Loading...
2024-05-07 CC Agenda Packet -Additional Information - ITEM C12 - Revised Appendix AAPPENDIX A Schedule A-1 BUILDING PERMIT FEES SINGLE FAMILY RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation Building Permit $501-$2,000 Valuation Building Permit $2,001-$25,000 Valuation Building Permit $25,001-$50,000 Valuation Building Permit $50,001-$100,000 Valuation Building Permit $100,001-$500,000 Valuation Building Permit $500,001-$1,000,000 Valuation Building Permit Over $1,000,000 Valuation SINGLE FAMILY RESIDENTIAL BUILDING PLAN CHECK Building Plan Check Under $500 Valuation Building Plan Check $501-$2,000 Valuation Building Plan Check $2,001-$25,000 Valuation Building Plan Check $25,001-$50,000 Valuation Building Plan Check $50,001-$100,000 Valuation Building Plan Check $100,001-$500,000 Valuation Building Plan Check $500,001-$1,000,000 Valuation Building Plan Check Over $1,000,000 Valuation SINGLE FAMILY RESIDENTIAL COMBO PERMITS: Electrical Permit Plumbing Permit Mechanical Permit NON -SINGLE FAMILY RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation Building Permit $501-$2,000 Valuation Building Permit $2,001-$25,000 Valuation Building Permit $25,001-$50,000 Valuation Building Permit $50,001-$100,000 Valuation Building Permit $100,001-$500,000 Valuation Building Permit $500,001-$1,000,000 Valuation Building Permit Over $1,000,000 Valuation CURRENT FY 23/24 $198 $198 + $3.51 for each $100 over $500 $250 + $25.41 for each $1,000 over $2,000 $835 + $19.51 for each $1,000 over $25,000 $1323 + $21.49 for each $1,000 over $50,000 $2,397 + $8.78 for each $1,000 over $100,000 $5,909 + $10.92 for each $1,000 over $500,000 $11,367 + $5.46 for each $1,000 over $1,000,000 $99 $99 + $3.94 for each $100 over $500 $158 + $11.40 for each $1,000 over $2,000 $420 + $16.81 for each $1,000 over $25,000 $840 + $4.21 for each $1,000 over $50,000 $1,051 + $5.25 for each $1,000 over $100,000 $3,153 + $6.30 for each $1,000 over $500,000 $6,301 + $3.15 for each $1,000 over $1,000,000 10% of the Building Permit Fee 10% of the Building Permit Fee 10% of the Building Permit Fee $198 $198 + $6.74 for each $100 over $500 $299 + $27.56 for each $1,000 over $2,000 $933 + $23.42 for each $1,000 over $25,000 $1,518 + $25.36 for each $1,000 over $50,000 $2,786 + $9.76 for each $1,000 over $100,000 $6,689 + $11.31 for each $1,000 over $500,000 $12,346 + $3.07 for each $1,000 over $1,000,000 PROPOSED FY 24/25 $205 $205 + $3.63 for each $100 over $500 $259 + $26.29 for each $1,000 over $2,000 $864 + $20.19 for each $1,000 over $25,000 $1369 + $22.24 for each $1,000 over $50,000 $2,480 + $9.09 for each $1,000 over $100,000 $6115 + $11.30 for each $1,000 over $500,000 $11,763 + $5.65 for each $1,000 over $1,000,000 $102 $102 + $4.08 for each $100 over $500 $164 + $11.80 for each $1,000 over $2,000 $435 + $17.39 for each $1,000 over $25,000 $869 + $4.36 for each $1,000 over $50,000 $1,088 + $5.43 for each $1,000 over $100,000 $3.263 + $6.52 for each $1,000 over $500,000 $6,520 + $3.26 for each $1,000 over $1,000,000 10% of the