CONTRACT 6367 Public Works Contract CLOSEDAgreement No. 6367 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND EMPIRE PIPE CLEANING AND EQUIPMENT, INC. SEWER MAIN CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 This CONTRACT is entered into this 20th day of May, 2022, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and EMPIRE PIPE CLEANING AND EQUIPMENT. INC., a California corporation ("the Contractor"). IM1011] R A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed THREE HUNDRED EIGHTY-EIGHT THOUSAND, FOUR HUNDRED FORTY-FIVE DOLLARS AND THREE CENTS ($388,445.03) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. I-D-1 Agreement No. 6367 3. TIME FOR PERFORMANCE. A. The Contractor will fiilly complete the Work within sixty (60) working days (the "Contract Time.") B. The Contract Time will commence when the City issues a Notice to Proceed. The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until: The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13. 5. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. 8. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. I-D-2 Agreement No. 6367 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and the manner in which is it performed. The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents_ 12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The City City of El Segundo 350 Main Street, El Segundo, CA 90245 Lifan Xu, City Engineer (310) 524-2368 lxu@elsegundo.org The Contractor Empire Pipe Cleaning and Equipment, Inc. 1788 N. Neville St. Orange, CA 92865 Mary Jo Van Thyne, President (714) 639-8352 nmajo r)em irepi pecicanier��4;1.com Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and I-D-3 Agreement No. 6367 properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications. 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. I-D-4 Agreement No. 6367 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Doclunents. IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUNDO Darrell Georg Interim City Manager ATT T: ;Fray Weever, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney By- elVazquez, Depu City Attorney Insurance Reviewed by: — 4 -'11 I-D-5 EMPIRE PIPE CLEANING AND EQUIPMENT, INC. Mary Jo Ulan Miyne President Taxpayer ID No. !� - Z'7,9 1,3217 Contractor State — 3 License No.: Contractor City Business License No.: Agreement No. 6367 BID PROPOSAL FOR City of El Segundo Sewer Main Closed -Circuit Television (CCTV) Inspection Project No PW 21-12 Bid Date: February 15, 2022 11:00 AM Provided By: 1788 N. Neville St Orange CA. 92865 Provided For: City of El Segundo 350 Main Street El Segundo CA 90245 Agreement No. 6367 PROPOSAL FOR THE SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Date Febuary 21 st 2022 Company Name: Empire Pipe Cleaning and Equipment Inc. TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the contract documents, access and any other field conditions which may effect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. I-C-1 Agreement No. 6367 IF, UAL EMPLOYMENT T OPPORTUNITY COMPLIANCE BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I-C-2 Agreement No. 6367 Company Name; BID SCHEDULE (REVISED 2/9/22) SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Empire Pipe Cleaning and Equipment Inc BASE BID ITEMS UNIT PRICE ITEM IN FIGURES NO. DESCRIPTION UNIT QTY $) .........._ AMOUNT ($) I Mobilization/Demobilization LS 1 .......... $15,000.00 $15,000.00 CCTV inspection of 6-inch diameter) sanitary sewer 2 including traffic control, LF 4,824 $1.28 $6,170.70 cleaning, debris removal and disposal, and sewage flow diversion if necessary CCTV inspection of 8-inch sanitary sewer including traffic control, 3 cleaning, debris removal and disposal, LF 180,958 $1.28 $231,475.44 and sewage flow diversion if necessary CCTV inspection of 10-inch sanitary sewer including traffic control, 4 cleaning, debris removal and disposal, LF 20,575 $1.28 $26,318.85 and sewage flow diversion if necessary CCTV inspection of 12-inch sanitary sewer including traffic control, 5 cleaning, debris removal and disposal, LF 23,476 $1.31 $30,859.03 and sewage flow diversion if necessary «wawa CCTV inspection of 15" sanitary sewer including traffic control, 1� 6 cleaning, debris removal and disposal, LF 8 060 $1.35 $24,435.73 and sewage flow diversion if necessary I-C-3 a Agreement No. 6367 BASE BID ITEMS. CONTINUED UNIT PRICE IN ITEM FIGURES NO. m ....... DESCRIPTION UNIT TY _. $ AMOUNT ($) CCTV inspection of 18" sanitary sewer including traffic control, 7 cleaning, debris removal and LF 9,754 $1.45 $14,178.14 disposal, and sewage flow diversion if necessary CCTV inspection of 21-inch sanitary sewer including traffic 8 control, cleaning, debris removal LF 4,817 $1.53 $7,358.60 and disposal, and sewage flow diversion if necessary CCTV inspection of 24-inch sanitary sewer including traffic 9 control, cleaning, debris removal LF 8,457 $1.90 $16,035.90 and disposal, and sewage flow diversion if necessary ............................... CCTV inspection of 27" sanitary sewer including traffic control, 10 cleaning, debris removal and LF 1,489 $2.90 $4,318.10 disposal, and sewage flow diversion if necessary CCTV inspection of 29" sanitary sewer including traffic control, 11 cleaning, debris removal and LF 74 $3.70 $273.80 disposal, and sewage flow diversion if necessary 12 Caltrans Double Permit Cost as LS 1 $12,000 necessary TOTAL BID ITEMS 1 THROUGH 12 = $ 388,424.30 TOTAL BID WRITTEN IN WORDS: Three Hundred Eighty Eight Thousand Four Hundred Twenty Four Dollars and Thirty Cents All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I-C-3b Agreement No. 6367 THIS PAGE LEFT BLANK I-C-4 Agreement No. 6367 BIDDER'S INFORMATION Company Name: Empire Pipe Cleaning and Equipment Inc. BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) Corporation If corporation, State of Incorporation (i.e., California) .. California Business Empire Pipe Cleaning and Equipment Inc. Address 1788 N. Neville St. Orange CA. 92865 Telephone No. 714 639 8352 Facsimile No. 714 283-8578 DIR ......................-__....__..____..______________________-.�. ExD. State Contractor's License No. and Class 36 and 42 DIR# 1000017286 Date 6-30-2023 9-26-1978 State License 9-30-22 State License Original Date Issued ww Expiration Date The following are the names, titles, email addresses, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: Mary Jo Van 11iyne -President maryjo@empirepipecleaning.com Craig Van Thyne - Vice President craig@empirepipecleaning.com 1788 N. Neville St. Orange CA 92865 (714) 639-8352 The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: NA All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: Empire Pipe Cleaning and Equipment Inc. I-C-5 Agreement No. 6367 Company Name: BIDDER'S INFORMATION (CONTINUED) Empire Pipe Cleaning and Equipment Inc. Bidder shall list the name of the person who attended the mandatory pre -bid job walk: Name: Manny Garcia Title: Superintendent I-C-6 Agreement No. 6367 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all a forenamed principals this BIDDER Empire Pipe Cleaning and Equipment Inc. Craig VanThyne - Vice President ! st day of Febuary 2022 Subscribed and sworn to this - (01._ day of F - it ilia 20 2�, i I-C-7 Agreement No. 6367 Bond No. CSBA-19782 PROPOSAL GUARANTEE BID BOND SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 KNOW ALL MEN BY THESE PRESENTS that, Empire Pipe Cleanng and Equipment, ling. , as BIDDER, and The Hanover Insurance Company , as SURETY, are held and firmly bound unto the City of El Segundo, in the penal sum of "Gain Peme.t of the Amami Bid DOLLARS ($10% , which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this 2nd day of Februanl 2022 BIDDER* Empire Pipe Cleaning and Equipment, Inc. 7 1788 N. Neville Street Orange, CA 92865, (714) 639-8352 5 Hutton Centre, Suite 1060 SURETY* The Hanover Insurance Company Santa Ana CA 92707 714 415-3808 1411 N. Batavia Street, Suite 201 Dwight Reilly, Attorney -in -Fact Orange, CA 92867, (714) 516-1232 Subscribed and sworn to this day of „ 20 NOTARY PUBLIC *Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I-C-8 Agreement No. 6367 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validit y of that document. State of California County of Orange On 02/02/2022 before me, Melissa Ann Vaccaro., Notaa Public (insert name and title of the officer) personally appeared Dwight Reilly who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. MELISSA ANN VACCARO WITNESS my hand and official seal. COMM. #2241394 N Notary Public -California V ORANGE COUNTY LL �r �'L' ` u � Comm. Expires May 12, 2022 P1P Signature (Seal) Melissa Ann Vaccaro nd No.,CSLA, 2 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OF ATTORNEY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing under the laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws ofthe State of Michigan, (hereinafter individually and collectively the "Company") does hereby constitute and appoint, Daniel Huckabay, Arturo Ayala, Dwight Reilly, Frank Morones, Shaunna Rozelle Ostrom, Michael D. Stong, Ben Stong and/or R. Nappi Of Commercial Surety Bond & Insurance Agency Inc., of Orange, CA each individually, if there be more than one named, as its true and lawful attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Twenty Five Million and No/100 ($25,000,000) in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981 — The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001 — Citizens Insurance Company of America) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 12th day of December, 2019. r THE HANOVER INSURANCE COMPANY MASSACHUSEM SAY INSURANCE COMPANY CIT'IZ'EN'S URANCLOMPANY OE AMERICA Robert Mum& Vkv President THE HANOVER INSURANCE COMPANY 7!77 CCIhAwAFp "F AM�teYrwATHE COMMONWEALTH OF MASSACHUSETTSCOUNTY OF WORCESTER )ss.On this 12tr" day of December, 2019 before me came the above named Vice PresidentsInsurance Company, Massachusetts, Bay Insurance Company and Citizens Insurance Company of America„ to me personally known to b the individuals and officers described Insurance and acknowledged that the seals affixed to the preceding 'instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. 1��QJOAMNRa. rAirrrr���:I+WfM'�' '«N,I.4".u�rxnaa�u�.aet�n C psfiout hrta��t �l .-KE�>'". I, the undersigned Vice President of The Hanover insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America„ hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies„ and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 2nd day of February 2022 CERTIFIED COP 4w °� Iq.,.. TFlebd¢Iri �, N41tetlne:z, Vice i cslYb�a Agreement No. 6367 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: 363528 Class No.: 36 and 42 2. The expiration date of BIDDER'S Contractor License is: September 30th 20 22 ....... 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non -responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on Feb 1 st 2022 , at Orange California Signature (insert City and State where Declaration signed). Craig Van thyn Typed Name Vice President Title Empire Pipe Cleaning and Equipment Inc. .......- ................................. Company Name I-C-9 Agreement No. 6367 NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) ss. County of Orange ) Craig Van Thyne , being first duly sworn, deposes and say tha he r she is Vice President of Empire Pipe Cleaning and Equipment Inc. the parry making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Signature Craig Van Thyne Typed Name Vice President Title I-C-10 Empire Pipe Cleaning and Equipment Inc. Name of Bidder/Comp any Name Febuary 1st, 2022 Date ent No. 6367 notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or Ivalidity of that document. State of California County of QrUna 11 Subscribed and sworn to (or affirmed) before me on this t t day of fir, 20 ZZ, by C proved to e n the basis of satisfactory evidence to be the person who appeared before me, Agreement No. 6367 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." Signature of Bidder:" Title: Business Name: Business Address: Telephone Number Dated this 1st Vice Presidnet Empire Pipe Cleaning and Equipment Inc. 1788 N. Neville St Orange CA. 92865 (11ij 639-8352 day of February Agreement No. 6367 DESIGNATION OF SUBCONTRACTORS SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: Empire Pipe Cleaning and Equipment Inc. As detailed in Section 2-3.1 (Page II-B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Subcontractmmmmmm ----- or's Contractor Description of License No., & Portion of Name of DIR Work Estimated Subcontractor Address Registration No. Subcontracted $ Amount (Number and Street) (CSLB #) NA NA NA (City, Zip Code) (DIR #) ........... _ _.................._ ..... ............. .. ...... _................ _ ..................... .............................� (Make copies of ll1i .page if additional space is needed) February I st, 2022 Signature of Bidder Date I-C-12 Agreement No. 6367 REFERENCES Company Name: Empire Pipe Cleaning and Equipment Inc. The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime contractor or major subcontractor within the past five (5) years: 1. Project Title: See Attached List for References Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $............................. �....... Date completed: ....................... Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? 2. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ .... .............................................. ---- Date completed:................ Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? I-C-13 Agreement No. 6367 3. Project Title: 4 Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed„ Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? I-C-14 Agreement No. 6367 5. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? Bidder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: iP ��_....._ : . '............... ... �7/ J 1-C-15 Agreement No. 6367 Empire Pipe Cleaning and Equipment Inc. 1788 N. Neville St. Orange CA. 92865 Office: (714) 639-8352 Fax: (714) 283-8578 www.empirepipecleaning.com REFERENCES LACDPW Sewer Maintenance Division 900 South Fremont St Alhambra. CA 91803-1331 Contact: Robert Swartz/ Senior Civil Engineer Phone 626 300-3367 Email: Rswartz@dpw.lacounty.gov System Cleaning, CCTV inspections condition assessment Completed 4 projects totaling 1,731,000 LF from 2018 to 2022 Total value for four projects is $2,588,000 No time extensions, stop notices, litigation, or liquidated damages City of Santa Barbara Public Works 520 E. Yanonali St Santa Barbara, CA 93103 CONTACT: Esteban Zambrano, Wastewater Collection System Supervisor PHONE: (805) 568-1026 Email: EZambrano@santabarbaraca.gov Current provider for On -Call Sewer Main Cleaning 2018-2022 Annual Contract Value $340,000.00 Provider of On -Call CCTV Inspections 2019 No time extensions, stop notices, litigation, or liquidated damages City of Cerritos 18125 S. Bloomfield Ave. Cerritos CA. 90703 CONTACT: Mary Anne Wozniak PHONE: 310-603-0220 mwozniak@cerritos.us Current Service Provider 2010 to 2021 Awarded new contract January 2022 Annual Cleaning and maintenance of 320,000 Feet of Sewer Line Annual Sewer Cleaning, On Call, Trouble spots, and lift station services, CCTV Inspections. Annual Contract Value of $365,000.00 No time extensions, stop notices, litigation, or liquidated damages Agreement No. 6367 City, of Norwalk 12650 Imperial Highway Norwalk CA. 90650 CONTACT: Julian Lee/ Utilities and Project Manager PHONE: 562-929-5599JI-ee@norwalkca.gov Service Provider 2010 to 2019 EPCE was the service provider for sewer mainline cleaning, lift station cleaning, and frequent trouble spot cleaning for the City of Norwalk. A five-year sewer master plan was developed and used POSM Collection Software for the CCTV Inspection. Plan was updated over a 5-year program. Cleaned 400,000 Feet of Sewer Line annually 2010 to 2017 CCTV Inspection of 250,000 lineal Feet per year 2012- to 2017 Annual contract Value of $375,000.00 No time extensions, stop notices, litigation, or liquidated damages City of Hermosa 'Beach 1315 Valley Drive Hermosa Beach CA. 90254 CONTACT: Bradley Cocking/Public Works Supervisor PHONE: 310-863-2159 email: bcocking@hemosabeach.gov Current Services Provider 2013 to Present Annual Cleaning and Video Inspection of Sewer Lines Annual Contract Value of $155,000.00 No time extensions, stop notices, litigation, or liquidated damages Agreement No. 6367 City of Redondo Beach 531 N Gertruda Avenue Redondo Beach, CA. 90277 CONTACT: Mario Carranza / Public Works Supervisor PHONE: 310-318-0686 Sewer Cleaning and Video Inspection of Sanitary Sewers 400,000 lineal feet / Citywide CCTV Inspection 2016-2021 Annual contract Value of $375,000.00 per year No time extensions, stop notices, litigation, or liquidated damages Cityof Ea Palma. 7822 Walker Street La Palma, CA. 90623 CONTACT: Carlo Nafarette / Public Works Director, City Engineer PHONE: 714-690-3312 CarloN@cityoflapalma.or,r Current Service Provider 2010 to Present Citywide Sewer Cleaning, Quarterly Hot Spots, Manhole and CCTV Inspections Annual Contract Value $155,000.00 No time extensions, stop notices, litigation, or liquidated damages Empire Pipe Cleaning & Equipment, Inc was the Prime Contractor on above Projects All contracts completed on time with no extensions or damages assesseda Agreement No. 6367 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: Empire pipe Cleaning and Equipment Inc. Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. Have you ever been disqualified from any government contract? Yes ❑ No IN 2. If yes, explain the circumstances: NA 3.. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes Cf No ❑ Bidder's Signature Craig Van Thyne Name (Please Print) I-C-16 Agreement No. 6367 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 p and EquipmentInc.Company Name; Empire Pipe Cleaning Ina mmmm . To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires California Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this insurance will render the bidder's proposal "nonresponsive." February 1 st, 2022 Date I-C-17 P-j�s .... IiµSignature Agreement No. 6367 END PROPOSAL SECTION I-C-18 Agreement No. 6367 �'NDO January 25, 2022 ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS For SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time is changed to Tuesday, February 8, 2022 at 11:00 am. 2. The mandatory pre -bid meeting date and time is changed to Monday, January 31, 2022 at 10:00 am. The question submittal date and time is changed to Tuesday, February 1, 2022 at 4:00 pm. 3. A revised version of the specifications accompanies this Addendum. Please note the specifications file name and title page both contain the words "Revised 1-25-22" As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this completed Addendum page with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non- responsive and subject to tion. Signature: Date: Z 3 ZO ZZ- �� -.-6._.. ,r Print Company Name:.... Page 1 of 1 W 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 6367 EL, E" NDO February 3, 2022 ADDENDUM NO.2 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time is changed to Tuesday, February 15, 2022 at 11:00 am. 2. Please see this project's attached Supplement to Addendum 2 for bid opening instructions, bid -related questions, and the responses to the questions. 3. Please use the revised bid sheets within this Addendum 2 when submitting a bid. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this completed Addendum page with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non- responsive and subject to reject` 1. 2Signature: Z_ ::. ...... Date:. 7 0(' /..............2, Print Company Name: r c- .. Page 1 of 1 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 6367 CITY OF EL SEGUNDO SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ADDENDUM NO.2 SUPPLEMENT DATE: February 3, 2022 TO: All Prospective Bidders Clarifying information and answers to bid questions have been provided below. The information in this Addendum has been made available to all prospective bidders and shall be considered as incorporated into the above -referenced project specifications. All other portions of Contract Documents and previous Addenda not specifically mentioned in this Addendum remain in force. A. CHANGES TO THE BID OPENING PROCEDURE: City Hall is located at 350 Main Street, El Segundo, CA 90245. Please follow the modified procedure below for the bid opening: 1. Each bidder's representative is required to wear a mask and maintain a 6-foot distance when interacting with City staff and others. Representatives are not to enter the building. 2. Instead of the City Clerk's Office, the bid opening will be held outside the City Hall Council Chambers lobby. The double automatic doors on the Main Street side of the City Hall Building will be opened; however, no entry will be allowed. The double doors will be unlocked and opened 15 minutes prior to the bid opening. 3. Bidders are more than welcome to submit their bid by the US postal service or other carrier service. However, the bidder is responsible for verifyinR their bid has been receivedinthe City Clerk's Office priortothe bid opening. The City Hall number is 310-524-2300. 4. Bidders can also choose to submit bids in person. The City Clerk's Office will open the doors 15 minutes before the bid opening and will accept bids through the doorway at that time. Please plan to be there early enough so that your bid may be received well before 11:00 am, in case there are multiple bidders there to do the same thing. 5. The City Clerk's Office will collect bid packages and record them on a log sheet. Having submitted their bid, bidders will wait outside in the Civic Center Plaza area until the bid opening. 6. Bid packages will be opened in the Council Chambers lobby. Bid amounts will be recorded on the log sheet and the log sheet will be signed by representatives from the City Clerk's Office and the Public Works Department. 7. The Public Works Department will email the completely -signed bid log sheet to all planholders once received from the City Clerk's Office, the same day as the bid opening. Agreement No. 6367 B. BID QUESTIONS AND ANSWERS Question 1: How much is the project cost estimate? Answer: $255,000 Question 2: Will the City provide bins to dump debris at the 2050 S. Hughes Way location? Answer: No, the Contractor will provide their own bins, their own bin transport, and dispose of the debris. According to the City Wastewater Division Supervisor, the City of El Segundo will NOT dispose of the debris generated from the project —this will be entirely the contractor's responsibility. Please also see the response to Question 21. Question 3: How will the Contractor get into 2050 S. Hughes Way? Answer: Either with a key provided to them or 24-hour advance notice to Wastewater Division. Question 4: Is there a GIS of sewer lines? Answer: GIS shapefiles of sewer mains from 2013 exist. However the City's sewer maps, which at times are updated by hand, may be more accurate. Question 5: Is there a run list or map of sewer locations available? Answer: Please see the electronic files of index maps accompanying this Addendum. There are several hundred sewer main maps related to those index maps. Question 6: Why is mechanical cleaning a requirement of all pipes to be cleaned? Do the pipes have mineral deposits or calcium that the contractor should be made aware of? Answer: Mechanical cleaning is required to remove roots, sediment, and other possible physical in -pipe obstacles prior to televising each pipe, and to also make visible as much of each pipe's surface area as possible. The City will not be aware of mineral or calcium deposits within the pipes unless made known through the televising. Agreement No. 6367 Question 7: Does the City prefer a specific inspection software to be used? Answer: Different brands of software are available but the software used must be NASSCO PACP certified as should the CCTV operators. Please see Section 1.0, page IV-A-1 of the specifications. Also, reports, photographs, and video are to be in color, detailed, and should comply with any conditions found in the specifications. Reports will be used to determine pipe condition and repair areas. The certified software used shall at minimum be able to generate as detailed a report as the example found on the following pages. Videos shall be in .MP4 format. After the first video and report have been generated, the contractor shall provide them to City staff to review and to check for compatibility issues/missing information. Agreement No. 6367 Inspection Report/ Inspection: 1 Inspected Date 111612010 Section Length _ 164.07 ft Area AREA 8 Vehicle GR-10 Weather Dry Use of Sewer Sanitary Surveyor's Name R. RODARTE Date Cleaned 11/612010 Certificate No, U-805-2423 Pre -Cleaning Jetting Section No 18 Sewer Rating 6142 Street NEVADA ST. & E. FRANKLIN Upstream MH 8-18 R AVE, Dowstream MH 831 City CITY OF EL SEGUNDO Dir of Survey Downstream Location Code Light Highway Purpose of Survey Routine Assessment Pipe ShapeCircular Year Laid Dia.lHeight 8 inch Year Rehabilitated Material VCP Tape / Media No 1 Lining Method Add. Information CONTRACT # 30-00241 1:306 Position Code Observation FOR UTILITY CROSSINGS SEE FILE D-271 AMH Upstream Manholle, Survey Begins 18-18 Grade C-M Cra c frcl fo 12 !ca s . 3, a�nclees of "S f� ;seal,, f7b&l1111p,%, rr ri (16 i�u tM o (A),.r�„ vMan�n 8 r,;� IS 16! dt 'YES Clfi Crad, Multiple, from 08 to 04 o'clock, %Whin 8 inches of S 3 joint: YES CiUi Crack Multiple, frorn 09 to 06 o'clock, within & inches of S 3 joint: YES FM Fracture Multiple, from 08 to 03 o'clock, within 8 inches ofS 4 joint: YES B Broken, from 07 to 03 o'clock, within 8 inches of joint: YES 5 FM Fracture Multiple, from 12 to 09 o'clock, within 8 inches ofS 4 joint: YES C{1II, Clack Multiple, frorn 12 to 12 o'clock, within 8 inches of S 3 joint: YES CL Crack Longitudinal, at 09 o'clock, within 8 inches of join(: S 2 YES TFA Tap Factory Made Active, at 02 o'clock, 6", within 8 inches of joint: NO CM Crack Multiple, from 09 to 02 o'clock, within 8 inches of S 3 joint: YES CL Crack Longitudinal, at 04 o'clock, within 8 inches of joint: S 2 YES PROTECT CROSSING UTILITIES EL SEGUNDO PROJECT 2010 Agreement No. 6367 CITY Or FL SEGUNDO Inspection Report / Inspection: 1 Inspected Dale Area Weather Surveyor's Name Certificate No. Section No 1115l2010 AREA 8 Dry R. RODARTE U-806.2423 18 Section Length Vehicle Use of Sewer Date Cleaned Pre -Cleaning Sewer Rating 164.07 ft GR-10 Sanitary 11/5/2010 Jetting 5142 Agreement No. 6367 City CITY OF Inspection Street f. & E. FRANKLIN E Photo: 472_2A, Media #:: 240810_1, 00:00:58 2,73F7, Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES Photo: 472_4A, Media #:: 240810_1, 00:02:14 8.49FT, Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES otos / Inspection: 1 Dale Area 1 Section No IS12010 AREA 8JB Photo: 472_3A. Media #: 240810_1. 00:01 30 5.17FT, Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES Photo- 472_5A, Media #:: 240810_1, 00:02:57 11.81 FT, Crack Multiple, from 09 to 06 o'clock, within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 Agreement No. 6367 Inspection photos / Inspection: 1 city Street Date Area Section No. CITY OF EL SEGUNDO NEVADA ST. & E. FRANKLIN AVE. 11f512010 AREA 8 18 Photo. 472_6A, Media #_: 240810_1, 00:03:26 13.66FT, Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES Photo_ 472_8A, Media #:: 240810_1, 00:04:52 16AFT, Fracture Multiple, from 12 to 09 o'clock, within 8 inches of joint: YES Photo: 472_7A, Media #:: 240810_1. 00:04:02 15.03FT, Broken, from 07 to 03 o'clock, within 8 inches of joint: YES Photo:472_9A, Media #:: 240810_1, W05:34 18.84FT, Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 Agreement No. 6367 Inspection photos / Inspection: 1 City I Street p' Date I Area V Section No CITY Photo: 472_10A, Media#:: 240810_1, 00:06:09 31.82FT, Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES Photo: 472_13A, Media #:: 240810_1, 00-09:58 121.61 FT, Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES Photo: 472_12A, Media #•: 240810_1, 00:09:15 108.34FT, Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES Photo: 472_14A, Media #:: 240810_1, 00:11:28 145.13FT, Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 Agreement No. 6367 Inspection photos / Inspection: 1 City Street Date Area Section No ?_L..SEGUNDO NEVADA ST. 8 E. FRANKLIN AVE, 111512010, AREA 8 18 Photo: 472_15A, Media#:: 240810_1, 00:12:03 152.16FT, Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES Photo: 472_17A, Media #:: 240810_1, 00:13:25 159A917T, Crack Multiple, from 04 to 02 o'clock, within 8 inches of joint: YES Photo: 472_16A, Media #:: 240810_1, 00:12:48 155.57FT, Crack Multiple, from 07 to 09 o'clock, within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 Agreement No. 6367 Question 8: Can the contractor piggyback off a City Caltrans permit for PCH? (Contractor is aware of payment responsibility.) Answer: If CCTV work on Pacific Coast Highway requires a Caltrans permit obtained by the City, then the Contractor must obtain a dual permit for the same area. All contractor costs for obtaining a Caltrans permit, if necessary, shall be included in the mobilization costs. Question 9: Will the City allow Contractor's license C36 or C42 in addition to Class A like other similar projects conducted by municipalities in Southern California? Answer: A minimum license classification of "A" is required. Other plumbing, pipe, and sanitation classifications will be accepted in addition to a Contractor's already having an "A" license, but not instead of an "A" license. Question 10: What permits will be required for this project? Will encroachment and other permits be no fees? Answer: Caltrans may require a dual permit for this project and the amount of their fees can be directed to the Caltrans permit office at 213-897-3631. A no -fee City of El Segundo Public Works Encroachment Permit will also be required, but will contain a condition not to include Pacific Coast Highway until only after Caltrans' requirements are met. Question 11: Will Traffic Control plans be required for this project? If yes, will these be specific locations, and can you provide which locations? Answer: Traffic control plans will be required for this project for all City locations and shall be per MUTCD and Work Area Traffic Control Handbook standards. If a majority of locations can be served using the same traffic control plan the City will review it as such. Areas that cannot use the same plan shall have a specific plan provided for them. Caltrans may have its own specific requirements for Pacific Coast Highway traffic control plans. Question 12: Are there any special permit locations to be inspected such as Cal Trans, Railroad, or utilities? Answer: The entire project requires a City Encroachment Permit and perhaps a Caltrans dual permit for Pacific Coast Highway. The City is not aware of permit requirements for other agencies at this time. If a permit issue is discovered by the Contractor during the project, the Contractor shall bring it to the City's attention. Agreement No. 6367 Question 13: Notifications to residents and businesses affected by our operations — Are these required for special specific locations or the entire project? Answer: Notifications to businesses and residents are required for the entire project at least a week in advance of work occurring in a neighborhood. Notices shall be reviewed and approved by City staff prior to the Contractor's door-to-door distribution. At minimum, notices shall provide the Contractor's contact information, and shall describe what residents and businesses might expect while the work is occurring, how long the work shall last, and whether or not they will be able to use their plumbing during the CCTV period. Question 14: Construction Signage — Is this requirement for lighted signboards apply to this project which states shall be placed two weeks in advance? We will be moving everyday so this should not apply. Answer: Lighted signboards shall be used for any major streets where project activities will disrupt the use of one or more traffic lanes, both for motorists' safety and those of the contractor's employees. Streets include but are not limited to those listed on page III-A-7 of the specifications. Question 15: SECTION III — General Scope of work - Can we work from the top of the system down? Specification says to perform work in Arterial locations first which does not make sense. Answer: Contractor shall schedule the work to be as efficient as possible. Arterial location do not need to all be performed first as notification to motorists will be required in advance for each. Question 16: Do message boards apply to this contract since we will be moving daily and not a construction project? Answer: Please see the response to Question 14. Question 17: Is there City GIS files available for this project? Answer: Please see the response to Question 4. Question 18: Do you require that all sewer lines be cleaned prior to CCTV Inspection (Section 5.0)? Answer: Yes. Please see Section 5.0, page IV-A-2 of the project specifications,. Question 19: Can the hydrant water meter be issued to the contractor so we can install at different locations throughout the city since we will be moving every day? Specification section II — 4. States city will install the meter? Answer: Yes, a traveling water meter can be issued to the contractor by the City's Water Division. The contractor will install the meter in that instance. Agreement No. 6367 Question 20: Can the contract time be extended to 120 working days from 60 working days? Does liquidated damages apply to this contract time? Answer: If the project cannot be finished in 60 working days despite the contractor's good faith effort every day in moving the work forward, the contractor can ask for additional time. The request should be made within a few weeks of the end of the 60-working-day period and City staff will review the rate of completion and other factors on the days already completed. Liquidated damages would apply to days incurred for the project beyond the original 60 working days that have not been or cannot be approved as additional project time. Question 21: In the Pre -Bid Meeting, it was discussed that a location would be provided for the Contractor to dispose of sewer debris and grit. Section 5.0 CLEANING states the city will be responsible for disposing debris. Is the contractor responsible for arranging these containers or is the city in control of the debris hauling? Answer: The last sentence, esifig in the third paragraph of page IV-A-3 in the specifications is removed from the paragraph, which now reads: "The CONTRACTOR shall be responsible for removing all solid and semisolid material from the cleaning operation from the worksite no less often than at the end of each workday. Materials, which accumulate during the workday, shall be placed in totally enclosed and watertight containers and hauled to the City site at 2050 S Hughes Way. Contractor shall contact the Wastewater Division Supervisor at 310-877-0675 or the General Services Manager at 310-524-2715 prior to hauling the debris to the City site." According to the City Wastewater Division Supervisor, the City of El Segundo will NOT dispose of the debris generated from the project —this will be entirely the contractor's responsibility. The site at 2050 S. Hughes Way visited during the pre -bid meeting can be used as a staging area only for the contractor's debris bins. The contractor shall be responsible for providing the debris bins, arranging their transportation, and disposing of their contents. Please also see the response to Question 2. Please see the forms in Appendix 3 to be submitted regarding project debris. Instructions regarding the forms are given on pages III-A-5 through III-A-10 of the project specifications. Question 22: What percentage of locations are easements? Answer: The answer to the question is not known. PW 21-12 Specifications Section 5.0, page IV-A-3 (ReAarcmi/l No. 6367 the routine preventive maintenance performed by City of El Segundo maintenance staff. It is recognized that some conditions may exist which prevent cleaning from being accomplished, or where damage would result if cleaning were continued. Should such conditions be encountered, the CONTRACTOR shall notify the ENGINEER and may be required to clean those specific sections. All sludge, dirt, sand, rocks, grease, roots and other solid or semisolid material resulting from the cleaning operations shall be removed and hauled away from the downstream manhole of the section being cleaned, unless specifically authorized by the City. Passing material from sewer section to sewer section shall not be permitted. The CONTRACTOR shall be responsible for removing all solid and semisolid material from the cleaning operation from the worksite no less often than at the end of each workday. Materials, which accumulate during the workday, shall be placed in totally enclosed and watertight containers and hauled to the City site at 2050 S Hughes Way. Contractor shall contact the Wastewater Division Supervisor at 310- 877-0675 or the General Services Manager at 310-524-2715 prior to hauling the debris to the City site. 6.0 TELEVISION INSPECTION A. Equipment CCTV equipment shall include video cameras, a video monitor, cables, power sources, and all equipment necessary to perform a CCTV inspection per the Contract Documents. A backup camera shall be provided onsite at all times. The camera shall be specifically designed and constructed for sanitary sewer inspection. It shall be operative in 100 percent humidity conditions. CCTV inspections shall be performed using Pan -and -Tilt camera system with a minimum of 360x270 degree rotation. The camera and video monitor shall produce a minimum of 460 lines per inch of resolution. Illumination sensitivity shall be 3 lux or less. During inspection, lighting intensity shall be adjusted to minimize reflective glare. Lighting and picture quality shall be adjusted to provide a clear, in -focus picture of the entire periphery of the pipeline for all conditions encountered. Camera focal distance shall be adjustable through a range from 25 millimeter (I inch) to infinity. The system used to move the camera through the pipe shall not obstruct the camera's view or interfere with proper documentation of the sewer conditions. Whenever non- remote powered and controlled winches are used to pull the television camera through the pipe, telephones, radios, or other suitable means of communication shall be set up between the two manholes of the reach being inspected to ensure that adequate communications exist between the members of the crew. The contractor shall have camera cables, power cords, and ancillary equipment capable of recording reaches up to 1,000 feet in one direction. The remote -reading footage counter device, which measures the distance traveled by the camera in the pipe between the centerlines of the upstream and downstream manhole, shall be accurate to plus or minus 0.3 meters in 300 meters (1 foot in 1000 IV-A-3 Agreement No. 6367 Question 23: Do you have a NASSCO PACP Version preference and is any NASSCO PACP Certified software approved to use? Answer: Please also see the response to Question 7. The most recent version of NASSCO PACP certified software is preferred. Question 24: Will hard drives be acceptable in lieu of DVDs for Inspection data and videos? Answer: Yes. After the first video and report are generated, they and the hard drive they are stored on shall be given to City staff temporarily to check on compatibility. Staff will return them to the contractor once the ability to use the drive and view the files are verified. Question 25: Can computer generated voice observations be used in lieu of Operator/microphone? Answer: No. Question 26: The price sheet — bid schedule shows a quantity of 180,060 LF of 15" Sewer Lines? Is this correct? Answer: No. Please use the attached revised bid sheets that shows the correct quantity of 18,060 linear feet of 15" diameter sewer lines. Agreement No. 6367 BID SCHEDULE (REVISED 2/3/22) SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: BASE BID ITEMS UNIT PRICE ITEM IN FIGURES NO. DESCRIPTION UNIT QTY ($) AMOUNT ($) 1 Mobilization/Demobilization LS 1 _. ................... CCTV inspection of 6-inch (diameter) sanitary sewer 2 including traffic control, LF 4,824 cleaning, debris removal and disposal, and sewage flow diversion if necessary CCTV inspection of 8-inch sanitary sewer including traffic control, 3 cleaning, debris removal and disposal, LF 180,958 and sewage flow diversion if necessary CCTV inspection of 10-inch sanitary sewer including traffic control, 4 cleaning, debris removal and disposal, LF 20,575 and sewage flow diversion if necessary CCTV inspection of 12-inch sanitary sewer including traffic control, 5 cleaning, debris removal and disposal, LF 23,476 and sewage flow diversion if __.