weirs within widened channel, and roadway improvements on Kellogg Avenue south of Hollister Avenue. Additional items included approximately 1,000 CIDH soldier piles; over 800 pre -cast wall panels; several drainage systems; dewatering and stream diversion; utility coordination; and coordination with several permitting agencies. This project was administered in accordance with Caltrans specification, methods, and procedures. Responsibilities included daily inspection of all work, grade take -offs and verification, shoring review, tracking item quantities and extra work, safety, and material verification. APWA Project of the Year, Winner. El Estero Wastewater Treatment Plant Tertiary Filter Replacement, Santa Barbara, CA. Construction Inspector. This $8.41VI project replaced the treatment plant's existing filtration system with a microfiltration/ultrafiltration facility. Work included demolition of an existing gravity filter, installation of driven concrete piles, construction of a new microfiltration/ultrafiltration facility, new filter feed pumps, replacement of chemical feed pumps, modifications to the chlorine contact basin, modifications to the reclaimed water storage reservoir, new reclaimed water transfer pumps, 12" and 24" pipeline placement, associated electrical and instrumentation modifications and other appurtenant work. Responsibilities included construction inspection of all work, pay quantities, tracking extra work, and coordination with the plant staff. APPENDIX A. RESUMES A-28