CONTRACT 6209A Amendment CLOSEDAgreement No. 6209A FIRST AMENDMENT TO AGREEMENT NO. 6209 BETWEEN THE CITY OF EL SEGUNDO AND GMU GEOTECHNICAL, INC. THIS FIRST AMENDMENT ("Amendment") is made and entered into this 22nd day of November 2021, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation existing under the laws of California ("CITY"), and GMU GEOTECHNICAL, INC., a California corporation ("CONSULTANT"). 1. Pursuant to its Section 34, Agreement No. 6209 ("Agreement") subsection C of Section 1 is amended in its entirety to read as follows: "C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed Fifteen Thousand Seven Hundred Fifty Dollars ($15,750) for CONSULTANT's services. Unless otherwise specified by written amendment to this Agreement, CITY will pay this sum as specified in the attached Exhibit "A," which is incorporated by reference." 2. Pursuant to Agreement Section 34, Exhibit "A," as referenced in Section 2 (Scope of Services), is amended to include the additional services set forth in Attachment 1 to this Amendment which is incorporated by reference. 3. This Amendment may be executed by the parties on any number of separate counterparts, and all such counterparts so executed constitute one Amendment binding on all the parties notwithstanding that all the parties are not signatories to the same counterpart. In accordance with Government Code §16.5, the parties agree that this Amendment will be considered signed when the signature of a party is delivered by electronic transmission. Such electronic signature will be treated in all respects as having the same effect as an original signature. 4. Except as modified by this Amendment, all other terms and conditions of the Agreement remain the same. [SIGNATURES ON NEXT PAGE] Agreement No. 6209A IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEG NDO &��' Elias Sass6n, Director of Public Works EST: Tracy Wea er, City Clerk APPROVED AS TO FORM: MAI ,Kp. HENSLEY, City Attorney Joaq in Vazquez De} y City Attorney G GEOTEC NICAL, INC. c Grego Silver, Presid t10EO Taxpayer ID No. 33-039134 Agreement No. 6209A ATTACHMENT 1 EXPANDED SCOPE OF SERVICES Agreement No. 6209A November 19, 2021 Mr. Elias Sassoon CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT 350 Main Street El Segundo, CA 90245 GMU Proposal P-21307 Subject: Proposal — Geotechnical and Structural Design Services — George Brett Field Scoreboard Foundation, City of El Segundo, California Dear Mr. Sassoon: GMU Geotechnical, Inc (GMU) is pleased to submit this proposal to provide geotechnical and structural design services for confirmation of existing scoreboard foundation dimensions and embedment and additional structural design services related to the connection of a proposed new scoreboard to the existing scoreboard foundations at George Brett Field. Connection to and utilization of existing scoreboard foundations will be possible provided the footings meet minimum foundation requirements per our analysis. Foundation internal strength with respect to amount and size of reinforcement, (if any) and strength of concrete will not be inspected or reported in any way per our scope of work outlined below. We proposed to perform the following scope of work: Task 1— Geotechnical Investigation Geotechnical Site ]nvesti gatioii • Perform a site visit to mark the location of our planned subsurface exploration. As required by law, we will notify Underground Service Alert (USA) of the proposed exploration location prior to exploratory excavation. • Explore the site by performing one (1) hand -excavated test -pit to a maximum depth of 8-feet below the existing grade at the proposed location of the scoreboard. • Confirm scoreboard footing diameter and embedment in relation to the lowest adjacent grade. Confirm connection type between the existing steel W-Section columns and concrete footings. Confirm surface grading at foundation location. • Collect bulk and relatively undisturbed soil samples for geotechnical laboratory testing. 23241 Arroyo Vista Rancho Santa Margarita I CA 92688 949 888 6513 1 FX: 949 8881380 I www gmugeo com Agreement No. 6209A Mr. Elias Sassoon, CITY OF EL SEGUNDO PROPOSAL: Geotechnical and Structural Design Services, George Brett Field Scoreboard Foundation, City of El Segundo, CA Task 2 — Geotechnical Laboratory Testing l�alaor'ator° "1"csti.n • Perform laboratory testing to evaluate various engineering properties of the sub- surface materials. Laboratory testing will likely consist of in -place moisture and density, soil classification, direct shear testing, and corrosion testing. Task 3 — Geotechnical Engineering Analysis and Structural Design Services Geotechnical Engincerimmrm7 Anal scs / Desi" ii Letter Preoaratioji • Analyze laboratory testing results to determine the sites deep foundation design parameters such as axial capacity, (end bearing and skin -friction), lateral capacity, and minimum required CIDH caisson diameter and embedment. • Provide a geotechnical design parameters letter with laboratory testing results and drill hole logs to be attached to the structural calculations packet for submission to the City of El Segundo. Str-aactural Plans and Structural Calculations • Complete structural analysis to determine if the existing foundation meets minimum requirements per the referenced geotechnical design letter and code requirements for overturning, embedment, and bearing capacity. The structural packet will be supported by the geotechnical design parameters letter from Task 1. • Complete structural analysis for the connection of the new scoreboard steel columns / posts to the existing foundation provided they meet the minimum requirements explained above. • Provide structural details for the scoreboard column connection to the existing foundation for submission to the City of El Segundo, and the contractor for use during construction/installation. City Plan