- ............... necessary CCTV inspection of 15" sanitary sewer including traffic control, 6 cleaning, debris removal and disposal, LF� 18,0(�0 and sewage flow diversion if necessary I-C-3 a Agreement No. 6367 BASE BID ITEMS, CONTINUED UNIT PRICE IN ITEM FIGURES NO. _ DESCRIPTION UNIT mQTY ($) AMOUNT $) CCTV inspection of 18" sanitary sewer including traffic control, 7 cleaning, debris removal and LF 9,754 disposal, and sewage flow diversion if necessary CCTV inspection of 21-inch sanitary sewer including traffic 8 control, cleaning, debris removal LF 4,817 and disposal, and sewage flow diversion if necessary CCTV inspection of 24-inch sanitary sewer including traffic 9 control, cleaning, debris removal LF 8,457 and disposal, and sewage flow diversion if necessary CCTV inspection of 27" sanitary sewer including traffic control, 10 cleaning, debris removal and LF 1,489 disposal, and sewage flow diversion if necessary CCTV inspection of 29" sanitary sewer including traffic control, 11 cleaning, debris removal and LF 74 disposal, and sewage flow diversion if necessary TOTAL BID ITEMS 1 THROUGH 11 IN TOTAL BID WRITTEN IN WORDS. All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I-C-3b Agreement No. 6367 Question 27: Since this is an inspection project and not construction, is there a need for 5% retention on the invoices? Answer: Yes, the 5% retention is required. Question 28: Is the last page in Appendix 3 part of the project? Answer: No. Please discard the last page describing traffic loops and alternative bid manhole and vault covers. It is not part of the project scope. LAST PAGE IN APPENDIX 3 Agreement No. 6367 10 The Contractor shall provide schedule of values for these items at the pre -construction meeting. TRAFFIC LOOP LOCATIONS AND QUANTITIES Notes: All traffic loops damaged during the course of construction shall be removed are replaced to the satisfaction of the agency maintaining them: Caltrans Contact: Karem Alchokhachi, karem.alchokhachi@dot.ca,g , - -8517 LACDPW Contact: Paul Etner, petner@dpw.lacounty.gov, 62 -4 ITEM DESCRIPTION UNIT QTY U NJq+ TOTAL COST Caltrans Eastbound traffic loops on Grand 1 Ave. at PCH EA 6 LACDPW eastbound 100 advance loops on Grand '09 2 Ave. west of Kansas St EA 2. LACDPW westbound advance loops on Grand 3 Ave. east of Kansas St ERA, 2 TOTAL COMBINED COST 0 '011 DESCRIPTION UNIT QTY UNIT COST TOTAL COST Manhole adjustment to 1 grade EA 11 Valve cover adjustment 2 to grade EA 42 Rectangular utility cover on Illinois adjustment to 3 grade EA 1 TOTAL COMBINED COST Agreement No. 6367 Question 29: Will answers to the questions be released prior to February 7? Answer: Yes. Additional project requirements No Parking postings should be installed at least 72 hours prior to construction occurring. Contractor shall contact City staff at the time of placement so that the Police Department can be informed. 0 Agreement No. 6367 EL `1�.C1ND0 February 9, 2022 ADDENDUM NO.3 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time remain Tuesday, February 15, 2022 at 11:00 am. 2. Please use the attached Bid Table, revised 2/9/22, which contains a new Bid Item 12 to be used as needed for Caltrans permit costs. Caltrans permit costs are no longer to be added to Bid Item 1 Mobilization costs. Backup documentation showing the Caltrans permit cost to the contractor shall be provided when billing for Bid Item 12. 3. A "C-42" with a "C-36" state contractor's license classification will be accepted in lieu of an "A" license classification for this project. 4. For work on Pacific Coast Highway, the contractor shall employ Caltrans 2018 Standard Specifications and 2018 Standard Traffic Control, and shall state so when applying for a double permit against the City's Annual Caltrans Permit 07-21 -N-UT-293 1. The Caltrans Standard Specifications 2018 are found at lift s.//do't ca govl rzo gams/(lesigii/ccs- staiidard-glans-acid-standard-s ecifications The attached Caltrans Standard Plans T9-T17 shall be used in addition to other Caltrans standard plans when necessary on Caltrans right-of-way. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this completed Addendum page with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non -responsive and subject to rejection. /7--D ( / 'j" Signature:. .___m Date: Print Company Name: �ITr Page 1 of 1 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 6367 BID SCHEDULE (REVISED 2/9/22) SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: BASE BID ITEMS UNIT PRICE ITEM IN FIGURES NO. DESCRIPTION UNIT QTY ($) AMOUNT ($) 1 Mobilization/Demobilization LS 1 CCTV inspection of 6-inch diameter) sanitary sewer 2 including traffic control, LF 4,824 cleaning, debris removal and disposal, and sewage flow diversion if necessary CCTV inspection of 8-inch sanitary sewer including traffic control, 3 cleaning, debris removal and disposal, LF 180,958 and sewage flow diversion if necessary CCTV inspection of 10-inch sanitary sewer including traffic control, 4 cleaning, debris removal and disposal, LF 20,575 and sewage flow diversion if necessary CCTV inspection of 12-inch sanitary sewer including traffic control, 5 cleaning, debris removal and disposal, LF 23,476 and sewage flow diversion if necessary CCTV inspection of 15" sanitary sewer including traffic control, 1�t 6 cleaning, debris removal and disposal, LF 6 8(160 and sewage flow diversion if necessary I-C-3a Agreement No. 6367 BASE BID ITEM NO. 7 ITEMS,„ COINTIN UED DESCRIPTION CCTV inspection of 18" sanitary sewer including traffic control, cleaning, debris removal and disposal, and sewage flow diversion if necessary UNIT LF TY 9,754 UNIT PRICE IN FIGURES $ AMOUNT($) CCTV inspection of 21-inch sanitary sewer including traffic 8 control, cleaning, debris removal LF 4,817 and disposal, and sewage flow diversion if necessary CCTV inspection of 24-inch sanitary sewer including traffic 9 control, cleaning, debris removal LF 8,457 and disposal, and sewage flow diversion if necessary CCTV inspection of 27" sanitary sewer including traffic control, 10 cleaning, debris removal and LF 1,489 disposal, and sewage flow diversion if necessary CCTV inspection of 29" sanitary sewer including traffic control, 11 cleaning, debris removal and LF 74 disposal, and sewage flow diversion if necessary 12 Caltrans Double Permit Cost as LS 1 $12,000 necessary TOTAL BID ITEMS 1 THROUGH 12 W TOTAL BID WRITTEN IN WORDS: All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I-C-3b ............... . ... 2018 STANDARD PLAN ............... TO Agreement Ncr. 6367- ............... . . WM UJ . . . .......... 0 Al. "C' 9 �Q z 2, an CL Fa t, All. V) z U) dg z LU < Ld o cc 00 00 0 < , I M z cr < z LLI E 0 u z X. < z < E o E F Z E LL LL 1 me am 2— DO 0 .............. ... L L-I.J . z ........ ............ .0 C) LLJ �xu M.< V) C,j wz Ld & p CD < MF F- V) z w LLI SO 0 < tz :t Z OW olo n. .......... .... . ... 0 M A dNi 0 E z o 0 0 E E -Cc u Is - - D- L,-L1 L.Li J J Nv �,5 2 E L 0 . L rr > 0 Lj 0 z E 11 c'. 6 ca < F-0 110 1 1 1 00 mm :p UJ ��j lo x . -j Ld M w 0 . . . . . . . 0 r - . - . . , LL, z ow 0 L U z E Z- :E 0 1 1 Lvv - 0� Fm L[ o o 1; .1 u ANUAK u LLI Z :-0 Fl ui >- LLI U) U) LLI R z H ELI� -J TT. u LLJ l o z x 0 0 LL. pC < w 0 ® J e w�w �= 0 Lu 444 Civ -) Lu 2 oz .4 + LL LL C 0 LL LU 0, LD LL LL, ..�. �. f fmp a Q� w 0 0 _j LL 286 2018 STANDARD PLAN T10A. w as r m o l Ir41 .✓ V o V d ........ M 11 m F I •� Vml o • ml a " Q ?� W ZLLI LL o i v�i C `w :3a w �` 0 0 LU J 0 oCC �z Zz "pWxj— 3 v°Co o IN I I• I I.I LL�a Qo3 °" m � • w � m tl 1 m J w, W x x x LL m o= o '�'� •• I �7 ,� N ,� I w l• I • � � Z 0 0 0 ® - I I• w M�, � �� ti u �vwi ° all& 1 I v o ®� ® ®® I J I z� + x�o ov mi j �, _ I.I P �+ 62 w� ml•I K fm ° bm wl.a (Aa"m,o v+ °a 'o>w m • �_ as 4 w"t +' mo m E �.y aaw�b �m o • Q..,„ • I 9 -� me LJ..� • H • En m + O �ar� o® mF W a 'qm a(IfC M �.. y I LU O1°° c D p m wn uv a • J cim m L - LL7 r • � of �n ca. • Icy ZQ� HH ea Ircrcn "" + • I ''' �`'w _,i Min F v • II °auaa �:"py�'3 ® of • '+„w 1, w % W U y J• O "YR N M¢ E.' '%- F® emu- ° W. rt�2.' A� v ¢ w wn t o R w I 1 9 1 r— m m o Eery �j 4W ,. 6 �+ o n, o s N o ° o ryry IIIIU 444M-,a IIl�k w �m C CA „ 0.. p POE — . =m n I �� p GG • m wwa "st9rt;18 qq m o °Emµy gz M q M "A,yy TAoz w Nz� +f ,...+M"".'mod' � y C y1 Q5 �' m/�Mr Aym® P Tp'�Awn N >i~~ ../"'". E'"•"" I �' 4«yp, uwM tfm✓ ry M • y;, tli� 3 %�, ry mw,gp,)''�^ • p teupW • ^^" zm-M "m"", ryry¢..mC':".0 ry m"m m O rr 2 I e g W o Oz tW 3 nib • a Lw Cn T u�. yy "p ye�d Cf1y Uo F .C1 m. ° � �` py 9p K? k J;y C @ v ° > tJm 00 > a 4-tL ac ° —O 287 ........ - 2018 STANDARD PLAN ............... T 11 ... O ,,, .. v o. u J �. N +` c W Z Q a L° L M �F/—� O Z µ mr E x o W N= = c z Lu- B N .L m LIJ CO) �ZOO a Z oo ~ -% O n VUI WIZ 0x o ?qa G O W C_7 z ` N~OZLU z Ci J a QZLL _ om U V J a7 C V LL � a OC LL ®� w w o IIIII (n O C w" fm� m C W %ry J 6® N 0UU z \I/ d �fr J w w s O b /p\ ..............................�................ _...—..............,. _ — & w m E t_ o yAj m ,•• Mw � ` iL- L 3 •'�µ� [H mm uo 1{j �• 1 $ h 10 Oml + w K' a wa1 j ....... p N ® E O 'kS M W Um o m o vg 0Ljj W L. c �.^• Q q C =fit m O® 0�. v X m. Z EL � CCmS L E a�4. ®a e=3 vvx �+ �m Wu-6 T .m cL 0B tle' �W O �G P I ' , .; Cl D;E�pht Ury lm- wz p, Kp{. m . OC >�'.ti oo Cam. L� C.S;N Ewa °a g.�1f; mRE< *6 _ Yvy VV IIJJ IIJJ 12 W s�pyy µ} .O IO.L tlm,�fy N93 F�rFY W LLO [�9 ASS{. C12� E Z r t 19 19- oe -6 o O E .2 E mW zs 00 W. M U) 0 L) WM Ld —i on Lu m z Ld 0 m L) �D x x x z Ej H R z IA 5 Q 1 C' z W� W 20,18 -STANDARD PLAN ........... T---1 1 A z 0 LLI (0 M LU U) COO Z Lu F Lu z cc LU 9L 0ZQ > X ui Z LU 0 a do Z Lu o J.— Z z Lu WLO z >- LU LL, Z FQ a:= F.V 0 LL ------------ 2 - -- -------------------------- . ..... . . ............... i ------------ 2018 STANDARD PLA,N T 2 —Agreement 04 Z F_ 20 LLI F_ LU 4 z cc U) 0(f) UA iR z o U) OZM _j _J LU 0. 00>x M Z LU wo F_ 0 0 z a 00 z 0 z 0 W LL, x M z 0 U. -4 mow, J _j IL o. C) 2 oL LL .o Ea FE -6 O o b E� o LU ir, 0 L 5 -1 lw o 0 p s LL. lu Ld o' X. U. wWJ x x x ­Z do w F2 O . ................ . . .......... . . . .,E 61: z o u W, OF 1. w w 5 om W� 8N > V w 71 o .1 ..S z 0SN ..2 zO0 r N m P LI, N AN 1 -1;1 W- z — — - —11) / w SF" o < I LU Z 0 Z w 0 >- LU Z uj U) uj e g cc _0 jZ.4 0 —Z vx 00 0 0 U z Lu z x Ld LL Ln W LL CC0 0 > V) �4 m LL N, z W < m Ld LO BE O-H H O O+= 0 it H O pS .. ......... . . LIU I o OZ 11 �31 > 2 c 0' CC CC E oo lL 'o o > 6 0 �> O 1 X 0 U 0— A2 ,6 I W,o ZU,IU blANUAKU PLAN 114 ;, I I _E — o COE to o W 6 Sp 6 14 E o O Z, F.5 a *L > -T; �o -zi A. SP o I E L. x E —, z 0 LLJ L) z z L) o o 0 CL dvivu 30NVEIIN3 W z • "of Ell 19 292 _..._------- ......... ---- 2018 STANDARD PLAN T15 g TU p W J a o e J W z w a x w Y b uj Y. a_ � Z ti J O J Im v � � �S :) m w U. U. r m aZ wz w aE E E N� +c E o W M _ + E �yc L m e L ov w vL- u i�x��:. 11 N m o m mj ®m a= 0, mm w ww '. p ._ � o v mom^ W Z � Q .c J 2 v u o a Z 1p s } uj W a —6 +`� o ° ®_ c �c nev m a + SY vae.... o®+m ®.� E'P m W E® N®W o V1 O J LL O m vam cc`0 am > 3Lr + L � z U W J ®oo v ar p us a—m +°ctcm ppll LLh >oomm�5.2— m — mLb-p�� JLE W U66.0 � O CjmpL3 m3U dL ���. #: i'T 117 Y W O W> tim NON p m m E OY ®++a mL tsM-GiX ®Om PH °L�° TDU®tm m6 LCL >llm LOP O + ° � p m tl u m aL"IJ t�/e+oUUO ¢;Eli > Z W 6 Cf c xr E d m O .... p�yy en O Eo m aF / ® 2 >"Rdm A CG La tlN L dL°4 , �:,.RN V °— � V uY YCC 'E.,. o o> w '12 °rna 4 I 111 +$ act m q� � ••^ Nm4JT kP���pnama �?�? Gm LUern 'y'U Ev A1mp�Wiu,'r^�lN qY"' ®U v_mm m g®m E �L +- om 9 >0 -E m m F ±° G�''h'�'M°'w o wa v ¢v >p on p +EN�vs�: 293 w- . .. ............... . .......... . ....... ....... . ........ . . . - ---------- . . . ........... . . ........... . . .... .. .. .. .. .. .. .. .. .. .. ...................... rj�-%�JTeem�� No. &3,67- 1 2018 STANDARD PLAN T16 WD >. I-Wc A o NV . . .. ......... �p Oz= w W, w Lu z z Si "R 5 0 z 0 _j UZ > O O w p cc z 00 LL lw ,w '0 OL w UA IT - 4�4� 4 w S" E.-HE I z 1 0) c 0 3- - E [_Tp w Z2 LO C) Pat M, LLJ LLJ 0 F— 4-F L a EC. LLI z < E' L N. 0 '? F 0 0 Ea SL u RK i -6K '011 9w. H H-, _00o, 9, EF 6 -.3 > 0 & 2 —6. Uj LLI SAI ;Hv ic Z 0 ui .40 0 a ............... . .......... - 0 218 STANDARD . ....... . PLAN ....... .............. Agreement -No . 6367 T 7 ui UJ of fg U) L) iR yka Adj LU z 0 Z LL L) b z 4 z < z wz 0 z L) o LL LL w. z. zw <mz 00 LL El Is . . . ........ . . z > 2 o. o-- 2 ga, T. b t T-- - . L6 o . Ll .5L o Lp L L o zg OL 0 Z m E E > o IS M, IF nE > In E oz iE I- o lo o E l -E E > L E Q 8 .2 > 6 oOt E RE a- w t ,2 CS ts. E 5 m E oT EUI E t lo E > Ld T2 o -�2 > R a THE FINAL PREMIUM IS This bond was issued in tWoo(2T367 PREDICATED ON THE original counterparts FINAL CONTRACT AMOUNT FAITHFUL PERFORMANCE BOND SEWER MAIN CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Bond No.1090777 Bond Fee: $6,604.00 EMPIRE PIPE CLEANING AND E UIPM:ENLl', INC. ("PRINCIPAL") and The Hanover Insurance Company , a corporation incorporated under the laws of the State of New Hampshire and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of THREE HUNDRED EIGHTY-EIGHT THOUSAND, FOUR HUNDRED FORTY-FIVE, DOLLARS AND THREE CENTS ($388,445.03), lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS AND PLANS NO. PW 21-12, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS AND PLANS NO. PW 21-12, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's completion and acceptance by CITY. 4. This bond is conditioned upon and guarantees due compliance with all applicable I-E-1 Agreement No. 6367 law including, without limitation, the El Segundo Municipal Code ("ESMC") 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS AND PLANS NO. PW 21-12 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I-E-2 Agreement No. 6367 SIGNED AND SEALED this 24th Em ire Pipe Cleaning and Equipmen t'RINCI - L" ' ES]DENT AL's SECRETARY day of may 2022 Inc. The Hanover Insurance Company PRINCIPAL's MAILING ADDRESS: StAETY'S AZWXWX�; Dwight Reilly, Attorney -in -Fact SURETY's SECRETARY SURETY'S MAILING ADDRESS: Empire Pipe Cleaning and Equipment, Inc. The Hanover Insurance Company 1788 N. Neville Street _ 5 Hutton Centre, Suite 1060 Orange, CA 92865 Santa Ana, CA 92707 NOTE: (1) ALL signatures must be acknowledged by a notary public„ Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I-E-3 Agreement No. 6367 ACKNOWLEDGMENT .. A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Oran e On 05/24/2022 before me, Melissa Ann Vaccaro Notary Public (insert name and title of the officer) personally appeared Dwight Reilly who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. aa•n.r MELISSAANNVACCARO WITNESS my hand and official seal. COMM.#24Ois42 i Notary Publlc-0allfornia LL :TiORANGE COUNTY a My Comm. Expires May 12, 2026' Signatur (Seal) Melissa Ann Vaccaro Bo 109077 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OFATTORN"EY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing underthe laws ofthe State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws ofthe State of Michigan, (hereinafter individually and collectively the "Company") does hereby constitute and appoint, Daniel Huckabay, Arturo Ayala, Dwight Reilly, Frank Morones, Shaunna Rozelle Ostrom, Michael D. Stong, Ben Stong, Benjamin Wolfe, Chelsea Arnold and/or R. Nappi Of Commercial Surety Bond & Insurance Agency Inc., of Orange, CA each individually, if there be more than one named, as its true and lawful attorney(s)- in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Twenty Five Million and No/100 ($25,000,000) in any single instance Thatthis power is made and executed pursuant to the authority ofthe following Resolutions passed by the Board of Directors ofsaid Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bond s, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with powerto attach thereto the seal ofthe Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President ofthe Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981— The Hanover Insurance Company; Adopted April 14, 1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001— Citizens Insurance Company of America and affirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 21s' day of April, 2022. THE HANOVER INSU E COMPANY THE HANOVER INSURANCE COMPANY MASSACHUSETTS I SURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSUE C MPANY OF AMERICA CITIZENS INSURANCE COMPANY OF AMERICA Vice THE COMMONWEALTH OF MASSACHUSETTS ) COUNTY OF WORCESTER ) ss. On this 211K day of April, 2022 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company. Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and subscribed to said Instrument by the authority and direction of said Corporations, ARL EEN V. SINIL}"8 �iaiTH uJd�ClSr cow uk� My Commission Expire$ June 15, 2023 ,A y Co V • l Ioni➢, f�tt7t a IC My („orrrillisslon Ixpinas June 15, 2023 I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy ofthe Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 24th _ day of May 2022 THE HANOVER INSURANCE COMPANY ?4r "°HV E'rT3 BAY INSURANCE COMPANY S CE 5C"PANY OF AMERICA CERTIFIED COPYic " + j cnM'v�n A. Rwawgside�c. Vice F'VesWant' Agreement No. 6367 THE FINAL PREMIUM IS This bond was issued in two (2) PREDICATED ON THE original counterparts FINAL CONTRACT AMOUNT LABOR AND MATERIALS BOND SEWER MAIN CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Bond No.1090777 Bond Fee: Included in Performance Bond EMPIRE PIPE CLEANING AND EQUIPMENT, INC., as principal ("PRINCIPAL") and The Hanover Insurance Com an , a corporation incorporated under the laws of the State of New Ham shire and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of THREE HUNDRED EIGHTY-EIGHT THOUSAND FOUR RIJNDRED FORTY-FIVE DOLLARS AND THREE CENTS ($388,445.03), lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT, SPECIFICATIONS AND PLANS NO. PW 21-12 ("Public Project"), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS AND PLANS NO. PW 21-12, and the public works contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles, which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment. 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor thereon. Agreement No. 6367 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS AND PLANS NO. PW 21-12, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] Agreement No. 6367 SIGNED AND SEALED this 24th day of 20 22 . Empire Pipe Cleaning and Equipment, Inc The Hanover Insurance Company PRJNCIPA'�ORESIDENT SURETY's RRrDwight Reilly, Attorney -in -Fact PRINCIPAL's SECRETARY PRINCIPAL's MAILING ADDRESS: SURETY's SECRETARY SURETY's MAILING ADDRESS: Empire Pipe Cleaning and E�me�nt, Inc. The Hanover Insurance Company 1788 N. Neville Street 5 Hutton Centre, Suite 1060 ........ . . .............. ........... Orange, CA 92865 Santa Ana, CA 9..2 T07 .... .... . . . ..... ..... .... . ............... ....... ...... ..... ...................... NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. Agreement No. 6367 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On 05/24/2022 before me, Melissa Ann Vaccaro Notary Public (insert name and title of the officer) personally appeared Dwight Reilly I who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. MELN" A ANN VACCARO 1942 WITNESS my hand and official seal. c°° z N Notary Pu�rlN� Calftynta � Comm, ExNaNn NaNay 12, 2p2fi Si nature ORANGE COUNTY DLC�w " `" Seal tL My 9 � ) Melissa Ann Vaccaro Bo 7 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER UFATTORNEY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing underthe laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, (hereinafter individually and collectively the "Company") does hereby constitute and appoint, Daniel Huckabay, Arturo Ayala, Dwight Reilly, Frank Morones, Shaunna Rozelle Ostrom, Michael D. Stong, Ben Stong, Benjamin Wolfe, Chelsea Arnold and/or R. Nappi Of Commercial Surety Bond & Insurance Agency Inc., of Orange, CA each individually, if there be more than one named, as its true and lawful attorney(s)- in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings, or other surety obligations, The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary ofthe Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner stated and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Twenty Five Million and No/100 ($25,000,000) in any single instance That this power is made and executed pursuant to the authority ofthe following Resolutions passed by the Board of Directors ofsaid Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with powerto attach thereto the seal ofthe Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President ofthe Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981— The Hanover Insurance Company; Adopted April 14, 1982— Massachusetts Bay Insurance Company; Adopted September 7, 2001—Citizens Insurance Company of America and affirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANYand CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 21s1 day of April, 2022. THE HANOVER INSMECI E COMPANY THE HANOVER INSURANCE COMPANY MASSACHUSETTSSURANCE COMPANY MASSACHUSETTS SAY INSURANCE COMPANY CITIZENS I SUTRA;PANY' OF AMERICA CITI ENS INSURANCE COMPANY OF AMERICA THE COMMONWEALTH OF MASSACHUSETTS ) COUNTY OF WORCESTER ) ss, On this 2;1"day of April, 2022 before me came the .above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me persona#Iy known to be the individuals and officers described herein„ and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company,, Massachusetts Bay Insurance Company and' Citizens Insurance Company of America„ respectively, and that the said corporate seals and their signatures asofficers were duly affixed and subscribed to said instrument by the authority and direction of said Corporations. ,4A ARLEEN V.V. SIMONS My COmmission Expires ��ry C13M IV dune W AieenV SlmonB,tif4l Nwaxry My tummission Expires June 15, 2023 s I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy ofthe Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 24th day of MaY 2022 THE HANOVER INSURANCE COMPANY T BAY INSURANCE COMPANY C@ CPANY OF AMERICA CERTIFIED COPY e,,k" A, RtlNNp14dar, VIcma Para Wi Vim A, Agreement No. 6367 N:' 4864 STATE OF CAI,IFOIi, IA DEPARTMENT OF INSURANCE SAN M NCISCO AMENDED Certificate of Authority Thus Is To C$xzawx, That, pursuant to the Insurance Code of the State of California, The iiatwwer 11-,n9ur,• p& Company of Bedford, New Hampshire , organized under the laws of New Hampshire , subject to its Articles of Incorporation or other fundamental organizational documents, is hereby authorized to transact within this State, subject to all provisions o f this Certificate, the f dlawing classes Of insurance: F i fe ,, Marine, Surety„ Disability, Plate Glass, Liability, Workers` Compensation, Common Carrier Liability, Boiler and Machinery, Burglary, Credit, Sprinkler, Team and Vehicle., Automobile, Aircraft and Miscellaneous as such classes are now or may hereafter be defined in the Insurance Latw of the State of California. Tames CFmnncATE is expressly conditioned upon the holder hereof now and hereafter being in full compliance with all, and not in violation of any, of the applicable laws and lawful requirements made under authority of the laws of the State of California as long as such laws or requirements are in effect and applicable, and as such laws and requirements now are, or may hereafter be changed or amended. IN Wk'bms WmmEoir, effective as of the_._. 20th _____day Cc'tober , I9 s 66_, I have hereunto set my hand and caused my.official seal to be affixed this._?oth..... day o f-47 Cober—,19. 6— By _ �,•, . o tl�& &don wide the Secretary of State must he acecutplished, as required by the CaWorrria Casxp� xss Coda uu i ms dy after issuance of flats Certificate of Authority, Failure to do so will be a violation of leas. 'Caro Sec. 701 and waif be grouaads for revolking this +Certtfcate of Authority pursuant to the covenants xnaaale in the 'application tborefor and the conditions contained herein, ROAM ='3 a W2405 4M3 6W GA - P.- Agreement No. 6367 FAI.... B""' CITY OF EL SEGUNDO CONTRACT DOCUMENTS PLANS & SPECIFICATIONS (Revised 1-25-22) FOR SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 350 MAIN STREET EL SEGUNDO, CA 90245 310-524-2300 https://www.elsegundo.org/govemment/departments/city-clerk/bid-rfp h�%s://www.elser�da.ark/avern�ner�i/dear��ner��s/ublic�warlcs/reques��public-works-bid MANDATORY PRE -BID MEETING MONDAY, JANUARY 31, 2022 AT 10:00 AM AT 2050 S HUGHES WAY EL SEGUNDO, CA 90245 BIDS DUE TUESDAY, FEBRUARY 8, 2022 AT 11:00 AM I Agreement No. 6367 2050 S. Hughes Way MANDATORY PRE -BID MEETING LOCATION January 31, 2022 at 10:00 am Vicinity maps �I I w ° n St NY AF 'f f/ll SKIP In er wl M1imr, "!, ,"l��l�� �7 i II r r vF IJI�' low 0 7 Nf a IT dy vrd IT" WO ds J7'� tn✓lr r.L � H i � IfV.��v r,wp✓wru,o l Vv Ei& 3w„uuaw6iiuGllla 1 W ini w „ . ry�II Wry, �I �wlf •11 ��� x:^ au IN ,, llww w'wy"wluxwrmw;ry amaw w+ri»},ri+w+w�dw!u�,Hxa�n!���+yuwr�l%Ri'"?a, ,,,., ,. .. w;" 7w7;h'��uM�k6«i,Sn'-9'IIVv'�4!tl uC ,,,,, Location map 0 Agreement No. 6367 BIDS WILL BE RECEIVED UP TO THE HOUR OF 11:00 A.M. TUESDAY, FEBRUARY 8, 2022 IN THE OFFICE OF THE CITY CLERK CITY HALL 350 MAIN STREET EL SEGUNDO, CALIFORNIA 90245 AT WHICH TIME THEY WILL BE PUBLICLY OPENED 3 Agreement No. 6367 SPECIAL INSTRUCTIONS TO CONTRACTORS Contractors are required to review section 7-3 of the STANDARD SPECIFICATIONS, pages II-B-25 thru II-B-26 "LIABILITY INSURANCE". ONLY CONTRACTORS ABLE TO OBTAIN AND FURNISH THE REQUIRED COVERAGE AND ENDORSEMENT "ISO" FORMS SHOULD CONSIDER SUBMITTING A BID PACKAGE. The Contractor will be required to apply and obtain an Encroachment Permit from the City Public Works Department as well as any applicable Building/Safety Permit from the City Building Planning and Building Safety Department. The permits will be issued on a "no -fee" basis. The Contractor shall be responsible for calling the Building Safety Division for inspections. All noted deficiencies shall be corrected by the contractor. The project will not be accepted as complete until the contractor obtains a final sign -off from the Department of Planning and Building Safety. Agreement No. 6367 TABLE OF CONTENTS SECTION I — LEGAL A. NOTICE INVITING SEALED BIDS B. BIDDING INSTRUCTIONS 1. DEFINITION 2. BIDDER'S REPRESENTATIONS 3. BIDDING DOCUMENTS 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS 5. PRODUCT SUBSTITUTIONS 6. SUBCONTRACTORS 7. ADDENDA 8. PRE -BID CONFERENCE 9. FORM AND STYLE OF BIDS 10. BID SECURITY 11. MODIFICATION OR WITHDRAWAL OF BID 12. OPENING OF BIDS 13. REJECTION OF BIDS 14. AWARD C. PROPOSAL 1. PROPOSAL, FIRST PAGE 2. BID SCHEDULES a. BASE BID 3. BIDDER'S INFORMATION 4. BIDDER AND NOTARIAL ACKNOWLEDGEMENT 5. PROPOSAL GUARANTEE BID BOND 6. CONTRACTOR'S LICENSE DECLARATION 7. NON -COLLUSION AFFIDAVIT 8. WORKER'S COMPENSATION CERTIFICATION 9. DESIGNATION OF SUBCONTRACTORS 10. REFERENCES 11. BIDDER'S STATEMENT OF PAST DISQUALIFICATIONS 11. INSURANCE REQUIREMENTS D. CITY OF EL SEGUNDO PUBLIC WORKS CONTRACT E. FAITHFUL PERFORMANCE BOND F. MATERIAL AND LABOR BOND i PAGE I-A-1 TO A-3 I-B-1 TO B-8 I-B-1 I-B-1 I-B-2 I-B-2 I-B-3 I-B-3 I-B-3 I-B-3 I-B-4 I-B-5 I-B-6 I-B-6 I-B-6 I-B-6 I-C-1 TO C-17 I-C-1 I-C-3 I-C-3 I-C-4 I-C-6 I-C-7 I-C-8 I-C-9 I-C-10 I-C-11 I-C-34 I-C-15 I-C-16 I-D-1 TO D-5 I-E-1 TO E-3 I-F-1 TO F-3 Agreement No. 6367 SECTION II — GENERAL REQUIREMENTS PAGE A. GENERAL SPECIFICATIONS II-A-1 TO A-2 1. REGISTRATION OF CONTRACTORS II-A-1 2. INSURANCE AND CITY BUSINESS LICENSE II-A-1 3. EMERGENCY INFORMATION II-A-1 4. FURNISHING OF WATER II-A-1 5. CALIFORNIA — OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION II-A-1 6. SOUND CONTROL II-A-2 7. AIR POLLUTION CONTROL II-A-2 8. WORKER UNIFORMS II-A-2 B. STANDARD SPECIFICATIONS II-B-I TO B-34 0-1 STANDARD SPECIFICATIONS II-B-I 0-2 NUMBERING OF SECTIONS II-B-I 0-3 MODIFICATIONS II-B-I 1-2 DEFINITIONS II-B-I 1-2.1 ADDITIONAL DEFINITIONS II-B-I 1-3 ABBREVIATIONS II-B-2 2-0 SCOPE AND CONTROL OF WORK II-B-3 2-1.1 ACCESS TO PROJECT SITE II-B-3 2-1.2 OWNERSHIP AND USE OF CONTRACT II-B-3 DOCUMENTS 2-3 SUBCONTRACTS II-B-3 2-3.1 GENERAL II-B-3 2-3.2 ADDITIONAL RESPONSIBILITY II-B-4 2-4 CONTRACT BONDS II-B-4 2-5 PLANS AND SPECIFICATIONS II-B-5 2-5.1 GENERAL II-B-5 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS II-B-5 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS II-B-6 2-8 RIGHT-OF-WAY II-B-6 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES II-B-6 2-9 SURVEYING II-B-6 2-9.3 SURVEY SERVICE II-B-6 2-9.3.1 CONSTRUCTION SURVEYING II-B-6 2-9.3.2 MEASUREMENT AND PAYMENT II-B-7 3-3.2.2 BASIS FOR ESTABLISHING COSTS II-B-7 3-3.2.3 MARK UP II-B-7 11 Agreement No. 6367 SECTION II — GENERAL REQUIREMENTS (Continued) 3-3.3 DAILY REPORTS BY CONTRACTOR 3-4 CHANGED CONDITIONS 3-5 DISPUTED WORK 4-1.3 INSPECTION REQUIREMENTS 4-1.3.1 GENERAL 4-1.3.2 INSPECTION OF MATERIALS NOT PRODUCED LOCALLY 4-1.6 TRADE NAMES OR EQUALS 5-2 PROTECTION 5-2.1 INCORRECT LOCATION OF UTILITIES 5-4 RELOCATION 5-4.1 RESPONSIBILITY OF UTILITY REMOVAL OR RELOCATION 5-5 DELAYS 5-5.1 CALCULATING IDLE TIME 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 CONTRACT SCHEDULE 6-1.2 CONTENT OF CONTRACT SCHEDULE 6-1.3 EFFECT OF CONTRACT SCHEDULE 6-1.4 COMMENCEMENT OF CONTRACT TIME 6-4 DEFAULT BY CONTRACTOR 6-4.1 GENERAL 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL OVER THE WORK 6-4.3 SURETY'S ASSUMPTION OF CONTROL 6-6 DELAYS AND EXTENSIONS OF TIME 6-6.1 GENERAL 6-6.2 EXTENSION OF TIME 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR 6-6.4 WRITTEN NOTICE AND REPORT 6-7.2 WORK DAYS AND WORKING HOURS 6-7.4 NIGHT WORK 6-7.5 WEEKEND AND HOLIDAY WORK 6-8 COMPLETION AND ACCEPTANCE 6-8.1 GENERAL GUARANTY 6-9 LIQUIDATED DAMAGES 6-9.1 FAILURE TO COMPLETE WORK ON TIME 6-11 DISPUTES AND CLAIMS; PROCEDURE 6-11.1 GENERAL 6-11.2 FORM iii PAGE II-B-8 II-B-8 II-B-9 II-B-9 II-B-9 II-B-10 II-B-12 II-B-12 II-B-13 II-B-14 II-B-14 II-B-14 II-B-14 II-B-15 II-B-15 II-B-15 II-B-16 II-B-16 II-B-16 II-B-16 II-B-17 II-B-17 II-B-17 II-B-18 II-B-18 II-B-18 II-B-18 II-B-18 II-B-19 Agreement No. 6367 SECTION II — GENERAL REQUIREMENTS (Continued) 6-11.3 CLAIMS SUBMITTED TO ENGINEER 6-11.4 CLAIMS IS PREREQUISITE TO OTHER REMEDY 6-11.5 DECISION ON CLAIMS 6-11.6 APPEAL OF ENGINEER'S DECISION 6-11.7 MEDIATION 6-11.8 ARBITRATION 6-11.9 WHEN ARBITRATION DECISION BECOMES BINDING 6-11.10APPEAL TO SUPERIOR COURT; WAIVER OF JURY TRIAL 7-2 LABOR 7-2.3 PREVAILING WAGES 7-2.4 RECORD OF WAGES PAID; INSPECTION 7-3 LIABILITY INSURANCE 7-3.1 GENERAL 7-3.2 INDEMNIFICATION AND DEFENSE 7-5 PERMITS 7-8.1 CLEAN UP AND DUST CONTROL 7-8.1.1 GENERAL 7-8.1.2 WATERING 7-8.6 WATER POLLUTION CONTROL 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS 7-10 PUBLIC CONVENIENCE AND SAFETY 7-10.1 TRAFFIC AND ACCESS 7-10.2 STREET CLOSURES, DETOURS, BARRICADES 7-10.5 PROTECTION OF THE PUBLIC 7-15 HAZARDOUS MATERIAL 9-2 LUMP SUM WORK 9-3.2 PARTIAL AND FINAL PAYMENTS 9.3.3 DELIVERED MATERIALS 100-1TERMINATION OF AGENCY LIABILITY PAGE II-B-20 II-B-21 II-B-21 II-B-21 II-B-22 II-B-22 II-B-22 II-B-22 II-B-23 II-B-23 II-B-24 II-B-24 II-B-24 II-B-27 II-B-28 II-B-28 II-B-28 II-B-28 II-B-28 II-B-29 II-B-30 II-B-30 II-B-30 II-B-31 II-B-31 II-B-32 II-B-33 II-B-34 II-B-34 1V Agreement No. 6367 SECTION III — SPECIAL PROVISIONS PAGE III -A -I THRU IV-A-11 APPENDICES Appendix 1 — City Map and Project Location Appendix 2 — Typical No Parking Sign — El Segundo Standard ST-18 Appendix 3 — Construction and Demolition Recycling Forms v Agreement No. 6367 NOTICE INVITING SEALED BIDS FOR SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT IN THE CITY OF EL SEGUNDO PROJECT NO.: PW 21-12 The City of El Segundo is accepting sealed bids in the City Clerk's office, 350 Main Street, El Segundo, California 90245, until 11:00 a.m. on: TUESDAY, FEBRUARY 8, 2022 at which time they will be publicly opened. Bids will not be accepted after that time. As described in the Bidding Documents, the bids are for a public works project ("Project") which consists of sewer main mechanical pipe cleaning, CCTV inspection, and related work as shown on the plans on file with the City's Public Works Department. Work on the Project must be performed in strict conformity with Specifications No. PW 21-12 as adopted by the El Segundo City Council on January 18, 2022 which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency, preferably municipal, references. The references shall be for the contractors' building similar projects (in terms of scope, size, type, magnitude and complexity), as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualification. Copies of the Plans, Specifications, Contract Documents and Engineer's estimate are available from the Engineering Division of the Public Works Department, City of El Segundo, 350 Main Street, El Segundo, California, 90245. Plans and Specifications are alternately available electronically via https://www.elsegundo.org/govemment/departments/public-works/request- public-works-bid A mandatory pre -bid meeting is scheduled for Monday, January 31, 2022, at 10:00 AM at 2050 S Hughes Way in El Segundo, CA 90245. Failure to attend the mandatory meeting will disqualify a company's bid. All questions regarding the project are due to https ://www.elsegundo.org/govemment/departments/public-works/request-public-works-bid by Tuesday, February 1, 2022, at 4:00 PM. The terms and conditions for bidding on the Project are described in the attached Bidding Instructions. This project requires payment of State prevailing rates of wages for Los Angeles County. The contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at I-A-1 Agreement No. 6367 www.dir.ca.gov. Note that the Project is subject to compliance monitoring and enforcement by California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4 to be nonresponsive. The contractor to whom the contract is awarded must assist in locating, qualifying, hiring and increasing the skills of minority group employees and applicants for employment, as set forth in Executive Order 11246 and 11375. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City of El Segundo hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. The Contractor's duty to pay State prevailing wages can be found under Labor Code Section 1770 et. Seq. and Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices including forfeitures and debarment. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor's request. In entering into a Public Works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or Sub -Contractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuantto thepublic works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Agreement No. 6367 Bidders and submitted to the City Clerk, 350 Main Street, City of El Segundo, in a sealed envelope plainly marked on the outside: SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT "SEALED BIDS FOR PROJECT NO.: PW 21-12 IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" The bid must be accompanied by a bid bond, made payable to the City of El Segundo for an amount no less than ten percent (10%) of the amount bid for the base contract. No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the State Business and Professions Code. For these projects, those acceptable classes of license shall be "A." The successful Contractor and his Sub -Contractors will be required to possess the correct license for their project classifications, and valid City Business Licenses from the City of El Segundo. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. Any contract entered into pursuant to this notice shall become effective or enforceable against the City of El Segundo only when the formal written contract has been duly executed by the appropriate officer(s) of the City of El Segundo. DATED this day of , 2022. CITY OF EL SEGUNDO, CALIFORNIA Tracy Weaver, City Clerk f0.1w, Agreement No. 6367 BIDDING INSTRUCTIONS DEFINITIONS. Unless provided otherwise, the definitions in the Greenbook, Special Conditions, or other Contract Documents are applicable to all Bidding Documents. 1.1 "Addenda" means written or graphic instruments issued by the City before the Bid Deadline that modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections. 1.2 "Alternate" means a proposed change in the Work, as described in the Bidding Documents which, if accepted, may result in a change to either the Contract Sum or the Contract Time, or both. 1.3 "Bid Deadline" means the date and time designated in the Notice for Bids as the last date and time for receipt of Bids, as may be revised by Addenda. 1.4 "Bidder" means a person or firm that submits a Bid. 1.5 "Bidding Documents" means the construction documents prepared and issued for bidding purposes including all Addenda. 1.6 "Lump Sum Base Bid" means the sum stated in the Bid for which Bidder offers to perform the Work described in the Bidding Documents, but not including unit price items or Alternates. 1.7 "Unit Price" means an amount stated in the Bid for which Bidder offers to perform the Unit Price Work for a fixed price per unit of measurement. 2. BIDDER'S REPRESENTATIONS. By making its Bid, Bidder represents that: 2.1 Bidder read, understood, and made the Bid pursuant to the requirements in the Bidding Documents. 2.2 Bidder visited the Project site and is familiar with the conditions under which the Work will be performed and the local conditions as related to the Contract Documents. 2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding Documents. 2.4 Bidder and all Subcontractors, regardless of tier, have the appropriate current licenses issued by the State of California Contractor's State License Board for the Work to be performed. If Bidder is a joint venture, the Bidder will have a joint venture license appropriate for the performance of the work, and each member of the joint venture will likewise have the appropriate license. Business and Professions Code §§ 7000-7191 establish licensing requirements for contractors. If aBidder, that is a specialty contractor, submits a Bid involving 3 or more specialized building trades, the work of which is more than incidental and supplemental to the performance of the Work for which Bidder holds a specialty contractor license, Bidder must also hold either (1) a specialty contractor "C" license in each such trade, (2) a General Engineering contractor "A" license, or (3) a General Building contractor "B" license. This requirement is applicable whether or not Bidder lists a Subcontractor for each such trade. 2.5 If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Agreement No. 6367 Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2.6 Bidder has the expertise and financial capacity to perform and complete all obligations under the Bidding Documents. 2.7 The person executing the Bid Form is duly authorized and empowered to execute the Bid Form on Bidder's behalf. 2.8 Bidder is aware of and, if awarded the Contract, will comply with Applicable Code Requirements in its performance of the Work. 2.9 The Bidder has paid the City's business license fee(s) 2.10 The Bidder, per SB 854 requirements for public projects, has registered with and paid their annual fee to the California State Department of Industrial Relations. Information about SB 854 and its requirements can be found at this link: http://www.dir.ca.gov/Public-Works/SB854.html 3. BIDDING DOCUMENTS 3.1 Bidders may obtain complete sets of the Bidding Documents from the City's Public Works Department for the sum stated in the Notice for Bids. 3.2 Bidders will use a complete set of Bidding Documents in preparing Bids. 3.3 The City makes copies of the Bidding Documents available, on the above terms, for the sole purpose of obtaining Bids for the Work and does not confer a license or grant permission for any other use of the Bidding Documents. 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS. 4.1 Before submitting its Bid, Bidder will carefully study and compare the various documents comprising the Bidding Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the Bid is submitted; will examine the Project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City's Representative errors, inconsistencies, or ambiguities discovered. 4.2 Requests for clarification or interpretation of the Bidding Documents will be addressed to the City's Representative. 4.2.1 The release of the bid package begins a quiet period for potential Bidders participating in this project. The City of El Segundo realizes it is critical to provide Bidders with a vehicle to ask questions so that quality responses can be prepared. Questions must be submitted in writing to project managers via the City website: https ://www.elsegundo. org/govemment/departments/public-works/request- public-works-bid Responses to all questions will be provided in writing to all Bidders in accordance with the schedule below. We will not identify companies or I-B-2 Agreement No. 6367 individuals that pose questions. Potential bidders must not call City of El Segundo employees to discuss potential projects or ask questions regarding the bid. Questions Due by February 1, 2022, at 4:00 PM Questions Answered by February 7, 2022 4.3 Clarifications, interpretations, corrections, and changes to the Bidding Documents will be made by Addenda. Clarifications, interpretations, corrections, and changes to the Bidding Documents made in any other manner will not be binding and Bidders must not rely upon them. 5. PRODUCT SUBSTITUTIONS. No substitutions will be considered before award of Contract. Substitutions will only be considered after award of the Contract and as provided for in the Contract Documents. 6. SUBCONTRACTORS. 6.1 Each Bidder will list in the Bid Form all first -tier Subcontractors that will perform work, labor or render such services. The Bid Form contains spaces for the following information when listing Subcontractors: (1) Work Activity; (2) name of Subcontractor; (3) city of Subcontractor's business location. Failure to list any of these items on the Bid Form will result in the City treating the Bid as if no Subcontractor was listed for the Work and that Bidder represents to the City that it is fully qualified to perform that portion of the Work and will perform do so. 6.2 Subcontractors listed in the Bid Form will only be substituted after the Bid Deadline with the City's written consent in accordance with California law. 7. ADDENDA. 7.1 Addenda will be in writing and issued only by the City. Addenda will be mailed or delivered to all who are known by the City to have received a complete set of Bidding Documents and who have provided a street address for receipt of Addenda. 7.2 Copies of Addenda will be made available for inspection at the City's Public Works Department. 7.3 The City will issue Addenda so that they are received by prospective Bidders not later than three (3) business days before the Bid Deadline. Addenda that withdraw the request for Bids or postpone the Bid Deadline may be issued anytime before the Bid Deadline. 7.4 Each Bidder is responsible for ensuring that it has received all issued Addenda before issuing a Bid. I-B-3 Agreement No. 6367 8. PRE -BID CONFERENCE. Bidder will attend a Pre -Bid Conference where City will discuss the Bidding Documents, answer questions, accept comments, and conduct a Project site visit. The City requires all Pre -Bid Conference attendees to arrive for the meeting on time and to sign an attendance list which is used to determine if Bidders meet this requirement. Any Bidder not attending the Pre -Bid Conference in its entirety will be deemed to have not complied with the requirements of the Bidding Documents and its Bid will be rejected. 9. FORM AND STYLE OF BIDS 9.1 Bids will be submitted on the Bid Form included with the Bidding Documents. Bids not submitted on the City's Bid Form will be rejected. 9.2 All blanks on the Bid Form will be filled in legibly in ink or by typewriter. 9.3 Bidder's failure to submit aprice for any Alternate or unit price will result in the Bid being considered as nonresponsive. If Alternates are called for and no change in the Lump Sum Base Bid is required, enter "No Change." 9.4 Each Bidder must fill out the "Bidders Statement of Past Contract Disqualifications" form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The Bidder must explain the circumstances of each disqualification. The City may reject the bid based on such information. 9.5 Bidder will make no stipulations on the Bid Form nor qualify the Bid in any manner. 9.6 The Bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the Bidder (if awarded the Contract) specifically agrees to construct a completed work ready for the use and in the manner which is intended. In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished must be paid for according to the unit or lump sum price established for such work under the contract, wherever such unit or lump sum price has been established. In the event no prices are named in the contract to cover such changes or alterations, the cost of such changes must be covered as extra work. 9.7 The Bid Form will be signed by a person or persons legally authorized to bind Bidder to a contract. Bidder's Representative will sign and date the Declaration included in the Bid Form. Failure to sign and date the declaration will cause Bid to be rejected. 9.8 Bids must be submitted in writing on the Proposal forms provided by the City of El Segundo. One (1) set of these Proposal forms is inserted loose herein for use by the bidders. Bidders are required to submit one (1) original set of the proposal forms. All information requested therein must be clearly and legibly set forth in the manner and form indicated. 9.9 Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed. No bidder shall at any time after submissions of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or Agreement No. 6367 discrepancies found in the Plans, Specifications, or other contract documents shall be called to the attention of the City of El Segundo and clarified prior to the submission of proposals. 10. BID SECURITY 10.1 Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Sum Base Bid as security for Bidder's obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to "City of El Segundo." When a Bond is used for Bid Security, failure to use the City's Bid Bond form will result in the rejection of the Bid. 10.2 If the apparent lowest responsible Bidder fails to sign the Agreement and furnish all items required by the Bidding Documents within the time limits specified in these Instructions to Bidders, the City will disqualify such Bidder and select the next apparent lowest responsible Bidder until all bids have been exhausted or the City may reject all bids. In such an event, the disqualified Bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the Bid Security, between the amount of the disqualified Bid and the larger amount for which the City procures the Work. 10.3 If a Bid Bond is submitted and an attorney -in -fact executes the Bid Bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the Bid Bond. The surety issuing the Bid Bond will be listed in the latest published State of California, Department of Insurance list of, "Insurers Admitted to Transact Surety Insurance in This State." 10.4 The City will retain Bid Security until the occurrence of one of the following: 10.4.1 All items required by the Bidding Documents have been furnished and the Agreement has been signed by the successful Bidder and the City. 10.4.2 The specified time has elapsed during which Bids may be withdrawn. 10.4.3 All Bids have been rejected. 10.5 The Bid Form, Bid Security, and all other documents required to be submitted with the Bid must be enclosed in a sealed opaque envelope. The envelope must be addressed to the City Clerk. The envelope must be identified with the Bidder's name and address, and identify the Project for which the Bid is submitted, as follows: "SEALED BIDS FOR PW 21-12: SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT. DO NOT OPEN WITH REGULAR MAIL." Proposals may be mailed or delivered by messenger. 10.6 Bids will be deposited at the designated location on or before the Bid Deadline. A Bid received after the Bid Deadline will be returned to Bidder unopened. 10.7 Bidder will assume full responsibility for timely delivery at the location designated for receipt of Bids. 10.8 Oral, telephonic, facsimile, or telegraphic Bids are invalid and will not be accepted. 10.9 All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws related to bids for contracts of this nature whether the same is expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and I-B-5 Agreement No. 6367 requirements set forth, contemplated, and referred to in the Plans, Specifications, and other contract documents, and to full compliance therewith. 11. MODIFICATION OR WITHDRAWAL OF BID. 11.11 Before the Bid Deadline, a submitted Bid may be modified or withdrawn. Notice of such action will be given to the City in writing and signed by the Bidder's authorized representative. A change so made will be so worded as not to reveal the amount of the original Bid. 11.12 A withdrawn Bid may be resubmitted up to the Bid Deadline, provided that it then fully complies with the Bidding Requirements. 11.13 Bid Security will be in an amount sufficient for the Bid as modified or resubmitted. 11.14 Bids may not be modified, withdrawn, or canceled within sixty (60) days after the Bid Deadline unless otherwise provided in Supplementary Instructions to Bidders. 11.15 Proposals may not be withdrawn after said Bid Deadline without forfeiture of the proposal guarantee. 11.16 The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so. 11.17 No mention shall be made in the proposal of Sales Tax, Use Tax, City Business License, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable. 11.18 No mention shall be made in the proposal of the cost of bonds as all amounts bid will be deemed and held to include any such costs, which may be applicable. 12. OPENING OF BIDS. Bids submitted in the manner required by these instructions and are received on or before the Bid Deadline will be opened publicly. 13. REJECTION OF BIDS. 13.1 The City will have the right to reject all Bids. 13.2 The City will have the right to reject any Bid not accompanied by the required Bid Security or any other item required by the Bidding Documents, or a Bid which is in any other way materially incomplete or irregular. 13.2.1 Unrequested/unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered. 13.3 In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor. No proposal will be accepted from a bidder who has not been licensed in accordance with the provisions of the State Business and Professions Code. I elve, Agreement No. 6367 14. AWARD 14.1 The City may retain all bids for a period of sixty (90) days for examination and comparison, and to delete any portion of the work from the contract. 14.2 The City will have the right to waive nonmaterial irregularities in a Bid and to accept the lowest responsive Bid as determined by The City. 14.3 The City will have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents. 14.4 The City will determine the low Bidder on the basis of the sum of the Lump Sum Base Bid plus all unit prices multiplied by their respective estimated quantities as stated in the Bid Form, if any, plus the Contractor Delay Damages multiplied by the "multiplier" as stated in the Bid Form, plus the amounts of all accepted Alternates. 14.4.1 Inclusion of Contractor Delay Damages within the Bid Form is solely for the purpose of determining the low bidder and establishing the City's maximum daily liability as a result of City delays to Contractor, if any, and City has no obligation to pay any daily Contractor Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Proposal Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 14.5 The City will select the apparent lowest responsive and responsible Bidder and notify such Bidder within thirty (30) days (unless number of days is modified in Supplementary Instructions to Bidders) after the Bid Deadline or reject all bids. Within ten (10) days after receiving the City's notice that Bidder was selected as the apparent lowest responsible Bidder, Bidder will submit to the City all of the following items: 14.5.1 One original of the Agreement signed by Bidder. 14.5.2 One original of the Payment Bond. 14.5.3 One original of the Performance Bond. 14.5.4 Certificates of Insurance on form provided by the City. 14.5.5 Names of all Subcontractors, with their addresses, telephone number, facsimile number, trade on Bidders' company stationery. Evidence, as required by the City, of the reliability and responsibility of the proposed Subcontractors such as statements of experience, statements of financial condition, and references. 14.5.6 Preliminary Contract Schedule. 14.5.7 Selection of Retention Options and Escrow Agreement for Deposit of Securities in Lieu of Retention and Deposit of Retention. If not submitted, the City will withhold retention. 14.5.8 Cost Breakdown. 14.6 Before award of the Contract, the City will notify Bidder in writing, if the City objects to a Subcontractor proposed by Bidder, in which case Bidder will propose a substitute acceptable to the City. Failure of the City to object to a proposed Subcontractor before award will not preclude the City from requiring replacement of any Subcontractor based upon information received subsequent to award, information which cannot be properly evaluated before award due to time I 03WA Agreement No. 6367 constraints, or information relating to a failure to comply with the requirements of the Contract. 14.7 If Bidder submits the original signed Agreements and all other items within ten (10) days after receiving the City's notification, and all such items comply with the requirements of the Bidding Documents, the City will award the Contract to Bidder by signing the Agreement and returning a signed copy of the Agreement to Bidder. 14.8 If the City consents to the withdrawal of the Bid of the apparent lowest responsible Bidder, or the apparent lowest responsible Bidder fails or refuses to sign the Agreement or submit to the City all of the items required by the Bidding Documents, within ten (10) days after receiving the City's notification, or the City determines that the Bidder is not financially or otherwise qualified to perform the Contract, the City may reject such Bidder's Bid and select the next apparent lowest responsible Bidder, until all bids are exhausted, or reject all Bids. Agreement No. 6367 PROPOSAL FOR THE SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Date , 20_ Company Name: TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the contract documents, access and any other field conditions which may effect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. Agreement No. 6367 EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that -the only persons orparties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I-C-2 Agreement No. 6367 BID SCHEDULE SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: BASE BID ITEMS UNIT PRICE ITEM IN FIGURES NO. DESCRIPTION UNIT QTY M AMOUNT $ 1 Mobilization/Demobilization LS 1 CCTV inspection of 6-inch (diameter) sanitary sewer 2 including traffic control, LF 4,824 cleaning, debris removal and disposal, and sewage flow diversion if necessary CCTV inspection of 8-inch sanitary sewer including traffic control, 3 cleaning, debris removal and disposal, LF 180,958 and sewage flow diversion if necessary CCTV inspection of 10-inch sanitary sewer including traffic control, 4 cleaning, debris removal and disposal, LF 20,575 and sewage flow diversion if necessary CCTV inspection of 12-inch sanitary sewer including traffic control, 5 cleaning, debris removal and disposal, LF 23,476 and sewage flow diversion if necessary CCTV inspection of 15" sanitary sewer including traffic control, 6 cleaning, debris removal and disposal, LF 180,060 and sewage flow diversion if necessary I-C-3 a Agreement No. 6367 BASE BID ITEMS, CONTINUED UNIT PRICE IN ITEM FIGURES NO. DESCRIPTION UNIT QTY ($) AMOUNT ($) CCTV inspection of 18" sanitary sewer including traffic control, 7 cleaning, debris removal and LF 9,754 disposal, and sewage flow diversion if necessary CCTV inspection of 21-inch sanitary sewer including traffic 8 control, cleaning, debris removal LF 4,817 and disposal, and sewage flow diversion if necessary CCTV inspection of 24-inch sanitary sewer including traffic 9 control, cleaning, debris removal LF 8,457 and disposal, and sewage flow diversion if necessary CCTV inspection of 27" sanitary sewer including traffic control, 10 cleaning, debris removal and LF 1,489 disposal, and sewage flow diversion if necessary CCTV inspection of 29" sanitary sewer including traffic control, 11 cleaning, debris removal and LF 74 disposal, and sewage flow diversion if necessary TOTAL BID ITEMS 1 THROUGH 11 TOTAL BID WRITTEN IN WORDS: All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I-C-3b Agreement No. 6367 THIS PAGE LEFT BLANK I-C-4 Agreement No. 6367 BIDDER'S INFORMATION Company Name: BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) If corporation, State of Incorporation (i.e., California) Business Address Telephone No. Facsimile No. State Contractor's License No. and Class DIR4 DIR Exp. Date State License State License Original Date Issued Expiration Date The following are the names, titles, email addresses, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: I-C-5 Agreement No. 6367 BIDDER'S INFORMATION (CONTINUED) Company Name: Bidder shall list the name of the person who attended the mandatory pre -bid job walk: Name: Title: I-C-6 Agreement No. 6367 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all a forenamed principals this day of , 20 BIDDER Subscribed and sworn to this NOTARY PUBLIC day of , 20_ I-C-7 Agreement No. 6367 PROPOSAL GUARANTEE BID BOND SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 KNOW ALL MEN BY THESE PRESENTS that, , as BIDDER, and , as SURETY, are held and firmly bound unto the City of El Segundo, in the penal sum of DOLLARS ($ ), which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of , 20 BIDDER* SURETY* Subscribed and sworn to this day of 20 NOTARY PUBLIC Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I-C-8 Agreement No. 6367 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: Class No.: 2. The expiration date of BIDDER'S Contractor License is: 20 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non -responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on , 20, at Signature Typed Name Title Company Name (insert City and State where Declaration signed). I-C-9 Agreement No. 6367 NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) ss. County of ) , being first duly sworn, deposes and say that he or she is of the parry making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Signature Typed Name Title Name of Bidder/Company Name Date I-C-10 Agreement No. 6367 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." Signature of Bidder: Title: Business Name: Business Address: Telephone Number: O Dated this day of , 20 Agreement No. 6367 DESIGNATION OF SUBCONTRACTORS SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: As detailed in Section 2-3.1 (Page 11-B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Name of Subcontractor Address Subcontractor's Contractor License No., & DIR Registration No. Description of Portion of Work I Subcontracted Estimated $ Amount (Number and Street) (CSLB #) (City, Zip Code) (DIR #) (Make copies of this page if additional space is needed) Signature of Bidder Date I-C-12 Agreement No. 6367 REFERENCES Company Name: The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime contractor or ma j or subcontractor within the past five (5) years: I. Project Title: Location: 2 Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm Did your firm have any financial interest in Project? Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm Did your firm have any financial interest in Project? under contract under contract I-C-13 Agreement No. 6367 3. Project Title: Location: M Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm Did your firm have any financial interest in Project? Project Title: Location: Name and address of owner under contract Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? I-C-14 Agreement No. 6367 Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract Did your firm have any financial interest in Project? Bidder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: I-C-15 Agreement No. 6367 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. 1. Have you ever been disqualified from any government contract? Yes ❑ No ❑ 2. If yes, explain the circumstances: 3. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes ❑ No ❑ Bidder's Signature Name (Please Print) I-C-16 Agreement No. 6367 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 0106 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A: VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires California Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this insurance will render the bidder's proposal "nonresponsive." Date Bidder's Signature I-C-17 Agreement No. 6367 END PROPOSAL SECTION I-C-18 Agreement No. 6367 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND [CONTRACTOR] SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 This CONTRACT is entered into this day of , 20 , by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and , ("the Contractor"). 1. WORK. A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed Dollars ($ ) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. 3. TIME FOR PERFORMANCE. A. The Contractor will fully complete the Work within sixty (60) working days (the "Contract Time.") Agreement No. 6367 B. The Contract Time will commence when the City issues allotice to Proceed. The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until: The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. 7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. 8. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not I-D-2 Agreement No. 6367 in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and the manner in which is it performed. The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 12. NOTICES. All communications to either parry by the other parry will be deemed made when received by such parry at its respective name and address as follows: The City The Contractor Lifan Xu City Engineer City of El Segundo 350 Main Street, El Segundo, CA 90245 (310) 524-2368 Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other parry. There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. I-D-3 Agreement No. 6367 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications. 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a parry is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUNDO I-D-4 Agreement No. 6367 Scott Mitnick City Manager ATTEST: Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney Lota David H. King, Assistant City Attorney Insurance Reviewed by: Taxpayer ID No. Contractor State License No.: Contractor City Business License No.: I-D-5 Agreement No. 6367 FAITHFUL PERFORMANCE BOND SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Bond No. Bond Fee: ("PRINCIPAL") and , a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. PW 21-12, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 21-12, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's Agreement No. 6367 completion and acceptance by CITY. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 21-12 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I-E-2 Agreement No. 6367 SIGNED AND SEALED this day of , 20 PRINCIPAL'S PRESIDENT SURETY'S PRESIDENT PRINCIPAL'S SECRETARY PRINCIPAL's MAILING ADDRESS: SURETY'S SECRETARY SURETY's MAILING ADDRESS: NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I-E-3 Agreement No. 6367 LABOR AND MATERIALS BOND SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Bond No. Bond Fee: ("PRINCIPAL") and corporation as principal M incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT, SPECIFICATIONS NO. PW 21-12 ("Public Project"), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 21-12, and the public works contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles, which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment. 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor I-F-1 Agreement No. 6367 thereon. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 21-12, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I-F-2 Agreement No. 6367 SIGNED AND SEALED this day of , 20 PRINCIPAL'S PRESIDENT PRINCIPAL'S SECRETARY PRINCIPAL's MAILING ADDRESS: NOTE: (1) (2) SURETY'S PRESIDENT SURETY'S SECRETARY SURETY's MAILING ADDRESS: ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. Bond shall be effective for one (1) year after acceptance of the job. I-F-3 Agreement No. 6367 SECTION II - GENERAL REQUIREMENTS CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL SPECIFICATIONS 1. REGISTRATION OF CONTRACTORS No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the laws of the State of California relating to licensing of contractors, for the type of work to be performed under this Contract. 2. INSURANCE AND CITY BUSINESS LICENSE Contractor and Sub -Contractors will obtain appropriate insurance and a City Business License before execution of the construction contract. 3. EMERGENCY INFORMATION The names, addresses and telephone numbers of the CONTRACTOR and subcontractors, or their representatives, will be filed with the City Engineer and the City Police Department BEFORE PERFORMING WORK. 4. FURNISHING OF WATER Water necessary for the prosecution of the work as herein specified will be furnished by the City in the following manner: The CONTRACTOR will deposit with the City Water/Wastewater Division the sum of One Thousand Four Hundred Forty -Four Dollars ($1,444.00) to insure against damage to a 21/z" Fire Hydrant water meter which will be furnished and installed by the City at a point convenient to the site of the work. This deposit will be refunded to the CONTRACTOR upon completion of the Project if, after removal and inspection of said meter by the City, it is found to be in satisfactory condition. In event of damage to this meter while under the jurisdiction of the CONTRACTOR, all or any part of said deposit may be retained by the City. A non-refundable Activation Fee of One Hundred Ten Dollars ($110.00) will be charged upon activation of the temporary meter. 5. CALIFORNIA - OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION All work performed under this contract will be done in strict compliance with the Cal -OSHA Rules and Regulations, latest edition. II-A-1 Agreement No. 6367 6. SOUND CONTROL The Contractor will comply with all local sound control and noise level rules, regulations and ordinances that apply to any work performed pursuant to the contract. Each internal combustion engine, used for any purpose on the Project or related to the Project, will be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine will be operated on the Project without said muffler. The use of loud signals will be avoided in favor of light warnings except those required by safety laws for the protection of personnel. 7. AIR POLLUTION CONTROL The Contractor is put on notice that he must abide by all existing rules and regulations of the SCAQMD (South Coast Air Quality Management District), relating to all operations or equipment which discharge visible emissions or solid or liquid particles to the atmosphere. 8. WORKER UNIFORMS All workers under the employment of the Contractor or his/her Sub -Contractor will wear an orange vest or an orange shirt while working in the public right-of-way. II-A-2 Agreement No. 6367 CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL PROVISIONS 0-0 STANDARD SPECIFICATIONS 0-1 GENERAL Except as modified by these Standard Specifications, the provisions of the latest edition of the "Standard Specifications for Public Works Construction" and its supplements prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, constitute the Standard Specifications for this project. 0-2 NUMBERING OF SECTIONS The numbering contained within the Standard Specifications of the Contract Documents is intended to correspond with Greenbook numbering. 0-3 MODIFICATIONS To the extent that the provisions of the Contract Documents conflict with the Greenbook, the Contract Documents take precedence. 1-2 DEFINITIONS The following subsection is added to Subsection 1-2 of the Greenbook. 1-2.1 ADDITIONAL DEFINITIONS Acceptance — The date on which the City Council accepts the Work as complete. Architect, Design Engineers, Soils Engineer, Structural Engineers - Advisors employed by the City. Bidder - Any individual, firm, partnership, corporation, or combination thereof, submitting a proposal for the work contemplated, acting directly or through a duly authorized representative. City Council - The body constituting the awarding authority of the City. Compensable Delay -- a delay entitling the Contractor to an adjustment of the Contract Sum and an adjustment of the Contract Time in accordance with this Agreement. II-B-1 Agreement No. 6367 Due Notice - A written notification, given in due time, of a proposed action where such notification is required by the contract to be given a specified interval of time (usually 48 hours or two working days) before the commencement of the contemplated action. Notification may be from Engineer to Contractor or from Contractor to Engineer. Engineer - The City Engineer, or designee, as defined in the Greenbook. Unless otherwise provided, all correspondence and decisions made relative to the contract will be by the City Engineer or his designated representative. Greenbook — The most recent edition of the Standard Specifications for Public Works Construction. PCC — California Public Contract Code. Prompt - The briefest interval of time required for a considered reply, including time required for approval of a governing body. Public Works Director — The City's Public Works Director, or designee. ❑ (Check if applicable) State Standard Specifications - State of California Standard Specifications, dated July 1992, Business and Transportation Agency, Department of Transportation Working Days - A working day is defined as any day, except Saturdays, Sundays, legal holidays and days when work is suspended by the Engineer, as provided in Subsection 6-3 and days determined to be non -working in accordance with Subsection 6-7, "Time of Completion." 1-3 ABBREVIATIONS The following Subsection is added to Subsection 1-3 of the Greenbook. 