Loading...
CONTRACT 6835 OtherAgreement No. 6835 File: ROE23067HBR RIGHT OF ENTRY PERMIT AND INDEMNITY AGREEMENT THIS PERMIT, dated for reference purposes only, December 5, 2023, is made by and between THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, a public agency existing under the authority of the State of California ("LACMTA/METRO"), and THE CITY OF EL SEGUNDO, a municipal corporation organized under the laws of the State of California, acting by and through its Department of Public Work ("Permittee"). The parties agree: For the consideration hereinafter stated, the parties agree as follows: The LACMTA hereby permits Permittee to enter upon and use the real property ("Property") located on METRO's C-Line Right -of -Way, specifically within Nash St between Atwood Way and El Segundo Blvd and Douglas Street at the crossing with Atwood Way and at the crossing with Park Place, in the City of El Segundo, State of California, and as shown on Exhibit "A", Site Drawing, and subject to the following terms and conditions. 2. Permittee's right to enter the Property is non-exclusive and personal to Permittee, its subsidiaries and their officers, agents and employees, licensees and invitees and, therefore is not assignable. 3. This Permit is granted to Permittee solely for the purpose of ADA ramp improvements, street utility demolition and disposition, street improvements, signing,striping, irrigation, and planting, which construction and installation work is set forth in the Scope of Work attached hereto as Exhibit "B" and incorporated herein by this reference (the "Work"), as depicted in the Construction Drawings & Schematics attached hereto and incorporated herein by this reference as Exhibit "C", all subject to the terms and conditions of this Permit. Any change to the approved plans during construction shall be submitted to LACMTA for review and approval. Permittee must coordinate all construction with Metro, under the direction of John Jaramillo, Director - Construction Management, contact information: (213) 418-3149 Tel; (213) 703-2485 Cell; and EmaflLaramill2i@metro.net. 4. This Permit is granted to Permittee, its employees, subcontractors, successors or assigns to enter specific areas as may be designated or assigned by LACMTA from time to time. MTA Right -of -Entry General — Track Allocation I CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 5. Permission to enter the Property is granted for a specific time period commencing on December 5, 2023, and ending on May 31, 2024. 6. In consideration of this Permit, Permittee shall pay to LACMTA Real Estate, prior to its initial entry, the sum of $0 Waived for use of the property. There may be additional fees ("Additional Fees") required by LACMTA as a result of construction support (such as Engineering, Construction Management inspection and/or other related support). John Jaramillo, Director -Construction Management, at (213) 418-3149 Tel; (213) 703-2485 Cell; and Email "aramillo etro,net will coordinate Additional Fees requirements and payments due to LACMTA by the Permittee. Payment of such Additional Fees shall be collected separately from this Permit. The granting of this Permit shall not be construed to provide Permittee with any rights beyond those expressly provided herein. 7. Permittee agrees, that its duly designated representatives has fully examined the Premises and accepts the use and occupancy thereof with full knowledge of the conditions thereof, and agrees that LACMTA shall not be liable for any loss, injury to persons or property damage caused by or resulting from the condition of state of repair of the subject Premises. 