CONTRACT 6841 Professional Services AgreementAgreement No. 6841
PROFESSIONAL SERVICES AGREEMENT
:,. BETWEEN
THE CITY OF EL SEGUNDO AND
Z & K CONSULTANTS
ENG 24-09: ON -CALL CONSTRUCTION INSPECTION SERVICES
This AGREEMENT is made and entered into this 271h day of December, 2023, by
and between the CITY OF EL SEGUNDO, a municipal corporation and general law city
("CITY") and Z & K CONSULTANTS, a California Corporation ("CONSULTANT"). The
parties agree as follows:
1. CONSIDERATION,
A. As partial consideration, CONSULTANT agrees to perform the work listed
in the SCOPE OF SERVICES, below;
B. As additional consideration, CONSULTANT and CITY agree to abide by
the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONSULTANT a sum not
to exceed Fifty Thousand ($50,000) annually in each fiscal year for
CONSULTANT's services. CITY may modify this amount as set forth
below. Unless otherwise specified by written amendment to this
Agreement, CITY will pay this sum as specified in the attached Exhibit "A,"
which is incorporated by reference.
2. SCOPE OF SERVICES.
A. CONSULTANT will perform services listed in the attached Exhibit "A,"
which is incorporated by reference.
B. CONSULTANT will, in a professional manner, furnish all of the labor,
technical, administrative, professional and other personnel, all supplies
and materials, equipment, printing, vehicles, transportation, office space
and facilities, and all tests, testing and analyses, calculation, and all other
means whatsoever, except as herein otherwise expressly specified to be
furnished by CITY, necessary or proper to perform and complete the work
and provide the professional services required of CONSULTANT by this
Agreement.
3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT
will use the appropriate generally accepted professional standards of practice existing at
the time of performance utilized by persons engaged in providing similar services. CITY
will continuously monitor CONSULTANT's services. CITY will notify CONSULTANT of
City of El Segundo Professional Services (REV 2018.05)
Page 1 of 11
Agreement No. 6841
any deficiencies and CONSULTANT will have fifteen (15) days after such notification to
cure any shortcomings to CITY's satisfaction. Costs associated with curing the
deficiencies will be borne by CONSULTANT.
4. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement,
CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and
hourly rates for each personnel category and reimbursable costs (all as set forth in
Exhibit "A") the tasks performed, the percentage of the task completed during the billing
period, the cumulative percentage completed for each task, the total cost of that work
during the preceding billing month and a cumulative cash flow curve showing projected
and actual expenditures versus time to date.
5. NON -APPROPRIATION OF FUNDS. Payments due and payable to CONSULTANT
for current services are within the current budget and within an available, unexhausted
and unencumbered appropriation of the CITY. In the event the CITY has not
appropriated sufficient funds for payment of CONSULTANT services beyond the current
fiscal year, this Agreement will cover only those costs incurred up to the conclusion of
the current fiscal year.
6. FAMILIARITY WITH WORK.
A. By executing this Agreement, CONSULTANT agrees that it has:
Carefully investigated and considered the scope of services to be
performed;
ii. Carefully considered how the services should be performed; and
iii. Understands the facilities, difficulties, and restrictions attending
performance of the services under this Agreement.
B. If services involve work upon any site, CONSULTANT agrees that
CONSULTANT has or will investigate the site and is or will be fully
acquainted with the conditions there existing, before commencing the
services hereunder. Should CONSULTANT discover any latent or
unknown conditions that may materially affect the performance of the
services, CONSULTANT will immediately inform CITY of such fact and will
not proceed except at CONSULTANT's own risk until written instructions
are received from CITY.
7. TERM. The term of this Agreement will be from January 1, 2024, to June 30, 2027.
Unless otherwise determined by written amendment between the parties, this
Agreement will terminate in the following instances:
A. Completion of the work specified in Exhibit "A";
City of El Segundo Professional Services (REV 2018.05)
Page 2 of 11
Agreement No. 6841
B. Termination as stated in Section 15.
8. TIME FOR PERFORMANCE.
A. CONSULTANT will not perform any work under this Agreement until:
CONSULTANT furnishes proof of insurance as required under
Section 22 of this Agreement; and
ii. CITY gives CONSULTANT a written notice to proceed.
B. Should CONSULTANT begin work on any phase in advance of receiving
written authorization to proceed, any such professional services are at
CONSULTANT's own risk.
9. TIME EXTENSIONS. Should CONSULTANT be delayed by causes beyond
CONSULTANT's control, CITY may grant a time extension for the completion of the
contracted services. If delay occurs, CONSULTANT must notify the Manager within
forty-eight (48) hours, in writing, of the cause and the extent of the delay and how such
delay interferes with the Agreement's schedule. The Manager will extend the
completion time, when appropriate, for the completion of the contracted services.
10. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the
main body of this Agreement takes precedence over the attached Exhibits; this
Agreement supersedes any conflicting provisions. Any inconsistency between the
Exhibits will be resolved in the order in which the Exhibits appear below:
A. Exhibit: A, Proposal for Services
11. CHANGES. CITY may order changes in the services within the general scope of
this Agreement, consisting of additions, deletions, or other revisions, and the contract
sum and the contract time will be adjusted accordingly. All such changes must be
authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY
resulting from changes in the services will be determined in accordance with written
agreement between the parties.
12.TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a
Taxpayer Identification Number.
13. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and
maintain during the term of this Agreement, all necessary permits, licenses, and
certificates that may be required in connection with the performance of services under
this Agreement.
City of El Segundo Professional Services (REV 2018.05)
Page 3 of 11
Agreement No. 6841
14. WAIVER. CITY's review or acceptance of, or payment for, work product prepared
by CONSULTANT under this Agreement will not be construed to operate as a waiver of
any rights CITY may have under this Agreement or of any cause of action arising from
CONSULTANT's performance. A waiver by CITY of any breach of any term, covenant,
or condition contained in this Agreement will not be deemed to be a waiver of any
subsequent breach of the same or any other term, covenant, or condition contained in
this Agreement, whether of the same or different character.
15. TERMINATION.
A. Except as otherwise provided, CITY may terminate this Agreement at any
time with or without cause.
B. CONSULTANT may terminate this Agreement at any time with CITY's
mutual consent. Notice will be in writing at least thirty (30) days before the
effective termination date.
C. Upon receiving a termination notice, CONSULTANT will immediately
cease performance under this Agreement unless otherwise provided in the
termination notice. Except as otherwise provided in the termination notice,
any additional work performed by CONSULTANT after receiving a
termination notice will be performed at CONSULTANT's own cost; CITY
will not be obligated to compensate CONSULTANT for such work.
D. Should termination occur, all finished or unfinished documents, data,
studies, surveys, drawings, maps, reports and other materials prepared by
CONSULTANT will, at CITY's option, become CITY's property, and
CONSULTANT will receive just and equitable compensation for any work
satisfactorily completed up to the effective date of notice of termination,
not to exceed the total costs under Section 1(C).
E. Should the Agreement be terminated pursuant to this Section, CITY may
procure on its own terms services similar to those terminated.
F. By executing this document, CONSULTANT waives any and all claims for
damages that might otherwise arise from CITY's termination under this
Section.
16.OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps,
models, photographs and reports prepared by CONSULTANT under this Agreement are
CITY's property. CONSULTANT may retain copies of said documents and materials as
desired but will deliver all original materials to CITY upon CITY's written notice. CITY
agrees that use of CONSULTANT's completed work product, for purposes other than
identified in this Agreement, or use of incomplete work product, is at CITY's own risk.
City of El Segundo Professional Services (REV 2018.05)
Page 4 of 11
Agreement No. 6841
17. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service
under this Agreement, no copies, sketches, or graphs of materials, including graphic art
work, prepared pursuant to this Agreement, will be released by CONSULTANT to any
other person or public CITY without CITY's prior written approval. All press releases,
including graphic display information to be published in newspapers or magazines, will
be approved and distributed solely by CITY, unless otherwise provided by written
agreement between the parties.
18.INDEMNIFICATION.
A. CONSULTANT agrees to the following:
L Indemnification for Professional Services. CONSULTANT will
save harmless and indemnify and at CITY's request reimburse
defense costs for CITY and all its officers, volunteers,
employees and representatives from and against any and all
suits, actions, or claims, of any character whatever, brought
for, or on account of, any injuries or damages sustained by
any person or property resulting or arising from any negligent
or wrongful act, error or omission by CONSULTANT or any of
CONSULTANT's officers, agents, employees, or
representatives, in the performance of this Agreement, except
for such loss or damage arising from CITY's sole negligence
or willful misconduct.
i. Indemnification for other Damages. CONSULTANT indemnifies
and holds CITY harmless from and against any claim, action,
damages, costs (including, without limitation, attorney's fees),
injuries, or liability, arising out of this Agreement, or its
performance, except for such loss or damage arising from
CITY's sole negligence or willful misconduct. Should CITY be
named in any suit, or should any claim be brought against it
by suit or otherwise, whether the same be groundless or not,
arising out of this Agreement, or its performance,
CONSULTANT will defend CITY (at CITY's request and with
counsel satisfactory to CITY) and will indemnify CITY for any
judgment rendered against it or any sums paid out in
settlement or otherwise.
B. For purposes of this section "CITY" includes CITY's officers, officials,
employees, agents, representatives, and certified volunteers.
C. It is expressly understood and agreed that the foregoing provisions will
survive termination of this Agreement.
City of El Segundo Professional Services (REV 2018.05)
Page 5 of 11
Agreement No. 6841
D. The requirements as to the types and limits of insurance coverage to be
maintained by CONSULTANT as required by Section 22, and any
approval of said insurance by CITY, are not intended to and will not in any
manner limit or qualify the liabilities and obligations otherwise assumed by
CONSULTANT pursuant to this Agreement, including, without limitation, to
the provisions concerning indemnification.