1-3.1 The following abbreviations are added to Subsection 1-3 of the Greenbook: AAN American Association of Nurserymen AGC Associated General Contractors of America AISC American Institute of Steel Construction APWA American Public Works Association ASME American Society of Mechanical Engineers IEEE Institute of Electric and Electronic Engineers NEC National Electric Code Green Book The most current edition of the Standard Specification for Public Works Construction, and subsequent supplements prepared by Southern California Chapters of AGC and APWA WATCH Work Area Traffic Control Handbook SPPWC Standard Plans for Public Works Construction by the American Public II-B-2 Agreement No. 6367 Works Association current edition and subsequent supplements ASA American Standard Association CITY City of El Segundo SSP State of California Standard Plans, current edition SSS State of California Standard Specifications, current edition SECTION 2 — SCOPE AND CONTROL OF WORK The following subsections 2-1.1 and 2-1.2 are added to the Greenbook. 2-1.1 ACCESS TO PROJECT SITE Not later than the date designated in the current Contract Schedule submitted by the Contractor, the City will provide access to the real property and facilities upon which the Work is to be performed, including access to real property and facilities designated in the Contract Documents for the Contractor's use. 2-1.2 OWNERSHIP AND USE OF CONTRACT DOCUMENTS. The Contract Documents and all copies furnished to or provided by the Contractor are the City's property and may not be used on other work. 2-3 SUBCONTRACTS Subsection 2-3 Subcontractors of Greenbook is deleted in its entirety and replaced with the following subsection. 2-3.1 GENERAL Except as provided in PCC §§ 4100 et. seq., each bidder will file with its bid the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractor's total bid. Only one subcontractor will be listed for each portion of the work, which portion will be defined in the bid. In each instance, the nature and extent of the work to be sublet will be described. The failure of the Contractor to specify a subcontractor, or the listing of more than one subcontractor for the same portion of the work, constitutes an agreement by the Contractor that it is fully qualified to perform that portion itself and that it will perform that portion itself. The Contractor must have the City Council's written consent to substitute a subcontractor other than that designated in the original bid, to permit any subcontract to be assigned or transferred, or to allow a subcontract to be performed by other than the II-B-3 Agreement No. 6367 original subcontractor. Subcontracting of work for which no subcontractor was designated in the original bid, and which is more than one-half of one percent of the work, will be allowed only in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the City Council setting forth the facts constituting the emergency or necessity. Violation of any of the above provisions will be considered a breach of the Contract, and the City may terminate the Contractor's control over the Work, cancel the contract, or assess the Contractor a penalty of not more than ten percent of the subcontract involved. All persons engaged in the work, including subcontractors and their employees will be considered as employees of the Contractor. The Contractor will be solely responsible for and have control over construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work. The City will deal directly with, and make all payments to, the prime Contractor. When subcontracted work is not being prosecuted in a satisfactory manner, the Contractor will be notified to take corrective action. The Engineer may report the facts to the City Council_ If the City Council so orders, and on receipt by the Contractor of written instructions from the Engineer, the subcontractor will be removed immediately from the Work. That subcontractor will not again be employed on the Work. If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2-3.2 ADDITIONAL RESPONSIBILITY Add the following to Subsection 2-3.2 Additional Responsibility: The Contractor will submit experience statements for each subcontractor who will perform contract work that amounts to more than ten percent (10%) of the Work. 2-4 CONTRACT BONDS The following paragraph is added to Subsection 2-4 of the Greenbook. The Faithful Performance Bond and the Labor and Materials Bond must be paid up and II-B-4 Agreement No. 6367 in effect for one year after the acceptance of the job by the City in accordance with the guarantee required by Subsection 6-8.1. 2-5 PLANS AND SPECIFICATIONS Subsection 2-5.1 of the Greenbook is replaced by the following subsection. 2-5.1 GENERAL The Contractor will maintain the following at the Work site: One as -built copy of the Plans and Specifications, in good order and marked to record current changes and selections made during construction. As -built plans are to be submitted to the City representative for approval prior to acceptance of the project as complete. 2. The current accepted Contract Schedule. 3. Shop Drawings, Product Data, and Samples. 4. Approved permits from other agencies, including Cal -OSHA permits for trench shoring. 5. All other required submittals. The Plans, Specifications, and other Contract Documents will govern the Work. The Contract Documents are intended to be complementary and cooperative and to describe and provide for a complete project. Anything in the Specifications and not on the Plans, or on the Plans and not in the Specifications, will be as though shown or mentioned in both. Payment for any items on the plans for which there are no specific bid item will be included in the various items of work or in any item to which it is appurtenant. If the Contractor performs any work which it knows or should know involves an error, inconsistency, or omission without notifying and obtaining written consent from the Engineer, the Contractor will be responsible for the resulting losses, including, without limitation, the costs of correcting defective work. 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS The following paragraph is added to subsection 2-5.2 of the Greenbook: As the figured dimensions shown on the plans and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions will be followed in preference to the scaled dimensions, and plans to a large scale will be II-B-5 Agreement No. 6367 followed in preference to the plans to a small scale. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract, the Contractor will apply to the Engineer for such further explanations as may be necessary, and will conform thereto as part of the Contract so far as may be consistent with the terms thereof. Any items shown on drawings and not mentioned in the specifications will be of like effect as if shown or mentioned in both. 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS Although it is believed that much of the information pertaining to conditions and existing utilities that may affect the cost of the Work will be shown on the Plans or indicated in the Specifications, the City does not warrant the completeness or accuracy of such information. The Contractor will carefully study and compare each of the Contract Documents with the others and with information furnished by the City and will promptly report in writing to the Engineer any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable law observed by the Contractor. The Contractor will take field measurements, verify field conditions, perform soil investigations, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to the Contractor before commencing the Work. Errors, inconsistencies, or omissions discovered at any time will be promptly reported in writing to the Engineer. 2-8 RIGHT-OF-WAY The following subsection is added to Subsection 2-8 of the Greenbook. 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES When the Contractor arranges for additional temporary work areas and facilities, the Contractor will provide the City with proof that the additional work areas or facilities have been left in a condition satisfactory to the owner(s) of said work areas or facilities before acceptance of the work. 2-9 SURVEYING Subsection 2-9.3, Survey Service, is deleted in its entirety and replaced by the following subsection: 2-9.3 SURVEY SERVICE 2-9.3.1 CONSTRUCTION SURVEYING The Contractor will provide for all construction surveying required to layout, monitor II-B-6 Agreement No. 6367 and complete the work. The surveying will be performed by a Land Surveyor or Civil Engineer authorized to practice land surveying by the State of California. The Project Benchmark is shown on the plans. The Contractor will establish all necessary control lines based on the plans and record information on file with the County of Los Angeles Surveyor and the Engineer. It is the responsibility of the Contractor to protect the survey control as shown on the plans. If the survey control is destroyed or disturbed during construction, the Contractor will provide for resetting them and file appropriate documents with the County of Los Angeles at the direction of the Engineer. Computations, survey notes, and other data used to accomplish the work will be neat, legible and accurate. Copies of all computations, survey notes, and other data (electronic format may be required) will be furnished to the Engineer before beginning work that requires their use. 2-9.3.2 MEASUREMENT AND PAYMENT Construction Survey — Unless a separate bid item is provided, payment will be considered included in the other items of the bid and no additional payment will be made therefore. 3-3.2.2 BASIS FOR ESTABLISHING COSTS Subsection 3-3.2.2 (c), Tool and Equipment Rental is modified where the second and third paragraphs are replaced with "Regardless of ownership, the rates to be used in determining the equipment usage costs will not exceed those listed for the same or similar equipment in the California State Department of Transportation publication of Labor Surcharge and Equipment Rates effective for the period of usage." 3-3.2.3 MARK UP Subsection 3-3.2.3, Mark Up, is deleted in its entirety and replaced by the following subsection: (a) Work by Contractor. The following percentages will be added to the Contractor's costs and will constitute the markup for all overhead and profits. 1) Labor............................................20 2) Materials......................................15 3) Equipment Rental .........................15 4) Other Items and Expenditures ...... 15 To the sum of the costs and markups provided for in this subsection, 1 percent will be added as compensation for bonding. No other formula, e.g., the Eichleay II-B-7 Agreement No. 6367 or other method, may be used to calculate daily damages for office overhead, profit, or other purported loss. (b) Work by Subcontractors. When all or any part of the extra work is performed by a Subcontractor, the markup established in 3-3.2.3(a) will be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor. (c) In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Bid Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 3-3.3 DAILY REPORTS BY CONTRACTOR Add the following paragraph to subsection 3-3.3, Daily Reports by Contractor: If disagreement continues regarding extra work, the Contractor may seek compensation in accordance with the Claims procedure. Daily Reports required by this subsection must be made part of the Claim as supporting data for the Claim. 3-4 CHANGED CONDITIONS Subsection 3-4, Changed Conditions, is deleted in its entirety and replaced with the following subsection: If the Contractor encounters concealed or unknown conditions that differ materially from those anticipated or expected ("changed conditions"), the Contractor will immediately notify the Engineer in writing of such changed conditions (upon discovery and before disturbing such changed conditions), as provided in Subsection 6-11, so that the Engineer can determine if such conditions require design details that differ from those design details shown in the Contract Documents. Notwithstanding the thirty (30) day time period set forth in Subsection 6-11.3, the Contractor will be liable to the City for any extra costs incurred as a result of the Contractor's failure to promptly give such notice. Changed conditions will include, without limitation, the following: Subsurface or latent physical conditions differing materially from those represented in the Contract Documents; 2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and II-B-8 Agreement No. 6367 3. Material differing from what is represented in the Contract which the Contractor believes may be hazardous waste as defined in California Health & Safety Code § 25117 that is required to be removed to a Class I, II, or III disposal site in accordance with applicable law. The Engineer will promptly investigate conditions that appear to be changed conditions. The Engineer's decision, and any dispute regarding that decision, will be made in accordance with Section 6-11 except that the Engineer will render a decision promptly. Any information provided pursuant to INFORMATION AVAILABLE TO BIDDERS is subject to the following provisions: The information is made available for the Bidders' convenience and is not a part of the Contract. 2. The City has not determined the accuracy or completeness of such information and all such information is made available to Bidders without any representation or warranty by the City whatsoever as to its accuracy, completeness, or relevancy. 3. Bidders will independently evaluate such information for their use and will be solely responsible for use or interpretation of such information. Any such use or interpretation will not be the basis of any claim against the City. 3-5 DISPUTED WORK Subsection 3-5 is deleted in its entirety and replaced by the following subsection. If the Contractor and the City do not reach agreement on disputed work, the City may direct the Contractor to proceed with the work. Any payment for the disputed work will be determined pursuant to the claims procedures in these Standard Specifications. Although not to be construed as proceeding under extra work provisions, the Contractor will keep and furnish records of disputed work as required by the Contract Documents. 4-1.3 INSPECTION REQUIREMENTS Subsection 4-1.3, Inspection Requirements, is deleted in its entirety and replaced by the following subsections. 4-1.3.1 GENERAL Unless otherwise specified, inspection at the source of production for such materials and fabricated items as bituminous paving mixtures, structural concrete, fabricated metal products, cast metal products, welding, reinforced and unreinforced concrete pipe, application of protective coatings, and similar shop and plant operations is not required. A certificate of compliance, signed by an authorized officer of the producer, certifying II-B-9 Agreement No. 6367 compliance with the contract documents will be submitted for all of the following materials: steel pipe, sizes less than 18 inches; vitrified clay pipe; asbestos cement pipe; cast iron pipe; reinforced concrete pipe; non -reinforced concrete pipe; and PVC sewer and water pipe; subject to sampling and testing by City. Standard items of equipment, such as electric motors, conveyors, plumbing fittings and fixtures, lumber, plywood, and so on, are subject to inspection at the job site. All other equipment items will be inspected and tested in accordance with the contract documents. The City does not provide full time inspection. The Contractor will provide 24-hour minimum notice for each inspection required by the work unless other arrangements have been agreed upon, in writing, with the City Engineer. Any inspection required outside of normal working hours and days, including holidays, will be at the Contractor's cost at rates established by the City. 4-1.3.2INSPECTION OF MATERIALS NOT PRODUCED LOCALLY Contractor purchased materials, fabricated items, and equipment, produced at sources located more than 50 miles outside the corporate limits of the City, and which are specified to be inspected in the Contract Documents, will be inspected by inspectors or testing laboratories arranged for and paid for by City. Report of such inspection must be submitted to the City. If any item inspected fails to meet the specified criteria, the Contractor will pay all costs for reinspection, and such costs may be deducted from payments due to the Contractor. 4-1.6 TRADE NAMES OR EOUALS Whenever any material, product, equipment, or service is specified by brand, trade, or proprietary name, the item so specified will be deemed to be followed by the words "or equal". For the City's consideration of a proposed "equal" item, the Bidder will submit, a minimum of ten (10) calendar days before the date of the bid opening, documentation of the particulars of the proposed "equal item". At a minimum, the submitted documentation will include: ■ Written request with explanation of why the product should be considered as an equal product. ■ Material specifications. ■ Technical specifications. ■ Test data. ■ Samples. ■ Comparison chart of key specifications of the "equal" item against similar specifications of the specified item. II-B-10 Agreement No. 6367 Work locations and reference telephone numbers of at least three (3) locations where the proposed "equal" item has been recently installed under similar conditions. ■ Warranty data. The Bidder will be notified by the Engineer whether or not the proposed "equal" product is acceptable to the City five (5) calendar days before the date of the bid opening. Failure to submit all required documentation and/or submittal of incomplete documents may result in the City's rejection of the proposed "equal" product without further consideration. 5-2 PROTECTION The following subsection is added to Subsection 5-2 of the Greenbook. 5-2.1 INCORRECT LOCATION OF UTILITIES If the Contractor, while performing the Work, discovers utility facilities not identified correctly or not shown in the contract plans or specifications by the City, the Contractor will immediately notify the City and utility owner in writing. 5-4 RELOCATION The following subsection is added to Subsection 5-4 of the Greenbook. 5-4.1 RESPONSIBILITY OF UTILITY REMOVAL OR RELOCATION The City will be responsible to arrange for the removal, repair, or relocation of existing utilities located within the project limits if such utilities are not correctly identified in the contract plans or specifications by the City. The City will have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation. 5-5 DELAYS The following paragraphs are added to Subsection 5-5 of the Greenbook. Actual loss, as used in this Subsection, will be understood to include no items of expense other than idle time of equipment and necessary payments for idle time of workers, cost of extra moving of equipment, and cost of longer hauls. Compensation for idle time of equipment and idle time of workers will be determined by Subsection 5-5.1 and no markup will be added in either case for overhead and profit. The cost of extra moving of equipment and the cost of longer hauls will be paid for as extra work. The following subsection is added to Subsection 5-5 of the Greenbook. II-B-11 Agreement No. 6367 5-5.1 CALCULATING IDLE TIME Equipment idle time will calculated in accordance with Subsection 3-3.2.2(c) and based upon the actual normal working time during which the delay condition exists, but in no case will exceed 8 hours in any one day. The days for which compensation will be paid will be the calendar days, excluding Saturdays, Sundays and legal holidays, during the existence of the delay. Worker idle time will be calculated in accordance with Subsection 3-3.2.2(a). 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK Section 6-1, Construction Schedule and Commencement of Work, is deleted in its entirety and replaced by the following subsections. Pre -Construction Meeting: After contract award, the City will arrange for a pre -construction meeting to discuss the construction of the project. City will invite utility agencies and the contractor will arrange for all of its sub -contractors to attend the meeting. 6-1.1 CONTRACT SCHEDULE After notification of award and before starting any work, the Contractor will submit a Contract Schedule to the Engineer for review, as required by these Specifications within fifteen (15) days of award. 6-1.2 CONTENT OF CONTRACT SCHEDULE The Contract Schedule, and any updated Contract Schedule, will meet the following requirements: 1. Schedules must be suitable for monitoring progress of the Work. 2. Schedules must provide necessary data about the time for the Engineer's decisions. 3. Schedules must be sufficiently detailed to demonstrate adequate planning for the Work. 4. Schedules must represent a practical plan to complete the Work within the Contract Time. 5. Schedules must show the critical path method for completing the Work. The Engineer's review of the form and general content of the Contract Schedule and any updated Contract Schedules is only for the purpose of determining if the listed requirements are satisfied, nothing more. II-B-12 Agreement No. 6367 6-1.3 EFFECT OF CONTRACT SCHEDULE The Contract Schedule, and any updated Contract Schedules, will represent a practical plan to complete the Work within the Contract Time. Extension of any schedule beyond the Contract Time will not be acceptable. Schedules showing the Work completed in less than the Contract may be acceptable if judged by the Engineer to be practical. Acceptance of such a schedule by the Engineer will not change the Contract Time. The Contract Time, not the Contract Schedule, will control in determining liquidated damages payable by the Contractor and in determining any delay. If a schedule showing the Work completed in less than the Contract Time is accepted, the Contractor will not be entitled to extensions of the Contract Time for Excusable Delays or Compensable Delays or to adjustments of the Contract Sum for Compensable Delays until such delays extend the completion of the Work beyond the expiration of the Contract Time. The Contractor will plan, develop, supervise, control, and coordinate the performance of the Work so that its progress and the sequence and timing of Work activities conform to the current accepted Contract Schedule. The Contractor will continuously obtain from Subcontractors information and data aboutthe planning for and progress of the Work and the delivery of equipment, will coordinate and integrate such information and data into updated Contract Schedules, and will monitor the progress of the Work and the delivery of equipment. The Contractor will act as the expeditor of potential and actual delays, interruptions, hindrances, or disruptions for its own forces and those forces of Subcontractors. The Contractor will cooperate with the Engineer in developing the Contract Schedule and updated Contract Schedules. The Engineer's review and comments about any schedule or scheduling data will not relieve the Contractor from its sole responsibility to plan for, perform, and complete the Work within the Contract Time. Review and comments about any schedule will not transfer responsibility for any schedule to the Engineer or the City nor imply their agreement with (1) any assumption upon which such schedule is based or (2) any matter underlying or contained in such schedule. The Engineer's failure to discover errors or omissions in schedules that have been reviewed, or to inform the Contractor that the Contractor, Subcontractors, or others are behind schedule, or to direct or enforce procedures for complying with the Contract Schedule will not relieve the Contractor from its sole responsibility to perform and complete the Work within the Contract Time and will not be a cause for an adjustment of the Contract Time or the Contract Sum. The Contractor will perform the Work in accordance with the currently accepted Contract Schedule. 6-1.4 COMMENCEMENT OF CONTRACT TIME II-B-13 Agreement No. 6367 The Contract Time will commence when the City issues a Notice to Proceed. The Work will start on the date specified in the Notice to Proceed and within a maximum of fifteen (15) days after the date of the Notice to Proceed, and be diligently prosecuted to completion with the time provided in the Specifications. 6-4 DEFAULT BY CONTRACTOR The language in subsection 6-4 is deleted in its entirety and replaced with the following subsections. 6-4.1 GENERAL Should the Contractor fail to begin delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fail to maintain the Work schedule (as determined by the current accepted Contract Schedule) which will ensure the City's interest, or if the Contractor is not carrying out the intent of the Contract, the City may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL OVER THE WORK The City may terminate the Contractor's control over the Work without liability for damages when, in the City's opinion, the Contractor is not complying in good faith, has become insolvent, or has assigned or subcontracted any part of the Work without the City's consent. Should such termination occur, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity and quality of the work completed and in place at the time of termination, less damages caused to the City by the Contractor's action or inaction. In the event of such termination of control, the City may do any one, or combination of, the following: 1. Serve written notice upon the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. In such event the Surety will, within 5 days, assume control and perform the Work as successor to the Contractor; 2. The City may perform the Work itself and deduct the cost thereof from any payment due to the Contractor; 3. The City may replace the Contractor with a different contractor to complete the work and deduct the cost thereof from any payment due to the Contractor. Nothing herein will waive, or serve as a limitation upon, any additional remedy the City may have under these Contract Documents or applicable law. II-B-14 Agreement No. 6367 6-4.3 SURETY'S ASSUMPTION OF CONTROL Should the Surety assume any part of the Work, it will take the Contractor's place in all respects for that part, and will be paid by the City for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default will be payable to the Surety as the Work progresses, subject to the terms of the Contract. If the Surety does not assume control and perform the Work within 5 days after receiving notice of cancellation, or fails to continue to comply, the City may exclude the Surety from the premises. The City may then take possession of all material and equipment and complete the Work by City's forces, by letting the unfinished work to another contractor, or by a combination of such methods. In any event, the cost of completing the Work will be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the City. If the sums due under the Contract are insufficient for completion, the Contractor or Surety will pay to the City within 5 days of completion, all costs in excess of the sums due. The provisions of this subsection will be in addition to all other rights and remedies available to the City under applicable law. 6-6 DELAYS AND EXTENSIONS OF TIME Subsections 6-6.1 to 6-6.4 are deleted and replaced with the following subsections. 6-6.1 GENERAL If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays except as otherwise provided herein. Excusable delay may include: war, earthquakes exceeding 3.5 on the Richter Scale, government regulation, labor disputes outside the contemplation of the parties, strikes outside the contemplation of the parties, fires, floods, changes to the Work as identified herein, or other specific events that may be further described in the Specifications. Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole will not warrant an extension of time. The City will not grant an extension of time for a delay by the Contractor's inability to obtain materials unless the Contractor furnishes to the Engineer documentary proof. The proof must be provided in a timely manner in accordance with the sequence of the Contractor's operations and accepted construction schedule. Should delays be caused by events other than those included herein, the Engineer may, II-B-15 Agreement No. 6367 but is not required to, deem an extension of time to be in the City's best interests. 6-6.2 EXTENSIONS OF TIME If granted, extensions of time will be based upon the effect of delays to the critical path of the Work as determined by the current accepted Contract Schedule. Delays to minor portions of the Work that do not affect the critical path will not be eligible for extensions of time. 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR Any payment for compensable delay will be based upon actual costs as set forth in Subsection 5-5 excluding, without limitation, what damages, if any, the Contractor may have reasonably avoided. The Contractor understands that this is the sole basis for recovering delay damages and explicitly waives any right to calculate daily damages for office overhead, profit, or other purported loss, using different formulas including, without limitation, the Eichleay Formula. 6-6.4 WRITTEN NOTICE AND REPORT If the Contractor desires payment for a delay or an extension of time, it will give the Engineer written notice of such request not later than the time limit set forth in the Proposal for submitting a claim after the event or occurrence giving rise to a delay claim. Failure to submit a written request within such amount of time will result in the Contractor waiving its delay claim. Any claim for payment or an extension of time must be in the form required by the "Claims" sections of these Specifications. In no event will the City grant the Contractor an extension of time if the delay is within the Contract Time as identified by the Contract Documents. 6-7.2 WORK DAYS AND WORKING HOURS City Hall is open from Monday thru Thursday lam -6pm. It is closed every other Friday and the following holidays: New Year's Day Martin Luther King, Jr. Day President's Day Memorial Day Independence Day Labor Day Veterans' Day Thanksgiving Christmas Eve II-B-16 Agreement No. 6367 Christmas New Year's Eve On workdays, Contractor's activities will be confined to the hours between 7:00 a.m. and 4:00 p.m. Please see Section 6-7.5 below for weekend and holiday work restrictions. 6-7.4 NIGHT WORK The following paragraph is added to Section 6-7 of the Greenbook: The City will not permit Work between the hours of 4 p.m. and 7 a.m. of the following day unless specifically provided for in the bid documents or unless the Contractor receives prior written approval. 6-7.5 WEEKEND AND HOLIDAY WORK The Engineer may, but is not required to, allow the Contractor to work on Saturdays, Sundays and City Holidays. 6-8 COMPLETION AND ACCEPTANCE Subsection 6-8 is deleted in its entirety and replaced by the following: The Work will be inspected by the Engineer for acceptance upon the Engineer receiving the Contractor's written assertion that the Work is complete. If, in the Engineer's judgment, the Work is complete and is ready for acceptance, the Engineer will accept the Work on behalf of the City in the manner prescribed by the City. The Engineer will recommend approval of the Notice of Completion to the City Council. This will be the date when the Contractor is relieved from responsibility to protect the Work. All work will be guaranteed by the Contractor against defective workmanship and materials furnished by the Contractor for a period of 1 year from the date the Work was completed. The Contractor will replace or repair any such defective work in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the City may perform this work and the Contractor's sureties will be liable for the cost thereof. 6-8.1 GENERAL GUARANTY The Contractor will remedy any defects in the work and pay for any damage to other work resulting therefrom, which will appear within a period of one year from the date of II-B-17 Agreement No. 6367 final acceptance of the work unless a longer period is specified. The owner will give notice of observed defects with reasonable promptness. 6-9 LIOUIDATED DAMAGES Subsection 6-9, Liquidated Damages, of the Greenbook is deleted in its entirety and replaced by the following subsections. 6-9.1 FAILURE TO COMPLETE WORK ON TIME If all the work called for under the contract is not completed before or upon the expiration of the Contract Time, the City will sustain damage. Since it is and will be impracticable to determine the actual damage which the City will sustain in the event of and by reason of such delay, it is therefore agreed that the Contractor will pay to the City the sum specified in the Proposal for each and every calendar day beyond the time prescribed to complete the work not as a penalty, but as a predetermined liquidated damage. The Contractor agrees to pay such liquidated damages as are herein provided, and in case the same are not paid, agrees that the City may deduct the amount thereof from any money due or that may become due to the Contractor under the contract. Unless otherwise specified, liquidated damages will be $250 per calendar day. 6-11 DISPUTES AND CLAIMS: PROCEDURE 6-11.1 GENERAL Consistent with PCC § 10240.6, "Claim" means a written demand or assertion by the Contractor that seeks an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, including a determination of disputes or matters in question between the City and the Contractor arising out of or related to the Contract Documents or the performance of the Work, and claims alleging an unforeseen condition or an act, error, or omission by the City, the Engineer, their agents or employees. "Claim" does not mean, and the Claims procedures herein do not apply, to the following: 1. Claims respecting penalties for forfeitures prescribed by statute or regulations, which a government agency is specifically authorized to administer, settle, or determine. 2. Claims respecting personal injury, death, reimbursement, or other compensation arising out of or resulting from liability for personal injury or death. 3. Claims respecting a latent defect, breach of warranty, or guarantee to repair. 4. Claims respecting stop notices. If a Claim is subjectto the Change Order procedures, the Claim arises upon the issuance of a written final decision denying in whole or in part the Contractor's Change Order Request. If a Claim is not subj ect to the Change Order Procedures, the Claim arises when II-B-18 Agreement No. 6367 the Contractor discovers, or reasonably should discover, the condition or event giving rise to the Claim. 6-11.2 FORM A Claim must include the following: A statement that it is a Claim and a request for a decision. 2. A detailed description of the act, error, omission, unforeseen condition, event or other condition giving rise to the Claim. 3. If the Claim is subject to the Change Order procedures, a statement demonstrating that a Change Order Request was timely submitted and denied. 4. A detailed justification for any remedy or relief sought by the Claim, including to the extent applicable, the following: a) If the Claim involves extra work, a detailed cost breakdown claimed. The breakdown must be provided even if the costs claimed have not been incurred when the Claim is submitted. b) To the extent costs have been incurred when the Claim is submitted, the Claim must include actual cost records (including, without limitation, payroll records, material and rental invoices) demonstrating that costs claimed have actually been incurred. c) To the extent costs have not yet been incurred at the time the Claim is submitted, actual cost records must be submitted on a current basis not less than once aweek during any periods costs are incurred. A cost record will be considered current if submitted within 7 days of the date the cost reflected in the record is incurred. At the Engineer's request, claimed extra costs may be subject to further verification procedures (such as having an inspector verify the performance of alleged extra work on a daily basis). 5. If the Claim involves an error or omission in the Contract Documents: a) An affirmative representation that the error or omission was not discovered before submitting a bid for the Contract; and b) A detailed statement demonstrating that the error or omission reasonably should not have been discovered by the Contractor, its Subcontractors and suppliers, before submitting a bid for the Contract. 6. If the Claim involves an extension of the Contract Time, written documentation II-B-19 Agreement No. 6367 demonstrating the Contractor's entitlement to a time extension. 7. If the Claim involves an adjustment of the Contract Sum for delay, written documentation demonstrating the Contractor's entitlement to such an adjustment. 8. A personal certification from the Contractor that reads as follows: "I, , BEING THE (MUST BE AN OFFICER) OF (CONTRACTOR NAME), DECLARE UNDER PENALTY OF PERJURY UNDER CALIFORNIA LAW, AND DO PERSONALLY CERTIFY AND ATTEST THAT I HAVE THOROUGHLY REVIEWED THE ATTACHED CLAIM FOR ADDITIONAL COMPENSATION OR EXTENSION OF TIME, AND KNOW ITS CONTENTS, AND SAID CLAIM IS MADE IN GOOD FAITH; THE SUPPORTING DATA IS TRUTHFUL AND ACCURATE; THAT THE AMOUNT REQUESTED ACCURATELY REFLECTS THE CONTRACT ADJUSTMENT FOR WHICH THE CONTRACTOR BELIEVES CITY IS LIABLE; AND, FURTHER, THAT I AM FAMILIAR WITH CALIFORNIA PENAL CODE § 72 AND CALIFORNIA GOVERNMENT CODE § 12650, ET SEQ., PERTAINING TO FALSE CLAIMS, AND FURTHER KNOW AND UNDERSTAND THAT SUBMITTING OR CERTIFYING A FALSE CLAIM MAY LEAD TO FINES, IMPRISONMENT, AND OTHER SEVERE LEGAL CONSEQUENCES." 