8. Permittee, on behalf of its successors and assigns, shall indemnify, defend release and forever hold harmless LACMTA and its officers, agents and employees, licensees and invitees from and against any and all loss, claims, demands, liabilities, penalties, liens, claims of lien, damages (including consequential damages), costs and expenses, which LACMTA may sustain, incur or become liable for, including without limitation, loss of or damage to property or injury to or death of any person or persons arising out of or in any manner connected with Permittee's use of the Property or exercise of this Permit, except to the extent caused by the gross negligence or willful misconduct of LACMTA. 9. Permittee, at its expense, shall comply with all applicable federal, state and local laws, ordinances, regulations, rules orders, and LACMTA policies and procedures with respect to the use of the Property. 10. While this permit is in effect, Permittee and its contractors shall, at its sole cost and expense, obtain and maintain in full force and effect throughout the term of this Permit, insurance, as required by LACMTA, and described in Exhibit "D" attached hereto. Permittee shall pay all premiums and assessments on the insurance coverage required and shall provide LACMTA certificates of insurance required to be maintained by Permittee prior to the date of the commencement of any activities by same on the Property. Each certificate shall expressly provide that such MTARight-of-Entry General —Track Allocation 2 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 policies shall not be cancelable or otherwise subject to modification except after thirty (30) calendar days' prior written notice to LACMTA. Notwithstanding the foregoing, the insurance requirements may be satisfied by providing evidence that Permittee is legally self -insured. Permittee agrees that any program of self-insurance shall protect the interests of LACMTA in the same manner as those interests would have been protected had a policy of commercial insurance been in effect. 11. Permittee shall ensure that all activities conducted on the Property shall be in accordance with LACMTA's written Track Allocation Procedures, as described in Exhibit "E", which is attached hereto and incorporated by reference herein. Permittee shall not enter the Property until it has received the applicable approvals and permits required by the Track Allocation Procedures. 12. In the event of an emergency resulting from Permittee's activities under this Permit that threatens or endangers (a) human life or safety or (b) operation of the LACMTA facilities, or any other improvement or appurtenance of LACMTA, Permittee shall promptly notify the LACMTA's rail operation control center at 323- 563-5290 or 323-563-5022 and LACMTA's contact person set forth in this Permit. Thereafter, Permittee may undertake such measures as are reasonably necessary to remedy such emergency provided that Permittee (w) acts in good faith; (x) uses its best efforts to remedy the emergency immediately; (y) otherwise conforms to the extent practicable, to the applicable provision of this Permit; and (z) follows all directives issued by the Rail Operation Control Center and/or LACMTA's Contact Person with respect to such emergency work. LACMTA reserves the right to change the telephone numbers listed above by delivering written notice thereof to Permittee. 13. The LACMTA may inspect the Premises covered by the Permit at any or all times. 14. The LACMTA may terminate this Permit and be relieved of any further performance if Permittee fails to perform any covenant herein contained at the time and in the manner herein provided or if LACMTA or any other person discovers any dangerous condition on the Premises. 15. Permittee shall not interfere with any of LACMTA's normal activities and shall promptly remove any vehicle or equipment that might be a source of interference to LACMTA's operations. MTARight-0f--Entry General— Track Allocation 3 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 16. Notices to LACMTA shall be given as follows: Los Angeles County Metropolitan Transportation Authority One Gateway Plaza, 22th Floor Los Angeles, CA 90012-2952 Attn.: Allan Sachez, Senior Real Estate Officer (213) 922-4669 1 alsanchez@ngtro.net 17. Notices to Permittee shall be given as follows: City of El Segundo 350 Main Street El Segundo, CA 90245 Attn.: Cheryl Ebert, Senior Civil Engineer (310) 524-2321 1 cebert else undo.or All written notices shall be deposited in the United States mail, postage prepaid, or delivered personally or by overnight courier. 