19.ASSIGNABILITY. This Agreement is for CONSULTANT's professional services.
CONSULTANT's attempts to assign the benefits or burdens of this Agreement without
CITY's written approval are prohibited and will be null and void.
20.INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that
CONSULTANT will act as an independent contractor and will have control of all work
and the manner in which it is performed. CONSULTANT will be free to contract for
similar service to be performed for other employers while under contract with CITY.
CONSULTANT is not an agent or employee of CITY and is not entitled to participate in
any pension plan, insurance, bonus or similar benefits CITY provides for its employees.
Any provision in this Agreement that may appear to give CITY the right to direct
CONSULTANT as to the details of doing the work or to exercise a measure of control
over the work means that CONSULTANT will follow the direction of the CITY as to end
results of the work only.
21.AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with
respect to all services and matters covered under this Agreement. CITY will have free
access at all reasonable times to such records, and the right to examine and audit the
same and to make transcript therefrom, and to inspect all program data, documents,
proceedings and activities. CONSULTANT will retain such financial and program
service records for at least three (3) years after termination or final payment under this
Agreement.
22.INSURANCE.
A. Before commencing performance under this Agreement, and at all other
times this Agreement is effective, CONSULTANT will procure and
maintain the following types of insurance with coverage limits complying,
at a minimum, with the limits set forth below:
Type of Insurance Limits
Commercial general liability: $2,000,000
Professional Liability $1,000,000
Business automobile liability $1,000,000
City of El Segundo Professional Services (REV 2018.05)
Page 6 of 11
Agreement No. 6841
Workers compensation Statutory requirement
B. Commercial general liability insurance will meet or exceed the
requirements of the most recent ISO-CGL Form. The amount of
insurance set forth above will be a combined single limit per occurrence
for bodily injury, personal injury, and property damage for the policy
coverage. Liability policies will be endorsed to name CITY, its officials,
and employees as "additional insureds" under said insurance coverage
and to state that such insurance will be deemed "primary" such that any
other insurance that may be carried by CITY will be excess thereto. Such
endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or
equivalent. Such insurance will be on an "occurrence," not a "claims
made," basis and will not be cancelable or subject to reduction except
upon thirty (30) days prior written notice to CITY.
C. Professional liability coverage will be on an "occurrence basis" if such
coverage is available, or on a "claims made" basis if not available. When
coverage is provided on a "claims made basis," CONSULTANT will
continue to renew the insurance for a period of three (3) years after this
Agreement expires or is terminated. Such insurance will have the same
coverage and limits as the policy that was in effect during the term of this
Agreement and will cover CONSULTANT for all claims made by CITY
arising out of any errors or omissions of CONSULTANT, or its officers,
employees or agents during the time this Agreement was in effect.
D. Automobile coverage will be written on ISO Business Auto Coverage Form
CA 00 01 06 92, including symbol 1 (Any Auto).
E. CONSULTANT will furnish to CITY duly authenticated Certificates of
Insurance evidencing maintenance of the insurance required under this
Agreement and such other evidence of insurance or copies of policies as
may be reasonably required by CITY from time to time. Insurance must
be placed with insurers with a current A.M. Best Company Rating
equivalent to at least a Rating of "A:VII."
F. Should CONSULTANT, for any reason, fail to obtain and maintain the
insurance required by this Agreement, CITY may obtain such coverage at
CONSULTANT's expense and deduct the cost of such insurance from
payments due to CONSULTANT under this Agreement or terminate
pursuant to Section 155.
23. USE OF SUBCONTRACTORS. CONSULTANT must obtain CITY's prior written
approval to use any consultants while performing any portion of this Agreement. Such
approval must approve of the proposed consultant and the terms of compensation.
City of El Segundo Professional Services (REV 2018.05)
Page 7of11
Agreement No. 6841
24.INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the
status on the project, which will include a schedule update and a short narrative
description of progress during the past month for each major task, a description of the
work remaining and a description of the work to be done before the next schedule
update.
25. NOTICES. All communications to either party by the other party will be deemed
made when received by such party at its respective name and address as follows:
If to CONSULTANT:
Z & K Consultants
473 E. Carnegie Drive, Suite 200
San Bernardino, CA 92400
Attention: Crystal Fraire
Phone: 951-310-7470
Email: cfraire@zandkconsultants.com
If to CITY:
City of El Segundo
350 Main Street
El Segundo, CA
Attention: Arianne Bola
Phone: 310-524-2364
Email: abola@elsegundo.org
Any such written communications by mail will be conclusively deemed to have been
received by the addressee upon deposit thereof in the United States Mail, postage
prepaid and properly addressed as noted above. In all other instances, notices will be
deemed given at the time of actual delivery. Changes may be made in the names or
addresses of persons to whom notices are to be given by giving notice in the manner
prescribed in this paragraph.
26. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest
laws and regulations including, without limitation, CITY's conflict of interest regulations.
27. SOLICITATION. CONSULTANT maintains and warrants that it has not employed
nor retained any company or person, other than CONSULTANT's bona fide employee,
to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not
paid nor has it agreed to pay any company or person, other than CONSULTANT's bona
fide employee, any fee, commission, percentage, brokerage fee, gift or other
consideration contingent upon or resulting from the award or making of this Agreement.
Should CONSULTANT breach or violate this warranty, CITY may rescind this
Agreement without liability.
28. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is
generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of
any other party. There will be no incidental or other beneficiaries of any of
CONSULTANT's or CITY's obligations under this Agreement.
29.INTERPRETATION. This Agreement was drafted in and will be construed in
accordance with the laws of the State of California, and exclusive venue for any action
involving this agreement will be in Los Angeles County.
City of El Segundo Professional Services (REV 2018.05)
Page 8 of 11
Agreement No. 6841
30. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state,
and local laws applicable to this Agreement.
31. ENTIRE AGREEMENT. This Agreement, and its Exhibit(s), sets forth the entire
understanding of the parties. There are no other understandings, terms or other
agreements expressed or implied, oral or written. This Agreement will bind and inure to
the benefit of the parties to this Agreement and any subsequent successors and
assigns.
32. RULES OF CONSTRUCTION. Each Party had the opportunity to independently
review this Agreement with legal counsel. Accordingly, this Agreement will be
construed simply, as a whole, and in accordance with its fair meaning; it will not be
interpreted strictly for or against either Party.
33. SEVERABILITY. If any portion of this Agreement is declared by a court of
competent jurisdiction to be invalid or unenforceable, then such portion will be deemed
modified to the extent necessary in the opinion of the court to render such portion
enforceable and, as so modified, such portion and the balance of this Agreement will
continue in full force and effect.
34.AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary
action has been taken by the Parties to authorize the undersigned to execute this
Agreement and to engage in the actions described herein. This Agreement may be
modified by written amendment.
35. ACCEPTANCE OF ELECTRONIC SIGNATURES. The Parties agree that this
Agreement, agreements ancillary to this Agreement, and related documents to be
entered into in connection with this Agreement will be considered signed when the
signature of a party is delivered by electronic (.pdf) or facsimile transmission. Such
electronic or facsimile signature will be treated in all respects as having the same effect
as an original signature.
36. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience
of reference only and will not affect the interpretation of this Agreement.
37. TIME IS OF ESSENCE. Time is of the essence for each and every provision of this
Agreement.
38. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire,
flood, explosion, acts of terrorism, war, embargo, government action, civil or military
authority, the natural elements, or other similar causes beyond the Parties' reasonable
control, then the Agreement will immediately terminate without obligation of either party
to the other.
City of El Segundo Professional Services (REV 2018.05)
Page 9 of 11
Agreement No. 6841
39. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT
represents that it has demonstrated trustworthiness and possesses the quality, fitness
and capacity to perform the Agreement in a manner satisfactory to CITY.
CONSULTANT represents that its financial resources, surety and insurance experience,
service experience, completion ability, personnel, current workload, experience in
dealing with private consultants, and experience in dealing with public agencies all
suggest that CONSULTANT is capable of performing the proposed contract and has a
demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY.
[Signatures on next page]
City of El Segundo Professional Services (REV 2018.05)
Page 10 of 11
Agreement No. 6841
IN WITNESS WHEREOF the parties hereto have executed this Agreement the
day and year first hereinabove written.
CITY OF EL SEGUNDO
Z & K Consultants
Darrell George Name: rystal Fraire
City Manager Title President
ATTEST:
tuk!-L-
Tracy Weaver,
City Clerk
APPROVED AS TO FORM:
MARK D. HENSLEY, City Attorney
M-
JoaquiH Vazquez, Deputy City Attorney
Name: Zack Faqih
Title: Secretary
Insurance Reviewed by: N e) i' ?4
City of El Segundo Professional Services (REV 2018.05)
Page 11 of 11
Taxpayer ID No. 80-0359298
City Business
License No.: 44118
EXHIBIT A
CONSULTANTS DECEMBEF'-ll 26, 2023
Agreement No. 6841
;
1. Cover Letter ........................... ........... ..... ........................ .... .......................... �..... ...... -A
2. Firm/Team Overview...., — ... - ... ........................................................ ......... ......... ...........2
3. References ............................. .............................., ...„,........,.., .,..,......,.,.,....- ...............,....8
4. Project Understanding and Approach— ........ ---............ ................. .......... ......................9
5. Cost Proposal................................................................................................... ...........11
6. Resumes...................................................................................................... Attachment A
EMCONSUL,TANTS
BUILDING SOLUTIONS
Agreement No. 6841
SECTION 1. COVER LETTER
City of El Segundo, City Clerk's Office December 26, 2023
350 Main Street, El Segundo, CA 90245
Attn: Arianne Bola, Senior Associate Engineer
Subject: Request for Proposal On -Call Construction Inspection Services
Dear Ms. Bola,
Augmentation.Z&K Consultants Inc. (Z&K) proudIy presents our proposal to the City of El Se undo for Public Works lirispection Services
Staff certified Disadvantaged.,
* . r • •
..-
Z&K is proposing the same experienced team members that successfully managed
Capital Improvement and Public Works Projects involving street improvements,
underground utility installation, overhead fiber installation, flatwork, curb, gutter,
sidewalk, driveway and pavement improvements, power pole replacements,
bridges, traffic signal improvements, sewer and storm drain improvements, water
lines, landscaping, grading, trenching, compaction, backfilling, mixes of concrete
or asphalt, and improvements to City facilities such as parks, community centers,
and city buildings. Z&K works proactively and diligently with City staff to successfully
deliver projects under, budget while mitigating numerous unforeseen delays.