6-11.3 CLAIMS SUBMITTED TO ENGINEER Within 30 days after the circumstances giving rise to a Claim occur, the Contractor will submit its Claim to the Engineer for a decision. Regardless of any Claim submittal, or any dispute regarding a Claim, unless otherwise directed by the Engineer, the Contractor will not cause any delay, cessation, or termination of the Work, but will diligently proceed with the performing the Work in accordance with the Contract Documents. Except as otherwise provided, the City will continue to make payments in accordance with the Contract Documents. 6-11.4 CLAIM IS PREREQUISITE TO OTHER REMEDY The Contractor certifies that it is familiar with PCC § 10240.2 and understands and agrees that submitting a Claim in accordance with these Specifications is an express condition precedent to the Contractor's right to otherwise pursue a claim whether through alternative dispute resolution or by litigation. Should the Contractor fail to submit a claim in accordance with these Specifications, including the time limits set forth herein, it will waive any right to a remedy, whether in law or equity, it might otherwise have pursuant to the Contract Documents or applicable law. II-B-20 Agreement No. 6367 6-11.5 DECISION ON CLAIMS The Engineer will promptly review Claims submitted by the Contractor in accordance with these Specifications. Should the Engineer require additional supporting evidence to evaluate the claim, the Engineer will request such additional information in writing. Any such requested data will be furnished not later than 10 days after the Contractor receives the Engineer's request. The Engineer will render a decision not later than 60 days after either receiving the Claim or the deadline for furnishing additional supporting data, whichever is later. If the Engineer fails to render a decision within the time period established herein, then the Claim will be deemed denied. The Engineer's decision will be final and binding unless appealed in accordance with these Specifications. The Engineer's decision on a Claim will include a statement substantially as follows: "This is a decision pursuant to the General Specifications of your contract. If you are dissatisfied with the decision, and have complied with the procedural requirements for asserting claims, you may have the right to alternative dispute resolution or litigation. Should you fail to take appropriate action within 30 days of the date of this decision, the decision will be come final and binding and not subject to further appeal." 6-11.6 APPEAL OF ENGINEER'S DECISION Should the Contractor dispute the Engineer's decision, then the Contractor must appeal that decision to the City's Public Works Director within 30 days of receiving the Engineer's decision. The Public Works Director will address disputes or claims within 30 calendar days after receiving such request and all necessary supporting data. The Public Works Director's decision on the dispute or claim will be the City's final decision. If the Contractor disputes the Public Works Director's decision, then the Contractor must demand alternative dispute resolution in accordance with this Section and the PCC within 30 days of the City's final decision. 6-11.7 MEDIATION If the City and the Contractor agree, disputes between the parties may be submitted to non -binding mediation. If the parties cannot agree to an alternative form of mediation, then mediation will be administered by the American Arbitration Association ("AAA") under its Construction Industry Mediation Rules, unless the use of such rules are waived by mutual stipulation of both parties. The parties may, but are not required to be, represented by counsel in mediation. II-B-21 Agreement No. 6367 The requirement for mediation will not alter or modify the time limitations otherwise provided for claims and no conduct or settlement negotiation during mediation will be considered a waiver of the City's right to assertthat claim procedures were not followed. 6-11.8 ARBITRATION If the City and Contractor do not agree to mediation, then a disputes will be submitted to neutral non -binding (except as provided herein) arbitration. Arbitration will be conducted in accordance with PCC § 10240.3. Any decision rendered by an arbitrator will be consistent with PCC § 10240.8. The exclusive venue for any arbitration will be in Los Angeles County. The expenses and fees of the arbitrators and the administrative fees, if any, will be divided among the parties equally. Each party will pay its own counsel fees, witness fees, and other expenses incurred for its own benefit. 6-11.9 WHEN ARBITRATION DECISION BECOMES BINDING The decision rendered by the arbitrator will become binding upon the parties unless appealed to the Los Angeles County Superior Court pursuant to PCC § 10240.12 within 30 days of the decision. If subsequent litigation results in an award to the party appealing the arbitration that is less than or equal to that of the arbitration decision, or if the litigation results in a decision in favor of the nonappealing party, then the party appealing the arbitration will pay the nonappealing party's attorney's fees and court costs. 6-11.10 APPEAL TO SUPERIOR COURT, WAIVER OF JURY TRIAL Should aparty timely object to the arbitration decision, it may file apetition with the Los Angeles County Superior Court in accordance with California Code of Civil Procedure ("CCP") §§ 1285, et seq. Notwithstanding the limitations set forth in CCP § 1286.2, the court may vacate, correct, or adjust an arbitration award, and enter judgment in accordance with CCP § 1287.4, for any legal or equitable basis including, without limitation, error of law. The court will apply the substantial evidence standard of review when considering the appeal of an objecting party. BY EXECUTING THESE CONTRACT DOCUMENTS, THE CONTRACTOR AGREES TO HAVE DISPUTES OR CONTROVERSY CONCERNING THE CONSTRUCTION, INTERPRETATION, PERFORMANCE, OR BREACH OF THESE CONTRACT DOCUMENTS, INCLUDING CLAIMS FOR BREACH OF CONTRACT OR ISSUES OF BAD FAITH DECIDED IN ACCORDANCE WITH THIS SECTION 6-11. BOTH THE CITY AND THE CONTRACTOR WAIVE THEIR RIGHT TO A JURY TRIAL FOR THESE DISPUTES OR ISSUES. II-B-22 Agreement No. 6367 6-11.11 AB 626 CLAIMS PROCESS Claims made by a Contractor for one or more of the following are subject to the claim resolution process set forth in Public Contract Code section 9204: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by the city under a contract for a public works project. (B) Payment by the city of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the city. 7-2 LABOR The following subsections are added to Subsection 7-2 of the Green Book. 7-2.3 PREVAILING WAGES The Contractor will post at appropriate conspicuous points at the site of the project a schedule showing determinations of the Director of Industrial Relations of the prevailing rate of per diem wages. It will be the Contractor's responsibility to obtain copies of the prevailing rate of per diem wages. One source that may be used is the California Department of Industrial Relations website which is currently located atwww.dir.ca.gov, or by calling the Prevailing Wage Unit at (415) 703-4774. Attention is directed to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by the Contractor or any subcontractor. Labor Code § 1777.5 requires the Contractor or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearestthe site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except: a) When employment in the area of coverage by the j oint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or b) When the number of apprentices in training in the area exceeds a ratio of one to five, or c) When the trade can show that it is replacing at least 1/30 of its membership II-B-23 Agreement No. 6367 through apprenticeship training on an annual basis state-wide or locally, or d) When the Contractor provides evidence that the Contractor employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. The Contractor is required to make contributions to funds established for the administration of apprenticeship programs if the Contractor employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. The Contractor and any subcontractor will comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. 7-2.4 RECORD OF WAGES PAID: INSPECTION Every Contractor and subcontractor will keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with the Work. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by the City, the Contractor will provide copies of the records at its cost. 7-3 LIABILITY INSURANCE Subsection 7-3, Liability Insurance, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-3.1 GENERAL Contractor will procure and maintain for the duration of the contract the following insurance coverages and limits against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work covered by this agreement by the Contractor, its agents, representatives, employees or subcontractors: COVERAGE PER ISO FORM COMBINED OCCURRENCE SINGLE LIMIT Comprehensive General Liability CL 00 02 01 85 or 88 $2,000,000 Business Auto CA 00 0101 87 $1,000,000 II-B-24 Agreement No. 6367 Workers' Compensation Statutory Contractor will provide endorsements or other proof of coverage for contractual liability. Combined single limit per occurrence will include coverage for bodily injury, personal injury, and property damage for each accident. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the policy will be endorsed such that the general aggregate limit will apply separately to this contract and a copy of the endorsement provided to the City. Liability policies will contain, or be endorsed to contain the following provisions: GENERAL LIABILITY AND AUTOMOBILE LIABILITY: The City, its officers, officials, employees, agents, and volunteers will be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage will contain no special limitations on the scope or protection afforded to the City, its officers, officials, employees, agents, or volunteers. The Contractor's insurance coverage will be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, and volunteers will be excess of the Contractor's insurance and will not contribute with it. The insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. Any failure to comply with reporting provisions of the policies will not affect coverage provided to the City, its officers, officials, employees, agents and volunteers. The Contractor's insurance will apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. WORKERS' COMPENSATION: The insurer will agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. ALL COVERAGES: Each insurance policy required by this subsection will be endorsed to state that coverage II-B-25 Agreement No. 6367 will not be suspended, voided, cancelled by either parry, reduced in coverage or in limits except after thirty (30) days written notice by certified mail, return receipt requested, has been given to: CITY CLERK City of El Segundo 350 Main Street El Segundo, CA 90245 Notwithstanding the foregoing, the endorsement may state that insurance may be cancelled upon ten (10) day notification for non-payment of premium. The Contractor will provide the City with updated proof of insurance should the Contract Time extend beyond the policy expiration date. All liability insurance will be on an occurrence basis. Insurance on a claims made basis will be rejected. Any deductibles or self -insured retentions will be declared to and approved by City. The insurer will provide an endorsement to City eliminating such deductibles or self -insured retentions as respects the City, its officials, employees, agents, and volunteers. Except for Workers Compensation Insurance, Contractor will furnish to City certificates of insurance and endorsements on forms acceptable to the City's City Attorney, duly authenticated, giving evidence of the insurance coverages required in this contract and other evidence of coverage or copies of policies as may be reasonably required by City from time to time. Endorsements must be supplied on ISO Form No. CG 20 10 1185, or equivalent. Certificate/endorsement for Workers Compensation Insurance will be furnished on State Comp Fund or other industry standard form. Except for worker's compensation insurance, all insurance required herein will be placed with insurers with a Best's Rating of not less than AXII. Worker's compensation insurance policies will meet the requirements of California law. All subcontractors employed on the work referred to in this contract will meet the insurance requirements set forth for Contractor. Contractor will furnish certificates of insurance and endorsements for each subcontractor at least five days before the subcontractor entering the job site, or Contractor will furnish City an endorsement including all subcontractors as insureds under its policies. Except as provided in Subsection 6-10, the Contractor will save, keep and hold harmless the City, its officers, officials, employees, agents and volunteers from all damages, costs or expenses in law or equity that may at any time arise or be claimed because of damages to property, or personal injury received by reason of or in the course of performing work, which may be caused by any willful or negligent act or omission by the Contractor or any of the Contractor's employees, or any subcontractor. The City will not be liable for any accident, loss or damage to the work before its completion and acceptance, except as provided in Subsection 6-10. II-B-26 Agreement No. 6367 The cost of such insurance will be included in the various items of work in the Contractor's bid and no additional compensation for purchasing insurance or additional coverage needed to meet these requirements will be allowed. In the event that any required insurance is reduced in coverage, cancelled for any reason, voided or suspended, Contractor agrees that City may arrange for insurance coverage as specified, and Contractor further agrees that administrative and premium costs may be deducted from payments due to the Contractor. Contractor will not be allowed to work until alternate coverage is arranged. Coverage will not extend to any indemnity coverage for the active negligence of the additional insured if the agreement to indemnify the additional insured would be invalid under Civil Code § 2782(b). 7-3.2 INDEMNIFICATION AND DEFENSE In addition to the provisions of Subsection 7-3 of the Greenbook as between the City and Contractor, Contractor will take and assume all responsibility for the work as stated herein or shown on the plans. The Contractor will bear all losses and damages directly or indirectly resulting to it, to the City, its officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents, traffic control, job site maintenance, or any other causes whatsoever. The Contractor will assume the defense of and indemnify and save harmless the City of El Segundo, its officers, employees, and agents, from and against any and all claims, losses, damage, expenses and liability of every kind, nature, and description, directly or indirectly arising from the performance of the contract or work, regardless of responsibility for negligence, and from any and all claims, losses, damage, expenses, and liability, howsoever the same may be caused, resulting directly, or indirectly from the nature of the work covered by the contract, regardless of responsibility for negligence, to the fullest extent permitted by law. In accordance with Civil Code § 2782, nothing in this Subsection 7-3.2 or in Subsection 7-3 of the Standard Specifications will require defense or indemnification for death, bodily injury, injury to property, or any other loss, damage or expense arising from the sole negligence or willful misconduct of the City, or its agents, servants or independent contractors who are directly responsible to the City, or for defects in design furnished by such persons. Moreover, nothing in this Subsection 7-3.2 or in Subsection 7-3 will apply to impose on the Contractor, or to relieve the City from, liability for active negligence of the City. The City does not, and will not, waive any rights against the Contractor which it may have by reason of the aforesaid hold harmless agreements because of the acceptance by the City, or deposit with City by Contractor, of any insurance policies described in Subsection 7-3 of the Special Provisions. This hold harmless agreement by the Contractor will apply to all damages and claims for damages of every kind suffered, or II-B-27 Agreement No. 6367 alleged to have been suffered by reasons of any of the aforesaid operations of Contractor, or any subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages. No act by the City, or its representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, will in any respect relieve the Contractor or anyone else from any legal responsibility, obligation or liability he might otherwise have. 7-5 PERMITS The following paragraph will be added to Subsection 7-5 of Greenbook: The Contractor will apply for permits required by the City Building Safety Division. These permits will be issued on a "no -fee" basis. However, the Contractor must pay for and obtain all other permits from other governmental and utility agencies necessitated by their operations. All bonding fees, (overweight and oversized vehicle permit fees) inspection permit fees or other fees charged or required for such permits must be paid by the Contractor. These costs will be included in the bid item provided. If no bid item is included, costs will be included in the various items of work, and no additional payment will be allowed. 7-8.1 CLEANUP AND DUST CONTROL Subsection 7-8.1, Cleanup and Dust Control, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-8.1.1 GENERAL On any construction project requiring trenching within public streets and for which total trenching is in excess of 500 feet, the Contractor will be required to sweep the worksite utilizing a pick-up type street sweeper a minimum of once daily. 7-8.1.2 WATERING Water for the laying of dust caused by Contractor's operations or the passage of traffic through the work will be applied as necessary or as directed by the Engineer. Water for the above or other purposes may be obtained from any approved source. If the Contractor chooses to use a City fire hydrant upon placing a $300 meter deposit and the payment of a $50 service fee, the Engineer will cause a meter to be installed. All water used from the hydrant will be metered and charged to the Contractor at the prevailing rate plus the current daily meter rental rate. The Contractor will be charged a $15 reconnect fee if the Contractor wishes to move the meter to a different hydrant. Costs of water to be used will be included in the cost of various bid items. II-B-28 Agreement No. 6367 7-8.6 WATER POLLUTION CONTROL This section is supplemented by the addition of the following requirements which establish storm water and urban runoff pollution prevention controls. (a) Storm or construction generated water containing sediment such as, construction waste, soil, slurry from concrete/asphalt concrete saw cutting operations, clean UP of concrete transit mixers or other pollutants from construction sites and parking areas will be retained or controlled on site and will not be permitted to enter the storm drain system. (b) Temporary sediment filtering systems such as sandbags, silt fences, or gravel berms will be utilized to trap sediment so that only filtered water enters the City's storm drain system. Proper clean up and disposal of settled sediment and the filtering system will be the responsibility of the CONTRACTOR. (c) Discharge of concrete transit mixer wash water on to approved dirt areas (sub - grade area designated for new concrete construction for example) is acceptable. Discharge on to private property, parkway areas, or the street is not permitted. (d) Plastic or other impervious covering will be installed where appropriate to prevent erosion of an otherwise unprotected area, along with any other runoff control devices deemed appropriate by the City. (e) Excavated soil stored on the site will be covered in a manner that minimizes the amount of sediments running into the storm drain system, street or adjoining properties. (f) No washing of construction or other industrial vehicles and equipment will be allowed adjacent to a construction site. During the rainy season (October 15 to April 15), Contractor will keep at the construction site sufficient materials and labor to install temporary sediment filtering systems and other water pollution prevention control measures. These control measures will be in place and maintained by the Contractor on a daily basis on days when construction is not in progress due to rain. (h) All costs associated with water pollution control will be borne by the Contractor. Any expense incurred by the City to expeditiously respond to storm drain contamination resulting from Contractor's failure to implement water pollution control measures will be charged to the Contractor. 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS Section 7-9 is supplemented by the following additional requirements: Where existing traffic striping, pavement markings, and curb markings are damaged or II-B-29 Agreement No. 6367 their reflectively reduced by the Contractor's operations, such striping or markings will also be considered as existing improvements and the Contractor will replace such improvements. Relocations, repairs, replacements, or re -establishments will be at least equal to the existing improvements and will match such improvements in finish and dimensions unless otherwise specified. 7-10 PUBLIC CONVENIENCE AND SAFETY Section 7-10 is supplemented by the following additional requirements: Unless otherwise specified all traffic control will be performed in accordance with the Work Area Traffic Control Handbook (WATCH) Latest Edition, published by Building News, 3055 Overland Avenue, Los Angeles, CA 90034, telephone 310-474-7771. 7-10.1 TRAFFIC AND ACCESS The Contractor will notify the occupants of all affected properties at least 48 hours prior to any temporary obstruction of access. Vehicular access to property line will be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer. At least one (1) twelve (12) foot wide traffic lane will be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The traffic lanes will be maintained on pavement, and will remain unobstructed. All work requiring that a lane be closed or a lane moved right or left will be noticed to the traveling public by use of City approved lighted arrow boards. Clearances from traffic lanes will be five feet to the edge of any excavation and 2 feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction. One four (4) foot wide paved pedestrian walkway will be maintained in the parkway area on each side of all streets. The clearance from the pedestrian walkway to any traffic lane will be five (5) feet. Pedestrians and vehicles will be protected from all excavations, material storage, and/or obstructions by the placement of an adequate number of lighted barricades (minimum two (2)) at each location, one (1) at each end of the obstruction or excavation), which will have flashing lights during darkness. Barricades will be Type I or Type 11 per Section 7-3 and lights will be Type A per Section 7-6 of the "Work Area Traffic Control Handbook" (WATCH). 7-10.2 STREET CLOSURES, DETOURS, BARRICADES Street closures will not be allowed except as specifically permitted by the Engineer. The Contractor will prepare any traffic control or detour plans that may be required as II-B-30 Agreement No. 6367 directed by the Engineer. Lane transitions will not be sharper than a taper of thirty (30) to one (1). Temporary traffic channelization will be accomplished with barricades or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor will prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed on finish pavement surfaces, which are to remain. Where access to driveway or street crossings need to be maintained, minimum 1 1/4 inch thick steel plating will be used to bridge the trench. All steel plating will have temporary asphalt concrete 1:12 minimum sloped ramps to assist vehicles to cross comfortably over the plates and have a non-skid surface. Plates subject to vehicle high traffic speeds and in residential areas will be secured by welding at the discretion of the Engineer. 7-10.5 PROTECTION OF THE PUBLIC It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor will use foresight and will take such steps and precautions as his operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the Project which will require that immediate and unusual provisions be made to protect the public from danger or loss of life, or damage to life and property, due directly or indirectly to prosecution of work under this contract. Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor's operations and when, in the opinion of the Engineer, immediate action will be considered necessary in order to protect the public or property due to the Contractor's operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation immediately, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer, may seem reasonable and necessary. The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, will be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. Such remedial measures by the City will not relieve the Contractor from full responsibility for public safety. II-B-31 Agreement No. 6367 7-15 HAZARDOUS MATERIAL The following Subsection will be added to Section 7 of the Greenbook: For any excavation, which extends more than four feet below existing grade, the Contractor will promptly, and before the conditions are disturbed, notify the Engineer, in writing, of 1) any material that the Contractor believes may be hazardous waste, as defined in Health and Safety Code § 25117, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law, 2) subsurface or latent physical conditions at the site differing from those indicated, or 3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. After receiving notice from the Contractor, the Engineer will promptly investigate any condition identified by the Contractor as being hazardous. The rights and obligations of the City and the Contractor with regard to such conditions (including, without limitation, the procedures for procuring change orders and filing claims) will be specified by the provisions of Subsection 3-4 (Changed Conditions) of the Greenbook. If a dispute arises between the City and the Contractor whether the conditions materially differ, involve hazardous waste, or cause a change in the Contractor's cost or time required for performance of the work, the Contractor will not be excused from any scheduled completion date provided for by the contract, but will proceed with all work to be performed under the contract. The Contractor will retain all rights provided by Subsection 3-5, Disputed Work, of the Greenbook. If the Engineer determines that material called to the Engineer's attention by the Contractor is hazardous waste, or if the Engineer otherwise discovers the existence of hazardous waste, the Contractor will be responsible for removal and disposal of the hazardous waste by qualified personnel and appropriate equipment in the manner required by law as directed by the Engineer, subject to the provisions of Section 3 (Changes in Work) of the Greenbook. 9-2 LUMP SUM WORK Subsection 9-2, Lump Sum Work, of the Greenbook is deleted in its entirety and replaced by the following: Items for which quantities are indicated as "Lump Sum," "L. S.," or "Job" will be paid for at the price indicated in the Proposal. Such payment will be full compensation for all costs for labor, equipment, materials and plant necessary to furnish, construct and install the lump sum item of work, complete, in place, and for all necessary appurtenant work, including, but not limited to, all necessary cutting, patching, repair and modification of existing facilities, and clean up of site. II-B-32 Agreement No. 6367 Contractor will furnish three copies of a detailed schedule, which breaks down the lump sum work into its component parts and cost for each part, in a form and sufficiently detailed as to satisfy Engineer that it correctly represents a reasonable apportionment of the lump sum. This schedule is subject to approval by Engineer as to both the components into which the lump sum item is broken down, and the proportion of cost attributable to each component. This schedule will be the basis for progress payments for the lump sum work. 9-3.2 PARTIAL AND FINAL PAYMENTS The text of Subsection 9-3.2 of the Standard Specifications is hereby deleted and replaced with the following: The closure date for the purpose of making partial progress payments will be the last working day of each month. The Contractor will prepare the partial payment invoice with measurement of the work performed through the closure date and submit it to the CITY for approval. When work is complete, the Contractor will determine the final quantities of the work performed and prepare the final progress payment, and submit it to the Engineer for approval. It will take a minimum of thirty-five (35) calendar days from the date of approving the Contractor's invoice to make the payment to the Contractor. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents, or legal release of filed Stop Payment Notices against the Contractor. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as -built conditions. The full five percent (5%) retention will be deducted from all progress payments. The Contractor will make a payment request for the retained amount, for approval by the City, upon field acceptance of the work by the City Engineer. The City Engineer upon field acceptance and receipt of the final as -built plans and any other reports or documents required to be provided by the Contractor will process a recommendation to the City Council for acceptance of the work. Not less than thirty-five (35) calendar days from the City Council acceptance of the work, the Contractor's final payment will be made provided Stop Payment Notices or other claims have not been filed against the Contractor and/or the City by material suppliers, sub -contractors, other governmental agencies, and private property owners. Until these Stop Payment Notices are released and claims are resolved the stop payment/claim amount will be withheld from the final payment. The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety or equal value. II-B-33 Agreement No. 6367 At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer, or a State or Federally chartered bank, as the escrow agent, who will pay such surety to the Contractor upon satisfactory completion of the contract. Pursuant to PCC § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, that any such election will be at the Contractor's own expense and will include costs incurred by the City to accommodate the Contractor's request. Progress payment paid by the City as contemplated herein, will be contingent upon the Contractor submitting, in addition to any additional documents, an updated Contract Schedule in the form prescribed by these Contract Documents. Failure of the Contractor to submit an acceptable updated Contract Schedule will result in the City withholding partial payment, without liability to the City, until such an acceptable updated Contract Schedule is submitted. Nothing herein will allow the Contractor to suspend or slow progress of the Work. A City Council resolution established a Project Payment Account, encumbered money in the current budget, and assigned that money to the Prcj ect Payment Account which is the sole source of funds available for payment of the Contract Sum. Contractor understands and agrees that Contractor will be paid only from this special fund and if for any reason this fund is not sufficient to pay Contractor, Contractor will not be entitled to payment. The availability of money in this fund, and City's ability to draw from this fund, are conditions precedent to City's obligation to make payments to Contractor. 9-3.3 DELIVERED MATERIALS Materials and equipment delivered or stored, but not incorporated into the work, will not be approved for progress payments. 100-1 TERMINATION OF AGENCY LIABILITY Before receiving final payment, the Contractor will execute a Release on Contract" form which will operate as, and will be a release to the City, the City Council, and each member of the City Council and their agencies, from all claims and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act of neglect of the City of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided in Subsections 9-3 of the Standard Specifications and except for any unsettled claims listed on said form which have been filed in compliance with the requirements for making claims. - END OF SECTION - II-B-34 Agreement No. 6367 SECTION III — SPECIAL PROVISIONS 1-0. GENERAL 1-1. GENERAL STANDARDS a. All work shall be performed in accordance with the latest edition of the Standard Specifications for Public Works Construction, including supplements thereto, the Standard Plans for Public Works Construction, and The Los Angeles County Sanitation District Standards or as specified herein. b. Strict compliance with Federal, State and local safety codes will be enforced. c. All CCTV operators shall be National Association of Sewer Service Companies (NASSCO) certified by passing the three day Pipeline Assessment and Certification Program (PACP). The methodology of evaluation, data collection, and reporting criteria used for the NASSCO certification shall be practiced for all CCTV evaluations in this Contract. d. The CONTRACTOR's supervisors must be able to communicate both verbally and in writing with the City of El Segundo staff and his/her crew. The CONTRACTOR's supervisor must demonstrate the capability to read, interpret, and understand the Safety/OSHA requirements, City of El Segundo's plans and specifications. e. If applicable, copies of material/weight certification shall be submitted to the inspector daily. f. The Engineer's decision shall be final as to interpretation and/or conflict between any of the referenced code, laws, ordinances, specifications and standards contained herein. 1-2. GENERAL SCOPE OF WORK The work to be done consists of obtaining all permits; complying with all applicable laws and permit requirements; setting up and maintaining traffic control; cleaning and inspecting the interior of 6"- through 27-diameter sewers at various locations in the vicinity of the City of El Segundo, as shown on the enclosed drawings using a color, closed circuit television camera; recording the entire inspection on DVDs; preparing inspection reports; and submitting the final product to the City of El Segundo. The order of sewer inspection shall be subject to the approval of the City of El Segundo. In general, the CONTRACTOR shall perform the work in the arterial streets first. Written inspection logs shall accompany the video inspection recordings for each sewer reach (manhole to manhole) inspected. The purpose of the inspections shall be to provide a permanent record of existing conditions, including line dimensions, materials, obstructions, breakage, connections, deterioration, etc. The CONTRACTOR shall adhere to the system of sewer defect classification specified herein. The total length of sewer lines to be cleaned and inspected is approximately 271,441 linear feet. The City of El Segundo may increase or decrease the actual length to be inspected by up to 20 percent based upon bid prices. 111-A-1 Agreement No. 6367 1-3. EXAMINATION OF JOB SITE The BIDDER shall make a detailed physical inspection of the site before submitting his/her proposal. It is understood that the BIDDER has satisfied himself/herself regarding existing conditions and existing access conditions which may affect bid prices for the proposed work. 1-4. INSPECTION On all questions relating to quantities, the acceptability of material, or work, the execution, progress or sequence of work and the interpretation of specifications or plans, the decision of the Engineer is final and binding, and shall be precedent to any payment under the contract. All work and materials are subject to inspection and approval of the Engineer. Inspection of the work shall not relieve the CONTRACTOR of the obligations to fulfill all conditions of the contract. 