18. The parties hereto agree that to their knowledge, no Board member, officer or employee of the Los Angeles County Metropolitan Transportation Authority has any financial interest, in this transaction, and that if any such interest comes to the knowledge of either party at any time, full and complete disclosure of all such information will be made in writing to the other party or parties, even if such interest would not be considered a conflict of interest under the laws of the State of California. MTA Right -of -Entry General —Track Allocation 4 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 THE UNDERSIGNED REPRESENTS AND WARRANTS THAT HE/SHE IS DULY AUTHORIZED TO EXECUTE AND DELIVER ON BEHALF OF THE PERMITTEE. LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUT ITY J Nam11 e: A anchez Title: Senior Real Estate Officer DATE: 12/20/2023 PERMITTEE: CITY OF EL SEGUNDO Name: Darrell George TITLE: City Manager DATE: Z - Is - L Name: oaquin Vazquez TITLE: Assistant City Attorney DATE: ..L,I'v-1%23 ,�-R Cj2 Name:p Tracy Weaver - TITLE: City Clerk DATE: I �?I ? . MTA Right -of -Entry General —Track Allocation 5 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 Met EXHIBIT A Site Drawin Metro's C-Line ROW shown In blue ryPl ' UNV mi W IN1,H'a' lk W: %�� /Ti/'R"ANPJJ rm�, Vy,ronri i ?rv,��eldw�.,� P it ikd"�Y l�n l.,„L ✓'w%� pi„ � 'fir7-1-in M- Street utility demolition and disposition, street USE: improvements, signing, striping, irrigation, and planting. N W , L-: S APN No.: N/A Jna Map FWww ce 0Wm P(W LINE NIA N/A EXHIBIT "A" tabon C'.mm"Tun(ty City CITY OF EL SEGUNDO NIA El Segundo EI Se undo Neaxmel C a 3t. Thomas G#Ade Gilds L.A.C.IVI„T.A. MTA Fk No, Angeles El Se undo 73242 Attn: Real Estate Dept One Gateway Plaza ROE23067HBR WJ L Scale Date - NIA treetl prvmn As Shown Los Ae aims CA 90012 NIA 11/29/2023 AS MTA Right -of --Entry General — Track Allocation 6 CITY OF EL SEG U N DO Rev. 3111/19 ROE230671-113R; 11/29/2023 Agreement No. 6835 EXHIBIT B Scope of Work 1 of 5 Nash St & Douglas St CWP 3.19 CONSTRUCTION WORK PLANS A. Prepa re Construction Work Plans (CWP) for individual Work elements or as specified by Metro, B. Show CWP preparation activities and Readiness Review Meetings on the three week look ahead schedules. C. Submit CWP prior to Readiness Review Meetings described in this Section, D, All CWPs shall be reviewed bybuilder, superintendent, subcontractor personnel, Including the field supervisor. E. Subject Work may not proceed until CWP has been approved by Metro. F. Comments must be resolved and CWP and associated inspection checklists (if applicable) resubmitted for approval prior to commencement of Work described in CWP. G. Address the items below in CWP as minimum. The format below must be followed. Note: Metro will not review partial submittals. 1. Description of Work and applicable Contract (approved by Metro) drawings and specification sections. • ADA Curb Ramp improvements at intersections of Nash St/Imperial Ave, Nash St/Atwood Way, Nash St/ Maple Ave, Nash St/Mariposa Ave, Nash St/Grand Ave, and Nash St/El Segundo Blvd. ADA Driveway improvement at 500 N. Nash St • Cold mill, AC pavement, and ARHM on Nash Street, between El Segundo Blvd and Imperial Highway. Refer to plans for limits and type of pavement rehabilitation. • Upgraded signage and striping to accommodate Class lI and Gass III bicycle facilities. • Pedestrian push button upgrades for ADA improvements at intersections on Nash St, between El Segundo Blvd and Imperial Highway. • Microsurfacing on Douglas St in multiple areas between Campus Dr and Transit Center Dr to improve street surface. Refer to plans for Microsurfacing limits. • Upgraded signage and striping on Douglas St to accommodate new surfaced street and bicycle facilities. • Refer to plans for full design and details. 