CONTRACT 6841 Professional Services AgreementAgreement No. 6841 PROFESSIONAL SERVICES AGREEMENT :,. BETWEEN THE CITY OF EL SEGUNDO AND Z & K CONSULTANTS ENG 24-09: ON -CALL CONSTRUCTION INSPECTION SERVICES This AGREEMENT is made and entered into this 271h day of December, 2023, by and between the CITY OF EL SEGUNDO, a municipal corporation and general law city ("CITY") and Z & K CONSULTANTS, a California Corporation ("CONSULTANT"). The parties agree as follows: 1. CONSIDERATION, A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below; B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement; C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed Fifty Thousand ($50,000) annually in each fiscal year for CONSULTANT's services. CITY may modify this amount as set forth below. Unless otherwise specified by written amendment to this Agreement, CITY will pay this sum as specified in the attached Exhibit "A," which is incorporated by reference. 2. SCOPE OF SERVICES. A. CONSULTANT will perform services listed in the attached Exhibit "A," which is incorporated by reference. B. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement. 3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT will use the appropriate generally accepted professional standards of practice existing at the time of performance utilized by persons engaged in providing similar services. CITY will continuously monitor CONSULTANT's services. CITY will notify CONSULTANT of City of El Segundo Professional Services (REV 2018.05) Page 1 of 11 Agreement No. 6841 any deficiencies and CONSULTANT will have fifteen (15) days after such notification to cure any shortcomings to CITY's satisfaction. Costs associated with curing the deficiencies will be borne by CONSULTANT. 4. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit "A") the tasks performed, the percentage of the task completed during the billing period, the cumulative percentage completed for each task, the total cost of that work during the preceding billing month and a cumulative cash flow curve showing projected and actual expenditures versus time to date. 5. NON -APPROPRIATION OF FUNDS. Payments due and payable to CONSULTANT for current services are within the current budget and within an available, unexhausted and unencumbered appropriation of the CITY. In the event the CITY has not appropriated sufficient funds for payment of CONSULTANT services beyond the current fiscal year, this Agreement will cover only those costs incurred up to the conclusion of the current fiscal year. 6. FAMILIARITY WITH WORK. A. By executing this Agreement, CONSULTANT agrees that it has: Carefully investigated and considered the scope of services to be performed; ii. Carefully considered how the services should be performed; and iii. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONSULTANT agrees that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONSULTANT discover any latent or unknown conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT's own risk until written instructions are received from CITY. 7. TERM. The term of this Agreement will be from January 1, 2024, to June 30, 2027. Unless otherwise determined by written amendment between the parties, this Agreement will terminate in the following instances: A. Completion of the work specified in Exhibit "A"; City of El Segundo Professional Services (REV 2018.05) Page 2 of 11 Agreement No. 6841 B. Termination as stated in Section 15. 8. TIME FOR PERFORMANCE. A. CONSULTANT will not perform any work under this Agreement until: CONSULTANT furnishes proof of insurance as required under Section 22 of this Agreement; and ii. CITY gives CONSULTANT a written notice to proceed. B. Should CONSULTANT begin work on any phase in advance of receiving written authorization to proceed, any such professional services are at CONSULTANT's own risk. 9. TIME EXTENSIONS. Should CONSULTANT be delayed by causes beyond CONSULTANT's control, CITY may grant a time extension for the completion of the contracted services. If delay occurs, CONSULTANT must notify the Manager within forty-eight (48) hours, in writing, of the cause and the extent of the delay and how such delay interferes with the Agreement's schedule. The Manager will extend the completion time, when appropriate, for the completion of the contracted services. 10. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below: A. Exhibit: A, Proposal for Services 11. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties. 12.TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number. 13. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement. City of El Segundo Professional Services (REV 2018.05) Page 3 of 11 Agreement No. 6841 14. WAIVER. CITY's review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT's performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character. 15. TERMINATION. A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. B. CONSULTANT may terminate this Agreement at any time with CITY's mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date. C. Upon receiving a termination notice, CONSULTANT will immediately cease performance under this Agreement unless otherwise provided in the termination notice. Except as otherwise provided in the termination notice, any additional work performed by CONSULTANT after receiving a termination notice will be performed at CONSULTANT's own cost; CITY will not be obligated to compensate CONSULTANT for such work. D. Should termination occur, all finished or unfinished documents, data, studies, surveys, drawings, maps, reports and other materials prepared by CONSULTANT will, at CITY's option, become CITY's property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination, not to exceed the total costs under Section 1(C). E. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated. F. By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 16.OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT under this Agreement are CITY's property. CONSULTANT may retain copies of said documents and materials as desired but will deliver all original materials to CITY upon CITY's written notice. CITY agrees that use of CONSULTANT's completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY's own risk. City of El Segundo Professional Services (REV 2018.05) Page 4 of 11 Agreement No. 6841 17. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or public CITY without CITY's prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties. 18.INDEMNIFICATION. A. CONSULTANT agrees to the following: L Indemnification for Professional Services. CONSULTANT will save harmless and indemnify and at CITY's request reimburse defense costs for CITY and all its officers, volunteers, employees and representatives from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, any injuries or damages sustained by any person or property resulting or arising from any negligent or wrongful act, error or omission by CONSULTANT or any of CONSULTANT's officers, agents, employees, or representatives, in the performance of this Agreement, except for such loss or damage arising from CITY's sole negligence or willful misconduct. i. Indemnification for other Damages. CONSULTANT indemnifies and holds CITY harmless from and against any claim, action, damages, costs (including, without limitation, attorney's fees), injuries, or liability, arising out of this Agreement, or its performance, except for such loss or damage arising from CITY's sole negligence or willful misconduct. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONSULTANT will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise. B. For purposes of this section "CITY" includes CITY's officers, officials, employees, agents, representatives, and certified volunteers. C. It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement. City of El Segundo Professional Services (REV 2018.05) Page 5 of 11 Agreement No. 6841 D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 22, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification. 19.ASSIGNABILITY. This Agreement is for CONSULTANT's professional services. CONSULTANT's attempts to assign the benefits or burdens of this Agreement without CITY's written approval are prohibited and will be null and void. 20.INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which it is performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only. 21.AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with respect to all services and matters covered under this Agreement. CITY will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. CONSULTANT will retain such financial and program service records for at least three (3) years after termination or final payment under this Agreement. 22.INSURANCE. A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $2,000,000 Professional Liability $1,000,000 Business automobile liability $1,000,000 City of El Segundo Professional Services (REV 2018.05) Page 6 of 11 Agreement No. 6841 Workers compensation Statutory requirement B. Commercial general liability insurance will meet or exceed the requirements of the most recent ISO-CGL Form. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. C. Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. D. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). E. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." F. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to Section 155. 