Z&K has carefully selected this "A -Team" and has committed our most qualified staff for the duration of the
contract to deliver successful the City's Projects. Our team members have strong Construction Management and
Inspection knowledge and leadership skills. They can manage multiple projects or tasks and have excellent oral and
communication skills. Our Public Works Inspectors can collaborate with a diverse group of people with different skill levels.
They will be able to conduct public workshops and have an explicit understanding of the California (Public Contract Code
and the City of El Segundo's Municipal Code efficiently and effectively, Our Construction Inspectors have experience
managing complex Public Works projects with broad knowledge and experience in the field of engineering,architectural„
and environmental. Z&K has a deep bench of qualified Public Works Inspectors accustomed to working with City Public
Works projects and procedures and are experienced to efficiently complete the City CIPs.
Our team currently holds similar contracts for the following:
I will serve as the contact person for the full duration of the contract, and I am authorized to bind the firm to the terms of
the proposaland execute legal documents on behalf of the firm. Z&K Consultants, Inc. does not have any exceptions and
commits to accept the terms and conditions of the City of El Segundo professional Services Agreement. By signing below,
I attest that all information submitted with the proposal is true and correct. The RFP Submittal and rate sheet will remain
valid for a period of not less than 90 calendar days from the date of submission.
Sincerely,
C !.� rkvz
Crystal Fraire, PE I President I Z&K Consultants Inc.
17130 Van Buren Blvd. I Suite 122 1 Riverside, CA 92504
951.310.7470 1 cfraire@zandkconsultants.com
CONSULTANTS Page 1 of 11
Agreement No. 6841
" w� • w w ' w ,, w w • w w
!IY w • •w ■ a
Our proposed Z&K team has successfully delivered numerous similar projects,
ahead of schedule and under budget. Z&K has identified a multidisciplinary team
to deliver excellent Inspection services for the City's upcoming Projects. The Z&K
team knows the importance of providing qualified and experienced personnel,
capable of working independently, that arrive on -site properly equipped and have the
necessary safety and technical training to start work with no learning curve.
Z&K commits to providing our best inspection services for timely project
completion.. We will dedicate the necessary resources to complete each assignment on time and within budget. Our key
personnel will be assigned to the project for the entire duration and will not be removed or replaced without concurrence
from the City.
We maintain an extensive history of working with various local' agencies.
Throughout the completion of many projects our team has demonstrated an
unparalleled ability to work 'well with local agency staff,�aaroject
stakeholders, engineers„ and contractors, We have successfully delivered.
projects in a timely and cost-effective manner and have acquiredan
understanding of agency requirements..
Z&K has extensive experience providing Inspection services for the following agencies:.
All proposed staff possess the certifications and licenses required to provide professional construction management and
inspection services. Our staff licenses include re rg istered civil engineers, traffic engineers„ QSDIQSP, ICC Certified in all
trades, certified plan reviewers, and Certified Building Officials for building projects. Our team has specialized construction
management and inspection training.
Management Approach N Z&K provides proven professional construction mana ement techniques to ensure the safe
construction of a quality project completed on time and within budget. Z&K accomplished this by establishing the systems„
policies, and procedures necessary to ensure adequate project controls are in place. The Construction Inspector must
ensure all parties understand the basic responsibilities and interrelationships of all team member such as the. Owner (both
project management and operations), the Design Engineer„ the Contractor, the construction management team, and the
subconsultants. Additionally„ a good Construction Inspector must have the knowledge and experience, to effectively
understand the interrelationships between the key management components of time, information„ cost, and quality. Decision
making„ including obtaining sufficient information to make reasoned decisions, is the key element leading to a successful
project. the project. Our Team successfully delivers projects through time, information„ funding, cost, and quality
management.
Page 2 of 11
CURRENT
L CONTRACTS
IMU&1=101
Agreement No.
On -Call Construction Mana ement and Inspection Services
6841
2023-2025
1
Cityof Laguna Beach
2
City of Carson
On -Call Construction Management and Inspection Services
2023-2026
3
City of Carson
On -Call Project Management and Inspection Services
2023-2026
4
_ mmm mm m
C�i r Costa Mesa
Support Services
On -Call Public Works/En meenn Staff S„
2023-2026
5
Hof _
City of La Mirada
mm
On -Call Construction Manage Services nmmmW
2023 2026
6
C of Palm Desert
�X
On -Call Construction Management and Inspection Services
2
2023 „ 025
7
City of Newport Beach
_
On -Call Project Management Services
2023 — 2026
City ofCMa each*
YConstruction...
On- Management Services
2
2023 — 2026
9
of Chino
�....._.....
On Call Full Engineering Services _................
2020 — 2025
10
_ __
Cif of Chino`
—. ......... — _
On -Call Project Management Services
2020 — 2025
11
Citr of Chino`
On -Call Construction Management Services
2022 —2025
12
City of Rancho Pales Verdes
_..
On -Call Construction Mana ement
2022 — 2025
13
CityServices
each
ll , a_.........-... _._.
_.. 22 —2025
14
._ .
City of Irwindale*
�
On -Call Construction Management Services _.
2022 —2025_
15
City of San Bernardino*
On -Call Project Mana ement and Construction Management
2019 — 2023
_...
16
City of San Bernardino'
—
On -Call Public Works Inspection Services _
2019 — 2023
17
Cit of Oc....
eanside*
........ - ...._
On -Call Construction Mangy ement Services
2019 — 2024
18
City of Oceanside*
On -Call Project Management Services ... ......20
2019 — 2024
19
mmITITITmm—
Lon each Utilities*
On -Call ram, Project, aged Construction Mana a ment Services
Prog_ j _ 9 m...IT
2021 — 2026
,
20
..—.
Cit of Norco
On -Cal Inspection Services for
ruction
21
City of Pomona
^Pro
On,ICall Construction uct on Managementdand Insect on ServicesPW
2021 — 2024
22
City of Norco
On-CaBuilding II Professional Inspection Services for
2
23
City of Corona
On -Call Public Works Ins e ction Se ricesDepartment
020 — 2023
24
City of Corona*
On-P
25
City of Lancaster
On -Call Consttructioln Management and Inslcec iqp Services
20211 — 2024
On -Call Management S
tPubl
2017 —2024..
27
City of Beaumont*
cg
On -Call Works Inspection
^ 2017 — 2024
28
City of Beaumont'
mmITITITITITmmmmmmm ^
On -Call Project Management Services
2017 — 2024
29
City of Temecula
On -Call Construction Management Services
„2019 — 2024
30
City of Moreno Valle
On -Call Construction Mana ement and Ins ection Services
2019 — 2024
31
Count of Los Angeles
On -Call Construction Mang ement and Ins ection Services
2019 — 2024
32
City of Eastvale
On -Call Construction Management Services
2022 — 2025
33
Cit of Eastvale
On -Call Public Works Inspection Services
2022 2025
Cit roof Eastvale
On -Call Project Management Services
2022 2025
35
County of Riverside
On -Call Construction Management and Inspection Services
2022 —2025
Trans ortation Department*
*Contract
has had Multiple Contract
Extensions
11*�'` i i t 101
The Z&K Team has successfully performed Construction Management, Construction Inspection, and Materials Testing
Coordination for numerous public agencies. The, following rojects have been completed on time and within budget.
Page 3 of 11
Agreement No. 6841
STREET IMPROVEMENT PROJECTS
CITY OF LAKE T RESURFACING
PORTOLA TO EL T INSPECTION L Y
SEAL ZONE F AND ARTERIAL Y SEAL JERONIMO AND MUIRLANDSLOS
ALISOS TO BAKE I The Z&K Team is providing Project Management, Construction Management,
Construction Inspection, Pre -Construction Inspection, and Contract Administration Services for
these projects, which involves the street resurfacing and the slurry seal. Relevant project features
include street resurfacing and rehabilitation, application of slurry seal, grinding and overlay, cold
milling, concrete improvements„ ARHM pavement, AC base course, aggregate base, signing,
striping., markings and pavement legends, removal and replacement of PCC curb ramps, removal
and replacement of PCC sidewalk, bike lame traffic loops„ Type E traffic loops, dig outs„ sewer and
storm drain manhole adjustments„ and water valves adjustments.
CITY OF COSTAESA, CITYWIDE PARKWAY MAINTENANCE,REHABILITATION, L L
PROJECT I Z&K Consultants, Inc. is providing Construction Management and Project Management Services for this
citywide street improvement program in the City of Costa Mesa. This project includes street improvements, intersection
improvements, ADA ramp improvements, conduit installation, traffic signal improvements„ mobilization, curb and gutters,
sidewalks, driveway approaches, spandrels, cross gutters„ adjustment of manholes and utility covers to grade, procurement
and application of slurry seal Type II, crack sealing, traffic signing„ striping and markings„ installation of traffic markers and
speed humps, and implementation of traffic control.
CITY OF CHINO, SLURRY SEAL PROGRAM (VARIOUS LOCATIONS CITYWIDE) I Z&K Consultants Inc. is providing
Project Management, Construction Management, and Inspection oversight services for this Project which includes street
rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits„ Chino Ave from City
Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pavement improvements,
street resurfacing, crack sealing, slurry seal, localized dig -outs, striping removal/install, and traffic loop detectors.