1-5. WORKING DAYS, TIME FOR COMPLETION, CONSTRUCTION SEQUENCE CONTRACTOR will commence work on date specified in the Notice to Proceed to be issued to said CONTRACTOR by the Public Works Department of CITY and will complete work on the PROJECT, within 60 (sixty) WORKING DAYS after the date of commencement. Hours of work shall be limited to: • 7:00 AM to 5:00 PM on residential streets and • 9:00 AM to 3:00 PM on major and collector streets • Weekdays only, unless otherwise approved by the City Engineer. The last two weeks of December is a moratorium period, from December 21, 2022, 7:00 am to January 3, 2022, 7:00 pm, during which no construction work shall occur on City streets or other public right-of-way. 111-A-2 Agreement No. 6367 1-5. NOTIFICATIONS The CONTRACTOR will notify all agencies listed here in a minimum of forty-eight (48) hours before start of operation. The following list of names and telephone numbers are intended for the convenience of the CONTRACTOR and the City does not guarantee either the completeness or correctness of this list. OPERATION 1. Start of work, shutdown of work, or resumption of work after shutdown 2. Closing of streets 3. Street striping 3. Water/Sewer/ Storm Drain OFFICE TELEPHONE Floriza Rivera, Public Works Staff 310-524-2361 Ron Campbell, Wastewater Div. Supervisor 310-524-2754 Lifan Xu, City Engineer 310-524-2368 Elias Sassoon, Director of Public Works 310-524-2356 El Segundo Police Department** 310-524-2200 El Segundo Fire Department** 310-524-2236 Street Maintenance Division 310-524-2709 Anthony Esparza / Ron Campbell / Ron Fajardo 310-524-2742 * * The CONTRACTOR will notify the Engineering Division before notifying these offices. The following information is provided for CONTRACTOR'S use to notify agencies if their facilities are affected by CONTRACTOR'S work: 1. Underground Service Alert (all excavation in public right-of-way) 800-227-2600 2. City of El Segundo — Water Division 310-524-2742 3. City of El Segundo - Wastewater Division 310-524-2754 4. City of El Segundo - Recreation and Parks 310-524-2707 5. Southern California Gas Company 310-671-9002 6. Southern California Edison Company (SCE) 310-417-3366 7. AT&T 310-515-4430 8. Time Warner Communication (Cable) 310-768-0400 Extension 414 9. Los Angeles County Sanitation District 310-699-7411 10. El Segundo Unified School District 310-615-2650 III-A-3 Agreement No. 6367 1-6. MOBILIZATION Mobilization shall conform to the provisions of Section 9-3.4 of the Standard Specifications. The scope of work under mobilization includes but is not limited to: 1. Obtaining all required permits to complete the project 2. Moving on to the site of all Contractor's equipment required for operations 3. Installing and removing all temporary facilities required for operations 4. Posting all OSHA required notices 5. Submittal of Construction Schedule, Contractor Contact List, and Notices to Residents for City approval 6. Notification of property owners, residents, businesses and motorists as necessary 7. Re -notification of all affected parties for all construction schedule changes 8. Participate in and provide updated 2-week look -ahead schedules for weekly project field meetings 9. Traffic control as required per W.A.T.C.H. manual and CA MUTCD 10. Preparation and cleaning of work area as necessary 11. If necessary, coordinating with Underground Service Alert (USA) or Dig Alert to mark underground utilities before any excavation 12. NPDES permit compliance 13. If necessary, furnishing bypass services to maintain wastewater service to consumers at all times. 14. If necessary, steel plating and asphalt ramping for excavated trenches and areas 15. Restoration, to existing standard conditions or better, of private and public property damaged by construction 16. Removal of all USA markings after new improvements are installed. 17. Demobilization 1-7. ACCESS TO DRIVEWAYS Access to driveways shall be maintained at all times for residents and businesses during non -working hours of 4:00 p.m. through 7:00 a.m. weekdays and 24-hours a day on weekends and holidays. 1-8. PROTECTION OF EXISTING IMPROVEMENTS Existing public and/or private improvements, adjacent property, utility and other facilities, trees, fences, sprinkler systems, plants, City benchmarks and centerline ties that are not to be removed, shall be protected from injury or damage as provided for in Sub -section of Part 1 of SSPWC "Greenbook" Standard Specifications. Any damage to existing facilities shall be reconstructed by the CONTRACTOR to equal or better pre -construction condition at his own expense and no additional compensation will be allowed. 1-9. DISPOSAL OF REMOVALS Except as provided for in Section IV-5.0, removed materials shall become the property III-A-4 Agreement No. 6367 of the CONTRACTOR and shall be legally disposed away from the site of work. Note: There are no authorized dump facilities within the City of El Segundo. 1-10. WASHING OF EQUIPMENT Equipment shall not be washed out on alleys, streets, or parking lots. Also, refer to Section 7-8.6 Water Pollution Control (II-B-28 and 29) for additional requirements. 1-11. REPAIRS, REPLACEMENTS AND CLEANUP The CONTRACTOR shall repair at his/her own expense any damage to property of the City, or of adjacent private property caused by him/her in the performance of the work. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Upon completion of the work and before final inspection, the entire worksite shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory and neat appearance. Work will not be approved until proper cleanup is accomplished. All cleanup costs shall be absorbed in the CONTRACTOR'S bid. 1-12. PUBLIC/ RESIDENT NOTIFICATION Due to the nature of this project involving some inconvenience to residents, businesses, and the public, a good public relations program is mandatory and evidence of satisfactory past performance in this area will be required. 1-13. TRAFFIC CONTROL, PUBLIC SAFETY AND CONVENIENCE 1. TRAFFIC CONTROL The CONTRACTOR shall place and maintain signs, cones, barricades with blinking amber lights, flagmen, detour signs, and other traffic control devices in conformance with the latest editions of the'WATCH" manual, the SSPWC "Greenbook" Standard Specifications and the current requirements set forth in the California Manual on Uniform Traffic Control Devices published by the Department of Transportation, State of California, the CONTRACTOR'S Traffic Control Plans and these Special Provisions, and as directed by the Engineer and the requirements of the respective jurisdictional agencies. Streets shall be kept open for traffic at all times. 2. PUBLIC CONVENIENCE At the pre -construction meeting, the CONTRACTOR shall submit a construction schedule to the City for approval. Based on the construction schedule, the CONTRACTOR will notify residents and businesses of the proposed work (as discussed in Section 1.0.17 above) and posttemporary "NO PARKING" signs at no cost to the City where necessary. Signs shall be posted at all intersections a maximum of 200 feet between signs. Signs may be attached to existing poles or street light standards. When necessary, the CONTRACTOR shall furnish the posts. Signs shall be posted at least seventy-two (72) hours prior to any construction in the area. III-A-5 Agreement No. 6367 Signs shall show specific dates and time of parking restrictions. (See Appendix for City of El Segundo Standard Drawing No. ST-18 "Typical Temporary No Parking Sign".) The dates and times on the signs shall be site specific and shall cover the minimum time required for "NO PARKING" to facilitate construction. Generic long term "NO PARKING" time designations are not acceptable. Parking shall not be restricted during any period when construction activity is not scheduled at the particular site. On streets where parking is being temporarily prohibited on one side due to construction and where the other side of the street has permanent "NO PARKING ANYTIME" signs, the CONTRACTOR shall contact the City Police Department and Public Works Department Street Division and obtain approval to bag these "NO PARKING ANYTIME" signs until construction has been completed for the subject block. ONCE A SECTION OF STREET HAS BEEN POSTED, FAILURE OF THE CONTRACTOR TO MEET AND COMPLETE THE APPROVED DAILY SCHEDULE DUE TO CONDITIONS UNDER THE CONTRACTORS CONTROL, WILL RESULT IN DAMAGES BEING SUSTAINED BY THE AGENCY. SUCH DAMAGES ARE, AND WILL CONTINUE TO BE, IMPRACTICAL AND EXTREMELY DIFFICULT TO DETERMINE. FOR FAILURE TO MEET AND COMPLETE THE SCHEDULE AFTER POSTING, THE CONTRACTOR SHALL PAY TO THE CITY, OR HAVE WITHELD FROM MONIES DUE, THE SUM OF $200 AS LIQUIDATED DAMAGES FOR EACH DAY OF ADDITIONAL POSTING REQUIRED TO COMPLETE THE PROPOSED WORK. REPOSTING AND NOTIFICATION WILL BE REQUIRED FOR EACH MISSED DAY. SAID POSTING AND NOTIFICATION WILL BE AT THE CONTRACTOR'S EXPENSE. The CONTRACTOR shall be responsible for adequate barricading of the work area and controlling of traffic in the vicinity of the project as specified in Sub- section 7-10 of the General Provisions. Should the CONTRACTOR appear to be neglectful or negligent in furnishing warning and protective devices, the City Engineer may direct attention to the existence of a hazard and the necessary warning and protective measures shall be furnished and installed immediately by the CONTRACTOR at his/her expense. Should the City point out the inadequacy of warning and protective measures, such action on the part of the City Engineer shall not relieve the CONTRACTOR from responsibility for public safety or abrogate his/her obligation to furnish and pay for these devices. If said devices will be placed or caused to be placed by the City Engineer, the cost of placing such devices shall be the sole responsibility of the CONTRACTOR and shall be paid for the rate of $50/hour for labor and vehicle use, $20/day per barricade and any other costs incurred by the City relative to traffic control. Said costs shall be deducted from the total contract price for the work. III-A-6 Agreement No. 6367 3. CONSTRUCTION SIGNAGE Providing construction signage shall consist of furnishing, installing, maintaining and removing construction signs and barricades as required by the California Manual on Uniform Traffic Control Devices. The traffic control system shall be installed on a road prior to starting work for that road and shall not be removed until all work has been completed on that road. Lighted signboards stating construction dates and times shall be provided for both directions on major streets at least two weeks prior to the construction and until construction is entirely completed on those streets. These streets include but are not limited to: • Pacific Coast Highway • Main Street • Rosecrans Avenue • Aviation Boulevard 4. TRAFFIC MAINTENANCE • Douglas St. • Nash St. • Grand Ave • Mariposa Ave The CONTRACTOR shall be responsible for handling vehicular and pedestrian traffic in accordance with Sub -section 7-10 of the SSPWC "Greenbook" Standard Specifications of these Special Provisions. The CONTRACTOR shall prepare all necessary traffic control plans prior to commencement of any work and submit those plans to the City for approval at the pre -construction meeting. The CONTRACTOR shall cooperate with the Engineer relative to handling traffic through all work areas When two-way traffic is restricted to one (1) lane, traffic shall be controlled as required by the California Manual on Uniform Traffic Control Devices. A pilot car and driver will be required at various locations if control by flaggers proves deficient in the opinion of the Engineer. In no case shall the CONTRACTOR provide less than one (1) lane of travel through the construction zone on all of the subject streets. CONTRACTOR'S equipment and personal vehicles of the CONTRACTOR'S employees shall not be parked on the traveled way at any time. Parking of construction equipment shall be confined to the approved storage site. The CONTRACTOR shall conduct all operations so as to provide reasonable access to the adjoining properties and have no greater length or quantity of work under construction that can be properly prosecuted with a minimum of inconvenience to the public. For each establishment, i.e. parking lots, business establishments and apartment buildings, the CONTRACTOR shall provide vehicular access to at least one (1) driveway. 111-A-7 Agreement No. 6367 1-14. CONSTRUCTION STAGING AREA The Contractor shall not store materials or equipment in the public right-of-way without prior written authorization from the Engineer. The Contractor shall store materials or equipment in an authorized area only. 1-15. USE OF PRIVATE PROPERTY The use of any private property by the CONTRACTOR is prohibited. The prohibited uses include, but are not limited to, CONTRACTOR'S use of water, electricity or natural gas from the private property, and storage of material or equipment and turning around/parking of his vehicles on private property. 1-16. COOPERATION WITH CONCURRENT CONSTRUCTION AND OPERATIONS: The Contractor shall cooperate with other contractors and the City's personnel performing work in the vicinity, shall conduct its operations in a manner to prevent unnecessary delay or hindrance to their work, and shall coordinate its work with theirs to permit proper and timely completion of all projects in the area. 1-17. COORDINATION WITH AFFECTED BUSINESSES AND RESIDENTS The Contractor shall respond to any complaints received from a property owner (business or resident) and contact the complainant within one (1) working day. The complaint shall be resolved within two (2) working days from the date on which it was received. The Contractor shall adjust its schedule to allow affected Businesses to operate as regularly scheduled. 1-18. NPDES COMPLIANCE Contractor shall thoroughly clean dust and debris resulting from his operations to comply with the "Clean Water Act." Sweeping, wet vacuuming, and/or other approved measures of removing such debris shall be taken during the removal and construction operations. No dust or debris shall be deposited or discharged into storm drain facilities. The Contractor shall provide and maintain at all times during construction ample means and devices to promptly remove and properly dispose of all water entering the excavations or other parts of the work. No concrete footing shall be laid in water, nor shall water be allowed to rise over them until the concrete or mortar has set at least eight (8) hours. Disposal of water shall be the sole responsibility of the Contractor. Disposal methods shall conform to the Porter -Cologne Water Quality Control Act of 1974, the Federal Water Pollution Control Act Amendments of 1972, and the California Administrative Code, Title 23, Chapter 3. Contractor shall not discharge or permit to be discharged to any street, channel, river, storm drain, or any appurtenances thereof, any non -rain water or other fluid substance from the project or from operations pertaining to the project site, without first securing a valid National Pollutant Discharge Elimination III-A-2 Agreement No. 6367 System (NPDES) permit unless the discharge is specifically listed as exempt or conditionally exempt in the most current list issued by the Regional Water Quality Control Board, Los Angeles Region. Contractor shall implement all necessary Best Management Practices (BMPs) to ensure that any conditionally exempt discharge meets all current requirements of the Regional Water Quality Control Board and City. City may prohibit or restrict any discharge if, in its sole discretion, the discharge is polluting, unsafe, or causes a nuisance condition to be created. 2. Contractor shall reduce the discharge of pollutants in storm water runoff to the maximum extent practicable by the effective implementation of appropriate BMPs. The following are the minimum requirements: a. Sediments from areas disturbed by construction shall be retained on site and stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities, or adjacent properties via runoff, vehicle tracking, or wind. b. Construction -related materials, wastes, spills, or residues shall be retained at the construction site to minimize transport from the work area to streets, drainage facilities or adjoining properties via vehicle tracking, runoff, or wind. c. Non-stormwater runoff from equipment and vehicle washing shall be contained at project sites. d. Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as limiting grading scheduled during the wet season; inspecting graded areas during rain events; planting and maintenance of vegetation on slopes; and covering erosion susceptible slopes. 3. The selection, submittal, and adherence to BMPs are the responsibility of the Contractor. The selected BMPs must be submitted to and approved by City prior to performing any operation under this contract which will disturb or expose soil, including, but not limited to: excavation, grading, demolition, clearing and grubbing, pavement removal, etc. 4. Construction activity that results in soil disturbances of less than one acre is subject to the General Permit for Storm Water Discharges Associated with Construction Activity (General Permit) if the construction activity is part of a larger common plan of development that encompasses one or more acres of soil disturbance or if there is significant water quality impairment resulting from the activity. If it is determined that the entire site consists of one acre or greater, the Contractor must file a Notice of Intent (NOI) with the State to comply with the terms of the General Permit, and must provide proof of a Waste Discharge Identification (WDID) Number to the City prior to the issuance of a grading permit. The preparation, submittal and adherence to all NOIs, Storm Water III-A-3 Agreement No. 6367 Pollution Prevention Plans (SWPPPs), Wet Weather Erosion Control Plans (WWECPs), and Contractor Self -Inspection Forms are the responsibility of Contractor. 5. The City may restrict the continuation of work if it is determined that the Contractor has not met all the NPDES requirements. 6. The cost of complying with these environmental requirements shall be considered included in the Contract bid price for other items of work unless the cost of compliance is listed as a separate bid item within the bid schedule. 6-0. MEASUREMENT AND PAYMENT 6-1. BASE BID ITEMS Measurement for payment of base bid items will be paid for at the unit price per item or lump sum amount listed and shall include compensation for furnishing all labor, equipment, tools, materials, and incidentals needed to provide the bid items. The contract price shall include full compensation for coordination, mobilization, and pedestrian/vehicular traffic control. The contract price shall include removal and proper disposal of existing surface, debris, and vegetation as necessary, as well as the restoration of public and private property, damaged during the construction, to the City's satisfaction. The costs of potential night work other than lighting or specialized equipment needed shall be incorporated in the bid cost for 10" water main to be installed or removed. Mobilization/Demobilization (Bid Item 1) Mobilization/demobilization shall be paid at the LUMP SUM price indicated on the bid and shall cover all work, including furnishing temporary water services to all consumers, as described in the Special Provisions Section of these Specifications. Closed Circuit Television (CCTV) Inspection of Sanitary Sewer (Bid Items 2-11) CCTV inspection of sanitary sewers shall be paid at the unit prices indicated on the bid and shall cover traffic control, mechanical pipe cleaning, debris removal and disposal, sewage flow diversion, video and report generation, and all other work as described in these Specifications. 6-2. ALTERNATIVE BID ITEMS (Not applicable for this project) If approved, measurement for payment of the following alternative items will be paid for at the unit price per item or lump sum amount listed and shall include full compensation for furnishing all labor, equipment, tools, materials, and incidentals needed to provide the alternative items. The contract price shall include full compensation for coordination, mobilization, and pedestrian/vehicular traffic control. The contract price shall include removal and proper disposal of existing surface, debris, and vegetation as necessary, professional land surveying as needed, III-A-4 Agreement No. 6367 and restoration of the public and private property, damaged during the construction, to the City's satisfaction. Alternative bid items are only applicable if the City determines they are necessary. Quantities are approximate. See also information on specific alternative bid items below. 6-3. CHANGE ORDER REQUESTS At the pre -construction meeting, the Contractor shall submit hourly labor rates used and hourly company -owned equipment rates, based on the current State of California Department of Transportation Labor Surcharge and Equipment Rental Rates, to be used for any time and materials work. Hourly labor rates shall be accompanied by a breakdown of what items contribute to the total labor rate for each type of employee. For company -owned equipment, equipment types, brands, and models shall be clearly listed along with their hourly rate. Change order requests shall be accompanied by complete backup documentation including but not limited to time/equipment/material signed verification by the inspector, certified payroll, dated and receipts clearly stating items purchased, applicable calculations, delivery tickets, etc. 7-0. CONSTRUCTION & DEMOLITION MATERIALS RECYCLING REQUIREMENTS The Contractor shall divert all Construction and Demolition (C&D) project - generated -waste from the project in accordance with the California Green (CALGreen) Building Standards Code (pursuant to El Segundo Municipal Code, Title 13, Chapter 11). C&D waste can only be legally collected, removed, or transported by City of El Segundo permitted waste haulers. If the Contractor plans on collecting, removing, or transporting its own waste, approval from the City Engineer or designee is required. Failure to meet the C&D waste recycling requirements will result in the assessment of penalties pursuant to El Segundo Municipal Code. Contractor shall prepare a C&D Debris Management Plan as follows: PART 1 GENERAL 1.1 SUMMARY A. This Section includes the following: procedures for ensuring optimal diversion of construction and demolition (C&D) waste materials generated by the Work within the limits of the Construction Schedule and Contract Sum. The Integrated Solid Waste Management Act of 1989 ("AB 939"), III-A-5 Agreement No. 6367 requires that localities throughout the state develop source reduction, reuse, recycling, and composting programs to reduce the tonnage of solid waste disposed in landfills by 50%; this requirement may increase in the future. C&D waste materials generated by the Work are targeted to achieve these diversion rates. 2. A minimum of 50% by weight of the solid wastes generated in the Work shall be diverted from landfill disposal through a combination of reuse, recycling, and composting activities. This section includes requirements for submittal of C&D Debris Management Plan prior to the commencement of the Work, and during the project, submittal of Contractor's quantitative reports for construction and demolition waste materials generated by the Contractor as a condition of approval of progress payments submitted to the Contracting Officer, and following completion of the project, as a condition of the release of final project retention. 1.2 DEFINITIONS A. Class III Landfill. A landfill that accepts non -hazardous waste such as household, commercial, and industrial waste, resulting from construction, remodeling, repair, and demolition operations. A Class III landfill must have a solid -waste -facilities permit from the California Department of Resources Recycling and Recovery (CalRecycle) and be regulated by the Enforcement Agency. B. Construction and Demolition Debris or C&D Debris. Building materials and solid waste resulting from construction, remodeling, repair, cleanup, or demolition operations that are not hazardous as defined in California Code of Regulations, Title 22, Section 66261.3 et seq. This term includes, but is not limited to, asphalt, concrete, Portland cement, brick, lumber, gypsum wallboard, cardboard and other associated packaging, roofing material, ceramic tile, carpeting, plastic pipe, and steel. The debris may be commingled with rock, soil, tree stumps, and other vegetative matter resulting from land clearing and landscaping for construction or land development projects. C. Contracting Officer. The City of El Segundo City Engineer or designee. D. C&D Recycling Center. A facility that receives only C&D material that has been separated for reuse prior to receipt, in which the residual (disposed) amount of waste in the material is less than 10% of the amount separated for reuse or recycling, by weight. E. Disposal. Final deposition of C&D or inert debris into land, including III-A-6 Agreement No. 6367 stockpiling onto land of construction and demolition debris that has not been sorted for further processing or resale, if such stockpiling is for a period of time greater than 30 days; and construction and demolition debris that has been sorted for further processing or resale, if such stockpiling is for a period of time greater than one year, or stockpiling onto land of inert debris that is for a period of time greater than one year. F. Diversion or Divert. The reuse or recycling of construction and demolition debris to avoid disposal in a landfill. G. Enforcement Agency (EA). Enforcement agency as defined in Public Resources Code 40130. H. Inert Disposal Facility or Inert Waste Landfill. A disposal facility that accepts only inert waste such as soil and rock, fully cured asphalt paving, uncontaminated concrete (including fiberglass or steel reinforcing rods embedded in the concrete), brick, glass, and ceramics, for land disposal. L Inert Solids or Inert Waste. Non -liquid solid wastes including, but not limited to, soil and concrete that do not contain hazardous waste or soluble pollutants at concentrations in excess of water quality objectives established by a regional Water Board pursuant to Division 7 (Sections 13000 et seq) of the California Water Code and does not contain significant quantities of decomposable solid resources. Mixed C&D Debris. Loads that include commingled recyclable and non - recyclable C&D debris generated at the construction site. K. Mixed Debris Recycling Facility. A processing facility that accepts loads of solid waste and/or recycling materials for the purpose of recovering reusable, recyclable, and compostable materials and disposing the non - recyclable residual materials. L. Recycling. The process of sorting, cleansing, treating and reconstituting materials for the purpose of using the altered form in the manufacture of a new product. Recycling does not include burning, incinerating or thermally destroying solid waste. M. Reuse. The use of a material that might otherwise be discarded, in the same or similar form as it was produced. N. Separated for Reuse. Materials, including commingled recyclables, that have been separated or kept separate from the solid waste stream for the purpose of additional sorting or processing of those materials for reuse or recycling in order to return them to the economic mainstream in the form of raw material for new, reused, or reconstituted products which meet the quality standards necessary to be used in the marketplace, and includes materials that have been "source separated." 111-A-7 Agreement No. 6367 O. Solid Waste. Refer to Public Resources Code Section 40191. P. Source -Separated. Materials, including commingled recyclables, that have been separated or kept separate from the solid waste stream at the point of generation, for the purpose of additional sorting or processing of those materials for reuse or recycling in order to return them to the economic mainstream in the form of raw materials for new, reused, or reconstituted products which meet the quality standards necessary to be used in the marketplace. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.1 SALVAGE, REUSE, RECYCLING AND PROCEDURES A. Identify reuse, salvage, and recycling facilities: Refer to the City's website for a list of local organizations and companies. https://www.else ndo.or z/�zovemment/departments/public-works/trash- recychn� B. Develop and implement procedures to reuse, salvage, and recycle new construction and excavation materials, based on the Contract Documents, the C&D Debris Waste Management Plan, estimated quantities of available materials, and availability of recycling facilities. Procedures may include on -site recycling, source separated recycling, and/or mixed debris recycling efforts. 1. Identify materials that are feasible for salvage, determine requirements for site storage, and transportation of materials to a salvage facility. 2. Explore the possibility of reusing project job -site inert materials, such as rock, concrete, dirt and aggregate, on -site for road base or other similar uses. Source separate new construction, excavation and demolition materials including, but not limited to the following types: a. Asphalt b. Concrete, concrete block, slump stone (decorative concrete block), and rocks. C. Red Clay Brick d. Soils III-A-8 Agreement No. 6367 e. Other materials, as appropriate, such as wood and corrugated cardboard. 4. Develop and implement a program to transport loads of mixed (commingled) new construction materials that cannot be feasibly source -separated to a mixed materials recycling facility. Contractor may develop their own C&D Debris Management Plan based on CALGreen requirements or use available City forms, found in the Appendices as follows: a. Form PW-A —Project Information b. Form PW-B — Pre -Project Worksheet C. Form PW-BI —Pre-Project Worksheet (This form is to be completed only if you plan to use your own company -owned bins/trucks for disposition of material.) d. Form PW-C — Post -Project Summary e. Form PW-D — Exemption Request — only use if it is infeasible to comply with requirements. 3.2 DISPOSAL OPERATIONS AND WASTE HAULING A. Legally transport and dispose of materials that cannot be delivered to a source -separated or mixed recycling facility to a transfer station or disposal facility that can legally accept the materials for the purpose of disposal. B. Use a permitted waste hauler or Contractor's trucking services and personnel. To confirm valid permitted status of waste haulers, visit the City of El Segundo website: hops://www.elsegundo.org//govemment/departments/public-works/trash- rec, cog C. Become familiar with the conditions for acceptance of new construction, excavation and demolition materials at recycling facilities, prior to delivering materials. D. Legally transport and deliver to facilities that can legally accept new construction, excavation and demolition materials for purpose of re -use, recycling, or composting. E. Do not burn, bury or otherwise dispose of solid waste on the project job -site. 3.3 REUSE AND DONATION OPTIONS A. Implement a reuse program to the greatest extent feasible. Options for reuse III-A-9 Agreement No. 6367 may include, but are not limited to: Los Angeles County Materials Exchange (LACOMax) LACoMAX is a free service provided by the Los Angeles County Department of Public Works, Environmental Programs Division, designed to help residents, businesses, and organizations in Los Angeles County find markets for their industrial by-products, surplus materials, and other would-be discards. All exchanges are coordinated between the parties. The site can be accessed at http://www.ladpw.org/epd/lacomax. 2. California Materials Exchange (CalMAX) is a free service provided by the State of California, Department of Resources Recycling and Recovery (CalRecycle) that connects businesses, organizations, manufacturers, schools, and individuals with online resources for exchanging materials. The site can be accessed at www.ca1recyc1e.ca.zov/Ca1MAX Habitat for Humanity ReStore resale outlets accept donated home improvement goods like furniture, home accessories, building materials and appliances. The materials are sold to the general public. The proceeds help local Habitat affiliates fund the construction of Habitat homes within their communities. Locations of ReStores can be found at www.habitat.org/restores 3.4 REVENUE A. Revenues or other savings obtained from recycled, re -used, or salvaged materials shall accrue to Contractor unless otherwise noted in the Contract Documents. END OF SECTION III-A-10 Agreement No. 6367 SECTION IV — TECHNICAL SPECIFICATIONS 1.0 GENERAL All CCTV operators shall be National Association of Sewer Service Companies (NASSCO) certified by passing the three-day Pipeline Assessment and Certification Program (PACP). The methodology of evaluation, data collection, and reporting criteria used for the NASSCO certification shall be practiced for all CCTV evaluations in this Contract. The CONTRACTOR's supervisors must be able to communicate both verbally and in writing with the City of El Segundo staff and his/her crew. The CONTRACTOR's supervisor must demonstrate the capability to read, interpret, and understand the Safety/OSHA requirements, City of El Segundo's plans and specifications. 2.0 PERMITS The CONTRACTOR shall acquire and pay all required fees and licenses for any encroachment permits required by Caltrans, County of Los Angeles, and other cities when inspections are on their right-of-ways. For inspections which require entry onto private property, notice must be given for permission to enter property. The CONTRACTOR shall notify City of El Segundo at least one week prior to the need for entry onto private property. In no case shall the CONTRACTOR enter private property prior to obtaining written approval from the City of El Segundo. The CONTRACTOR shall comply with the requirements of the noise ordinances of the jurisdictions where inspections will be performed. 3.0 CONFINED SPACE PROCEDURES CCTV inspections shall be conducted from above ground. Manhole entry, when required, shall be conducted in strict accordance with permit required confined space entry regulations, including: • Entry permit • Trained authorized entrants • Attendants • Supervisors • Rescue plan provisions, including full body harness with lifeline and mechanical retrieval device • Isolation and control of energy and material inflow • Controlled access to the space • Purging and cleaning the space of materials and residue • Special hazards consideration IV-A-1 Agreement No. 6367 • Continued forced air ventilation • Continuous air monitoring • Minimum of two types of communication systems • All other protective equipment that may be required, or the CONTRACTOR deems necessary for proper protection of its workers All manholes in this work are defined as Title 8 Permit Required Confined Spaces. The CONTRACTOR's attention is directed to General Industrial Safety Orders of the State of California, Article 108, Confined Spaces, Section 5157 (Sections 5156, 5157, and 5158, Title 8, California Code of Regulations). 4.0 TRAFFIC CONTROL The CONTRACTOR shall place and maintain signs, cones, barricades with blinking amber lights, flagmen, detour signs, and other traffic control devices in conformance with the latest editions of the'WATCH" manual, the SSPWC "Greenbook" Standard Specifications and the current requirements set forth in the California Manual on Uniform Traffic Control Devices published by the Department of Transportation, State of California, the CONTRACTOR'S Traffic Control Plans and these Special Provisions, and as directed by the Engineer and the requirements of the respective jurisdictional agencies. Streets shall be kept open for traffic at all times. The CONTRACTOR shall apply for all traffic control permits and pay all applicable fees. Safe and adequate pedestrian and vehicular access shall be provided in accordance with Section 7- 10 of the Standard Specifications for Public Works Construction (SSPWC), 2009 Edition. PROJECT INFORMATION SIGNAGE: Contractor shall furnish and install, at no cost to the City, a sufficient number of project information signage per these specifications, and as approved by the City Engineer. Sign size shall be 48"x48" and the sign color shall be blue with white text. Sign messages shall include the following information: "City of El Segundo", CCTV INSPECTION OF SANITARY SEWER SYSTEM, dates of construction, and an information phone number. A mockup sign shall be approved by the City prior to sign fabrication. Signs shall be placed at construction areas. 