23. USE OF SUBCONTRACTORS. CONSULTANT must obtain CITY's prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation. City of El Segundo Professional Services (REV 2018.05) Page 7of11 Agreement No. 6841 24.INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the status on the project, which will include a schedule update and a short narrative description of progress during the past month for each major task, a description of the work remaining and a description of the work to be done before the next schedule update. 25. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: If to CONSULTANT: Z & K Consultants 473 E. Carnegie Drive, Suite 200 San Bernardino, CA 92400 Attention: Crystal Fraire Phone: 951-310-7470 Email: cfraire@zandkconsultants.com If to CITY: City of El Segundo 350 Main Street El Segundo, CA Attention: Arianne Bola Phone: 310-524-2364 Email: abola@elsegundo.org Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 26. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY's conflict of interest regulations. 27. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT's bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT's bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability. 28. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT's or CITY's obligations under this Agreement. 29.INTERPRETATION. This Agreement was drafted in and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County. City of El Segundo Professional Services (REV 2018.05) Page 8 of 11 Agreement No. 6841 30. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state, and local laws applicable to this Agreement. 31. ENTIRE AGREEMENT. This Agreement, and its Exhibit(s), sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns. 32. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party. 33. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 34.AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. 35. ACCEPTANCE OF ELECTRONIC SIGNATURES. The Parties agree that this Agreement, agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by electronic (.pdf) or facsimile transmission. Such electronic or facsimile signature will be treated in all respects as having the same effect as an original signature. 36. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 37. TIME IS OF ESSENCE. Time is of the essence for each and every provision of this Agreement. 38. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, acts of terrorism, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' reasonable control, then the Agreement will immediately terminate without obligation of either party to the other. City of El Segundo Professional Services (REV 2018.05) Page 9 of 11 Agreement No. 6841 39. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY. [Signatures on next page] City of El Segundo Professional Services (REV 2018.05) Page 10 of 11 Agreement No. 6841 IN WITNESS WHEREOF the parties hereto have executed this Agreement the day and year first hereinabove written. CITY OF EL SEGUNDO Z & K Consultants Darrell George Name: rystal Fraire City Manager Title President ATTEST: tuk!-L- Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney M- JoaquiH Vazquez, Deputy City Attorney Name: Zack Faqih Title: Secretary Insurance Reviewed by: N e) i' ?4 City of El Segundo Professional Services (REV 2018.05) Page 11 of 11 Taxpayer ID No. 80-0359298 City Business License No.: 44118 EXHIBIT A CONSULTANTS DECEMBEF'-ll 26, 2023 Agreement No. 6841 ; 1. Cover Letter ........................... ........... ..... ........................ .... .......................... �..... ...... -A 2. Firm/Team Overview...., — ... - ... ........................................................ ......... ......... ...........2 3. References ............................. .............................., ...„,........,.., .,..,......,.,.,....- ...............,....8 4. Project Understanding and Approach— ........ ---............ ................. .......... ......................9 5. Cost Proposal................................................................................................... ...........11 6. Resumes...................................................................................................... Attachment A EMCONSUL,TANTS BUILDING SOLUTIONS Agreement No. 6841 SECTION 1. COVER LETTER City of El Segundo, City Clerk's Office December 26, 2023 350 Main Street, El Segundo, CA 90245 Attn: Arianne Bola, Senior Associate Engineer Subject: Request for Proposal On -Call Construction Inspection Services Dear Ms. Bola, Augmentation.Z&K Consultants Inc. (Z&K) proudIy presents our proposal to the City of El Se undo for Public Works lirispection Services Staff certified Disadvantaged., * . r • • ..- Z&K is proposing the same experienced team members that successfully managed Capital Improvement and Public Works Projects involving street improvements, underground utility installation, overhead fiber installation, flatwork, curb, gutter, sidewalk, driveway and pavement improvements, power pole replacements, bridges, traffic signal improvements, sewer and storm drain improvements, water lines, landscaping, grading, trenching, compaction, backfilling, mixes of concrete or asphalt, and improvements to City facilities such as parks, community centers, and city buildings. Z&K works proactively and diligently with City staff to successfully deliver projects under, budget while mitigating numerous unforeseen delays. Z&K has carefully selected this "A -Team" and has committed our most qualified staff for the duration of the contract to deliver successful the City's Projects. Our team members have strong Construction Management and Inspection knowledge and leadership skills. They can manage multiple projects or tasks and have excellent oral and communication skills. Our Public Works Inspectors can collaborate with a diverse group of people with different skill levels. They will be able to conduct public workshops and have an explicit understanding of the California (Public Contract Code and the City of El Segundo's Municipal Code efficiently and effectively, Our Construction Inspectors have experience managing complex Public Works projects with broad knowledge and experience in the field of engineering,architectural„ and environmental. Z&K has a deep bench of qualified Public Works Inspectors accustomed to working with City Public Works projects and procedures and are experienced to efficiently complete the City CIPs. Our team currently holds similar contracts for the following: I will serve as the contact person for the full duration of the contract, and I am authorized to bind the firm to the terms of the proposaland execute legal documents on behalf of the firm. Z&K Consultants, Inc. does not have any exceptions and commits to accept the terms and conditions of the City of El Segundo professional Services Agreement. By signing below, I attest that all information submitted with the proposal is true and correct. The RFP Submittal and rate sheet will remain valid for a period of not less than 90 calendar days from the date of submission. Sincerely, C !.� rkvz Crystal Fraire, PE I President I Z&K Consultants Inc. 17130 Van Buren Blvd. I Suite 122 1 Riverside, CA 92504 951.310.7470 1 cfraire@zandkconsultants.com CONSULTANTS Page 1 of 11 Agreement No. 6841 " w� • w w ' w ,, w w • w w !IY w • •w ■ a Our proposed Z&K team has successfully delivered numerous similar projects, ahead of schedule and under budget. Z&K has identified a multidisciplinary team to deliver excellent Inspection services for the City's upcoming Projects. The Z&K team knows the importance of providing qualified and experienced personnel, capable of working independently, that arrive on -site properly equipped and have the necessary safety and technical training to start work with no learning curve. Z&K commits to providing our best inspection services for timely project completion.. We will dedicate the necessary resources to complete each assignment on time and within budget. Our key personnel will be assigned to the project for the entire duration and will not be removed or replaced without concurrence from the City. We maintain an extensive history of working with various local' agencies. Throughout the completion of many projects our team has demonstrated an unparalleled ability to work 'well with local agency staff,�aaroject stakeholders, engineers„ and contractors, We have successfully delivered. projects in a timely and cost-effective manner and have acquiredan understanding of agency requirements.. Z&K has extensive experience providing Inspection services for the following agencies:. All proposed staff possess the certifications and licenses required to provide professional construction management and inspection services. Our staff licenses include re rg istered civil engineers, traffic engineers„ QSDIQSP, ICC Certified in all trades, certified plan reviewers, and Certified Building Officials for building projects. Our team has specialized construction management and inspection training. Management Approach N Z&K provides proven professional construction mana ement techniques to ensure the safe construction of a quality project completed on time and within budget. Z&K accomplished this by establishing the systems„ policies, and procedures necessary to ensure adequate project controls are in place. The Construction Inspector must ensure all parties understand the basic responsibilities and interrelationships of all team member such as