CITY OF CHINO„ ALLEY/SANITATION REHABILITATION PROJECT I Z&K Consultants Inc. is providing, Project
Management and Construction Management for this Project which, includes removal of existing alley pavement and base
section to construct new AC pavement section and ribbon gutter in multiple alleys in the City of Chino. Scope of work
includes new PCC drive and alley approaches, curb and gutter, 4' PCC alley gutter, new AC pavement section over
compacted crushed miscellaneous base, and the construction of several block walls.
CITY OF SAN BERNARDINO, STREET REHABILITATION(PROGRAM (0 MAJOR CITY STREETS) I Z&K Consultants,
Inc. is providing Project Management, Construction Management and Inspection Services for this long-term, on -call contract
with the City of San Bernardino, 'which includes street resurfacing and pavement rehabilitation for over 30 major streets and
multiple major street intersections in the City, The projects include roadway and pavement rehabilitation, concrete
improvements„ cross gutters„ curb and gutters„ curb ramps, ADA improvements, storm drain and pipeline relocation, traffic
signal improvements, traffic control, full depth removal ,arid, replacement of asphalt concrete, cold milling and AC overlay of
existing asphalt concrete, slurry seal application PCC sidewalk„ replacement of existing PCC driveways, driveway
approaches„ curb ramps„ retaining curbs, S high retaining wail, parkway culverts, cross gutters, asphalt -concrete pavement,
removal and replacement of trees„ clearing and grubbing, installation and configuration of multiple traffic loop detectors and
bicycle traffic loop detectors, installation of city project signs, preservation of existing city Survey monuments„ adjusting
manhole and utility covers to grade, reconfiguration and installation of street lighting, and installation of pavement markings
and striping.
CITY OF COMPTON,L RESIDENTIAL STREET REHABILITATION PROJECT, PHASE 1 & PHASE(Two
Separate Projects) I Z&K Consultants, Inc, is providing Project Management, Construction Management„ Inspection, and
Labor Compliance services for this Project, The scope of work consists of roadway and pavement rehabilitation, concrete
improvements, asphalt overlay, construction staging„ heavily travelled intersections, traffic control, clearing and grubbing„.
S'V'WPPP preparation, cold mill and overlay,, PCC sidewalk, manholes and utility covers„ speed humps, pedestrian crossings,
ADA improvements, slurry seal application, HMA ,pavement, ARHM overlay„ AC base course, aggregate base, full depth
AC slot pavement, alley intersection„ driveway and driveway approach, landscaping„ irrigation„ adjusting manhole and utility
covers to grade, water valve, water meter, street lighting installation of loop detectors„ traffic signal modification, adjustment
of streetlight and traffic signal pull boxes to grade,.
CITY OF SAN MARINO, STREET REHABILITATION PROGRAM PHASE '1 & PHASE 2 (TWO SEPARATE PROJECTS)
I Z&K Consultants, Inc. provided Project Management and Construction Inspection Services for this program, which
consisted of citywide roadway pavement rehabilitation. The program's improvements included construction of roadway and
pavement rehabilitation, concrete improvements, cross gutters„ curb and gutters, curb ramps, ADA improvements, cold -
milling asphalt concrete pavement and re -paving with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM), clearing
and grubbing„ , localized pavement repairs, replacing impacted traffic striping, markings, pavement legends„ loop detectors„
curb painting, driveways and driveway approaches, installing speed humps„ adjusting utility frames and grates, inspection
and replacement of sewer manholes, water valves, water meters, and storm drain manholes, preparation and
implementation of SVWPPP and temporary construction BMPs, and providing temporary traffic control.
CITY OF NORWWALK, CI E'O LOCAL STREETS REHABILITATION PROJECT I Z&K Consultants„ Inca is providing
Construction Management and Inspection services for the Local Streets Rehabilitation Protect, funded by the Community
Development Block Grant (CIJI C) fund. The scope of work includes improvements to concrete appurtenances, including
cross gutters, curb and gutters, upgrades of curb ramps to ADA standards, and intersection improvements„ traffic signal
Page 4 of 11
improvements, bike lanes, underground utility coordination, conduit installation, and reh�bii atioerl fNgacV41pavement
conditions.
CITY OF ROSEMEAD, WALNUT GROVE AVE. RESURFACING PROJECT, PHASE I IZ&K Consultants, Inc. is providing
Project Management, Construction Management and Inspection Services for this project, which involves street resurfacing
of Walnut Grove Ave.,, from Marshall St. to Grand Ave. in the City of Rosemead. In addition to street improvements„ the
project included intersection improvements, removal and' replacement of existing AC pavement„ cold mill and overlay„
asphalt pothole repairs, replacement of PCC sidewalk, removal and replacement of ADA ramps, curb and gutter„ bike lane
and bike trail, traffic signal modifications, installation of medians, adjustment of manholes and utility covers to grade,
installation of specialty and bicycle loop detectors, installation of speed humps, pedestrian crossings, and guardrail and
roadway markers.
CITY OF ALHAMBRA, FY 19-20 & 20-21 STREET REHABILITATION PROJECTS (TWO SEPARATE: PHASES) I The
Z&K Team is performing. Project Management, Construction Management, Construction Inspection, and Labor Compliance
Services for this project„ which consists of the pavement and street rehabilitation of 23 local street segments located south
of Mission Road,, west of Garfield Avenue, east of Atlantic Boulevard„ and north of Valley Boulevard. Improvements include
street resurfacing, slurry seal treatment, varying depths of cold mill and overlay, construction staging, full depth removal
and reconstruction, concrete improvements such as removal and replacement of broke and off -grade sidewalk, ADA ramps
that need updating„ brake and off -grade curb and gutter„ PCC sidewalk, installation of loop detectors„ adjustment of manhole
covers and utility covers to grade, driveway aprons in need of repairs, and concrete cross gutter reconstruction.
CITY OF TORRANCE, RESIDENTIAL & ARTERIALPAVEMENT IMPROVEMENT PROJECT, 1-159/1-139 IZ&K
Consultants, Inc. is providing Project Management„ Construction Management and Construction Inspection services for this
project, which consists of pavement improvements to a residential neighborhood and four arterial streets. Improvements
include roadway and pavement rehabilitation„ concrete improvements, cross gutters, curia and gutters, curb ramps, ADA
improvements, clearing and grubbing, application of slurry seal, cold mill and AC overlay, removal and disposal of existing)
pavement, localized pavement repairs, as well as tree removals and replacements, asphalt berm replacement, AC base
course„ PCC sidewalk, PCC driveways and driveway approaches, access and ramps, replacing pavement markingis and
striping on concrete and asphalt, and installation of raised pavement markers and City project signs.
CITY OF IRWINDALE, 202112022 RESURFACINGL RESURFACING PHASE I — AYON AVE,
CALLE DEL NORTE, PAT MIRANDA LN, CALLEE PASEO, ALLEN, PROGRESS L, CENTRAL ST
PEPPERTREE I Z&K provided Construction/Project Management and Inspection for this project. The project included street
resurfacing, traffic control, raised crosswalks, speed humps, cold milling and AC overlay of existing asphalt concrete„
construction of new curb and gutter, PCC sidewalk, installation and configuration of multiple traffic loop detectors, installation
of city project signs, preservation of existing city survey monuments, adjusting manhole and utility covers to grate,
installation of pavement markings and striping. Related work includes mobilization, traffic control, assisting in preparation
of NPDES, local utility coordination, construction management, daily inspection, labor compliance, geotechnical and
materials testing coordination.
CITY OF TORRANCE, ANZA/VISTA MONTANA/PACIFIC COAST HIGHWAY INTERSECTION E T I Z&K
Consultants, Inc provided project management and inspection services for the Anza/Vista Montana/Pacific Coast Highway
Intersection Improvements Project. This Project consists of construction of the Pacific Coast Highway/Anza Intersection
Improvements with appurtenances as shown oni, City of Torrance Plan No.'s ST-1019/SD-517/C- 2019-8/TS-2019-2/ST-
1019-TC; curb, gutter, sidewalk„ catch basins, curb ramps, raised medians, striping, traffic signal replacement; grind and
overlay, and AC pavement; and all other incidental work in this specification document.
CITY OF CHINO, ON -CALL SERVICES FOR VARIOUS STREET IMPROVEMENT PROJECTS I Z&IK Consultants, Inc. is
providing Project Management, Construction Management and Construction Inspection Services for this long-term, on -call
contract for the City of Chino. The Z&K team has served a wide range of projects„ which includes the following projects:
16th, 17th, & 18th St. Between Tronkeel Ave. and Tangerine Ave. Street Widening Project; Ramona Ave, and Walnut Ave.
Street Rehabilitation and Traffic Signal Modifications Project„ 111h St. Pavement Reconstruction Alley and Intersection
Accessibility Project; CDBG Alley Project and Alley/Sanitation Rehabilitation Project; and FY20/21 Alley/Sanitation
Rehabilitation Project.
• r • •aw- r, •• w •w• • r .�
CITY OF VERNON, 50th STREET WATERREPLACEMENT PROJECT I The Z&K Team is providing Project
Management and Inspection Services for the City ofVernon's 50th Street Water Main Replacement Project.. The projects
scope of work includes demolition and reconstruction of the 12" iron ductile pipeline and all associated renovations to the
Page 5 of 11
�•r • w • •-'ww • « r� «« r • w M w
«
• w �• • :rr r. • •
:"w r w w • • • r w -w • +�. « « w^ • • w. .' r r .- •
r • -• w s• .ww r • r,
■
• � w • -'� r i r • -
,� , .icy. i i _, -�� i r +. � w • ., • ,.. - w - w •y �;
w w « w« :Ni w Y wr • •, • »r r • r .• - •r- -w • +
-
• • • • w w w • r • . • •
w • - •-• w • w w «aw -• w •
•• w • r •. w • • r. w r •
r_ r r w•• r • w« w r,. «• r • -'w w w- .r. w w r •
Page 6 of 11
Agreement No. 6841
ORGANIZATIONAL CHART
.w �, . . _w s w �� w • � w w
ow•µ^w� ■- � • w' w w; � ww'� w Mw
,^ w•_ w ., .. , � w w M � w .. � w _ w w w w ,. w w x w aw
PROFESSIONAL AND QUALIFIED, TEAM I The key to a successful project is a highly qualified and well -managed team.
