CONTRACT 6049A Amendment CLOSEDAgreement No. 6049A FIRST AMENDMENT TO AGREEMENT NO. 6049 BETWEEN THE CITY OF EL SEGUNDO AND OMNIS CONSULTING, INC. THIS FIRST AMENDMENT ("Amendment") is made and entered into this 14th day of October, 2021, by and between CITY OF EL SEGUNDO, a general law city and municipal corporation existing under the laws of California ("CITY"), and OMNIS CONSULTING, INC., a California corporation ("CONSULTANT"). The parties agree as follows: Pursuant to Section 34 of Agreement No. 6049 ("Agreement"), the not -to -exceed compensation sum of Twenty -Four Thousand Eight Hundred Eighty Dollars ($24,880) in Agreement Section 1(C) is increased by an additional Eighteen Thousand Seven Hundred Fifty Dollars ($18,750) to establish a new aggregate not -to -exceed sum of Forty -Three Thousand Six Hundred Thirty Dollars ($43,630). 2. Pursuant to Section 34 of the Agreement, the Scope of Services in Agreement Section 2 (A) is augmented to include the additional services specified as Task 4 in attached Exhibit "B," which is incorporated by reference. 3. Pursuant to Section 34 of the Agreement, Agreement Section 8 is amended to read: "The term of this Agreement will be from March 1, 2021, to June 30, 2022." 4. This Amendment may be executed in any number of counterparts, each of which will be an original, but all of which together constitutes one instrument executed on the same date. 5. In accordance with Government Code § 16.5, the Parties agree that this Amendment and related documents in connection with this Amendment will be considered signed when the signature of a party is delivered by electronic transmission. Such electronic signature will be treated in all respects as having the same effect as an original signature 6. Except as modified by this Amendment, all other terms and conditions of the Agreement will remain the same. [SIGNATURES ON NEXT PAGE] Agreement No. 6049A IN WITNESS WHEREOF the parties hereto have executed this Amendment the day and year first hereinabove written. CITY OF EL SEGUNDO, a gen : I law city, A&�A City Manager ATTEST: Tracy Weaver, City Clerk APPROVED AS TO FORM: Jnaq in Vazquez, _.... De.ti ty City Attorney 2 OMNIS CONSULTING, INC. a California Corporation btl�W � Irvp 47 P A rP� Noel Zemle fi�'P'4If YNR �Cq pu nN�l C9w h2�yfl Rxer 4i Yya��u ,wnw z r i mr a�a rwzr�.i�r��x Noel Zemla, President Agreement No. 6049A XHI IT' B Omniss i gg Inc. Civil Engineering Design Infrastructure Management Construction Inspection October 8, 2021 Floriza Rivera, Principal Engineer Department of Public Works -Engineering Division City of El Segundo 350 Main Street El Segundo, CA 90245 Subject: Proposal to Provide Additional Engineering and Architectural Design Services for Recreation Park Equipment Check -Out Building Restroom Upgrades Dear Ms. Rivera: Omnis Consulting Inc. (Omnis) is pleased to present this proposal for engineering and architectural design services for the subject restroom upgrades. Our team will include one (1) subconsultant, Designer Projects, for the architectural design services and preparation of the architectural plans. We have the resources in place to meet the City's needs and we are ready to begin work with your authorization. We look forward to again working with you and the City. I can be reached at directly 909-631- 1537 should you have any questions or require additional information regarding this proposal. Sincerely, Omnis Consulting Inc. Noel Zemla, PE Project Manager Agreement No. 6049A Infrastructure Management Construction Inspection PROJECT UNDERSTANDING Omnis is under contract to design upgrades to the two (2) existing restrooms within the Recreation Park Equipment Check -Out Building (Check -Out Building) and ADA building entrance and path of travel upgrades per City Professional Services Agreement No. 6049 and Purchase Order No. 30-00422. The City has requested additional design of the Check -Out Building to expand the current (190 square feet) restroom area into the existing storage space (approximately 400 square feet) and rearrange the 56 square feet of utility room area. Basic Services covered by this agreement are limited to design and preparation of drawings for the purpose of providing a set of construction documents for securing a construction permit and to obtain construction bids. Submittals to the City will include Conceptual, Preliminary, Pre -Final, and Final plans. Technical Specifications will be included with the Pre -Final and Final plan submittals. The final product will include final engineering and architectural plans and technical specifications for the construction bidding advertisement consisting of: o Four (4) restrooms reconfigured to comply with current ADA and CBC requirements, updated and upgraded with new plumbing and fixtures, accessories (such as mirrors, paper dispensers, etc.), interior paint, flooring, lighting, and