Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2020-08-27 Planning Commission Agenda
PLANNING COMMISSION LEAR:y fIo AGENDA PURSUANT TO EXECUTIVE ORDER N-29-20 ISSUED BY GOVERNOR GAVIN NEWSOM ON MARCH 17, 2020, THE FOLLOWING MEETING WILL TAKE PLACE SOLELY BY TELECONFERENCE / VIDEOCONFERENCE. How Can Members of the Public Observe and Provide Public Comments? Residents are strongly encouraged to participate remotely via Spectrum Channel 3 and 22, AT&T U-verse Channel 99 and/or El Segundo TV at YouTube.com. Members of the Public may provide comments electronically by sending comments to the following e-mail address, with a limit of 150 words and accepted up until 30 minutes prior to the meeting: PUBLICCOMMUNICATIONS@elsegundo.org, in the subject line please state the meeting date and item number. Depending on the volume of communications, the emails will be read to Council during public communications and are subject to disclosure under the Public Records Act. Members of the Public may also provide comments in the designated area in Council Chamber up to and during public communication portion of the meeting. Members of the public must observe "social distancing" requirements at all times, i.e., remain six (6) feet from other attendees during the entirety of the event or gathering. Additional Information: The City Council, with certain statutory exceptions, can only take action upon properly posted and listed agenda items. Any writings or documents given to a majority of the City Council regarding any matter on this agenda that the City received after issuing the agenda packet are available for public inspection in the City Clerk's office during normal business hours. Such Documents may also be posted on the City's website at www.elsegundo.org and additional copies will be available at the City Council meeting. Unless otherwise noted in the Agenda, the Public can only comment on City -related business that is within the jurisdiction of the City Council and/or items listed on the Agenda during the Public Communications portions of the Meeting. Additionally, the Public can comment on any Public Hearing item on the Agenda during the Public Hearing portion of such item. The time limit for comments is five (5) minutes per person. Before speaking to the City Council, please state: Your name and residence and the organization you represent, if desired. Please respect the time limits. DATE: Thursday, August 27, 2020 TIME: 5:30 p.m. PLACE: City Council Chambers, City Hall 350 Main Street El Segundo, California 90245-0989 VIDEO: El Segundo Cable Channel 3 (Live). Replayed Friday following Thursday's meeting at 1:00 pm and 7:00 pm on Channel 3. (Schedule subject to change) All files related to this agenda are available for public review in the Planning Division office, Monday through Thursday 7:00 am to 5:00 pm and alternating Fridays until 4:00 pm beginning at 7:00 am Monday prior to the Planning Commission meeting. The Planning Commission, with certain statutory exceptions, can only take action upon properly posted and listed agenda items. Unless otherwise noted in the Agenda, the public can only comment on City -related business that is within the subject -matter jurisdiction of the Planning Commission and items listed on the Agenda during the Public Communications portion of the meeting. Additionally, the public can comment on any public hearing item on the Agenda during the public hearing portion of such item. The time limit for comments is generally five minutes per person. Playing of video tapes or use of visual aids may be permitted during meetings if they are submitted to the Planning and Building Safety Director a minimum of two working days before the meeting and they do not exceed five minutes in length. Written materials distributed to the Planning Commission within 72 hours of the Planning Commission meeting are available for public inspection immediately upon distribution in the City Clerk's office and on the City's website, www.elsegundo.org. In compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting, please contact City Clerk, (310) 524-2307. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. 2 A. Call to Order B. Pledge of Allegiance C. Roll Call D. Public Communications (Related to City Business only and for which the Planning Commission is responsible-5 minutes per person; 30 minutes total). Individuals who received value of $50 or more to communicate to the Planning Commission on another's behalf, and employees speaking on their employer's behalf, must so identify themselves before addressing the Commission. Failure to do so is a misdemeanor. While all comments are welcome, the Brown Act does not allow the Commission to take action on any item not on the agenda. The Commission may respond to comments after public communications is closed. E. Consent Calendar All items are to be adopted by one motion without discussion. If a request for discussion of an item is made, the items should be considered individually under the next Agenda heading. 1. Approval of the July 09, 2020, Planning Commission Meeting Minutes. 2. Receive and File Zoning Code Interpretation regarding educational service businesses as permitted use in Smoky Hollow Specific Plan. RECOMMENDED ACTION: Approve the Minutes 2. Administrative Use Permit for a Wireless Communications Facility. Address: 2240 East Imperial Highway Applicant: AT&T Mobility Represented Justin David at Synergy Project Description: A request to install a new fagade-mounted wireless communications facility for AT&T Mobility on an existing 13-story office building. The proposed facility will be fully concealed with fiberglass reinforced plastic screens and will only be visible from the interior courtyard between the existing three buildings at the site. (Environmental Assessment No. EA-1277 and Administrative Use Permit No. AUP 20-01) Environmental Determination: The City The project is categorically exempt from environmental review pursuant to California Code of Regulations, Title 14 ("CEQA guidelines") Section 15301 as a Class 1 (Existing Facilities). RECOMMENDED ACTION: Receive and File the Director of Planning and Building Safety's approval of Environmental Assessment No. EA-1277 and Administrative Use Permit No. 20-01. F. Call items from Consent Calendar G. Written Communications (other than what is included in Agenda packets) 3 H. New Business —Public Hearing 3. Termination of Precise Plan No. 87-01 for Environmental Assessment No. EA-1280 and Precise Plan Amendment No. PPA No. 20-01 Address: 2361-2381 E. Rosecrans Avenue Applicant: Toni Reina, representing Continental Development Corporation Project Description: An amendment to terminate Precise Plan No. 87-01 for the development located at 2361-2381 East Rosecrans Avenue (The Terrace at Continental Park) to allow the current underlying Urban Mixed -Use South (MUS) zone development standards and uses to apply to the project site. Environmental Determination: The project is categorically exempt from environmental review pursuant to California Code of Regulations, Title 14 ("CEQA guidelines") Section 15332 as a Class 32 exemption (In -fill Development Projects). RECOMMENDED ACTION: Adopt Resolution No. 2884. Continued Business —Public Hearing. J. Report from Planning and Building Safety Director or designee K. Planning Commissioners' Comments L. Adjournment —next meeting scheduled for September 10, 2020, 5:30 pm. POSTED: Vetum-Wem , Au,9w 20, 2020 @10:05 pvw (Signature) (Date and time) 0 MINUTES OF THE EL SEGUNDO VIRTUAL PLANNING COMMISSION Regularly Scheduled Meeting July 09, 2020 A. Call to Order Vice Chair Newman virtually called the meeting at 5:35 p.m. B. Roll Call Present via teleconferencing: Vice Chair Newman Present via teleconferencing: Commissioner Wingate Present via teleconferencing: Commissioner Hoeschler Absent: Chair Baldino and Commissioner Keldorf C. Pledge of Allegiance Commissioner Wingate led the pledge. D. Public Communications None. E. Consent Calendar None. F. Call items from Consent Calendar None. G. Written Communications (other than what is included in Agenda packets) Agenda Item 1-1 the Resolution of Approval for Exhibit B for the Community Benefits Plan. H. New Business —Public Hearing None. I. Continued Business —Public Hearing. 1. EA 1273 — 140 Sheldon Street. Smoky Hollow Community Benefits Plan. Project Address: 140 Sheldon Street Applicant: Scott Fishfader Principal Planner Paul Samaras gave the staff report and presented a PowerPoint presentations virtually. He displayed the plans of the second floor of office space. 1 61 The proposed benefit will provide two public benches, bike racks, landscaping and accent lighting. The applicant was present for questions. Vice Chair Newman inquired how the project was scored under the community benefits plans. Mr. Samaras stated that previous projects reviewed earlier in the year fell under Tier 2 level of review. However, this project only exceeds the FAR by a small amount so it falls under Tier 1 level of review. Open Public Communications Scott Fishfader and Patty Fishfader, the applicant and owner of 140 Sheldon Street, were present for questions. They stated that the Planning Manager, Gregg McClain, and Mr. Samaras assisted them with the community benefit program. Mr. Fishfader is interested upgrading the aesthetics of the building to be more appealing to their new tenant. Ms. Newman asked Mr. and Mrs. Flshfader how many employees they have. Mr. Fishfader stated they had four full-time and one part-time employees. Ms. Newman asked the applicants about their experience with the community benefits programs. Frank Glynn, the applicants' architect, shared his experience with the community benefit program with the commissioners. He acknowledged Mr. McClain and Mr. Samaras were both great in assisting him with the project. Mr. Glynn provided a brief history of the previous owner's concept of using the whole building as one space. He stated that the Fishafaders' design was a completely different design to utilize the first and second floor. Commissioner Wingate concerned about the parking for two businesses being occupied in the building. Mr. Glynn stated that they have provided eight parking spaces in the back and additional on -street parking in front of the building. In addition, the applicants are planning to pay for additional parking in -lieu spaces. Closed Public Communications The Commission discussed the design of the building, concluding that the benches are a great asset along with the landscape to the design. MOTION: Approved, that the Planning Commission adopt Resolution No. 2883, recommending approval of Environmental Assessment No. EA-1273 and Community Benefits Plan No. CBP 19-02 for an internal addition of 912 square -feet to an existing building at 140 Sheldon Street in the SH-W district of the Smoky Hollow Specific Plan. Moved by Commissioner Wingate, seconded by Commissioner Hoeschler. Motion carried by the following vote (3-0): Roll Call Ayes: Newman, Wingate, Hoeschler, Absent: Chair Baldino and Commissioner Keldorf C. J. Report from Planning and Building Safety Director or designee Director Sam Lee welcomed everyone back. He mentioned that on July 21, 2020, the Council has scheduled the second reading for Short Term Rental and home sharing is ordinance. He also reminded the Commissioners that the terms for Chair and Vice Chair are expiring and they will need to reapply. K. Upcoming Agenda Items and Schedule No updates. M. Planning Commissioners' Comments Mr. Hoeschler is excited about the parklets implemented on Main Street. He is concerned about the traffic backing up on PCH from the Chick-fil-A restaurant. L. Adjournment —the meeting adjourned at 6:00 PM. The next meeting scheduled for July 27, 2020 has been adjourned. PASSED AND APPROVED ON THIS 09 DAY OF JULY 2020. Sam Lee, Director of Planning and Building Safety Ryan Baldino, Planning Commission Chair 7 EL SEGUNDO PLANNING COMMISSION MEETING DATE: August 27, 2020 AGENDA STATEMENT AGENDA HEADING: Consent AGENDA DESCRIPTION: New fagade-mounted wireless communications facility on an existing 13-story office building located at 2240 East Imperial Highway in the Urban Mixed Use North (MU-N) zone. The project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to 14 California Code of Regulations § 15301 as a Class 1 categorical exemption (Existing Facilities). Address: 2240 East Imperial Highway Applicant: Justin David at Synergy, representing AT&T Mobility RECOMMENDED PLANNING COMMISSION ACTION: Receive and file ATTACHED SUPPORTING DOCUMENTS: 1. Approval letter dated August 19, 2020 2. Plans ORIGINATED BY: Maria Baldenegro, Assistant Planner REVIEWED BY: Gregg McClain, Planning Manager 607 APPROVED BY: Sam Lee, Director of Planning and Building S On August 19, 2020, the Director granted approval to install a new fagade-mounted wireless communications facility on an existing 13-story office building located at 2240 East Imperial Highway. Fagade-mounted wireless communication facilities that are screened by solid materials on all four sides, architecturally compatible with the surrounding environment, and do not exceed the maximum height of the applicable zoning district, are considered "minor facilities" that require approval of a "Wireless Communications Facilities Permit," otherwise known as an administrative use permit. (ESMC §§ 15-19-2, 15-19-6.) The approval includes conditions that protect the City and surrounding users from potentially negative impacts. The conditions, findings of approval, and environmental assessment are provided in the attached approval letter. Staff believes that the project is appropriate for the location and will not operate in a way that will create unwanted impacts. Staff recommends that the Planning Commission receive and file the Director's approval. In the alternative, any Planning Commissioner may request that an item be discussed and a decision on the application be made by the Planning Commission instead. TYPE OF ACTION (LEGISLATIVE; QUASI-JUDICIAL; OR ADVISORY) Quasi-judicial: In the event the Planning Commission desires to review the Director's approval of the administrative use permit, the Planning Commission acts in its quasi-judicial capacity (i.e., applying established standards to applications to determine specific rights under existing law). 