the. Owner (both project management and operations), the Design Engineer„ the Contractor, the construction management team, and the subconsultants. Additionally„ a good Construction Inspector must have the knowledge and experience, to effectively understand the interrelationships between the key management components of time, information„ cost, and quality. Decision making„ including obtaining sufficient information to make reasoned decisions, is the key element leading to a successful project. the project. Our Team successfully delivers projects through time, information„ funding, cost, and quality management. Page 2 of 11 CURRENT L CONTRACTS IMU&1=101 Agreement No. On -Call Construction Mana ement and Inspection Services 6841 2023-2025 1 Cityof Laguna Beach 2 City of Carson On -Call Construction Management and Inspection Services 2023-2026 3 City of Carson On -Call Project Management and Inspection Services 2023-2026 4 _ mmm mm m C�i r Costa Mesa Support Services On -Call Public Works/En meenn Staff S„ 2023-2026 5 Hof _ City of La Mirada mm On -Call Construction Manage Services nmmmW 2023 2026 6 C of Palm Desert �X On -Call Construction Management and Inspection Services 2 2023 „ 025 7 City of Newport Beach _ On -Call Project Management Services 2023 — 2026 City ofCMa each* YConstruction... On- Management Services 2 2023 — 2026 9 of Chino �....._..... On Call Full Engineering Services _................ 2020 — 2025 10 _ __ Cif of Chino` —. ......... — _ On -Call Project Management Services 2020 — 2025 11 Citr of Chino` On -Call Construction Management Services 2022 —2025 12 City of Rancho Pales Verdes _.. On -Call Construction Mana ement 2022 — 2025 13 CityServices each ll , a_.........-... _._. _.. 22 —2025 14 ._ . City of Irwindale* � On -Call Construction Management Services _. 2022 —2025_ 15 City of San Bernardino* On -Call Project Mana ement and Construction Management 2019 — 2023 _... 16 City of San Bernardino' — On -Call Public Works Inspection Services _ 2019 — 2023 17 Cit of Oc.... eanside* ........ - ...._ On -Call Construction Mangy ement Services 2019 — 2024 18 City of Oceanside* On -Call Project Management Services ... ......20 2019 — 2024 19 mmITITITmm— Lon each Utilities* On -Call ram, Project, aged Construction Mana a ment Services Prog_ j _ 9 m...IT 2021 — 2026 , 20 ..—. Cit of Norco On -Cal Inspection Services for ruction 21 City of Pomona ^Pro On,ICall Construction uct on Managementdand Insect on ServicesPW 2021 — 2024 22 City of Norco On-CaBuilding II Professional Inspection Services for 2 23 City of Corona On -Call Public Works Ins e ction Se ricesDepartment 020 — 2023 24 City of Corona* On-P 25 City of Lancaster On -Call Consttructioln Management and Inslcec iqp Services 20211 — 2024 On -Call Management S tPubl 2017 —2024.. 27 City of Beaumont* cg On -Call Works Inspection ^ 2017 — 2024 28 City of Beaumont' mmITITITITITmmmmmmm ^ On -Call Project Management Services 2017 — 2024 29 City of Temecula On -Call Construction Management Services „2019 — 2024 30 City of Moreno Valle On -Call Construction Mana ement and Ins ection Services 2019 — 2024 31 Count of Los Angeles On -Call Construction Mang ement and Ins ection Services 2019 — 2024 32 City of Eastvale On -Call Construction Management Services 2022 — 2025 33 Cit of Eastvale On -Call Public Works Inspection Services 2022 2025 Cit roof Eastvale On -Call Project Management Services 2022 2025 35 County of Riverside On -Call Construction Management and Inspection Services 2022 —2025 Trans ortation Department* *Contract has had Multiple Contract Extensions 11*�'` i i t 101 The Z&K Team has successfully performed Construction Management, Construction Inspection, and Materials Testing Coordination for numerous public agencies. The, following rojects have been completed on time and within budget. Page 3 of 11 Agreement No. 6841 STREET IMPROVEMENT PROJECTS CITY OF LAKE T RESURFACING PORTOLA TO EL T INSPECTION L Y SEAL ZONE F AND ARTERIAL Y SEAL JERONIMO AND MUIRLANDSLOS ALISOS TO BAKE I The Z&K Team is providing Project Management, Construction Management, Construction Inspection, Pre -Construction Inspection, and Contract Administration Services for these projects, which involves the street resurfacing and the slurry seal. Relevant project features include street resurfacing and rehabilitation, application of slurry seal, grinding and overlay, cold milling, concrete improvements„ ARHM pavement, AC base course, aggregate base, signing, striping., markings and pavement legends, removal and replacement of PCC curb ramps, removal and replacement of PCC sidewalk, bike lame traffic loops„ Type E traffic loops, dig outs„ sewer and storm drain manhole adjustments„ and water valves adjustments. CITY OF COSTAESA, CITYWIDE PARKWAY MAINTENANCE,REHABILITATION, L L PROJECT I Z&K Consultants, Inc. is providing Construction Management and Project Management Services for this citywide street improvement program in the City of Costa Mesa. This project includes street improvements, intersection improvements, ADA ramp improvements, conduit installation, traffic signal improvements„ mobilization, curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters„ adjustment of manholes and utility covers to grade, procurement and application of slurry seal Type II, crack sealing, traffic signing„ striping and markings„ installation of traffic markers and speed humps, and implementation of traffic control. CITY OF CHINO, SLURRY SEAL PROGRAM (VARIOUS LOCATIONS CITYWIDE) I Z&K Consultants Inc. is providing Project Management, Construction Management, and Inspection oversight services for this Project which includes street rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits„ Chino Ave from City Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pavement improvements, street resurfacing, crack sealing, slurry seal, localized dig -outs, striping removal/install, and traffic loop detectors. CITY OF CHINO„ ALLEY/SANITATION REHABILITATION PROJECT I Z&K Consultants Inc. is providing, Project Management and Construction Management for this Project which, includes removal of existing alley pavement and base section to construct new AC pavement section and ribbon gutter in multiple alleys in the City of Chino. Scope of work includes new PCC drive and alley approaches, curb and gutter, 4' PCC alley gutter, new AC pavement section over compacted crushed miscellaneous base, and the construction of several block walls. CITY OF SAN BERNARDINO, STREET REHABILITATION(PROGRAM (0 MAJOR CITY STREETS) I Z&K Consultants, Inc. is providing Project Management, Construction Management and Inspection Services for this long-term, on -call contract with the City of San Bernardino, 'which includes street resurfacing and pavement rehabilitation for over 30 major streets and multiple major street intersections in the City, The projects include roadway and pavement rehabilitation, concrete improvements„ cross gutters„ curb and gutters„ curb ramps, ADA improvements, storm drain and pipeline relocation, traffic signal improvements, traffic control, full depth removal ,arid, replacement of asphalt concrete, cold milling and AC overlay of existing asphalt concrete, slurry seal application PCC sidewalk„ replacement of existing PCC driveways, driveway approaches„ curb ramps„ retaining curbs, S high retaining wail, parkway culverts, cross gutters, asphalt -concrete pavement, removal and replacement of trees„ clearing and grubbing, installation and configuration of multiple traffic loop detectors and bicycle traffic loop detectors, installation of city project signs, preservation of existing city Survey monuments„ adjusting manhole and utility covers to grade, reconfiguration and installation of street lighting, and installation of pavement markings and striping. CITY OF COMPTON,L RESIDENTIAL STREET REHABILITATION PROJECT, PHASE 1 & PHASE(Two Separate Projects) I Z&K Consultants, Inc, is providing Project Management, Construction Management„ Inspection, and Labor Compliance services for this Project, The scope of work consists of roadway and pavement rehabilitation, concrete improvements, asphalt overlay, construction staging„ heavily travelled intersections, traffic control, clearing and grubbing„. S'V'WPPP preparation, cold mill and overlay,, PCC sidewalk, manholes and utility covers„ speed humps, pedestrian crossings, ADA improvements, slurry seal application, HMA ,pavement, ARHM overlay„ AC base course, aggregate base, full depth AC slot pavement, alley intersection„ driveway and driveway approach, landscaping„ irrigation„ adjusting manhole and utility covers to grade, water valve, water meter, street lighting installation of loop detectors„ traffic signal modification, adjustment of streetlight and traffic signal pull boxes to grade,. CITY OF SAN MARINO, STREET REHABILITATION PROGRAM PHASE '1 & PHASE 2 (TWO SEPARATE PROJECTS) I Z&K Consultants, Inc. provided Project Management and Construction Inspection Services for this program, which consisted of citywide roadway pavement rehabilitation. The program's improvements included construction of roadway and pavement rehabilitation, concrete improvements, cross gutters„ curb and gutters, curb ramps, ADA improvements, cold - milling asphalt concrete pavement and re -paving with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM), clearing and grubbing„ , localized pavement repairs, replacing impacted traffic striping, markings, pavement legends„ loop detectors„ curb