Building Permit Fee 10% of the Building Permit Fee 10% of the Building Permit Fee $205 $205 + $6.97 for each $100 over $500 $309 + $28.52 for each $1,000 over $2,000 $965 + $24.24 for each $1,000 over $25,000 $1,571 + $26.24 for each $1,000 over $50,000 $2,883 + $10.10 for each $1,000 over $100,000 $6,922 + $11.70 for each $1,000 over $500,000 $12,776 + $3.18 for each $1,000 over $1,000,000 Page 1/7 APPENDIX A Schedule A-1 BUILDING PERMIT FEES NON -SINGLE FAMILY RESIDENTIAL BUILDING PLAN CHECK Building Plan Check Under $500 Valuation Building Plan Check $501-$2,000 Valuation Building Plan Check $2,001-$25,000 Valuation Building Plan Check $25,001-$50,000 Valuation Building Plan Check $50,001-$100,000 Valuation Building Plan Check $100,001-$500,000 Valuation Building Plan Check $500,001-$1,000,000 Valuation Building Plan Check Over $1,000,000 Valuation NON-SIGNLE FAMILY RESIDENTIAL COMBO PERMITS: Electrical Permit Plumbing Permit Mechanical Permit OTHER DEPARTMENTAL REVIEW MISCELLANEOUS: GRADING PERMITS Demolition Permit Duplicate Certificate of Occupancy Temporary Certificate of Occupancy Other Inspections not specified Overtime Inspection (4 hour minimum) Additional Plan Review Expedited Plan Review in addition to regular Plan Review Fee Pre -Inspection Site Visit Overtime Hourly Rate is 120% of the Regular Hourly Rate Grading Permit under $2,000 Valuation Grading Permit $2,001-$10,000 Valuation Grading Permit $10,001-$50,000 Valuation Grading Permit $50,001-$100,000 Valuation Grading Permit $100,001-$500,000 Valuation Grading Permit Over $500,000 Valuation CURRENT FY 23/24 $99 $99 + $7.45 for each $100 over $500 $211 + $18.27 for each $1,000 over $2,000 $631 + $8.38 for each $1,000 over $25,000 $840 + $4.21 for each $1,000 over $50,000 $1,051 + $5.78 for each $1,000 over $100,000 $3,363 + $1.68 for each $1,000 over $500,000 $4,201+ $1.07 for each $1,000 over $1,000,000 40% of the Building Permit Fee 10% of the Building Permit Fee 20% of the Building Permit Fee 15% of the Building Permit Fee $405 $28 $746 + $10,000 deposit refunded at time of Final C of O $196 OT Hourly Rate Hourly Rate OT Hourly Rate $244 $81 $81 + $33.31 for each $1,000 over $2,000 $347 + $9.76 for each $1,000 over $10,000 $737 + $5.87 for each $1,000 over $50,000 $1,030 + $1.46 for each $1,000 over $100,000 $1,615 + $1.46 for each $1,000 over $500,000 PROPOSED FY 24/25 $102 $102 + $7.71 for each $100 over $500 $218 + $18.91 for each $1,000 over $2,000 $653 + $8.67 for each $1,000 over $25,000 $869 + $4.36 for each $1,000 over $50,000 $1,088 + $5.98 for each $1,000 over $100,000 $3,480 + $1.74 for each $1,000 over $500,000 $4,347+ $1.11 for each $1,000 over $1,000,000 40% of the Building Permit Fee 10% of the Building Permit Fee 20% of the Building Permit Fee 15% of the Building Permit Fee $419 $29 $772 + $10,000 deposit refunded at time of Final C of O $203 OT Hourly Rate Hourly Rate OT Hourly Rate $252 $84 $84 + $34.47 for each $1,000 over $2,000 $359 + $10.10 for each $1,000 over $10,000 $814 + $6.07 for each $1,000 over $50,000 $1,066 + $1.51 for each $1,000 over $100,000 $1,671 + $1.51 for each $1,000 over $500,000 Page 2/7 APPENDIX A Schedule A-1 GRADING PLAN CHECK BUILDING PERMIT FEES Grading Plan Check under $2,000 Valuation Grading Plan Check $2,001-$10,000 Valuation Grading Plan Check $10,001-$50,000 Valuation Grading Plan Check $50,001-$100,000 Valuation Grading Plan Check $100,001-$500,000 Valuation Grading Plan Check Over $500,000 Valuation EXPEDITED PLAN CHECK SURCHARGE CURRENT FY 23/24 $107 $107 + $39.09 for each $1,000 over $2,000 $420 + $5.27 for each $1,000 over $10,000 $631 + $4.19 for each $1,000 over $50,000 $840 + $4.19 for each $1,000 over $100,000 $2,516 + $4.19 for each $1,000 over $500,000 50% of Plan Check Fees PROPOSED FY 24/25 $111 $111 + $40.45 for each $1,000 over $2,000 $435 + $5.45 for each $1,000 over $10,000 $653 + $4.34 for each $1,000 over $50,000 $869 + $4.34 for each $1,000 over $100,000 $2,604 + $4.34 for each $1,000 over $500,000 50% of Plan Check Fees PLAN RETENTION SURCHARGE 1 % of Permit Fees 1 % of Permit Fees Page 3/7 APPENDIX A Schedule A-2 CURRENT FY 23/24 PROPOSED FY 24/25 Electrical Permits Permit Issuance $55.00 $57.00 Residential Appliances, up to 5 hp $146.00 $151.00 Non -Residential Appliances, up to 5 hp $146.00 $151.00 Electrical Sign $162.00 $168.00 Motors/Transformers (Ratings in HP, KW, KVA, or KVAR) up to 100 $146.00 $151.00 100 + $244.00 $252.00 Temporary Power Pole $130.00 $135.00 Services, Switchboards, Control Centers, & Panels up to 600 volts up to 400 amps SFR $146.00 $151.00 Non-SFR $146.00 $151.00 over 400 amps $196.00 $202.00 greater than 600 volts $244.00 $252.00 Switchboards First Section Standing Panel N/A N/A Additional Sections N/A N/A Fire Warning Communication Control Panel N/A N/A Fire Warning Communication Control Panel - over 600 volts N/A N/A Fire Warning Communication Control Panel - add'I sections N/A N/A Recept, Switch, Lighting Outlet, and Lighting Fixture, per fixture SFR: First 10 items $18.00 $19.00 Each item over 10 $3.00 $3.00 Non-SFR: First 10 items $18.00 $19.00 Each item over 10 $3.00 $3.00 Pole or Platform Mounted Fixtures, per fixture SFR $82.00 $85.00 Non-SFR $82.00 $85.00 Swimming Pool $244.00 $252.00 Meter Reset $114.00 $118.00 Electrical Duct Bank (per 100 lin ft) $99.00 $102.00 Branch Circuits (Temporary or Future) $99.00 $102.00 Miscellaneous Conduits and Conductors (per 100 linear feet) $98.00 $101.00 Inspections not specified $196.00 $202.00 Reinspection's Hourly Rate Hourly Rate After Hours Inspection (4 hour minimum) OT Hourly Rate OT Hourly Rate Plan Check - 100% of Permit Fee Overtime Hourly Rate is 120% of the Regular Hourly Rate Page 4/7 APPENDIX A Schedule A-2 CURRENT FY 23/24 PROPOSED FY 24/25 Plumbing Permits Permit Issuance $55.00 $57.00 Plumbing Fixtures and Vents SFR $21.00 $22.00 Non-SFR $29.00 $30.00 Repair or Alteration of Drainage or Vent Piping SFR $82.00 $85.00 Non-SFR $98.00 $101.00 Grease Interceptor $196.00 $202.00 Piping (per dwelling unit) $98.00 $101.00 Repipe Single Family Residential (per dwelling unit) $98.00 $101.00 Multi