1 Rl Before an administrative use permit may be granted, the Director or the Commission must find the following findings are met as required by ESMC § 15-22-5: 1. There is compatibility of the particular use on the particular site in relationship to other existing and potential uses within the general area in which the use is proposed to be located. 2. The proposed use is consistent and compatible with the purpose of the zone in which the site is located. 3. The proposed location and use and the conditions under which the use would be operated or maintained to not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. 4. Potential impacts that could be generated by the proposed use, such as noise, smoke, dust, fumes, vibration, odors, traffic and hazards have been recognized and compensated for. As stated above, the Director found that the proposed facility satisfied these findings and thus granted the permit. AERIAL VIEW OF SITE IGIPERIAL HWY ------ — — • � .r AT&T Fa4— Mounted+ ■ Antennns,on th_.- f Building - a - P s ,,rra•OD WAY �A7W D 2 QJ • L 111 • Ii• I L S DOS Planning & Building Safety Department August 19, 2020 Mr. Justin David Synergy Advantage Engineers 7543 Woodley Avenue Van Nuys, CA 91406 Subject: Environmental Assessment No. EA-1277 and Administrative Use Permit No. AUP 20-01 for a Wireless Communications Facilities Permit Address: 2240 East Imperial Highway Dear Mr. David, On February 21, 2020, the applications listed above were submitted to the Planning and Building Safety Department for processing. The applications request approval to install a new fagade-mounted wireless communications facility on an existing 13-story office building located at 2240 East Imperial Highway. The proposed equipment is concealed by multiple fiberglass reinforced plastic screens, and boxing in the antennas from public view. The applications have been reviewed, and are hereby APPROVED in accordance with El Segundo Municipal Code (ESMC) Chapter 15-19, and subject to the conditions of approval in the attached Exhibit A. The associated environmental determination and findings supporting the decision are described in Exhibit B. Please note that this letter does not constitute the City's final decision in this matter. This determination is scheduled to be "received and filed" by the Planning Commission at the August 27, 2020, meeting. Any Planning Commissioner may request that this permit be discussed and a decision be made by the Commission instead of "received and filed." Should you have any questions, please feel free to contact Assistant Planner Maria Baldenegro at (31 t524-2341, or via email at mariabaldenegroCa)elsegundo. org. Si Sam L of Planning and Building Safety cc: Kilroy Finance Partnership, L.P., P.O. Box 64733, Los Angeles, CA 90064 project file 10 Exhibit A CONDITIONS OF APPROVAL In addition to all applicable provisions of the El Segundo Municipal Code (ESMC), AT&T Mobility, agrees that it will comply with the following provisions as conditions for the City of El Segundo's approval of Administrative Use Permit No. 20-01: This approval is for the location of a new wireless communications facility on the of the exterior fagade of an existing 13-story office building, consisting of: a. Four Antennas and supporting equipment. b. Two new fiberglass reinforced plastic (FRP) boxes enclosing the antennas and equipment. c. Four new equipment cabinets within an existing equipment room located on the 13th floor of the building. 2. In the event that any of these conditions conflict with the recommendations and/or requirements of another permitting agency or City department, the stricter shall apply. 3. Construction of the project shall substantially conform to the plans stamped as approved by the Planning Department with the effective date of this approval. 4. Prior to building permit final approval, Staff shall conduct a site visit to ensure that the conditions of approval associated with the permit are adhered to, including the painting and screening of the wireless facility panels, the location of the antennae and equipment, etc. 5. The Applicant agrees to indemnify and hold the City harmless from and against any claim, action, damages, costs (including, without limitation, attorney fees), injuries, or liability, arising from the City's approval of Environmental Assessment No. EA-1277 or Administrative Use Permit No. AUP 20-01. Should the City be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of the City approval of Environmental Assessment No. EA-1277 or Administrative Use Permit No. AUP 20-01, the Applicant agrees to defend the City (at the City's request and with counsel satisfactory to the City) and will indemnify the City for any judgment rendered against it or any sums paid out in settlement or otherwise. For purposes of this section, "the City" includes the City of El Segundo's elected officials, appointed officials, officers, and employees. By signing this document, Samuel S. Cha, on behalf of AT&T Mobility, certifies that he read, understood, and agrees to the Project Conditions listed in this document. Samuel S. Cha, Property Management, Los Angeles Market (AT&T Mobility) {If Corporation or similar entity, needs two officer signatures or evidence that one signature binds the company) 11 Exhibit B Environmental Determination and Required Findings Environmental Assessment 1277: After considering the facts and findings, the Director finds this project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to 14 California Code of Regulations §15301 as a Class 1 categorical exemption (Existing Facilities). The proposed project does not involve significant expansion of use beyond that previously existing. Further, the site is developed with three buildings and only one building will be utilized for the facility. The proposed project consists of new equipment mounted to the exterior facade of a 13-story office building, and with no additional site disturbance. Administrative Use Permit 20-01: The following are the facts in support of each finding for this decision: Finding No. 1: There is compatibility of the particular use on the particular site in relationship to other existing and potential uses within the general area in which the use is proposed to be located. Facts in Support of Finding No. 1: 1. The site is developed with three office buildings as a campus with parking. 2. The proposed use will help provide seamless coverage within the network for existing and future subscribers of the services provided by the applicant. 3. The proposed four antennas will be concealed within two FRP boxes, mounted at a height of 26 feet and will not exceed the 175-foot maximum height limit for the MU-N zone. 4. Four equipment cabinets will be installed within an existing equipment room on the 13t" floor of the building. 5. The proposed high speed 5G network facility has an overall range of 250-feet in radius and is primarily intended to serve the tenants of the AT&T campus. The equipment will be concealed by multiple fiberglass reinforced plastic (FRP) screens and the boxing will only be visible from the interior court between the three buildings. The antennas and screening will be compatible with existing uses at the site and will not be mounted at a height that exceeds the maximum height limit in the MUN of 175 feet. Finding No. 2: The proposed use is consistent and compatible with the purpose of the Zone in which the site is located. Facts in Support of Finding No. 2: 1. The General Plan land use designation for the site is Urban Mixed Use North. 3 12 2. The purpose of the Urban Mixed Use North (MU-N) zone is "...to provide for a mixture of compatible commercial, office, research and development, retail and hotel uses in a mutually beneficial manner" (Section 15-5E-1). Office uses are permitted in the MUN zone. The proposed use is consistent with this purpose by providing support services to the tenants in the office building located within the MUN Zone and the surrounding land uses. Finding No. 3: The proposed location and use, and the conditions under which the use would be operated or maintained to be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. Facts in Support of Finding No. 3: The proposed facility meets all Federal Communication Commission (FCC) requirements set forth by the American National Standards Institute (ANSI) and Institute of Electrical and Electronic Engineers (IEEE) who establish operational and safety standards for radio frequency electromagnetic fields. Finding No. 4: Potential impacts that could be generated by the proposed use, such as noise, smoke, dust, fumes, vibration, odors, traffic, and hazards have been recognized and compensated for. Facts in Support of Finding No. 4: The proposed wireless communication facility will not generate noise, smoke, fumes, vibrations or other potentially hazardous impacts would require mitigation. 4 13 SITE NUMBER: CLLN000844 SITE NAME: ENTERTAINMENT HEAD QUARTERS LEGAL DESCRIPTION ABBREVIATED DESCRIPTION: SUBD:RANCHO SAUSAL REDONDO *LOT COM AT INTERSECTION OF S, LINE OF IMPERIAL HWY WITH W LINE OF DOUGLAS ST TH S ON S D W LINE 463 FT TH S 89 47' W 599.21 FT IMP 1=OFF,301058SF,YB:1982;IMP2=OFF,301058SF,YB:1982. PROJECT DESCRIPTION THE PROJECT ENTAILS: AT&T PROPOSED TO MODIFY (E) WIRELESS TELECOMMUNICATIONS SITE BY: • INSTALL (4) NEW ANTENNA PIPE MOUNTS • INSTALL (3) AIR5331 ANTENNA • INSTALL (1) GALTRONICS ANTENNA • INSTALL (4) 4402 • INSTALL (3) PSU 08 • INSTALL (2) RAYCAP • INSTALL (4) BASEBANDS • INSTALL (2) NEW FRP BOXES (DESIGNED BY OTHERS) GENERAL NOTES THE FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. A TECHNICIAN WILL VISIT THE SITE AS REQUIRED FOR ROUTINE MAINTENANCE. THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT DISTURBANCE OR EFFECT ON DRAINAGE; NO SANITARY SEWER SERVICE, POTABLE WATER, OR TRASH DISPOSAL IS REQUIRED AND NO COMMERCIAL SIGNAGE IS PROPOSED. SITE INFORMATION PROPERTY OWNER: KILROY REALTY FINANCE PARTNERSHIP, ADDRESS: P.O. BOX 64733 LOS ANGELES, CA 90064 APPLICANT: AT&T ADDRESS: 1452 EDINGER AVE. 2ND FLOOR., TUSTIN, CA 92780 LATITUDE (NAD 83): LONGITUDE (NAD 83): LONGITUDE/LATITUDE TYPE: GROUND ELEVATION: OCCUPANCY CLASSIFICATION: PROPOSED USE: BUILDING USE: CONSTRUCTION TYPE: ZONING CLASSIFICATION: APN #: JURISDICTION: (WEST) 33.9301 (EAST) 33.9301 (WEST) —1 18.3850 (EAST) —1 18.3841 NAD 83 TBD U — UNMANNED TELECOMMUNICATION FACILITY UNMANNED TELECOMMUNICATION FACILITY PARKING STRUCTURE 11 4138-004-018 CITY OF EL SEGUNDO PROJECT TEAM PROJECT MANAGER: SYNERGY A DIVISION OF ADVANTAGE ENGINEERS, LLC 7543 WOODLEY AVENUE, SUITE 201 VAN NUYS, CA 91406 CONTACT: JARED SALISBURY PHONE: (818) 523-9075 EMAIL: JSahsbury@synergy.cc SAC/ZONING/PERMITTING: SYNERGY A DIVISION OF ADVANTAGE ENGINEERS, LLC 2500 RED HILL AVE, SUITE 240 SANTA ANA, CA 92705 CONTACT: JARED SALISBURY PERMITTING: ARYIEL SANCHEZ PHONE: (562) 567-3387 RF ENGINEER: AT&T 1452 EDINGER AVE. 3RD FLOOR., TUSTIN, CA 92780 CONTACT: CARL SCUSSEL PHONE: (828) 508-2779 EMAIL: CS 1 30q@ATT.COM ENGINEER: SYNERGY A DIVISION OF ADVANTAGE ENGINEERS, LLC 7543 WOODLEY AVENUE, SUITE 201 VAN NUYS, CA 91406 CONTACT: LESZEK KRASUSKI, P.E. PHONE: (818) 590-6317 EMAIL: LKrasuski@synergy.cc CONSTRUCTION GC: SENIOR TECHNICAL PROJECT MANAGER: AT&T 1452 EDINGER AVE. 3RD FLOOR., TUSTIN, CA 92780 CONTACT: DANIEL CHAMPAGNE PHONE: (617) 650-0004 EMAIL: dc6777@ATT.COM PARKING STRUCTURE / L4 GARAGE PROJECT: 5G SMALL CELL USID NUMBER: 123083 PACE NUMBER: MRLOS061 100 AT&T SITE ADDRESS: 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOCATION MAPS VICINITY MAP LOCAL MAP rig Lennox Middle School DHL Express Gateway - Sender One Climbing, Q yoga, Fitness and... Jack m the Box Q [ 4 - _ ' ® 02240 East imPa'1el Hwy Imperial Mwy _ 1 - "- - perial Highway s a tl� w n sm s -�_ ' --^ - -- • • - \'- Boeing Satellite Systemsr Z L "� � Wa pWO - Airport Courthouse ® -- ' m n w„2m SI -. •' -- - - w � Lk_.. _ •= e°d Starbucks P ROJ ECTcificPlaceApartments :a 'e Place Los Angelesi Eµ,fA Laxl El Segundo andder Motorcycle Q Rentals and Tours Los... SITE Rentals wmm%Eagle wiltitirm •. Northrop GrummanQ Y ,1 �.ann w„wn% n - ,. 