painting, driveways and driveway approaches, installing speed humps„ adjusting utility frames and grates, inspection and replacement of sewer manholes, water valves, water meters, and storm drain manholes, preparation and implementation of SVWPPP and temporary construction BMPs, and providing temporary traffic control. CITY OF NORWWALK, CI E'O LOCAL STREETS REHABILITATION PROJECT I Z&K Consultants„ Inca is providing Construction Management and Inspection services for the Local Streets Rehabilitation Protect, funded by the Community Development Block Grant (CIJI C) fund. The scope of work includes improvements to concrete appurtenances, including cross gutters, curb and gutters, upgrades of curb ramps to ADA standards, and intersection improvements„ traffic signal Page 4 of 11 improvements, bike lanes, underground utility coordination, conduit installation, and reh�bii atioerl fNgacV41pavement conditions. CITY OF ROSEMEAD, WALNUT GROVE AVE. RESURFACING PROJECT, PHASE I IZ&K Consultants, Inc. is providing Project Management, Construction Management and Inspection Services for this project, which involves street resurfacing of Walnut Grove Ave.,, from Marshall St. to Grand Ave. in the City of Rosemead. In addition to street improvements„ the project included intersection improvements, removal and' replacement of existing AC pavement„ cold mill and overlay„ asphalt pothole repairs, replacement of PCC sidewalk, removal and replacement of ADA ramps, curb and gutter„ bike lane and bike trail, traffic signal modifications, installation of medians, adjustment of manholes and utility covers to grade, installation of specialty and bicycle loop detectors, installation of speed humps, pedestrian crossings, and guardrail and roadway markers. CITY OF ALHAMBRA, FY 19-20 & 20-21 STREET REHABILITATION PROJECTS (TWO SEPARATE: PHASES) I The Z&K Team is performing. Project Management, Construction Management, Construction Inspection, and Labor Compliance Services for this project„ which consists of the pavement and street rehabilitation of 23 local street segments located south of Mission Road,, west of Garfield Avenue, east of Atlantic Boulevard„ and north of Valley Boulevard. Improvements include street resurfacing, slurry seal treatment, varying depths of cold mill and overlay, construction staging, full depth removal and reconstruction, concrete improvements such as removal and replacement of broke and off -grade sidewalk, ADA ramps that need updating„ brake and off -grade curb and gutter„ PCC sidewalk, installation of loop detectors„ adjustment of manhole covers and utility covers to grade, driveway aprons in need of repairs, and concrete cross gutter reconstruction. CITY OF TORRANCE, RESIDENTIAL & ARTERIALPAVEMENT IMPROVEMENT PROJECT, 1-159/1-139 IZ&K Consultants, Inc. is providing Project Management„ Construction Management and Construction Inspection services for this project, which consists of pavement improvements to a residential neighborhood and four arterial streets. Improvements include roadway and pavement rehabilitation„ concrete improvements, cross gutters, curia and gutters, curb ramps, ADA improvements, clearing and grubbing, application of slurry seal, cold mill and AC overlay, removal and disposal of existing) pavement, localized pavement repairs, as well as tree removals and replacements, asphalt berm replacement, AC base course„ PCC sidewalk, PCC driveways and driveway approaches, access and ramps, replacing pavement markingis and striping on concrete and asphalt, and installation of raised pavement markers and City project signs. CITY OF IRWINDALE, 202112022 RESURFACINGL RESURFACING PHASE I — AYON AVE, CALLE DEL NORTE, PAT MIRANDA LN, CALLEE PASEO, ALLEN, PROGRESS L, CENTRAL ST PEPPERTREE I Z&K provided Construction/Project Management and Inspection for this project. The project included street resurfacing, traffic control, raised crosswalks, speed humps, cold milling and AC overlay of existing asphalt concrete„ construction of new curb and gutter, PCC sidewalk, installation and configuration of multiple traffic loop detectors, installation of city project signs, preservation of existing city survey monuments, adjusting manhole and utility covers to grate, installation of pavement markings and striping. Related work includes mobilization, traffic control, assisting in preparation of NPDES, local utility coordination, construction management, daily inspection, labor compliance, geotechnical and materials testing coordination. CITY OF TORRANCE, ANZA/VISTA MONTANA/PACIFIC COAST HIGHWAY INTERSECTION E T I Z&K Consultants, Inc provided project management and inspection services for the Anza/Vista Montana/Pacific Coast Highway Intersection Improvements Project. This Project consists of construction of the Pacific Coast Highway/Anza Intersection Improvements with appurtenances as shown oni, City of Torrance Plan No.'s ST-1019/SD-517/C- 2019-8/TS-2019-2/ST- 1019-TC; curb, gutter, sidewalk„ catch basins, curb ramps, raised medians, striping, traffic signal replacement; grind and overlay, and AC pavement; and all other incidental work in this specification document. CITY OF CHINO, ON -CALL SERVICES FOR VARIOUS STREET IMPROVEMENT PROJECTS I Z&IK Consultants, Inc. is providing Project Management, Construction Management and Construction Inspection Services for this long-term, on -call contract for the City of Chino. The Z&K team has served a wide range of projects„ which includes the following projects: 16th, 17th, & 18th St. Between Tronkeel Ave. and Tangerine Ave. Street Widening Project; Ramona Ave, and Walnut Ave. Street Rehabilitation and Traffic Signal Modifications Project„ 111h St. Pavement Reconstruction Alley and Intersection Accessibility Project; CDBG Alley Project and Alley/Sanitation Rehabilitation Project; and FY20/21 Alley/Sanitation Rehabilitation Project. • r • •aw- r, •• w •w• • r .� CITY OF VERNON, 50th STREET WATERREPLACEMENT PROJECT I The Z&K Team is providing Project Management and Inspection Services for the City ofVernon's 50th Street Water Main Replacement Project.. The projects scope of work includes demolition and reconstruction of the 12" iron ductile pipeline and all associated renovations to the Page 5 of 11 �•r • w • •-'ww • « r� «« r • w M w « • w �• • :rr r. • • :"w r w w • • • r w -w • +�. « « w^ • • w. .' r r .- • r • -• w s• .ww r • r, ■ • � w • -'� r i r • - ,� , .icy. i i _, -�� i r +. � w • ., • ,.. - w - w •y �; w w « w« :Ni w Y wr • •, • »r r • r .• - •r- -w • + - • • • • w w w • r • . • • w • - •-• w • w w «aw -• w • •• w • r •. w • • r. w r • r_ r r w•• r • w« w r,. «• r • -'w w w- .r. w w r • Page 6 of 11 Agreement No. 6841 ORGANIZATIONAL CHART .w �, . . _w s w �� w • � w w ow•µ^w� ■- � • w' w w; � ww'� w Mw ,^ w•_ w ., .. , � w w M � w .. � w _ w w w w ,. w w x w aw PROFESSIONAL AND QUALIFIED, TEAM I The key to a successful project is a highly qualified and well -managed team. We offer the City a cohesive, talented team of licensed and certified professionals. Our Construction Inspection professionals keep these key objectives In mind: • Quality services and project deliverables • Time and budget efficiency • Adherence to quality and assurance standards • Constant communication • Application of technical and practical expertise. w w r -� 'w'- . • w- . -w • Mw � w w Mwr . w., w w. - w w • w �� w, www w w i • w w ♦ w roject e Itside agencies. Page 7 of 11 COMPANY PERSONNEL Agreement No. 6841 Z&K has carefully selected this "A -Team" and committed our most qualified staff for the duration of the contract to deliver successful projects. Our key team members have extensive experience in construction management and inspection services for public agencies. 6111*10,11 0 I City of Chino Amer Jakher Director of Public Works 13220 Central Ave Chino, CA 91710 ajakher@cityofchino.org 909.334.3250 i�� I Ali � V III ij Long Beach Water Department Wendy Chen, Manager of Engineering 1800 E. Wardlow Road, Long Beach, CA 90807 Wendy.Chen@Ibwater.org 562.754.3370 City of El Segundo Cheryl Ebert Senior Civil Engineer 350 Main Street, El Segundo, CA 90245 cebert@elsegundo.org 310.524.2321 Page 8 of 11 SECTION, PROJECT -- • Z&K has thoroughly reviewed the RFQ&P; we confirmed our team will provide all scope of work tasks as outlined in the RFP scope of services to ensure the success of the City of El Segundo's Projects. Z&K has a strong knowledge of the City, County, State, and Federal codes and procedures that are required to deliver successful projects. Z&K will ensure that all codes and procedures are properly followed for the City's Projects. Some of the requirements are as follows: o City Standards and Design Manuals o Caltrans Construction & Safety Manual o California Building Code o OSHA Construction Safety Orders o California Plumbing Code o Local Assistance Procedures Manual (LAPM) o California Mechanical Code o Work Area Traffic Control Handbook (WATCH) o California Electrical Code o Manual of Uniform Traffic Control Devices o California Building Energy Efficiency Standards (MUTCD) o Title 24, Part 2, 2.5, 3, 4, 5, 6, 11 o Project Safety Plan (PSP) o California Fire Code o Site Health and Safety Plan o California Residential Code o Activity Hazard Analysis (AHA) o California Green Building Code o Health and Safety Pews/guidelines/requirements o California Disabled Regulations o Environmental Protection .Agency (EPA) o City Codes & Ordinances o California Department of Education (CDE) o APWA "Greenbook" Standard Specifications for o Department of Toxic Substances Control (DTSC) Public Works Construction o The California Division of State Architects (DSA) o Caltrans Standards/Specifications/Procedures regulations We will provide public works inspection services on various City awarded capital improvement projects in El Segundo on an as -needed basis. We understand that projects may include new construction or renovation projects, program -wide projects„ and/or infrastructure projects. We understand that the Public Works Inspector must have experience performing inspection services for direct contract construction projects and will provide support to the City's Construction Manager. The Z&K Team, at a minimum, will perform the following: •. • s r • • -r. -r w +� ••r • •• � •r r i • • ±• • .