other needed repairs. SCOPE OF SERVICES Task 1.0 Proiect Coordination Omnis' project manager will coordinate the project design through permitting with the City and bidding by the City. Omnis' coordination efforts will include: o Coordination with Public Works staff for the design intent and design criteria o Coordination with Designer Projects for the preparation of the Architectural plans o Coordinate with Building Safety Division for all plan checks and permitting Task 1.0 Schematic Design Phase The Schematic Design Phase services will include: o Architect and Engineer visit the site and field verify existing conditions. o Recreate existing plans to include the additional area. o Research code for compliance with ADA and California codes and regulations. o Design the bathroom and additional area to comply with ADA/CBC and fit in the current footprint of the building. P.O. Box 955, Chino Hills, California 91709, Tel: r Agreement No. 6049A Omnis Consultin c. Civil Engineering Design Infrastructure Management Construction Inspection o At the completion of the Schematic Design Phase, the Architect will provide the floor plan drawing for review and approval by the City for the following options: 1. Adding additional Plumbing fixtures and upgrading the Electrical fixtures without rearranging the existing utility room. 2. Upgrading all Mechanical, Electrical, and Plumbing (MEP) systems to the current codes, utilizing the current location as much as possible. 3. Upgrading all MEP systems to current code and relocating the utilities to a different location. Task 3.0 Design Develo meet Phase Once the Schematic Design is approved and one of the three options is selected by the City, the Architect and MEP Engineer will prepare the design development drawings to include site plan, roof plan, floor plans, reflected ceiling plans, interior elevations, sections, Mechanical, Electrical and Plumbing plans. The design drawings will also identify any design issues requiring structural solutions. The Architect and/or MEP Engineer will attend meetings (virtual or in person) with the City for resolving any design issues. At the completion of the Design Development Phase, the City will receive a set of architectural drawings that will be developed into Construction Documents. Task 4.0 Construction Document Phase After approval of the Design Development drawings by the City, the Architect and MEP Engineer will proceed with preparation of the final construction documents which include: o Title sheet with site plan o Roof Plan, Floor plans and reflected ceiling plans o Interior elevations, sections, finish schedules, and signage o Architectural details and specifications. o Mechanical plans. o Electrical plans o Plumbing plans The Architect and MEP Engineer will provide technical specifications for utilities, plumbing fixtures, accessories and finish materials as needed. Construction documents are for the purpose of submittal for a building permit. A meeting (virtual or in person) with the City is also included in this phase. At the completion of the Construction Document Phase, the plans can be submitted for plan check and processing to obtain the construction permit. The Architect and MEP Engineer will respond to plan check comments as needed until the permit is obtained. Agreement No. 6049A Omnis Consultjm Civil Engineering Design Infrastructure Management Construction Inspection PROPOSED SCHEDULE Schematic Design Design Development Construction Documents Total 2 weeks 2 weeks 4 weeks 8 weeks FEE PROPOSAL Currently, $8,460 remains in Purchase Order 30-00422 and these fees are required to complete the design. The below fees are in addition to the remaining budget in Purchase Order 30-00422. The hourly rates below include all direct and indirect costs including labor, equipment, materials, supplies, travel, etc. Task 1.0 1 Project Coordination $2,320 Task 2.0 Schematic Design Phase .......................................... $9,000 Task 37,0D iun Develo ment Phase $9,250 Task 4struction Document Phase $18J50 Total Additional Fee Required = $39,320 Additional services are not included but may be provided if authorized by the City. Additional services to be charged to the City based on hourly rates and include: o Structural engineering design and calculations. o Geotechnical, civil engineering, environmental and landscape architecture. o Colored renderings. o Revisions and changes to the City's previous instructions and information. o Services in connection with bidding, contractor's proposals, and change orders. o Job site visits, meetings, and processing beyond the scope of services. o Construction administration, construction observation or project management. o Other procedures and requirements that are not known at this time. o Any services that are generally not accepted professional practices. Page 3 of 3