1�- '1 - United States W 120th St W 12pry, w tzon, se Fin 1 FFRy t- j ! F . �I Few r ����iff�� 1 F� •a _ Postal Service a W12,at E, 2 '. — Cif F! ::f l'O r e +� e Z E o 7 c s 3 w caws E' m 6 w,zznas Lo i w,2.a Sl 3 12.E 9 H Eucalyptus w,zznEs Park N W 12Aa St Id 1.►-r. " 1r \ I RRi`Kr1r '-'T .i. • r'TL r. - 1 r�:� . w 12ft EGran yr 125'1h S1 W,2.m s1 Vi aro..an ay r_�' = a D Los Angeles O w,zams g", w,mma Air Force Base = Goode E N N DRIVING DIRECTIONS FROM AT&T OFFICE: 1452 EDINGER AVE. TUSTIN, CA 92780 HEAD NORTHEAST TOWARD AT&T; TURN LEFT TOWARD AT&T; TURN RIGHT ONTO AT&T; TURN LEFT ONTO EDINGER AVE; TURN LEFT ONTO NEWPORT AVE; TURN RIGHT TO MERGE ONTO CA-55N/STATE RTE 55 N; USE THE RIGHT (2) LANES TO TAKE EXIT 13 FOR CALIFORNIA 22 W/GARDEN GROVE FWY TOWARD LONG BEACH; USE THE RIGHT (2) LANES TO MERGE ONTO 1-405 N; KEEP LEFT AT THE FORK STAY ON 1-405 N; USE THE RIGHT (2) LANES TO TAKE EXIT 45A TO MERGE ONTO 1-105 W TOWARD EL SEGUNDO; TAKE EXIT 1 D FOR NASH ST TOWARD AIRPORT; USE THE 2ND FROM THE LEFT LANE TO TURN LEFT ONTO W IMPERIAL HWY; TURN LEFT ONTO DIRECTV E DR 2222 E IMPERIAL HWY EL SEGUNDO, CA 90245 DRAWING INDEX SHEET NO: SHEET TITLE T-1 TITLE SHEET T-2 GENERAL NOTES, LEGEND AND ABBREVIATIONS A-1 1ST LEVEL FLOOR PLAN A-2 3RD LEVEL FLOOR PLAN A-3 13TH LEVEL FLOOR PLAN AND EQUIPMENT LAYOUT PLAN A-4 PARTIAL FLOOR PLAN AND ELEVATION A-5 ELEVATION A-6 SPECIFICATIONS A-7 DETAILS AND SPECIFICATIONS A-8 DETAILS STEALTH — FRP DETAILS AND SPECIFICATIONS: T1 TITLE SHEET N1 NOTES & SPECIFICATIONS N2 NOTES & SPECIFICATIONS S1 PLAN & ELEVATION VIEWS ALPHA SECTOR S2 PLAN & ELEVATION VIEWS ALPHA SECTOR S3 PLAN & ELEVATION VIEWS BETA/GAMMA SECTOR S4 PLAN & ELEVATION VIEWS BETA/GAMMA SECTORS S5 DETAILS E-1 1ST LEVEL FLOOR PLAN AND ELECTRICAL ROOM LAYOUT PLAN E-2 SINGLE LINE DIAGRAMS & PANEL SCHEDULES E-3 GROUNDING SCHEMATIC & GROUNDING DETAILS E-4 GENERAL ELECTRICAL NOTES APPROVALS THE FOLLOWING PARTIES HEREBY APPROVE AND ACCEPT THESE DOCUMENTS & AUTHORIZE THE SUBCONTRACTOR TO PROCEED WITH THE CONSTRUCTION DESCRIBED HEREIN. ALL DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL BUILDING DEPARTMENT & MAY IMPOSE CHANGES OR MODIFICATIONS. AT&T RF ENGINEER: AT&T OPERATIONS: SITE ACQUISITION: CONSTRUCTION MANAGER: PROPERTY OWNER: ZONING: PROJECT MANAGER: DATE: DATE: DATE: DATE: DATE: DATE: DATE: CODE COMPLIANCE I 1. CALIFORNIA ADMINISTRATIVE CODE (INCL. TITLES 24 & 25) 2019 2. CALIFORNIA BUILDING CODES 2019 3. CALIFORNIA ELECTRICAL CODES 2019 4. CALIFORNIA MECHANICAL CODES 2019 5. CALIFORNIA PLUMBING CODES 2019 6. ANSI/TIA-222—H-2016 7. LOCAL BUILDING CODES 8. CITY / COUNTY ORDINANCES 9. CALIFORNIA FIRE CODE 2019 EDITION 10. ASCE 7-16 11. ACI 318-14 12. ACI 530-13 13. STEEL CONSTRUCTION MANUAL, 14TH EDITION DO NOT SCALE DRAWINGS SUBCONTRACTOR SHALL VERIFY ALL PLANS & EXISTING DIMENSIONS & CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME. UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA 800-227-2600 48 HOURS BEFORE YOU DIG u AT&T _0 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 rLHIVJ rMLrHMtu n r : Synergu a division of `\ advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 -PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY F—CURRENT ISSUE DATE: Llc-r—1 1r11 r�I�. CONSTRUCTION =REV.: DATE: DESCRIPTION: BY: 12/20/19 90% CD, ISSUED FOR R EVI EW VTA 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA AD 01 /17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA DRAWN BY: CHK.: APV.:- VTA PAD -LICENSURE: LK Qp,O PS SlON K Rq SG1 1358 1211 n .1231 �1 y� YA n CJV1\- OF CAL�F� IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: TITLE SHEET :SHEET NUMBER: REVISION: T-1 E CLLN000844 14 LEGEND PROPOSED TRENCH GAS LINE POWER LINE TELCO LINE WATER LINE CABLE TV LINE OIL LINE STREET LIGHT LINE SEWER LINE STORM DRAIN LINE PROPERTY LINE CENTER LINE X X X X X X X X CHAIN LINK FENCE BLOCK WALL DRIVEWAY �( GUY POLE X JOINT POLE C FIRE HYDRANT ® CURVE DATA DETAIL NUMBER SHEET NUMBER DETAIL NUMBER L CROSS SECTION SHEET NUMBER OPLACEMENT DATA It PROPERTY LINE IL CENTER LINE E.O.P. EDGE OF PAVEMENT E.O.D. EDGE OF DIRT R/W RIGHT OF WAY INTENT 3. THE OWNER SHALL BE NAMED AS AN ADDITIONAL INSURED ON ALL POLICIES. 12. ALL SHRUBS, PLANTS OR TREES THAT HAVE BEEN DAMAGED OR DISTURBED DURING THE 1. THESE CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE DONE &THE MATERIALS TO BE 4. REFER TO THE MASTER AGREEMENT FOR REQUIRED INSURANCE LIMITS. COURSE OF THE WORK, SHALL BE REPLANTED AND/OR REPLACED SO AS TO RESTORE THE WORK SITE TO ITS ORIGINAL CONDITION. FURNISHED FOR CONSTRUCTION. ADMINISTRATION 13. IF DAMAGE OCCURS TO THE CITY OR COUNTY FACILITIES, THE CONTRACTOR SHALL 2. THE INTENTION OF THE DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS REASONABLY 1. BEFORE THE COMMENCEMENT F ANY WORK, THE CONTRACTOR WILL ASSIGN A PROJECT IMMEDIATELY NOTIFY, TRAFFIC CONTROL LIGHTING; STREET LIGHTING. NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK AS STIPULATED IN MANAGER WHO WILL ACT AS A SINGLE POINT OF CONTACT FOR ALL PERSONNEL INVOLVED IN THE CONTRACT. THIS PROJECT. THIS PROJECT MANAGER WILL BE DEVELOPING A MASTER SCHEDULE FOR THE 14. AT LEAST TWO DAYS PRIOR TO THE COMMENCEMENT OF ANY WORK, NOTIFY THE POLICE 3. THE PURPOSE OF THE SPECIFICATIONS IS TO INTERPRET THE INTENT OF THE DRAWINGS AND PROJECT WHICH WILL BE SUBMITTED TO THE OWNER PRIOR TO THE COMMENCEMENT OF ANY TRAFFIC BUREAU; AND THE FIRE DEPARTMENT. TO DESIGNATE THE METHOD OF THE PROCEDURE TYPE AND QUALITY OF MATERIALS REQUIRED TO WORK. 15. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE PROCESSING OF ALL APPLICATION COMPLETE THE WORK. 2. SUBMIT A BAR TYPE PROGRESS CHART NOT MORE THAN THREE (3) DAYS AFTER THE DATE PERMIT FORMS ALONG WITH THE REQUIRED LIABILITY INSURANCE FORMS, CLEARLY 4. MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE ANTICIPATED AND SHALL BE CONSIDERED ESTABLISHED FOR COMMENCEMENT OF THE WORK ON THE SCHEDULE, INDICATING A TIME BAR DEMONSTRATING THAT AT&T, THE CITY, COUNTY OR STATE AS ALSO INSURED WITH THE AS PART OF THE WORK. NO CHANGES THAT ALTER THE CHARACTER OF THE WORK WILL BE MADE FOR EACH MAJOR CATEGORY OF WORK TO BE PERFORMED AT THE SITE, PROPERLY SEQUENCED REQUIRED LIABILITY INSURANCE IN THE AMOUNT OF $1,000,000.00 FOR THIS CONSTRUCTION OR PERMITTED BY THE OWNER WITHOUT ISSUING A CHANGE ORDER. AND COORDINATED WITH OTHER ELEMENTS OF WORK AND SHOWING COMPLETION OF THE PROJECT. WORK SUFFICIENTLY IN ADVANCE OF THE DATE ESTABLISHED FOR SUBSTANTIAL COMPLETION OF 16. VAULTS, PEDESTALS, CONDUITS AND OTHER TYPES OF SUBSTRUCTURE ARE EITHER CONFLICTS THE SITE. SPECIFIED ON THIS PLAN OR WILL BE SPECIFIED BY THE CONSTRUCTION ENGINEER. ANY AND 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL MEASUREMENTS AT THE 3. PRIOR TO COMMENCING CONSTRUCTION, THE OWNER SHALL SCHEDULE AN ON -SITE MEETING ALL DEVIATIONS FROM THE SPECIFIED TYPES OF MATERIAL MUST BE APPROVED BY THE SYSTEM SITE BEFORE ORDERING ANY MATERIALS OR DOING ANY WORK. NO EXTRA CHARGE OR WITH ALL MAJOR PARTIES. THIS WOULD INCLUDE(THOUGH NOT LIMITED TO) THE OWNER, ENGINEER, IN WRITING BEFORE INSTALLATION THEREOF. COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND PROJECT MANAGER, CONTRACTOR, LAND OWNER REPRES- ENTATIVE, LOCAL TELEPHONE 17. ALL U.G. CONDUIT MUST BE SCHEDULE 40 OR BETTER. DIMENSIONS INDICATED IN THE CONSTRUCTION DRAWINGS. ANY SUCH DISCREPANCY IN COMPANY, TOWER ERECTION FOREMAN(IF SUBCONTRACTED). DIMENSIONS WHICH MAY BE FOUND SHALL BE SUBMITTED TO THE OWNER FOR CONSTRUCTION 18. CONDUIT REQUIREMENTS: BEFORE THE CONTRACTOR PROCEEDS WITH THE WORK IN THE AFFECTED AREAS. 4. CONTRACTOR SHALL BE EQUIPPED WITH SOME MANS OF CONSTANT COMMUNICATIONS, SUCH UG-SCHEDULE 40 EXCEPT ALL RADIUS CONDUITS TO AS A MOBILE PHONE OR A BEEPER. THIS EQUIPMENT WILL NOT BE SUPPLIED BY THE OWNER, 2. THE BIDDER, IF AWARDED THE CONTRACT, WILL NOT BE ALLOWED ANY EXTRA COMPENSATION NOR WILL WIRELESS SERVICE BE ARRANGED. BE SCH. 80 RISERS -SCHEDULE 80 BY REASON OF ANY MATTER OR THING CONCERNING WHICH SUCH BIDDER MIGHT HAVE FULLY INFORMED THEMSELVES PRIOR TO THE BIDDING. 5. DURING CONSTRUCTION, CONTRACTOR MUST ENSURE THAT EMPLOYEES AND 19. GROUND REQUIREMENTS: SUBCONTRACTORS WEAR HARD HATS AT ALL TIMES. CONTRACTOR WILL COMPLY WITH ALL 5/8" ROD - 8' LENGTH 3. NO PLEA OF IGNORANCE OF CONDITIONS THAT EXIST, OR OF DIFFICULTIES OR CONDITIONS AT&T SAFETY REQUIREMENTS IN THEIR AGREEMENT. THAT MAY BE ENCOUNTERED OR OF ANY OTHER RELEVANT MATTER CONCERNING THE WORK TO #2 GROUND WIRE BE PERFORMED IN THE EXECUTION OF THE WORK WILL BE ACCEPTED AS AN EXCUSE FOR ANY 6. PROVIDE WRITTEN DAILY UPDATES AND PHOTOGRAPHS OF ON SITE PROGRESS TOTHE WOOD MOLDING, STAPLED EVERY 3' AND FAILURE OR OMISSION ON THE PART OF THE CONTRACTOR TO FULFILL EVERY DETAIL OF THE ALL PROJECT MANAGER VIA E-MAIL. AT EACH END GROUNDS 2' FROM POLE THE REQUIREMENTS OF THE CONTRACT DOCUMENTS GOVERNING THE WORK. 7. A COMPLETE INVENTORY OF CNSTRUCITON MATERIALS AND EQUIPMENT IS REQUIRED PRIOR 20. THE MYERS ELECTRICAL METER PEDESTAL NEEDS SILICONE SEALANT AT BASE AROUND THE WARRANTIES AND BONDS TO START OF CONSTRUCTION. PIED TO PREVENT RAIN INTRUSION (LEAVE 1/2 INCH OPENING) AND ADD DESICCANT BAG 1. CONTRACTOR IS RESPONSIBLE FOR APPLICATION AND PAYMENT OF CONTRACTOR LICENSES 8. NOTIFY THE OWNER/PROJECT MANAGER IN WRITING NO LESS THAN 48 HOURS IN ADVANCE "ADCOA" TYPE 1, SIZE 16 TO PEDESTAL AS REQUIRED. AND BONDS. OF CONCRETE POURS, TOWER ERECTIONS, AND EQUIPMENT CABINET PLACEMENTS. 21. POWER REQUIREMENT FOR 3 WIRE SERVICE 120/24OV. 2. SEE MASTER CONTRACTION SERVICES AGREEMENT FOR ADDITIONAL DETAILS. 9. CLOSEOUT PACKAGE IS DUE COMPLETE WITH DETAILED TOP PHOTOS UPON SITE PUNCHWALK 22 CONTRACTOR SHALL NOTIFY POWER AND TELCO COMPANIES THREE DAYS PRIOR TO THE WITH PROJECT MANAGER (SEE PROJECT MANAGER FOR SAMPLE CLOSEOUT PACKAGE). START OF CONSTRUCTION FOR CONDUIT INSPECTION. STORAGE CLEAN UP 1. ALL MATERIALS MUST BE STORED IN A LEVEL AND DRY FASHION AND IN A MANNER THAT STIPULATED CONDITIONS DOES NOT NECESSARILY OBSTRUCT THE FLOW OF OTHER WORK. 1. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE SITE FREE FROM ACCUMULATON OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR EMPLOYEES AT WORK. AT THE COMPLETION OF THE 1. INSTALLATION OF IMPROVEMENTS SHALL BE SUBJECT TO RESTORATION UPON TERMINATION RELATED DOCUMENTS AND COORDINATION WORK, THEY SHALL REMOVE ALL RUBBISH FROM AND ABOUT THE BUILDING AREA, INCLUDING OF THE LEASE AND VACATING OF THE PREMISES. 1. GENERAL CONSTRUCTION, ELECTRICAL AND ANTENNA DRAWINGS ARE INTERRELATED. IN ALL THEIR TOOLS, SCAFFOLDING AND SURPLUS MATERIALS AND SHALL LEAVE THEIR WORK PERFORMANCE OF THE WORK, THE CONTRACTOR MUST REFER TO ALL DRAWINGS. ALL CLEAN AND READY FOR USE. 2. INSTALLATION SHALL BE COMPLIANT WITH THE CBC, NEC, UMC AND ALL OTHER GORVERNING COORDINATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 2. VISUALLY INSPECT EXTERIOR SURFACES AND REMOVE ALL TRACES OF SOIL, WASTE CODES AND ORDINANCES. CHANGE ORDER PROCEDURE MATERIALS, SMUDGES, AND OTHER FOREIGN MATTER. 3. ALL IMPACTED SURFACES AND BUILDING COMPONENTS SHALL BE RESTORED BACK TO THE 1. CHANGE ORDERS MAY BE INITIATED BY THE OWNER AND/OR THE CONTRACTOR INVOLVED. 3. REMOVE ALL TRACES OF SPLASHED MATERIALS FROM ADJACENT SURFACES. ORIGINAL PRE -LEASE CONDITIONS UPON TERMINATION OF THE LEASE AND VACATING OF THE THE CONTRACTOR, UPON VERBAL REQUEST FROM THE OWNER SHALL PREPARE A WRITTEN 4. IF NECESSARY TO ACHIEVE A UNIFORM DEGREE OF CLEANLINESS, HOSE DOWN THE EXTERIOR PREMISES. PROPOSAL DESCRIBING THE CHANGE IN WORK OR MATERIALS AND ANY CHANGES IN THE OF THE STRUCTURE. 4. FINISH COLOR ON FIBER CONDUIT TO MATCH ADJACENT WALL. CONTRACT AMOUNT AND PRESENT TO THE OWNER WITHIN 72 HOURS FOR APPROVAL. SUBMIT REQUESTS FOR SUBSTITUTIONS IN THE FORM AND IN ACCORDANCE WITH PROCEDURES GENERAL NOTES 5. CONFIRM EMON DMON UNIT IS TIED INTO PANEL "1PE" AND "TL2" REQUIRED FOR CHANGE ORDER PROPOSALS. ANY CHANGES IN THE SCOPE OF WORK OR MATERIALS WHICH ARE PERFORMED BY THE CONTRACTOR WITHOUT A WRITTEN CHANGE ORDER AS DESCRIBED & APPROVED BY THE OWNER SHALL PLACE FULL RESPONSIBILITY OF THESE ACTIONS ON THE CONTRACTOR. 2. BTS CABINETS MUST BE STORED INSIDE UNTIL THERE IS POWER ON SITE. 3. STORAGE METHOD MUST MEET ALL RECOMMENDATIONS OF THE ASSOCIATED MANUFACTURER. SHOP DRAWINGS 1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AS REQUIRED AND LISTED IN THESE DRAWINGS TO THE OWNER FOR APPROVAL. 2. ALL SHOP DRAWINGS SHALL BE REVIEWED, CHECKED AND CORRECTED BY CONTRACTOR PRIOR TO SUBMITTAL TO THE OWNER. PRODUCTS & SUBSTITUTIONS 1. SUBMIT 3 COPIES OF EACH REQUEST FOR SUBSTITUTION. IN EACH REQUEST IDENTIFY THE PRODUCT OR FABRICATION OR INSTALLATION METHOD TO BE REPLACED BY THE SUBSTITUTION. INCLUDE RELATED SPECIFICATION SECTION AND DRAWING NUMBERS AND COMPLETE DOCUMENTATION SHOWING COMPLIANCE WITH THE REQUIREMENTS FOR SUBSTITUTION. 2. SUBMIT ALL NECESSARY PRODUCT DATA AND CUT SHEETS WHICH PROPERLY INDICATE AND DESCRIBE THE ITEMS, PRODUCTS AND MATERIALS BEING INSTALLED. THE CONTRACTOR SHALL, IF DEEMED NECESSARY BY THE OWNER SUBMIT ACTUAL SAMPLES TO THE OWNER FOR APPROVAL IN LIEU OF CUT SHEETS. CODE COMPLIANCE 1. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. THESE SHALL INCLUDE BUT NOT BE LIMITED TO THE LATEST VERSION OF THE FOLLOWING: 2017 LA CITY BLDG CODE 2016 CALIFORNIA BUILDING CODE. 2016 CALIFORNIA ELECTRICAL CODE. 2016 CALIFORNIA PLUMBING CODE. 2016 CALIFORNIA MECHANICAL CODE. 2016 CALIFORNIA CODE OF REGULATIONS FOR ENERGY CONSERVATION. INSURANCE AND BONDS 1. CONTRACTOR SHALL AT THEIR OWN EXPENSE CARRY AND MAINTAIN FOR THE DURATION OF THE PROJECT ALL INSURANCE REQUIRED AND LISTED. 