+ • r •- • • • r+� •- - -• • • r r r •- r •• r. r r •_ r r• r r •• • r � . r • �. • r • »r a � • • •. .;. r- - i. r r M - M . Mom•. • r, ,,, • M 1Y-•. • • . � ♦ ti i • � • •,; � � . �r � • � • r • � . r• , r r r • • ,• III@Ago • r • 11531141• •• - • • - Deliverables: 1. Inspect a variety of public works construction projects including streets, bridges, curbs, gutters, storm drains, sewers, water lines„ traffic signals and control, landscaping, city cash contracts, grading, trenching, compaction, backfilling, mixes of concrete or asphalt etc. to ensure compliance with applicable codes, ordinances and regulations.. I Z&K will inspect a variety of public wanks construction projects including streets, bridges,. curbs, gutters„ storm drains,: sewers, water lines, traffic signals and control„ landscaping„ city casts contracts, grading, trenching, compaction, backfilling, mixes of concrete or asphalt etc. to ensure compliance with applicable codes, ordinances and regulations. 2. Prepare cost estimates, contract agreements and progress payment. I The team will prepare cost estimates, contract agreements, and progress payments. Z&K will provide construction schedule and budget updates to City's Contract. Officer, We will maintain a current monthly accounting, of construction costs to complete the project, including approved change orders for City's review and approval. 3„ Perform inspections of public works facilities to ensure compliance with plans, specifications,and standards for public works projects* 11! The Z&K team will perform inspections of public works facilities to ensure compliance with plans, specifications, and standards for public works projects. CONSULTANTS Page 9 of 11 p e eto utp Ic ,. P841 4. Perform Private Development Grading and!, Encroachment Permit inspections an'A T itralloc construction contract inspections. I The team will perform Private Development Grading and Encroachment Permit Inspections and Public Contract Construction Contract lrispections as needed. 5. Review plans and specifications for other city contracts, I We will review all plans and specifications for other city contracts. Z&K Inspectors will monitor the Contractor and their subcontractors to ensure that they follow the plans, specifications, and regulations as well as any federal, state, or local regulations. 6. Coordinate work with other city departments and utilities. I The team will coordinate work with other city departments ands utilities. Z&K will participate in public outreach activities and assist the City in forming and maintaining good relations with the local business community re arding construction impacts by providlin community outreach and a contact person to manage public relations for the 'Tturation of the project. At a minimum, �:e Z&K team distribute verbal and written notices to local businesses before any construction impacts take place. Z&K will manage and track public inquiries for the Contractor and for the City and will advise of any concerns and findings. We will coordinate with the contractor access to adjacent business/residents during construction phases. 7. Perform routine field tests. I The Z&K team will perform routine field tests. 8. Inspect materials for identification as conforming to specifications. I Z&K will inspect materials for identification as conforming to specifications. Sampling and testing activities will be conducted in accordance with the contract documents and approved procedures. The Inspector will work with the Contractor to correct any failed tests and achieve compliance. Our team can effectively make decisions and coordinate on field issues related to material testing and inspection. 9, Inspect materials used, including reinforcing material's and the mix, slump and placement of concrete; use equipment such as measuring rods, tapes, surveying transits and calculators to determine distance, location, dimension, depth and grade and calculate volume; take samples of materials for testing. I We will inspect all materials used, including everything listed, and take samples of materials testing. Z&K will coordinate with materials testing firms regarding quality of work completed, 10, Observe work in progress and upon completion. I Z&K proposed staff will complete daily reports, including equipment„ crews/personnei, and photos (before, during and after construction), site and weather conditions, traffic control measures, labor, equipment and materials used, quantity of work erformed, and major incidents. The I nspector/Construction Manager will review the inspectors' daily reports and will ensure the City receives them daily. The Inspector will complete daily measurements of quantities, of work with the Contractor and log them in the daily inspection reports. He will provide all documented measurements and calculations to the I nspector/Construction Manager to process progress payments, change orders, extra work, etc. Z&K will evaluate the completion of work and we will recommend to the City when work is ready for final inspection. 11. Record amounts of materials used, and work performed; prepare necessary reports for progress payments and maintain field records including sketches, photo ra hs, drafting and narrative notes; inspect tracts, upon completion and process the necessary c YAK will record amounts of materials used and work performed; prepare necessary reports for progress payments and maintain field records including sketches, photographs, drafting and narrative notes; inspect tracts upon completion and process the necessary documents. 15. Perform basic plan checking for subdivision, residential, and some commercial development; explain the limits and parameters of the work as required; perform various engineering technical support work, including drafting and acting, as a member of a Survey crew. I Z&K will perform basic plan checking for subdivision, residential, and some commercial development; explain the limits and parameters of the work as required; perform various engineering technical support work, including drafting and acting as a member of a survey crew. 16. Build and maintain positive working relationships with co-workers, other City employees, and the public using principles of good customer service, I The team will actively build: and maintain positive working relationships with coworkers, other city employees, and: the public. Z&K will participate in public outreach activities and assist the Cit in forming, and maintaining good relations with the local business community regarding construction impacts by providing community outreach and a contact person to manage public relations for the duration of the project. At a minimum, the Z&K team distribute verbal and written notices to local businesses before any construction impacts take place. Z&K will manage and track public inquiries for the Contractor and for the City and will: advise of any concerns and indings, 17. Perform related duties as required. I Z&K will perform any other related duties as needed by the City. EMCONSULTANTS Page 10 of 11 COSTPROPOSAL Agreement No. 6841 City of El Segundo, City Clerk's Office December 26, 2023 350 Main Street, El Segundo, CA 90245 Attn: Arianne Bola, Senior Associate Engineer Subiect: Request for Proposal On -Call Construction Inspection Services Dear Ms. Bola, Z&K Consultants Inc. (Z&K) proudly presents our cost proposal for On -Call Construction Inspection Services. Z&K has carefully selected team members that are recognized as experts in engineering services and will provide "turn -key" Construction Inspection services for the City's CIP projects. We understand the importance of meeting budgets and schedules; we have a strategic plan in place to deliver projects with such benchmarks in mind. Z&K Consultants based our cost proposal on the scope of work provided in the Request for Proposals. All prevailing wage requirements will be followed by the team. All team members are in conformance with the State of California Labor compliance requirements. Rates included in our Cost Proposal are fully billable rates. All overhead costs are included. All insurance will be in force at the time of contract execution. Below is a table with the hourly rate schedule. Z&K Consultants, Inc. Hourly Rates: Senior Construction Inspector........................................................................................... $144 I will serve as the contact person for the full duration on the contract and I am authorized to bind the firm to the terms of the proposal. By signing below, I attest that all information submitted is true and accurate. This proposal shall remain valid for a period of not less than 120 days