We offer the City a cohesive, talented team of licensed and certified professionals. Our Construction Inspection
professionals keep these key objectives In mind:
• Quality services and project deliverables
• Time and budget efficiency
• Adherence to quality and assurance standards
• Constant communication
• Application of technical and practical expertise.
w w r -� 'w'- . • w- . -w • Mw � w w Mwr .
w., w w. - w w • w �� w, www w w i • w
w ♦ w roject
e
Itside agencies.
Page 7 of 11
COMPANY PERSONNEL Agreement No. 6841
Z&K has carefully selected this "A -Team" and committed our most qualified staff for the duration of the contract to deliver
successful projects. Our key team members have extensive experience in construction management and inspection
services for public agencies.
6111*10,11 0 I
City of Chino
Amer Jakher
Director of Public Works
13220 Central Ave
Chino, CA 91710
ajakher@cityofchino.org 909.334.3250
i�� I Ali
� V III ij
Long Beach Water Department
Wendy Chen, Manager of Engineering
1800 E. Wardlow Road, Long Beach,
CA 90807
Wendy.Chen@Ibwater.org
562.754.3370
City of El Segundo
Cheryl Ebert
Senior Civil Engineer
350 Main Street, El Segundo, CA
90245
cebert@elsegundo.org
310.524.2321
Page 8 of 11
SECTION, PROJECT -- •
Z&K has thoroughly reviewed the RFQ&P; we confirmed our team will provide all scope of work tasks as outlined in the
RFP scope of services to ensure the success of the City of El Segundo's Projects. Z&K has a strong knowledge of the
City, County, State, and Federal codes and procedures that are required to deliver successful projects. Z&K will ensure
that all codes and procedures are properly followed for the City's Projects. Some of the requirements are as follows:
o City Standards and Design Manuals
o
Caltrans Construction & Safety Manual
o California Building Code
o
OSHA Construction Safety Orders
o California Plumbing Code
o
Local Assistance Procedures Manual (LAPM)
o California Mechanical Code
o
Work Area Traffic Control Handbook (WATCH)
o California Electrical Code
o
Manual of Uniform Traffic Control Devices
o California Building Energy Efficiency Standards
(MUTCD)
o Title 24, Part 2, 2.5, 3, 4, 5, 6, 11
o
Project Safety Plan (PSP)
o California Fire Code
o
Site Health and Safety Plan
o California Residential Code
o
Activity Hazard Analysis (AHA)
o California Green Building Code
o
Health and Safety Pews/guidelines/requirements
o California Disabled Regulations
o
Environmental Protection .Agency (EPA)
o City Codes & Ordinances
o
California Department of Education (CDE)
o APWA "Greenbook" Standard Specifications for
o
Department of Toxic Substances Control (DTSC)
Public Works Construction
o
The California Division of State Architects (DSA)
o Caltrans Standards/Specifications/Procedures
regulations
We will provide public works inspection services on various City awarded capital improvement projects in El Segundo on
an as -needed basis. We understand that projects may include new construction or renovation projects, program -wide
projects„ and/or infrastructure projects. We understand that the Public Works Inspector must have experience performing
inspection services for direct contract construction projects and will provide support to the City's Construction Manager. The
Z&K Team, at a minimum, will perform the following:
•. • s r •
• -r. -r w +� ••r • •• � •r r i • • ±• • .+ • r •-
• • • r+� •- - -• • • r r r •- r •• r.
r r •_ r r• r r ••
• r � . r • �. • r
• »r a � • • •. .;. r- - i. r r
M
- M . Mom•. • r, ,,, • M 1Y-•. • • . � ♦ ti i •
� • •,; � � . �r � • � • r • � . r• , r r r • • ,•
III@Ago • r • 11531141• •• - • • -
Deliverables:
1. Inspect a variety of public works construction projects including streets, bridges, curbs, gutters, storm drains,
sewers, water lines„ traffic signals and control, landscaping, city cash contracts, grading, trenching,
compaction, backfilling, mixes of concrete or asphalt etc. to ensure compliance with applicable codes,
ordinances and regulations.. I Z&K will inspect a variety of public wanks construction projects including streets, bridges,.
curbs, gutters„ storm drains,: sewers, water lines, traffic signals and control„ landscaping„ city casts contracts, grading,
trenching, compaction, backfilling, mixes of concrete or asphalt etc. to ensure compliance with applicable codes,
ordinances and regulations.
2. Prepare cost estimates, contract agreements and progress payment. I The team will prepare cost estimates,
contract agreements, and progress payments. Z&K will provide construction schedule and budget updates to City's
Contract. Officer, We will maintain a current monthly accounting, of construction costs to complete the project, including
approved change orders for City's review and approval.
3„ Perform inspections of public works facilities to ensure compliance with plans, specifications,and standards
for public works projects* 11! The Z&K team will perform inspections of public works facilities to ensure compliance with
plans, specifications, and standards for public works projects.
CONSULTANTS Page 9 of 11
p e eto utp Ic ,. P841
4. Perform Private Development Grading and!, Encroachment Permit inspections an'A T itralloc construction
contract inspections. I The team will perform Private Development Grading and Encroachment Permit Inspections and
Public Contract Construction Contract lrispections as needed.
5. Review plans and specifications for other city contracts, I We will review all plans and specifications for other city
contracts. Z&K Inspectors will monitor the Contractor and their subcontractors to ensure that they follow the plans,
specifications, and regulations as well as any federal, state, or local regulations.
6. Coordinate work with other city departments and utilities. I The team will coordinate work with other city departments
ands utilities. Z&K will participate in public outreach activities and assist the City in forming and maintaining good relations
with the local business community re arding construction impacts by providlin community outreach and a contact person
to manage public relations for the 'Tturation of the project. At a minimum, �:e Z&K team distribute verbal and written
notices to local businesses before any construction impacts take place. Z&K will manage and track public inquiries for
the Contractor and for the City and will advise of any concerns and findings. We will coordinate with the contractor access
to adjacent business/residents during construction phases.
7. Perform routine field tests. I The Z&K team will perform routine field tests.
8. Inspect materials for identification as conforming to specifications. I Z&K will inspect materials for identification as
conforming to specifications. Sampling and testing activities will be conducted in accordance with the contract documents
and approved procedures. The Inspector will work with the Contractor to correct any failed tests and achieve compliance.
Our team can effectively make decisions and coordinate on field issues related to material testing and inspection.
9, Inspect materials used, including reinforcing material's and the mix, slump and placement of concrete; use
equipment such as measuring rods, tapes, surveying transits and calculators to determine distance, location,
dimension, depth and grade and calculate volume; take samples of materials for testing. I We will inspect all
materials used, including everything listed, and take samples of materials testing. Z&K will coordinate with materials
testing firms regarding quality of work completed,
10, Observe work in progress and upon completion. I Z&K proposed staff will complete daily reports, including
equipment„ crews/personnei, and photos (before, during and after construction), site and weather conditions, traffic control
measures, labor, equipment and materials used, quantity of work erformed, and major incidents. The
I nspector/Construction Manager will review the inspectors' daily reports and will ensure the City receives them daily. The
Inspector will complete daily measurements of quantities, of work with the Contractor and log them in the daily inspection
reports. He will provide all documented measurements and calculations to the I nspector/Construction Manager to process
progress payments, change orders, extra work, etc. Z&K will evaluate the completion of work and we will recommend to
the City when work is ready for final inspection.
11. Record amounts of materials used, and work performed; prepare necessary reports for progress payments and
maintain field records including sketches, photo ra hs, drafting and narrative notes; inspect tracts, upon
completion and process the necessary c YAK will record amounts of materials used and work performed;
prepare necessary reports for progress payments and maintain field records including sketches, photographs, drafting
and narrative notes; inspect tracts upon completion and process the necessary documents.
15. Perform basic plan checking for subdivision, residential, and some commercial development; explain the limits
and parameters of the work as required; perform various engineering technical support work, including drafting
and acting, as a member of a Survey crew. I Z&K will perform basic plan checking for subdivision, residential, and some
commercial development; explain the limits and parameters of the work as required; perform various engineering technical
support work, including drafting and acting as a member of a survey crew.
16. Build and maintain positive working relationships with co-workers, other City employees, and the public using
principles of good customer service, I The team will actively build: and maintain positive working relationships with
coworkers, other city employees, and: the public. Z&K will participate in public outreach activities and assist the Cit in
forming, and maintaining good relations with the local business community regarding construction impacts by providing
community outreach and a contact person to manage public relations for the duration of the project. At a minimum, the
Z&K team distribute verbal and written notices to local businesses before any construction impacts take place. Z&K will
manage and track public inquiries for the Contractor and for the City and will: advise of any concerns and indings,
17. Perform related duties as required. I Z&K will perform any other related duties as needed by the City.
EMCONSULTANTS Page 10 of 11
COSTPROPOSAL Agreement No. 6841
City of El Segundo, City Clerk's Office December 26, 2023
350 Main Street, El Segundo, CA 90245
Attn: Arianne Bola, Senior Associate Engineer
Subiect: Request for Proposal On -Call Construction Inspection Services
Dear Ms. Bola,
Z&K Consultants Inc. (Z&K) proudly presents our cost proposal for On -Call Construction Inspection
Services. Z&K has carefully selected team members that are recognized as experts in engineering
services and will provide "turn -key" Construction Inspection services for the City's CIP projects. We
understand the importance of meeting budgets and schedules; we have a strategic plan in place to
deliver projects with such benchmarks in mind.
