Pilot Project
Project Goals & Objectives
• Implementation of Smoky Hollow Specific Plan pilot parking
project.
• Conversion to one-way street and provide angled parking.
• Overall goal is to increase parking capacity.
ELSEGUNDO
9/20/2022 City of El Segundo 1 350 Main St. El Segundo, CA 90245 2
Pilot Parking Project
• Nevada Street & Oregon Street
• Limits: El Segundo Boulevard to Grand Avenue
• One-way couplet
• Two consecutive blocks
9/20/2022
City of El Segundo 1 350 Main St. El Segundo, CA 90245
4
Angled Parking Analysis
• City of Los Angeles Department of Transportation Angled
Parking Standard.
• Analyzed 45 degree through 75 degree parking.
• 45 degree parking yielded the most gain.
ELSEGUND0
9/20/2022 City of El Segundo 1 350 Main St. El Segundo, CA 90245 5
45 DEGREE PARKING
75 DEGREE PARKING
g. -.tp, w i
1
r EDDE u�rt �
bry� W EDCE LfQ b
• • oia iKr � � ..r-I �
nwtw EaLpe Leanpa
a+ + !rELLOwuEDGE uRE
D451RT ttLLDW IMC.
NOTES
w r.ae-wws .reannz�c.
MbOiY to RWoxIX iaR YnEwrnsM
LZaS
nioARD L,a.'rt
NNJI06 MR D�ilrm0u[ 1xR0Wli W[ x Ucii DWEc,pN
cm of un umblFs
ommmWQR w iRM16PUREAMM
ON —STREET
ANGLE PARKING STALLS
Previous Stud (2016)
New Parkin Stud (2022)
Segment Location
Existing Parallel
Parkin Capacity
g p y
Total Potential
Parkin g
Increase In
Parkin Spaces
g p
Percentage
Increase In
Parking
Existing Parallel
Parkin Capacity
g p y
Potential
Diagonal Parking
Capacity (1 side)
Remaining
Parallel Parkin g
Total Potential Increase In
Parkin Parkin Spaces
g g p
Percentage
Increase In
Parking
Standard Street
22
23 1
5%
17
11
10 21
4
24%
Eucalyptus Street
27
36 9
20 4
33%
21
10
15
25
11
4
19%
Sheldon Street
16
25%
10
5
6
1
10%
Penn Street
19
23
4
21%
17
6
10
16
-1
-6%
Sierra Street
18
22
4
22%
9
4
6
10
1
11%
Lomita Street
22
24
2
9%
19
11
10
21
2
11%
Maryland Street
25
31
6
24%
20
15
11
26
6
30%
Center Street (North)
26
36
10
38%
26
21
14
35
9
35%
Center Street (South)
17
24
7
41%
8
3
8
11
3
38%
Nevada Street (North)
23
28
5
22%
21
13
12
25
4
19%
Nevada Street (South)
21
32
11
52%
19
5
15
20
1
5%
Oregon Street (North)
20
26
6
30%
23
23
10
33
10
43%
Oregon Street (South)
26
34
8
31%
20
12
12
24
4
20%
California Street
28
36
8
29%
24
17
15
32
8
33%
Totals
• 1 1
310
395
85
0
27%
-• •• 1
254
-�
156 154
•• ' •1
310
56
22%
Pilot Project Costs
• Alternative 1—Approx. $1OOk
• Signing and striping only.
• Alternative 2 —Approx. $3OOk
• Signing and striping.
• Raised landscaping planters.
• Alternative 3 - $2.2 mil
• Roadway rehabilitation, replace driveways, sidewalk, and curb ramps.
• Corner curb extensions with landscaping and irrigation.
• Signing and striping improvements.
EL�EGUNDO