from the date of submittal. The payment terms shall be net thirty (30) days. We are excited about this opportunity to serve the City of El Segundo and are committed to the successful completion the City's important CIP projects. Sincerely, t ('A Crystal Fraire, PE I President Z&K Consultants Inc. 17130 Van Buren Blvd. I Suite 122 1 Riverside, CA 92504 951.310.7470 1 cfraire@zandkconsultants.com Z&K Consultants, Inc. I www.zandkconsultants.com 1951.310.7470 Page 11 of 11 „ p 7117, i , Fi��Y ?ti �i /iOJnlus, , y, /! ��s//✓1 0 r�. �! /� '�Fniirr � '¢ %� P �l 4. '/('/jaYFi/r �d ff%F�r F�ru f!p/liYr/19/���. J� � / !, � ( I'rnipr r��. �/ / b BUILDING SOLUTIONS Agreement No. 6841 Thomas Dawson, CIAO, ICC Cer "Ifier BUILDING SOLU TIONS Senior Construction Inspector LICENSES & REGISTRATION » International Code Counsel Certifications » Building Plan Examiner » California Commercial » Combination Inspect/Legacy » California Commercial Plumbing Inspector » California Commercial Mechanical Inspector » California Residential Mechanical Inspector » California Residential Electrical Inspector » California Residential Plumbing Inspector » Certified Building Official » CLB License No. 674861 » OSHA 30 Hr. Management"Zelevant Key Highlights: Construction ContractConstruction Inspection Administration Project Management En f yp oI SubmittalCD G Fun edrojects urrogress Billin, Review Charige Order Review Request forInformation Cons,tructabil�it,y Review Materials Testini Coordination Cail/OSHA o Public Utility ooin SWPPP Compliance QuaIity Control/Quality Assurance Tr,?'V-ic Control on Arterial Streets hment Permit Inspection Street Improvement A,C Grind and Overlay Pavement Rehabilitation Underground Overhead )Installation Updates . Traffic Signalsand Traffic Loops ADA Ramps,Sidewalks, Curb Drivewaysand Gutter, Power Pole Replacements Caltrans Construction Intersection Improvements Federally Funded Projects RemovalAC ! Base Cement Treatment Landscaping and Irrigation SCE Coordination Mr. Dawson has over 25 years of experience in public works inspection„ construction management, contracting, quality control„ and management of large-scale capital improvement projects, and has successfully delivered over 28 street Improvement ,projects involving street improvements, intersection improvements„ ADA ramp improvements, bike lanes and bike trails, conduit installation, traffic signal improvements, asphalt overlay, construction staging, traffic control, clearing and grubbing, SWPPP preparation, manholes and utilty covers, loop detectors„ P'CC sidewalk, speed humps, and pedestrian crossings. Mr. Dawson's expertise extends to Ns familiarity with Caltrans, Federal Department of Labor and State of California Division of Labor Standards Enforcement„ and equal' employment opportunity compliance monitoring. Mr. Dawson is experienced in performing quality control and code compliance inspection services for owners, engineers„ and local jurisdictions. Relevant Project Experience City of LakeForest: Street Resurfacing of Merin Ranch Roaarom Fortola to El Toro, Lake Forest, CA I Construction I' anagerlSerrlor ConstructionInspector° This street improvement program involves resurfacing of Glenn Ranch Road from Portola to El Taro„ as well as pre -construction inspection services for the slurry sea) of Zone F and arterial slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. This program required ARHM overlay, traffic control, signing, striping, marking„ and legends, traffic loop detectors, bike lane traffic loops, adjustments to storm drain manhole frame and sewer manhole„ gas valve lid and can„ water valve lid and can, removal and replacement of PCC sidewalk, removal and replacement of existing curb ramps, cold milling, ,and removal and replacement of concrete sidewalk, removal and replacement of curb ramps, localized repairs, and other miscellaneous improvements. City of Compton. Annual Residential Rehabilitation Project (Phases 1 & Phase 2A), Compton, CA j Construction Manager/Senior (Construction lnspelctors Scope of work consisted of construction of cold mill, ARHM pavement, AC base course, aggregate base, full depth AC slot pavement, curb and gutters, sidewalks, cross gutter„ alley intersection, driveway approach, curb ramps, signing, striping, markings, and pavement legends, speed hump, traffic signal loop, adjust to ggrade existing sewer manhole, water valve, water meter, and storm drain manhole,. Mr. Dawson"s responsibilities included construction inspection, reviewing traffic control plans, issues management, cost control, labor compliance, dispute resolution, quality controllinspection, public relations, and ensuring site safety. City of Sean Marino: Street Rehabilitation Program, San Marino, CA (Phase 1 and Phase 2) N Construction anagerfSenior Construction Inspector: Improvements include cold -milling asphalt concrete pavement and repaving with HMA and ARHM, clearing and grubbing, localized pavement repairs„ replacing impacted traffic striping„ markings, pavement legends, loop detectors, curb painting, replacing damaged curb and gutter, curb ramps, cross gutters„ sidewalks, driveways and driveway approaches, inspection and replacement of sewer manholes, coordinating with local utilities, preparation and implementation of S (PPP and B'MPs, and providing temporary traffic control in conformance with the contract documents and applicable permits. City of Alhambra: FY 19.20 & FY 20-21 SB1 Street Rehabilitation Projects,, Alhambra, CA (Phase 1 and Phase 2) j Construction Manager/Senior Construction lnspector� This program consists of pavement and street rehabilitation of 23 local street segments located south of mission road, west of Garfield Avenue, east of Atlantic Boulevard, and north of Valley Boulevard, Pavement improvements include intersection improvements, slurry seal treatment, varying depths of cold milling and overlay„ and full depth removal and reconstruction. The project also includes concrete improvements such as removal and replacement of broken; and off -grade sidewalk„ ADA ramps, median installation, sidewalks, and driveway approaches, that need updating, broken and off grade curb and gutter„ driveway aprons, in need of repairs, concrete cross gutter reconstruction, and traffic signing striping, and markings. Thomas Fussell Senior Construction Inspector LICENSES & REGISTRATION » Electrical Training apprenticeship IBEW Local 441 City of Orange, California » Journeyman Electrician, State Agreement No. 6841 1000NSULTANTS BUILDING SOLUTIONS Encroachment .. • GrindStreet Improvement AC and Overlay Pavement Rehabilitation Underground Utilities Overhead Fiber Installation Updates 4 Traffic Signalsf1 Traffic Loops ADA Ramps, Sidewalks, Curb Gutter, Driveways Power Pole Replacements Caltrans Construction Intersection• + Federally Funded Projects RemovalAC f Replacement StripingBase Cement Treatment ti Signage Landscaping Irrigation SCE Coordination r w w. •'r. • ww w w 'w • - ,r^ w • r • w r w, ww r .. - w.r w • w •r- ,, w w_ - � • w �- .. •,, r • .• -w. ., w r •r- •- r w � ♦ • w .• r r r w •• w r "�•� �w ^^ w w- w r w r' + � r � • � � • •I r " w. • r • r w r - x w w+ w � •, „ w „w r• w w w w w .•w ., repair,w . w • w w" • • • 'r w w 11 • • wvalveboxes, r w r, r, qp = w r • fire hydrant• Russell r r r Caltranis standard specifications and standard plans. Relevant Project Experience � � � • �w w � r r' l.,w •w �•wa, M•w "r^w r• -« • r w w w r w', • w w r � „I Iw r r w w ^r, w • .r_ r r w w^ • - • � r • ' "` w • w +� ^ r. r +w * . w w • • » • • w, w w • ■ ' w • - I - r r - • r - w + r- w _ • � w w �^, - ., • w ^w, r • • • • w r r � w r;�^ r • • r w ,; r w o w r w r • w o w w~ w r M w w • .� MN�w' • ♦ r •� .. r .. • I � :* w w • � w w ' • r + ', w, w � 1 w. r * M • w •... w qM w � � - e� � • r.,w .w w• • .• r w - r +• r • • i r w _ •- r, • • - ww. r � • rw +� w i w w• r• r w� • w •w-,w w • Iww r ,�� w w r, r -• r • � ,. �r r r r w ww r - ! . «, w� r rw • � w w " �� r _ w ^r . w .„ w w .. • w w r r r� • w, r r w. • r U ConstructionRelevant Key Highlights, InspectionConstruction AdministrationContract EngineeringProject Management Support SubmittalCDBG Funded Projects Progress Billing Change Review OrderReview Requestfor r. ." Review Constructability Materials Testing Coordination Compliance RelationsPublic CoordinationUtility SWPPP Compliance Control/QualityQuality TrafficAssurance . r, Senior Construction Inspector EDUCATION » Master of Science in Civil Engineering - University of Jordan, Amman, Jordan » Bachelor of Science in Civil Engineering - Mutah University Relevant Key Highlights: Construction Management Construction Inspection Contracto Project Engineering Support CDBG FundedProjects Submittal Progress Billing Review Change Order Request for Constructability Review TestingMaterials Coordination Cal/OSHAo. Public Relations Utility Coordination SWPPP Compliance Quality Control/Quality Assurance Traffic Control Agreement No. 6841 BUILDING SOLUTIONS Encroachment Permit Inspection Street Improvement AC Grind and Overlay Pavement Rehabilitation Underground Overhead Fiber Installation Updates r Traffic Signalsand Traffic Loops Driveways Power Pole Replacements ImprovementsCaltrans Construction Intersection Federallyr.r Projects AC Removaland Replacement Base Cement Treatment Striping : Signage Landscaping r Irrigation SCE Coordination TRAINING & REGISTRATION Mr, Alhroob is a qualified civil engineer with experience in construction inspection, » QSD/QSP