Z&K Consultants based our cost proposal on the scope of work provided in the Request for
Proposals. All prevailing wage requirements will be followed by the team. All team members are in
conformance with the State of California Labor compliance requirements. Rates included in our Cost
Proposal are fully billable rates. All overhead costs are included. All insurance will be in force at the
time of contract execution.
Below is a table with the hourly rate schedule.
Z&K Consultants, Inc. Hourly Rates:
Senior Construction Inspector........................................................................................... $144
I will serve as the contact person for the full duration on the contract and I am authorized to bind the
firm to the terms of the proposal. By signing below, I attest that all information submitted is true and
accurate. This proposal shall remain valid for a period of not less than 120 days from the date of
submittal. The payment terms shall be net thirty (30) days. We are excited about this opportunity
to serve the City of El Segundo and are committed to the successful completion the City's
important CIP projects.
Sincerely,
t ('A
Crystal Fraire, PE I President
Z&K Consultants Inc.
17130 Van Buren Blvd. I Suite 122 1 Riverside, CA 92504
951.310.7470 1 cfraire@zandkconsultants.com
Z&K Consultants, Inc. I www.zandkconsultants.com 1951.310.7470 Page 11 of 11
„ p 7117, i , Fi��Y ?ti �i /iOJnlus, , y,
/! ��s//✓1 0 r�. �! /� '�Fniirr � '¢ %� P �l 4. '/('/jaYFi/r �d ff%F�r F�ru f!p/liYr/19/���. J� � / !, � ( I'rnipr r��.
�/
/
b
BUILDING SOLUTIONS
Agreement No. 6841
Thomas Dawson, CIAO, ICC Cer "Ifier
BUILDING SOLU
TIONS
Senior Construction Inspector
LICENSES &
REGISTRATION
» International Code
Counsel Certifications
» Building Plan Examiner
» California Commercial
» Combination Inspect/Legacy
» California Commercial
Plumbing Inspector
» California Commercial
Mechanical Inspector
» California Residential
Mechanical Inspector
» California Residential
Electrical Inspector
» California Residential
Plumbing Inspector
» Certified Building Official
» CLB License No. 674861
» OSHA 30 Hr.
Management"Zelevant Key Highlights:
Construction
ContractConstruction Inspection
Administration
Project
Management
En f yp oI
SubmittalCD G Fun edrojects
urrogress Billin, Review
Charige Order Review
Request forInformation
Cons,tructabil�it,y Review
Materials Testini Coordination
Cail/OSHA o
Public
Utility ooin
SWPPP Compliance
QuaIity Control/Quality
Assurance
Tr,?'V-ic Control on Arterial Streets
hment Permit
Inspection
Street Improvement
A,C Grind and Overlay
Pavement Rehabilitation
Underground
Overhead )Installation
Updates . Traffic Signalsand
Traffic Loops
ADA Ramps,Sidewalks, Curb
Drivewaysand Gutter,
Power Pole Replacements
Caltrans Construction
Intersection Improvements
Federally Funded Projects
RemovalAC !
Base Cement Treatment
Landscaping and Irrigation
SCE Coordination
Mr. Dawson has over 25 years of experience in public works inspection„ construction
management, contracting, quality control„ and management of large-scale capital
improvement projects, and has successfully delivered over 28 street Improvement
,projects involving street improvements, intersection improvements„ ADA ramp
improvements, bike lanes and bike trails, conduit installation, traffic signal
improvements, asphalt overlay, construction staging, traffic control, clearing and
grubbing, SWPPP preparation, manholes and utilty covers, loop detectors„ P'CC
sidewalk, speed humps, and pedestrian crossings. Mr. Dawson's expertise extends to
Ns familiarity with Caltrans, Federal Department of Labor and State of California
Division of Labor Standards Enforcement„ and equal' employment opportunity
compliance monitoring. Mr. Dawson is experienced in performing quality control and
code compliance inspection services for owners, engineers„ and local jurisdictions.
Relevant Project Experience
City of LakeForest: Street Resurfacing of Merin Ranch Roaarom Fortola to El Toro, Lake Forest, CA I
Construction I' anagerlSerrlor ConstructionInspector° This street improvement program involves resurfacing of Glenn
Ranch Road from Portola to El Taro„ as well as pre -construction inspection services for the slurry sea) of Zone F and arterial
slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. This program required ARHM overlay, traffic control, signing,
striping, marking„ and legends, traffic loop detectors, bike lane traffic loops, adjustments to storm drain manhole frame and
sewer manhole„ gas valve lid and can„ water valve lid and can, removal and replacement of PCC sidewalk, removal and
replacement of existing curb ramps, cold milling, ,and removal and replacement of concrete sidewalk, removal and
replacement of curb ramps, localized repairs, and other miscellaneous improvements.
City of Compton. Annual Residential Rehabilitation Project (Phases 1 & Phase 2A), Compton, CA j Construction
Manager/Senior (Construction lnspelctors Scope of work consisted of construction of cold mill, ARHM pavement, AC base
course, aggregate base, full depth AC slot pavement, curb and gutters, sidewalks, cross gutter„ alley intersection, driveway
approach, curb ramps, signing, striping, markings, and pavement legends, speed hump, traffic signal loop, adjust to ggrade
existing sewer manhole, water valve, water meter, and storm drain manhole,. Mr. Dawson"s responsibilities included
construction inspection, reviewing traffic control plans, issues management, cost control, labor compliance, dispute
resolution, quality controllinspection, public relations, and ensuring site safety.
City of Sean Marino: Street Rehabilitation Program, San Marino, CA (Phase 1 and Phase 2) N Construction
anagerfSenior Construction Inspector: Improvements include cold -milling asphalt concrete pavement and repaving
with HMA and ARHM, clearing and grubbing, localized pavement repairs„ replacing impacted traffic striping„ markings,
pavement legends, loop detectors, curb painting, replacing damaged curb and gutter, curb ramps, cross gutters„ sidewalks,
driveways and driveway approaches, inspection and replacement of sewer manholes, coordinating with local utilities,
preparation and implementation of S (PPP and B'MPs, and providing temporary traffic control in conformance with the
contract documents and applicable permits.
City of Alhambra: FY 19.20 & FY 20-21 SB1 Street Rehabilitation Projects,, Alhambra, CA (Phase 1 and Phase 2) j
Construction Manager/Senior Construction lnspector� This program consists of pavement and street rehabilitation of
23 local street segments located south of mission road, west of Garfield Avenue, east of Atlantic Boulevard, and north of
Valley Boulevard, Pavement improvements include intersection improvements, slurry seal treatment, varying depths of cold
milling and overlay„ and full depth removal and reconstruction. The project also includes concrete improvements such as
removal and replacement of broken; and off -grade sidewalk„ ADA ramps, median installation, sidewalks, and driveway
approaches, that need updating, broken and off grade curb and gutter„ driveway aprons, in need of repairs, concrete cross
gutter reconstruction, and traffic signing striping, and markings.
Thomas Fussell
Senior Construction Inspector
LICENSES & REGISTRATION
» Electrical Training
apprenticeship IBEW Local 441
City of Orange, California
» Journeyman Electrician, State
Agreement No. 6841
1000NSULTANTS
BUILDING SOLUTIONS
Encroachment
.. •
GrindStreet Improvement
AC and Overlay
Pavement Rehabilitation
Underground Utilities
Overhead Fiber Installation
Updates 4 Traffic Signalsf1
Traffic Loops
ADA Ramps, Sidewalks, Curb Gutter, Driveways
Power Pole Replacements
Caltrans Construction
Intersection• +
Federally Funded Projects
RemovalAC f Replacement
StripingBase Cement Treatment
ti Signage
Landscaping Irrigation
SCE Coordination
r w w. •'r. • ww w w 'w • - ,r^ w • r •
w r w, ww r .. - w.r w • w •r- ,, w w_
- � • w
�- .. •,, r • .• -w. ., w r •r- •- r w � ♦ • w
.• r r r w •• w r
"�•� �w ^^ w w- w
r w r' + � r � • � � •
•I r " w. • r • r w r - x w w+ w � •, „
w „w r• w w w w w
.•w ., repair,w . w • w w" • •
• 'r w w 11 • •
wvalveboxes, r w r, r, qp = w r • fire hydrant• Russell r r r
Caltranis standard specifications and standard plans.
Relevant Project Experience
� � � • �w w � r r' l.,w •w
�•wa, M•w "r^w r• -« • r w w w r w', • w w r � „I Iw r r
w w ^r, w • .r_ r r w w^ • - • � r • '
"` w • w +� ^ r. r +w * . w w • • » • • w, w w • ■
' w • - I - r r - • r - w + r- w _ • � w w �^, - ., • w ^w, r •
• • • w r r
� w r;�^ r • • r w ,; r w o w r
w r • w o w w~ w r M w w • .� MN�w' •
♦ r •� .. r .. • I � :* w w • � w w ' • r + ', w, w � 1 w. r * M • w •... w qM w � �
- e� � • r.,w .w w• • .• r w - r +• r •
• i r w _ •- r, • • - ww. r � • rw +� w i
w w• r• r w� • w •w-,w w • Iww r ,�� w w r, r -•
r • � ,. �r r r r w ww r - ! . «, w� r
rw • � w w " ��
r _ w ^r . w .„ w w .. • w w r r r� • w, r
r w. • r U
ConstructionRelevant Key Highlights,
InspectionConstruction
AdministrationContract
EngineeringProject Management
Support
SubmittalCDBG Funded Projects
Progress Billing
Change Review
OrderReview
Requestfor r. ." Review
Constructability
Materials Testing Coordination
Compliance
RelationsPublic
CoordinationUtility
SWPPP Compliance
Control/QualityQuality
TrafficAssurance
. r,
Senior Construction Inspector
EDUCATION
» Master of Science in Civil
Engineering - University
of Jordan, Amman,
Jordan
» Bachelor of Science in
Civil Engineering - Mutah
University
Relevant Key Highlights:
Construction Management
Construction Inspection
Contracto
Project
Engineering Support
CDBG FundedProjects
Submittal
Progress Billing Review
Change Order
Request for
Constructability Review
TestingMaterials Coordination
Cal/OSHAo.
