Loading...
2024-03-05 CC Agenda Packet - ITEM D9 - Historical SummaryCITY OF ELSE GUNDO Historical Summary Urho Saari Swim Stadium Renovation Timeline of Action Items, Aquatics Facilities 2005- Aquatics Master Plan Recommended that Urho Saari Swim Stadium be renovated and repaired 2006-City Council Approves the Concept of a Two Pool Swim Stadium p g g complex at El Se undo High School 2006- Bond measure that supports two pools at El Segundo High School fails (Measure Q) 2008- Study conducted by Rowley International determines that $676,000 in filtration and circulation repairs are needed for the Plunge 2010- Pool Alternative Study by Rossetti & Councilman Hunsaker conduct community input meetings and stakeholder strategic plan meetings to gather feedback on aquatics programming and facilities 2015- W iseburn Aquatic Center Program, Design and Financial Analysis 2020- The Plunge Needs Assessment and Feasibility Study ELSEGUN1 3/5/2024 City of El Segundo 1 350 Main St. El Segundo, CA90245 2 • "Aquatics Master Plan 2005. RJM Design Group • Public Enaag eft: • Community wide phone survey, user group questionnaires, stakeholder questionnaires, community workshops. • Summary of Findings: • Renovate and repair existing facilities to maximize efficiency and to contribute to appropriate community image • Facilitate the development of new aquatic facilities at Hilltop Park • New aquatic facilities desired • Swimming pool for fitness or exercise, 15% • Swimming pool for recreation, 14% • Swimming pool for competitive swimming, 3% • Swimming pool for competitive water polo, 3% ELSEGUY 3/5/2024 City of El Segundo 1 350 Main St. El Segundo, CA90245 3 "Pool Alternatives Study", 2010, Rossetti & Councilman Hunsaker Public Enaaaement: Staff meeting, stakeholder meetingg, public meeting, Planning Commission meeting,. Parks and Recreation Commission meefing, School Board presentation, Workgroup meetings, Council meeting. Summary of Findings: • Existing facilities do not meet current community needs • Preserve El Segundo's tradition of competitive aquatics • Provide competition aspect within city aquatics • Add competitive diving • Stay within reality in terms of cost and development • Preserve the history of Urho Saari Stadium which should remain open while building new facility • Considered Urho Saari Concept #1 and #2 (Indoor and Outdoor pools) • Considered Imperial Avenue Concept #1 and #2 (Outdoor Pools) • Considered Hilltop Concept #1 and #2 (Outdoor Pools) E,LSEGUN 3/5/2024 City of El Segundo 1 350 Main St. El Segundo, CA90245 4 "City of El Segundo Wiseburn Aquatic Center, Program, Design and Financial Analysis", 2015, Isaac Sports Group, LLC Public Engagement: • Meetings with City staff, Wiseburn School District, ESUSD, Pool Design Committee. Summary of Findings: • Provide a top Aquatic Center to move El Segundo Swimming and Water Polo Team programs from Urho Saari Swim Stadium to Aquatics Center • Significantly expand existing aquatic programming and open swim/recreation access for the residents of El Segundo • Generate economic impact for El Segundo through sport tourism generated by swimming, water polo, and other training and competitive events and programs at the Aquatic Center • Funding for renovation of Urho Saari Swim Stadium remains a priority for City Council (Staff Report, 9/29/16) ELSEGUNi 3/5/2024 City of El Segundo 1 350 Main St. El Segundo, CA90245 5 "The Plunge Needs Assessment & Feasibility Study". 2020, Mithun Communitv Enaaaement: Meetings with stakeholders, City maintenance staff, City Aquatics team, Community members, user groups, coaches and instructors. Summary of Findinas: Code compliance issues • Lighting • Ventilation Issues • Acoustics • Mechanical system not to code • Inconsistent water temperature • Preserve building as cherished landmark • Neighborhood recreation, "Fun, community vibe" • Through community input and staff interaction, it was discovered that these groups envisioned the Plunge as a family recreation swim facility where the community could enjoy lap swimming, swimming lessons, and family swim time. Due to the existing El Segundo Wiseburn Aquatics Center programming being much more competitive in nature, the desire was not to focus on another competitive pool bur more of a fun, community rocused environment. (Staff report, 6/ 1 /21) 3/5/2024 City of El Segundo 1 350 Main St. El Segundo, CA90245 N. ELSEGUNI