Training construction management, field investigation, and quality control for numerous capital is Caltrans Temporary Improvement projects ^and federally funded projects, involvingstreet improvements, p p j y p I ', , p Pedestrian Pedestrian roadway widenings, bridges, waterfwastewater projects„ sewer pipeline projects, water » Cal OSHA pipeline projects, storm drain projects, oonstruction, storm drains, traffic signals, traffic » 30-Hr.sive Driving signs, streetlights, pavement marlcin s, construction projects, and maintenance protects. He has successfully delivered over 2 storm drain and pipeline projects. His inspection Training » Risk Management responsibilities include the aty t�o revi�e�w improvement plans, inspect public improvements construction, negotiate and administer contracts, and prepare and maintain Training i Hydrology Study a variety of reports. Mr. Allhroob has a thorough understanding of Call -OSHA practices ,and >> Hydraulic Drainage Hydr n Desi procedures, 'traffic control„ ADA and CaltransADA requirements, as well as extensive knowledge of Caltrans construction practices, physical characteristics and properties of traffic highway materials, and approved methods and equipment >i Concrete Pavement Training control and construction used in making physical tests of construction materials, Additionally, Mr. Alhroob is i> Hot Mix Asphalt (HMA) thoroughly familiar with the Creenbook and Caltrans field and construction office procedures, with experience assisting in inspection to assure compliance with plans and Design & Verification specifications„ assisting in preparation of contract change orders, contract estimates, and for progress payments, coordinating field testing of materials compliance with project specifications and the Caltrans Quality Assurance Program„ maintaining accurate project records, performing analytical. calculations, and monitoring Contractor progress by preparing progress reports as required. Relevant Project Experience City of San Bernardino: 40th Street Widening from Johnson to Electric Avenue Project I Senior Construction Inspector; This project includes the widenin of 40th Street from two (2) to four (4) lanes from Johnson to Electric Avenue including upgrade of the existing traffic signaat Electric Avenue. This includes finalizing the street and sewer design, right of way acquisition, and undergrounding of the overhead lines under Rule 20-A. r ar r • • rr ,raw r r, r rr• • r r r w r r rr r -. •M .+ r, � , rw r � �, w , w r r • - • w- r■ •: r w wr r r., .r e•^ • w' -• r •^ w r, r r .•• • • • r r r • • • + • w r w• • r • r • .• r w r r •, * r rr r ... w �r« w r r r r .• ew r ,� r 'w _ �, w •- N r • •r• - w •.,_� r w.,r Agreement No. 6841 Eduardo (Eddie) Davalos M3CONSULTANTIS BUILDING SOLUTIONS Senior Construction Inspector EDUCATION & CERTIFICATIONS Citrus College, Covina, CA, Public Works/Earth Work OSHA 30 Hour Construction Safety & Health )> Sexual Harassment "%Wlevant Key Highlights: Construction peManagement Construction Insction Contract Administration Project Management Engineering Support CDBG Funded Projects Submittal Reviews Progress Billing Review Change Order Review Request for Information Review Constructabty Review Materials Testing Coordination Cal/OSHA Compliance Public Relations Utility Coordination SWPPP Compliance Quality Control/Quality Assurance Traffic Control on Arterial Streets Encroachment Permit Inspection Street Improvement AC Grind and Overlay Pavement Rehabtation Underground Utilities Overhead Fiber Installation Updates to Traffic Signals and Traffic Loops ADA Ramps, Sidewalks, Curb and Gutter, Driveways Power Pole Replacements Caltrans Construction Intersection Improvements Federally Funded Projects AC Removal and Replacement Base Cement Treatment Striping & Signage Landscaping and Irrigation SCE Coordination extends to his familiarity with Galtrans, -ederaFJ1—,e­p—a ment OT Lafor aril SEaTo (it Gaw-Urmar- Enforcement, and'equal employment opportunity compliance monitoring. Relevant Project Experience . ................ N:FVZ-TR =-i U1,11- tMi material, and equipment reports. Agreement No. 6841 Gregory H'unkle, CBO, I C Certified M3CONSIULTANTS BUILDING SOLUTIONS Senior Construction Inspector EDUCATION » Construction Technology, Orange Coast College » Building Inspection Technology, Coastline College, Huntington Beach LICENSES & REGISTRATION » General Contractor » Building Inspector » Plumbing Inspector » Mechanical Inspector » Electrical Inspector » Combination Inspector » Commercial Combination Inspector » Building Official » Certified Special Inspector for Structural Welding » Certified Special Inspector for Structural Masonry » Certified Special Inspector for Structural Steel » Certified Special Inspector for Reinforced Concrete Project 111anagement Engineering Support CD:CDBG Funded Projects ChangeSubmittal Reviews Progress Billing Review Order Constructability TestingMaterials Coordination Cal/OSHA Compliance Public Relations Utility Coordination SWPPP Compliance Quality Control/Quality Assurance Traffic Control on Arterial Streets Encroachment Inspection Street Improvement AC ,,and Overlay RehabilitationPavement Underground Utilities i . f UpdatestoSignals f Traffic Loops a Da Ramps, Curb and Gutter, Driveways Power Pole Replacements ConstructionCaltrans FederallyIntersection Improvements ,, Projects AC Replacement Base Cement Treatment Striping & :.., Landscaping and .. SCE Coordination Mr. Hunkle has over 27 years of experience in public works inspection, construction management, contracting, quality control, and management of large-scale capital improvement projects„ and has successhilly delivered over 25 street rehabilitation projects, involving residential streets„ cold mild and overlay, ARHM p'avement., AC base course', aggregate base, full depth AC slot pavement, curb and gutters, sidewalks, cross gutters, alley intersections, driveway approaches, curb ramps, signing, striping, and signing, speed humps, traffic signal loops, water valves and meters, and sewer and storm drain manholes. Mr. Hunkle's expertise extends to his familiarity with Caltrans, Federal Department of Labor and State of California Division of Labor Standards Enforcement, and EEO compliance monitoring. Mr. Hunkle is experienced in performing quality control and code compliance inspection services with observation reports for owners, engineers, and local jurisdictions. Relevant • ect Experience wa � M� M e w f. •" � ., � • w � •. WON pavernent and placement of pavement surface • Jamil Borner Senior Construction Inspector EDUCATION » BA, Communication Specialist - Baylor University, Waco, TX LICENSES & REGISTRATION Relevant Project Experience Construction rianagement Construction.` ContractAdministration En 'neerin • dM f 1, w Projects Submittal Progress Change Order Review Requiest forInformation Review Const�ructability Review Materials Testi'ni Coordination CaIIOSHA CornpJance Public CoordinationUtility SWPPP Compliance eControl/Quality* Assurance Traffic Control on Arterial Streets Agreement No. 6841 0 I BUILDING SOLUTIONS Encroachment Permit Inspection RehabilitationStreet Improvement AC Grind and Overlay Pavement Underground Utilities Overhead Fiber Installation Updatesf and LoopsTraffic ADA z f ` f ♦ Gutter, Driveways Power Pole f Caltrans Construction Intersection Improvements Federallyf. Pro ec�ts AC Removaland Replacement Base Cement Treatment f f s f . :f `' Striping LandscapingIrrigation SCE Coordination City of Costa Mesa JUitywide Parkway Maintenance, Street Rehabilitation, and Slurry Seal Project, Costa Mesa, CA 11 Senior Construction inspector: Citywide street improvement program in the City of Costa Mesa„ which involves slurry seal, street improvements, intersection improvements, ADA ramp improvements, conduit Installation, traffic signal improvements, mobilization, curb and gutters, sidewalks, driveway approaches„ spandrels, cross gutters„ adjustment of manholes and utility covers to grades procurement and application of slurry seal Type Il, crack sealing„ traffic signing, striping and markings, installation of traffic markers and speed humps„ and implementation of traffic control, Mr. Borner performed evaluation and mark outs for all dig outs and concrete that required repairs for the entire project. City of Alhambra: FY 1-20 & 20-21 Street Rehabilitation Projects, Alhambra, CA I Senior Construction Inspector. These street improvement programs consist of the pavement and street rehabilitation of 23 local street segments located south of Mission Road, west of Garfield Avenue, east of Atlantic Boulevard, and north of Valley Boulevard. Improvements included slurry seal treatment„ varying depths of cold million and overlay, full depth removal and reconstruction, concrete improvements such as removal and replacement of broke and off grade sidewalk„ ADA ramps that need updating„ broke and off -grade curband gutter„ driveway aprons in need or repairs, and concrete cross gutter reconstruction. Mr. Borner provided daily construction inspection services„ monitored' contractors" daily progress through daily reports and photos„ reviewed traffic control procedures, coordinated scheduling, issues management„ meetings, monitored cost control, labor compliance, reviewed RFIs and submittals, change orders, dispute resolution, coordinated public relations activities, and organized final walkthrough and project completion reports. City of Compton: Annual Residential