Public Relations
Utility Coordination
SWPPP Compliance
Quality Control/Quality Assurance
Traffic Control
Agreement No. 6841
BUILDING SOLUTIONS
Encroachment Permit Inspection
Street Improvement
AC Grind and Overlay
Pavement Rehabilitation
Underground
Overhead Fiber Installation
Updates r Traffic Signalsand
Traffic Loops
Driveways
Power Pole Replacements
ImprovementsCaltrans Construction
Intersection
Federallyr.r Projects
AC Removaland Replacement
Base Cement Treatment
Striping : Signage
Landscaping r Irrigation
SCE Coordination
TRAINING &
REGISTRATION
Mr, Alhroob is a qualified civil engineer with experience in construction inspection,
» QSD/QSP Training
construction management, field investigation, and quality control for numerous capital
is Caltrans Temporary
Improvement projects ^and federally funded projects, involvingstreet improvements,
p p j y p I ', , p
Pedestrian
Pedestrian
roadway widenings, bridges, waterfwastewater projects„ sewer pipeline projects, water
» Cal OSHA
pipeline projects, storm drain projects, oonstruction, storm drains, traffic signals, traffic
» 30-Hr.sive Driving
signs, streetlights, pavement marlcin s, construction projects, and maintenance protects.
He has successfully delivered over 2 storm drain and pipeline projects. His inspection
Training
» Risk Management
responsibilities include the aty t�o revi�e�w improvement plans, inspect public
improvements construction, negotiate and administer contracts, and prepare and maintain
Training
i Hydrology Study
a variety of reports. Mr. Allhroob has a thorough understanding of Call -OSHA practices ,and
>> Hydraulic Drainage
Hydr n
Desi
procedures, 'traffic control„ ADA and CaltransADA requirements, as well as extensive
knowledge of Caltrans construction practices, physical characteristics and properties of
traffic highway materials, and approved methods and equipment
>i Concrete Pavement
Training
control and construction
used in making physical tests of construction materials, Additionally, Mr. Alhroob is
i> Hot Mix Asphalt (HMA)
thoroughly familiar with the Creenbook and Caltrans field and construction office
procedures, with experience assisting in inspection to assure compliance with plans and
Design & Verification
specifications„ assisting in preparation of contract change orders, contract estimates, and
for
progress payments, coordinating field testing of materials compliance with project
specifications and the Caltrans Quality Assurance Program„ maintaining accurate project records, performing analytical.
calculations, and monitoring Contractor progress by preparing progress reports as required.
Relevant Project Experience
City of San Bernardino: 40th Street Widening from Johnson to Electric Avenue Project I Senior Construction
Inspector; This project includes the widenin of 40th Street from two (2) to four (4) lanes from Johnson to Electric Avenue
including upgrade of the existing traffic signaat Electric Avenue. This includes finalizing the street and sewer design, right
of way acquisition, and undergrounding of the overhead lines under Rule 20-A.
r ar r • • rr ,raw r r, r rr• • r r r
w
r r rr r -. •M .+ r, � , rw r � �, w , w r r • -
• w- r■ •: r w wr r r., .r e•^ • w' -• r •^ w r, r r
.•• • • • r r r • •
• +
• w r w• • r • r • .• r
w r r •, * r rr r ... w �r« w r r r r .• ew
r ,� r 'w _ �, w •- N r • •r• - w •.,_� r w.,r
Agreement No. 6841
Eduardo (Eddie) Davalos M3CONSULTANTIS
BUILDING SOLUTIONS
Senior Construction Inspector
EDUCATION &
CERTIFICATIONS
Citrus College, Covina, CA,
Public Works/Earth Work
OSHA 30 Hour Construction
Safety & Health
)> Sexual Harassment
"%Wlevant Key Highlights:
Construction peManagement
Construction Insction
Contract Administration
Project Management
Engineering Support
CDBG Funded Projects
Submittal Reviews
Progress Billing Review
Change Order Review
Request for Information Review
Constructabty Review
Materials Testing Coordination
Cal/OSHA Compliance
Public Relations
Utility Coordination
SWPPP Compliance
Quality Control/Quality
Assurance
Traffic Control on Arterial
Streets
Encroachment Permit
Inspection
Street Improvement
AC Grind and Overlay
Pavement Rehabtation
Underground Utilities
Overhead Fiber Installation
Updates to Traffic Signals and
Traffic Loops
ADA Ramps, Sidewalks, Curb
and Gutter, Driveways
Power Pole Replacements
Caltrans Construction
Intersection Improvements
Federally Funded Projects
AC Removal and Replacement
Base Cement Treatment
Striping & Signage
Landscaping and Irrigation
SCE Coordination
extends to his familiarity with Galtrans, -ederaFJ1—,ep—a ment OT Lafor aril SEaTo (it Gaw-Urmar-
Enforcement, and'equal employment opportunity compliance monitoring.
Relevant Project Experience
. ................
N:FVZ-TR =-i U1,11- tMi
material, and equipment reports.
Agreement No. 6841
Gregory H'unkle, CBO, I C Certified M3CONSIULTANTS
BUILDING SOLUTIONS
Senior Construction Inspector
EDUCATION
» Construction Technology,
Orange Coast College
» Building Inspection
Technology, Coastline
College, Huntington Beach
LICENSES & REGISTRATION
» General Contractor
» Building Inspector
» Plumbing Inspector
» Mechanical Inspector
» Electrical Inspector
» Combination Inspector
» Commercial Combination
Inspector
» Building Official
» Certified Special Inspector for
Structural Welding
» Certified Special Inspector for
Structural Masonry
» Certified Special Inspector for
Structural Steel
» Certified Special Inspector for
Reinforced Concrete
Project 111anagement
Engineering Support
CD:CDBG Funded Projects
ChangeSubmittal Reviews
Progress Billing Review
Order
Constructability
TestingMaterials Coordination
Cal/OSHA Compliance
Public Relations
Utility Coordination
SWPPP Compliance
Quality Control/Quality
Assurance
Traffic Control on Arterial
Streets
Encroachment
Inspection
Street Improvement
AC ,,and Overlay
RehabilitationPavement
Underground Utilities
i . f
UpdatestoSignals
f Traffic Loops
a Da Ramps,
Curb and Gutter, Driveways
Power Pole Replacements
ConstructionCaltrans
FederallyIntersection Improvements
,, Projects
AC
Replacement
Base Cement Treatment
Striping & :..,
Landscaping and ..
SCE Coordination
Mr. Hunkle has over 27 years of experience in public works inspection, construction
management, contracting, quality control, and management of large-scale capital
improvement projects„ and has successhilly delivered over 25 street rehabilitation
projects, involving residential streets„ cold mild and overlay, ARHM p'avement., AC
base course', aggregate base, full depth AC slot pavement, curb and gutters,
sidewalks, cross gutters, alley intersections, driveway approaches, curb ramps,
signing, striping, and signing, speed humps, traffic signal loops, water valves and
meters, and sewer and storm drain manholes. Mr. Hunkle's expertise extends to his
familiarity with Caltrans, Federal Department of Labor and State of California Division
of Labor Standards Enforcement, and EEO compliance monitoring. Mr. Hunkle is
experienced in performing quality control and code compliance inspection services
with observation reports for owners, engineers, and local jurisdictions.
Relevant • ect Experience
wa � M� M e w f. •" � ., � • w � •.
WON
pavernent and placement of pavement surface •
Jamil Borner
Senior Construction Inspector
EDUCATION
» BA, Communication
Specialist - Baylor
University, Waco, TX
LICENSES &
REGISTRATION
Relevant Project Experience
Construction rianagement
Construction.`
ContractAdministration
En 'neerin • dM f
1, w Projects
Submittal
Progress
Change Order Review
Requiest forInformation Review
Const�ructability Review
Materials Testi'ni Coordination
CaIIOSHA CornpJance
Public
CoordinationUtility
SWPPP Compliance
eControl/Quality*
Assurance
Traffic Control on Arterial Streets
Agreement No. 6841
0 I
BUILDING SOLUTIONS
Encroachment Permit
Inspection
RehabilitationStreet Improvement
AC Grind and Overlay
Pavement
Underground Utilities
Overhead Fiber Installation
Updatesf and
LoopsTraffic
ADA z f ` f
♦ Gutter, Driveways
Power Pole f
Caltrans Construction
Intersection Improvements
Federallyf. Pro ec�ts
AC Removaland Replacement
Base Cement Treatment
f f s f . :f `'
Striping
LandscapingIrrigation
SCE Coordination
City of Costa Mesa JUitywide Parkway Maintenance, Street Rehabilitation, and Slurry Seal Project, Costa Mesa, CA
11 Senior Construction inspector: Citywide street improvement program in the City of Costa Mesa„ which involves slurry
seal, street improvements, intersection improvements, ADA ramp improvements, conduit Installation, traffic signal
improvements, mobilization, curb and gutters, sidewalks, driveway approaches„ spandrels, cross gutters„ adjustment of
manholes and utility covers to grades procurement and application of slurry seal Type Il, crack sealing„ traffic signing, striping
and markings, installation of traffic markers and speed humps„ and implementation of traffic control, Mr. Borner performed
evaluation and mark outs for all dig outs and concrete that required repairs for the entire project.