2. CONTRACTOR SHALL NOT COMMENCE WITH THEIR WORK UNTIL THEY HAVE PRESENTED AN ORIGINAL CERTIFICATE OF INSURANCE STATING ALL COVERAGE TO THE OWNER. 1. INDEMNIFICATION CLAUSE: THE CONTRACTOR AGREES AND SHALL; 6. ASSUME SOLE AND COMPLETE RESPONSIBILITY OF THE JOBSITE CONDITIONS DURING THE 7. COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND 8. PROPERTIES. THAT THESE REQUIREMENTS SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND CONDITIONS. THE CONTRACTOR FURTHER AGREES TO DEFEND 9. INDEMNITY AND HOLD AT&T, REPRESENTATIVES AND ENGINEERS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF THE WORK ON THIS PROJECT. 1 2. PRIOR TO THE BEGINNING OF ANY CONSTRUCTION AND THROUGHOUT THE COURSE OF CONSTRUCTION WORK, THE CONTRACTOR SHALL FULLY COMPLY WITH "CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH " ACT OF 1973 INCLUDING ALL REVISIONS AND 1 AMENDMENTS THERETO. 1 3. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF GO 95, 128, AND THE STANDARD "SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION", AS ADOPTED BY THE CITY, COUNTY OR STATE AS MODIFIED BY STANDARD PLANS AND ADDENDUMS. 4. THE EXISTENCE AND LOCATION OF UTILITIES AND OTHER AGENCIES FACILITIES AS SHOWN HEREON ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. OTHER FACILITIES MAY EXIST, THE CONTRACTOR SHALL VERIFY PRIOR TO THE START OF CONSTRUCTION AND SHALL USE EXTREME CARE AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO THESE FACILITIES. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITY OR AGENCY FACILITIES WITHIN THE LIMITS OR WORK, WHETHER THEY ARE SHOWN ON THIS PLAN OR NOT. 5. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT 811 AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY EXCAVATION. 6. THE CONTRACTOR SHALL NOTIFY THE CITY, COUNTY OR STATE ENGINEER INSPECTION DEPARTMENT, AT LEAST TWO DAYS BEFORE THE START OF ANY WORK REQUIRING THEIR INVOLVEMENT. 7. ALL WORK AREA AND STREET TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS OF THE WORK AREA TRAFFIC CONTROL BOOK AND SPECIFICATIONS FROM THE CITY, COUNTY OR STATE. 8. THE CITY, COUNTY OR STATE SHALL SPECIFY THE EXPIRATION PERIOD OF THE PERMIT FOR THIS CONSTRUCTION PROJECT. 9. THE MINIMUM COVER FOR ALL CONDUITS PLACED UNDERGROUND SHALL BE 36 INCHES TO THE FINISHED GRADE AT ALL TIMES. 10. THE CONTRACTOR SHALL TUNNEL ALL CURB AND GUTTERS AND BORE ALL CONCRETE DRIVEWAYS AND WALKWAYS AT THE DIRECTION OF THE CITY, COUNTY OR STATE INSPECTOR. 11. ALL AC. AND/OR CONCRETE PAVEMENT SHALL BE REPLACED AT THE DIRECTION OF THE CITY, COUNTY OR STATE ENGINEERS. FINISH COLOR ON PROPOSED FRP BOX TO MATCH ADJACENT WALL ALL FLOOR CORES MUST BE REVIEWED AND APPROVED BY BUILDING ENGINEERS ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF THE WORK EVIDENCE OF FINAL INSPECTION SHALL BE PROVIDED TO LANDLORD UPON COMPLETION OF THE WORK 0. PRIOR TO COMMENCEMENT OF THE WORK TENANT SHALL SUBMIT INSURANCE DOCUMENTATION FOR ANY TRADE(S) ASSOCIATED WITH THE WORK NAMING KILROY REALTY CORPORATION AS ADDITIONALLY INSURED AND AS CERTIFICATE HOLDER. L. LANDLORD SHALL POST A "NOTICE OF NON -RESPONSIBILITY" ON THE PREMISES. 2. TENANT SHALL NOTIFY LANDLORD A MINIMUM OF TEN (10) DAYS PRIOR TO COMMENCEMENT OF THE WORK. u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 rLHiN�) rMLrHMtU n r : 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 -PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: ISSUED FOR: LREV.: DATE: DESCRIPTION: BY:� A 12/20/19 90% CD, ISSUED FOR REVIEW VTA A 12/26/19 REVISED 90% CID ISSUED FOR REVIEW VTA 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA AD 01 /17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA D RAW N BY: C H K .: APV. � VTA �I InrnlC-1 Inr_- - Q�0 ES�lpNA O <. KRgs x 1358rn � m !� 31,Z1 }.._ ClV1 a��Q C;= 0 Cr., IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. _!"' I I rrT TITI r FJI 1 LL I I I I LL. GENERAL NOTES, LEGEND AND ABBREVIATIONS LCI-IRRT NIIILARRR RR\/I1,�InNI- T 2 E CLLN000844 15 PROPOSED LOOSE FIBER UP TO 3RD FLOOR PROPOSED POWER CONDUIT AND LOOSE FIBER TO PROPOSED LOOSE FIBER PROPOSED POWER CONDUIT UP TO 3RD FLOOR FALSE CEILING PROPOSED POWER CONDUIT v u u u ❑ 1024 1000 Fi 'be. Fi Fiber— Fiber— Fiber Fiber— Fiber— Fiber— Fiber— Fiber —Fiber— i PW PWR PWR PWR PWR PWR PWR PWR PWR PWR PW 1028 ❑ 1003® a 1040 1020 iz STUDIO ® EAST WING: ® 10 CONDUIT RUN FROM 1034 ® ®®®® RICH EISEN ELECTRICAL. ❑ ❑ 1042 1043 EXISTING EAST 2 SPIN TELECTRICAL ROOM — 1041 - on o EXISTING WEST 3 1044 1045 ELECTRICAL ROOM ` — QQ a rj J / PWR -PWR WR WEST WING: CONDUIT RUN FROM PROPOSED POWER CONDUIT GROUND LEVEL GYM. UP TO 3RD FLOOR a a a a a a a 1ST LEVEL FLOOR PLAN 1 /SCALE: 1 16 -1 -0 0 5' 15' 30' SCOPE OF WORK: SCOPE OF WORK: WEST WING: EAST WING: • GROUND LEVEL GYM ELECTRICAL ROOM RICH EISEN ELECTRICAL ROOM PANEL "TL2" PANEL "1 PE" BREAKERS 16 & 18. (208Y/120V 3 PHASE 4W) FED FROM • AVAILABLE FIBERS TO BE UTILIZED. TRANSFORMER "71-1" BREAKERS 26 & 28. ±8'-1 1 „ ±9'-g„ (E) EQUIPMENT ROOM (E) EQUIPMENT ROOM EXISTING ELECTRICAL PANEL, TYP. OF (3) AT&T TO UTIILIZE EXISTING TRANSFORMER EXISTING ELECTRICAL PANEL 1 PE EXISTING TRANSFORMER EXISTING GROUND BAR EXISTING EQUIPMENT RACK o EXISTING ELECTRICAL o° � � � PANELS cc)z o : EXISTING EQUIPMENT + I °O w PANEL AT&T TO UTIILIZE � o EXISTING ELECTRICAL -H � PANEL TL2 w b bi EXISTING EQUIPMENT w PANEL 1 N EXISTING EQUIPMENT N i (E) WEST ELECTRICAL ROOM LAYOUT PLAN SCALE:-1 ' 3 (E) EAST ELECTRICAL ROOM LAYOUT PLAN SCALE: ^ ' ' L 3/8 -0 0 1' 25' 3/8-1 -0 0 12' 5 AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 I`LAIN�) I- NLl`/ANLU bT: Synergy a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: LISSUED FOR: � CONSTRUCTION F-REV.:=DATE: DESCRIPTION:=6Y:-i A 12/20/19 90% CD, ISSUED FOR REVIEW VTA A 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA AD 01/17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA DRAWN BY: CHK.: APV.: VTA L—I I�rnlc-�I Inr_- - e�0 � `sr�tiA EX KR,gs r ? 1358 x ' 12 3! ,2I CN11.. �� Or CAL�F� IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. l�1 IrrT TITI r rJl ILL I I I ILL. 1ST LEVEL FLOOR PLAN SHEET NUMBER: REVISION: A-1 I E CLLN000844 Ire PROPOSED AT&T �1 PROPOSED AT&T �1 ANTENNA LOCATION ANTENNA LOCATION PROPOST RAYCAP &(2) PROPOSED AT&T RAYCAP & FIBER BOX & FIBER BOX, 4402 RRUS r Ll Lj- Li Li Li Li Li Li Li Li Li Li Li Ll L (L PROPOSED POWER CONDUIT � FROM RICH EISEN ELECTRICAL ROOM AT 1ST FLOOR FibeFibeFiber Fiber FlDeFil Fib Fbe/�� PROPOSED LOOSE FIBER FROM 13iH FLOOR EXISTING RAMP UP AT&T TELE/DATA ROOM NOTE: 3RD FLOOR LIMIT RAMP UP RAMP DOWN N 3RD LEVEL FLOOR PLAN SCALE: AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 I- LHIV� h`NL--'HKLU bT: A Synergy a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (1-4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: LISSUED FOR: � CONSTRUCTION r—REV.:=DATE: DESCRIPTION:=6Y:—i A 12/20/19 90% CD, ISSUED FOR REVIEW VTA A 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA 01 /09/20 REVISED 90% CID ISSUED FOR REVIEW VTA AD 01/17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA DRAWN BY: CHK.: APV.: VTA - I/ r-K C11 Inr.- " Q � ESS/0 o EKKRAggr `i) G" �yG) 1358 x m Vj /- 31111 a * T.._ ClVII- C. C.. )row IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET TITLE: 3RD LEVEL FLOOR PLAN LSHEET NUMBER: REVISION: A-2 E CLLN000844 17 — — — — — — — — o Ll Ll FIFIFIFIFIF-1 HHHHHH El — r — — — I — — — — — — — — Ll Ll — — — L 0 �L� Lyl- U PROPOSED FIBER ROUTE DOWN TO 3RD FLOOR H A A /1111 Fiber— Fiber— Fibers Fiber— Fiber —Fiber— Fibe Fibe >` Fiber Fiber Fibe- Fiber — Fi� EXISTING CABLE TRAY V e I- \ i I ® °0 i� 00 �7 LL� EXISTING AT&T EQUIPMENT LOCATION 2 I AT TELE/DATA ROOM N Hill Hill 13TH LEVEL FLOOR PLAN SCALE: 1 1/16"=1'-0" 0 5' 15' 30' +20,-6" (4) 2" CONDUITS FROM BUILDING RISER EXISTING EQUIPMENT I HOT AISLE BY OTHERS (SPRINT) - VERIZON - SPRINT I I I I EXISTING AT&T o I 00 I I -- -- COLD AISLE �- -- -- -- EQUIPMENT RACKS, TYP. CD CDI +I r -, - T—MOBILE I I _ ❑ — — AT&T — I LL d I r- - -L —Jif I-- -_�EE4 41 — PROPOSED (4) BASEBANDS I F — — — — — — — — — -- -- I I TO EXISTING RACK I I I F - - - I I SPARE STELLAR I N CD N —_ _ _ _ _ _ _ _ _ I I EXISTING EQUIPMENT BY OTHERS (STELLAR) EXISTING WALL MOUNTED TELEPHONE AT 48" AFF ±4'-6" f 16'-0" NOT USED (E) EQUIPMENT ROOM LAYOUT PLAN CAL ,/ SCALE: E:0" 0 1' 2' 4' 8 2 4=0 u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 1-'LHN�) I'NLI-'HKtU bT: S, Synergo a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY -CURRENT ISSUE DATE: 02/12/20 LI C_C_1 1rf"\ r/'\m. CONSTRUCTION =REV.: DATE: DESCRIPTION: BY: A 12/20/19 90% CD, ISSUED FOR REVIEW VTA 12/26/19 REVISED 90� CD, ISSUED FOR REVIEW VTA 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA 01/17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA UMIAVViN CST: u-IY\.: Hrv.: VTA PAD LK F-LICENSURE: IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: 13TH LEVEL FLOOR PLAN AND EQUIPMENT LAYOUT :SHEET NUMBER: REVISION: A-3 E CLLN000844 0 I N EXISTING STAIRCASE (N) AIR 5331 ANTENNA f9'-4„ PROPOSED FRP SCREEN i 40 SECTOR 'A' 30' (N) GALTRONIC ANTENNA PROPOSED AT&T CONDUIT ROUTE PROPC AT&T POINT SECTOR 'B' 340' 6'-0" J. k ' AIR 5331 ANTENNA, OF 2 z �w J w ) Q:� )C) _ Cn XISTING STAIRCASE 'ROPOSED AT&T CONDUIT ROUTE 'ROPOSED AT&T 'OWER CONDUIT SECTOR 'C' 120" PARTIAL FLOOR PLAN SCALE: I 1 3/16"=1'-0" 0 1' 3' 5' 10' PROPOSED RAYCAP, (2) 4402 RRU PROPOSED AT&T FRP BOX WITH (2) 5331 ANTENNAS AND (2) PSU 08 �a_w n r� cU J u �L.-i C EXISTING SECURITY CAMERA THE RICH EISEN SHOW EXISTING STOREFRONT LJ I I LJ Cm LJ SCALE: 3/16"=1'-0" PROPOSED RAYCAP FIBER BOX PROPOSED AT&T FRP BOX WITH (1) 5331 ANTENNA, (1) GALTRONICS ANTENNA, (2) 4402 RRU AND (1) PSU 08 o' w z w U 0 a w U cn u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 I- LHN�) I- Ktl-HKtU tSY: S ner V gy a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY -CURRENT ISSUE DATE: 02/12/20 CONSTRUCTION =REV.: DATE: DESCRIPTION: BY: 12/20/19 90% CD, ISSUED FOR REVIEW VTA 'B\, 12/26/19 REVISED 90% CD ISSUED FOR REVIEW VTA //C\ 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA zk 01/17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA UMIAVVN CST: u-IY\.: Hrv.: VTA PAD LK -LICENSURE: 0 E s al�NA O �K KRgs C �) Lin �y� 21358 " x .12 91,21 a Tl �- CIv11. �� OF CAUF� IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: PARTIAL FLOOR PLAN AND ELEVATION :SHEET NUMBER: REVISION: A-4 E PARTIAL ELEVATION (FROM NORTH) 2J CLLN000844 19 \_ EXISTING STOREFRONT PARTIAL ELEVATION (FROM EAST) SCALE: 3/16"=1'-0" PROPOSED AT&T FRP BOX WITH (2) 5331 ANTENNAS AND (2) PSU 08 EXISTING SECURITY CAMERA 1 400 u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 rL/AIN�) I'NLl'HNLU bT: Synergo, a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY -CURRENT ISSUE DATE: 02/12/20 LI C_C_1 1rf"\ r/'\m. CONSTRUCTION =REV.: DATE: DESCRIPTION: BY: A 12/20/19 90% CD, ISSUED FOR REVIEW VTA 'B\ISSUED 12/26/19 REVISED 90% CD, FOR REVIEW VTA //C\ 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA //D\ 01/17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA UMIAVVIN CST: u-IY\.: Hrv.: VTA PAD LK FLICENSURE: IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: ELEVATION :SHEET NUMBER: REVISION: A-5 E NOT USED KA CLLN000844 20 OO V�PT5120V SURGE PROTECTED AC DISCONNECTS SAT&T Densification ® • HXWXD-10.13"X6.15"X6" Internal Disconnect With Breakers • WEIGHT -10 LBS. Service Entrance Rated • PICO LOAD BREAKERS- FIVE 10 AMP ■ PICO - NEQ.20213 • MICRO LOAD BREAKERS - FIVE 20 AMP • LOAD BREAKER POSITIONS- FIVE ■ MICRO-NEQ.20214 K.- • PICO &MICRODISCONNECT BREAKER -60AMP _ln • HXWXD-16.15" X 6.68" X 6.285" External Disconnect With Breakers • WEIGHT -11LBS. Service Entrance Rated • PICO LOAD BREAKERS - FIVE 10 AMP ■ PICO - NEQ.20283 • MICRO LOAD BREAKERS- FIVE 20 AMP • LOAD BREAKER POSITIONS - FIVE ■ MICRO - NEQ.20284 • PICO&MICRODISCONNECTBREAKER-60AMP «-- -- --- --- - - .... --------- -- .....-......-...... -_......... _-........ --......... ---......... _.......... --.......... _........... -.......... --........... _........... -............. -........... --........... --........... _........... -............. -............ _............ --........... -........... -- PTS Breakers r ■ 20 AMP - NEQ.20285 • 13MM DIN RAIL LOAD BREAKER ■ 25 AMP - NEQ.20286 RAYCAP SPECIFICATION PSU AC 08 (100-250) VAC DIMENSIONS: HEIGHT = 2.71" DEPTH = 10.78" WIDTH = 7.08" WEIGHT = 11.46 LBS Technical Data01 3 Technical Data Table 1 lists regulatory approved configurations. The listed standards on a specific frequency band may not be generally available on all markets. Contact the local Ericsson responsible for details. Table 1 Radio 4402 Technical Data Description Value Maximum nominal 4 x 5 W output power(') Number of carriers per LTE: 6 downlink, 6 uplink branch WCDMA: 6 downlink, 6 uplink NB-IoT in -band mode:l NB-IoT carrier per configured LTE host carrier NB-IoT standalone model carrier per RF port NB-IoT guard band model NB-IoT carrier per configured LTE host carrier Number of carriers per LTE: 4 x 6 downlink, 4 x 6 uplink radio WCDMA: 4 x 6 downlink, 4 x 6 uplink NB-IoT in -band mode:l NB-IoT carrier per configured LTE host carrier NB-IoT standalone mode: 4 x 1 carriers per RF port NB-IoT guard band model NB-IoT carrier per configured LTE host carrier Frequency(2) B66A for WCDMA, LTE, NB-IoT in -band mode, NB- IoT standalone mode, and NB-IoT guard band mode 1710-1780 MHz uplink 2110-2180 MHz downlink Dimensions with Cover, Single Radio Height (A) 213.5 mm Width (B) 200 mm Depth (C) 105 mm Dimensions with Antenna, Single Radio Height (A) 213.5 mm Width (B) 200 mm Depth (C) 125 mm 250/1551-LZA 7016001/1 Uen H 1 2019-12-03 5 41 RADIO 4402 SPECIFICATION G P2408-06789 Description: 6 • Single -sector 8-Port MIMO antenna for Base Station, Small Cell and Outdoor DAS applications. • 65° beam width dual -polarized covering 600 MHz/LTE/CELL OF and AWS/PCS/WCS/BRS Bands. • 4x ports for 617-896 MHz • 4x ports for 1695-2690 MHz with Manual Electrical Tilt (MET) 8-Port 617-896 and 1695-2690 MHz Dual -Band Directional Panel Antenna Radio Description Description Value Weight Radio 4402 with Cover, Single Radio 4.7 kg Radio 4402 with Antenna, Single Radio 5.1 kg Color Body NCS S 1 002-B Frequency Band [MHz] , 617-698 698-806 806-896 1695-2180 2300-2400 2496-2690 Input Connector Type 4x 4.3-10(F) 4x 4.3-1 D(F) Polarization Dual slant 451(t45°) Horizontal Beamwidth 71° 71° 65° 66° 67° 62° Vertical Beamwidth 76.8o 72.0° 60.1° 15.1° 11.6° 11 Electrical Tilt 0° Fixed 2° - 12° MET Gain (max.) 8.6 dBi 8.8 dBi 9.3 dBi 14.2 dBi 14.8 dBi 15.6 dBi Gain (avg.) 7.7 dBi 8.1 dBi 8.7 dBi 13.2 dBi 13.9 dBi 14.2 dBi Front -to -Back Ratio, 1800 28 dB 30 dB 30 dB 28 dB 28 dB 25 dB XPOL Discrimination @ 0° 18 dB 20 dB 20 dB 20 dB 20 dB 25 dB VSWR/RL 1.5:1 / 14.0 dB Port -to -Port Isolation 20 dB PIM @ 2x43 dBm <-153 dBc Max Power / Port 100 Watts 100 Watts Impedance 50 n (1) For detailed information about licenses and HWAC, see the following: WCDMA: Licenses and Hardware Activation Codes in Ericsson Software Model in the WCDMA RAN CPI library. LTE: Manage Licenses and Hardware Activation Codes in the Radio Node libraries. (2) For information about IBW, see RIBS Configurations. O 0 0 Unit of measurement: mm \ c.oae Figure 2 Radio 4402 Dimensions with Cover, Single Radio Operating Temperature -40° to 158°F (-400 to +70°C) Antenna Weight 31 Ibs (14 kg) Antenna Dimension (Height x Width x Depth) 24.7" (626 mm) x 15.0" (380 mm) x 7.2" (184 mm) Radome Material ASA RoHS Compliant Radome Color Gray Ingress Protection Outdoor (IP65) Wind Survival Rating 150 mph (241 km/h) Copyright © 2018 - Galtronics Corporation Ltd. Proprietary Information. All rights reserved. Galtronics reserves the right to modify or amend any antenna or specification without prior notice. a N 0 a 0 250/1551-LZA 7016001/1 Uen H 2019-12-03 r.nl r�nnllr� 51 GALTRONICS ANTENNA SPECIFICATION 3.1 0 Antenna Integrated Radio Unit Description Physical Characteristics I A �o 0 B Ge14462A Figure 2 AIR 5331 Dimensions Table 3 AIR 5331 Dimensions Description Value Height (A) 600 mm Width (B) 303 mm Depth (C) Excluding handle: 110 mm Including handle: 159 mm Table 4 AIR Unit Weight with and without Installation Kit AIR Unit Type Weight without Mounting Kit Weight with Mounting Kit SXK 109 2015/1 SXK 109 2016/1 AIR 5331 B260 14 kg 18.5 kg 20.2 kg The whole body of the AIR Unit including the radome is gray, and the color code is NCS S 1002-13. 214/1551-LZA 7016001/3 Uen A 1 2018-04-04 31 AIR5331 ANTENNA SPECIFICATION roil dillillilk All +45* +4510 +45°Q +45* MET 45°O -45°© -45°O -45°0 1695-2690 MHz 617-896 MHz 617-896 MHz 1695.2690 MHz GP240 GALT:RONICS i 1 114.11m 252.3mm 9.931n] [7.zan] 380.omm 114.961n 280.3mm _ I I.35in _ 010.5mm [.41 in] G "b 1626.1 mm 127.Omm 24.6511 5.0on _ 127.0mm _ 5.00m I Copyright © 2018 - Galtronics Corporation Ltd. Proprietary Information. All rights reserved. Galtronics reserves the right to modify or amend any antenna or specification without prior notice. �GALTIONICS WE'RE MAKING WAVES- ., Description Part Number: Antenna with 8x 4.3-10(F) Connectors, Gray (Including MK-06853 Wall/Pole Mounting Bracket) GP2408-06789-112 Mounting Brackets: Part Number: Heavy Duty Mounting Bracket (wind speed of 150 mph) [Included] This standard mounting bracket offers an easy installation solution to mount the antenna to either a horizontal or a vertical pole. M K-06853 Heavy Duty Mounting Bracket (wind speed of 150 mph) [Optional] This optional mounting bracket offers an easy installation solution to mount the antenna to either a horizontal or a vertical pole. 62-45-09 ."f Matting Connector Torque: 4.3-10: 3.7 ft-Ib (5 Nm) Copyright © 2018 - Galtronics Corporation Ltd. Proprietary Information. All rights reserved. Galtronics reserves the right to modify or amend any antenna or specification without prior notice. 1 4100 u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 rv�Iv� rKtr�,Ktu � r 1ner a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: ISSUED FOR: CONSTRUCTION -REV.:-DATE:-DESCRIPTION:-BY: A 12/20/19 90% CD, ISSUED FOR REVIEW VTA 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA //C\ 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA AD 01 /17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA DRAWN BY: CHK.: APV.: VTA PAD LK -LICENSURE: G , A L �4- 2 1358 2 .lZ31�1 � T - Civil. a��P r C cp;, r� IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: SPECIFICATIONS -SHEET NUMBER: REVISION: A-6 E PSU AC08 2 CLLN000844 (N) 5/8"0 SS HILTI KWIK BOLT 3 WITH MINIMUM 4" 5'-11 1/2" EMBEDMENT INTO FULLY GROUTED MASONRY WALL (V.I.F) (N) AIR 5331 (ICC ESR-1385) TYP. OF 4, 2 ® TOP & 2 ® BOTTOM (N) AIR 5331 ANTENNA, 3'-11 3/4" 11 3/4" _ ANTENNA 9 3 1/2 TYP. OF 2 (N) L4X4X1/2 FRP GIRT II (N) GALTRONIC ANTENNA I (BY OTHERS) I O I o I 00 (N) FRP BOX (BY OTHERS) p - 1 —$ (N) 5/8"0 SS HILTI KWIK BOLT 3 M p f1s" WITH MINIMUM 4 EMBEDMENT, o 4 0 TOP & 4 0 BOTTOM, o° o _; --------------------- --------- -- 8 TOTAL (ICC ESR-1385) 1'-0" 1'_s" (N) 5/8"0 SS HILTI KWIK BOLT 3 WITH MINIMUM 2"lzo ±3„ EMBEDMENT INTO FULLY GROUTED MASONRY WALL TYP. OF -H z o (N) ANTENNA TYP. 4 0 BOX EDGES, (ICC ESR-1385) N i 28,MOUNTING 28» in SEE 3 (TYP.) —7 (E) 2.0 STD (E) 2.0 STD PIPE MAST (TYP.) \ p PIPE MAST (TYP.) (E) MASONRY WALL 0:41 (E) MASONRY WALL PLAN VIEW PLAN VIEW (N) 5/8"0 SS HILTI KWIK BOLT 3 WITH MINIMUM 2" EMBEDMENT ® WALL EDGE LOCATION, TYP. OF 4, AND WITH 4" (N) FRP BOX, (N) 5/8"0 SS HILTI KWIK BOLT 3 WITH N FRP BOX, MINIMUM EMBEDMENT FOR INNER BY OTHERS MINIMUM 4" EMBEDMENT INTO FULL LOCATION, TYP. OF 4, (8) TOTAL GROUTED MASONRY WALL (V.I.F) BY OTHERS (ICC ESR-1385) 1'-11 3/4" 4 0 TOP & 4 @ BOTTOM, 8 TOTAL 1'-11 3/4" (ICC ESR-1385) 7-7 i - CN -H (E) MASONRY WALL (E) MASONRY WALL SIDE ELEVATION VIEW SIDE ELEVATION VIEW (N) FRP CONNECTION @ SECTOR 'A' SALE: 2 (N) FRP CONNECTION @ SECTOR 'B' & 'C' SCALE: w 'I N.T.S. N.T.S. BASEBAND 6630 OPTIMIZED FOR MAIN —REMOTE CONFIGURATIONS 13.85" 19 INCH WIDE, 1 U HIGH, <352mm DEEP O O • 15 SFP/SFP+FOR CPRj INTER —CONNECT TO RADIO UNITS REDUCING THE NEED FOR BASEBAND R503 • 2 OPTICAL 1 /10Gbps SFP/SFP+ PORTS AND 2 O Q ELECTRICAL 1 Gbps RJ45 PORTS O (E) CMU WALL Q EGHT EXTERNAL ALARM PORTS • DUAL 48V DC POWER FEEDING • SELF—CONTAINED ENVIRONMENTAL CONTROL & FIELD O(N) 2"0 STD STL PIPE �O REPLACEABLE FAN UNITS HARDWARE PREPARED FOR NR AND 3 HEAVY—DUTY ANGLE WALL MOUNT O • (5G) eCPRI KIT WMA 238 BY SITE PRO 1, A VALMONT COMPANY, TYP. OF 2 COMPARISON • BASEBAND 6630 IS STANDALONE & HAS ITS OWN CLIMATE CONTROL O II -H O (N) AT&T ANTENNA 1 g" • BASEBAND 663 HAS 15 CPRI PORTS & DUAL POWER FEEDING O MOUNTING BRACKETS PER 5 ANTENNA MANUFACTURER • 123W est. POWER CONSUMPTION (@25°C, TYPICAL LOAD) I I s USE 5/8"0 HILTI KWIK BOLT 3 O ® LTE, WCDMA AND GSM CAPACITY AND MIXER MODE CAPABILITY o (STAINLESS STEEL) WITH 4 MIN. ® \ 11U BASEBAND 6630 CAPACITY & CAPABILITIES EQUIVALENT TO BASEBAND 5216 O EMBEDMENT INTO FULLY GROUTED CMU WALL (V.I.F), TYP. OF 4 ICC—ESR-1385 ( ) FRO NR, BASEBAND 6630 HAS CONNECTIVITY ADVANTAGES OVER BASEBAND 5216 (UNDER STUDY) O ro o, 0 0 0�0 0 o p o�o o p o o ���o o ® n o o ® m O Em BB 6630: 4 TO 6 C P R 1— 8 PORTS (10.1 Gbps) 8" 4" 0 0000000°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°0°00°0°0°0°0°0°0°0°0 o ACCESSIBLE FOR m m WAVE RADIO WITH N R CONFIGURED • BB 5216: 2 TO 3 CPRI-8 PORTS ACCESSIBLE FOR mmWAVE RADIOS WITH NR CONFIGURED NOT USED 151 BASEBAND 6630 SPECIFICATION SCALE 4 N.T.S. I (N) ANTENNA MOUNTING DETAIL SCALE: 3 N.T.S. u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 I'LHIN�:) I'NLI'HKtU tsr: Synergy a division of 1 advantage engineerq 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: 1 LISSUED FOR: � CONSTRUCTION REV.: —DATE: DESCRIPTION:BY:� �AA 12/20/19 90% CID, REVIEWED FOR �VTAi zi12/26/19 REVISED 90% CD, VTA � ISSUED FOR REVIEW 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA AD 01 /17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA DRAWN BY: CHK.: APV.: I Inrnlc-I Inr. VTA PAD LK ES3/�y KR4SGgI �yc 1358 � m SHEET TITLE: � DETAILS AND SPECIFICATIONS SHEET NUMBER: REVISION: A-7 E CLLN000844 22 (N) WITH CHAN TYP. FRONT VIEW TOP VIEW (N) RADIO OR PSU UNIT (E) CMU WALL (N) 1 /4"0 SS HILTI KWIK BOLT 3 WITH 2" EMBEDMENT TYP. OF 4 (ICC ESR-1385) (N) P 1000T UNISTRUCT MOUNTING BRACKET TYP. OF 2 (E) CMU WALL (N) P 1000T UNISTRUCT MOUNTING BRACKET TYP. OF 2 (N) RADIO OR PSU UNIT 1 NOT USED 12 1 PROPOSED RADIO & PSU UNIT INSTALLATION METHOD SNAS. 1 DESIGN CRITERIA: 1. WIND DESIGN DATA ULTIMATE WIND VELOCITY = 110 MPH EXPOSURE _ INTERNAL PRESSURE COEFFICIENT = 2. SEISMIC DESIGN DATA SITE CLASS RISK CATEGORY SEISMIC IMPORTANCE FACTOR (1) MAPPED SPECTRAL RESPONSES SEISMIC DESIGN CATEGORY RESPONSE MODIFICATION (Rp) AMPLIFICATION FACTOR (ap) C 0.18 D 11 1.0 SS = 1.85 S, = 0.651 D 2.5 1.0 Sds = 1.233 ANALYSIS PROCEDURE = EQUIVALENT LATERAL FORCE 4=0 u AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 I'LHIN�:) I'Ktl-'HKtU tsr: '114., Synergy a division of advantage enginePrq 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (1-4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: 71 I ISSUED FOR: I LREV.:= DATE:—DESCRIPTION:—BY:— F��AA 12/20/19 90% CD, ISSUED FOR REVIEW �A Zj� 12/26/19 REVISED 90% CD, VTA ISSUED FOR REVIEW A 01 /09/20 REVISED 90% CD, ISSUED FOR REVIEW VTA AD 01 /17/20 100% CD's VMW AE 02/12/20 REVISED 100% CD's VTA DRAWN BY: CHK.: APV.: I Inrnlc-I Inr. VTA PAD LK K RCD r vu A EsSI✓4 SHEET TITLE: I SHEET NUMBER: REVISION: A-8 E NOT USED 5 1 NOT USED 4 1 NOT USED 3J CLLN000844 23 ................... .................. ALPHA ............ BETA/GAMMA -oovrioht 2020 STEALTHR Concealment Solutions. Inc. All Riohts Reserved Raycap I 0STEALTH 7555—A PALMETTO COMMERCE PARKWAY NORTH CHARLESTON, SC 29420 USA P: (BOO)-755-06B9 / F: (B43)-207-0207 WWW. STEALTH CONCEALMENT. C O M PROJECT MANAGER: MATT LOCHER ; B43-437-61 09 FINAL ENGINEERING SYNERGY DEVELOPMENT SERVICES, INC. ENTERTAINMENT HQ PARKING STRUCTURE/L4 GARAGE 2240 E. IMPERIAL HWY EL SEGUNDO, CA 90245 STEALTH JOB # : AT19-01232H-29R0 ° ° ° ° ° ° ° ° ° ° T1 TITLE SHEET ° N1—N2 NOTES & SPECIFICATIONS ° S1—S2 PLAN & ELEVATION VIEWS ALPHA SECTOR ° S3—S4 PLAN & ELEVATION VIEWS ° BETA/GAMMA SECTORS S5 DETAILS L C 85880 P. 9/30/2020 J� ISMAIAS L. RECINOS CALIFORNIA PROFESSIONAL ENGINEER 4N'��IMASM o........ P.A. Consulting, Municipal & Environmental Engineers Planners. Surveyors. Landscape Architects New Jersey Newyork Pennsylvania Virginia Customer Loyalty through Client Satisfaction T 1 2000 Midlantic Drive, Suite 100 Mt. Laurel, NJ 08054 856-797-0412 REv1rs: MASER PROJECT #:19937155A 02-10-20 i 24 GENERAL 1. THE TYPICAL NOTES SHALL APPLY FOR ALL CASES UNLESS OTHERWISE SPECIFICALLY DETAILED WITHIN THE DRAWINGS. SOME NOTES MAY NOT BE APPLICABLE IN PART OR IN WHOLE FOR EVERY PROJECT. 2. ANY ITEMS REFERENCED AS BEING ON "HOLD" ARE TO BE INCLUDED IN THE WORK AS SHOWN. HOWEVER, CONSTRUCTION OR FABRICATION IS NOT TO BEGIN UNTIL THE "HOLD" REFERENCE IS REMOVED. 3. DIMENSIONS CONTAINED WITHIN MUST BE FIELD VERIFIED AND CUSTOMER APPROVED PRIOR TO FABRICATION OF MATERIALS. 4. THE MODIFICATIONS DEPICTED IN THESE DRAWINGS ARE INTENDED TO PROVIDE STRUCTURAL SUPPORT FOR THE ADDITION OF THE ANTENNA SCREENING SYSTEMS OUTLINED WITHIN. THE EXISTING STRUCTURE OR BUILDING SHALL BE ANALYZED AND RETROFITTED AS REQUIRED, BY OTHERS, TO WITHSTAND THE LOADS IMPOSED BY THE NEW STEALTH@ ENCLOSURE SHOWN ON THE DRAWINGS. 5. ANTENNA CONCEALMENT PRODUCTS SHALL BE INSTALLED BY A CONTRACTOR EXPERIENCED IN SIMILAR WORK. CARE SHALL BE TAKEN IN THE INSTALLATION OF ANY AND ALL MEMBERS IN ACCORDANCE WITH RECOGNIZED INDUSTRY STANDARDS AND PROCEDURES. ALL APPLICABLE OSHA SAFETY GUIDELINES ARE TO BE FOLLOWED. STEALTH@ IS NOT PROVIDING FIELD INSTALLATION SUPERVISION. 6. THESE DRAWINGS INDICATE THE MAJOR OPERATIONS TO BE PERFORMED, BUT DO NOT SHOW EVERY FIELD CONDITION THAT MAY BE ENCOUNTERED. THEREFORE, PRIOR TO BEGINNING OF WORK THE CONTRACTOR SHOULD SURVEY THE JOB SITE THOROUGHLY TO MINIMIZE FIELD PROBLEMS. 