Street Rehabilitation Project: Phases 1 & 2A Compton, CA I Senior Construction Inspector: This project included street rehabilitation of seven major City streets. Scope of work included roadway pavement improvement, repairs to cross gutters, curb and gutters, curb ramps, ADA compliance, construction of slurry seal, grind and overlay, cold mill, ARHM pavement, AC base course, aggregate base, full depth AC slot pavement, asphalt overlay, PCC sidewalks and driveways, alley intersection, signing, striping, markings, traffic signal loop, loop detectors, and adjust to grade existing sewer manhole. Scope included full -service construction management, reviewing traffic control plans, meetings, scheduling, cost control, staging coordination, quality control/Inspection, permits/environmental compliance, progress payments, monthly staff reports, site safety„ as-builts drawings, final walkthrough, and project completion reports. Agreement No. 6841 JIMMY MARTIN, ACI, ICC Cert Senior Construction Inspector LICENSES & REGISTRATION )) ICC Soils Special Inspector >> ICC Reinforced Concrete Inspector Galtrans Various Certifications KI I 4#1- il .444 "kielevant Key Highlights: Construction Management Construction Inspection Contract Ad DWministration Project Management Enineering, ort rp 0i ects CG Fun �ed 7 Submittal Reviews Progress BiifinM Review Change Order eview Request for Information Review Co:nstructabil�ity Review Materials Testini" Coordination Cal/OSHA Comp Jance Public Relations Utility Coordination SWPPP Compliance Quality Control/Quality Assurance Tr;?ffic Control CONSULTANTS BUILDING SOLUTIONS X7 C2 k, uCCU sage Ica Ion ACI Field Technician Grade 1 Mr. Martin has more than 27 years of construction management and inspection )> 30 Cal/OSHA experience on major capital improvement projects and is a certified ICC and ACI. )> Confined S ace Training Jimmy has been performed senior construction inspection services for various >> Traffic Control Technician and projects including intersection improvements, new intersections, bridges, Traffic Control Flagger interchanges, street improvements, traffic signal modifications, retaining walls, )) Certified California sound walls, MSE walls, sewer pipeline projects, water pipeline projects, water Journeyman Laborer (ACC) treatment facilities, wastewater treatment facilities, pipeline projects, and flft stations �) Pervious Concrete echnician and has successfully delivered over 17 retaining walls and has successfully (NRMCA) delivered over 20 street irnprovement projects, Jimmy's public works inspection >) Carpent responsibilities include the ability to review improvement plans, inspect public v Cementzason improvements construction, negotiate and administer contracts, and prepare and >) Fall Protection maintain a, variety of reports. Jimmy values safety as a top priority and is, acutely Traffic Control Safety aware of security protocol and adherence to regulatory requirements. Jimmy proficiently surveys, inspects and evaluates production environments to determine fulfillment of safety andsecurity standards. Jimmy possesses strong leadership capabilities that consistently lead to project productivity and profitability. His ability to supervise various levels of personnel and increase each team member's performance contribute to the overall success of program goals and client satisfaction. Relevent Proiect Experience ♦ Mrsm-� 11-441yk cM..ers to grade, installation of pave�neniit markings and striping e 11 ted work includes mobilization, traffic control, assisting in preparation of NPIDES, local utility coordination, construction management, daily inspection, labor compflance, geotechnical and materials testing coordination, Noah Hernandez Senior Construction Inspector EDUCATION » Bachelor of Arts in Public Administration, California State University Fullerton LICENSES & REGISTRATION » Certificate in Project Management, California State University Fullerton » Sexual Harassment Prevention Training » Defensive Driver Training » OSHA 30 Hour Training Construction MManagement Construction Inspection Contract Administration Engineering Ruppoirt CDBG Funded Projects ��Submittal m� lReviews '. Informationilling Review Change Order Review Request for Constructalbility CoordinationMaterials Testing Compliance PublicRelations Utility Coordination QualitySWPPP Compliance Assurance Traffic Control 1, Arterial Streets Agreement No. 6841 CONSULTANTS BUILDING SOLUTIONS Encroachment InspectionStreet .. AC Grind and Overlay Pavement Rehabilitation Underground Utilities Overhead Fiber Installation Updates i Traffic Signalsand LoopsTraffic ADA Ramps, Sidewalks,, Drivewaysand Gutter, Power Pole Replacements ImprovementsCaltrans Construction Intersection FundedFederally Prolects AC Removal .. Base Cement Treatment Landscaping, a�ng Irrigation SCE Coordinabon Mr. Hernandez has experience in construction inspection, construction management, contracting, field investigation, project management„ and quality control' for numerous capital improvement projects and federally funded projects„ involving street improvement, bridge construction, storm drains, traffic signals, traffic signs, streetlights, pavement markings, construction projects, and maintenance projects. Mr. Hernandez has a thorough understanding of Cal -OSHA practices and procedures, ADA and Caltrans ADA requirements, as well as extensive knowledge of Caltrans construction practices„ physical characteristics and properties of highway construction materials, and approved methods and equipment used in making physical tests of construction materials. Additionally„ Mr. Hernandez is familiar with Caltrans field and construction office procedures„ with experience assisting in inspection to assure compliance with plans and specifications„ assisting in preparation of contract change orders„ contract estimates„ and progress payments, coordinating field testing of materials for compliance with project specifications and the Caltrans duality Assurance Program„ maintaining accurate project records„ performing analytical calculations, and monitoring Contractor progress by preparing progress reports as required. Relevant Project Experience City of Torrance: Residential and Arterial Pavement Improvement, 1-159/1-139, Torrance, CA I Senior Construction Inspector: Improvements include application of slurry 'seal, cold mild and overlay localized pavement repairs, tree removalslreplacements, asphalt berm replacement„ repairs to curb, gutter„ sidewalk„ driveways„ and access ramps. Mr. Hernandez performs daily duties of construction quality, assurance inspection, including oversight of excavation, compaction, subgrade inspection, backfill„ paving, and inspection of structures, electrical„ welding„ drainage, and underground utilities. Mr. Hernandez coordinated materials testing, attends meetings with City representatives, contractors, and other agencies, prepares constructability reviews„ and ensures compliance with project plans. City of Irvine: Annual Street Rehabilitation and Slurry Seat Project, Irvine, CA I Senior Construction Inspector: Inspection included asphalt pavement cold -milling„ pavement fabric installation, asphalt concrete pavement overlays, slurry seal application„ removal and replacement of concrete improvements such as sidewalks, ramps„ driveways„ curbs and gutters. Mr. Hernandez inspected tasks such as adjustment of a survey monument„ water valve installation, sewer cleanout, and installation of signing, striping and pavement markings. He oversaw document management of ,shop drawings, RFIs, change orders„ progress payments, meeting minutes, etc. Mr, Hernandez prepared a final punch -(list„ verified completion of final items„ and assisted in project closeout. City of Sean Bernardino: 'Street Rehabilitation Program (30+ Major Streets), San Bernardino, CA I 'Senior Construction Inspector: This Ion term, on -call contract involves concrete improvements and pavement improvements of over 30 ma or streets in the City of San Bernardino. The contract also includes the rehabilitation and resurfacing of various streets an intersections. Scope of work includes full depth removal and replacement of asphalt concrete„ intersection improvements, ADA ramp improvements, bike lanes„ conduit installation„ traffic signal improvements cold milling and overlay of existing asphalt concrete, mobilization, traffic control„ sta ing for major streets and intersections, removal of traffic striping, installation of traffic striping and pavement markers, installation of loop detectors and bicycle loop detectors, construction of cross walks, removal and replacement of sidewalk, driveways, PCC curb and gutter„ cross utters„ spandrels, curb ramps along both residential and commercial streets„ manhole and utility vault adjustments, an � preparation of SWPPP and erosion control plans. City of Fullerton: Longview Derive 'Street Improvements and Water/Sewer Malin Replacement Fullerton, CA I Senior Construction Inspector: Inspection of water, sewer and street rehabilitation preject. The project included replacing 2500 linear feet of 8-inch DIP water main and appurtenances, 2500 linear feet of 8-inch VCP, PVC SDR 26 sewer main, new manholes and storm drains, removing and replacing existing sewer and video inspection and abandoning existing water mains and valves. Street and drainage improvement work included cold planning, excavation, asphalt concrete, aggregate base, curb and gutter, access ramps.