City of Alhambra: FY 1-20 & 20-21 Street Rehabilitation Projects, Alhambra, CA I Senior Construction Inspector.
These street improvement programs consist of the pavement and street rehabilitation of 23 local street segments located
south of Mission Road, west of Garfield Avenue, east of Atlantic Boulevard, and north of Valley Boulevard. Improvements
included slurry seal treatment„ varying depths of cold million and overlay, full depth removal and reconstruction, concrete
improvements such as removal and replacement of broke and off grade sidewalk„ ADA ramps that need updating„ broke
and off -grade curband gutter„ driveway aprons in need or repairs, and concrete cross gutter reconstruction. Mr. Borner
provided daily construction inspection services„ monitored' contractors" daily progress through daily reports and photos„
reviewed traffic control procedures, coordinated scheduling, issues management„ meetings, monitored cost control, labor
compliance, reviewed RFIs and submittals, change orders, dispute resolution, coordinated public relations activities, and
organized final walkthrough and project completion reports.
City of Compton: Annual Residential Street Rehabilitation Project: Phases 1 & 2A Compton, CA I Senior
Construction Inspector: This project included street rehabilitation of seven major City streets. Scope of work included
roadway pavement improvement, repairs to cross gutters, curb and gutters, curb ramps, ADA compliance, construction of
slurry seal, grind and overlay, cold mill, ARHM pavement, AC base course, aggregate base, full depth AC slot pavement,
asphalt overlay, PCC sidewalks and driveways, alley intersection, signing, striping, markings, traffic signal loop, loop
detectors, and adjust to grade existing sewer manhole. Scope included full -service construction management, reviewing
traffic control plans, meetings, scheduling, cost control, staging coordination, quality control/Inspection,
permits/environmental compliance, progress payments, monthly staff reports, site safety„ as-builts drawings, final
walkthrough, and project completion reports.
Agreement No. 6841
JIMMY MARTIN, ACI, ICC Cert
Senior Construction Inspector
LICENSES &
REGISTRATION
)) ICC Soils Special Inspector
>> ICC Reinforced Concrete
Inspector
Galtrans Various Certifications
KI I 4#1- il
.444
"kielevant Key Highlights:
Construction Management
Construction Inspection
Contract Ad
DWministration
Project Management
Enineering, ort
rp 0i
ects CG Fun �ed 7
Submittal Reviews
Progress BiifinM Review
Change Order eview
Request for Information Review
Co:nstructabil�ity Review
Materials Testini" Coordination
Cal/OSHA Comp Jance
Public Relations
Utility Coordination
SWPPP Compliance
Quality Control/Quality
Assurance
Tr;?ffic Control
CONSULTANTS
BUILDING SOLUTIONS
X7 C2
k, uCCU sage Ica Ion
ACI Field Technician Grade 1 Mr. Martin has more than 27 years of construction management and inspection
)> 30 Cal/OSHA experience on major capital improvement projects and is a certified ICC and ACI.
)> Confined S ace Training Jimmy has been performed senior construction inspection services for various
>> Traffic Control Technician and projects including intersection improvements, new intersections, bridges,
Traffic Control Flagger interchanges, street improvements, traffic signal modifications, retaining walls,
)) Certified California sound walls, MSE walls, sewer pipeline projects, water pipeline projects, water
Journeyman Laborer (ACC) treatment facilities, wastewater treatment facilities, pipeline projects, and flft stations
�) Pervious Concrete echnician and has successfully delivered over 17 retaining walls and has successfully
(NRMCA) delivered over 20 street irnprovement projects, Jimmy's public works inspection
>) Carpent responsibilities include the ability to review improvement plans, inspect public
v Cementzason improvements construction, negotiate and administer contracts, and prepare and
>) Fall Protection maintain a, variety of reports. Jimmy values safety as a top priority and is, acutely
Traffic Control Safety aware of security protocol and adherence to regulatory requirements. Jimmy
proficiently surveys, inspects and evaluates production environments to determine
fulfillment of safety andsecurity standards. Jimmy possesses strong leadership capabilities that consistently lead to project
productivity and profitability. His ability to supervise various levels of personnel and increase each team member's
performance contribute to the overall success of program goals and client satisfaction.
Relevent Proiect Experience
♦
Mrsm-� 11-441yk
cM..ers to grade, installation of pave�neniit markings and striping e 11 ted work includes mobilization, traffic control, assisting
in preparation of NPIDES, local utility coordination, construction management, daily inspection, labor compflance,
geotechnical and materials testing coordination,
Noah Hernandez
Senior Construction Inspector
EDUCATION
» Bachelor of Arts in Public
Administration, California
State University Fullerton
LICENSES & REGISTRATION
» Certificate in Project
Management, California State
University Fullerton
» Sexual Harassment
Prevention Training
» Defensive Driver Training
» OSHA 30 Hour Training
Construction MManagement
Construction Inspection
Contract Administration
Engineering Ruppoirt
CDBG Funded Projects
��Submittal
m� lReviews
'.
Informationilling Review
Change Order Review
Request for
Constructalbility
CoordinationMaterials Testing
Compliance
PublicRelations
Utility Coordination
QualitySWPPP
Compliance
Assurance
Traffic Control 1, Arterial
Streets
Agreement No. 6841
CONSULTANTS
BUILDING SOLUTIONS
Encroachment
InspectionStreet ..
AC Grind and Overlay
Pavement Rehabilitation
Underground Utilities
Overhead Fiber Installation
Updates i Traffic Signalsand
LoopsTraffic
ADA Ramps, Sidewalks,,
Drivewaysand Gutter,
Power Pole Replacements
ImprovementsCaltrans Construction
Intersection
FundedFederally Prolects
AC Removal ..
Base Cement Treatment
Landscaping, a�ng Irrigation
SCE Coordinabon
Mr. Hernandez has experience in construction inspection, construction management, contracting, field investigation, project
management„ and quality control' for numerous capital improvement projects and federally funded projects„ involving street
improvement, bridge construction, storm drains, traffic signals, traffic signs, streetlights, pavement markings, construction
projects, and maintenance projects. Mr. Hernandez has a thorough understanding of Cal -OSHA practices and procedures,
ADA and Caltrans ADA requirements, as well as extensive knowledge of Caltrans construction practices„ physical
characteristics and properties of highway construction materials, and approved methods and equipment used in making
physical tests of construction materials. Additionally„ Mr. Hernandez is familiar with Caltrans field and construction office
procedures„ with experience assisting in inspection to assure compliance with plans and specifications„ assisting in
preparation of contract change orders„ contract estimates„ and progress payments, coordinating field testing of materials
for compliance with project specifications and the Caltrans duality Assurance Program„ maintaining accurate project
records„ performing analytical calculations, and monitoring Contractor progress by preparing progress reports as required.
Relevant Project Experience
City of Torrance: Residential and Arterial Pavement Improvement, 1-159/1-139, Torrance, CA I Senior Construction
Inspector: Improvements include application of slurry 'seal, cold mild and overlay localized pavement repairs, tree
removalslreplacements, asphalt berm replacement„ repairs to curb, gutter„ sidewalk„ driveways„ and access ramps. Mr.
Hernandez performs daily duties of construction quality, assurance inspection, including oversight of excavation,
compaction, subgrade inspection, backfill„ paving, and inspection of structures, electrical„ welding„ drainage, and
underground utilities. Mr. Hernandez coordinated materials testing, attends meetings with City representatives, contractors,
and other agencies, prepares constructability reviews„ and ensures compliance with project plans.
City of Irvine: Annual Street Rehabilitation and Slurry Seat Project, Irvine, CA I Senior Construction Inspector:
Inspection included asphalt pavement cold -milling„ pavement fabric installation, asphalt concrete pavement overlays, slurry
seal application„ removal and replacement of concrete improvements such as sidewalks, ramps„ driveways„ curbs and
gutters. Mr. Hernandez inspected tasks such as adjustment of a survey monument„ water valve installation, sewer cleanout,
and installation of signing, striping and pavement markings. He oversaw document management of ,shop drawings, RFIs,
change orders„ progress payments, meeting minutes, etc. Mr, Hernandez prepared a final punch -(list„ verified completion of
final items„ and assisted in project closeout.
City of Sean Bernardino: 'Street Rehabilitation Program (30+ Major Streets), San Bernardino, CA I 'Senior
Construction Inspector: This Ion term, on -call contract involves concrete improvements and pavement improvements of
over 30 ma or streets in the City of San Bernardino. The contract also includes the rehabilitation and resurfacing of various
streets an intersections. Scope of work includes full depth removal and replacement of asphalt concrete„ intersection
improvements, ADA ramp improvements, bike lanes„ conduit installation„ traffic signal improvements cold milling and overlay
of existing asphalt concrete, mobilization, traffic control„ sta ing for major streets and intersections, removal of traffic striping,
installation of traffic striping and pavement markers, installation of loop detectors and bicycle loop detectors, construction
of cross walks, removal and replacement of sidewalk, driveways, PCC curb and gutter„ cross utters„ spandrels, curb ramps
along both residential and commercial streets„ manhole and utility vault adjustments, an � preparation of SWPPP and
erosion control plans.
City of Fullerton: Longview Derive 'Street Improvements and Water/Sewer Malin Replacement Fullerton, CA I Senior
Construction Inspector: Inspection of water, sewer and street rehabilitation preject. The project included replacing 2500
linear feet of 8-inch DIP water main and appurtenances, 2500 linear feet of 8-inch VCP, PVC SDR 26 sewer main, new
manholes and storm drains, removing and replacing existing sewer and video inspection and abandoning existing water
mains and valves. Street and drainage improvement work included cold planning, excavation, asphalt concrete, aggregate
base, curb and gutter, access ramps.