2. Include actions that are defined as "special events" in Work that may constitute exposing the public to danger, inconvenience, or risk. • No special events for this work that may constitute exposing public to danger, inconvenience, or risk. 3. List of current required submittals to complete Work activity, NITARight-0f--Entry General — Track Allocation 7 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 EXHIBIT B Scope of Work 2 of 5 Nash St & Douglas St CWP El Segundo Blvd Improvements Project 1l ,1 ��;. ii<ist a submttais��r�ss:� r�or�adrork on h!�'i�'�4 S.M. .M. _ .--. Description Su ti CCl _. AS {iatC CJ 1Cr.ffiie...... '�^3 Base Llateriat5 �__._.......__...__...�w _ ww GS�1ixe5_......__....�...._...v._... CCL�C,4 to 5 _ t.aurnirraires �ww Poles Pull Boxes _.._�.._ ws Videc Detection System Conduit..m.µ�_..--_w.�.,--�._._._......w. urninated Street Name Sign . Oil _ Si nal Gear 011 � Controller Cabinet Jl3 Foundation Concrete Wx 014 Loop Materials� M�N 016 Conductor 0,7 , _ _ Parrorated .costs Cl. Pe3ea Clamp ._ ._. UT �1�2Q� Traf3ze Sl "�atariAs _..._�'................... �f rurzaateti Domes 21 St e materials _ 2 03. 5tn tra Materials- Reflewlibe viarkers - �_ _.. _. SW PPP _._.._-.._w_..... 024 Traffic Control Plans MTARight-of-Entry General —Track Allocation 0 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 EXHIBIT B Scope of Work 3 of 5 Nash St & Douglas St CWP 4. individual(s) and positions) responsible for supervision of Work, including contact information. Sully -Miller Z&K Consultants City of El Segundo Contractor Project Manage. r Owner Andres Acosta Zack Fagih Cheryl Ebert Project Manager Project Manager / Construction Project Manager 714-504-7786 Manager 310-524-2321 a iK ..e k'•.�;..w' as0.k.m 949 6375040 Cory Clayton Thomas Dawson Superintendent Inspector 714-720-5136 949-274-0561 5. Planned start date of Work, progress rate expected, and extended Work hours required (i.e. Construction Schedule). An hour to hour breakdown may be requested by Metro for certain projects. Traffic signal work at Nash 5t / El Segundo alvd: TS4100� * Instal VOS cable 9 I 27-1ov-23 27-Nov-23 21 D% TS4200 Instau now *hide detection cameras ;" 2 28Nov-23 29-Nw-23 21 0 TS4300 Insaa PPS posts foundatwnsicoMuOt tatonis I 30Nov-23 30-Nw-23 21 0% TS4400 Install new Pedestrian countdaw+ dis"ys 1 01 Oec-23 01-Dec-23 21 UIN TS4500 Insafl PPB posts7APS urns 7 2 04-Oec-23 05-ner.-23 21 0%1 IS4600 Instail new sWal displays+ new TINS pole 151 1 06-Dec•23 060ec-23 21 0.4 TS4700 Insar top mount Msplay pole (61 1 1 07-Dec-23 07 Dec-23 21 0'; TS4800 Sqnal tum on T I 094)ec-23 08-Dec-23 21 3:1. Concrete work: NA11D0 Install 8MPS 1 1 03Nov-23 03Nov-23 6 01"> NA1200 Sawcut for Removals 4 4 D6Nov-23 09-Nov23 6 V", NA1300 Reawvals for Curbs+ Sidewwlks : ADA Ramp! I 1 13-.Nov-23 21N0v-23 6 NA1400 Race and Compact Base for Curbs' Cross G 6 6 22Nov-23 30Noav-23 6 (l NA1500 Form and Pour Curb and Gutter •1 4 0'-0ec 23 06 0ec-23 6 6 NA1600 Imiae Curb: Parkway Dra'a1s 1 1 074)oc.23 07-Dec-23 I T: NA1700 AC Paw Sots 2 Z 074)o023 O&Doc•23 6 Q°'•:, NA1800 Crade for Ueymd,c Drr.evrays;ADARmnps 4 4 11Dec23 140ac23 6 fY"" NA1900 Forn and Pow S+dewak' Dr -ways / Ramgs 3 3 15-Dec-23 t9-Dec-23 6 Da" ' MTA Right -of -Entry General —Track Allocation 9 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 EXHIBIT B Scope of Work 4of5 Nash St & Douglas St CWP Pavement work on Nash St: NA3000 Imp'emum Tragic Control 1 1 15-0o023 15-Do 23 V' 05, NA3100 Instal BMPS 1 1 15-Dec23 154)ec23 5 0'.11 NA3200 Remove Ewstng AC 5 5 15-0ec-23 21•Dec•23 5 0'L' NA3300 L%%w 6astng Manhole and Malves 2 2 224)ec-23 26-Dec-23 µ'€ 0" NA3400 Puce HMA 2 2 27-0ec-23 28-0ec-23 5 0111 NA3500 Cad Ala 2 2 29-0ec-23 02Jan-24 6 0' NA3600 Pace RHMA 2 2 03Jan-24 04-Jan-24 6 NA3700 Adjust Water Valdes to Grade 2 2 05-Jan-24 08-Jan-24 0 0?