Family Residential (per dwelling unit) $147.00 $152.00 Lawn Sprinklers, Vacuum Breakers, and Backflow Protection Dev. Each Lawn Sprinkler System per Valve $41.00 $42.00 Each Vacuum Breaker or Backflow Protection Device $41.00 $42.00 Backflow Protection Device greater than 6" $342.00 $354.00 Gas System, per system SFR Less than 2" $146.00 $151.00 2" or more $146.00 $151.00 For Each Outlet over 5 $19.00 $20.00 Non-SFR Less than 2" $146.00 $151.00 2" or more $146.00 $151.00 For Each Outlet over 5 $19.00 $20.00 Water Heater SFR $114.00 $118.00 Non-SFR $114.00 $118.00 Solar Water Heating system (Combo) SFR $304.00 $315.00 Non-SFR $304.00 $315.00 Piping to a Condesate Pump, piping repair, sump pump $82.00 $85.00 Earthquake Valve $146.00 $151.00 Sewer 0-25 linear feet $98.00 $101.00 each additional 100 linear feet $48.00 $50.00 Swimming Pool $244.00 $252.00 In -Ground Spa $146.00 $151.00 Pool/Spa Heater $114.00 $118.00 Miscellaneous $227.00 $235.00 Inspections not specified $196.00 $202.00 Reinspection's Hourly Rate Hourly Rate After Hours Inspection (4 hour minimum) OT Hourly Rate OT Hourly Rate Page 5/7 APPENDIX A Schedule A-2 CURRENT FY 23/24 PROPOSED FY 24/25 Plan Check - 100% of Permit Fee Overtime Hourly Rate is 120% of the Regular Hourly Rate Mechanical Permits Permit Issuance $55.00 $57.00 Forced -Air or Gravity -Type Furnace or Burner SFR $146.00 $151.00 Non-SFR $146.00 $151.00 Floor Furnace - Installation or Relocation $146.00 $151.00 Suspended/Recessed Wall/Floor Mounted Heater - Install/Reloc $146.00 $151.00 Fireplace SFR $146.00 $151.00 Non-SFR $146.00 $151.00 Appliance Vents per each Inlet/Outlet SFR $41.00 $42.00 Non-SFR $41.00 $42.00 Air Handling Units $98.00 $101.00 Air Inlet/Air Outlet - First 10 vents $146.00 $151.00 Air Inlet/Air Outlet - Each additional vent $3.00 $3.00 Variable Air Volume Box $73.00 $76.00 Single Register Ventilation Fan $73.00 $76.00 Independent Venting System $146.00 $151.00 Hood served by Mechanical Exhaust $146.00 $151.00 Boilers, Compressors, and Absorption Systems 0-15 HP or 0-500,000 Btu/h $146.00 $151.00 15-30 HP or 500,001-1,000,000 Btu/h $228.00 $236.00 31-50 HP or 1,000,001-1,750,000 Btu/h $276.00 $286.00 50+ HP or 1,750,001+ Btu/h $342.00 $354.00 Smoke/Fire Damper $98.00 $101.00 Smoke Control Damper $98.00 $101.00 Thermostat $98.00 $101.00 Incinerator/Kiln $146.00 $151.00 Alteration to Duct Work not otherwise noted $13.00 $13.00 Miscellaneous $227.00 $235.00 Inspections not specified $196.00 $202.00 Reinspection's Hourly Rate Hourly Rate After Hours Inspection (4 hour minimum) OT Hourly Rate OT Hourly Rate Page 6/7 APPENDIX A Schedule A-2 Plan Check - 100% of Permit Fee Overtime Hourly Rate is 120% of the Regular Hourly Rate Combo Permits Electric Vehicle Charging System Residential Commercial Solar Charging System: Residential Commercial Swimming Pool Residential Commercial Generator Sign CURRENT FY 23/24 PROPOSED FY 24/25 $320.00 $331.00 $895.00 $926.00 $625.00 $647.00 $1,098.00 $1,136.00 $1,361.00 $1,409.00 $1,711.00 $1,770.00 $762.00 $788.00 $352.00 $365.00 Page 7/7