Loading...
2022-09-20 CC Agenda Packet - PRESENTATION - ITEM D11 - Smoky Hollow Parking Pilot ProjectCITY OF ELSEGUNDO Smoky Hollow Parking Pilot Project Project Goals & Objectives • Implementation of Smoky Hollow Specific Plan pilot parking project. • Conversion to one-way street and provide angled parking. • Overall goal is to increase parking capacity. ELSEGUNDO 9/20/2022 City of El Segundo 1 350 Main St. El Segundo, CA 90245 2 Pilot Parking Project • Nevada Street & Oregon Street • Limits: El Segundo Boulevard to Grand Avenue • One-way couplet • Two consecutive blocks 9/20/2022 City of El Segundo 1 350 Main St. El Segundo, CA 90245 4 Angled Parking Analysis • City of Los Angeles Department of Transportation Angled Parking Standard. • Analyzed 45 degree through 75 degree parking. • 45 degree parking yielded the most gain. ELSEGUND0 9/20/2022 City of El Segundo 1 350 Main St. El Segundo, CA 90245 5 45 DEGREE PARKING 75 DEGREE PARKING g. -.tp, w i 1 r EDDE u�rt � bry� W EDCE LfQ b • • oia iKr � � ..r-I � nwtw EaLpe Leanpa a+ + !rELLOwuEDGE uRE D451RT ttLLDW IMC. NOTES w r.ae-wws .reannz�c. MbOiY to RWoxIX iaR YnEwrnsM LZaS nioARD L,a.'rt NNJI06 MR D�ilrm0u[ 1xR0Wli W[ x Ucii DWEc,pN cm of un umblFs ommmWQR w iRM16PUREAMM ON —STREET ANGLE PARKING STALLS Previous Stud (2016) New Parkin Stud (2022) Segment Location Existing Parallel Parkin Capacity g p y Total Potential Parkin g Increase In Parkin Spaces g p Percentage Increase In Parking Existing Parallel Parkin Capacity g p y Potential Diagonal Parking Capacity (1 side) Remaining Parallel Parkin g Total Potential Increase In Parkin Parkin Spaces g g p Percentage Increase In Parking Standard Street 22 23 1 5% 17 11 10 21 4 24% Eucalyptus Street 27 36 9 20 4 33% 21 10 15 25 11 4 19% Sheldon Street 16 25% 10 5 6 1 10% Penn Street 19 23 4 21% 17 6 10 16 -1 -6% Sierra Street 18 22 4 22% 9 4 6 10 1 11% Lomita Street 22 24 2 9% 19 11 10 21 2 11% Maryland Street 25 31 6 24% 20 15 11 26 6 30% Center Street (North) 26 36 10 38% 26 21 14 35 9 35% Center Street (South) 17 24 7 41% 8 3 8 11 3 38% Nevada Street (North) 23 28 5 22% 21 13 12 25 4 19% Nevada Street (South) 21 32 11 52% 19 5 15 20 1 5% Oregon Street (North) 20 26 6 30% 23 23 10 33 10 43% Oregon Street (South) 26 34 8 31% 20 12 12 24 4 20% California Street 28 36 8 29% 24 17 15 32 8 33% Totals • 1 1 310 395 85 0 27% -• •• 1 254 -� 156 154 •• ' •1 310 56 22% Pilot Project Costs • Alternative 1—Approx. $1OOk • Signing and striping only. • Alternative 2 —Approx. $3OOk • Signing and striping. • Raised landscaping planters. • Alternative 3 - $2.2 mil • Roadway rehabilitation, replace driveways, sidewalk, and curb ramps. • Corner curb extensions with landscaping and irrigation. • Signing and striping improvements. EL�EGUNDO 9/20/2022 City of El Segundo 1 350 Main St. El Segundo, CA 90245 8