> NA3800 Adust Manholes and Valdes to Grace 4 4 09J.an-24 12Jan-24 7 0-, NA3900 Cat rack J 3 16Jan-24 18-Jan-24 9 NA4000 Strpn91Sgns 4 4 19 Jan2424 Jan 24 9 NA4100 Reestabksh Survey Monuments 11 5 15-Jan-24 31-Jan-24 (p ,) , Douglas St — Microsurfacing and Striping: D0110C 1.1.n,S 1-9 ,Bury Aalj J 06 Am 24 it_l,N Dortiv Cat-_ - l 1G- 'n 4 Tki—N DOI}0^. $; •.Tc - 1 14A".?1 ..14 t -21 6. Prerequisite activities required including Third Party permits ie. approved Traffic Control Plan (TCP), haul route, Metro Rail Safety Training Badges, Lift plans, Quadrennial/Annual reports, Crane Operator and Qualified Rigger Certifications if applicable). Copies must accompany the submittal. • Traffic Control Plans • Metro Safety Training 7. Include aJob Hazard Analysis (JHA) for scope of Work as a stand-alone document. Use template on next page. • See bottom of Construction Work Plan 8. Identification of Inspections and tests to be accomplished, including drawings and specifications to be used for acceptance. • Asphalt compaction testing • Base compaction testing 9. Inspection hold points for Contractor, Metro, and third parties identified on inspection checklists. • Project Specifications do not require inspection checklist, 10. A list of all the equipment to be used during each activity in the construction schedule. • Bomag Cedar rapids CR522 Paving Machine • CAT 563 Single Drum Compactor • CAT CB10 Double Drum Roller • Wirtgen 210i Cold Miller MTA Right -of -Entry General — Track Allocation 10 CITY OF EL SEG U N DO Rev. 3111/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 EXHIBIT B Scope of Work 5 of 5 Nash St & Douglas St CWP • JD 210 Skip Loader • KW t800 Oil Distributor Truck • Road tec SB3000 MTV Shuttle Buggy Street Sweeper Striping Truck Micro Milling machine 11. Copies of all permits associated with the work addressed within the above CWP from federal, state, country, and local jurisdiction(s). • City of El Segundo Encroachment Permit • Caltrans Encroachment Permit 12. COVID-19 Plan for construction. • In the event of COVID-19 health concern, the contractor, construction manager, and City staff will follow the guidelines as provided by Los Angeles County Public Health Department MTARight-of-Entry General —Track Allocation 11 CITY OF EL. SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 EXHIBIT C Construction Drawings Full set of plans are on record with Metro Construction Management MTARight-0f--Entry General —Track Allocation 12 CITY OF EL SEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 Exhibit "D" Page 1 of 2 INSURANCE REQUIREMENTS FOR LEASES, LICENSES, AND PERMITS Lessee, Licensee, or Permittee shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from, or in connection with, the use of LACMTA property hereunder by the Lessee, Licensee, or Permittee, their agents, representatives, employees or subcontractors. Minimum Scon of Insurance, (Check all applicable boxes) Coverage shall be at least as broad as: 0 Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001). 0 Insurance Services Office Form No.CA 0001 covering Commercial Automobile Liability. 0 Worker's Compensation insurance as required by the State of California and Employer's Liability Insurance. ❑ Course of Construction (Builder's Risk) insurance providing coverage for "all risks" of loss. ❑ Property insurance against all risks of loss to any tenant improvements or betterments. ❑ Insurance Services Office Railroad Protective Liability ❑ Contractor's Pollution Liability with coverage for: a. bodily injury, sickness, disease, mental anguish or shock sustained by any person, including death; b. property damage including physical injury to or destruction of tangible property including the resulting loss of use thereof, clean-up costs, and the loss of use of tangible property that has not been physically injured or destroyed; C. defense, including costs, charges and expenses incurred in the investigation, adjustment or defense of claims for such compensatory damages; and d. losses caused by pollution conditions that arise from the operations of the contractor. ❑ Insurance Services Office Excess Liability (CX 00 0109 08 or equivalent) Minimum Limits of Insurance (Check all applicable boxes) Lessee, Licensee, or Permittee shall maintain limits no less than: 0 General Liability: $2,000,000 per occurrence for bodily injury, personal injury, property damage and fire legal. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. 0 Automobile Liability: $2,000,000 per accident for bodily injury and property damage. 0 Workers' Compensation: Statutory as required by the State of California; Employer's Liability: $1,000,000 per accident for bodily injury or disease. ❑ Course of Construction (Builder's Risk): Completed value of the project. ❑ Property Insurance: Full replacement cost with no coinsurance penalty provision. ❑ Railroad Protective Liability: $2,000,000 per occurrence. Aggregate limit shall apply separately to this project/location or the aggregate limit shall be twice the required per occurrence limit ❑ Contractor's Pollution Liability: $2,000,000 per occurrence/$4,000,000 annual aggregate. ❑ Excess Liability: $5,600,000 per occurrence. Policy shall afford coverage on a following form basis and respond to Commercial General, Commercial Auto Liability claims in the same manner as underlying coverage without limitation. Deductibles and Self -Insured Retentions Any deductibles or self -insured retentions in excess of $25,000 must be declared to and approved by LACMTA. At the option of LACMTA, either: the insurer shall reduce or eliminate such deductibles or self -insured retentions as respects LACMTA, its officials and employees; or the Lessee, Licensee, or Permittee shall procure a bond guaranteeing payment of losses, and related investigations, claim administration and defense expenses. MTA Right -of -Entry General — Track Allocation 13 CITY OF EL SEGU N DO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 Exhibit "D" Page 2 of 2 Other Insurance Provisions The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. Los Angeles County Metropolitan Transportation Authority, its subsidiaries, officials and employees are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Lessee, Licensee, or Permittee; products and completed operations of the Lessee, Licensee, or Permittee; premises owned, occupied or used by the Lessee, Licensee, or Permittee; and automobiles owned, leased, hired or borrowed by the Lessee, Licensee, or Permittee. The coverage shall contain no special limitations on the scope of protection afforded to LACMTA, its subsidiaries, officials and employees. 2. For any claims related to this project, the Lessee, Licensee, or Permittee insurance coverage shall be primary insurance as respects LACMTA, its subsidiaries, officials and employees. Any insurance or self-insurance maintained by LACMTA, its subsidiaries, officials and employees shall be excess of the contractor's insurance and shall not contribute with it. 3. Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to LACMTA, its subsidiaries, officials and employees. 4. The Lessee, Licensee, or Permittee insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 5. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either a party, or reduced in coverage or in limits, except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to LACMTA. 6. Workers' Compensation and Employer's Liability policies shall provide a waiver of subrogation in favor of LACMTA. 7. Railroad Protective Liability in the amount of $2,000,000 per occurrence written in the name of LACMTA shall be obtained to satisfy this coverage requirement. As an alternate to this requirement, the Commercial General Liability may remove the exclusion for work performed within 50ft of railroad track and evidence provided on the certificate of insurance. 8. LACMTA lease number must be included with description of Deed premises. 