5.0 CLEANING All sewer lines shall be mechanically cleaned within seventy-two (72) hours prior to CCTV inspection to provide sufficient opening for the camera to pass through the pipe. The CONTRACTOR shall notify the City of El Segundo at least one (1) week prior to performing sewer line cleaning and CCTV video inspection work. The sewer pipe diameters shown on the drawings are nominal dimensions. The CONTRACTOR shall verify the actual internal pipe diameters and length of each reach and note the actual size in their report. The CONTRACTOR shall notify the ENGINEER of any discrepancies. The sewer lines are assumed to be fairly clean and relatively free of debris due to IV-A-2 Revised sed PW ? i . i? Sp cificatioris page ]IV , ...3 Agreement No. 6367 the routine preventive maintenance performed by City of El Segundo maintenance staff. It is recognized that some conditions may exist which prevent cleaning from being accomplished, or where damage would result if cleaning were continued. Should such conditions be encountered, the CONTRACTOR shall notify the ENGINEER and may be required to clean those specific sections. All sludge, dirt, sand, rocks, grease, roots and other solid or semisolid material resulting from the cleaning operations shall be removed and hauled away from the downstream manhole of the section being cleaned, unless specifically authorized by the City. Passing material from sewer section to sewer section shall not be permitted. The CONTRACTOR shall be responsible for removing all solid and semisolid material from the cleaning operation from the worksite no less often than at the end of each workday. Materials, which accumulate during the workday, shall be placed in totally enclosed and watertight containers and hauled to the City site at 2050 S Hughes Way. Contractor shall contact the Wastewater Division Supervisor at 310- 877-0675 or the General Services Manager at 310-524-2715 prior to hauling the debris to the City site. 6.0 TELEVISION INSPECTION A. Equipment CCTV equipment shall include video cameras, a video monitor, cables, power sources, and all equipment necessary to perform a CCTV inspection per the Contract Documents. A backup camera shall be provided onsite at all times. The camera shall be specifically designed and constructed for sanitary sewer inspection. It shall be operative in 100 percent humidity conditions. CCTV inspections shall be performed using Pan -and -Tilt camera system with a minimum of 360x270 degree rotation. The camera and video monitor shall produce a minimum of 460 lines per inch of resolution. Illumination sensitivity shall be 3 lux or less. During inspection, lighting intensity shall be adjusted to minimize reflective glare. Lighting and picture quality shall be adjusted to provide a clear, in -focus picture of the entire periphery of the pipeline for all conditions encountered. Camera focal distance shall be adjustable through a range from 25 millimeter (1 inch) to infinity. The system used to move the camera through the pipe shall not obstruct the camera's view or interfere with proper documentation of the sewer conditions. Whenever non- remote powered and controlled winches are used to pull the television camera through the pipe, telephones, radios, or other suitable means of communication shall be set up between the two manholes of the reach being inspected to ensure that adequate communications exist between the members of the crew. The contractor shall have camera cables, power cords, and ancillary equipment capable of recording reaches up to 1,000 feet in one direction. The remote -reading footage counter device, which measures the distance traveled by the camera in the pipe between the centerlines of the upstream and downstream manhole, shall be accurate to plus or minus 0.3 meters in 300 meters (1 foot in 1000 IV-A-3 Agreement No. 6367 feet). The CONTRACTOR shall calibrate his/her measuring device each day with a known distance to the satisfaction of the City of El Segundo prior to starting the inspection and recording process. B. Inspections Inspections shall be performed during periods of low flow. When performing television inspection, the camera lens shall not be submerged nor shall the depth of flow in the pipe exceed the following limits: 150 mm. - 250 mm. (6" - 10") pipes - 20% of the pipe diameter 0.3 meters - 0.6 meters (12" - 24") pipes - 25% of the pipe diameter 0.7 meters (27") and up pipe - 30% of the pipe diameter When the camera lens would be submerged or the depth of flow at the upstream manhole of the sewer section being worked is above the specified maximum, the CONTRACTOR shall, with prior written approval of the City of El Segundo, temporarily reduce the depth of flow by plugging or bypassing the flow. Payment for plugging and bypassing shall be based upon per reach of sewer, and shall include all equipment, labor, materials, and tools. The Camera shall be lowered into the manhole and placed into the pipe. The camera cable shall be retracted to remove slack to ensure and accurate footage reading,. The cable footage counter shall be reset to the distance between the centerline of the manhole and the front lens of the camera. The camera shall be moved through the sewer in a downstream direction at a uniformly slow rate, not faster than 30 feet per minute, by means of power cable winches or self-propelled tractors at each manhole, stopping and rotating the camera head at each defect, lateral, and other significant observation, to allow for adequate evaluation. The CONTRACTOR shall rotate the camera head at a minimum of two (2) joints per 100 feet of pipe inspected regardless of whether there are any defects or significant observations. The CONTRACTOR shall provide a 360-degree pan of all manholes. During video inspection, the camera shall stop at each lateral connection, focus on the bottom of the opening and then make one slow clockwise observation around the perimeter of the lateral, which clearly shows the quality of the connection. Each observation shall be noted with a voice recording, except ongoing conditions such as hairline cracks and hair roots at most joints, in which case a general observation shall be documented. The observation shall also be noted on the inspection report with stationing referenced. The camera lens shall be kept clear of condensation and debris. Recorded footage showing steam, inadequate lighting, or other poor image quality will be cause for rejection and non-payment by City of El Segundo. At predetermined times during the contract period, the CCTV camera shall be pointed at a sample television chart that provides the camera's lack of distortion, resolution, and the ability to review colors accurately. The resulting test shall be recorded onto a DVD so that the recorded quality can be assessed. Recordings with distortion or discoloration shall IV-A-4 Agreement No. 6367 be rejected. C. Obstructions Obstructions may be encountered during the internal inspection that prevent the travel of the camera. If an obstruction is not passable, the CONTRACTOR shall witt:,draw the equipment and begin internal inspection from the opposite end of the sewer reach. Should an additional obstruction be encountered (excluding protruding taps) after employment of the equipment from the opposite end of the sewer, and no means are available for moving the television camera past the obstruction, the CONTRACTOR shall notify the ENGINEER, and the inspection shall be postponed until the obstruction is removed. A reverse setup, if necessary, shall be performed by the CONTRACTOR at no additional cost to City of El Segundo. Should the camera get stuck in the sewer, the CONTRACTOR shall be responsible for all costs involved in extracting it. Costs related to difficulties encountered during internal television inspection are incidental to the contract and claims for additional compensation, therefore, will not be considered. D. Defects to be Reported All defects, including but not limited to minor, moderate, and severe offset joints; cracks in the pipe, inflow, sags, siphons, missing sections, infiltration, debris, grease, roots vermin, etc., shall be pointed out, quantified verbally and projected on CCTV recordings. The CONTRACTOR shall notify the ENGINEER of any additional damage found. E. Submittals All original DVD's and one set of duplicate copies shall be submitted to and shall become the property of the City of El Segundo. DVD's shall be reviewed by the ENGINEER for focus, lighting, sound, clarity of view, and technical quality. Videos recorded while a camera has flipped over in the process of traveling and the viewing of laterals, obstructions or defects are blocked by cables, skids or other equipment will not be accepted. Sharp focus, proper lighting, and clear distortion - free viewing during the camera operations shall be maintained. Failure to maintain these conditions will result in the rejection of the recording by the ENGINEER. Any reach of sewer whose recording quality and /or inspection is not acceptable to the ENGINEER shall be re -televised at no additional cost to City of El Segundo. 7.0 MISCELLANEOUS. A. Operational Plan: Prior to cleaning, the CONTRACTOR shall submit a detailed operational plan for the proposed cleaning for the ENGINEER'S approval. IV-A-5 Agreement No. 6367 B. Monitoring Log During the performance of the work, the monitoring technician shall, in addition to his audio and video record of conditions, log in writing the location of all service laterals and chimneys, all leaks, cracks, root intrusions, unaligned pipes, dips, deflected joints, collapsed sections, deposits, and other conditions or data pertinent to the physical condition of the sewer. Conditions and defects shall be located by footage and clock reference and shall be described using the PACP defect classification. C. Reporting Requirements At the conclusion of the CCTV inspection, all original written logs and all original recording media and one duplicate set copy in storage cartons shall become the property of the City of El Segundo, and the cost there of shall be included in the price for inspection. Additionally, the CONTRACTOR shall provide a DVD with a written Inspection Report of the CONTRACTOR's evaluation of each sewer inspected, with recommendations on any corrective measures necessary. The report shall be submitted within fourteen (14) days of the completion of the CCTV inspection. The Inspection Report shall include the following: • Brief summary of the work performed • Summary list of all pipeline reaches inspected in Excel or Access, as determined by the ENGINEER, with the pipe and manhole identifications, summary of observations; and defects • Inspection log sheet for each reach • Photographs of major defects for each reach of sewer in JPEG format IV-A-6 Agreement No. 6367 1. The Inspection Log for each reach shall include the following information: • City of El Segundo Project or Contract No. • Date and time of inspection • Weather condition • Contractor's name • Street name and address at the upstream manhole • Nearest cross street name • Operator's name • Surface material • Atlas sheet number • Upstream manhole number • Downstream manhole number • Reach (pipe) number • Upstream manhole depth • Downstream manhole depth • Drainage Region or Service Area Number • Direction of camera • Pipe size • Pipe shape • Pipe material • Flow depth at upstream manhole • Flow depth at downstream manhole • Length of pipe joints • DVD Number • Description of observations • Schematic of pipe reach showing laterals and observations by footage • Clock position of observations • Photographs of major defects or typical pipe condition • Notice of the manhole frame and cover condition (upstream and downstream) • Notice of condition of the manhole structures (upstream and downstream) • Date sewer cleaned prior to inspection 2. All DVD's shall be labeled on the disk and on the disk case with the following information: • Disk number • Date of inspection • Name of contractor • Drainage Region identification • Atlas Sheet number(s) • City of El Segundo Contract Number IV-A-7 Agreement No. 6367 3. Voice recordings on the DVD shall be clear, complete, and distinct. The audio recording shall be made on a real time basis and not in any voice over manner after the video is recorded. A vocal description shall be recorded at the beginning of each disc, and at the beginning of each inspection while the Initial Screen Text is displayed. A voice recording shall also be performed during each observation and at the conclusion of each inspection. Inappropriate language and idle chatter are not acceptable and shall be grounds for rejection of work by the ENGINEER. If rejected, the nonconforming recordings shall be corrected to comply at no cost to City of El Segundo. 4. Initial text screen for each pipe reach shall be identified with text and voice recording including the following: • City of El Segundo Project or Contract No. • Date • Time • Weather condition • Contractor's name and Contract Number • Street name and address at the upstream manhole • Nearest cross street name • Upstream manhole number • Downstream manhole number • Recording direction • Pipe size • Pipe shape • Pipe material 5. During the CCTV inspection, the running screen shall show the running footage and the following text at the bottom of the screen: • Manhole number upstream • Manhole number downstream • Pipe size • Date • Time 6. At the end of each pipe segment, an ending screen text and voice recording shall include the following: • End of segment inspection • Condition that prevented complete inspection, if applicable. D. Spill Reporting and Handling In the event of a sewer overflow or customer service interruption/backup related to the CONTRACTOR's operations, the CONTRACTOR shall immediately notify the IV-A-8 Agreement No. 6367 City of El Segundo Wastewater Supervisor, Ron Campbell, at (310) 877-0675, and shall contain the overflow and eliminate the cause of the spill. The CONTRACTOR shall be responsible for any fines levied by the California Regional Water Quality Control Board and others, reimbursement of agency incurred costs, damage, cleanup, restoration of flow, and any disruption of service cost to customers, and all related costs incurred by the customer as a result of the CONTRACTOR'S work. IV-A-9 Agreement No. 6367 SUBJECT SEWER DEFECT CLASSIFICATION LATERALS: PROTRUDING, MINOR A SERVICE CONNECTION THAT PROJECTS LESS THAN '/z INCH BEYOND THE INTERIOR PIPE WALL. PROTRUDING, MAJOR A SERVICE CONNECTION THAT PROJECTS MORE THAN '/z INCH BEYOND THE INTERIOR PIPE WALL. DEFECT STRUCTURAL DAMAGE TO THE PIPE WALL AT THE POINT OF CONNECTION. ALIGNMENT: SAG IN THE LINE, MINOR VERTICAL MISALIGNMENT OR DIP IN THE LINE THAT DOES NOT CAUSE A SIGNIFICANT RESTRICTION IN FLOW SAG IN THE LINE, MAJOR VERTICAL MISALIGNMENT OR DIP IN THE LINE THAT CAUSES A SIGNIFICANT RESTRICTION IN FLOW. HORIZONTAL HORIZONTAL DEPARTURE FROM A TRUE LINE. MISALIGNMENT ROOTS: MAIN LINE, MINOR ROOTS OR EVIDENCE OF ROOTS GROWING THROUGH JOINTS OR CRACKS IN THE SEWER MAIN, NOT SIGNIFICANT ENOUGH TO CAUSE A RESTRICTION IN THE FLOW. MAIN LINE, MAJOR ROOTS OR EVIDENCE OF ROOTS GROWING THROUGH JOINTS OR CRACKS IN THE SEWER MAIN, SEVERE ENOUGH TO CAUSE A RESTRICTION IN THE FLOW. LATERAL ROOTS OR EVIDENCE OF ROOTS SEEN AT A SERVICE CONNECTION. IV-A-10 Agreement No. 6367 SUBJECT SEWER DEFECT CLASSIFICATION INFILTRATION: JOINT GROUNDWATER ENTERING THE MAIN AT A JOINT. DEFECT GROUNDWATER ENTERING THE MAIN AT A DEFECT. LATERAL GROUNDWATER ENTERING THE MAIN THROUGH OR AROUND A LATERAL CONNECTION. OTHER: EROSION PIPE WORN AWAY BY FLOW, GENERALLY AT THE BOTTOM. CORROSION PIPE DETERIORATED BY CHEMICAL ATTACK, GENERALLY AT THE TOP. IV-A-11 Agreement No. 6367 APPENDICES 1. City Maps and Project Area 2. Typical No Parking Sign —El Segundo Standard ST-18 3. Construction and Demolition Recycling Forms IV-A-12 Agreement No. 6367 APPENDICES 1. City Map and Project Locations 2. Typical No Parking Sign —El Segundo Standard ST-18 3. Construction and Demolition Recycling Forms Agreement No. 6367 APPENDIX I City Map and Location Map U) o CO r I / � > e W w P�„ - A`JM 13��bPi ; J11 � 1S 1 �� l� 'sE9a00 1S�! alo Neoo ' I � 'U �� � AbM N1N3hI1NOp 'I is DIV. Y. �� xt'e 'j,�7 • \� sniv s�3ns on,sw m NSVN � dd ' ; OM110 iY1N3NI1NOp �V�,p 4NY ; 3„- I� , 15 la6daM • -. 4 0 t_ 0M113 tlG3M1Nd35 N i � �,' :. i�YNVIONI o �; is SIaN,„, � tS Ell � w � NOJ.9NI45Uni � f Fl�t o (� ��r�� � � mNaon,vo � "I MNi1031"VO i � r � g 19 � � •J3dp ; 1 o m 1S s nvavn3N �. OC�O Deli I , � ls, aNv,Aaew oNvuams R i J� M s vsty al El Ell is uN elnvm u UH d'�'0 041� t(—s � va?34 1S Vatl3�5 ' MOTE � 1S NN3d � H ❑�I�i��J o EE M L '�� = � as snldAlvana o i 11:1 El EE O �O� E�S I �Ipva avoo 0 �i is aaosrvoo L a ����❑ m o ����� VLS� E�r�a� yg � VINI•JaIA ��jn L j ( 1" 9N!1 NM �,j��I ��.�jIIIJJ 15 3NNOAve �� i� LJ�° � lll--l�ll' VLSIA ul'WOl • Y' �I !9 A311VA �¢ inl �J�J 'a1y '• 'j �o � r ��53aall!M - 16 � 31V 6J `•S3 N LS N� 11 �,-.-�'� NSIP •'..l..d I (pJNE u � v F V v e N4�m r r�o pwU��Ii�K�ryfL I y N�IY ql Y��I rrr////, r iiieir�i�ya, ,/ry oi�iramli% I w c l 111 0 m� b� 0 U m AD Of "` ii p 11 z N r�r�rl�rrrrro, OAY,!!nd t46tauuinnnrrrreramarurrrarrmrr� r �s Jr 2 w i lr; E a=a / o 0 c h �- G If ah o h O o "„ ,: ,, iuwmumw141Wr�� w�"��r!Nw wUrrtiwylup�y�y0 9)N"�yl%� �)»iYilv➢YYJdn>;rr9�hAJ�rr��eu d m011",% ,%,,,,,uN�ly!M>)rrtomum¢Nimmm�wrrwaru�rruuwr'r uu�oi�mr' ml�r�nn ?ai sl!�a�ro�rerowiuusom�rrrimr ��rartsmiuJumPo�a�in'r !Iwum! am �YrW r r rf �„ uff, Orr k c E a °� O % ° �` +r / ruM,w' d'M,`,�Ir'NJil6`Dif1(i,"N, Piro U Q) "° D NW% h m S pi sa N-s s 3... �r� dry �000 r iilip NAFIVLM, G 1'rnl a 6 o zs 0 co M,coo a W o % Ohm`o % '. r 9 AV�� „i i Hwii o N� f�Si(r�(Ciil���d�i9��bli �1(9�� / CO �1 N' Uhl.I OII�G r �,�, I rrr � U rlW,gr "" Y pw,,,,siau6u-wrq 70 I9 rl 0 1 Ilr u � m,u f �����: "rah°,Il�� _O o UO(J fr�yri°I oBrr Oq Ze N _"r,. w " o �S,, )1F1/f11Rd'A,j➢ 4CL i r V .� Arwi�pu�yixmwVWmhgvummixmnr — C7 mra.rma�ri W r r r ruw�nuur�in�mmmhiRUAai�iu�r° W w I e 00 � rn I O >(7 . aM��4�''wGGIG c0 Agreement No. 6367 APPENDIX 2 Typical No Parking Sign — El Segundo Standard ST-18 Agreement No. 6367 12 ru J cr w r M r w J cr w N ~ J OD IN ( DAY ) N 1 COLOR LEGEND SIGN SHALL BE LIGHT REFLECTIVE AND BE MM RED MADE OF WATER RESISTANT STIFF CARDBOARD WHITE OR OTHER STIFF DURABLE MATERIAL. DESIGN BY: P.B. CITY OF EL SEGUNDO, CALIFORNIA APPROVED BY: ENGINEERING DIVISION a-^ a 11-14- -8q DATE: [ ! • 7. 89 DRAWN BY: Y.B. TYPICAL City Engineer: R.E. 2�8 0 9 Date -'� STANDARD DRAWING NO. DATE: 11. 13. 89 TEMPORARY NO PARKINGSIGN Agreement No. 6367 APPENDIX 3 CONSTRUCTION AND DEMOLITON MATERIALS RECYCLING FORMS Agreement MN6367IONS City of El Segundo i.G Public Works Department (310) 524-2300 Construction and Demolition Debris Waste Management Plan (WMP) PUBLIC WORKS PROJECTS (including MUNICIPAL ROAD CONSTRUCTION, OVERLAY, SIDEWALK REPAIR OR LAND CLEARING PROJECTS) INSTRUCTIONS Pursuant to the California Green Building Code of 2016 (2016 CALGreen), the City of El Segundo requires diversion (repurposed, reused, or recycled) of at least 65% of non -hazardous construction and demolition (C&D) debris from Public Works projects. A C&D Waste Management Plan must be submitted to the Public Works Department for municipal projects or projects on public property. The contents of this packet, when completed, constitute a C&D Debris Waste Management Plan (WMP). This packet is designed to track the amount of C&D debris diverted or disposed from your City -related (i.e. Public Works) project. If you believe your project cannot achieve the required diversion, you must complete and submit Form PW-D, the EXEMPTION REQUEST form, to the City (i.e. your Project Manager) explaining the circumstances, and requesting an exemption from the requirements. Step 1: Complete Forms PW-A and PW-B Form PW-A is the PROJECT INFORMATION form. This form asks for basic project information, such as name, type, description, location, and contractor contact information. Form PW-B is the PRE -PROJECT WORKSHEET form. This form asks for estimated amounts of debris that will be generated by the project. Option 1: If you are electing to contract with hauler(s) from the Authorized Hauler list who will handle recycling compliance on your behalf, complete Form PW-B (short form). Option 2: If you will be handling all waste management activities (through direct hauling or use of own bins), complete Form PW-B1. Estimate the weight of the C&D debris, by material type, that will be recycled, reused, salvaged, disposed and/or transformed from your project. You must complete either Form PW-B or PW-B1. Step 2: Submit Forms to Public Works Forms PW-A and PW-B (or PW-B1) must be submitted to your Public Works Project Manager and approved prior to commencing work. Step 3: Complete POST -PROJECT SUMMARY - FORM PW-C At least 5 business days prior to contractor requesting release of final project retention, submit a completed FORM PW-C to your Public Works Project Manager. *NOTE* A FACILITY INFO list showing nearby companies that accept C&D materials for recycling is included in this packet. This list was developed to assist you in finding local facilities to use as an alternative to disposal. If you use a certified mixed C&D processing facility, your project will meet the diversion requirements. There are authorized haulers that do business in El Segundo. The HAULER LIST showing companies that are authorized to collect solid waste inEl Segundo is included in this packet. You must use one of these haulers if contracting for waste removal service. For your convenience, there are electronic versions of the forms that will automatically calculate waste generation, disposal, and diversion based on the data entered. Rev.12/4/2020 Agreement No. & ,W PW-A Project Name: Contractor Name: City of El Segundo Public Works Department (310) 524-2300 Date: PW Project Manager_ PW Project Name: FORM PW-A - PROJECT INFORMATION Submit this form to the Public Works Department prior to commencing your project I for all municipal projects subject to compliance, or projects on public property. Project Address / Location: Mailing Address: Ofc Phone No.: City / State / Zip: Cell No: Email: Project Type: Mark appropriate box in each column with an "X": F-1 Road (construction, overlay, repair) F-1 Facility Improvement (renovation, alteration, or addition) l USE FORMS PROVIDED BY EL SEGUNDO COMMUNITY DEVELOPMENT DEPT F-1 Land Clearing (trail, grading, etc.) F-1 Other Estimated Project Start Date: Estimated Project End Date: Request for Exemption: F-1 (If you are requesting an exemption, fill out Form PW-D: Exemption Request) To the best of my knowledge, the above information is an accurate representation of the proposed project. I have been made aware of the 2016 CALGreen requirements and will comply with all requirements. Print Name Title Signature PW OFFICE USE ONLY -Approval Status F-1 Approved F-1 Denied F-1 Further Explanation Needed F-1 Exempt Due to Infeasibility Reviewed By Date Date Rev. 12/4/2020 2 Agreement No. 6MF PW-B tA, City of El Segundo Public Works Department (310) 524-2300 Date: PW Project Manager: PW Project Name: FORM PW-B - PRE -PROJECT WORKSHEET - PUBLIC WORKS PROJECTS This form must be completed and approved or a demolition / building permit will not be issued. Instead of completing a detailed accounting of the types and quantities of C&D debris that will be generated from this project (FORM PW-131), you have the option to select one of El Segundo's authorized waste haulers. These haulers can handle your project's debris in such a way as to comply with CALGreen standards. If you elect this option, please specify which authorized hauler(s) and/or facility(ies) you will be using and sign the acknowledgement below. El Segundo authorized hauler(s) and/or facility(ies) can be found on the City's website: Irp;j.;�;fOs://wv�r�.ellse�gu.�irrori�s.�sir�/T�,�?��;irirnirim,�,irnj./�tl,�, airtirirneirrot.s/ u.�lk�lliic..w�sirlks/I.iraslrro..irec clliiirro It is your responsibility to ensure that the hauler knows you are contracting for "C&D Recycling Service" so that the material is properly handled and waste diverted. You need to obtain weight tickets from the hauler indicating the type and weight of the material collected. In order to comply with the requirements of the WM P, I will contract with the following hauler(s): Hauler: I understand that I am responsible for obtaining copies of any and all weight tickets from all haulers and/or facilities which receive debris from this project and that I will submit a Post -Project Summary (FORM PW-C) at least 5 business days prior to final inspection. Print Name Signature Date Rev.12/4/2020 Agreement No. 6"rW-B1 City of El Segundo G Public Works Department (310) 524-2300 Date: PW Project Manager: PW Project Name: FORM PW-B1 - PRE -PROJECT WORKSHEET - PUBLIC WORKS PROJECTS [This form is to be completed only if you plan to use your own company -owned bins/trucks for disposition of material] This form must be completed and approved or a demolition / building permit will not be issued. In the table below, list estimated weight or cubic yards of debris that will be generated, recycled, reused, salvaged, disposed, and/or transformed by this project. You must include all recyclers, salvage companies, recycle facilities, mixed -use material recovery facilities, landfills, and/or transformation facilties that will be used for the project. List of materials to be generated from the project: ex. wood, metal, concrete, asphalt, drywall, cardboard, mixed C&D debris, etc. TONS Reused/Salvaged/Donated Ex.: Habitat for Humanity, Thirft Stores, regrind onsite, reuse fixtures, reuse dirt/concrete/asphalt Recycled A facility that accepts 100% recyclable materials to be turned into other products. Delivered to Mixed C&D Recycling Facilties that recover some materials for recycling Disposed/Landfilled/Transformed Transfer station, landfill, orSERRF Generated (total of above) CUBIC YARDS Facilities to be Used I or my company elect not to use an authorized hauler because I or my company own containers (bins or roll -off boxes) Initial Here and/or dump vehicles and will not be contracting for debris removal services. I understand that I am responsible for obtaining copies of any and all weight tickets from all haulers and/or facilities Initial Here which receive debris from this project and that I will submit a Post -Project Summary (FORM PW-C) at least 5 business days prior to final inspection. Print Name Signature Date Rev. 12/4/2020 3-A Agreement No. 6367n1w-c - ✓ City of El Segundo Public Works Department (310) 524-2300 Form PW-C - Post Project Summary Project Name: Project Address: Contractor Name: Project Number: Project Manager: Date: This form must be submitted to the Public Works Department at least 5 business days prior to project finalization. Provide facility name, material, and total tonnage disposed and/or diverted. Documentation must be attached (i.e. weight tickets). If an approved mixed waste processing facility was used, a report by the facility for this project is preferred. Return the completed form to the Public Works Department. You may use additional sheets if necessary. If you used one of the City's authorized haulers or facilities, complete this section, then skip to the SIGNATURE section below. I used (List haulers and/or facilities that were used) to meet the recycling requirements. Weight tickets are attached. I. FACILITIES Please list all facilities (i.e. landfill and/or transformation, recycling/reuse/salvage, mixed C&D debris processing, materals recovery) used for this FACILITY NAME TONS DELIVERED TONS DIVERTED TONS DISPOSED DIVERSION RATE 1 2 3 4 Other (reused on site) TOTALS (A) (B) (C) Please enter disposal and diversion totals for each item below, according to letter. Totals reported must match those listed in Section I: TOTAL GENERATED (A) TOTAL DIVERTED(B) TOTAL DISPOSED(C) OVERALL PROJECT DIVERSION RATE Ov00% % (B/A)-100 To the best of my knowledge, the above information is an accurate representation of the disposition of the construction and demolition materials generated on the jobsite. I understand that the City of El Segundo may audit disposal and recycling documentation for this project. Print Name Signature PW OFFICE USE ONLY Diversion Requirement Met: Yes No Exemption: = Yes No Reviewed and Approved by: Date: Rev.12/4/2020 4 Agreement No. 6367 PW-D - ✓ City of El Segundo Public Works Department (310) 524-2300 Project Name: Contractor Name: Project Number: Form PW-D - Exemption Request Project Address: Project Manager: Date: If it is infeasible for you to comply with all of the requirements set forth by the Construction and Demolition Debris Recycling Form and you are requesting an infeasibilty exemption, please use the following space to explain why your project should be considered exempt from recycling requirements. PW OFFICE USE ONLY Exemption Approved: Yes No Reviewed by: Date: Rev.12/4/2020 Agreement No. 6367 The Contractor shall provide schedule of values for these items at the pre -construction meeting. TRAFFIC LOOP LOCATIONS AND QUANTITIES Notes: All traffic loops damaged during the course of construction shall be removed and replaced to the satisfaction of the agency maintaining them: Caltrans Contact: Karem Alchokhachi, Ilair�:irrrn.all� 1���alll��a� l��ii���a..� a.�:�a�, 213-272-8517 LACDPW Contact: Paul Etner, Ir)(.�tir�(.! ir@dr) .Ila (--'OLlir�ty,,gov, 626-458-1709 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Caltrans Eastbound traffic loops on Grand 1 Ave. at PCH EA 6 LACDPW eastbound advance loops on Grand 2 Ave. west of Kansas St EA 2 LACDPW westbound advance loops on Grand 3 Ave. east of Kansas St EA 2 TOTAL COMBINED COST ALTERNATIVE BID MANHOLE AND VAULT COVER QUANTITIES Notes: All utility covers in the resurfaced areas shall be adjusted to grade. Contractor to verify quantities prior to bidding. ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Manhole adjustment to 1 grade EA 11 Valve cover adjustment 2 to grade EA 42 Rectangular utility cover on Illinois adjustment to 3 grade EA 1 TOTAL COMBINED COST Agreement No. 6367 ri ry orr EL°SEGUNDO January 25, 2022 ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS For SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time is changed to Tuesday, February 8, 2022 at 11:00 am. 2. The mandatory pre -bid meeting date and time is changed to Monday, January 31, 2022 at 10:00 am. The question submittal date and time is changed to Tuesday, February 1, 2022 at 4:00 pm. 3. A revised version of the specifications accompanies this Addendum. Please note the specifications file name and title page both contain the words "Revised 1-25-22" As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this completed Addendum page with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non- responsive and subject to rejection. Signature: Print Company Name: Page 1 of 1 Date: 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 6367 ri ry orr EL°SEGUNDO February 3, 2022 ADDENDUM NO. 2 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time is changed to Tuesday, February 15, 2022 at 11:00 am. 2. Please see this project's attached Supplement to Addendum 2 forbid opening instructions, bid -related questions, and the responses to the questions. 3. Please use the revised bid sheets within this Addendum 2 when submitting a bid. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this completed Addendum page with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non- responsive and subject to rejection. Signature: Print Company Name: Page 1 of 1 Date: 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 6367 CITY OF EL SEGUNDO SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ADDENDUM NO. 2 SUPPLEMENT DATE: February 3, 2022 TO: All Prospective Bidders Clarifying information and answers to bid questions have been provided below. The information in this Addendum has been made available to all prospective bidders and shall be considered as incorporated into the above -referenced project specifications. All other portions of Contract Documents and previous Addenda not specifically mentioned in this Addendum remain in force. A. CHANGES TO THE BID OPENING PROCEDURE: City Hall is located at 350 Main Street, El Segundo, CA 90245. Please follow the modified procedure below for the bid opening: 1. Each bidder's representative is required to wear a mask and maintain a 6-foot distance when interacting with City staff and others. Representatives are not to enter the building. 2. Instead of the City Clerk's Office, the bid opening will be held outside the City Hall Council Chambers lobby. The double automatic doors on the Main Street side of the City Hall Building will be opened; however, no entry will be allowed. The double doors will be unlocked and opened 15 minutes prior to the bid opening. Bidders are more than welcome to submit their bid by the US postal service or other carrier service. However, the bidder is responsible for verifying their bid has been received in the City Clerk's Office prior to the bid opening. The City Hall number is 310-524-2300. 4. Bidders can also choose to submit bids in person. The City Clerk's Office will open the doors 15 minutes before the bid opening and will accept bids through the doorway at that time. Please plan to be there early enough so that your bid may be received well before 11:00 am, in case there are multiple bidders there to do the same thing. 5. The City Clerk's Office will collect bid packages and record them on a log sheet. Having submitted their bid, bidders will wait outside in the Civic Center Plaza area until the bid opening. 6. Bid packages will be opened in the Council Chambers lobby. Bid amounts will be recorded on the log sheet and the log sheet will be signed by representatives from the City Clerk's Office and the Public Works Department. 7. The Public Works Department will email the completely -signed bid log sheet to all planholders once received from the City Clerk's Office, the same day as the bid opening. Agreement No. 6367 B. BID QUESTIONS AND ANSWERS Question 1: How much is the project cost estimate? Answer: $255,000 Question 2: Will the City provide bins to dump debris at the 2050 S. Hughes Way location? Answer: No, the Contractor will provide their own bins, their own bin transport, and dispose of the debris. According to the City Wastewater Division Supervisor, the City of El Segundo will NOT dispose of the debris generated from the project this will be entirely the contractor's responsibility. Please also see the response to Question 21. Question 3: How will the Contractor get into 2050 S. Hughes Way? Answer: Either with a key provided to them or 24-hour advance notice to Wastewater Division. Question 4: Is there a GIS of sewer lines? Answer: GIS shapefiles of sewer mains from 2013 exist. However the City's sewer maps, which at times are updated by hand, may be more accurate. Question 5: Is there a run list or map of sewer locations available? Answer: Please see the electronic files of index maps accompanying this Addendum. There are several hundred sewer main maps related to those index maps. Question 6: Why is mechanical cleaning a requirement of all pipes to be cleaned? Do the pipes have mineral deposits or calcium that the contractor should be made aware of? Answer: Mechanical cleaning is required to remove roots, sediment, and other possible physical in -pipe obstacles prior to televising each pipe, and to also make visible as much of each pipe's surface area as possible. The City will not be aware of mineral or calcium deposits within the pipes unless made known through the televising. Agreement No. 6367 Question 7: Does the City prefer a specific inspection software to be used? Answer: Different brands of software are available but the software used must be NASSCO PACP certified as should the CCTV operators. Please see Section 1.0, page IV-A-1 of the specifications. Also, reports, photographs, and video are to be in color, detailed, and should comply with any conditions found in the specifications. Reports will be used to determine pipe condition and repair areas. The certified software used shall at minimum be able to generate as detailed a report as the example found on the following pages. Videos shall be in .MP4 format. After the first video and report have been generated, the contractor shall provide them to City staff to review and to check for compatibility issues/missing information. CITY OF EL SEGUNDO Inspection Report/ Inspection: I ---, ..................... . . --------- ----- -.. .1 ... . . ............... Inspected Date Area Weather. . . Surveyor's Name Certificate No. Section No, 111/512010 AREA 8 Dry R. RODARTE U-805.2423 Is Section Length Vehicle UseofSewer Date Cleaned Pre -Cleaning Sewer Rating 1) 164A7 It GR-10 Sanitary 111512010 Jetting 6142 Street NEVADA SST. & E. FWANZN Upstream MH 8-18 AVEDowstrearn MH 8-31 R City CITY OF EL SEGUNDO Dir of Survey Downstream Location Code Light Highway Purpose of Survey Routine Assessment Pipe Shape Circular Year Laid DiadHeighl 81nch Year Rehabilitated Material VCP Tape /Media No I Lining Method - — — ------ ------------- . . . ........ Add. Information CONTRACT if 30-00241 ................ 1:306 Position Code Observation Grade CM Crack Multiple, torn 06 to 04 o clock, within 8 inches of S 3 joint: YES C lVi Crack Multiple, from 09 to 06 o°clock, within 8 inches of S3 join',: YES FM Fracture Multiple, from D8 to 03 o'clock, within 8 inches ofS 4 joint: YES B Broken, from 07 to 03 o'clock, within 8 inches of joint: YES 5 FM Fracture Multiple, from 12 to 09 o'clock, within 8 inches ofS 4 joint: YES CM Cra6R MILIMPIC-, 1`170111 12 to 12 o'clock, within 8 inches of S 3 joint: YES CL Crack Longitudinal, at 09 o'clock, within 8 inches of joint: S 2 YES TFA Tap Factory Made Active, at 02 o'clock, 6", within 8 inches of joint: NO CM Crack Multiple, from 00 to 02 o'clock, within 8 inches of S 3 joint: YES CL Crack Longitudinal, at 04 o'clock, within 8 inches of joint: S 2 YES CITY OF EL SEGUNDO Anrppmpnt — ------ -- - ............... Inspection Report/ Inspection: 1 . . ....... . Inspected Date Area Weather Surveyor's Name erbicate-N,o, Section No 2010 AREA 8 Dry R. RODARTE U-805-2423 18 Section Length Use of Sewer Date Cleaned Pre-Cleaning Sewer Rating 1164.07 R GR-10 Sanitary 111612010 Jetting . .............. 