7. PROTECTION OF EXISTING STRUCTURES DURING THE COURSE OF THE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 8. THE STRUCTURAL INTEGRITY OF THIS STRUCTURE IS DESIGNED TO BE ATTAINED IN ITS COMPLETED STATE. WHILE UNDER CONSTRUCTION ANY TEMPORARY BRACING OR SHORING WHICH MAY BE REQUIRED TO MAINTAIN STABILITY PRIOR TO COMPLETION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 9. THE PLANS AND DETAILS WITHIN DO NOT INCLUDE DETAILS OR DESIGN FOR DRAINAGE FROM OR WATERPROOFING OF EXTERIOR OR INTERIOR SURFACES OF THE EXISTING BUILDING OR STRUCTURE. THESE DETAILS MUST BE COMPLETED BY OTHERS. DESIGN NOTES: 2017 COUNTY OF LOS ANGELES BUILDING CODE INCORPORATING THE 2016 CALIFORNIA BUILDING CODE DESIGN LOADS: SEISMIC DESIGN LOADS: WIND: ULTIMATE WIND SPEED 110 MPH PER ASCE 7-10 STANDARD Ss: 1.645 OCCUPANCY CATEGORY: II Sl: 0.606 EXPOSURE: C IMPORTANCE FACTOR: 1 DESIGN WIND PRESSURE : 47.0 PSF DESIGN: 1. ENGINEERING AND DESIGN CALCULATIONS FOR STEALTH @ POLE AND TOWER PRODUCTS ARE PREPARED IN ACCORDANCE WITH THE LATEST VERSION OF THE ASCE 7-10. OTHER STRUCTURES ARE DESIGNED IN ACCORDANCE WITH APPLICABLE LOCAL OR NATIONAL STANDARDS PER CLIENT INPUT. ENCLOSURE: DESIGN REACTIONS (LRFD): Reactions - Alpha I I Reactions - Beta & Sector Gamma Sectors T(Ib) 99.6 T(lb) 122. C (Ib) 324.0 C (lb) 86. V (lb) 94.7 V (lb) 110. M (kip-ft) 0.0 M (kip-ft) 0. THE DESIGN REACTIONS ARE TYPICAL AT EACH CONNECTION. THE DESIGN REACTIONS ARE CONSIDERED TO ACT IN ANY DIRECTION. THE CONNECTION OF THE CONCEALMENT TO THE STRUCTURE SHALL BE COMPLETED BY OTHERS FOR THE DESIGN REACTIONS LISTED ABOVE. THE ADEQUACY OF THE EXISTING STRUCTURE TO SUPPORT THE DESIGN REACTIONS SHALL BE DETERMINED BY OTHERS. -oovriaht 2020 STEALTH(ai Concealment Solutions. Inc. All Riahts Reserved STEALTHSKIN PANELS 1. FASTENER HOLES IN ESSV PANELS ARE NOT FACTORY DRILLED AND MUST BE DRILLED IN THE FIELD. 2. PANEL FASTENERS TO BE SPACED 12" O.C. MAX. AND LOCATED 6" MAX. HORIZONTALLY FROM EACH EDGE AT TOP AND BOTTOM OF PANEL. MAINTAIN 1" MIN. EDGE DISTANCE FROM ALL EDGES. 6' WIDE PANELS REQUIRE (5) FASTENERS TOP AND BOTTOM. 3. WHEN FASTENER BOLT HEAD OR NUT BEARS DIRECTLY ON SURFACE OF ESSV PANEL, TIGHTEN PANEL BOLTS ONLY 1/2 TURN PAST SNUG. APPLY THREAD LOCK COMPOUND TO THE THREADS OF METAL BOLTS. USE THIN BEAD OF EPDXY TO LOCK THE NUTS OF FRP BOLTS AND STEALTH@ STAINLESS STEEL PANEL BOLTS. USE WASHER OR FLANGED HEAD BOLT, OR FASTENER WITH LARGE BEARING SURFACE. 4. PANELS WILL EXPAND AND CONTRACT DUE TO TEMPERATURE. WHEN INSTALLING PANELS IN COLD TEMPERATURES, EVENLY SPACE PANELS ALONG LENGTH OF SCREEN WALL WITH EQUAL GAPS BETWEEN PANELS TO ALLOW FOR EXPANSION DURING WARM TEMPERATURES. 5. SURFACES OF PANELS SHALL BE COATED WITH SUITABLE PAINT FOR UV PROTECTION. TOP EDGE OF PANEL MUST BE COVERED TO PREVENT WATER TRAVEL BETWEEN PANELS. USE SHERWIN WILLIAMS "COROTHANE II" OR PRE APPROVED EQUIVALENT. 6. EXPOSED TOP AND SIDE FOAM EDGES OF PANELS MUST BE COVERED OR COATED FOR UV PROTECTION. STEALTH@ WILL PROVIDE PANEL EDGE CAPS TO BE FIELD APPLIED FOR THIS PURPOSE FOR MOST APPLICATIONS. PANEL EDGE CAPS TO BE SECURED WITH TEK SCREW INSTALLED @ 12" MAXIMUM SPACING ON THE INSIDE FACE OF THE PANEL. STRUCTURAL STEEL 1. STEEL FABRICATION AND INSTALLATION SHALL BE DONE IN ACCORDANCE WITH THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION MANUAL AND SPECIFICATIONS. 2. STEEL I -SHAPE, ANGLE, CHANNEL, AND MISCELLANEOUS MEMBERS SHALL CONFORM TO ASTM A36 (36 KSI MIN. YIELD STRENGTH) STEEL SPECIFICATIONS, U.N.O. 3. STEEL PLATE MEMBERS SHALL CONFORM TO ASTM A36 (36 KSI MIN. YIELD STRENGTH) STEEL SPECIFICATIONS U.N.O. 4. STEEL PIPE AND ROUND TUBE MEMBERS SHALL CONFORM TO ASTM A500 GRADE B (42 KSI MIN. YIELD STRENGTH)STEEL SPECIFICATIONS, U.N.O. 5. STEEL RECTANGULAR AND SQUARE TUBE MEMBERS SHALL CONFORM TO ASTM A500 GRADE B (46 KSI MIN. YIELD STRENGTH) STEEL SPECIFICATIONS, U.N.O. 6. STEEL WIDEFLANGE MEMBERS SHALL CONFORM TO ASTM A992 (50 KSI MIN, YIELD STRENGTH) STEEL SPECIFICATIONS U.N.O. 7. ALL BOLTS FOR STEEL -TO -STEEL CONNECTIONS SHALL CONFORM TO ASTM F3125 GRADE A325 SPECIFICATIONS, U.N.O. A325N AND A325X ALLOWED. 8. STRUCTURAL BOLTS SHALL BE TIGHTENED USING TURN -OF -THE -NUT METHOD. 9. BOLT HOLE EDGE DISTANCES SHALL BE A MINIMUM 1", U.N.O. 10. ALL WELDING SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND PROCEDURES OF THE AMERICAN WELDING SOCIETY (AWS) BY CERTIFIED WELDERS PER AWS D1.1 FOR STEEL AND AWS D1.2 FOR ALUMINUM. STEEL WELDS SHALL BE BY E70XX, LOW HYDROGEN ELECTRODE. 11, STEEL SHALL BE HOT DIP GALVANIZED PER ASTM A123 SPECIFICATIONS AFTER FABRICATION OR PAINTED WITH RUST INHIBITIVE PRIMER. 12. STEEL HARDWARE SHALL BE HOT DIP GALVANIZED PER ASTM F2329, U.N.O. 13. AFTER ANY FIELD HOLE PUNCHING / DRILLING OR CUTTING HAS BEEN COMPLETED, OR FOR ANY DAMAGED STRUCTURAL MEMBER, TOUCH UP ALL BARE MATERIAL AND WELDED AREAS WITH TWO COATS OF GAL -CON OR SIMILAR MATERIAL TO RESTORE THE GALVANIZED PROTECTION ON THE MEMBERS. 14. ALL WELDED STEEL ASSEMBLIES AND INDIVIDUAL STEEL PARTS SHOULD HAVE THE PART NUMBER WELDED ONTO THE PART OR ASSEMBLY. THE PART NUMBERS SHOULD BE LOCATE CONSISTENTLY AND AWAY FROM ANY CONNECTION POINT TO AVOID ANY INTERFERENCE ISSUES WITH THE WELD. DISCLAIMER ALL STRUCTURAL COMPONENTS TO BE CONNECTED TOGETHER SHALL BE COMPLETELY FIT UP ON THE GROUND OR OTHERWISE VERIFIED FOR COMPATIBILITY PRIOR TO LIFTING ANY COMPONENT INTO PLACE. REPAIRS REQUIRED DUE TO FIT -UP OR CONNECTION COMPATIBILITY PROBLEMS AFTER PARTIAL ERECTION ARE THE FINANCIAL RESPONSIBILITY OF THE CONTRACTOR. U <�❑ aWz0 EW F1.e�4 IN LLJL.VJ 2'M20j 1. UAYi WmW , �i z 000 OZLLZ o L3 ❑ az� z m w 0[000U z I- J CJ � WCr J a � iZz Imo 2<0< JILnW o�� Q z t�IL -<Ll jz Q10 F_o3 �go Naa] Ln ❑ 3 NZa 0 a° 4 w'" Consulting, Municipal & Em ranmental Engineers Planners .8-eyors. Landscape Architects DECIMALS X t 1/16" xxx : o.or ANGULAR X f 0.51 U Z z w z O (D N c) U W C °_ aall CY(D<< � Z = U W J LV LU Z W a o (� 0 D�Z oZS �avww U0 W W 0LUH N N W oC W z W Z V) 02-10-20 1 25 REVISION TABLE REVISION DESIGNER DATE SCOPE OF REVISION 0 MSG 12-17-19 FINAL ENGINEERING } a 1 MSG 02-10-20 REVISED FINAL ENGINEERING UJ ❑ z m J 00 o= U ❑ YIa QNL\ =ice aII°z z0� L W M . LLJ r QNm2 oa4 LLJ 0J'I -J z yi zz. �WmW �i z 000 OZWZ o L3 ❑ az0 0UJ00U zualuzi zz UJJ❑- W G.' J iZ �aNQ Imo JIInW o0� L�� Qz t�Q, Q�o3 Zgo N�a] ,n ❑ 3 NZa cc M DRAWING NOT TO SCALE. UNLESS SPECIFIED OTHERWISE DIMENSIONS SHOWN ARE IN INCHES TOLERANCES DECIMALS ANGULAR X t 1/16" X f 0.51 .XXX t 0.01" U Z V) ~ z w z O (D N U LU a = rn a LL o'(D<< Z = U J W LULU Z W a O � � z C6 � < LU cn W � U) LU 0 LU H N J > Ln N W z aC W W z V) JOB #: AT19-1232H-29R0 DRAWN: MSG DESIGNED: PMA REVISED: /�■ N2 REVISION 02-10-20 1 Copvriqht 2020 STEALTH® Concealment Solutions, Inc. All Rights Reserved NOTES I.) THE INTEGRITY OF THE EXISTING STRUCTURE SHALL BE VERIFIED BY OTHERS. 2.) DIMENSIONS OF THE EXISTING STRUCTURE ARE BASED UPON DRAWINGS BY SYNERGY ADVANTAGE ENGINEERS DATED 09/27119. 3.) THE ATTACHMENT TO THE EXISTING STRUCTURE (DESIGN AND FASTENERS) SHALL BE PROVIDED BY OTHERS. 4.) THE PANELS ARE TO BE PAINTED / TEXTURED ACCORDING TO THE CUSTOMER APPROVED SAMPLE(S). 5.) IT IS THE CUSTOMER'S RESPONSIBILITY TO VERIFY FIT WITH SPECIFIC MOUNTING AND COAX CABLES. 6.) IT IS STRONGLY RECOMMENDED THAT THE CUSTOMER REVIEWS THE RF CONSIDERATIONS IN THIS DESIGN. 7.) DUE TO THE USE OF NON -CONVENTIONAL MATERIALS FOR RF PERFORMANCE, THIS CONCEALMENT WAS NOT DESIGNED TO BE WATERPROOF. A WATERPROOF MEMBRANE OR CONNECTION METHOD MUST BE INSTALLED BELOW CONCEALMENT BY CONTRACTOR TO PREVENT WATER INTRUSION TO THE EXISTING STRUCTURE IS REQUIRED. Zoovriaht 2020 STEALTH(RR Concealment Solutions, Inc. All Riahts Reserved 9'-4" R'-II 1/1)" 3/8" GUSSET PLATE (TYP.) 1/4" FRP PANEL 5/8" 0 FRP THRU BOLTS, AT EACH FRP-FRP CONNECTION (TYP.) Sxlsting Structure r%1 Ant 1ITMA/ 1/4" FRP SHEET ON TOP AND BOTTOM #14 SS SCREW WITH 3/8" SS FLAT (PERFORATED FOR WASHER OR 3/8" ISOPLAST BOLT WITH 1'-6" VENTILATION) ZZZ, FLANGED NUT IN RF AREAS @ 12" O.C. 1/4" FRP PANEL , OA 0 0 0 0 0 0 0 0 0 0 0 o 0 N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I'-6"X2'-0" 3MM THICK 1'-6" INVISIWAVE APERTURE IN 1/4" FRP PANEL FRONT ELEVATION VIEW -"', , j -"-ucture SIDE ELEVATION VIEW v } L J 01 �o 3 ~ rYZ)o° o = ° �Wz2� a �Wa� UzU _-_ W2WUlWJ o4 Yn 2ZUU z o 0�Z 0 0 O O a z ° T f Lj WpI z~W W _J Ji z Imo �aNQ f)W za® 4 LI ° w v Q1°°� zao 1n0W� N°V� �a5 NZa a5� d5 Consulting. Manicipa18 Environmental Planne—S—eyers• Landscape Engineers Architects Penns —is Vir in enl atis action DECIMALS x t 1/16.. ANGULAR .xxx t 0.01" x t 0.5° U Z V ~ w Z > cl� Q z pC = O 0 U0 < J �, U z = U ry j w LU a = J O z ~ LU a- w C7 J W H = O LU 66 Q ~ Z Lu cV Lu J oC w W Z V) 02-10-20 1 27 NOTES: I. FRAME TO BE BONDED IN THE FACTORY. 2. CONNECTION TO THE STRUCTURE IS DESIGNED BY OTHERS. CONNECTION TO EXISTING STRUCTURE IS DESIGNED BY OTHERS SIDE ELEVATION VIEW -oovriaht 2020 STEALTHni Concealment Solutions, Inc. All Riahts Reserved M 3/8" STIFFENER PLATE (TYP.) >tructure (TYP,) (BY OTHERS) FRONT ELEVATION VIEW 3/8" GUSSET PLATE (TYP.) 5/8" 0 FRP THRU BOLTS, AT EACH FRP-FRP CONNECTION (TYP.) L4X4X1/2 FRP GIRT (TYP.) Existing Structure L4X4X1/2 FRP GIRT (TYP.) L4X4X 1 /2 FRP POST (TYP.) JLno D o=° 1,3q a�C] �2a WMNW rn� WNUJ W U J Wo~ z � Vz Y, 2�-W 2 - U zIz o o pZt`Z o DODO faz o�F FWkoI FJO� zzu J i z Imo �aNQ nW tea® IL z y Cn On � Q10 zao N inztt a 0a d0 �'1Y1C1rJ�it Consulting. Manicipai 8 Environmental Planne—S—eyors• Landscape Engineers Architects Penns —is Vir in e 1 atis action DECIMALS X t 1/16" ANGULAR .XXX t 0.01" X t 0.5° U Z LU Z L1J � W } Q = o z 0 U0 < J �, U z = U j a w W a = J LU z ~ LU 0— W CD J W H = 66 a > Z W~ N W J oC W W Z V) 02-10-20 1 1/4" FRP 6'-0" A/S3 110 (_I ICCCT PI ATC /TVP 1 A/S3 B/S3 - I�WTI 0kyjI��i�l B/S2 I I I #14 SS SCREW WITH 3/8" SS FLAT WASHER OR 3/8" ISOPLAST BOLT WITH FLANGED NUT IN RF AREAS @ 12" O.C. 8 1/2 IO 0 0 0 0 0 0 0 0 0 0 0 O O O o 0 I'-6"X2'-0" 3MM THICK ° ° INVISIWAVE APERTURE IN 1/4" FRP PANEL I O O O O O O O O o O I'-6" 1/4" FRP SHEET ON TOP AND BOTTOM (PERFORATED FOR VENTILATION) 1/4" FRP PANEL y-ucture SIDE ELEVATION VIEW -oovriaht 2020 STEALTHCRi Concealment Solutions, Inc. All Riahts Reserved FRONT ELEVATION A -A VIEW #14 SS SCREW WITH 3/8" SS FLAT WASHER OR 3/8" ISOPLAST BOLT WITH FLANGED NUT IN RF AREAS @ 12" O.C. O O o 0 0 0 O O o C? o o N o I'-6"X2'-0" 3MM THICK INVISIWAVE APERTURE IN G O 1/4" FRP PANEL o o o o o o o O o 0 0 0 FRONT ELEVATION B-B VIEW �2, >�o 3ran° J =gym �]00 o=0a � 0 Q�l\U w ��G aNO� L WM.W a ��tn r �Cq oa14 WL]'jJ z Uz _+ Yi ���4. W 0Z-Z z�z 0 0 0 O Z O Cc, o=a U��D aaF 0In07U w E � �JC] o z zlw 2a0a ~Yo J=Il1W QC] -a) oa® a w QFO� a3 zuoo N Ln w InZa awe cc �a d� '12%, 11�Vll"1►7 Consulting, Municipal & Environmental Engine rs Planners.Surveyors.Landscape Architects Penns Ivania Vir ilia Satisfaction �� s(�I�Yar♦rrc� to 100 C ER DECIMALS X t 1/16" ANGULAR .XXX t 0.011, X t 0.5° U Z V) I --I W U Z > r4 U 'e < O V)LU O' (D Q J W d d LIJ �_ LU LU LU CD z U W C7 w���� asa w 0 w N W ~ qZ m ILD J W W Z U0 02 io 20 1 wt CONNECTION TO EXISTING STRUCTURE IS DESIGNED BY OTHERS NOTES: I. FRAME TO BE BONDED IN THE FACTORY. 2. CONNECTION TO THE STRUCTURE IS DESIGNED BY OTHERS. SIDE ELEVATION VIEW -oovriaht 2020 STEALTHnR Concealment Solutions, Inc. All Riahts Reserved 3/8" STIFFENER M PLATE (TYP.) Structure 5'-1 1 1 /2" T-1 1 3/4" 5/8" 0 FRP THRU BOLTS, AT EACH FRP-FRP CONNECTION (TYP.) L4X4X3/8 FRP GIRT (TYP.) PIPE CONNECTION TO EXISTING STRUCTURE (TYP,) (BY OTHERS) 2.0 STD PIPE MAST (TYP.) ANTENNAS (TYP.) (BY OTHERS) Existing Structure PLAN VIEW 0 iV 100 I'-1 1 3/4" FRONT ELEVATION VIEW 3/8" GUSSET PLATE (TYP.) L4X4X3/8 FRP GIRT (TYP.) L4X4X3/8 FRP POST (TYP.) Y L J � Ln �o 3 ~ fY]C]D U o=& ❑ �a a11°z �0a WMNW N�� ��� a WUjJ W9j zQz u� 2W�W 2 - L3 z�z o o pZt`Z o O O a z a f W,pI z w W-j i z � ~ o Q N Q m f)W za® IL °w� v -w Q � ❑ > z � o ,h n �a5 NZa d� �'1Y1C1rJ�it Consulting. Municipal & Environmental Plan--S—r yors• Lantlscape Engineers Architects Penns Ivania vir in e 1 atis action C DECIMALS X t 1/16" ANGULAR R .XXX t 0.01" X i U Z (n ~ LU Z 1-4 % O N Q q> pC = O 0 (f) C Q Q = U ~ Q w ` W F- j w W a a LU � Z a -1 D LLJ z U W Q O W w N J z w L1J Qol� J W W Z V) 02-10-20 1 30 JLno fY]�0 o=& ❑ aC] �2a WN W M2 1N rn� WU'jJ Wo~ z�� Y, �W— 2 - U z�z o o 0 Z o O O a z a f WpI z ~ w WJ0J �aNQ �zz Imo f)W za® °t5 v4Li On Q�o� z o � NOVA Ln w I inza �a5 a�� 1g PLEASE NOTE: THIS DESIGN TYPICAL FOR QTY. (2) CONCEALMENTS 1 /4" FRP BACKER - 1Y1!"1►71� Consulting. Manicipa18 Environmental Engineers Planne—S—eyers• Landscape Architects Penns Ivanis Vir in on atis action ` s e to 100 �55 L a I PLEASE NOTE: 3MM THICK C 85880 FRP AND STEALTHCORE INVISIWAVE PANEL FRAMING ASSEMBLY TO BE * *_ FULLY FACTORY -BONDED IN FO OFE ENGINEER 880 0 " SHIfEIRICI�I'�20 TOLERANCES DECIMALS ANGULAR X t 1/16" X .XXX t 0.011, U PLEASE NOTE: FOR OPTIMUM PERFORMANCE, MOUNT SO THAT z THE FACE OF THE mmWAVE RADIO IS 1.25"-1.5" FROM THE INSIDE OF THE INVISIWAVE Cn (D CONCEALMENT MATERIAL, WITH AZIMUTH LU z_ ADJUSTED AS CLOSE TO PERPENDICULAR AS iUi �C LU Ln POSSIBLE _ i FULLY FACTORY BONDED Lu a rn INVISIWAVE ASSEMBLY cn CY a a U LU J w w Z a LU in 0 O � U LU LU Q Lu HC Ln UN J } LLJ LU DC LU LU Z V) JOB #: AT19-1232H-29R0 DRAWN: MSG DESIGNED: PMA REVISED: S5REVISION 02-10-20 Copyriqht 2020 STEALTH(R) Concealment Solutions, Inc. All Riqhts Reserved 31 3/4" POWER CONDUIT & LOOSE FIBER UP TO 3RD 3/4" POWER CONDUIT & FLOOR AZIMUTH = LOOSE FIBER UP FROM AZIMUTH = 340° PROPOSED POWER CONDUIT 30° 1 ST FLOOR AND LOOSE FIBER TO PROPOSED LOOSE FIBER FALSE CEILING - (N) 3/4" 0 POWER CONDUIT V ❑ ❑ i� 1024 1000 Fi bey Fi Fiber— Fiber Fiber Fiber Fiber Fiber Fiber Fiber Fiber i PW PWR PWR PWR PWR PWR PWR PWR PWR PWR PW AZIMUTH i = 120° 1028 ® ,� 0 o 1020 1003101040 STUDIO a0w 1034 ® ®®®® 0 0 e a SPIN 1042 1043 / JZ] / 1041 0 Ix 0 1044 I 1045 1044 EXISTING WEST 4 L ELECTRICAL ROOM - QQ a J Fibe�Fi��FiHe�Fiber—Fiber—Fiber—Fiber—Fiber— WEST WING: CONDUIT RUN FROM EAST WING: CONDUIT RUN FROM EXISTING EAST ELECTRICAL ROOM 2 - P� P� P� PROPOSED LOOSE FIBER DN FROM 13TH FLOOR EXISTING 3/4"0 POWER CONDUIT TO RICH RICH EISEN ELECTRICAL. 