Check • GMU understands that City plan check comments will be limited. Response to a single round of plan check comments will be provided under our scope if required. Note: Task 2 will be performed for the type of scoreboard which the city desires to have installed. The construction plans will also include detailed assembly based on the manufacturer's recommendations. Further, construction plans must include a note that the contractor must obtain an electrical permit and a building permit. It must also have a note that the contractor must provide the electrical connection to the scoreboard and must make sure that the amperage/voltage is compatible with the manufacturer's requirements. November 19, 2021 2 GMU Proposal P-21307 Agreement No. 6209A Mr. Elias Sassoon, CITY OF EL SEGUNDO PROPOSAL: Geotechnical and Structural Design Services, George Brett Field Scoreboard Foundation, City of El Segundo, CA Schedule — We anticipate that we can mark the site for dig -alert within 1-week from notice to proceed. Investigation can be completed within 2-weeks from notice to proceed. Upon completion of investigation, we anticipate an additional week for lab testing followed by an additional 2-weeks for design parameters letter, structural design, and plans. Total of up to 5 weeks for completion of all deliverables. ESTIMATED FEE We will provide the above outline scope of work on a time -and -materials basis in accordance with the attached 2021 Schedule of Charges. The estimated cost for each task is as follows: Task 1 — Geotechnical Investigation... .............. ........ .................. . ..........$ 7,500 Task 2 — Geotechnical Laboratory Testing................................................................$ 2,750 Task 2 — Geotechnical Engineering Analysis and Structural Design Services,..........$ 5,500 ➢ Total Estimated Cost (Tasks 1 through 3)......................................S 15,750 Please notify us immediately if the proposed scope of services does not meet your current needs, or if any significant changes are made to the proposed development so that we can revise our scope of services. Revision of the scope of services may affect the estimated fee. LIMITATIONS The proposed budget is dependent on the following items: The above costs include a single round of response to plan check comments. Analysis of existing scoreboard foundations are limited to external stability based on size and embedment only. Concrete strength, amount and size of reinforcement, flexural and shear strength of existing footings will not be analyzed or discussed in our final report. If it is found that the existing foundation is insufficient based on external stability an additional / modified proposal may be provided for a complete design of new scoreboard foundations November 19, 2021 3 GMU Proposal P-21307 Agreement No. 6209A Mr. Elias Sassoon, CITY OF EL SEGUNDO PROPOSAL: Geotechnical and Structural Design Services, George Brett Field Scoreboard Foundation, City of El Segundo, CA CLOSURE We look forward to working with you on this project. Please do not hesitate to call if there are any questions regarding any aspect of this proposal. Respectfully submitted, - GMU GEOTECHNICAL, INC. FSlI. �` Q JA> pli&' OP 1 r®t a Matthew T. Farrington, M. Sc., PE 90349 Project Manager Attachments: General Conditions for Geotechnical Engineering Services 2021 Schedule of Charges I accept the scope and budget estimate set forth in this proposal: (Please sign below and initial each page of the General Conditions on bottom right) Signature of Client or Authorized Agent: Date aav/mtf/P-21307_George Brett Field Scoreboard Foundations, (10/28/2021) rev, 3 (11 /19/21) November 19, 2021 4 GMU Proposal P-21307 Agreement No. 6209A 7-7 2021 SCHEDULE OF CHARGES PROFESSIONAL SERVICES Document Preparation and Project Services CAD/GIS Design Engineer Staff Engineer or Geologist Senior Staff Engineer or Geologist Project Engineer or Geologist Senior Engineer or Geologist Associate Engineer or Geologist Principal/Director FIELD INSPECTION & TESTING SERVICES $ 97.00/hour $ 118.00/hour $ 152.00/hour $ 175.00/hour $ 195.00/hour $ 230.00/hour $ 245.00/hour $ 270.00/hour Staff Engineering Technician $ 105.00/hour* • Services provided under direct supervision of a Senior Engineering Technician Senior Engineering Technician $ 118.00/hour* • Inspections for soils/grading, asphalt, concrete, batch plants, piles/caissons, etc. • Certifications by ACI, ICC, Caltrans, local jurisdictions, etc. Registered Special Inspector (No 4-hour minimum) $ 118.00/hour* • Certifications by ACI, ICC, Caltrans, local jurisdictions, etc. • Reinforced concrete, Post -Tension, Masonry, Welding, Bolting, Fireproofing Instrumentation Engineer $ 150.00/hour • Slope inclinometer and Piezometer monitoring • Manometer for floor -level surveys • Stormwater turbidity & pH meter • Groundwater monitoring - pressure transducer, datalogger, water chemistry meter, etc. •, Pipeline video camera for drains, wells, etc. Engineering Seismological Technician (includes 3-channel seismograph) $ 150.00/hour • Blast vibration monitoring • Construction vibration & noise monitoring (pile driving, drilling, demolition, etc.) *Notes: (1) Rates include vehicle, nuclear density gauge, and equipment for testing, inspection, and sampling. (2) No 4-hour minimum charges apply. (3) Overtime is charged at 1.5 times the base rate. Overtime is defined as time worked on the project in excess of 8 hours per day and all time on Saturdays, Sundays, and holidays. (4) Additional hourly surcharge for Prevailing Wage projects for Field Personnel per CA Labor Code §1720, et seq. Add $ 27.00/hour LABORATORY TESTING SERVICES Laboratory Testing $ 122.00/hour (For special materials testing and laboratory costs on a per -test basis, see GW 's Laboratory Fee Schedule) OTHER CHARGES Outside Services Cost + 15% Reimbursables & Reprographics Cost