9. Course of construction policies shall contain the following provisions: a) LACMTA shall be named as loss payee. b) The insurer shall waive all rights subrogation against LACMTA. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A- VII, unless otherwise approved by LACMTA. Verification of Coverage Lessee, Licensee, or Permittee shall furnish LACMTA with original certificates of insurance and endorsements evidencing coverage required by this clause. All documents are to be received and approved by LACMTA before work commences. As an alternative, the Lessee, Licensee, or Permittee may provide complete, copies of all required insurance policies, including endorsements affecting the coverage required by these specifications. Contractors and Subcontractors Lessee, Licensee, or Permittee shall include all contractors and subcontractors as insureds under its policies or require certificates and endorsements for each contractor and subcontractor. All coverages for contractors and subcontractors shall be subject to all of the requirements stated herein. Lessee, Licensee or Permittee shall serve as the repository for all certificates of insurance for their contractors and subcontractors; however LACMTA reserves the right to request copies for review. MTARight-of--Entry General— Track Allocation 14 CITY OF ELSEGUNDO Rev. 3/11/19 ROE23067HBR; 11/29/2023 Agreement No. 6835 EXHIBIT E Track Allocation Procedures Metro Track Allocation Quick -Reference Sheet Updated 2021-12-20 Stop 1) Access the Metro Track Allocation (rA) system: L&Li Stop Z) Create a profile: a. Leave "Project Number," "Contract #/ ROE," 'Task Number," and "Radio Call Sign" blank. b. Rail Operations will need to approve the profile before TA Request Forms can be submitted. Step 3) Complete the TA Request Form. Rafl Opvn­ Control All-n- Request Fern, I A) Select the Metro Rail Line nearest your project. Profile Icon B) Confirm Contact Information, If changes are needed, access and edit your profile via the icon. C) Select the work week, which starts on Sunday- D) Select Start and End time (military time). _171 .............. I ..................... " ���kXag a F) Select "X------------------ VT- ... T ... .................. F..1 Work will be midnight cut-off at �dnight if not selected. __ �111111111­ " F) Select "N /A" if no war k falls within 6 ft of tracks * G) Select nearest Metro station from pullclown menu or type nearest Intersection and click "Add New Item" H) Select "No' for work failing 20ft outside the Metro Right -of -Way. Metro CM will advise on Power Down requirements based an the work.* 1) Enter crew size, J) Use the Copy button to pull pre -fill information from the top bar down to other days. Adjust information as necessary for specific days, The "X" button will clear all information on a line. K) Include a description of all major work items, especially all crane or heavy equipment activity. L) Select "No Right of Way Access- if work does not require access to Metro property.* M) Select "EIC" (Employee in Charge) under "Self Support' If work will not Impact Metro operatoons N) Include Metro CM ernalls to receive copy: kumiqr^ W ray r,=L=l 0) Click "Submit" when ready or click "Save" to keep form for future use. *Metro CM will advise If other selections are required. Stop 41 Attend Tuesday TA meeting: A link to the virtual meeting will be sent to the requester following submittal of the Form. Notes: TA Request Forms are da by 42M 01 dig Lido. akA J21 gilgridardays befafe ibe wed of1he pLWMjd mtg& TA Request Forms must be submitted 3 weeks rior to the week of the proposed work if single tracking or Power Down is required. TA Request Forms may be submitted for up to four weeks in advance. Work near Metro Division Yards use a similar but separate allocation process. Request a Yard Allocation Form to fill manually. MTA Right -of -Entry General — Track Allocation 15 CITY OF EL S E G U N D O Rev. 3/11/19 ROE23067HBR; 11129/2023