3/4" 0 POWER GROUND LEVEL GYM. AT&T TELE/DATA ROOM EISEN ELECTRICAL 'V CONDUIT UP TO 3RD FLOOR 11' ROOM AT 1 ST FLOOR 1 ST LEVEL FLOOR PLAN 3 PARTIAL 3RD LEVEL FLOOR PLAN 1 1/ 6CA1E-0" 0 5' 15' 30' 1/ 6CA1E-0" 0 5' 15' 30 SCOPE OF WORK: SCOPE OF WORK: WEST WING: EAST WING: • GROUND LEVEL GYM ELECTRICAL ROOM RICH EISEN ELECTRICAL ROOM PANEL "TL2" PANEL "1 PE" BREAKERS 16 & 18. (208Y/120V 3 PHASE 4W) FED FROM • AVAILABLE FIBERS TO BE UTILIZED. TRANSFORMER "TL1 " BREAKERS 26 & 28. EXISTING ELECTRICAL PANELS f9'-9„ AT&T TO UTIILIZE (E) EQUIPMENT ROOM EXISTING ELECTRICAL PANEL "1 PE" EXISTING TRANSFORMER EXISTING TRANSFORMER EXISTING GROUND BAR - - EXISTING ELECTRICAL I PANELS O 1005 O EXISTING EQUIPMENT 00 I w PANEL 1044 AT&T TO UTIILIZE o EXISTING ELECTRICAL I + =D PANEL TL2 00 � EXISTING EQUIPMENT i w PANEL Ln EXISTING EQUIPMENT RACKS N N 8'-11" EXISTING EQUIPMENT mw WEST ELECTRICAL ROOM LAYOUT PLAN SCALE: 4 EAST ELECTRICAL ROOM LAYOUT PLAN SCALE: ' 2 ' 3/8-1-0 0 1 2' S' 3/8 -1 -0 0 1 2' 5' AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 PLANS PREPARED BY: Agrllll� S Ag� y y a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 -PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (1-4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: i 12/26/19 �-ISSUED FOR: CONSTRUCTION :REV.: DATE: DESCRIPTION: BY: 12/20/19 90� CD, ISSUED FOR REVIEW VTA A 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA DRAWN BY: CHK.: APV.: MJS MJS MJS -1 I IhrKl(-I Inr_ AR�hi MI EL v SHE RIDGE * No. C-19797 (!I -30-21 E D IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. _!'I IrrT TITI r -JI1LL I I I I LL 1ST LEVEL FLOOR PLAN AND ELECTRICAL ROOM LAYOUT PLAN CI-I��T fill INARP-R- E�i B CLLN000844 32 MOUNTING SIJRFA(��E '' MAIN M1�0 PANEL ��� VOLTS PHASE WIRE Y BUSS 400A LOCATION VOLT AMPS w Of:2 0 U) Y m c) Y m 0 cn :2 � w Q VOLT AMPS LOCATION 0 A 0 B 0 C 0 A7 0 B 0 C D I MM I NCz, MODULE 1200 1 2 -0 1200 D I MM I NCz, MODULE SPARE TO J-50X 2q 3 4 20 SPARE TO J-E30X SPARE TO J-E3OX 2C 5 6 _20 SPARE TO J-E30X SPARE TO J-E30X 2C 7 8 20 SPARE TO J-ISOX D I MM I NO MODULE 1200 2C 9 10 20 1200 D I MM I NO MODULE SPARE TO J-BOX 2 C 11 . 12 .0 SPARE TO J-E3OX SPARE TO J-E30X 2q 13 14 20 1-00 D I MM I NO MODULE SPARE TO J-50X 2C 15 16 20 SPARE TO J-i30X D I MM I NO MODULE 1200 _2G 17 • 18 -0 SPARE TO J=BOX SPARE TO J-E30X 2G 19 • 20 20 SPARE TO J-ISOX SPARE TO J-50X 2q 21 22 20 SPARE TO J-E30X SPARE TO J=ISOX 2C 23 . 24 20 1200 D I MM I NCB MODULE DIMMING MODULE 1200 2C 25 • 26 20 1200 RRU RADIO (NEW) SPARE TO J-50X 2q 27 28 -0 1200 RRU RADIO (NEW) SPACE 2C 29 . 30 20 SPACE SPACE 2C 31 • 32 20 SPACE SPACE 2 33 3420 SPACE SPACE 2 35 . 36 20 SPACE SPACE 2C 37 • 38 -O SPACE SPADE 2C 39 40 20 2000 ROLL UP DOOR MONITOR $ EXIT SIGNS a00 2 41 . 42 SO VOLT —AMPS PER PHASE: 0 A = &.000 0 B = 600 0 C = 6,200 TOTAL VOLT-AMPS=a,�00 AMPS= 45.a8 LCL= NOTES: PANEL SCHEDULE MOUNTING SURFACE PANEL "IFE" MAIN MLO 120/200 VOLTS PHASE WIRE Y BUSS 100 LOCATION VOLT AMPS J LU Of N 12 Y m c> 6 Y m Cn � w � � VOLT AMPS LOCATION 0 A 0 B 0 C 0 A 0 B 0 C SPACE 1 2 15 600 EMON DMON A/C A\/ ROOM 1200 59 3 4 15 600 EMON DMON A/G A\/ ROOM 1200 2 5 . 6 15 600 EMON DMON A/C A\/ ROOM 2®® 2C 7 8 20 SPARE SPARE -2c 9 0 10 20 SPARE SPARE 2C 11 . 12 20 SPARE SPARE 29131. 14 20 SPARE SPARE 15 o 16 20 1200 RRU RADIO (NEW) SPARE 2 17 • 18 20 1200 RRU RADIO (NEW) 19 • 20 21 o 22 23 • 24 25 • 26 27 o 28 29 . 30 31 • 32 33 0 34 35 • 36 37 • 38 39 0 40 41 . 42 VOLT -AMPS PER PHASE: 0 A 0 B = 5,000 0 C TOTAL VOLT -AMPS= `j 8OO AMPS= 21.66 LCL= NOTES: G I RCU I T E3REAIGER5 16 $ 15 ARE EX I ST I NO EXISTING PANEL "1PE"- PANEL SCHEDULE AND SINGLE LINE DIAGRAM SINGLE LINE DIAGRAM �/4"� CONDUIT (S) # 12 (1) #12 GREEN WEST SECTOR L_A4 'IDE FEED MAIN SERVICE 480 DELTA PRIMARY 112.5 KVA 120/208 30 SECONDARY FED FROM MAIN SERVICE NSFORMER "TL I " �M NEL< )IT 4 S 2a R L_A4 RRU, RRU EAST SECTOR LA4 EXISTING PANEL "IPE" I OOA/240Y RRU, RRU WEST SECTOR L.A4 KA I ELECTRICAL NOTES: 1, CONTRACTOR SHALL INSPECT THE EXISTING CONDITIONS PRIOR TO SUBMITTING BID. ANY QUESTIONS ARISING DURING THE BID PERIOD IN REGARDS TO THE CONTRACTORS FUNCTIONS, THE SCOPE OF WORK, OR ANY OTHER ISSUE RELATED TO THIS PROJECT SHALL BE BROUGHT UP DURING THE BID PERIOD WITH THE PROJECT MANAGER FOR CLARIFICATION, NOT AFTER THE CONTRACT HAS BEEN AWARDED. 2. LOCATION OF EQUIPMENT, CONDUIT AND DEVICES SHOWN ON THE DRAWINGS ARE APPROXIMATE AND SHALL BE COORDINATED WITH FIELD CONDITIONS PRIOR TO ROUGH —IN. 3. THE CONDUIT RUNS AS SHOWN ON THE PLANS ARE APPROXIMATE. EXACT LOCATION AND ROUTING SHALL BE PER EXISTING FIELD CONDITIONS. 4. PROVIDE PULL BOXES AND JUNCTION BOXES WHERE SHOWN OR REQUIRED BY NEC. 5. ALL CONDUITS SHALL BE MET WITH BENDS MADE IN ACCORDANCE WITH NEC CHAPER 9, TABLE 2. NO RIGHT ANGLE DEVICE OTHER THAN STANDARD CONDUIT ELBOWS WITH 12" MINIMUM INSIDE SWEEPS FOR ALL CONDUITS 2" OR LARGER. 6. ALL CONDUIT TERMINATION'S SHALL BE PROVIDED WITH PLASTIC THROAT INSULATING GROUNDING BUSHINGS. 7. ALL WIRE SHALL BE TYPE THHN/THWN-2, SOLID, ANNEALED COPPER UP TO SIZE #10 AWG (#8 AND LARGER SHALL BE CONCENTRIC STRANDED) 75 DEGREE C, (167 DEGREES F), 98% CONDUCTIVITY, MINIMUM #12. S. ALL WIRES SHALL BE TAGGED AT ALL PULL BOXES, J—BOXES, EQUIPMENT BOXES AND CABINETS WITH APPROVED PLASTIC TAGS, ACTION CRAFT, BRADY, OR APPROVED EQUAL. 9. ALL NEW MATERIAL SHALL HAVE A U.L LABEL. 10. CONDUIT ROUGH —IN SHALL BE COORDINATED WITH THE MECHANICAL EQUIPMENT TO AVOID LOCATION TO CONFLICTS. VERIFY WITH MECHANICAL CONTRACTOR AND COMPLY AS REQUIRED_ 11. ALL PANEL DIRECTORIES SHALL BE 12. INSTALL AN EQUIPMENT GROUNDING CONDUCTOR IN ALL CONDUITS PER THE SPECIFICATIONS AND NEC. THE EQUIPMENT GROUNDING CONDUCTORS SHALL BE BONDED AT ALL JUNCTION BOXES, PULL BOXES, AND ALL DISCONNECT SWITCHES, STARTERS, AND EQUIPMENT CABINETS. 13. THE CONTRACTOR SHALL PREPARE AS —BUILT DRAWINGS, DOCUMENT ANY AND ALL WIRING AND EQUIPMENT CONDITIONS AND CHANGES WHILE COMPLETING THIS CONTRACT. SUBMIT AT SUBSTANTIAL COMPLETION. 14. ALL DISCONNECT SWITCHES AND OTHER CONTROLLING DEVICES SHALL BE PROVIDED WITH ENGRAVED LAMICOID NAMEPLATES INDICATING EQUIPMENT CONTROLLED, BRANCH CIRCUITS INSTALLED ON, AND PANEL FIELD LOCATIONS FED FROM (NO EXCEPTIONS.) 15. PROVIDE CORE DRILLING AS NECESSARY FOR PENETRATIONS OR RISERS THROUGH BUILDING. DO NOT PENETRATE STRUCTURAL MEMBERS WITHOUT STRUCTURAL ENGINEER'S APPROVAL. SLEEVES AND/OR PENETRATIONS IN FIRE RATED CONSTRUCTION SHALL BE PACKED WITH FIRE RATED MATERIAL WHICH SHALL MAINTAIN THE FIRE RATING OF THE WALL OR STRUCTURE. FILL FOR FLOOR PENETRATIONS SHALL PREVENT PASSAGE OF WATER, SMOKE, FIRE AND FUMES. ALL MATERIAL SHALL BE UL APPROVED FOR THIS PURPOSE. 16. ELECTRICAL CHARACTERISTICS OF ALL EQUIPMENT (NEW AND EXISTING) SHALL BE FIELD VERIFIED WITH THE OWNER'S REPRESENTATIVE AND EQUIPMENT SUPPLIER PRIOR TO ROUGH —IN OF CONDUIT AND WIRE. ALL EQUIPMENT SHALL BE PROPERLY CONNECTED ACCORDING TO THE NAMEPLATE DATA FURNISHED ON THE EQUIPMENT (THE DESIGN OF THESE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN AND SOME EQUIPMENT CHARACTERISTICS MAY VARY FROM DESIGN AS SHOWN ON THESE DRAWINGS). LOCATION OF ALL OUTLET, BOXES, ETC., AND THE TYPE OF CONNECTION (PLUG OR DIRECT) SHALL BE CONFIRMED WITH THE OWNER'S REPRESENTATIVE PRIOR TO ROUGH —IN. ABBREVIATIONS: AWC AMERICAN WIRE GAUGE BCTW BARE COPPER TINNED WIRE GPS GLOBAL POSITIONING SYSTEM PCs PERSONAL COMMUNICATION SYSTEM PPC POWER PROTECTION CABINET PRC PRIMARY RADIO CABINET RWY RACEWAY TYP TYPICAL RGS RIGID GALVANIZED STEEL EMT ELECTRICAL METALLIC TUBING DWG DRAWING IGR INTERIOR GROUND RING (HALO) ACCA ANTENNA CABLE COVER ASSEMBLY MGB MASTER GROUND BAR BTS BASE TRANSMISSION SYSTEM GEN GENERATOR GR GROWTH SICW STRANDED INSULATED COPPER WIRE PTLC POWER TRANSFER LOAD CENTER (E) EXISTING AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 PLANS PREPARED BY: a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 -PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: 12/26/19 -ISSUED FOR: CONSTRUCTION :REV.: DATE: DESCRIPTION: BY: A 12/20/19 90% CD, ISSUED FOR REVIEW VTA A 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA DRAWN BY: CHK.: APV.: MJS MJS MJS I IhrKl(-I Inr_ 0 AR�hi MICHAEL 0 v SHEWBRIDGE ;.A * No. C-19797 -30-21 Q DE IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: SINGLE LINE DIAGRAMS PANEL SCHEDULES CI-I��T NII INARP-R- Rp-\/iginNi. E�2 B CLLN000844 33 NOTES: AT&T AT&T AT&T 1. GROUNDING IS SHOWN DIAGRAMMATICALLY ONLY. ANTENNA ANTENNA ANTENNA QTY. PER PLAN QTY. PER PLAN QTY. PER PLAN 2. CONTACTOR SHALL GROUND ALL EQUIPMENT AS A COMPLETE SYSTEM. GROUNDING SHALL BE IN COMPLIANCE WITH CEC SECTION 250 AND AT&T GROUNDING AND BONDING REQUIREMENTS (ATT-TP-76416) AND MANUFACTURER'S SPECIFICATIONS. 3. ALL GROUND CONDUCTORS SHALL BE COPPER; NO ALUMINUM CONDUCTORS S-IALL BE USED. 4. GROUNDING EARTH RESISTANCE SHALL NOT EXCEED 25 OHMS. IF A SINGLE ROD, PIPE OR PLATE HAS EARTH RESISTANCE IN EXCESS OF 25 OHMS, SUPPLEMENTAL GROUNDING ELECTRODES SHALL BE ADDED AT 6 FEET MINIMUM INTERVALS IN ORDER TO ACHIEVE EARTH RESISTANCE OF LESS THAN 25 OHMS. AT&T RAYCAP LEGEND AT&T AT&T SURGE SUPPRESSOR RADIO 2205 RADIO 2205 • EXOTHERMIC CONNECTION III--■ GROUND ROD QTY PER PLAN QTY PER PLAN TEST GROUND ROD WITH ■ MECHANICAL CONNECTION 11 �-�/] T INSPECTION SLEEVE I T I Q --------------- I N I — F I ------------------- EXTERNAL TOOTHED Q Q I TINNED COPPER GROUNDING BAR ' N I N I I I 3/8" 0 X 1 1/2' CLOSED BARREL, FOR ALL EXTERIOR TWO —HOLE CONNECTORS I I I 5 5 NUT r BLACK HEAT SHRINK UV RATED O O CONDUCTOR INSULATION TO BUTT UP ° ° 5/S LOCK WASHER j AGAINST THE CONNECTOR BARREL ANTENNA GROUND BAR j CLEAR HEAT SHRINK O 11 O S/S FLAT WASHER --- - ------ LABEL ------ --- --ELABEL S, FLAT WASHER SCHEMATIC GROUNDING DIAGRAM DO NOT 'i*' MIN_ SfS BOLT (1 OF 2) ISCONNEC SPACI%G TO BLDG GROUND "DO NOT DISCONNECT" TAG OR COLD WATER ON ALL GROUNDING BAR INTERCONNECTS AND PIPING EQUALIZERS TWO HOLE LUG ` ANTENNA 6ROUND 5AR � \ \�ANTENNA AZIMUTH = 30° AZIMUTH = 340° 6ROUND 5R #4 OR6 RWG STRANDED CU CONDJCTOR WITH GREEN, 60OV, THWN-2 INSULATION ` CLOTH TELCO FLEX, TYP. / \ \ GROUNDING BAR ON WALL, FLOOR, OR ON ANTENNA TOWER ° 1 Fiber FI I ' \ I I 000 (D®0 Iz i I I / \ 1 r16" IL. PROPOSED AT$ fi RAYG�P ° (2) TWO EXOTHERMIC TO BE USED $ FIE3ER 5OX, (2) WITH #2 AWG SOLID BARE TINNED COPPER GROUNDING CONDUCTOR AZIMUTH = 120° PVC NON—METALLIC CONDUIT I SCH 40 TYPE (NIdC) CONDUIT PROPOSED AT$fi WITH STRAP WITHIN TWO INCHES OF CONDUIT END—/ RArGAP & F 15ER {SOX GROUNDING CONDUCTOR TO GROUNDING BAR GROUNDING DETAILS GROUNDING PLANS GROUNDING PLANS, SCHEMATIC GROUNDING DIAGRAM, & GROUNDING DETAILS AT&T 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 PLANS PREPARED BY: S Ag� H y mof y �� a division of � advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 -PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: 12/26/19 -ISSUED FOR: CONSTRUCTION :REV.: DATE: DESCRIPTION: BY: 12/20/19 90% CD, ISSUED FOR REVIEW VTA zi12/26/19 � REVISED 90% CD, ISSUED FOR REVIEW VTA DRAWN BY: CHK.: APV.: MJS MJS MJS I IhrKl(-I Inr_ AR�tii MICHAEL v SHEWBRIDGE * No. C-19797 -3O-2I Q DE IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. -SHEET TITLE: GROUNDING SCHEMATIC GROUNDING DETAILS SHEET NUMBER: E�3 REVISION: IV CLLN000844 34 GENERAL ELECTRICAL NOTES 1 . ALL WORK AND MATERIAL SHALL BE IN COMPLETE COMPLIANCE WITH THE LATEST 11. THE CONTRACTOR SHALL FURNISH A ONE YEAR WRITTEN GUARANTEE OF 27. ALL CONDUCTORS SHALL BE COPPER #12 AWG MINIMUM SIZE, TYPE THHNITHWN EDITION OF THE N.E.G. AND ALL REGULATIONS, LAWS, SAFETY ORDERS, MATERIALS AND WORKMANSHIP FROM THE DATE OF SUBSTANTIAL COMPLETION. THERMOPLASTIC, 600 VOLT, 75 DEGREES CELSIUS WET AND 90 DEGREES CELSIUS ORDINANCES OR CODES AND ANY OTHER LAWFUL OWNER OR ANY PUBLIC DRY AND UL LISTED UNLESS NOTED OTHERWISE. CONDUCTORS #12 AWG AND AUTHORITY WITH JURISDICTION BEARING ON THIS PROJECT, IN THE EVENT OF 12. COORDINATE WITH OTHER TRADES AS TO THE EXACT LOCATION OF THEIR SMALLER SHALL BE SOLID. CONDUCTORS #10 AWG AND LARGER SHALL BE CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL_ RESPECTIVE EQUIPMENT. SUPPLY POWER AND MAKE CONNECTION TO EQUIPMENT STRANDED, UNLESS SPECIFICALLY NOTED TO THE CONTRARY. REQUIRING ELECTRICAL CONNECTIONS. REVIEWIVTHE DRAWINGS OF OTHER TRADES 2. THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS AND WIRE WAYS AND LOCATION OF EQUIPMENT. 28. JUNCTION AND PULL BOXES: FOR INTERIOR DRY LOCATIONS, BOXES SHALL BE SHALL BE IN ACCORDANCE WITH THE UNIFORM BUILDING CODE, CHAPTER 23 AND 13. EXACT METHOD AND LOCATION OF CONDUIT PENETRATIONS AND OPENINGS IN GALVANIZED ONE-PIECE, DRAWN STEEL, KNOCKOUT TYPE WITH REMOVABLE "GUIDELINE FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING CONCRETE WALLS OR FLOORS OR STRUCTURAL STEEL MEMBERS SHALL BE AS MACHINE SCREW SECURED COVERS. FOR OUTSIDE, DAMP OR SURFACE LOCATIONS, PIPING SYSTEMS", PUBLISHED BY SMACNA AND PPIC, OR THE SUPERSTRUT-SEISMIC DIRECTED BY THE STRUCTURAL ENGINEER. PERFORM GORING, SAW CUTTING, BOXES SHALL BE HEAVY CAST ALUMINUM OR CAST IRON WITH REMOVABLE, RESTRAINT SYSTEM, OR THE KIN -LINE SEISMIC RESTRAINT SYSTEM. PATCHING, AND REFINISHING OF EXISTING WALLS AND SURFACES VMEREVER IT IS GASKETED, NON-FERROUS MACHINE SCREW SECURED COVERS. BOXES SHALL BE 3. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEWAND FREE FROM NECESSARY TO PENETRATE_ OPENINGS SHALL BE SEALED IN AN APPROVED METHOD SIZED FOR THE NUMBER AND SIZES OF CONDUCTORS AND CONDUIT ENTERING THE DEFECTS AND SHALL BE LISTED BY UNDERWRITER'S LABORATORIES (UL) AND BEAR TO MEET THE FIRE RATING OF THE PARTICULAR WALL, FLOOR OR CEILING. BOX AS EQUIPPED WITH PLASTER EXTENSION RINGS WHERE REQUIRED, BOXES THEIR LABEL, DR LISTED AND CERTIFIED BY A NATIONALLY RECOGNIZED TESTING SHALL BE LABELED TO INDICATE PANEL AND CIRCUIT NUMBER, OR TYPE OF SIGNAL 14, UTILITY PENETRATIONS OF ANY KIND IN FIRE AND SMOKE PARTITIONS AND CEILING OR COMMUNICATIONS SYSTEM. AUTHORITY WHERE UL DOES NOT HAVE A LISTING. CUSTOM MADE EQUIPMENT ASSEMBLIES, SHALL BE FIRESTOPPE❑ AND SEALED WITH AN APPROVED MATERIAL SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING SECURELY INSTALLED. 29. ALL OUTDOOR ELECTRICAL DEVISES OR EQUIPMENT SHALL BE OF WEATHERPROOF TO ITS SAFETY. IN ADDITION, THE MATERIALS, EQUIPMENT, AND INSTALLATION SHALL TYPE. COMPLY WITH THE LATEST EDITION OF THE FOLLOWING CODES AND REGULATIONS: 15. CONNECTIONS TO VIBRATING EQUIPMENT AND SEISMATIC SEPARATIONS: 30. ALL PANELS, DISCONNECT SWITCHES, TRANSFER SWITCHES AND ALL OTHER EXPOSED ELECTRICAL DEVISES SHALL BE SUPPLIED WITH A LOCKABLE DEVISE PER AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) LIQUID -TIGHT FLEXIBLE STEEL CONDUIT IN DRY INTERIOR LOCATIONS AND IN AREAS T-MOBILE REQUIREMENTS. INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE) EXPOSED TO WEATHER, DAMP LOCATIONS, CONNECTIONS TO TRANSFORMER NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) ENCLOSURES, AND FINAL CONNECTIONS TO MOTORS. 31. ALL EQUIPMENT, MONOPOLE, FRAME, CABLE TRAY AND ANTENNA GROUND WIRE AMERICAN STANDARD ASSOCIATION (ASA) CONNECTIONS TO GROUND BUSSES SHALL BE MADE WITH CRIMP TYPE NATIONAL FIRE PROTECTION AGENCY (NFPA) PROVIDE A SEPARATE INSULATED GROUNDING CONDUCTOR IN FLEXIBLE CONDUIT COMPRESSION CONNECTIONS TO CONNECTORS (MINIMUM 2 HOLE LUGS WITH FULL AMERICAN NATIONAL STANDARD INSTITUTE (ANSI) RUNS. MAXIMUM LENGTH SHALL BE SIX FEET UNLESS OTHERWISE NOTED. BOLTING). BUSS SHALL BE PRE -DRILLED TO ACCOMMODATE ALL CONNECTORS. NATIONAL ELECTRICAL CODE (NEC) CALIFORNIA CODE OF REGULATIONS TITLE 24 (CCR) 16. ROUTE EXPOSED AND CONCEALED CONDUIT PARALLEL AND PERPENDICULAR TO 32. ALL GROUNDING SHALL BE PER N.E.C. SECTION 250 AND 810 AND THE GROUNDING INSULATED POWER CABLE ENGINEERS ASSOCIATION (IPCEA) WALL AND ADJACENT PIPING. ARRANGE CONDUIT TO MAINTAIN HEADROOM AND TO REQUIREMENTS OF THESE DRAWINGS. ALL LOCAL CODES HAVING JURISDICTION PRESENT A NEAT APPEARANCE. 33. ALL GROUND WIRE CONNECTIONS BETWEEN GROUND BUSSES AND OTHER GROUND 17, WHENEVER A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE EQUIPMENT BUSSES AND GROUND RODS SHALL BE CADWELDED. 4. THE CONTRACTOR SHALL VISIT THE SITE INCLUDING ALL AREAS INDICATED ON THE DEVISES, CIRCUIT BREAKERS, GROUND FAULT PROTECTION SYSTEMS, ETC. (ALL MATERIALS), ARISES ON THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR 34. ALL METALLIC GROUND WIRE CONDUIT SHALL BE GROUNDED TO THE GROUND WIRE DRAWINGS AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE EXISTING SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND USING SET SCREW CONNECTIONS AT CONDUIT END CAPS AND CRIPM CONNECTIONS CONDITIONS AS WELL AS THE ELECTRICAL AN❑GROUNDING REQUIREMENTS OF SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTES ON THE DRAWINGS OR AT WIRE. THIS PROJECT AND BY SUBMITTING A ACCEPTS THE CONDITIONS UNDER WHICH IN THE SPECIFICATIONS TO ENSURE COMPLETE AND OPERABLE SYSTEMS AS 35. COAT ALL BOLTED LUG & BUSS GROUND CONTACT SURFACES WITH KOPR-SHIELD, HE SHALL BE REQUIRED TO PERFORM HIS WORK. HIS REQUIRED BY T-MOBILE AND THE ARCHITECT. NO-OX, OR EQUAL PRIOR TO ATTACHMENT. 5. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO OBTAIN A COMPLETE SET OF 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAW CUTTING, TRENCHING, 36 MAIN CIRCUIT BREAKER SHALL BE RATED FOR STANDARD A.I.C. RATING HIGHER CONTRACT DOCUMENTS, ADDENDA, DRAWINGS AND SPECIFICATIONS AS WELL AS BACK FILLING, COMPACT ION AND PATCHING OF CONCRETE AND ASPHALT AS THAN INCOMING A.I.C. THE LATEST EDITION OF ANY T-MOBILE DESIGN SPECIFICATIONS. HE SHALL CHECK REQUIRED TO PERFORM HIS WORK. ATTENTION IS CALLED TO THE FACT THAT THERE THE DRAWINGS OF THE OTHER TRADES AND SHALL CAREFULLY READ THE ENTIRE ARE EXISTING UNDERGROUND UTILITY LINES. THE CONTRACTOR IS RESPONSIBLE 37. ALL EQUIPMENT SHALL BE U.L. LISTED. SPECIFICATIONS AND DETERMINE HIS RESPONSIBILITIES, FAILURE TO ❑O SO SHALL FOR NOTIFICATION AND COORDINATION WITH ALL PROPERTY OWNERS, UTILITIES NOT RELEASE THE CONTRACTOR FROM DOING THE WORK IN COMPLETE AND APPROPRIATE "DIG -ALERT' UNDERGROUND MARKING AGENCIES AND 38. ALL EQUIPMENT SHALL BE BRACED FOR STANDARD A.I.C. RATING HIGHER THAN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. COMPANIES. THE CONTRACTOR SHALL ALWAYS USE EXTREME CAUTION WHEN INCOMING FROM UTILITY COMPANY. 6. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES AT THE SITE, TRENCHING FOR HIS WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE 39. ALL CORING CLEARANCES SHALL BE FIELD VERIFIED AND ALL CONDUIT ROUTING ANY COSTS TO INSTALL WORK TO ACCOMPLISH SAID COORDINATION WHICH DIFFERS PROPER AND APPROVED REPAIR OF ANY AND ALL DAMAGES CAUSED DURING THE SHALL BE COORDINATED WITH PROPERTY OWNERS /REPRESENTATIVE. FROM THE WORK AS SHOWN ON THE DRAWINGS SHALL BE INCURRED BY THE COURSE OF HIS WORK. CONTRACTOR. ANY DISCREPANCIES, AMBIGUITIES OR CONFLICTS SHALL BE 19, STRAIGHT FEEDER, BRANCH CIRCUIT, AND CONDUIT RUNS SHALL BE PROVIDED WITH 40. ALL CONNECTIONS TO EXISTING MAIN SWITCH GEAR INCLUDING "BUS -TAPS" AND/OR BROUGHT TO THE ATTENTION OF THE T-MOBILE PROJECT MANAGER AND THE SUFFICIENT WEATHER PROOF PULL BOXES OR JUNCTION BOXES TO LIMIT THE "HOT -TAPS" REQUIRE CERTIFICATION AND APPROVAL. FABRICATION AND ARCHITECT IN WRITING PRIOR TO SUBMITTING A BID. ANY SUCH CONFLICTS NOT MAXIMUM LENGTH OF ANY SINGLE CABLE PULL TO 100 FEET. PULL BOXES SHALL BE CERTIFICATION SHALL BE FURNISHED BY A CONTRACTOR APPROVED BY THE CLARIFIED PRIOR TO BID SHALL BE SUBJECT TO THE INTERPRETATION OF THE SIZED PER CODE OR PER THE LATEST EDITION OF THE T-MOBILE DESIGN APPLICABLE UTILITY. T-MOBILE PROJECT MANAGER AT NO ADDITIONAL COST. SPECIFICATIONS WHICHEVER IS MOST RESTRICTIVE. LOCATIONS SHALL BE 41. CONTRACTOR SHALL COORDINATE WORK WITH UTILITY COMPANIES FOR FINAL AND DETERMINED IN THE FIELD OR AS INDICATED ON THE DRAWINGS. EXACT WORK AN MATERIAL REQUIREMENTS. CONSTRUCT TO UTILITY COMPANIES 7. THE CONTRACTOR SHALL OBTAIN AND KEEP UP-TO-DATE A COMPLETE RECORD SET ENGINEERING PLANS AND SPECIFICATIONS ONLY. OF DRAWINGS, UPON COMPLETION OF THE WORK, A SET OF REPRODUCTIBLE CONTRACT DRAWINGS SHALL BE OBTAINED FROM THE T-MOBILE PROJECT 20, MAXIMUM NUMBER OF CONDUCTORS IN OUTLET OR JUNCTION BOXES SHALL 42. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL MANAGER, AND ALL CHANGES AS NOTED ON THE RECORD SET OF DRAWINGS SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE AND ALL APPLICABLE LOCAL CODES. BE TURNED OVER TO THE T-MOBILE PROJECT MANAGER AT THE COMPLETION OF BE INCORPORATED THEREON BY THE CONTRACTOR WITH RED INK IN A NEAT, 21. IDENTIFICATION NAME PLATES SHALL BE MICARTA 1/8 INCH THICK AND APPROVED WORK. LEGIBLE, UNDERSTANDABLE AND PROFESSIONAL MANNER. SIZE WITH BEVELED EDGES AND ENGRAVED WHITE LETTERS A MINIMUM OF 1/4 INCH 8. ALL INTERRUPTION OF ELECTRICAL POWER SHALL BE KEPT TO A MINIMUM. HIGH ON BLACK BACKGROUND. NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS HOWEVER, WHEN AN INTERRUPTION IS NECESSARY, THE SHUTDOWN MUST BE IN THE SERVICE DISTRIBUTION AND POWER DISTRIBUTION SWITCH BOARDS OR COORDINATED WITH T-MOBILE AND THE PROPERTY OWNER 14 DAYS PRIOR TO THE PANEL BOARDS, DISCONNECTING SWITCHES, TRANSFORMERS, TERMINAL CABINETS, OUTAGE. ANY OVERTIME PAY SHALL BE INCLUDED IN THE CONTRACTOR'S BID. WORK TELEPHONE CABINETS, ETC. ALL NAMEPLATES SHALL BE ATTACHED WITH SCREWS. IN EXISTING SWITCHBOARDS OR PANEL BOARDS SHALL BE COORDINATED WITH THE PULL BOXES, JUNCTION BOXES, AND DEVICE BOXES SHALL BE MARKED WITH A T-MOBILE PROJECT MANAGER AND THE BUILDING OWNER PRIOR TO REMOVING PERMANENT MARKER. ACCESS PANELS OR DOORS. 22. THE EXACT LOCATION OF ALL ELECTRICAL DEVISES AND EQUIPMENT SHALL BE 9. SHOP DRAWINGS SHALL BE SUBMITTED FOR ITEMS INDICATED ON PLANS. SHOP COORDINATED WITH THE PLANS AND DETAILS, PRIOR TO INSTALLATION. DRAWINGS SHALL INCLUDE ALL DATA WITH CAPACITIES, SIZES, DIMENSIONS, CATALOG NUMBERS AND MANUFACTURER'S BROCHURES, 23. DRAWINGS ARE DIAGRAMMATIC ONLY. ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE 10. AFTER ALL REQUIREMENTS OF THE SPECIFICATIONS ANENFHE DRAWINGS HAVE COORDINATED WITH OTHER SECTIONS. ❑O NOT SCALE THE ELECTRICAL DRAWINGS BEEN FULLY COMPLETED, REPRESENTATIVES OF T-MOBILE WILL INSPECT THE FOR LOCATIONS OF ANY ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL, OR WORK. THE CONTRACTOR SHALL PROVIDE COMPLETE PERSONNEL TO MECHANICAL ITEMS OR FEATURES. DEMONSTRATE THE OPERATION OF ANY ITEM OR SYSTEM TO THE FULL 24. ELECTRICAL METALLIC TUBING (EMT) MAY BE USE❑ WHERE NOT SUBJECT TO SATISFACTION OF THOSE REPRESENTATIVES, FINAL ACCEPTANCE OF THE WORK MECHANICAL DAMAGE, DIRECT BURIED PVC SCHEDULE 40 MAY BE INSTALLED WILL BE MADE BY T-MOBILE AFTER RECEIPT OF APPROVAL AND RECOMMENDATION BENEATH SLAB OR BELOW GRADE AND SHALL BE CONCRETE ENCASED UNLESS OF ACCEPTANCE FROM EACH REPRESENTATIVE. NOTED OTHERWISE. RIGID GALVANIZED STEEL CONDUIT SHALL BE FULL WEIGHT THREADED TYPE AND SHALL ONLY BE USED WHEN REQUIRED BY PERMITTING AUTHORITY. AN EQUIPMENT GROUNDING CONDUCTOR SHALL BE PROVIDED IN ALL CONDUIT RUNS. 25. ELECTRICAL METALLIC TUBING (EMT) CONDUIT FITTINGS SHALL BE STEEL, RAIN TIGHT THREADLESS COMPRESSION TYPE. DIE CAST, SET SCREW, OR INDENTURE TYPES ARE NOT ACCEPTABLE. SET SCREW TYPE AT IS NOT ACCEPTABLE. RIGID STEEL CONDUIT FITTINGS INCLUDING COUPLINGS, LOCKNUTS, NIPPLES, ETC. SHALL BEAR THE U.L. LABEL AND SHALL BE THREADED AND THOROUGHLY GALVANIZED EXCEPT WHERE AN ADAPTER IS NEEDED TO CONNECT TO PVC. 26. ALL TELCO CONDUIT INSTALLATIONS AN OTHER CONDUIT RUNS AND STUBS SHALL INCLUDE A YELLOW 3/8" POLYPROPYLENE PULL STRING WITH MINIMUM 200 POUNDS OF PULLING TENSION. IN ADDITION IN EMPTY CONDUIT RUNS, PROVIDE A "TRUE -TAPE" MEASURING LINE. GENERAL ELECTRICAL NOTES _1 • 1452 EDINGER AVE, 2ND FLOOR TUSTIN, CA 92780 PLANS PREPARED BY: Syn 77V alf a division of advantage engineers 7543 Woodley Ave., #201, Van Nuys, CA 91406 Office: (818) 840-0808 Fax: (818) 840-0708 :PROJECT INFORMATION: (5G - SMALL CELL) CLLN000844 ENTERTAINMENT HEAD QUARTERS (L4 GARAGE) 2240 E IMPERIAL HWY. EL SEGUNDO, CA 90245 LOS ANGELES COUNTY CURRENT ISSUE DATE: 12/26/19 c_c_I Irr\ ran. CONSTRUCTION :REV.: DATE: DESCRIPTION: BY: A 12/20/19 90% CD, ISSUED FOR VTA REVIEW AB 12/26/19 REVISED 90% CD, ISSUED FOR REVIEW VTA UKHVVIN LiT: l,HN.:/AI-'V.: MJS MJS MJS -I I f-r-K (_1 Inr_ AR�hi V� MICHAEL v SHEWBRIDGE * No. C-19797 C1� -�0-21 E D IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. _ IrrT TITI -JF-1LL I I I I LC GENERALAL ELECTRICAL NOTES CI-IPT_T fill IKAPF-P- PP\/ICIr)NI- E 4 B CLLN000844 35 EL SEGUNDO PLANNING COMMISSION MEETING DATE: August 27, 2020 AGENDA STATEMENT AGENDA HEADING: New Business AGENDA DESCRIPTION: Consideration and possible action regarding approval oP 1. Environmental Assessment No. EA-1280; and 2. Precise Plan Amendment No. PPA 20--01: a) Amendment to terminate Precise Plan No. PP 87-01 for properties located at 2361- 2381 East Rosecrans Avenue (The Terrace at Continental Park) to allow the current underlying Urban Mixed -Use South (MUS) zone development standards and uses to apply. Applicant: Toni Reina, representing Continental Development Corporation.. RECOMMENDED PLANNING COMMISSION ACTION: Continue this item to the next regular scheduled meeting on September 10, 2020, to provide additional time for staff to evaluate the environmental impacts of this project. ATTACHED SUPPORTING DOCUMENTS: None ORIGINATED BY: Maria Baldenegro, Assistant Plann REVIEWED BY: Gregg McClain, Planning Manager APPROVED BY: Sam Lee, Director of Planning and Building Safet o;�> I. Introduction On April 14, 2020, Toni Reina representing Continental Development Corporation filed an application to terminate Precise Plan No. PP 87-1 for "The Terrace" at Continental Park so that the development standards and permitted uses of the underlying Mixed -Use South (MUS) zone will apply to the property located at 2361-2381 East Rosecrans Avenue. it. Recommendation Staff recommends that the Planning Commission continue this item to the next regular scheduled meeting on September 10, 2020, to provide time for staff to conduct additional research. PAPlanning E Building Safetyl0 Planning - old�PROJECTS (Planning)5EA-12W PRECISE PEAN AMENDMENIREA-1280 PPA Staff Report Continued.doc 36