5 142 MAlp-well i10311*4 Re] Inspection - _ .................. City Street f Date Area r Section No. CITY OF Et_ SEGUNDO NEVADA ST. & E. FRANKLIN AVE.I 111512010 I AREA 8 I 18 Photo: 472 2A, Media #:: 240810_1. 00:00:58 2.73FT, Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES Photo; 472 4A, Media #:: 240810 1, 00.02:14 8.49FT, Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint, YES Photo: 472_3A„ Media #: 240810_1 00:01 30 5.17FT, Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES Photo, 472_5A, Media #:: 240810_1, 00:02:57 11.81 FT, Crack Multiple, from 09 to 06 o'clock„ within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 Inspection photos I Inspection: I .............. city Street Date 1 Area Section No. :L SEGUNDO NEVADA ST. & E. FRANKLIN AVE. 11/5/2010 I AREA 8 1 18 Photo: 472 6A, Media #:: 240810_1, 00:03:26 13.66FT, Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES Photo. 472 8A, Media #:: 240810_1, 00,04:52 16.4FT„ Fracture Multiple, from 12 to 09 o'clock, within 8 inches of joint: YES Photo: 472_7A, Media #:: 240810_1, 00:04:02 15.03FT, Broken, from 07 to 03 o'clock, within 8 inches of joint: YES Photo:472_9A, Media #:: 240810_1, 00-05:34 18.84F7, Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 OF EL 1r - s City Street Date Area Section No :L SEGUNDO NEVADA ST. & E. FRANKLIN AVE. 111512010 AREA 8 18 Photo: 472 10A, Media #: 240810_1, 00:06:09 31.82FT, Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES Photo: 472�13A, Media #:: 240810_1, 00:09:58 121.61 FT, Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES Photo: 472_12A, Media #•: 240810_1, 00 09:15 108.34FT, Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES Photo: 472_14A, Media #- 240810_1, 00:11:28 145.13FT, Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES EL SEGUNDO PROJECT 2010 i Inspection: m... _ ......... City Street i Date Area ` Section No CITY OF EL SEGUNDO NEVADA ST. & E. FRANKLIN AVE.I 11/512010 AREA 8 l 18 Photo:472_15A, Media#:; 2408101, 00,12,03 152.16FT, Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES Photo: 472_17A, Media #:: 240810_1, 00:13:25 159.19FT, Crack Multiple, from 04 to 02 o'clock, within 8 inches of joint: YES Photo 472_16A, Media #:: 240810_1, 00:12:48 155.57FT, Crack Multiple, from 07 to 09 o'clock, within 8 inches of joint. YES EL SEGUNBC PROJECT 2010 Agreement No. 6367 Question 8: Can the contractor piggyback off a City Caltrans permit for PCH? (Contractor is aware of payment responsibility.) Answer: If CCTV work on Pacific Coast Highway requires a Caltrans permit obtained by the City, then the Contractor must obtain a dual permit for the same area. All contractor costs for obtaining a Caltrans permit, if necessary, shall be included in the mobilization costs. Question 9: Will the City allow Contractor's license C36 or C42 in addition to Class A like other similar projects conducted by municipalities in Southern California? Answer: A minimum license classification of "A" is required. Other plumbing, pipe, and sanitation classifications will be accepted in addition to a Contractor's already having an "A" license, but not instead of an "A" license. Question 10: What permits will be required for this project? Will encroachment and other permits be no fees? Answer: Caltrans may require a dual permit for this project and the amount of their fees can be directed to the Caltrans permit office at 213-897-3631. A no -fee City of El Segundo Public Works Encroachment Permit will also be required, but will contain a condition not to include Pacific Coast Highway until only after Caltrans' requirements are met. Question 11: Will Traffic Control plans be required for this project? If yes, will these be specific locations, and can you provide which locations? Answer: Traffic control plans will be required for this project for all City locations and shall be per MUTCD and Work Area Traffic Control Handbook standards. If a majority of locations can be served using the same traffic control plan the City will review it as such. Areas that cannot use the same plan shall have a specific plan provided for them. Caltrans may have its own specific requirements for Pacific Coast Highway traffic control plans. Question 12: Are there any special permit locations to be inspected such as Cal Trans, Railroad, or utilities? Answer: The entire project requires a City Encroachment Permit and perhaps a Caltrans dual permit for Pacific Coast Highway. The City is not aware of permit requirements for other agencies at this time. If a permit issue is discovered by the Contractor during the project, the Contractor shall bring it to the City's attention. 4 Agreement No. 6367 Question 13: Notifications to residents and businesses affected by our operations — Are these required for special specific locations or the entire project? Answer: Notifications to businesses and residents are required for the entire project at least a week in advance of work occurring in a neighborhood. Notices shall be reviewed and approved by City staff prior to the Contractor's door-to-door distribution. At minimum, notices shall provide the Contractor's contact information, and shall describe what residents and businesses might expect while the work is occurring, how long the work shall last, and whether or not they will be able to use their plumbing during the CCTV period. Question 14: Construction Signage — Is this requirement for lighted signboards apply to this project which states shall be placed two weeks in advance? We will be moving everyday so this should not apply. Answer: Lighted signboards shall be used for any major streets where project activities will disrupt the use of one or more traffic lanes, both for motorists' safety and those of the contractor's employees. Streets include but are not limited to those listed on page III-A-7 of the specifications. Question 15: SECTION III — General Scope of work - Can we work from the top of the system down? Specification says to perform work in Arterial locations first which does not make sense. Answer: Contractor shall schedule the work to be as efficient as possible. Arterial location do not need to all be performed first as notification to motorists will be required in advance for each. Question 16: Do message boards apply to this contract since we will be moving daily and not a construction project? Answer: Please see the response to Question 14. Question 17: Is there City GIS files available for this project? Answer: Please see the response to Question 4. Question 18: Do you require that all sewer lines be cleaned prior to CCTV Inspection (Section 5.0)? Answer: Yes. Please see Section 5.0, page IV-A-2 of the project specifications. Question 19: Can the hydrant water meter be issued to the contractor so we can install at different locations throughout the city since we will be moving every day? Specification section II — 4. States city will install the meter? Answer: Yes, a traveling water meter can be issued to the contractor by the City's Water Division. The contractor will install the meter in that instance. Agreement No. 6367 Question 20: Can the contract time be extended to 120 working days from 60 working days? Does liquidated damages apply to this contract time? Answer: If the project cannot be finished in 60 working days despite the contractor's good faith effort every day in moving the work forward, the contractor can ask for additional time. The request should be made within a few weeks of the end of the 60-working-day period and City staff will review the rate of completion and other factors on the days already completed. Liquidated damages would apply to days incurred for the project beyond the original 60 working days that have not been or cannot be approved as additional project time. Question 21: In the Pre -Bid Meeting, it was discussed that a location would be provided for the Contractor to dispose of sewer debris and grit. Section 5.0 CLEANING states the city will be responsible for disposing debris. Is the contractor responsible for arranging these containers or is the city in control of the debris hauling? Answer: The last sentence, " debris deliver-ed to too si " in the third paragraph of page IV-A-3 in the specifications is removed from the paragraph, which now reads: "The CONTRACTOR shall be responsible for removing all solid and semisolid material from the cleaning operation from the worksite no less often than at the end of each workday. Materials, which accumulate during the workday, shall be placed in totally enclosed and watertight containers and hauled to the City site at 2050 S Hughes Way. Contractor shall contact the Wastewater Division Supervisor at 310-877-0675 or the General Services Manager at 310-524-2715 prior to hauling the debris to the City site." According to the City Wastewater Division Supervisor, the City of El Segundo will NOT dispose of the debris generated from the project —this will be entirely the contractor's responsibility. The site at 2050 S. Hughes Way visited during the pre -bid meeting can be used as a staging area only for the contractor's debris bins. The contractor shall be responsible for providing the debris bins, arranging their transportation, and disposing of their contents. Please also see the response to Question 2. Please see the forms in Appendix 3 to be submitted regarding project debris. Instructions regarding the forms are given on pages III-A-5 through III-A-10 of the project specifications. Question 22: What percentage of locations are easements? Answer: The answer to the question is not known. PW ? i... i? Specificatiori s Sectiori. 5.0, page IIV...A 3 (Revised ed 2/3/ 2' ) Agreement No. 6367 the routine preventive maintenance performed by City of El Segundo maintenance staff. It is recognized that some conditions may exist which prevent cleaning from being accomplished, or where damage would result if cleaning were continued. Should such conditions be encountered, the CONTRACTOR shall notify the ENGINEER and may be required to clean those specific sections. All sludge, dirt, sand, rocks, grease, roots and other solid or semisolid material resulting from the cleaning operations shall be removed and hauled away from the downstream manhole of the section being cleaned, unless specifically authorized by the City. Passing material from sewer section to sewer section shall not be permitted. The CONTRACTOR shall be responsible for removing all solid and semisolid material from the cleaning operation from the worksite no less often than at the end of each workday. Materials, which accumulate during the workday, shall be placed in totally enclosed and watertight containers and hauled to the City site at 2050 S Hughes Way. Contractor shall contact the Wastewater Division Supervisor at 310- 877-0675 or the General Services Manager at 310-524-2715 prior to hauling the debris to the City site. 6.0 TELEVISION INSPECTION A. Equipment CCTV equipment shall include video cameras, a video monitor, cables, power sources, and all equipment necessary to perform a CCTV inspection per the Contract Documents. A backup camera shall be provided onsite at all times. The camera shall be specifically designed and constructed for sanitary sewer inspection. It shall be operative in 100 percent humidity conditions. CCTV inspections shall be performed using Pan -and -Tilt camera system with a minimum of 360x270 degree rotation. The camera and video monitor shall produce a minimum of 460 lines per inch of resolution. Illumination sensitivity shall be 3 lux or less. During inspection, lighting intensity shall be adjusted to minimize reflective glare. Lighting and picture quality shall be adjusted to provide a clear, in -focus picture of the entire periphery of the pipeline for all conditions encountered. Camera focal distance shall be adjustable through a range from 25 millimeter (1 inch) to infinity. The system used to move the camera through the pipe shall not obstruct the camera's view or interfere with proper documentation of the sewer conditions. Whenever non- remote powered and controlled winches are used to pull the television camera through the pipe, telephones, radios, or other suitable means of communication shall be set up between the two manholes of the reach being inspected to ensure that adequate communications exist between the members of the crew. The contractor shall have camera cables, power cords, and ancillary equipment capable of recording reaches up to 1,000 feet in one direction. The remote -reading footage counter device, which measures the distance traveled by the camera in the pipe between the centerlines of the upstream and downstream manhole, shall be accurate to plus or minus 0.3 meters in 300 meters (1 foot in 1000 IV-A-3 Agreement No. 6367 Question 23: Do you have a NASSCO PACP Version preference and is any NASSCO PACP Certified software approved to use? Answer: Please also see the response to Question 7. The most recent version of NASSCO PACP certified software is preferred. Question 24: Will hard drives be acceptable in lieu of DVDs for Inspection data and videos? Answer: Yes. After the first video and report are generated, they and the hard drive they are stored on shall be given to City staff temporarily to check on compatibility. Staff will return them to the contractor once the ability to use the drive and view the files are verified. Question 25: Can computer generated voice observations be used in lieu of Operator/microphone? Answer: No. Question 26: The price sheet — bid schedule shows a quantity of 180,060 LF of 15" Sewer Lines? Is this correct? Answer: No. Please use the attached revised bid sheets that shows the correct quantity of 18,060 linear feet of 15" diameter sewer lines. Agreement No. 6367 BID SCHEDULE (REVISED 2/3/22) SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: BASE BID ITEMS UNIT PRICE ITEM IN FIGURES NO. DESCRIPTION UNIT QTY M AMOUNT $ 1 Mobilization/Demobilization LS 1 CCTV inspection of 6-inch (diameter) sanitary sewer 2 including traffic control, LF 4,824 cleaning, debris removal and disposal, and sewage flow diversion if necessary CCTV inspection of 8-inch sanitary sewer including traffic control, 3 cleaning, debris removal and disposal, LF 180,958 and sewage flow diversion if necessary CCTV inspection of 10-inch sanitary sewer including traffic control, 4 cleaning, debris removal and disposal, LF 20,575 and sewage flow diversion if necessary CCTV inspection of 12-inch sanitary sewer including traffic control, 5 cleaning, debris removal and disposal, LF 23,476 and sewage flow diversion if necessary CCTV inspection of 15" sanitary sewer including traffic control , 180,060 6 cleaning, debris removal and disposal, LF 18,060 and sewage flow diversion if necessary I-C-3 a Agreement No. 6367 BASE BID ITEMS, CONTINUED UNIT PRICE IN ITEM FIGURES NO. DESCRIPTION UNIT QTY ($) AMOUNT ($) CCTV inspection of 18" sanitary sewer including traffic control, 7 cleaning, debris removal and LF 9,754 disposal, and sewage flow diversion if necessary CCTV inspection of 21-inch sanitary sewer including traffic 8 control, cleaning, debris removal LF 4,817 and disposal, and sewage flow diversion if necessary CCTV inspection of 24-inch sanitary sewer including traffic 9 control, cleaning, debris removal LF 8,457 and disposal, and sewage flow diversion if necessary CCTV inspection of 27" sanitary sewer including traffic control, 10 cleaning, debris removal and LF 1,489 disposal, and sewage flow diversion if necessary CCTV inspection of 29" sanitary sewer including traffic control, 11 cleaning, debris removal and LF 74 disposal, and sewage flow diversion if necessary TOTAL BID ITEMS 1 THROUGH 11 TOTAL BID WRITTEN IN WORDS: All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I-C-3b Agreement No. 6367 Question 27: Since this is an inspection project and not construction, is there a need for 5% retention on the invoices? Answer: Yes, the 5% retention is required. Question 28: Is the last page in Appendix 3 part of the project? Answer: No. Please discard the last page describing traffic loops and alternative bid manhole and vault covers. It is not part of the project scope. Agreement No. 6367 The Contractor shall provide schedule of values for these items at the pre -construction meeting. TRAFFIC LOOP LOCATIONS AND QUANTITIES Notes: All traffic loops damaged during the course of construction shall be removed and, P g g IIIIIIIIIIIIIIIIIIIIIIII����� . � � Illllllullllllllliiii , replaced to the satisfaction of the agency maintaining them: Caltrans Contact: Karem Alchokhachi, Il�a�ir��ir n.all� I���alll��a��l��ii�w;�a a.: 2 8517 LACDPW Contact: Paul Etner, I)(.wtir�(ir@Ilau(--'OLlir�.ov, 626 41 9 ITEM DESCRIPTION UNIT QTY UNJT CO,, ,, TOTAL COST Caltrans Eastbound II,�°°� Illllllllllllllllllllllllllllllu����°' traffic loops on Grand I,,,I 1 Ave. at PCH EA 6 IIIIIII III ,, LACDPW eastbound advance loops on Grand 2 Ave. west of Kansas St EA 2 LACDPW westbound IS advance loops on GrandIllllllp II ii 3 Ave. east of Kansas St III, EA Illlhlllllllllll 2 TOTAL COMBINED COST ��illl';""°"'IIIIIIIIIIIIIIIIIIIIIIII . Illlliiilllllllllllll °"° °°°�"""` ALTERNATIV ID IIII �,ANHOLE AND VAULT COVER QUANTITIES Notes: 1 ��IIIIIIIIII ilot "covers in the resurfaced areas shall be adjusted to grade. Contractor to verify " quanlll�ties prior to bidding. ��°°"'IIIIIIIIIIIIIIIIIIIIIIII DESCRIPTION UNIT QTY UNIT COST TOTAL COST Manhole adjustment to 1 grade EA 11 Valve cover adjustment 2 to grade EA 42 Rectangular utility cover on Illinois adjustment to 3 grade EA 1 TOTAL COMBINED COST Agreement No. 6367 Question 29: Will answers to the questions be released prior to February 7? Answer: Yes. Additional project requirements No Parking postings should be installed at least 72 hours prior to construction occurring. Contractor shall contact City staff at the time of placement so that the Police Department can be informed. Agreement No. 6367 crivo ELSEGUNDO February 9, 2022 ADDENDUM NO. 3 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time remain Tuesday, February 15, 2022 at 11:00 am. 2. Please use the attached Bid Table, revised 2/9/22, which contains a new Bid Item 12 to be used as needed for Caltrans permit costs. Caltrans permit costs are no longer to be added to Bid Item 1 Mobilization costs. Backup documentation showing the Caltrans permit cost to the contractor shall be provided when billing for Bid Item 12. 3. A "C-42" with a "C-36" state contractor's license classification will be accepted in lieu of an "A" license classification for this project. 4. For work on Pacific Coast Highway, the contractor shall employ Caltrans 2018 Standard Specifications and 2018 Standard Traffic Control, and shall state so when applying for a double permit against the City's Annual Caltrans Permit 07-2 1 -N-UT-293 1. The Caltrans Standard Specifications 2018 are found at c;/,z/,tgn/s;;;, st hd.2 d. 1 �� �� t �� r :: � cc )' c tz h The attached Caltrans Standard Plans T9-T17 shall be used in addition to other Caltrans standard plans when necessary on Caltrans right-of-way. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this completed Addendum page with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non -responsive and subject to rejection. Signature: Print Company Name: Page 1 of 1 Date: 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 6367 BID SCHEDULE (REVISED 2/9/22) SEWER MAIN CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PROJECT PROJECT NO.: PW 21-12 Company Name: BASE BID ITEMS UNIT PRICE ITEM IN FIGURES NO. DESCRIPTION UNIT QTY M AMOUNT $ 1 Mobilization/Demobilization LS 1 CCTV inspection of 6-inch diameter) sanitary sewer 2 including traffic control, LF 4,824 cleaning, debris removal and disposal, and sewage flow diversion if necessary CCTV inspection of 8-inch sanitary sewer including traffic control, 3 cleaning, debris removal and disposal, LF 180,958 and sewage flow diversion if necessary CCTV inspection of 10-inch sanitary sewer including traffic control, 4 cleaning, debris removal and disposal, LF 20,575 and sewage flow diversion if necessary CCTV inspection of 12-inch sanitary sewer including traffic control, 5 cleaning, debris removal and disposal, LF 23,476 and sewage flow diversion if necessary CCTV inspection of 15" sanitary sewer including traffic control , 180,060 6 cleaning, debris removal and disposal, LF 18,060 and sewage flow diversion if necessary I-C-3 a Agreement No. 6367 BASE BID ITEMS, CONTINUED UNIT PRICE IN ITEM FIGURES NO. DESCRIPTION UNIT QTY ($) AMOUNT $ CCTV inspection of 18" sanitary sewer including traffic control, 7 cleaning, debris removal and LF 9,754 disposal, and sewage flow diversion if necessary CCTV inspection of 21-inch sanitary sewer including traffic 8 control, cleaning, debris removal LF 4,817 and disposal, and sewage flow diversion if necessary CCTV inspection of 24-inch sanitary sewer including traffic 9 control, cleaning, debris removal LF 8,457 and disposal, and sewage flow diversion if necessary CCTV inspection of 27" sanitary sewer including traffic control, 10 cleaning, debris removal and LF 1,489 disposal, and sewage flow diversion if necessary CCTV inspection of 29" sanitary sewer including traffic control, 11 cleaning, debris removal and LF 74 disposal, and sewage flow diversion if necessary 12 Caltrans Double Permit Cost as LS 1 $12,000 necessary TOTAL BID ITEMS 1 THROUGH 12 TOTAL BID WRITTEN IN WORDS: All work shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I-C-3b 2018 STANDARD PLAN T9 Agreement o. s� + J W H O W E a Ii J WW v�v o�wD W V m c ooQ v H _ p L L + O }+ a cn aC �o c m C o in 0 Vi �z M mv_ao Q m to Op D E O z Z z H D Q Q 5 F a Ow O D N + Z ° ° D a o uOD C)J o y m o E W D LL y .} E D d N D 0 M LL L Qr U l O M iL % r N W D O U a + � O m � + O N L ° o `o ° m 0 N t - o m E L N o �yf - O U n w J n e N E Q o D D C y O O + m w b d � .D at D O O . N N L aaa `o N N O � o O E o N x m OO n E N c o N L E U � 9 > ° } wy 6 u O +o n c v E L + L + - o ° m v N E IE m E > W n m000c3s ° L Nrn Q O II II O M N H E v r O - N c+ 0 c y E 3 N v N L v E c- N- O N + N v + N O O . wO 1.10 N � L L v o ac _E E m E E a V MQv N L W O o LOB + O D O d d O O O N O D D II L W N J ; VI OC N O O O Onn ti N N 0 0 0 L 3 a� N N 7 + 285 N O O W 3 0 o N o z_ m U Q a N 00 � O O Z � n V. E Z 3 n N E n E Z Q o w � Q � � n� E w i0 O m K O N * in �ommo Q W Z � d � N N WO o W _ �~ [O Q H J N Q Z W Q J s .. W Z J ow ao E N �n o�n o �n o�nO�nom Nm p + 0 0 0 0 0 0 0 m 0 0 0 0 0 0 0 0 0 0 0 DU Za 5 - mow' x Z? Q U s � Q Q d K N W W UW �LL w� _� UZ o N '^ 4 0 o 0 Z.. W N_ r o J J �W WZ �o - o 0 �Z QQ �� s 0 0 0 0 om o � 2 s O w _ N � d O E N i(1 O i(1 O i(1 O i(1 O in �D i(1 O �tf io 2018 STANDARD PLAN T10 v greemen o. 6361 U) O R e 0 QIQI o l l lop J wU) Q M CO) y - =. a �_ �•` WLLI CL CL — Qw Q M o ��oc rya m in _ oz OW w M • w N¢ Wz J j 1 _ w o I° e a w J 0 U ®� �� o 0o z ZO Q o _ w z O W z o N za M o 414141 d p a Q o y oc o • o o t �m w J ww U. o o ¢ o w Q _ ¢ m a03 N `o O U. W 00 o s W r I I w w a W E_ w ° T 1 W� 1 1� J cc • D y®la v c + t �y E j I° W • O U +. N 0r o Ill w u 0 Z a ..° }` von rt O +a y w Z CN - 11°� EN N t2p +o N c0 • vo u O • y/I^\fI / 4 xzJ za H �� �� a avc L+ N o E0� pv O adN u j� •y z Y a e LJJ • m� 000 d N°0 '_° as oo+ xN0 cc 1 oz ow 0- + NJ c--. � w=•� -„N oav }rN• o+]IE m qi9uaa �c_'Ooa'ry UN m0 c -o c% Ot p �_ U°0 0, o N„" 1 1 N owa K J Z N DVQ NC rL° Boa EN° x p c;o o° N n °o o -.0 w mN mod— i Q K J o.- NLN cN+ ;cam Noa cDN]aW M O~ p =OcKO;�¢WN o Z NOtUb dNDy > °a •I• wN 4 4 O O Izw ~O ¢aDNp O � n m r w w f ~O O e0 Z elj • N O NN U N TOL VD 0 b0>OMOL; Ly O N >L9~L O+t NN ON a0 N_o+DaNDE °eO�Np°N =+° N CA ¢ +NNp ..Z 0z °oe v u vwuoa ca0- 9 ¢W m ¢ U W O w¢O '0 ._NNN NP N 03 O pO�ON+ND Cp' pp O U° w0Z. 9 Z OW -D ON]OT� Or- O >. +oNCEd pQ =° —¢ LNL° W. N N f I° ° z J v w w O O so -i N -�°_ °� ^� °yLpCN b �N OO+E C-pjN ON N UOUcypNc NO OO ]O + Zz O O x N3 pNvc> aU0WZ .aaU_ LcNp I O MOEUH. pUC uUCONN Y~ ¢ MNWz i�OQNaf� �,U tyyW E m°¢ pCN . X-zn O U 3VW1 O w J O ON 0 U- Eo,.. O N+c NN DON - U -o' FNp 7H NLN d0 ¢O3�+H O+ Q- MN] C,7Ocn yc D-v w ow az N N° a vm+` oc - NNN D�40O] ON+O pNN • NN ❑ yaI qq J'� itLi •� zn _ �pTN _O UL Ca+ NOt- LEO dj U_ vdN -qC L'�LO NCO O E�N+ y vvN NEB+NU O oUE a x�av ] Nl 3O?DN ° OUT OD yLOOONU L - ON 4 O �M �VIW NaD CONON LO 1-0 Nh y UU N - N z zz lo =O>j.wul OO O0+ Na co-0 w Oc® OCCKN NE 0, r f z ¢ 3 ❑w //n`\ //n`\ //n`\ /}//nn`r\\ 4 4 4 UUZ ❑ IJ IJ IJ Ooc �N3 U N= N- c Q K O V N L O V 9Dt N°w�D - 2L.2 Ern°Op p- O w p ape in OO._ 1I IIJI IIJI IIJI IIUJI o -- = t �� QOic D+-O�uo NPN o. EOam++ A-0 NO-OL NOLON cNLLN H Ut UDUN] Ory+3pi .ENO+•- a dN C `OO•- O N]O 3w0.-- -00O -OL e • Z N Q 286 2018 STANDARD PLAN T10A Agreement o. 636 _N o. a o a W w10 3 W Z I y =1 m o o o w LU e oLU r w Q- Z w a -� w w - o kh� o o e }/p\r IJ �, , W, ® J r a z O O> a LU 3 o w z • _i. •o+ o •i` 5 a� o o • oo ~V�O m • oI z Z Z Z w n p We"I oM vZa ¢ w ° • • • • • p �� �U v of w Jy c o 0 o of ,• o l I .I U. w a03 O y, 4 ^� U. W • - M W vx ° m¢ y + r v ° I w l e Ld _ _ LL m m m tc c w m" • 17 • . ®� 1z1 w a v v v Z o- ° N E ° N lur w / ° a • z N o W Y O • w �� C JOa W p O ❑ NQ °N ° 0 ¢ W0 m J ONlI -z + N h0 0 o°aut-a0N'}N;N- •1} mww QQ w w • •Llam OUvCENtLV0 Yc3 DN }m Ov a z1.1 cpJ m • ca ❑< L °ca.pvc} P. N♦N;Ox + 0 in Oa N Q mw ToN-cO3D TO o WO LN vNW O_ � O E. O Q ° r �I W '80 -.0 NL O dD ytnjD�LOLY tL_O DO p�GD DL}NU�O cf D Uo. 2, cp U _ No NMCOLE' = H -- -6 vn jtQ �Oa+v o e 1 1 �O 3 =I e a U°o J O97 LC v,ph NE_ ov, NLilO ano M}„ °� � coa �f w W� W 1 L) _ v °- -.i N - Dv E 01- OW N [�00.-N JO N zaw 1 NQ W NOD Jt00 00' - O�UC GNTU LU O' J wncN.°°v °" 00 aVO Uv�cv N= ¢ 1 mi „o °� 'v-- Soot°Ea oim w w� } a 0, r v O MO d.Cp� - 3 Cry Wk °1 1 w Q O _ •I U °n°}D°� v°a oorvvn° j�v o+ w0 'O�NNt O N • J K¢¢ L O OC EUN�NO} �W C� U+U Ent E CLOp'jLUE cNt JtN� CO`, E ULOTVO W+ vNU O EpNpWwp.- o ® ° ~O aN ou Etw HQ 7w 0. .--o N; �^ � z mOL a tiaWZ\L I W m \ \ I III a a az U o o ti UJ W \da ~ N `_ '"w O a _ o ° OVN a'00 rn O Nv ° NL t v OWE ZW w w ON N¢ o NNc'+t h}OE a;oN W� � O] '_ LNtt + ._ aV. �D9 EOL WLOL o • zm wZ -6 aoc00v cn mt a}c° 9 ON UO �O] Uw0 O,cOC O '-OO.v • ina `s • • L' W p0 NLLO w W WioL EaDO u`� + WOO'O atx ~ w°1m��wcON_0 aW z h ¢ VcNQON'o D+yO�°NU DtEO-°NNU O DQj}NNmOO SoUON;U QUNW _ON Ca N z OO> L t > U LI- OWN ❑¢ N U rd Cat 3 OOL NW3v ¢ UUC IIQQ a w N U°D U}LO�cO zN v �LOU UN D� WN �D WOCL EyO� M] 00 IIIJJJ zm c� s ❑¢ ° n /, /\ /\ ° W oah ao�N000 NN v Eac10 ou K3 �ii lC �ii .iC wd Wz w �Oa lur yur yur yur z I ._ N L L 'o-'O x} O C W L t j N �� UDON] 0- zw n K3` z n ii. iC ¢a �(`JH-yvl °co c+° o �.}]o -o NL 4.11. �C o¢ n 287 2018 STANDARD PLAN T11 Agreement o. 6361 N N - oU W Z J F `oo u � �OZ u m 0 Imo EY W 0 „ 0 y w Q M � y CC r N Oc _ _ za aWy c =_ w Q M o= J y > g Y 0- ❑<❑❑ OJ Z Q LLj o L r z O s o oz ZOV= o :a ti 0 W a z W — ;v c <C>Z = E p Z • N a U N o U J a N N ¢ a Nv � J ❑tt] M p nyLL +O d N N K o ~LL "- Oa 0 J zN: o z jj jj n n goo m v _ LL JVl JVL yIJ� yIJ� z L N p p r d c ♦ N O 0 - c a N t 60 i D OaCy Nu O N D _ p Z N C. CUM N N LLJ O Ld p._ a a a F- N N c •u Li.l w a w p w N a o w w z 0 w0N O N E Q a N O O N • O QO I• p N N ; 0 N _ 0 U O • i0(1 w - N D Q z z NN UO w oN I•` '-0 °N w Y O Na 2 • O O N� • � L � LaJ t O I° N D va N j LA E •y n . • O `v • `� z L) O, INw N�NE N ay -� L . N w a vN� l U _ Q • J U p ? N � N NQ DOD p aD D U N `• d N �• J v ` NN NON • v Q 0 ® w U ¢ L L O O Z U �O Oc.ty Js14 M` �} ° r } 002 ° at � vx aa� sv u 16r �aa w wi v° t �t wu + OE xU� op N CD � Op 1 �O c O L • ❑ N N�D vO ; > MI - p n0 Nw � pv0 }N'- f ON L}0 DNN Nw � �WNN .;N'�p ¢ UN OOU m �n wI �o ata a � ❑ '� a y N N O. L N 'Y O '0 LN Ot O N L W Ot } 0 w OOtY t 2Q Kw CC QUO -O NM O •- so g(a a D =L =nN 2T5 Zi NZ D] Nw OOO c N d _ L O D L UN CQ1 �Nq Ntt Qp N4 pL /I\ O - ❑Q N E a N 3 0 a t N N U • O CN < O QUpp N CC 3t NOo ¢jL N>N. Jjj� Jjj� p U V V Q Q K= w 0,22 =a� Eo�L oz Q 3 NON DOO N NNt JNNp LLj U-N-U C- In pt NL O03 -pU N LaNac O}� •EOoo 0� U w w w v ¢ O.0 O O z CV M v 288 2018 STANDARD PLAN T11A Agreement o. c Q • a LLI H � zY c a 3N • a LLI y Q Q • a 0 3 O CO3 s m z z y H LU �Algr J LLI Z M oT o a r B ElZ LLI Om o 0 Q > X J �JZLLla � O N _ a11 z o_�Z Z w • w V m W Q Ln 0 } o a v LLIQ CO az L�C3J� N� Z LLZ�Q ou=J� O w 0 OC O N r V C V O� U + u IJ 0 Y w �• LL vx o N + • N N ON O a O E LL + M t Q 0 N N N U L H N y O] U L N O M +a _ °oo m o-N W NO U W e N h O a O NLL O U is �O O O .OL�- 5 ddN N (A 33 NC DMO + O +O Ot D. Q • p� O O O O ~ c O O w Q t L n_ + v Z w W M O U ° MO O C O O O] Q ¢ Q 2 w O O o n N _va J z in O N N IU w N CcC m u J o '^ 3 ❑a ' o W N OUm DC° �+ - O U Q N N c Z V°'1 S U N LO L W • U U Z T Opt+ 0 N 0 o a'y Q you ow � ° Uo UN f • LLI O•L Zv LM U Y ¢ LO U N °O J ?w,,, Not ^y o3 U z a w a o a ® e a ❑m a Q a 0 u m P ar 'oL n h d oNa • • �( Z cu`�iv c�D ov _U� N� Ub F— y 3 EL+ p+ 0E N •I > oc dm ¢¢ J x x x W Z m v n Z v Q v N • - O d w w O rn00 za z '1\U • Z OL N- V) W W Z e N N0 O - N +O U W U +ALL ON _ N z N .O iw m+ wU N 0 LO OOLN N° r 3V1 .-D HOC t OL L O� - N0 }OU 00 ; - 1 �m • N +o a°o,m o0 U + U N in zF ❑ � W o+ Qo ° u o.o 6 K z � � Kw U CD NL ND -0N o N n jj � o << u,� oNo�o cE U �vl, JVL D U O Oi OL y) w 3 � �� • ON mUt� O O w N No t O O a J o cv 3yn W Ci V�1 ¢ 0 0 NE 3�NOU U?m 4 UmNY W d , ;w •-N N UL zz w N 0 0 0 J r w LL 4� 4 • N DU EL-o 0000° aoc o On D__M (�Ct O•� O d+ L Z N M 289 2018 STANDARD PLAN T12 Agreement o. N z W 0 HWZ� y�0U) _ 3 > Ny�W m o O Z M _ c g3= N • <o J J W a 00>x �y b - _ M Z W p0 a v Ja� U.a ` BU.10 J 3 a- o I xxax • � H 0 (7 ° o" 0 Q Q U. x E'Iz E " o mX N - w <z } cj Q w W E 0a } � • w N O ]aa "v C } O Ev 0 y w a U N N O w M w. ar 0 0= N . 1. o�w } aam m N.. • z is oat °r vo a NO OU Q 0 -O Q r C ; + C p O O O • N t N D} +O ° 01 DV LL J Iz J a z NF 3 v ❑ 3 ❑wO p °kU w w . o.m o o J o �. n a� Fx Z a I,u? !Cs `•, U r F a. . .I •I 0 0 � o W :za k z fCs 3� N • v N m NI= W Z - - n z w w I. ` w o " v o w ] ct a} o 0 w 000 wZ I - tiU Vl + ��pw W N ❑�� w D }° Ow C� O ° } Lm> w =N+ NT 12, Ohl }+-+ .�WOrnO N °O HOC W N o z O —Iz — — 11N Ow L O O0 N= WO �N LN W ~ �N u. N0N Nw OC 3O w+aCN asjW OZ aa d LLa oz i D° 0 o Mu -CEvQ0vEEx 000_ UJ LD N-vvat i0E Lv�> oov W a ® ~ ON N w �I\ QKW o N E c0� o° U 0 '� O O W o'- N+ •yU-� --w. D _ O vjG N p+Em 100 V O . ]° E}° ad�3c} t Ow ° 0DL p O ECo-0°y+0 nE.° I 0.1CDO au FNaa E. ¢�< N m v n r 290 ZU15 STANDARD PLAN T13 • I I l b� Agreement o. 0 z o g ¢ m J W Z Q U HOZ — co 0 W a > W F O o" & z E ¢ W a o Z w a JAw W V0 w LO Ll o � w a = a 0y> oZ 0ZQ °' J c¢, - (j, 0 Z V = O W (3 Z Wz W _ Vzzx a V J J wM LL LL00 In Q LL Q � � Q F 2 � ~ d CO w W N o i- a ~ w O J N M J W Z CL x x x x m M M M R v ❑¢ ❑m ❑U ❑o ❑w Z V) N D N v N W a E o O + -0, 0N N ]O y - N o n � - at O 3 D 3 O U W y N ❑¢ Z D � yy 00 �� W UI 'U N�� O N +Op+ON C p � NO O� U y ¢ D O 0 U U3+ LaVLy p D +N N p0 c t p W c o D U • p 0 L W O p p c N Q+ O] W L M O. O D y am+ O N O E n D p O. m �pc o �� p p +0 U M N '0' N O L p O 0 p N N a c W w c W L a p a N - N t L a v - y b D v .. p a O W y N L D C T •N N Q O O N L N } L T O 3 0 3W pD O. _-NCO ] o N p�N O. = Cps ] _ p� L ac a N L O•- O O 0- . N D O ✓i T p N E L p E p Q U a 3 0- - U N EO 0 0 o U N y y u N- O J� U C+OatC 3 D N•L p 0j+ � ¢Dw J x CON OO U D L U+ V y¢- _ ¢❑ U 'F U�NQ0 p N- U c ZN+ W U ^¢ya O> O U p U d N E m O Q c W N 0��+0 UON +p L p0_O N QO7 OU 3 011C + N + O U O O N m L cw p+ O. ND N W 00- W 00 F cD w ¢00 ¢ 0_t Cp w 1 ;¢ O+ ww Z N N M v vl t0 I- m J vl 291 LL O� ao Q w r ED m a m c5 J • � k �I- 17 t n 1 T NI ❑❑❑ ❑ 207E STANDARD PLAN T74 • N W O ° o - awa 2pW ODU .DE mwoa o; D+oo oLoo O N o Q � CDo a+O�v o0 t E o O N❑ m U o M]OO om a NO o - a�N ¢ S o o m T m a b L o.° ma c o of L m+ t o aw o oy } o m w + c o + v N o no a D � y rn w � m � o Q o O <OLN N + D � Uo v y D Q N ❑ oc D•- K O OCTL .-.w rvt o+ ¢ •_ O q mp_d'C D Eon UUNON aDN L 3 o a o L UN Oj p�} ] C D ]y a0 +oD NiI N C 4i p w a0 N - C P o m g - rn D - L M W] K M y O T yE N m O o 3to p U u o O v L ++ DO o3NNU O O L O a m EO 4 0 = N U o y dWtla �_ ou O CT+ owmcu L N ODC oOE N E p _ N E_ 30NVdiN3 N + W of L 6+D Uw aN oQNN} UO ty o. Ddy L o�0++ �u�o N Co o •Ey ,.. F o QU U p U � C uL RU W • 2 ww kO w l • W ¢dz • <M � �z N ❑M K 4 IJ IJ IJ m w OP �d ow O VI KJQ • N U 4141414 FO a� M _w ~Or ❑¢ U�z._ Z III m 2 w • M X O d Z UIw/11n U mI r W M ° ME " Iw. z ¢ w • • 1A loz • `� o� Z 0 1 az • o M O N U 11 w III••• OQI I a z. wM •Ic w 1• 3 ° u 1 l z U M d • W N z L) a. a ir N F- 0 x W c U o a =�•a' � 30Ntla1N3dWva •.•—� reemen c o. C W /~� W N M �a 2 N C W 2 V J oo Z c O W z Y Q i Z a L)a. r V Q 0 z_ LLp z LL LL ir MaM F- Ii F F = oc _ H u ° 3 oN U o Q Eir o N N W +v Z O it o f E F- z °or - W y 'o � C E 00 ' N O U W O a 0. O N L 10 NN O mot n,o � .,o o O U a mO L 0 N C - o O D N},y N N + O O N a W U m o v o v S o J d D u y L a L I N� 2018 STANDARD PLAN T15 Agreement o. 6361 2MO LO LLI CO) H > ��3 o N W= _ v,LLJ c�x " r N a o J W x M Q S z aR OZ w o2z w=_ M w a M a LLJ a Z N w J Z L) s o IL❑< ❑� W o 0 0 J z w h w �x J VOA LL o m Q Z oo� w N ; �00 L L y O r O C° � � iL 3N Z p _ a - O._ v E a - °E N Z E L t C L � w N E O pE vco p OLL MDO N N C W J U N y U O c O d D OVOE U_- N300 �Lv OL-> I L oD yUi} 'aj0 lo WN OmO yON c p U pN j YN' CND 3 C 0 O - U 3 0 N L Z w w O> O+ Z L } F i d 2 O E° H 0 N L N D J O•� FULN LdL _ W >- L O D E M iN Z Q N c =cl ^ ^ ^ D O a+0 O Z ^ O N ZM Q > <p c 9v= u �am roa0 o F° W Z c o z J =o>m a ay vo o o -P- o} 0 O LUp J °—vDLc°>m} °aac W Lva E`�m -aye L +mjO o sno oQot wmo w +c a,a mom VI N LL N Orn m w E L y U N O> VI o D m w O O a,�LMy+ vrL `Ov O J Z U W O O Cho] OV- W Q O L 30L N d LLNb ]N ] a 0 0 N U °° p U W �O J Q y�C LOO�p OOO Q ND v9 Dap L } = N L J-- ZNNO 3Na <w ❑<w _ v tea° ^ F- _ u GO w � -+A v•3 Ou Nt L+Up + yw aaz O O >oco r°°'+n m3 rin �zw Er W T =� u._ _+v SOU L L - N VIN O Y O}] v+ O > N w 0 0 U N L°LD U� 00 -tO-E .-.jLU LNr +00 D a3E40 3O 3 W W 20 JU D U1 L Uv •- y } Op L p b¢ ¢ Of] LZ bw_ av� .N°EQCta}LL 9LN }V N E O O U�y�Q �Ow LNL O. Eip , LOU.L 3 DOOf3 03 NJa CL j� L OQ�LL > jQv D Eri so o Q a p U K F 0 0_ v - a o v} v v 4 ¢ 3 6 O L L OC;jN w NL>LLNL•N �}L C]�N NLmN U O of ° v q+ O+ O +O .E > O U O ° 3 Of '^ N ^ Of C N O+ EL N> _ NLL �9N 0 L3 UO LUpL� } NN NDDpNN N} - O. E°> N v- y N � a U D- N�N � U U C ,zwN} cc OCHE 0. DEC (nL ]� N O N v} N E M - J V pfT O M E N N y 0 0> _ v y 0 (L° °Lot 0- 0 O N .pN=4"LU UNQo EO Va>t EWyo °c oL NNNN 40-+O EN L+ LN LLI+LNN�}O p•=L L •�O >OUcj j =>QO t9 } N° E U - N ~ wdOr�EEmOo =a>O a0 �c=� >aOrOn z Z 293 2018 STANDARD PLAN T16 Agreement o. 6361 s LU M M y co � yo a W2 w Nm G a N V N �o OO V _ oW �_ Q w z <~ J W 2 oa OZ m s�Wh R J Q w z o z w o �N _ a O - Q a W co - ogoQ P a = LD a- H J v ^ o a _ J � w_ u� Z oo Z O Z QhQ 6 0 z J Qo Z o V>J o ° LL22 O v ° � O u I �1 v L O M M i L w > Ii ° D �00 N w � o n n- 1L v ^o h me w w w ° �[NN O mE z0 Q2 pin ac � W 5 ✓wl ✓wl �D ^LQ //O a cF° NNm c0 N D D V O E C W ° V 1 0 W W o v N j o E M N a 0 j O W Nw ; a ] N W 3 y O W O1wn YUO �L cc 4 LL . w == a 0 w 3cU O+� ° O ° y W o - ZW O + W 3 TO 1E rc°a D WT W w c W QN 9-'- Q 0 a'� WL Em; aOo ° WaN o > J J Ci W>- i° W o, c p r '] ' Q o L> v Z 3 yam wia o •`uNvo pa w C9 a p r`W a o a t>'L+ _ -W •L +WjO O O°m coi vucn .;Dc K LLI Ld Z NW; }L OfN QO} �Ua L p>Uf0 c O N J moo p O� WND Uam Q GLO]� J �-� 'on .a U -a] °cC o2�w W u ° o E -ppLd Z NmW Ulcn O J O WLO vOj N WL E L W ] E U U b TEp N � Z ZQ 0: N; S. N L y y�- > J ; -> U O O U �' O N v •�+•C.p+ W 2 •L- O Oc j +O Dp W O•L jLU -LCN VL100> ;EO ¢O 30 W � ^ W N W~O DCQ pLt N ° mp ° .EO �.�y W J._ m G Q N a E v +_-QEm(W-q�ZE<O LLI CO N¢ 0•Oi�ND[0i QNN0° ,LLpNaTN VO°41 =3a •�+ -p�Q3LOEQwe DWj aOa�WNvL cT_UzN 4 4 4 4 Uw M. wOoE] a0 Nap NLNc0¢oE Oc E;LL0O+E•WOUw Dof W CO. O]Uz N E °E _ LLI LLI >p ¢ NL_O N; rn NWON NO W O > °ENNN WO WN t- J J �°W'MZ oL> 'c NE v°>E ,L +NQ-+v] O�E Cp ;cD•c � U In c°m ]ob°- o E U WQ N UD •-o _ co° a0 El .a>m a- 6�=t 0, °ON O Z M v o 294 2018 STANDARD PLAN T17 0 0 N 0 0 i Ed, az lw Ld N v J w Z _ Q d � Z 000 reement Ny. 6:3 2mcn ,, W n >. r rya O3 z >- J N O M Zo J W = 2 z O Z w J MaW U ao ZJZ z Iz a O(7� VZ �VO� LL�H LL aMZ FOO LL h > E v T o n _ o - o N O a N o Yta voa aL°Ou v a- > s a= uL O o Oa L+ ;+ O T•t >C va w f U U O>L+ y U p L E a O -v O O.Y LN p L D U OOf ° � +W>o } U p d � U W L Ot t y° N m E E; 3 N L > N U O] L ]Q L N L + O D D 7 N~ oL v p N + 3 O o U N a N N N a N > D ° 7E+ + v >° O o y u N L v N L - p>- E M O o N 3 Lj C O d D N p L+ U O v v 7 N U e - + L c OU E > _ - - ao n>o ti m sEo m c SO o 50 ... 30 - v t a t O 4 O i W w O D ' o +O o N U ° U L N, v O ] O o } o UO ac v v + w oL° O y >oA v o c +o•- o v U u a D o o o c v E 0 v + O U> a v vo L y U a°N U} y 2 o a v N O `� U L O y v 'L N cc E o o o f .N D o ° p - .-, v U _ o ; E + N - + ;] N + O o c o Q u o °iv ywN N N C NO v+ N O Q >- v rnv o c ° '_ m NEB n E o N LL t D O O O v Ot O N N O N - v a L po. •I' Lj o } D'O E� p W v c � - m y O. - - O L o L N v U } •yi m pi y O O L N E m y p� N O� E rn' C.- oam+v v o-L O v-La _U N p N O1LE >D - E E v�yo rnyO oiv 0 ON N U N U 0.0 L c N LLJ C. rn EQ_t U 0+ U° _ N O d > u° vLir >+ �> Z N M Q ^ m 295